HomeMy WebLinkAboutCDP 12-04; ARMY & NAVY ACADEMY ATHLETIC FIELD; STRUCTURAL SLAB FLOW; 2014-07-31JONES, CAHL & ASSOCIATES, INC.
CONSULTING ENGINEERS
City of Carlsbad July 31, 2014
Department of Transportation
5950 El Camino Real
Carlsbad, CA 92008
Attn: Jay Jordan, Public Works Inspector
Re: Hoehn Buick-Cadillac - 5334 Paseo Del Norte
SDP 12-04 Dwg. No. 482-2A
Dear Mr. Jordan,
It is acceptable to have the wall of the flow thru planter
as part of the structural slab as the structural plans depict
and waterproofed aè shOwn on the civil drawings.
SINCERELY,
C 60934
in '/31/ft
DANIEL RUBIO,R.C.E. 60934
18090 Beach Boulevard, Suite 12 • Huntington Beach, California 92648 • Phone: (714) 848-0566 • Fax: (714) 848-6322