HomeMy WebLinkAboutCDP 15-17A; 6125 Paseo Del Norte; HYDROLOGY AND HYDRAULICS STUDY; 2016-07-24J Brian C. Regan P .E. __ ) _j REC}-:IVED HYDROLOGY AND HYDRAULICS STUDY COP 15-17{A) DWG 486-SA For 6125 PASEO DEL NORTE PHASE 2 Prepared: June 13th, 2016 Revised: July 24, 2016 Prepared By: Hofman Planning & Engineering 3156 Lionshead Ave, Suite 1 Carlsbad, CA 92010 PE C35343 exp. 9-30-17 JUL 2 6 2016 LOPMENT r-: I (' c .:::J Date 6125 PASEO DEL NORTE Ph. IV Final Hydrology and Hydraulics Study Page 2 of 5 TABLE OF CONTENTS Prepared by: BCR Section 1. Project ................................................................................................ 3 Section 1.1 Objective . . . .. . . . . .. . .. . .. . .. . . . . .. . . .. .. . . .. .. . . . .. .. .. . .. . .. .. . . .. . .. . .. . . .. .. .. .. . . 3 Section 1.2 Project Description ...... .. .... ...... ...... .... ........ ...... ...... .. . .... .. ... .. .. ... .. 3 Section 1.3 Existing Condition ................................................................ 3 Section 1.4 Proposed Improvements 3 Section 2. Methodology ...... .. .... . . . . . . ... . . . .. .... ... . . . ... ... .... . . ... ... ... . .. ...... ... .... . . . . . 4 Section 3.1 Rational Method ................................................................ 4 Section 3. Results ............................................................... .............................. 4 Section 3.1 Proposed Condition ................................................................. 4 Section 4. Conclusit:m .... . . ... ... . . .... .. . . .. ... ... .. . .. .... ... . . . ... ... ... ... ... ... . . . ... ... ...... . . . ... ..... . ... 5 Section 5. Attachmtents Attachment A Vicinity Map Attachment B Post-Developed Hydrology Calculations Attachment C Post-Developed Hydrology Exhibit __ j _j . . I 6125 PASEO DEL NORTE Ph. IV Final Hydrology and Hydraulics Study Page 3 of 5 SECTION 1. PROJECT 1.1 OBJECTIVE This Hydrology study has been prepared in support of the construction documents: grading and surface improvements plans Dwg. 486-5A based on the Coastal Development permit CDP-15-17(A) for the 6125 PASEO DEL NORTE in their PHASE 2. The 6125 PASEO DEL NORTE PHASE 2 parking lot as well as incidental utilities, landscaping, and hardscape improvements are proposed within the existing site on two parcels. It will contain one main building and covered outdoor parking spaces. In addition, there will be hardscape and one relocated trash enclosure. The site has one study areas since there is only one storm drain facility proposed. The remainder of the site outside of Phase II only involves the renovation of an existing structure and no new proposed drainage facilities. 1.2 PROJECT DESCRIPTION The 6125 Paseo Del Norte Phase 2 parking expansion project is located on the west side of Paseo Del Norte south of Palomar Airport Rd. in the City of Carlsbad. The surrounding area is composed of commercial and office professional land uses. The 6125 Paseo Del Norte Phase 2 parking expansion site currently consists of an addition of 26 parking spaces. Due to the increase in paved surface a bio-retention facility is proposed 1.3 EXISTING CONDITION The area to be disturbed by the proposed development is currently undeveloped, but previously graded and covered with spoils. 1.4 PROPOSED IMPROVEMENTS A parking lot expansion will be constructed across the site and will be improved with the incidental utilities, landscaping and hardscaping. We are incorporating pervious pavers combined with a bio-retention facility. Total disturbed area is .642 Acres . _j __ ; 6125 PASEO DEL NORTE Ph. IV Final Hydrology and Hydraulics Study Page 4 of 5 SECTION 2: METHODOLOGY 2.1 RATIONAL METHOD This study followed the rational method as outlined in the 2003 San Diego County Hydrology Manual. Basin areas as well as areas of impervious surfaces (pavement, concrete,) were calculated. Given the amount b of the previous/ impervious for proposed conditions, the runoff coefficients C was calculated at 0.9. We then used the Advanced Engineering Software using Rational Method Hydrology program version 7.7 to calculate the flows and time of concentration for the100 year storm events using different "c" coefficients according to the corresponding DMA (Drainage Management Areas) surface conditions. We have used a constant C value of 0.9 for the study area. The actual runoff for the one basin is based on the initial time of concentration of a minimum of 5 minutes. SECTION 3: RESUL Tl~ 3.1 RATIONAL METHOD Proposed ConditiC>ns 100 year storm event: See exhibit H BMP-1 BIORETENTION POST PROJECT SURFACE AREA Nodes TYPE (A c) "C" Q100 (cfs) 10-11 POROUS CONCRETE 0.3 .9 TOTAL 0.3 0.9 2.28 For the sake of conservatism we have rounded up the flow to be 3 cfs. These results do not reflect the detention and infiltration capacity of the system; no flow reductions have been calculated due to the retention, infiltration and treatment in bio-retention __) 6125 PASEO DEL NORTE Ph. IV Final Hydrology and Hydraulics Study Page 5 of 5 SECTION 4: CONCLUSION This Hydrology study has been prepared in support of Coastal Development permit CDP-15-17(A) for the Ei125 PASEO DEL NORTE in their phase 2 The main focus is to quantity the maximum flow into an out of the bio-retention basin. The storm water quality issues from the 6125 PASEO DEL NORTE, PHASE 2 have been addressed in the Storm Water Management Plan (SWMP) for 6125 PASEO DEL NORTE PHASE 2 submitted in the package under a separate cover. Please refer to the SWMP for information on all the proposed LID BMP's. This Hydrologic and Hydraulic Analysis has been prepared by me or under my direction and supervision. I attest to the technical information contained herein and the engineering data upon which recommendations and conclusions are based. _j PROJECT SfTE CITY OF OCEANSIDE ~ITY. OF VISTA CITY OF ENCINITAS VIC IN AP NTS ATTACHMENT "A" __ ) ATTACHMENT "B" PAGE 1 **************************************************************************** RATIONAL METHOD HYDROLOGY COMPUTER PROGRAM PACKAGE Reference: SAN DIEGO COUNTY FLOOD CONTROL DISTRICT 2003, 1985, 1981 HYDROLOGY MANUAL (c) Copyright 1982-2015 Advanced Engineering Software (aes) Ver. 22.0 Release Date: 07/01/2015 License ID 1517 Analysis prepared by: BRIAN REGAN P.E. 35343 ************************** DESCRIPTION OF STUDY ************************** * HYDROLOGY ANALYSIS FOR PARKING EXPANSION 6125 PASEO DEL NORTE * * * * * ************************************************************************** FILE NAME: PASEO.DAT TIME/DATE OF STUDY: 10:19 06/13/2016 USER SPECIFIED HYDROLOGY AND HYDRAULIC MODEL INFORMATION: 2003 SAN DIEGO MANUAL CRITERIA USER SPECIFIED STORM EVENT(YEAR) = 100.00 6-HOUR DURATION PRECIPITATION (INCHES) = 3.200 SPECIFIED MINIMUM PIPE SIZE(INCH) = 18.00 SPECIFIED PERCENT OF GRADIENTS (DECIMAL) TO USE FOR FRICTION SLOPE = 1. 00 SPECIFIED CONSTANT Rill/OFF COEFFICIENT = 0. 900 NOTE: USE MODIFIED RATIONAL METHOD PROCEDURES FOR CONFLUENCE ANALYSIS *USER-DEFINED STREET-SECTIONS FOR COUPLED PIPEFLOW AND STREETFLOW MODEL* HALF-CROWN TO STREET-CROSSFALL: CURB GUTTER-GEOMETRIES: MANNING WIDTH CROSSFALL IN-/ OUT-/PARK-HEIGHT WIDTH LIP HIKE FACTOR NO. (FT) (FT) SIDE / SIDE/ WAY (FT) (FT) (FT) (FT) (n) 1 30.0 20.0 0.018/0.018/0.020 0.67 2.00 0.0312 0.167 0.0150 GLOBAL STREET FLOW-DEPTH CONSTRAINTS: 1. Relative Flow-Depth= 0.00 FEET as (Maximum Allowable Street Flow Depth) -(Top-of-Curb) 2. (Depth)*(Velocity) Constraint = 6. 0 (FT*FT/S) *SIZE PIPE WITH A FLOW CAPACITY GREATER THAN ATTCHMENT "B" PAGE 2 OR EQUAL TO THE UPSTREAM TRIBUTARY PIPE.* **************************************************************************** FLOW PROCESS FROM NODE 10.00 TO NODE 11.00 IS CODE= 22 >>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<< *USER SPECIFIED(GLOBAL): OFFICE PROFESSIONAL/COMMERCIAL RUNOFF COEFFICIENT= .9000 S.C.S. CURVE NUMBER (AMC II) = 77 USER SPECIFIED Tc(MIN.) = 5. 000 100 YEAR RAINFALL INTENSITY(INCH/HOUR) = 8.431 SUBAREA RUNOFF(CFS) = 2.28 TOTAL AREA(ACRES) = 0. 30 TOTAL RUNOFF(CFS) = 2.28 END OF STUDY SUMMARY: TOTAL AREA(ACRES) PEAK FLOW RATE(CFS) 0. 3 TC(MIN.) = 2.28 END OF RATIONAL METHOD ANALYSIS FOR CONSERVATISM SAKE USE 3 CFS 5.00 //