HomeMy WebLinkAboutCDP 03-29; LAUER RESIDENCE; HYDROLOGY AND HYDRAULIC REPORT; 2004-03-01HYDROLOGY AND HYDRAULIC REPORT
VACANT LOT ON HIGHtAND DR.
CARLSBAD, CA 92008
PREPAREDFOR: t'l',~,'o.+ ~oLfvOOtj
BILL&PATTYLA(JER \e, 5\~'n+t.f c}<~rt~-t-°
DATE: 1-13-2003 ~~ CUA~\fJ~ {)\~?·
REVISED: 7-1-2003 v J · \
REVlsEn: 3-1-2004 r. r:r::
· \)tn"\, ~ 6-~er.-t.-c-:>~S
PREPARED BY:
PASCO ENGiNEERING, INC.
535 NORTH HWY. 101, SUITE A
SOLANA BEACH, CA. 92075
WAYNE A. PASCO, RCE 29577
RECEIVED
MAR 3·0 20!J,,
ENGINEERING
DEPARTMENT
TABLE OF CONTENTS
A. lNTRODUCTION ....................................................................................... 1
13. DISCUSSION .....•........................................................................................ 1
C. CONCLUSION ............................................................................................ 1
D. 100 YEAR HYDROLOGY CALCULATIONS .................................... 2-14
E. HYDRAULICS .................................................................................... 15-19
APPENDIX A ............................................................................. FOLDOUT
A. INTRODUCTlON
The subject property is geographically located at 33° 08' 45" N and 117° 19' 45" W. It is
physically located on a vacant lot on Highland Drive in Carlsbad, California 92008.
The purpose of this report is to analyze the impacts of 100 year storm flows on the
proposed storm drain system. Also, to provide calculations for a detention/infiltration
trench whose for storm water detentio:Q. and treatment.
Based on data, calculations and recommendations contained within this report, a system
can be constructed to adequately intercept, contain and convey Q100 to the appropriate
discharge points.
B. DISCUSSION
The hydraulic soil group classification for the site is "D". Type D soil was chosen for a
conservative analysis. The methodology used herein to determine Q100 is modified
rational. The program utilized is by Advanced Engineering Software (AES). The
attached site hydrology map (Appendix A) shows the hydraulic node location map for the
HGL calculations herein. Hydrology Calculations can be found in Section D. Also, see
Section E for hydraulic calculations.
The site currently drains from east to west in sheet flow form .. The proposed drainage
system will collect runoff in a series of area drains and convey the water to the western
edge of the lot where it will be discharged into a small flow spreader that will return the
concentrated flow to a sheet flow form before it leaves the property. See section E for
flow spreader calculations.
Currently drainage between the edge of Highland Drive and the property line flows
across the property. This drainage will be picked up in the proposed drainage system and
discharged into the flow spreader. Drainage within the street will remain in the street and
will not be affected.
C. CONCLUSION
Based on the information and calculations contained in this report it is the professional
opinion of Pasco Engineering that the storm drain system as proposed on the
corresponding Site Plan will function to adequately intercept, contain and convey Q100 to
the appropriate points of discharge.
D. HYDROLOGY CALCULATIONS
** * * * **.:. * * ***** * ** * * ** ** * ****!* * *"' *"* * * *** * * **** * *****t ** * ***** * *** ** ** * * *** * *
' ' RATIONAL METHOD HYDROLOGY COMPUTER PROGRAM PACKAGE
Reference: SAN DIEGO COUNTY FLOOD CONTROL DISTRICT
1985,1981 HYDROLOGY MANUAL·
(c) Copyright 1982-92 Advanced Engineering Software (aes)
Ver. 1. 3A Release Date.: 3/06/92 Licenl!le ID 1388
Analysis prepared by:
Pasco Engineering, Inc.
535 North Highway 101 Suite A
Solana Beach, CA 92075
(858)259-8212
************************** DESCRIPTION OF STUDY *.*************************
: Vertrees Hydro Study part 2 ,~op~)~y :
* * * ~~...R. *~oRO-l.SY.ST'Pi!l** ~**** ** *** ***** * *** ****.*** * ** * * * * ** * *
FILE NAME: PE980G2.DAT
TIME/DATE OF STUDY: 15:16 1/13/2003 --. ---------------,_ -;-------------
USER SPECIFIED HYDROLOGY AND HYDRAULIC MODEL INFORMATION: ----------------------------------------------------¥-----------------------1985 SAN DIEGO MANUAL CRIT&RIA l'JP(IW,-(l) 7" ~ pp. eJ/1 t> f.£ 0
USER SPECIFIED STORM EVENT(YEAR) = 100.00
6'-HOUR DURATION PRECIPITATION {"INCHES) =
· S·PECIFIED. MINIMUM PIPE SIZE(INCH) = 3.00
SPECIFIED PERCENT OF.GRADIENTS(DECIMAL) TO
SAN DI'E(;OHYDROLOGY MANUAL "C"-VALUES USED
NOTE: ONLY PEAK CONFLUENCE VALUES CONSIDERED
(< 1J-c«,A.01tJC° ')v EN(..\_\) SIE 0
2. 610 j4yo·, /JO\')€ ttA (> -d' 1.-t\j\~ C
USE :FOR!.FRICTION SLOPE = . 95 ~f~qpy,
;
********t*******************************************************************
FLOW. PROCESS FROM NODE 6.10 TO NODE 6.00 IS CODE= 21 ---------------------------------------------------------------------------->>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<< ---------------·-----------------------:------------;-----------------------SOIL CLASSIFICATION IS "D" 1 SINGLE .FAMILY DEVELOPMENT RUNOFF COEFFICIENT.= .55?0
INITIAL SUBAREA FLOW-LEN~TH = 104.00
UPSTREAM ELEVATION= 143.00
DOWNSTREAM ELEVATION= 135.90
ELEVATION DIFFERENCE= 7.10
URBAN SUBAREA OVERLAND TIME OF FLOW(MINUTES) =
*CAUTION: SUBAREA SLOPE EXCEEDS COUNTY NOMOGRAPH
DEFINITION. EXTRAPOLATION OF NOMOGRAPH USED.
100 YEAR RAINFALL INTENSITY(INCH/HOUR) = 6.605
SUBAREA. RUNOFF(CFS) = .34
5.322
TOTAL AREA(ACRES,) = .09 TOTAL RUNOFF(CFS) , .34
****************************************************************************
FLOW PROCESS FROM NODE :6. 00 TO NODE 5.00 IS CODE= 3 ·----------------------------------------------------------------· -----------
>>>>>COMPUTE PIPEFLOW TRAVELTIME THRO SUBAREA<<<<<
>>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<<
----------------------------------------------------=----=-.--====-=========
DEPTH OF FLOW IN 3.0 INCH PIPE IS
PIPEFLOW VELOCITY(FEET/SEC.) = 14.6
UPSTREAM NODE ELEVATION= 135.90
DOWNSTREAM NODE ELEVATION= 125.60
1.4 INCHES
FLOWLENGTH(FEET) = 29.00 MANNING'S N
ESTIMATED PIPE DIAMETER(INCH) = 3.00
PIPEFLOW THRO SUBAREA(CFS) = .34
= .009
NUMBER OF PIPES=
1
1
*******~******************************~**********************~**************
FLOW PROCESS FROM NODE 5.10 TO NODE 5.00 IS CODE= · 8 ----------------------------------------------------------------------------
>>>>>ADDITiON OF SUBAREA TO MAINLINE PEAK FLOW<<<<<
-----==---==---------------------------------------------------------------
100 YEAR RAINFALL INTENSITY(INGH/HOUR) = 6.579
SOIL CLASSIFICATION IS "D"
SINGLE FAMILY DEVELOPMENT RUNOFF COEFFICIENT= .5500
SUBAREA. AREA(ACR~S) = .02 SUBAREA RUNOFF(CFS) =
TOTAL AREA(ACRES) = .11 TOTAL RUNOFF(CFS) =
TC(MIN) = 5.36
.07
.41
* * * * * * * * * * * * *.* * * * *;, * * * * *'** * * * * * * * * * * * * * * * * *'* * * * * * * * * * * * ** ** * *"* * * * * * * ** * * * * * *
FLOW PROCESS FROM NODE 5.00 TO NODE 4.00 IS CODE= 3
>>>>>COMPUTE PIPEFLOW TRAVELTIME THRU SUBA:REA<<<<< .
>>>>>USING COMPUTER-ESTIMAT$D PIPESiiE (NON-PRESSURE FLOW)<~<<< -----=-----------,-------------------------------------------=-----===-===== DEPTH OF FLOW IN 6.0 INCH PIPE IS 2.5 .INCHES
PIPEFLOW VELOCITY(FEET/SEC.) = 5.3
UPSTREAM NODE ELEVATION= 125.60
DOWNSTREAM NODE ELEVATION= 124.70
FLOWLENGTH(FEET) = 43-.00 MANNING'S N = .009
ESTIMATED PIPE DIAMETER(INCH) = 6.00 NUMBER OF PIPES=' 1
PIPEFLOW THRU SUBAREA(CFS) = .41
TRAVEL TIME(MIN.) = .13 TC(MIN.) = 5.49
l
* * * * * * * * * * * * ** * ** * * * *·* * * *.* * * * * * * *·* :!< * ** ** * * * * * * * *·* * * * * ** * ** * * * ** * * ** * * * * * * * * *
FLOW PROCESS FROM NODE 4 .• 10 TO NODE 4.00 IS CODE= 8
-------· --------------. '• .. -----------. ------------------------,--------------
>>>>>ADDITION OF SUBAREA TO MAINLINE PEAK FLOW<<<<< • j
~============= -== --· .===-= -========== -================================ '======
100 YEAR RAINFALL INTENSITY(INCH/HOUR) = 6.474
'SOIL. CLASSIFICATION IS "-O"
SINGLE FAMILY DEVELOPMENT RUNOFF COEFFICIENT= .5500
SUBAREA AREA(ACRES) = .01 SUBAREA RUNOFF{CFS) = .04
TOTAL AREA(ACRES) = .12 TOTAL RUNOFF(CFS) = .45
TC(MIN) = 5.49
i *******************************************************t******************** I FLOW PROCESS FRQM NODE 4.00 TO NODE · 3.00 IS CODE= i 3
-------.-----------------------------------------------------··-------------
>>>>>COMPUTE PIPEFLOW TRAVELTIME THRU SUBAREA<<<<<
>>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<<
==========-=================================================================
DEPTH OF FLOW IN 6.0 INCH PIPE IS 2.6 INCHES
PIPEFLOW VELOCITY(FEET/SEC.) = 5.5
UPSTREAM NODE ELEVATION= 124.70
DOWNSTREAM NODE ELEVATION= 124.20
FLOWLENGTH(FEET) = 23.00 MANNING'S N .009
ESTIMATED PIPE DIAMETER(INCH) = 6.00 NUMBER OF PIPES -. 1
PIPEFLOW THRU SUBAREA(CFS) = .45
TRAVEL TIME (MIN.) = . 07 TC (MIN_.) = 5. 56
*************************************************************;**************
FLOW PROCESS FROM NOD~ 3.10 TO NODE 3.00 IS CODE= . 8
>>>>>ADDITION OF SUBAREA TO MAINLINE PEA~ FLOW<<<<<
============================================================================
100 YEAR RAINFALL INTENSITY{INCH/HOUR) = 6.422
SOIL CLASSIFICATION IS "D"
SINGLE FAMILY DEVELOPMENT RUNOFF COEFFICIENT= .5500
SUBAREA AREA(ACRE$) = .00 SUBAREA RUNOFF(CFS) = .02
TOTAL AREA(ACRES) = .13 TOTAL RUNOFF(CFS) = .47
3
****~***k***************************************!***:*******************~****
FLOW PROCESS FROM NODE 3.00 TO NODE 2.po rs CODE= 3
>>>>>COMPUTE PIPEFLOW TRAVELTIME THRU SUBAREA<<<<<
>>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<<
=--=-=-==--=---------------==------=------------=---==--===-==--===-========
DEPTH OF FLOW IN 6.0 INCH PIPE IS 1,7 INCHES
PIPEFLOW VELOCITY(FEET/SEC.) = 10.6
UPSTREAM NODE ELEVATION= 124.20
DOWNSTREAM NODE ELEVATION= 116.50
FLOWLENGTH(FEET) = 60.00 MANNING'S N = .009
ESTIMATED PIPE DIAMETER(INCH) = 6.00 . NUMBER OF PIPES= 1
PIPEFLOW THRU SUBAREA(CFS) = .47
TRAVEL TIME (MIN.) = . 0·9 TC (MIN.) = 5. 65
===== ~===='·===============·================================================
END OF STUDY SUMMARY:
PEAK FLow··RATE (CFS) =
TOTAL AREA(ACRES) =
.47
.13
Tc (MIN.) = 5. 6'5
============·===============================================================
END OF RATIONAL METHOD ANALYSIS
*j+.~**~************************************************~*****~************** . .
' RATIONAL METHOD HYDROLOGY COMPUTER PROGRAM PACKAGE
Reference: SAN DIEGO COUNTY FLOOD CONTROL DISTRICT
1985,1981 HYDROLOGY MANUAL
(c) Copyright 1982-92 Advanced Engineering Software (aes)
Ver. 1.3A Release Date: 3/06/92 License ID 1388
Analysis prepared by:
Pasco Engineering, Inc.
535 North Highway 101 Suite A
Solana Beach, CA 92075
(858)259-8212
** * ** **'* * * * ** **** **** ** * ** ·DESCRIPTION OF STUDY *** * *** **** *** *** ** * * * * * * *
: Vertrees Hydro Study p t,yp., 5 f p :
****fWf9JJJ:?**~d*SX~f,n.********************************************
FILE NAME: PE980G.DAT
TIME/DATE OF STUDY: 11:29 1/13/2003
USER SPECIFIED HYDROLOGY AND HYDRAULIC MODEL INFORMATION: ----------------------------------------------------------------------------1985 SAN DIEGO MANUAL CRITERIA
USER SPECIFIED .STORM EVENT(YEAR) = 100.00
6-HOUR DURATION PRECIPITATION (INCHES)= 2.600
SPECIFIED MINIMUM PIPE SIZE(INCH) = 3.00
.SPECIFIED PERCENT OF GRADIENTS(DECIMAL) TO USE FOR FRICTION SLOPE= .95
·sAN DIEGO -HYDROLOGY MANUAL "C"-VALUES USED
NOTE: ONLY PEAK CONFLUENCE VALUES CONSIDERED
* * * *'*'* * * * * * * * * * * * * * * * * * * * *"* * * * * * *·* * * * * * * * * * * * * * * * *'* * * * * * * * * ** * * * * * * * * * * * * * * *
FLOW-'PROCESS FROM NODE 8.10 TO NODE 8.00 IS CODE= 21 -·----------~--------------------------------------· ------------------------->>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<<
=======-=================· ==================================================
SOIL CLASSIFICATION IS "D" .
SINGLE FAMILY DEVELOPMEN~ RUNOFF COEFFICIENT= .5500
INITIAL SUBAREA FLOW-LENGTH= 59.00
UPSTREAM ELEVATION= 143.00
DOWNSTREAM ELEVATION= 137.00
ELEVATION DIFFERENCE= 6.00
URBAN SUBAREA OVERLAND TIME OF FLOW(MINUTES) = 3.510
*CAUTION: SUBAREA SLOPE EXCEEDS COUNTY NOMOGRAPH
DEFINITION. EXTRAPOLATION OF NOMOGRAPH USED.
TIME OF CONCENTRATION ASSUMED AS 5-MINUTES
100 YEAR RAINFALL INTENSITY(INCH/HOUR) = 6.850
SUBAREA RUNOFF(CFS) -.06
TOTAL AREA(ACRES) = .02 TOTAL RUNOFF(CFS) = .06
**********************************************************~*****************
FLOW PROCESS FROM NODE 8.00 TO NODE 7.00 IS CODE= 3 _______________ , ------------------------------------------------------------
>>>>>COMPUTE PIPEFLOW TRAVELTIME THRU SUBAREA<<<<<
>>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<<
=============================================== ·============================
DEPTH OF FLOW IN 3.0 INCH PIPE IS
PIPEFLOW VELOCITY(FEET/SEC.) = 8.7
UPSTREAM NODE ELEVATION= 137.00
DOWNSTREAM NODE ELEVATION= 132.60
.6 INCHES
FLOWLENGTH(FEET) = 14.00 .MANNING'S N = .009
ESTIMATED PIPE DIAMET$R(INCH) --3.00 NUMBER OF PIPES= 1
********************************************************************~*******
FLOW PROCESS FROM NODE 7.10 TO NODE 7.00 IS CODE= 8 ------------------------: -------------------------·------------------------->~>>>ADDITION OF SUBAREA TO MAINLINE PEAK FLOW<<<<<
---iOO-YE;R RAINFALL INTENSITY (INCH/HOUR) = 6 ;82.7
SOIL CLASSIFICATION IS "D"
SINGLE FAMILY DEVELOPMENT RUNOFF COEFFICIENT= .5500
SUBAREA AREA (ACRES) = . 0 0 SUBAREA RUNOFF (CFS) =
TOTAL AREA(ACRES} = .02 TOTAL RUNOFF(CFS} =
T~(MIN} = 5.03
.03
.09
* * * *'* * * * * * * * * * * *** *·*·* *** * *·* * * * * * * * * * * * * * * * * * **·* * ** * *·* * * * * ** * * * * * * * * * * * * * * * * *
FLOW PROCESS FROM NODE 7.00 TO· NODE 6.00 IS CODE= 3 ----------------. -'-------------------------', --------------------------------
>>>>>COMPUTE PIPEFLOW TRAVELTIME THRU SUBAREA<<<<<
>?>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<< ------------------------------------=--=-=-------.------------------------.-DEPTH OF FLOW IN 3.0 INCH PIPE IS .9 INCHES
PtPEFLOW VELOGITY(FEET/SEC.) = 7.7
UPSTREAM NODE ELEVATI9N = 132.60
DOWNSTREAM NODE ELEVATION= 129.70
FiOWLENGTH(FEET) = 19.00 MANNING'S N = .009
E$TIMATED P:j:PE DIAMETER(INCH} = 3.00 NUMBER OF PIPES= 1
PIPEFLOW THRU SUBAREA(CFS} = .09
T~VEL TIME(MIN.} = .04 TC(MIN.) = 5.07
****************************************************************************
. F:j:.OW. PROCESS FROM NODE 6.10 TO NODE 6.00 IS CODE= 8 --------·------------------------. -----------·----------------------------->:;>>>>ADDITION ·oF SUBAREA TO MAINLINE. PEAK FLOW<<<<< .
===,============================:.'-========================================= i.oo, YEAR RAINFALL INTENSITY(INCH/HOUR) = 6. 791
SOIL CLASSIFICATION IS "D"
SINGLE FAMILY DEVELOPMENT RUNOFF COEFFICIENT= .5500
SUBAREA AREA(ACRES} = · .00 SUBAREA RUNOFF(CFS} = .01
TOTAL AREA(ACRES) .O~ TOTAL RUNOFF(CFS} = .10
T~(MIN) = 5.07
! !
****************************************************************************
FLOW PROCESS FROM NODE 6.00 TO NODE 5.00 IS CODE= 3 ---------------------------------------------------------------------------->>>>>COMPUTE PIPEFLOW TRAVELTIME THRU SUBAREA<<<<<
>~>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<<
=-=.-----=------=--==--=====-==--====-==~====·==,==========================
DEPTH OF FLOW IN 3.0 INCH PIPE IS
PIPEFLOW VELOCITY(FEET/SEC.} = 5.4
UPSTREAM NODE ELEVATION= 129.70
D9WNSTREAM NODE ELEVATION= 128.70
1.2 INCHES
FLOWLENGTH(FEET} = 18.00 MANNING'S N = . 009
ESTIMATED PIPE DIAMETER(INCH) = 3.00 NUMBER OF PIPES=
PIPEFLOW THRU SUBAREA(CFS) = .10
TRAVEL TIME(MIN.) = .Q6 TC(MIN.} = 5.12
1
****************************************************************************
FLOW PROCESS FROM NODE 5.30 TO NODE 5.00 IS CODE=
>>>>>ADDITION OF SUBAREA TO MAINLINE PEAK FLOW<<<<<
100 YEAR RAINFALL INT~NSITY(INCH/HOUR} = 6.743
*USER SPECIFIED(SUBAREA):
SINGLE FAMILY DEVELOPMENT RUNOFF COEFFICIENT= .9000
SUBAREA AREA(ACRES} = .06 SUBAREA RUNOFF(CFS} = .35
0
8
**********i*****************************************************************
FLOW PROCESS FROM NODE 5.20 TO NODE 5.00 IS CODE= 8 ---------· ------------------------------------.----------------------------->>>>>ADDITION OF SUBAREA TO MAINLINE PEAK FLOW<<<<< ======.======·=============-===-==·-===-=---==--======--==--=---==--===-====
100 YEAR ~INFALL INTENSITY(INCH/HOUR) = 6.743
*USER SPECIFIED(SUBAREA):
SINGLE FAMILY DEVELOPMENT RUNOFF COEFFICIENT= .9000
SUBAREA AREA(ACRES) = .04 SUBAREA RUNOFF(CFS) = .25
TOTAL AREA (iCRES) = .13 TOTAL RUNOFF (CFS) = • 7 0
TC(MIN) = 5.12
****************************************************************************
FLOW PROCESS FROM NODE 5.10 TO NODE 5~00 IS CODE= 8 -------------·-------------------------------------------------------------->>>>>ADDITI9N OF SUBAREA TO MAINLINE PEAK FLOW<<<<<
========================================'===================================
100 YEAR RAINFALL INTENSITY(INCH/HOUR) = 6.743
*USER SPECIFIED(SUBAREA):
SINGLE FAMitY _DEVELOPMENT RUNOFF COEFFICIENT= .9000
SUBAREA ARE~ (ACRES) = . 01 SUBAREA RUNOFF (CFS) = • 0 6
TOTAL AREA(~CRES) = .14 TOTAL RUNOFF°(CFS) = .77
TC(MIN) = • 5.12
****** * * * * * * *1<* * * * *** * ** * ******'* ****·*'* ******'******* *"**** *** *** * * * * ******** **
FLOW PROCESp FROM NODE 5.00 TO NODE 4.00 IS CODE= 3 . . ---------------------------------------------------------------------------. .
>>>>>COMPUTE PIPEFLOW TRAVELTIME THRU SUBAREA<<<<<
>>>>>USING ~OMPUTER-ESTIMATED PIPESIZE' ('NON-PRESSURE FLOW)<<<<<
===·=======· =i= ===========================================================
DEPTH OF. FLOW IN 6. 0 INCH PIPE IS 2 .. 8 INCHES
PIPEFLOW'VELOCITY(FEET/SEC.) = 8.6
UPSTREAM NODE ELEVATION= 128.70
DOWNSTREAM NODE ELEVATION= 126.70
FLOWLENGTH(FEET) = 41.00 ~NNING'S N = .009
-ESTIMATED P~PE DIAMETER(INCH) = 6.00 NUMBER OF PIPES= 1
PIPEFLOW THRU SUBAREA{CFS) = .77
TRAVEL TIME;(MIN.) = .08 TC(MIN.) = 5.20
i '
*************k**************************************************************
FLOW PROCESS FROM NODE 4.10 TO NODE 4.00 IS CODE= 8
>>>>>ADDITION OF SUBAREA TO MAINLINE PEAK FLOW<<<<<
===-================================================ .'======================
100 YEAR RAINFALL INTENSITY(INCH/HOUR) = 6.677
SOIL CLASSIFICATION rs "D"
SINGLE FAMILY DEVELOPMENT RUNOFF COEFFICIENT= .5500
SUBAREA AREA(ACRES) = .01 SUBAREA RUNOFF(CFS) = .05
TOTAL AREA(~CRES) = .15 TOTAL RUNOFF(CFS) = .82
TC(MIN) = : 5.20
****************************************************************************
FLOW PROCESS FROM NODE 4.00 TO NODE 3.00IS CODE= 3 ---------------------------------------------------------------------------->>>>>COMPUTE PIPEFLOW TRAVELTIME THRU SUBAREA<<<<<
>>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<<
== ·==--------------------~-----------------------=-----------=---===-======.
DEPTH OF FLOW IN 6.0 INCH PIPE IS
PIPEFLOW VELOCITY(FEET/SEC.) = 6.4.
UPSTREAM NODE ELEVATION= 126.70
DOWNSTREAM NODE ELEVATION= 126.20
3.7 INCHES
FLOWLENGTH(FEET) = 23.00 MANNING'S N = • 009
ESTIMATED PIPE DIAMETER(INCH) = 6.00 NUMBER OF PIPES= , 1
~********************************************************~******************
FLOW PROCESS FROM NODE 3.10 TO NODE 3.00 IS CODE = 8 ---------·------------------------------------------------------------------>>>>>ADDITION OF SUBAREA TO MAINLINE PEAK FLOW<<<<<
====·=================='==========================-=========================
100 YEAR RAINFALL IN+ENSITY(INCH/HOUR) = 6.628
SOIL CLASSIFICATION IS "D"
SINGLE FAMILY DEVELOPMENT RUNOFF COEFFICIENT= .5500
SUBAREA AREA(ACRES) =· .00 SUBAREA RUNOFF(CFS) =
TOTAL AREA(ACRES) = .16 TOTAL RUNOFF (CFS) =
TC(MIN) = 5.26
.03
.84
**************************************************~*************************
FLOW PROCESS FROM NODE 3.00 TO NODE 2.00 IS CODE= 3 --'-------------------------------------------------------------------------
>>>>>COMPUTE PIPEFLOW TRAVELTIME THRO SUBAREA<<<<<
>>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<<
====-.==--=----=====-==~--=----=----==============;========================
2.2 INCHES DEPTH -OF FLOW IN 6.0 INCH PIPE IS
PIPEFLOW VELOCITY(FEE+/SEC.)" = 13.3
UPSTREAM NODE ELEVATION= 126.20
DOWNSTREAM NODE ELEVA+ION = 116.50
FLOWLENGTH(FEET) = i65.00 MANNING'S N
ESTIMATED PIPE DIAMETER(INCH) = 6. 00
= .009
NUMBER OF PIPES=
PIPEFLOW THRU SUBAREA (CFS) ·= . 84
TRAVEL TIME(MIN.) = , .08 TC(MIN.) = 5.34
-. -
1
-----------------------:----------------------------,------------==----==---END OF STUDY SUMMARY::
PEAK FLOW RATE(CFS) =
TOTAL AREA.( ACRES) = !
.84
.16
Tc(MIN.) = 5.34
===--==----=----=====·=;====================================================
END OF RATIONAL METHOD ANALYSIS
8
**********~**~*******************;******************************************
RATIONAL METHOD HYDROLOGY COMPUT.ER PROGRAM PACKAGE
Reference: SAN DIEGO COUNTY FLOOD CONTROL DISTRICT
1985,1981 HYDROLOGY MANUAL
(c) Copyright 1982-92 Advanced Engineering Software (aes)
Ver. 1.3A Release D~te: 3/06/92 License ID 1388
Analysis prepared py:
Pasco E~gineering, Inc.
535 North ~ighway 101 Suite A
Solana·Beach, CA 92075
(858)259-8212
*********'***.************** DESCRIPTION OF STUDY *******·*·******************
* Vertrees Hydro Study -Existing. *
* *
***£lJ.;J.J~t,i***~*****************~******************************************
FILE NAME: PE980G3.DAT
TIME/DATE OF STUDY: 15:34 l/1~/2003 ---------------------------------~------------------------------------------USER SPECIFIED HYDROLOGY AND HYDRAULIC MODEL INFORMATION:
1985 SAN DIEGO MANUAL CRITERIA .
USER SPECIFIE:D STORM EVENT(YEAR)i = 100.00 /
6-HOUR DURATION.PRECIPITATION (1NCHES) = 2.610
SPECIFIED. MINIMUM PIPE SIZE(INCH) = 3.00
SPECIFIED.PERCENT OF GRADIENTS(QECIMAL) TO USE.FOR FRICTION SLOPE= .95
SAN DIEGO HYDROLOGY MANUAL "C;'-V'ALUES USED
NOTE: ONLY PEAK CONFLUENCE.VALUES CONSIDERED
* ** * * * ** * * * * * * * **'* * * * * * * * * * * * * * * * * * * * ** * * *·** * * * * * *'* * * * *'* * * *'* * * * * * * * * * * * * *** *
FLOW PROCESS FROM NODE 2.00 TO NODE 1.00 IS CODE= 21 ---------------------------------------------------------------------------->>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<<
-===--==-----------·------------.---------------------------------=----==== SOIL CLASSIFICATION IS "O" i
SINGLE FAMILY DEVELOPMENT-RUNOF~ COEFFICIENT= .5500
INITIAL SUBAREA FLOW-LENGTH= ;162.00
UPSTREAM ELEVATION= 141.00 ·-
DOWNSTREAM ELEVATION= 123.00
ELEVATION DIFFERENCE= 18.00
URBAN SUBAR}i;A OVERLAND TIME OF FLOW(MIN.UTES) =
*CAUTION: SUBAREA SLOPE EXCEEDS:COUNTY NOMOGRAPH
DEFINITION. EXTRAPOLATION OF NOMOGRAPH USED.
100 YEAR RAINFALL INTENSITY(INCH/HOUR) = 6.357
SUBAREA RUNOFF(CFS) = 1.00.
5.647
TOTAL AREA(AC~ES) = .29 ;TOTAL RUNOFF(CFS) =
. . . 1.00 -----=---------------------------------------------------.. -----------------END OF STUDY SUMMARY:
PEAK FLO~ RATE(CF.S) =
TOTAL AREA(ACRES) =
/1.00: Tc(MIN.) =
.29
END OF RATIONAL METHOD ANALYSIS
5.65
q
0
(._
COUNTY OF SAN DIEGO
DEPARTMENT OF SANITATION &
FLOOD CONTROL .. ,
45 I I \'!!t"''l?-,<,l ,,;:r"
..... ~
I
()'
1'5 I I &.ly > ,, ~ ·+-----+-----··· < > i
33°
.. . I
. . €•~-""cl·-b -'-
4 ' I -· SI I I I --A l.r, rn, t.ll , :>1 ------··. --· ····-· ·---. p,.,pnf,d br
U.S. DEPARTi\tENJl' OF COMMERCE
NATIONAL OCEANIC AND I\T~OSP11£KJC ADf>llNISTRATION
SP!CIAL STUDIES BRANCH, OFFICE Of' ll'f f>ROLOGY, NATIONAL WEATHER SERVICE
30• -I I t I H I
11 a• 45 1 30 1 15 1 · 117°
(
l15 I 30 1 15 1
I • I ,•o
JJ6°
. ! '
I !
I
(
COUNTY OF SAN DIEGO
DEPARTMENT Of' SANITATIOt-l 6-
FLOOO CONTROL
45 1
30'
15 I
( ,; ''
100-YEl\ll 24-HOlf'~ PllECIPIT ATIOti
,...20../ ISOPLUVIALS 0.f 100 -YEAR 24-HOUR
.330 ~-----+-----~----_.l~~
·-·-
tis I _,_ ________ ,
Prcrof•d hr
U.S. DEPARTMENfr OF COMMERCE
NATIONAL oci::...:-ac MID ... ,·:,IO!il'IIEJUC ADMINIS'fRATJON
SPECIAL STUDIES U~A:-lCII, OfflCE Of' 11.,0l~OLOGY, NATl~NAL WEATHER S~RVlCE
H ,I· .... I )• • -w
·! i
30 1 -t
I HI" /1 !i I )O' 15 • 117° lt!i I JOI
'''F.
. ( '
''
I !i' I Ir,•
-r-->
6.0
J"H-ll llllllllllll I I I I I I I I I IIIIIII I = 5.0 I =
4.0 P5 =
D =
3.0
2.0
rt{l r-r =~I rm
EQU;\ TION' ,
7.44 P5 D-0.645
Intensity (in/hr)
'(}-Hour Precipitation (in)
Duratiqn (min),
1
II I
~ 1 ..
!
!I llilii
111ill111/1111:
llllllllllll]:
.,,_U.\JI I I I I I I I I I I ~ o·
u.o -~:
0:5'1-1--!-+-l-+-+-+-!---hl-l--1-H4+++-l+H-+l+H-lttH#fl+Hl+H+H-~~H-lttHit+-+-;,,,.,;:-+,-+t--H'"C'--+r.-i-+tt-+r+t-3.0
0.4
I · · : ~ -: .. : l , , -r-l_l" """":J,-.''(!r·1···11 II l:H!rr. . *'
0.3r-: ~:~-r,·~\l:\ =r~-~= ~f ~ =-=~: ~.~:c; = x -. -•. ---, . -, -~ -c;;s; : ~
-·-·-=:~---·-·1=1· _ -----. t " . . ; · · =~·--1.0 ,.. ··-. •• · .•. -·'-: 1-1-·· " · ,; . • : ·, Lil., ~ I ·· 1--, H . . ., -l
0.2 = ~~ :~ :j_ .-_ ·f-:= ~.tt = J[,-~~:ti -: ... ; ; : :; :i;I ~i. Jn-H:_U,_
11:t+U I
--+-•~1=t~: :j.:p:=l:1$1-:!:l:t~t
1-tt-•·t· 1.5 '
l--1-l-...... ---' ' -'---H . . . ' -' I ' -1--1--l-l-l ----·· -· · u J:t;: I,· 'f · · ':jJj H}~:1~~lfi:J:l _ :1 II II II; I IT 11
_ b::, , .L.Li.±:,12= j. ' , 0.1, 4 . 5 6 7 8 9 10' 15 20 30
Minutes
40 50 2
Duration
3
Hours
4 5 6
<p ::r: 0 C -,
"U al
Intensity-Duration Design Chart -Template
HazMaVCountv Hvdr0<wolOQV Mnnualllnt Dur Oesion Chart.FH8
Directions for Application:
(1) From precipitation maps determine G hr and 24 hr amounts
for the selected frequency. These maps are included in the
County Hydrology Manual (10, 50, and 100 yr maps,inclucled
. in the Design and Procedure Manual).
(2) Adjust 6 hr precipitation (if necessary) so that it is within
the range of 45% to 65% of the 24 hr precipitation (not
applicaple to Desert).
(3) Plot 6 hr precipitation on the right side of the chart.
(4) Draw a line through the point parallel to the plotted lines.
(5) This line is the intensity-duration curve for the location
being analyzed.
5 i %(2) ---·~--
Note: This chart replaces the Intensity-Duration-Frequency
curves used since 1965.
P6 I 1 j 1,5
Duration ! I . I 51 i\L'O
. i ' 2 , 2.5 3
I i I . I
' 3.5, 4 4.5
I ; I I
5
I
5.5 6
I I
7
10
15
20
25
30
40
50
60
90
120
150
180
240
300
360
.C.OJ :t!l5;5,27 6.59 7.90 9.22: I0.!..4_ 11.86 13.11, 14.-l!Ji l!JUI
2, 12 3.18 4.24 5.30 6.36 7.42. 8 48 9.54 10.60 I L66; 12.72
1.68 2.5313.37 4.21. 5.0!, 5.90' 6.74. 7.58. 8.42. 9.2, 0 10.11
1.30 1.95: 2.59 3.24: 3.89 4.54 I 5.19. 5.84 . 6.49 7.1:l; 7.7fl
1.08 1.62°2,15 2.69:3.23 3.77° 4.31. 4.85. 5.39. 5.93: 646
o.93 1.40; 1.87 2.33: 2.nol 327; 3 73 : 4.20 4.67 • 5.1:i ; 5.co
0.B3 1.24j 1.66 2.07;2.49;2.90: 3.32: 3.73: 4.15. 4.56: 4.98
0.69 1.03J1.38 1,72:207:2.41; 2.76. 3.10. 3.45 3.79, 4.13
0.60 0,90! 1.19 149 1.79 2.09; 2.39' 2.69 2.98 328 3.58
0,53 0.80: 1.06 1.33 i 1.59: 1 .861 2.12 : 2.39 : 2 65: 2.92 . 3.18
0.41 .0.61 0.82 1.02 1.23, 1.43, 1.63. 1.84 2.04 2.25 2.45
0 3410.51 0.68 0.85: 1.02: 1. 19! 1.36: 1.53 . 1.70. 1 fl7' ;1 04
0.29 0.44 o.so o.73·0.aoi1.03' 110· 1,32 1.41' 152· 115
0.20 :o.39 os2 o.u5!0,10;091 1.04: 1.10. 1 :i, · 144 · 1.!il
0.22 ! 0.33, 0.43 0.54 , 0.65, 0. 76 0.87 . 0.98 . 1.08 . 1.19 . 1.30
0.19 ;0,28 0.38 0 47, 0.56 0.66 0.75. 0.85 0.94 1.03 1.13
0.11 i 0.25 o.33 0.42: o.5o · o.58 ,_<>.uZ__· o. 15 o.84 • o.92 · 1 oo
[
F I G lL.lLIJ•;_
3-1 ·
I f
TABLE 2
RUNOFF COEFFICI~NTS .(RATIONAL METHOD)·
-DEVELOPED AREAS {URBAN)
Coe ff i ~ ~ ..f.
Soi i _ Grpup · q)
Land U.se
A ! C
Residential: --D
Single Family .40 .45 .so
Multi-Units .45 .so .60
Mobile homes .• 45 .50 .ss
Rural (lots greater than 1/2 acre) .30 • 35 .40
Conme.rc i al (2) I .Bo .70 • 75 I \
80% Impervious
Industrial (2) .80 .as .90
90°/4 lmpervi ous
NOTES: (
.(l)So~l Group-m~s are available at the:offices Qf the Department of Publ~c Works.
(2)wh~re actual cc;,nditi'ons deviate-significantly from the.tabulated· impervi-ous-
ness values of 80% or 90°/4, the values given for ~oefficient C, may be revised
'by multiplying 80% or 90% by the ratio of actua·l imperviousness to the
tabulated imperviousnesJ. However, in no case shall the final coefficient
Qe less than 0.5.0-For example: C(?nsidet-comme,rci al property on D soi I ,-group.
Actual impetvi ousness -0 50%
· Tabulated. imperviousness = 80%
Rev'i sed C = SO x 0.8S ;= 0.53 80
l3
IV-A-9
APPENDIX IX-8 Rev_. '-S/81
/
. w.
1 ¾
f R §::tj
"I 000
/ .. ,
(Jo,
~,
2000 1000 0
Soil Type Classification
(From uses Soil Maps)
CbD-+
MlE-+
Type "C"
Type "A"
LvF3 -+ Type "D"
• Approximate Boundary of Drainage Ar~
-\ .. :-~
. ·--~
E. HYDRAULIC CALCULATIONS
HYDRAULICS SECTION TABLE OF CONTENTS
• DETENT!ON/INFILTRATION CALCULATIONS
• RIP-RAP CALCULATIONS
• AREA DRAIN CALCULATIONS
• PIPE CAPACITY CALCULATIONS
PASCO ENGINEERING, INC. PE ---
DATE ----
PASCO ENGLVEERING, INC. -535 NOR1'H HWY. 101, SUITE A. -SOLANA BE4 CH, C.4.LIFORN1.t1 92075·-858.259.8212
15
f\T Nt>'t>t z.o
~ o.il\ *-Ve: \1.~ ~
~ea.. ~!:::(l.OL.cUr l'lo)>f MI\P
B6Clrv.sf ~lk1 is lo~)
Jt2 f>tJc.l(.'1"1t-i A-r -rH1~ v £1..a:,rr
WILL BE ADtOJA-,E,.
~
3
7-6 The Contractor's Representatlv.
Add tbt followlng paragraphs
•The Contractor a11d Engineer shall provide each otlier
111th a local phono 111•ber at which ilaey or their
representative IYY,~ contacted 24 hours a day.•
: ·:.-,, PART 2 . .
200-1.t
CONSTRUCTlaf MATERIALS
SEqflaf 200 .. ftOCK MATERIALS
General
Adds •Alt.rn•fe Rock Materlal• -Type •s• es cte-1crlbed 111 Section 400 •Y be u1ed, uelass speclfl-
cal ly prohibited In Speclel Provisions•.
200-1 .6 Stone for Rlprep
Adds Nlhe hutlvtdUel clHMI of roclts used In slope
protection shall confor• to tti. follot1lng,
PERCENTAGE LARGER 1lfAN*
CLASSES
Rock 1/2 1/4 tb. 2 Ho.,
Shes 2 Ten I Ton Ton Ton Backing Backing
4 Ton 0-5 .
2 Ton ,0-100 o-,
1 Ton 9,-100 ,0-100 o-,
112 Ton -,0-100 . o-,
1/il Ton 95-100 -,0-100
200 lb 9'-100
.. -75 lb 9,-100 o-,
2, lb 2,-1, o-,
, lb 9.0-100 2,-7'
· .. 1 lb . ,· ..... -· . , .. '
90-100 .. . .
•Th• 1110unt of 11aterhtl ... 11.-than the 111111 lest site 11,,._d In tho tabl• for any class of rock slope
protectlan shell flOf •xeffd the percentage l l•Jt._.
. .._.. ...
........._ .....
I lsted fn tho table determined on • weight bash.
Cot11pll1nce vi tll the percentage ll111lt shown In the
table for all other sizes of 11e lndlvldua-1 piece!
o_f eny class of rock slopo pro1octlon sliall be dt·
teralned by tho ratio of the nuaiber" of lndh1dual,
pieces lara,r lhan tho smallest size lhted,ln trit
table for 11tat class. · · ·
,.200-1.6, 1 Seloctton of {llprap· and Filter
Dllnkot M11dMIII
Fl lier Dlanket C3)
Upper Layer(s_)
. Opti 1 Opt. 2 ,.,. Rock "'rrnp Sec.· Soi;.
Ft/Sec Class rh ck-.200 400-Opt. ,.
C 1> (2) ness "T" -(,t) (4) C,) --tlo,,
Dack• I
6-1 Ing .Ci l/lG" C2 o.o.
Ho. 2 I Bae~-7-8 Ing 1.0 11-1• OJ D.G. -Fae-
8-9., Ing I. 4 3/0" ,--D.G. -314",
1 1/2" ,.,-11 Light 2.0 111" --P.B. -· -J/4•,
1/.t 1 1/2" 11-13 Ton 2.1 J/,111 --P.B.
!>1/2
)/-1'', ,_·,~ I l/211
.Ton , ... I" -P.B. E~· ,,4 .:, '. 1/2~ I~-' Type 8
2 Tet11 , ... 2" -Type B --
I',.. . .,,.,. '" .. . . .......... .
.f>'. ..... .
• l.ov•
l~ Ley,
.' (6
-
-
·-.
! -
-
Se .. -
Sa
Sa
Sa
..,
I
. .l
1 :
kt' tJC't>~ I.\ Ii)
Q,ol)t. 013\:.) t.f~ \/e q. \o .t-,J
~~ W<~~1 N~b€ Mf\-r
Br C f!\~ O,oo ,~ lJ:>\,.).
h:-z 3""<,~,~ ~«:' i\\~
Y~()t..,"i, VI\.,\.. ~~ ~-a\l•Ti
-l
3
7-6 Tho Contractor's Ropresentath•
Add ttw fol lowing paragraphs
•The Contrectcr and Engineer shall provide e~ch other
vfth • locel phono J11M1ber It wlttch ih•r or their
.representative ••Y .t>e contacted 2~ hours a daY•" :·~:-; ~
200-1.1
PART 2
C<*SlRUCTIClf MATERIALS
SEql'IClf 200 ... ROCK MATERIM.S
General
Adda •Attern•te Rock Heterl•I• -Type •s• as de-acrlbed la Section 400 •Y be u10d, unless spoclfl-
cally prohlbl-nd .In Spec:l•I Provtstons•.
2oc>-1 .6 Stone for RtprtP
Addi -the lndlYtdual etas•• of rock• uHd In slope
protection shall confar• to ttie following,
PERCENTAGE LARGER THAN*
CLASSES
Rock 2 Ton
1/2 1/4 No. 2 No. 3
Sizes J Ton · Ton Ton Bicking Backing
'
-4 Ton o-, .
2 Ton ,0-100 o-,
1 Ton 9,-100 ,0-100 o-,
1/2 Ton -,0-100 o-,
1/4 Ton 95-100 -,0-100
200 lb 9,-100
.. -1, lb 9,-100 o-,
25 lb 2,-1, o-,
' lb 90-100 2,-75
1 lb 90-100
*The 1110unt of .. tertal ... 11.-then the smallest
11:r• listed In the tebl• for any class of rock slope
protection shall not ttxceecf the percentage I l•lt. . ··""
-·---
llsted In thlt iable deter•ltiod ~•weight basis~ eo.,,t Ienco wt th the percentage llll!l·t shown In the
table for 111 other sizes of 1h, lndlvlduaf pleo,i
of eny cf ass of rock slope pro1oc ti on ·sha 11 be d9•
tet111fned by tm re·tlo of the num~ of lndlvldual.
pieces larger than tho S111allo•t size listed .In tfN
table for 1hat class. · · ·
41200-t.G.I Seloct,on of (l·tprap· and FIiter
01anKot Midf".J at
,.,. Rock Ft/Sec Class
(1) (2) -llo. l Dacie-. 6-7 ,Ing
No. 2
7-8 Bae~-Ing
Fae-a-,., Ing -
,., .. n light
1/4
11-tJ Ton
·.··~ ~1/2 .Toti
1
,,_, C I r • .,
it;, --
FIii..-Olenket (3)
Upper Layer(s_)
. Opti 1 Op·t. 2 .
Rlprnp Sec.·
fhfck-. 200
ness •r11 ~ (4) -
.6 J/IG" -
I
1.0 1/.t" -
I• 4 3/R" -
2.0 1/2" -·
2.7 l/4"
l.4 , ..
.4.3 1 1/2" , ... 2"
,_,, ..
Sec;.
400-Opt. ,.
(,O
I
C2
03
-
--
--
-
---
.fl'. ~-.... .
(5)
O.G.
o.o.
D.G.
314",
I 112" P.a.
3/.t",
1 1/2" P.O. ,, .....
I 1/2" P.a.
Type B
Type B
• Lc,v, !: Lay,
.' C6
-
-
! -
-
·-
Sa ·--
Sa
Sa
s.
. ..
. :, .; I,,.-...-;, 144#111JIIIW#MJJl#,'1111ijjl'Ar.lWI'"'!,.,. ' ot •••• , .......... . I
... :..
NODE
3
4
5.3
5.2
5
6
7
8
NODE
3
4
5
6
Sheet5
Vertrees Residence Hydraulic Calculations
Area Drai,:i Inlet Calculations
CALCULATE CAPACllY,OF AREA DRAINS.
FORMULA: Qcap = 3.0(P}(D"1.5} / 3. DMSION BY 3 ACCOUNTS FOR GRATE &
REASONABLE BLOCKAGE.
SOUTH SYSTEM
.PERIMETER AVAJLHW GRATE FACTOR
Q100(CFSl P(FTJ D(FTJ 2* CAPACITY (CFSl INLET TYPE
0.03 4.00 0.20 3.00 0.36 12" X 12" YARD DRAIN
0.05 4.00 0.20 3.00 0.36 12" x 12" YARD DRAIN
0.35 4.00 0.20 3.00 0.36 12" x 12" YARD DRAIN
0.25 4.00 0.20 3.00 0.36 12" x 12" YARD DRAIN
0:06 '4.00 0.20 3.00 0.36 12" x 12" YARD DRAIN
0.01 4.00 0.20 3.00 0.36 12" x 12" YARD DRAIN
0.03 4.00 0.20 3.00 0.36 12" x 12" YARD DRAIN
0.06 4.00 0.20 3.00 0.36 12" x 12" YARD DRAIN
NORTH SYSTEM
PERIMETER AVAJLHW GRATE FACTOR
Q100(CFSl P(EIJ. D(FTJ 2* CAPACITY (CFSl INLET TYPE
0.02 4.00 0.20 3.00 0.36 12" x 12" YARD DRAIN
0.04 4.00 0.20 3.00 0.36 12'! x 12" YARD DRAIN
0.07 4.00 0.20 3.00 0.36 12" x 12" YARD DRAIN
0.34 4.00 0.20 3.00 · 0.36 12" x 12" YARD DRAIN
Page1
16
•t.
Project Description
Proj~File
Worksheet
Flow ~lement
Method
Solve For
Section Data
6" PVC CAPACITY
Cross Section for Circular Channel
c:\haestad\academic\fmw\980.fm2
. 6" PVC Capacity
Circular Channel
Manning's Formula
. Channel Depth
Mannings Coefficient 0.009
Chann~I Slope 0,010000 ft/ft
Depth , 0.43 ft
Diameter 6.00 in
---=D=isch=a __ rg .... e ____ o=.84.;...;..._c .... fs;...__~-MAX DISCJ/Nl.Gte ~ ~ Y Pf)/,Jf IN ~ '15~.J 1Jl£U~
lo" P /ff OK Foll Plfflte.£ S YSTe!'f.
02/11/03
02:41:22 PM
0.43 ft
Academic Edition
1
v~
H 1
NTS
6.00 in
Haestad Methods, lhc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
l9
FlowMaster "5.17
Page 1 of 1
APPENDIX A