HomeMy WebLinkAboutCDP 05-19; TOYOTA CARLSBAD; REPORT OF TESTING OF COMPACTED FILL FOR BUILDING PAD; 2007-04-03cvroi1 CONSTRUCTIO N-TESTINGA ENGINEERING, INC. SAN DIEGO, CA RIVERSIDE, CA VENTURA, CA TRACY, CA' - SACRAMENTO, CA N. PALM SPRINGS, CA 1441 Montiel Road 12155 Magnolia Ave. 1645 Pacific Ave.. 242W. Larch 3628 Madison Ave. . 19020 N. Indian Ave. Suitell5 Suite6C Suite107 Suite Suite 22 Suite 2-K Escondido, CA 92026 'Riverside, CA 92503 Oxnard, CA 93033 Tracy, CA 95376 N. Highlands, CA 95660 N. Palm Springs, CA 92258 (760)746-4955 (951)352-6701 "(805)486-6475 (209)839-2890 (916)331-6030 (760)329-4677 (760) 746-9806 FAX (951) 352-6705 FAX '(805) 486-9016 FAX (209) 839-2895 FAX (916) 331-6037 FAX (760) 328-4896- FAX I •. ' REPORT OF TESTING OF COMPACTED FILL FOR BUILDING PAD PROPOSED TOYOTA 'CARLSBAD RENOVATION 6020 AVENIDA ENCINAS . .' CARLSBAD, CALIFORNIA CITY OF CARLSBAD PROJECT NO.: CDP 05-19 CITY OF CARLSBAD GRADING PLAN DRAWING NO 441-6A (by bha, Inc) Prepared for: STELLAR PROPERTIES, LLC 'ATTENTION: MS. PEGGY KELCHER 6030 AVENIDAENCINAS, SUITE 220 CARLSBAD, CALIFORNIA 92008 I PREPARED BY: "CONSTRUCTION TESTING & ENGINEERING, INC. 1441 MONTIEL ROAD,. SUITE 115 ESCONDIDO, CA 92026 I CTE PROJECT NO 10-8882G APL 3,2007 GEOTECHNICAL I ENVIRONMENTAL I CONSTRUCTION INSPECTION AND TESTING I 'CIVIL ENGINEERING I JSURVEYING H o. 0.5. . H 1.5 :C0'er Thickhss by Expansion Pressure-Feet I Expansion From Graph:I".'I 0.5 1.5 Er - .—i.—I1 1 77, 'I ,-:--- :800 700 600 500 400, 300:200 ioo 0 HlliNNIOO NP .. .. .up... MEN til NNUM IN UIIII!NL 80 - 70 -60 w. -50 > .4° 0 W 0 0 20 - CONSTRUCTION TESTING & ENGINEERING. INC. SAN DIEGO, CA RIVERSIDE, CA VENTURA, CA TRACY, CA SACRAMENTO, CA N. PALM SPRINGS, CA 1441 Montiel Road 12155 Magnolia Ave. 1645 Pacific Ave. 242W. Larch 3628 Madison Ave. 19020 N. Indian Ave. Suitel15 Suite 6C Suite 107 Suite IF Suite 22 Suite 2-K Escondido, CA 92026 Riverside, CA 92503 Oxnard, CA 93033 Tracy, CA 95376 N. Highlands, CA 95660 N. Palm Springs, CA 92258 (160) 746-4955 (951) 352-6701 (805) 486-6475 (209) 839-2890 (916)331-6030 (760) 329-4677 (160) 746-9806 FAX (951) 352-6705 FAX (805) 486-9016 FAX (209) 839-2895 FAX . (916) 331-6037 FAX (760) 328-4896- FAX REPORT OF RESISTANCE RVALUE-EXPANSION PRESSURE Job No. 10-8882 Job Name: Toyota Carlsbad Lab/Invoice No. 17347 Sampled By: Mike Maddocks Date May 21, 2007 Type of Material: Reddish Brown Sandy Clay Submitted By: Mike Maddocks Date:May 21, 2007 Source of Material: Parking Lot South End Tested! Calc.By: Stu Sloan Date:May 23, 2007 Test Procedure: Cal 301 - - Reviewed By: Anthony Scott Date: May 25, 2007 Specimen, ivioio No. I2 3 Exudation N/A. Expansion . N/A R-value <5 to clay criteit, êcii TI 45 was unable to cornpacl Expansion 100 below 300 psi exudatioi pressure. Initial Wt: SampIeg' Dry wt: Sample, g Wet Wt. Sample, g . . . . - Compactor Air Pressure, ft. lbs. . .. . . -. Initial Moisture, % Wet weight and Dry weight, g Water Added, ml Moisture at Compaction, % Wt. Of Briquette and Mold, g . Wt. Of Briquitte,g Wt. Of Mold, g ___e Height of Briquette, in Dry Denity, pcf, ' . - '-'- -•' _________ _________ __________ Stabilometer PH @ 1000 lbs Stabilometer PH @ 2000 lbs Displacement R'Value ,. Corrected 'R'Value <5' , <5• <5 .. - Exudation Pressure, lbs Exudation Pressure, psi . Stabilometer Thickness - ft . . Expansion Pressure .. Expansion Press, Thick-ft - R VALUE @ 300 LBS/1N2 neh' EXUDATION PRESSURE, LEIS/10 Anthony Scott Laboratory Supervisor GEOTE19HN!.C.AI I ENVIRONMENTAL I CONSTRUCTION INSPECTION AND TESTING LcJVlL.eNG.,INEER.ING I SURVEYING CONSTRUCTION TESTING & ENGINEERING. INC. ' ' SAN DIEGO, CA RIVERSIDE, CA VENTURA, CA TRACY, CA SACRAMENTO, CA N. PALM SPRINGS, CA 1441 Montiel Road I 12155 Magnolia Ave. 1645 Pacific Ave. 242W. Larch 3628 Madison Ave. 19020 N. Indian Ave. Suite 115 7 , Suite 6C Suite 107 Suite Suite 22 Suite 2-K Escondido, CA 92026 Riverside, CA 92503 Oxnard, CA 93033 Tracy, CA 95376 N. Highlands, CA 95660 N. Palm Springs, CA 92258 (760) 746-4955 (951) 352-6701 (805) 486-6475 (209) 839-2890 (916) 331-6030 (760) 329-4677 (760) 746-9806 FAX (951) 352-6705 FAX (805) 486-9016 FAX (209) 839-2895 FAX (916) 331-6037 FAX (760) 328-4896- FAX REPORT OF RESISTANCE 'R' VALUE-EXPANSION PRESSURE Job No. 10-8882G Job Name: Toyota Carlsbad Lab/Invoice No. 17347 Sampled By: Mike Maddocks Date 5/21/07 Type of Material: Brown Clayey Sand . Submitted By: Mike Maddocks Date: '- 5/21/07 Source of Material: ParkingLotNorthEnd Tested/ Calc.By: StuSloan Date:5/23/07 TestProcedure:Cal301 Reviewed By: Anthony Scott Date:5/25/07 Specimen/MoldNo. 7 9 8 Compactor Air Pressure, ft.Ibs. 200 140 100 Exudation 13 Initial Moisture, % 4.9 4.9 4.9 Wet.weight and Dry weight, g I Expansion N/A Water Added, ml 90 100 110 Moisture at Compaction, % 12.7 13.6 14.5 R-value 13 WI. Of Briquette and Mold, g 3214 3247 3194 Wt. Of Mold, q 2122 2091 2060 WI. Of Briquitte,g 1092 1156 1134 TI 4.5 - Height of Briquette, in 1 2.44 2.61 2.60 Expansion #VALUEI Dry Density, pcf 120.4 118.2 115.5 Stabilometer PH @ 1000 lbs 49 53 56 Stabilometer PH @ 2000 lbs 117 128 132 Displacement 3.24 3.85 3.93.,- R'Value 22 13 11 Corrected 'R' Value 21 14 12 Exudation Pressure, lbs 6180 4460 2690 Exudation Pressure, psi 494 357 215 Stabilometer Thickness - ft 0 75 0.82' 0,84 Expansion Pressure 0.0003 0.0000 0.0000 Expansion Press, Thick-ft 0.10 0 00 , 000 Initial Wt. Sample,g Dry wt. Sample, g Wet Wt. Sample, g 1.5 ~ viz;' 11, Lj~_ 05 R VALUE @ 300 LBS!1N2 100 90 80 uJ 70 60 > 50 LU 40 Ui 30 Of cc 20 10 0 800 700 600 500 400 300 200 100 0 0 0.5 1 1.5 EXUDATION PRESSURE, LBS/1N2 Cover Thickness by Expansion Pressure-Feet I Expansion From Graph:IN/A I Anthony Scott Laboratory Supervisor GEOTECHNICAL I ENVIRONMENTAL I CONSTRUCTION INSPECTION AND TESTING I CIVIL ENGINEERING I SURVEYING I TABLE OF CONTENTS . SECTION : •. . •, . . •. PAGE 1.0 SITE DESCRIPTION AND PROPOSED DEVELOPMENT .................................................... 1 2.0 FILL PLACEMENT .............. . ...................... .......................................................................... .....I I 3.0 TESTING .............................. .............................................................. ............................................. 1 4.0 TREATMENT OF BUILDING PADS .... . ........................................................... ......................... 2 .5.0 ADDITIONAL CONSTRUCTION OBSERVATION ................................................................ 2 6.0 CONCLUSIONS AND RECOMMENDATIONS .................................................................... 0 LIMITATIONS ............................................................................................................................. 3 TABLES . TABLE I . . COMPACTION TEST SUMMARY . .. . TABLE II LABORATORY TEST DATA 0 I • FIGURES •. • 0 FIGURE 1 .• • • • • •. •• . S • • •.. SITE INDEX MAP • • •.. • • • . . •• • FULL-SIZE PLAN SHEET • 0 •• • S • • APPROXIMATE COMPACTION TEST LOCATIONS . S • ... S I 1 5 0 . 05 5 I I I I I I \\Cte_server\projects\lO 8001 to 10 9000 Projects\10 8882G\Rpt_Comp Testing, Bldg Pad Complete Recs doe Report of 'Testing of Compacted Fill For Building Pad .. Page 1 Proposed Toyota Carlsbad Renovation'. ' : : •. ' '6020 Avenida Encinas, Carlsbad, California April 3, 2007 . . . ' . '• CTE Job No. 10-8882G I.Q. SITE DESCRIPTION AND PROPOSED' DEVELOPMENT I . . The proposed project is located on'the east side of the 6000 block of AvehidaEncinas in Carlsbad, California. Land use in the area is primarily light commercial. The project area is a.rectangular shaped parcel that is adjacent to Interstate '5 '(I-5_ along its eastern boundary, and. is bounded by I ' existing Toyota of Carlsbad structures, to the west. These structures are to remain in place: The I 'building on the western portion of the site is to remain. Previously existing structures and parking areas to the east of 'this building have been demolished in preparation for .the proposed I improvements A large wall, from the previous structure remains at the southeast corner of the site, 'adjacent to 1-5, and, will be integrated 'into the new structure. The site 'is generally flat with an 'approximate (pre-graded) elevation of'59 to 65 feet above mean sea level (msl), sloping gently to the I south.. 2.0 FILL PLACEMENT Compacted fill was placed ,during recent grading to prepare .the subject building pads ,fpr the I 'construction of the proposed service center and parking structure. Fill material was derived fro1non ' site sources. Fill was generally placed in uniform compacted lifts at near optimum moisture content. I . ' Grading was performed using standard heavy-duty construction' equipment. 10 TESTING Testing was .'performed to supplement field observations in promoting compliance v'ith the I ' ' applicable project requirements.' Testing of compacted' fill addressed by this report was conducted between March 2 and March 13, 2007 Field-testing of the compacted fill material was conducted in \\Cteserver\projects\10-800 I to 10-9000 Projects\I0-8882G\Rpt_Comp Testing,.Bldg Pad, Complete Rec.dc Report of Testing of Compacted Fill For Building-Pad . . . Page2 Proposed Toyota Carlsbad Renovation . . . . . 6020 Avenida Encinas, Carlsbad, California. . . . April 3, 2007'. . . .. . CTE Job No. 10-8882G I accordance with ASTM D2922 and D3017 (nuclear method). Results of the field-testing inaicate I .that fill materials were compacted to the appropriate minimum percentage (90%) of the laboratory maximum dry density as determined by test method ASTM D- 1557.. . I Tabulated. results of the field 'compaction testing perforthed are provided in the attached Table I, I, "Compaction Test Summary." 'Laboratory determination of the reference compaction values for the "Laboratory fill materials is provided in Table II, Test Results." The full-size plan sheet submitted I ' herewith shows the approximate location of the. compaction tests performed. . . 4.0 TREATMENT OF BUILDING PADS To prepare the building pads, areas receiving fill were over-excavated to the depth of competent I natural material, ranging in depth from 5.5 to 15.q feet below proposed grade Bottoms of I overexcavations,were verified by a CTE geologist Based on the preparatory grading performed and our understanding of the project, we anticipate that all proposed building foundations will bear entirely in properly recompacted engineered fill. . 5.0 ADDITIONAL CONSTRUCTION OBSERVATION All additional grading and backfilling should be obeived and tested. to assure conformance with recommendations presentd herein and in the apróved project soils report (Geotechnicäl Engineering Investigation, Proposed Toyota Carlsbad Renovations and Addition Development, I 6020-6030 Avenida Encinas, Carlsbad, California, Prepared by NorCal Engineering, Projet No. 12040-05, dated April 4,' 2005) and addendum (Addendum 01 to Geotechnical Engineering te_server\projects\lO 8001 to 10-'9000 Projects\10 8882\Rpt_Comp Testing Bldg Pad Complete Recs doe I Report of Testing of Compacted Fill For Building Pad Page 3 I . . Proposed Toyota Carlsbad Renovation . . .. . . .: 6020 Avenida Encias, Carlsbad, California April. 3, 2007 . . . ..CTE Job No; 10.882GV I Investigation, Proposed Toyota Carlsbad Renovation, 6020 Avenida Encinas, Carlsbad, California, CTE Job No 10-8882G, dated February 23, 2007) 6.0 CONCLUSIONS AND RECOMMENDATIONS .: ••V ' We conclude that the soil engineering and engineering geologic aspects of the grading are in compliance with the approved geotechnical report and the grading plans (City of Carlsbad Grading 'I Plan Drawing No.:,441-6A I I Proposed improvements shall be designed and constructed in accordance with the recommendations of the referenced approved soils report and addendum 70 LIMITATIONS As limited by the scope of the services that we agreed to perform, our opinions presented herein are ' based on our observations, test results, and understanding of the proposed site development Our service was performed according to the currently accepted standard of practice and in a way that provides 'a reasonable measure of the compliance of the grading operations with the job requirements No warranty, express or implied, is given or intended with respect to the performance of the project in any respect Submittal of this report should not be construed as relieving the grading contractor of his rcsponsibility to comply with the project requirements. V : I V V 0 V V : V •. .. V I \\Cteserver\projects\10 8001 to 10-9000 Projects\10 8882G\Rpt_Comp Testing Bldg Pad, Complete Recs. doc I Report of Testing of Compacted Fill For Building Pad Page 4 I Proposed Toyota Carlsbad Renovation : 6020 Avenida Encinas, Carlsbad, California . April 3, 2007 CTE Job No. 10-8882G. The opportunity to be of service is appreciated. If you have any questions regarding testing I conducted, observations made during construction or recommendations presented herein, please do not heitate to contact this office. I Respectfully submitted, I CONSTRUCTION TESTING & ENGINEERING, INC Dan Math, GE #2665 Martin R Siem, CEG #2311 Principa ngineer Senior Engineering Geologist I Project Geologist ir NO 2665 2131106 m CALIFO G, OP 'I 1 I \\Cte_server\projects\lO 8001 to 10-9000 Projects\lO 8882G\Rpt_Comp Testing Bldg Pad Complete Recs doc TABLE I COMPACTION TEST SUMMARY Job Name: .1 Carlsbad Toyota Job Address: . 6020 Avenida Encinas, Carlsbad Job No 108882G . . 77- Date: 3/26/2007:. •.., ______ Date Test No Location Elevation Feet Density pcf. Moisture %Dry Content I. Compaction Weight Relative % Soil Type 3/2/2007 1 Building Pad South End 58.0 113.1 11.7 92% 1 3/2/2007 2 Building Pad South End 58.0 116.1 11.7 94% _1 3/2/2007 3 Building Pad South End 59.0 113.3 11.0 92% 1 3/2/2007 4 Building Pad South End 60.0 113.9 10.4 93% 1 3/2/2007 5 Building Pad South End . 60.0 . 114.6 11.5 93% 1 3/5/2007 6 Building Pad Area A 59.0 118.3 10.2 96% 1 3/5/2007 7 Building Pad Area A 60.0 112.5 12.5 91% 1 3/5/2007 8 Building Pad Area A 61.0 117.4 11.7 95% 1 3/5/2007 9 BuildingPadAreaA 61.0 114.8 12.3 93% 1 3/5/2007 10 BuildingPadAreaB 59.0 119.1 10.8 97% 1 3/5/2007 11 Building Pad Area B 58.5 111.7 11.9 91% 1 3/5/2007 12 BuildingPadAreaB 59.0 113.5 10.6 92% 1 3/5/2007 13 Building Pad Area B 60.0 115.1 10.7 94% 1 3/5/2007 14 Building Pad Area B 61.0 119.5 11.6 97% 1 3/5/2007 15 BuildingPadAreaB 61.5 112.8 11.0 92% 1 3/5/2007 16 Building Pad Area B 62.0 118.4 10.1 96% 1 3/6/2007 17 Building Pad Loading Dock 54.0 121.0 11.9 98% 1 3/6/2007 18 BuildingPadLoadingDock 55.0 . 114.8 9.5 93% 1 3/6/2007 19 Building Pad Loading Dock 57.0 115.6 10.3 94% 1 3/6/2007 20 BuildingPadLoadingDock 57,5 111.9 12.2 91% 1 3/6/2007 21 BuildingPadAreaA 57.5 115.8 11.2 94% 1 3/6/2007 22 BuildingPadAreaA 63.0 118.2 10.8 96% 1 3/6/2007 23 Building Pad Area B 62.5 113.5 11.7 92% .1 3/6/2007 24 BuildingPadAreaB 62.0 120.8 12.6 98% 1 3/7/2007 25 Building Pad Area.0 57.0 114.6 I1.8 93%. 1 3/7/2007 26 BuildingPadAreaC 58.5 112.9 10.9 92% 1 3/7/2007 27 BuildingPadAreaC 59.0 115.6 11.5 1 94% 1 3/7/2007 28 Building Pad Area C . 60.0 118.9 11.8 97% 1 3/7/2007 29 BuildingPadAreaC 61.5 110.9 14.6 94% 2 3/7/2007 30 BuildingPadAreaC 62.0 108.1 13.4 92% 2 3/8/2007 31 Building Pad Area D 59.0 110.6 14.3 94% 2 3/8/2007 32 BuildingPadAreaD 60.0 117.9 11.8 96% 3/8/2007 33 BuildingPadAreaD 60.0 112.3 12.6 91% 1 3/8/2007 34 BuildingPadAreaD 59.0 118.5 12.3 96% 3/8/2007 35 BuildingPadAreaE 50.0 108.9 14.7 93% 2 3/8/2007 36 Building Pad Area E 60.0 107.1 15.8 91% 2 3/9/2007 37 Building Pad Area E 60.5 110.8 15.5 94% 2 3/9/2007 38 Building Pad Area E 60.0 115.6 14.1 98% 2 3/9/2007 39 BuildingPadAreaD 62.0 115.4 9.9 1 94% 1 3/9/2007 40 Building Pad Area D 62.0 112.7 11.9 92% 1 3/9/2007 41 Building Pad Area E 61.0 112.3 13.1 91% 3/9/2007 42 BuildingPadAreaF 59.0 114.7 11.6 93% 1 3/9/2007 43 BuildingPadAreaF 60.0 118.1 10.8 96% 1 3/9/2007 44 BuildingPadAreaF 61.0 115.0 12.9 93% 1 3/12/2007 45 BuildingPadAreaG 59.0 111.4 14.3 95% 2 3/12/2007 46 Building Pad. Area G 60.0 108.2 12.9 92% 2 3/12/2007 47 Building Pad Area G 61.0 110.8 14.6 94% 1 2 ** TEST FAILED, SEE RETEST TABLE COMPACTION TEST SUMMARY Job N'am . .N' 1.: Job Addre 6020 Avenida Encinas, Carlsbad Date 3/26/2007 Date Test Location Elevation Density Moisture Relative Soil No Feet pcf Content Compaction Type %.. Wight 3/12/2007 48 Building Pad Area G 63.0 113.9 14.2 97% 2 3/13/2007 49 Building Pad Area G 62.0 117:1 11.5 95% _l 3/13/2007 50 Building Pad Area G 62.5. 113.7 12.1 92% 1 3/13/2007 51 . Building Pad Area E 62.0 118.7 10.7 97% 1 3/13/2007 52 Building Pad Area G 63.0 115.6 12.9 94% 1 3/13/2007 53 Building Pad 63:5 118.4 12.5 96% _____ 3/13/2007 54 . Building Pad 63.5 119.7 11.1 97% 1 3/13/2007 55 Building Pad 63.5 116.9 10.1 95% . ** TEST FAILED, SEE RETEST 2 TABLE II LABORATORY TEST DATA Job'Na fr.';Gar1sbad Toyota :. Job ddiess b20 Avenida Encmas Calsbad bN'o. 10882G Date 3/26/2007 Maximum Optimum Sample No £ Dry Density Moisture Soil - pci Content Descnjtion 1 123.0 10.5 Light brown silty SAND with traces of CLAY 2 117.5 : 13.0 Dark brown sandy CLAY 1 A CONSTRUCTION TESTING & ENGINEERING, INC. S GEOTECHNICAL AND CONSTRUCTION ENGINEERING TESTING AND INSPECTION 1441 MONTIEL ROAD. STE 115 ESCONDIDO CA. 92026 (766j 746-4955 CTE JOB NO: SITE INDEX MAP 10-8882 PROPOSED CARLSBAD TOYOTA RENOVATION SCALE:SHOW 6020 AVENIDA ENCINAS - DATE: FIGURE: CARLSBAD, CALIFORNIA 04/07 1 14PiV 21O4OO-15 LEGEND O APPROXIMATE COMPACTION TEST LOCATION I 56 0 I APPROXIMATE ELEVATION OF REMOVALS EXIST AC. PA V/NC TO REMAIN I I - EXIST AC. PA VEMEN T TO BE REMOVED AREA OF OVERLAY A. C. PA VEMEN T <:> REMOVE EXIST. A. C. PA VEMEN T & REPA VE PER SOILS ENGINEERS RECOMMENDA liON REMOVE EXIST. CONCRETE PAVING & REPAVE PER SOIL ENGINEERS RECOMMENDA 770NS FOR A. C. PA WEN T NEW A. C. PA VEMENT <>EXIST CONC. PA V/NC TO BE REMOVED LIMITS OF NEW PA V7NG -- - - - REMOVE EXIST. AC PAVING & REPLACE 14117-I CONCRETE PER SOILS ENGINEER'S RECOMMENDA liONS CONSTRUCT NEW CONCRETE PAVING i..- 4J'CONST. 4" PCC SIDEWALK <t>U PAINTED PEDESTRIAN CROSSING / * \ \; PR 770N OF EAEMENT TO QUITCLAIMED BY \SDG&E AF U17LITY RELOCA 770N \ \ \ (J) .0 0) rT O) o. / PL 00 rrj I