Sampo Engineering, Inc.
Land Planning, Civil Engineering, Surveying, Mapping
-_ Th
October 22, 2009
Joe McMahon, Public Works Inspector OCT 26 2009
City of Carlsbad J
5950 El Camino Real
Carlsbad, CA 92008-8802
Subject: Partial Building Pad Verification for Hagey Residence Grading Permit No.
458-3A, Jefferson Street, Carlsbad, APN: 155-140-37 & 38
Dear Mr. McMahon,
Our office field surveyed the subject property on October 19, 2009 to determine the new
building and garage pad elevations. As the Engineer of Work, I hereby state that rough
grading for a portion of the new garage pad and building pad have been completed in
substantial conformance with the approved plans.
The following list provides the partial pad elevations as field verified and as shown on the
approved grading plan:
Plan Approved Field Measured
Pad Elevation Pad Elevation
Partial Garage Pad 64.0 64.0
Partial Building Pad at Lower Level 47.3 47.3
Our office will field verify the remaining portion of the garage pad and building pad at the
time of building construction. If you have questions please feel free to contact me.
Respectfully, NDS