Loading...
HomeMy WebLinkAboutCDP 11-15; BARELMANN JUNIPER RESIDENCE; REPORT OF FIELD DENSITY TESTS; 2012-05-31Al EAST COUNTY SOIL CON$ULTATION AND NE ENGIERING, INC 10925 HARTLEY ROAD, SUITE SANTEE, CALIFORNIA 92071 (619)258-7901 Fax; 258-79.02 Robert & Margaret Barelmann May 31, 2012 P.O.Box 1.698 ProjectNo 11-1106E7 Carlsbad, California92008 Subject Report of Field Density. Tests Proposed Single-Family Residence and Detached Garage! Shop 150 Juniper Avenue Carlsbad, California 92008 Reference "Limited Geotechmcal Investigation, Proposed Single-Family Residence and Detached Garage, 150 Juniper Avenue, Carlsbad, California 92008", Project No 11-1 106E7, Prepared by East County Soil Consultation and Engmeenng, mc, Dated June 14,101,1% S Dear. Mr..Bre1thänn: This is to present the results of field density tests performed on the building pad for the proposed single-family residence and detached garage! shop at the subject site In accordance with your request, rn-place field density tests were performed in accordance with ASTM Dl55 (Sand Cone Method) Grading was conducted on May 23 and 24, 2012 under the observation and itesqng of a representitive of East County Soil Consultation & Engineerrng Inc The results of the field density tests are presented on Page T-1 under "Table of Test Results" The laboratory determinations of the maximum dry densities and optimum moisture contents of the fill soils are set forth on Page L-1 under "Laboratory Test Results" The approximate test locations are shown on Plate-No. 1.. •: Following clearing and grubbing, i e the removal of vegetation, concrete waste and debris from the removal of the existing structure, subgrade soils were overexcavated to a depth of approximately 2 to 3 feet below existing grade into the dense terrace deposits The garage pad overexcavation was extended a minimum of 5 feet 11.aterally beyond the perimeter footing Prior to the placement of new fill, the bottom of the excavation was scarified to a depth of approximately 6:inches, moistUre .onditionedand. compacted.. • ROBERT BARELMANN/JUNIPER AVENUE PROJECT NO 11-1106E7 PAGE T-1 TABLE OF TEST RESULTS ASTM D.1556 MAXIMUM DEPTH FIELD DRY DRY TEST SOIL OF FILL MOISTURE DENSITY DENSITY .NO. TYPE IN FEET %DRY WT. P.C.F. . P.C.F 1 1 2 7.3 112.3 122.0 2 1 1.5 7.4 115.7 122.0. 3 2 3 F 10.5 121.9 130.0 4 2 4 FG 10.7 125..0 130.0 5 2 2 9.2 120.1 130.0 6 2 4 FG 9.2 122.3 130.0 PERCENT COMPACTION 92 95 94 96 92 94 101-40 ,l 1 FG = FINISH GRADE 3 ROBERT BARELMANNI JUNIPER AVENUE PROJECTNC. 11-I106E7 PAGE 14 LABORATORY TEST RESULTS RESULTS OF MAXIMUM DENSITY AND. OPTIMUM MOISTURE The maximum dry densities and optimum moisture contents of the fill materials as determined. by ASTM D1557, Procedures A and B which use 25 blows of a 10-pound slide hammer falling from a height of 18 inches on each of 5 equal layers in a 4-inch diameter 1/30 cubic foot compaction cylinder and Procedure C which uses 56 blows of a 10-pound slide hammer falling from a height of 18 inches on each of 5 equal layers in a 6-inch diameter 1/13.3 cubic foot compaction cylinder are presented as follows: OPTIMUM MAXIMUM MOISTURE SOIL TYPE! DRY DENSITY CONTENT PROCEDURE DESCRIPTION LB/ CU. FT. % DRY WT. 1/A REDDISH BROWN SILTY SAND 122.0 9.4 2/A DARK BROWN SILTY SAND 130.0 8.6 . Af-Fyp t/%.'7)' 77 or /-a c/aN/Pa ,1kA EAST COUNTY SOIL CONSULTATION I I & ENGINEERING, INC. I 10925 HARThEY RD., SUITE I. SANE. CA 92071 I I (619) 258-7901 Fax (619) 258-7902 I 4w 4 i ;477 go