UPDATED GEOTECHNICAL RECOMMENDATIONS
PROPOSED NEW SINGLE FAMILY RESIDENCE
TO BE LOCATED AT
LOT 2, YUKI LANE
CARLSBAD, CALIFORNIA
EDG Project No. 155513-1
September 3, 2015
PREPARED FOR:
Pacific Beach 2014, Ltd.
c/o San Dieguito Development
Attn: Ted Montag
11 06 Second St PMB 255
Encinitas, CA 92024
p: 760.635.7633
ENGINEERING
DESIGN GROUP
-·~~---~----··------·-
2121 Montiel Road, San Marcos, California 92069 • {760) 839-7302 ·Fax: (760) 480-7477 • www.designgroupca.com
-~-._ ,.._' ,.,,...,.,,u._., ',..,..._...._., -'-"''' , .. ,..,..,,.n,IVT _...,.,,....,,,,. .... ""'fo..VVV \' VVJ ....,....,..., I ~Vol... I u ..... \' UVJ -rVV I"'TI J WWVYII'Y.UV,;)I!::Jil~IVUfJ\.ICl.\..UIII
'"·
Date: September 3, 2015
To: Pacific Beach 2014, Ltd.
c/o San Dieguito Development
Attn: Ted Montag
1106 Second St PMB 255
Encinitas, CA 92024
p: 760.635.7633
e: tedmontag3@msn.com
Re: Proposed new residence to be located at Lot 2 Yuki Lane, Carlsbad, California
Subject: Updated Geotechnical Report
We have provided the following updated limited geotechnical report for the proposed new
residence at the above referenced address. Earthwork recommendations and foundation design
parameters are presented in this report. In general it is our opinion that the proposed construction,
as described herein, is feasible from a geotechnical standpoint, provided the recommendations of
this report and generally accepted construction practices are followed.
If you have any questions regarding the following report please do not hesitate to contact our
office.
Sincerely,
ENGINEERING DESIGN GROUP
Steven Norris
California GE#2590
Erin E. Rist
California RCE #65122
Table of Contents
1.0 SCOPE ............................................................................................................................ 1
2.0 SITE AND PROJECT DESCRIPTION ............................................................................. 1
3.0 FIELD INVESTIGATION .................................................................................................. 1
4.0 SUBSURFACE CONDITIONS ......................................................................................... 1
5.0 GROUND WATER .......................................................................................................... 1
6.0 LIQUEFACTION .............................................................................................................. 2
7.0 CONCLUSIONS AND RECOMMENDATIONS ................................................................ 3
7.1 GENERAL ................................................................................................................... 3
7.2 EARTHWORK ............................................................................................................. 3
7.3 FOUNDATIONS ........................................................................................................... 4
7.4 CONCRETE SLABS ON GRADE ................................................................................ 6
7.5 RETAINING WALLS .................................................................................................... 8
8.0 SURFACE DRAINAGE ................................................................................................... 11
9.0 CONSTRUCTION OBSERVATION AND TESTING ....................................................... 11
10.0 MISCELLANEOUS ......................................................................................................... 12
APPENDICES
References ................................................................................................................. Appendix A
General Earthwork and Grading Specifications ........................................................... Appendix B
Retaining Wall Drainage Detail .................................................................................. Appendix C
1.0 SCOPE
This report gives our recommendations for the proposed new residence to be constructed on Lot
2, Yuki Lane, Carlsbad, California. The scope of our work conducted onsite to date has included
a visual reconnaissance of the property and surrounding areas, review of past reports, and
preparation of this report presenting our findings, conclusions and recommendations.
2.0 SITE AND PROJECT DESCRIPTION
The subject property consists of a graded building pad bordered to the south by single family
dwellings, to the north and east by a vacant un-developed lots and to the west by Yuki Lane. The
general topography of the site area consists of coastal foothill terrain. The site consists of a
relatively flat building pad flanked to the north by ascending 2:1 graded slope to the lot above, to
the south and west by graded descending slopes. At the time of this report the property is
generally undeveloped. The building pad was graded in and around summer-fall 2014. We
understand the proposed new development will consist of a new two story single family residence.
3.0 FIELD INVESTIGATION
No additional subsurface investigation was conducted as part of the proposed scope of work.
Grading of the subject site occurred in 2014. Engineering Design Group provided limited
observation and testing during the grading of the building pads.
4.0 SUBSURFACE CONDITIONS
Based upon our limited earthwork observation and testing conducted at the time of site grading
fills on the order of 3-11 feet should be anticipated in the area of the proposed building pad. Fill
materials general classify as SW-SM according to the Unified Soil Classification System, and
based on visual observation, are considered to possess low potential for expansion.
5.0 GROUND WATER
Groundwater was not encountered in during the grading of the subject property. Groundwater is
not anticipated to pose a significant constraint to construction, however based upon our
experience, perched groundwater conditions can develop where no such condition previously
existed. Perched groundwater conditions can develop over time and can have a significant
Yuki Lane Development
Lot 2. Yuki Lane, Carlsbad, California
ENGINEERING DESIGN GROUP
GEOTECHNICAL, CIVIL, STRUCTURAL CONSULTANTS
Page No.1
Job No. 155513-1
impact, especially at basements. Waterproofing membrane shall be specifically detailed by
waterproofing consultant. If groundwater conditions are encountered during site excavations, a
slab underdrain system may be required.
Any proposed bioretention facilities within close proximity of the residence shall be lined with an
impervious waterproof barrier. Proper surface drainage and irrigation practices will play a
significant role in the future performance of the project. Please note in the "Concrete Slab on
Grade" section of this report for specific recommendations regarding water to cement ratio for
moisture sensitive areas should be adhered. The project architect and/or waterproofing
consultant shall specifically address waterproofing details.
6.0 LIQUEFACTION
It is our opinion that the site could be subjected to moderate to severe ground shaking in the event
of a major earthquake along any of the faults in the Southern California region. However, the
seismic risk at this site is not significantly greater than that of the surrounding developed area.
Liquefaction of cohesionless soils can be caused by strong vibratory motion due to earthquakes.
Research and historical data indicate that loose, granular soils underlain by a near-surface
ground water table are most susceptible to liquefaction, while the stability of most silty sands and
clays is not adversely affected by vibratory motion. Because of the dense nature of the soil
materials underlying the site and the lack of near surface water, the potential for
liquefaction or seismically-induced dynamic settlement at the site is considered low. The
effects of seismic shaking can be reduced by adhering to the most recent edition of the Uniform
Building Code and current design parameters of the Structural Engineers Association of
California.
Yuki Lane Development
Lot 2, Yuki Lane, Carlsbad, California
ENGINEERING DESIGN GROUP
GEOTECHNICAL. CIVIL, STRUCTURAL CONSULTANTS
Page No.2
Job No. 155513-1
7.0 CONCLUSIONS AND RECOMMENDATIONS
7.1 GENERAL
In general it is our opinion that the proposed new residence, as discussed and described herein,
is feasible from a geotechnical standpoint, provided the recommendations of this report and all
applicable codes are followed.
7.2 EARTHWORK
We anticipate site grading will be limited to a shallow rip and recompact of the upper 8 inches in
the area of the proposed building pad and backfill behind proposed new retaining walls and utility
trenches. All grading should be done in accordance with the recommendations below as well as
the standards of county and state agencies, as applicable.
7.2.a. Site Preparation
Prior to any grading, the areas of proposed improvements should be cleared of surface and
subsurface debris (including organic topsoil, vegetative and construction debris). Removed debris
should be properly disposed of off-site prior to the commencement of any fill operations. Holes
resulting from the removal of debris, existing structures, or other improvements which extend
below the undercut depths noted, should be filled and compacted.
7.2.b. Removals
The area of the proposed new building and settlement sensitive improvements shall be scarified
with a shallow rip, approximately 8 inches, moisture conditioned and the recompacted to 90
percent minimum relative compaction.
7.2.c. Transitions
All settlement sensitive improvements should be constructed on a uniform building pad. The
building pad area was undercut during original grading to an approximate depth of 3-4 feet.
Where new footing excavations extend beyond the area of undercut footings may require
overexcavation and recompaction to a minimum of one foot below the bottom of the footing, as
determined by the geotechnical engineer at the time of construction.
Yuki Lane Development
Lot 2, Yuki Lane, Carlsbad, California
ENGINEERING DESIGN GROUP
GEOTECHNICAL, CIVIL, STRUCTURAL CONSULTANTS
Page No.3
Job No. 155513-1
7.2.d. Fills
All new fill and backfill should be brought to approximately +2% of optimum moisture content and
re-compacted to at least 90 percent relative compaction (based on ASTM 01557). Compacted
fills should be cleaned of loose debris and oversize material in excess of 6 inches in diameter,
brought to near optimum moisture content, and re-compacted as described above.
Fills should generally be placed in lifts not exceeding 6-8 inches in thickness. Import of soil
material is not anticipated, however if import material is required, soils should have a very low
potential for expansion (EI<20), free of debris and organic matter. Prior to importing soils, they
should be visually observed, sampled and tested at the borrow pit area to evaluate soil suitability
as fill.
7.2.e. Slopes
Where new slopes are constructed permanent slopes may be cut to a face ratio of 2: 1 (horizontal
to vertical). Permanent fill slopes shall be placed at a maximum 2:1 slope face ratio. All temporary
cut slopes shall be excavated in accordance with OSHA requirements and shall not undermine
adjacent property or structures without proper shoring of excavation and/or structures.
Subsequent to grading, planting or other acceptable cover should be provided to increase the
stability of slopes, especially during the rainy season (October thru April). Contractor shall take all
necessary precautions to protect improvements at the street during anticipated excavations.
7.3 FOUNDATIONS
The following design parameters may be utilized for new foundations founded on competent
material.
7.3.a. Footings bearing into competent sandstone or recompacted fill material may be designed
utilizing maximum allowable soils pressure of 2,000 psf.
7.3.b. Seismic Design Parameters 2013 CBC
Site Class D
Spectral Response Coefficients
Yuki Lane Development
Lot 2, Yuki Lane, Carlsbad, California
ENGINEERING DESIGN GROUP
GEOTECHNICAL, CIVIL, STRUCTURAL CONSULTANTS
'
Page No.4
Job No. 155513-1
SMs (g) 1.183
SM1 (g) 0.679
Sos (g) 0.789
So1 (g) 0.453
7.3.c. Bearing values may be increased by 33% when considering wind, seismic, or other short
duration loadings.
7 .3.d. The parameters in the table below should be used as a minimum for designing new footing
width and depth below lowest adjacent grade into recompacted fill material. Footing
depths are to be confirmed in the field by a representative of Engineering Design Group
prior to the placement of form boards, steel and removal of excavation equipment.
No. of Floors Supported Minimum Footing Width *Minimum Footing Depth Below Lowest
·Adjacent Grade
1 15 inches 18 inches. ..
2 15inches 18inches
3 18 inches 24 ·inches
7.3.e. All footings founded into competent material should be reinforced with a minimum of two
#4 bars at the top and two #4 bars at the bottom (3 inches above the ground). For footings
over 30 inches in depth, additional reinforcement, and possibly a stemwall system will be
necessary, and should be reviewed by project structural engineer prior to construction.
7.3.f. All isolated spread footings should be designed utilizing the above given bearing values
and footing depths, and be reinforced with a minimum of #4 bars at 12 inches o.c. in each
direction (3 inches above the ground). Isolated spread footings should have a minimum
width and depth of 24 inches.
7.3.g. For footings adjacent to slopes a minimum of 10 feet (competent, compacted material)
Yuki Lane Development
Lot 2, Yuki Lane, Carlsbad, California
ENGINEERING DESIGN GROUP
GEOTECHNICAL, CIVIL, STRUCTURAL CONSULTANTS
Page No.5
Job No. 155513-1
and horizontal setback in competent material or properly compacted fill should be
maintained. A setback measurement should be taken at the horizontal distance from the
bottom of the footing to slope daylight. Where this condition cannot be met it should be
brought to the attention of the Engineering Design Group for review.
7.3.h. All excavations should be performed in general accordance with the contents of this
report, applicable codes, OSHA requirements and applicable city and/or county
standards.
7.3.i. All foundation subgrade soils and footings shall be pre-moistened to 2% over optimum to a
minimum of 18 inches in depth prior to the pouring of concrete.
7.4 CONCRETE SLABS ON GRADE
We recommend the following as the minimum design parameters for new concrete slabs on
grade.
7.4.a. Concrete slab on grade of the proposed building and driveway should have a minimum
thickness of 5 inches and should be reinforced with #4 bars at 18 inches o.c. placed at the
midpoint of the slab.
7.4.a.i Slump: Between 3 and 4 inches maximum
7.4.a.ii Aggregate Size: 3/4-1 inch
7.4.a.iii Moisture Sensitive Areas: At concrete slab on grade floors in moisture
sensitive area (i.e. floors, below grade walls) we recommend a maximum
water to cement Ratio -0.45 maximum Compressive Strength "' 4,500 psi
minimum (No special inspection required for water to cement ratio purposes,
unless otherwise specified by the structural engineer). This recommendation
is intended to achieve a low permeability concrete.
7.4.a.iv Moisture retarding additive: in concrete at concrete slab on grade floors
and moisture sensitive area
7.4.a.v Corrosion Potential: Based upon laboratory testing conducted as part of
the field investigation onsite soils meet ACI exposure categories SO, C1. The
project structural engineer to note increased concrete protection
requirements for corrosive environments, as applicable. EDG is not an
expert in corrosion or corrosion prevention. All corrosion recommendations
Yuki Lane Development
Lot 2, Yuki Lane, Carlsbad, California
ENGINEERING DESIGN GROUP
GEOTECHNICAL, CIVIL, STRUCTURAL CONSULTANTS
Page No.6
Job No. 155513-1
shall be provided by the corrosion consultant.
7.4.a.vi Non-Moisture Sensitive Areas: Compressive Strength= 2,500 psi
minimum.
7.4.b. In areas of level slab on grade floors we recommend a one inch layer of coarse sand
material, Sand Equivalent (S.E.) greater than 50 and washed clean of fine materials,
should be placed beneath the slab in moisture sensitive areas, above the vapor barrier.
There shall be not greater than an 1f2 inch difference across the sand layer.
7.4.c. In moisture sensitive areas, a vapor barrier layer (15 mil) should be placed below the
upper one inch of sand. The vapor barrier shall meet the following minimum requirements:
• Permeance of less than 0.01 perm [grains/(ft2 hr in/Hg)] as tested in accordance with
ASTM E 1745 Section 7.1.
• Strength per ASTM 17 45 Class A.
• The vapor barrier should extend down the interior edge of the footing excavation a
minimum of 6 inches. The vapor barrier should lap a minimum of 8 inches, sealed
along all laps with the manufacturer's recommended adhesive. Beneath the vapor
barrier a uniform layer of 3 inches of pea gravel is recommended under the slab in
order to more uniformly support the slab, help distribute loads to the soils beneath the
slab, and act as a capillary break.
7.4.d. The project waterproofing consultant should provide all slab underdrain, slab sealers and
various other details, specifications and recommendations (i.e Moiststop and Linkseal) at
areas of potential moisture intrusion (i.e. slab penetrations). Engineering Design Group
accepts no responsibility for design or quality control of waterproofing elements of the
building.
7.4.e. Adequate control joints should be installed to control the unavoidable cracking of concrete
that takes place when undergoing its natural shrinkage during curing. The control joints
should be well located to direct unavoidable slab cracking to areas that are desirable by
the designer.
7.4.f. Any additional fills used to support slabs, should be placed in accordance with the grading
section of this report, Section 7.1, and compacted to 90 percent Modified Proctor Density,
ASTM D-1557, and as described in the Earthwork section of this report.
7.4.g. All subgrade soils to receive concrete slabs and flatwork are to be pre-soaked to 2 percent
over optimum moisture content to a depth of 18 inches.
Yuki Lane Development
Lot 2, Yuki Lane, Carlsbad, California
ENGINEERING DESIGN GROUP
GEOTECHNICAL, CIVIL, STRUCTURAL CONSULTANTS
Page No.7
Job No. 155513-1
7.4.h. Exterior concrete flatwork, due to the nature of concrete hydration and minor subgrade soil
movement, are subject to normal minor concrete cracking. To minimize expected
concrete cracking, the following may be implemented:
• Concrete may be poured with a 10 inch deep thickened edge. Flatwork adjacent to top
of a slope should be constructed with an outside footing to attain a minimum of 7 feet
distance to daylight.
• Concrete slump should not exceed 4 inches.
• Concrete should be poured during "cool" (40 -65 degrees) weather if possible. If
concrete is poured in hotter weather, a set retarding additive should be included in the
mix, and the slump kept to a minimum.
• Concrete subgrade should be pre-soaked prior to the pouring of concrete. The level
of pre-soaking should be a minimum of 2% over optimum moisture to a depth of 18
inches.
• Concrete should be constructed with tooled joints creating concrete sections no larger
than 225 square feet. For sidewalks, the maximum run between joints should not
exceed 5 feet. For rectangular shapes of concrete, the ratio of length to width should
generally not exceed 0.6 (i.e., 5 ft. long by 3 ft. wide). Joints should be cut at
expected points of concrete shrinkage (such as male corners), with diagonal
reinforcement placed in accordance with industry standards.
• Isolation joints should be installed at exterior concrete where exterior concrete is
poured adjacent to existing foundations.
• Drainage adjacent to concrete flatwork should direct water away from the
improvement. Concrete subgrade should be sloped and directed to the collective
drainage system, such that water is not trapped below the flatwork.
• The recommendations set forth herein are intended to reduce cosmetic nuisance
cracking. The project concrete contractor is ultimately responsible for concrete quality
and performance, and should pursue a cost-benefit analysis of these
recommendations, and other options available in the industry, prior to the pouring of
concrete.
7.5 RETAINING WALLS
Retaining walls up to 6 feet are anticipated as part of site development. We anticipate retaining
walls at the bottom of the graded slope along the north side of the property. We understand the
new retaining wall is proposed to a design height of 6 feet, to include a maximum retained height
of 4.5 feet and an additional 1.5 feet freeboard beyond the anticipated retained height.
Retaining walls may be designed and constructed in accordance with the following
Yuki Lane Development
Lot 2, Yuki Lane, Carlsbad, California
ENGINEERING DESIGN GROUP
GEOTECHNICAL, CIVIL, STRUCTURAL CONSULTANTS
Page No.8
Job No. 155513-1
recommendations and minimum design parameters.
7.5.a. Retaining wall footings should be designed in accordance with the allowable bearing
criteria given in the "Foundations" section of this report, and should maintain minimum
footing depths outlined in the "Foundations", Section 7.3, of this report. It is anticipated
that all retaining wall footings will be placed on recompacted material or competent
sandstone.
7.5.b. Unrestrained cantilever retaining walls should be designed using an active equivalent fluid
pressure of 35 pcf. This assumes that granular, free draining material with very low
potential for expansion (E. I. <20) will be used for backfill, and that the backfill surface will
be level. Where soil with potential for expansion is not low (E. I. >50) a new active fluid
pressure will be provided by the project soils engineer. Backfill materials should be
considered prior to the design of the retaining walls to ensure accurate detailing. We
anticipate onsite material will be utilized as retaining wall backfill. For sloping backfill, the
parameters provided in the table below may be utilized.
Backfill Sloping 2:1 Slope 1.5:1 Slope 1:5:1 or Steeper
Condition
Active Fluid 50 pcf 65 pcf 80 pcf
Pressure
·.·.
Any other surcharge loadings shall be analyzed in addition to the above values.
7.5.c. If the tops of retaining walls are restrained from movement, they should be designed for an
uniform at-rest soil pressure of 65 psf.
7.5.d. In moisture sensitive areas (i.e. interior living space where vapor emission is a concern), in
our experience poured in place concrete provides a surface with higher
performance-repairability of below grade waterproofing systems. The owner should
consider the cost-benefit of utilizing cast in place building retaining walls in lieu of masonry
as part of the overall construction of the residence. Waterproofing at any basement floors
is recommended in areas of moisture sensitive floor finishes.
7.5.e. Retaining walls shall be designed for additional lateral forces due to earthquake, where
required by code, utilizing the following design parameters.
Yuki Lane Development
Lot 2, Yuki Lane, Carlsbad, California
ENGINEERING DESIGN GROUP
GEOTECHNICAL, CIVIL, STRUCTURAL CONSULTANTS
Page No.9
Job No. 155513-1
• Yielding Walls = PE= (3/8) kAE (y) H2 -applied at a distance of 0.6 times the
height (H) of the wall above the base
• Horizontal ground acceleration value kH = 0.25g.
• Where non-yielding retaining walls are proposed, the specific conditions
should be brought to the attention of Engineering Design Group for alternative
design values.
• The unit weight of 120 pcf for the onsite soils may be utilized.
• The above design parameters assume unsaturated conditions. Retaining
wall designs for sites with a hydrostatic pressure influence (i.e groundwater
within depth of retaining wall or waterfront conditions) will require special
design considerations and should be brought to the attention of Engineering
Design Group.
7.5.f. Passive soil resistance may be calculated using an equivalent fluid pressure of 300 pcf.
This value assumes that the soil being utilized to resist passive pressures extends
horizontally 2.5 times the height of the passive pressure wedge of the soil. Where the
horizontal distance of the available passive pressure wedge is less than 2.5 times the
height of the soil, the passive pressure value must be reduced by the percent reduction in
available horizontal length.
7.5.g. A coefficient of friction of 0.33 between the soil and concrete footings may be utilized to
resist lateral loads in addition to the passive earth pressures above.
7.5.h. All walls shall be provided with adequate back drainage to relieve hydrostatic pressure,
and be designed in accordance with the minimum standards contained in the "Retaining
Wall Drainage Detail", Appendix C. The waterproofing elements shown on our details are
minimums, and are intended to be supplemented by the waterproofing consultant and/or
architect. The recommendations should be reviewed in consideration of proposed
finishes and usage, especially at basement levels, performance expectations and budget.
If deemed necessary by the project owner, based on the above analysis, and
waterproofing systems can be upgraded to include slab under drains and enhanced
waterproofing elements.
7.5.i. Retaining wall backfill should be placed and compacted in accordance with the
"Earthwork" section of this report. Backfill shall consist of soil with a very low expansion
potential, granular, free draining material.
7.5.j. Retaining walls sllould be braced and monitored during compaction. If this cannot be
accomplished, the compactive effort should be included as a surcharge load when
designing the waiL
Yuki Lane Development
Lot 2, Yuki Lane, Carlsbad, California
ENGINEERING DESIGN GROUP
GEOTECHNICAL, CIVIL, STRUCTURAL CONSULTANTS
Page No. 10
Job No. 155513-1
8.0 SURFACE DRAINAGE
Adequate drainage precautions at this site are imperative and will play a critical role on the future
performance of the proposed improvements. Under no circumstances should water be allowed to
pond against or adjacent to tops of slopes and/or foundation walls.
The ground surface surrounding proposed improvements should be relatively impervious in
nature, and slope to drain away from the structure in all directions, with a minimum slope of 2% for
a horizontal distance of 7 feet (where possible). Area drains or surface swales should then be
provided in low spots to accommodate runoff and avoid any ponding of water. Any french drains,
backdrains and/or slab underdrains shall not be tied to surface area drain systems. Roof gutters
and downspouts shall be installed on the new and existing structures and tightlined to the area
drain system. All drains should be kept clean and unclogged, including gutters and downspouts.
Area drains should be kept free of debris to allow for proper drainage.
Over watering can adversely affect site improvements and cause perched groundwater
conditions. Irrigation should be limited to only the amount necessary to sustain plant life. Low flow
irrigation devices as well as automatic rain shut-off devices should be installed to reduce over
watering. Irrigation practices and maintenance of irrigation and drainage systems are an
important component to the performance of onsite improvements.
During periods of heavy rain, the performance of all drainage systems should be inspected.
Problems such as gullying or ponding should be corrected as soon as possible. Any leakage from
sources such as water lines should also be repaired as soon as possible. In addition, irrigation of
planter areas, lawns, or other vegetation, located adjacent to the foundation or exterior flat work
improvements should be strictly controlled or avoided.
9.0 CONSTRUCTION OBSERVATION AND TESTING
The recommendations provided in this report are based on subsurface conditions disclosed by
the investigation and our general experience in the project area. Interpolated subsurface
conditions should be verified in the field during construction. The following items shall be
conducted prior/during construction by a representative of Engineering Design Group in order to
verify compliance with the geotechnical and civil engineering recommendations provided herein,
as applicable. The project structural and geotechnical engineers may upgrade any condition as
Yuki Lane Development
Lot 2, Yuki Lane, Carlsbad, California
ENGINEERING DESIGN GROUP
GEOTECHNICAL, CIVIL, STRUCTURAL CONSULTANTS
Page No. 11
Job No. 155513-1
deemed necessary during the development of the proposed improvement(s).
9.1 Review of final approved grading and structural plans prior to the start of work for
compliance with geotechnical recommendations.
9.2 Attendance of a pre-grade/construction meeting prior to the start of work.
9.3 Observation of subgrade and excavation bottoms.
9.4 Testing of any fill placed, including retaining wall backfill and utility trenches.
9.5 Observation of footing excavations prior to steel placement and removal of excavation
equipment.
9.6 Field observation of any "field change" condition involving soils.
9. 7 Walk through of final drainage detailing prior to final approval.
The project soils engineer may at their discretion deepen footings or locally recommend additional
steel reinforcement to upgrade any condition as deemed necessary during site observations.
Engineering Design Group shall, prior to the issuance of the certificate of occupancy, issue in
writing that the above inspections have been conducted by a representative of their firm, and the
design considerations of the project soils report have been met. The field inspection protocol
specified herein is considered the minimum necessary for Engineering Design Group to have
exercised "due diligence" in the soils engineering design aspect of this building. Engineering
Design Group assumes no liability for structures constructed utilizing this report not meeting this
protocol.
Before commencement of grading the Engineering Design Group will require a separate contract
for quality control observation and testing. Engineering Design Group requires a minimum of 48
hours notice to mobilize onsite for field observation and testing.
10.0 MISCELLANEOUS
It must be noted that no structure or slab should be expected to remain totally free of cracks and
minor signs of cosmetic distress. The flexible nature of wood and steel structures allows them to
respond to movements resulting from minor unavoidable settlement of fill or natural soils, the
swelling of clay soils, or the motions induced from seismic activity. All of the above can induce
movement that frequently results in cosmetic cracking of brittle wall surfaces, such as stucco or
interior plaster or interior brittle slab finishes.
Data for this report was derived from surface observations at the site, knowledge of local
conditions, and a review of reports and plans prepared by others. The recommendations in this
Yuki Lane Development
Lot 2, Yuki Lane, Carlsbad, California
ENGINEERING DESIGN GROUP
GEOTECHNICAL, CIVIL, STRUCTURAL CONSULTANTS
Page No. 12
Job No. 155513-1
report are based on our experience in conjunction with the limited soils exposed at this site and
neighboring sites. We believe that this information gives an acceptable degree of reliability for
anticipating the behavior of the proposed improvement; however, our recommendations are
professional opinions and cannot control nature, nor can they assure the soils profiles beneath or
adjacent to those observed. Therefore, no warranties of the accuracy of these recommendations,
beyond the limits of the obtained data, is herein expressed or implied. This report is based on the
investigation at the described site and on the specific anticipated construction as stated herein.
If either of these conditions is changed, the results would also most likely change.
Man-made or natural changes in the conditions of a property can occur over a period of time. In
addition, changes in requirements due to state of the art knowledge and/or legislation are rapidly
occurring. As a result, the findings of this report may become invalid due to these changes.
Therefore, this report for the specific site, is subject to review and not considered valid after a
period of one year, or if conditions as stated above are altered.
It is the responsibility of the owner or his representative to ensure that the information in this report
be incorporated into the plans and/or specifications and construction of the project. It is advisable
that a contractor familiar with construction details typically used to deal with the local subsoil and
seismic conditions be retained to build the structure.
If you have any questions regarding this report, or if we can be of further service, please do not
hesitate to contact us. We hope the report provides you with necessary information to cont~nue
with the development of the project.
Yuki Lane Development
Lot 2, Yuki Lane, Carlsbad, California
ENGINEERING DESIGN GROUP
GEOTECHNICAL, CIVIL, STRUCTURAL CONSULTANTS
Page No. 13
Job No. 155513-1
APPENDIX A
REFERENCES
1. California Geological Survey, Probabilistic Seismic Hazards Mapping Ground Motion Page.
2. California Department of Conservation, Division of Mines and Geology, Fault Rupture Zones in
California, Special Publication 42, Revised 1990.
3. Day, Robert W. "Geotechnical and Foundation Engineering Design and Construction." 1999.
McGraw Hill.
4. Engineering Design Group, Rough Grading As-Graded Report, dated January 23, 2015.
5. Engineering Design Group, Updated Geotechnical Investigation and Foundation
Recommendation, Proposed Subdivision Located at 4400 Park Drive, Carlsbad, California. EDG
Project No. 135229-1, dated October 30, 2013.
6. Engineering Design Group, Limited Geotechnical Investigation Report, dated October 23, 2004.
7. Engineering Design Group, Response to Comments and Addendum 3, dated October 18, 2005.
8. Engineering Design Group, unpublished in house data.
9. Franklin, A.G. and Chang, F.K. 1977, "Permanent displacements of Earth embankments by
Newmark sliding block analysis, Report 5, Miscellaneous Paper, S 71-17, U.S. Army Corp of
Engineers, Waterways Experiment Station, Vickburg, Mississippi."
10. Greensfelder, R.W., 1974 Maximum Credible Rock Acceleration from Earthquakes in California
Division of Mines and Geology, Map Sheet 23.
11. Kennedy, Michael P. & Tan, Siang S., Geologic Map of the Oceanside, San Luis Rey, and San
Marcos 7.5' Quadrangle, Sand Diego County, Californie, dated 1996.
12. Lin, Dan, Preliminary Site Plan, 4394 Yuki Lane, dated 5-26-15.
13. Lee, L.J., 1977, Potential foundation problems associated with earthquakes in San Diego, in
Abbott, P.L. and Victoria, J.K., eds. Geologic Hazards in San Diego, Earthquakes, Landslides, and
Floods: San Diego Society of Natural History John Porter Dexter Memorial Publication.
14. Ploessel, M.R. and Slossan, J.E., 1974 Repeatable High Ground Acceleration from Earthquakes:
California Geology, Vol. 27, No.9, P. 195-199
15. State of California, Fault Map of California, Map No. 1, Dated 1975.
16. State of California, Geologic Map of California, Map No.1, Dated 1977.
17. Structural Engineers Association of Southern California (SEAOSC) Seismology Committee,
Macroseminar Presentation on Seismically Induced Earth Pressure, June 8, 2006.
18. U.S. Army Corps of Engineers, 1985, Coast of California Storm and Tidal Waves Study, Shoreline
Movement Data Report, Portuguese Point to Mexican Border, dated December
19. U.S. Army Corps of Engineers, 1985, Coast of California Storm and Tidal Waves Study, Coastal
Cliff Sediments, San Diego Region (CCSTWS 87-2), dated June.
20. VanDorn, W.G., 1979 Theoretical aspects of tsunamis along the San Diego coastline, in Abbott,
P.L. and Elliott, W.J., Earthquakes and Other Perils: Geological Society of America field trip
guidebook.
21. Various Aerial Photographs
APPENDIX B
General Earthwork and Grading Specifications
1.0 General Intent
These specifications are presented as general procedures and recommendations for grading and
earthwork to be utilized in conjunction with the approved grading plans. These general earthwork
and grading specifications are a part of the recommendations contained in the geotechnical report
and shall be superseded by the recommendations in the geotechnical report in the case of conflict.
Evaluations performed by the consultant during the course of grading may result in new
recommendations which could supersede these specifications or the recommendations of the
geotechnical report. It shall be the responsibility of the contractor to read and understand these
specifications, as well as the geotechnical report and approved grading plans.
2.0 Earthwork Observation and Testing
Prior to commencement of grading, a qualified geotechnical consultant should be employed for the
purpose of observing earthwork procedures and testing the fills for conformance with the
recommendations of the geotechnical report and these specifications. It shall be the responsibility
of the contractor to assist the consultant and keep him apprised of work schedules and changes, at
least 24 hours in advance, so that he may schedule his personnel accordingly. No grading
operations should be performed without the knowledge of the geotechnical consultant. The
contractor shall not assume that the geotechnical consultant is aware of all grading operations.
It shall be the sole responsibility of the contractor to provide adequate equipment and methods to
accomplish the work in accordance with the applicable grading codes and agency ordinances,
recommendations in the geotechnical report and the approved grading plans not withstanding the
testing and observation of the geotechnical consultant If, in the opinion of the consultant,
unsatisfactory conditions, such as unsuitable soil, poor moisture condition, inadequate compaction,
adverse weather, etc., are resulting in a quality of work less than recommended in the geotechnical
report and the specifications, the consultant will be empowered to reject the work and recommend
that construction be stopped until the conditions are rectified.
Maximum dry density tests used to evaluate the degree of compaction shouls be performed in
general accordance with the latest version of the American Society for Testing and Materials test
method ASTM 01557.
3.0 Preparations of Areas to be Filled
3.1 Clearing and Grubbing: Sufficient brush, vegetation, roots and all other deleterious material
should be removed or properly disposed of in a method acceptable to the owner, design
engineer, governing agencies and the geotechnical consultant.
The geotechnical consultant should evaluate the extent of these removals depending
on specific site conditions. In general, no more than 1 percent (by volume) of the fill material
should consist of these materials and nesting of these materials should not be allowed.
3.2 Processing: The existing ground which has been evaluated by the geotechnical consultant
to be satisfactory for support of fill, should be scarified to a minimum depth of 6 inches.
Existing ground which is not satisfactory should be overexcavated as specified in the
following section. Scarification should continue until the soils are broken down and free of
large clay lumps or clods and until the working surface is reasonably uniform, flat, and free
of uneven features which would inhibit uniform compaction.
3.3 Overexcavation: Soft, dry, organic-rich, spongy, highly fractured, or otherwise unsuitable
ground, extending to such a depth that surface processing cannot adequately improve the
condition, should be overexcavated down to competent ground, as evaluated by the
geotechnical consultant. For purposes of determining quantities of materials overexcavated,
a licensed land surveyor I civil engineer should be utilized.
3.4 Moisture Conditioning: Overexcavated and processed soils should be watered, dried back,
blended and I or mixed, as necessary to attain a uniform moisture content near optimum.
3.5 Recompaction: Overexcavated and processed soils which have been properly mixed,
screened of deleterious material and moisture-conditioned should be recompacted to a
minimum relative compaction of 90 percent or as otherwise recommended by the
geotechnical consultant.
3.6 Benching: Where fills are to be placed on ground with slopes steeper than 5:1 (horizontal
to vertical), the ground should be stepped or benched. The lowest bench should be a
minimum of 15 feet wide, at least 2 feet into competent material as evaluated by the
geotechnical consultant. Other benches should be excavated into competent material as
evaluated by the geotechnical consultant. Ground sloping flatter than 5:1 should be benched
or otherwise overexcavated when recommended by the geotechnical consultant.
3. 7 Evaluation of Fill Areas: All areas to receive fill, including processed areas, removal areas
and toe-of-fill benches, should be evaluated by the geotechnical consultant prior to fill
placement.
4.0 Fill Material
4.1 General: Material to be placed as fill should be sufficiently free of organic matter and other
deleterious substances, and should be evaluated by the geotechnical consultant prior to
placement. Soils of poor gradation, expansion, or strength characteristics should be placed
as recommended by the geotechnical consultant or mixed with other soils to achieve
satisfactory fill material.
4.2 Oversize: Oversize material, defined as rock or other irreducible material with a maximum
dimension of greater than 6 inches, should not be buried or placed in fills, unless the
location, materials and disposal methods are specifically recommended by the geotechnical
consultant. Oversize disposal operations should be such that nesting of oversize material
does not occur, and such that the oversize material is completely surrounded by compacted
or densified fill. Oversize material should not be placed within 10 feet vertically of finish
grade, within 2 feet of future utilities or underground construction, or within 15 feet
horizontally of slope faces, in accordance with the attached detail.
4.3 Import: If importing of fill material is required for grading, the import material should meet
the requirements of Section 4.1. Sufficient time should be given to allow the geotechnical
consultant to observe (and test, if necessary) the proposed import materials.
5.0 Fill Placement and Compaction
5.1 Fill Lifts: Fill material should be placed in areas prepared and previously evaluated to
receive fill, in near-horizontal layers approximately 6 inches in compacted thickness. Each
layer should be spread evenly and thoroughly mixed to attain uniformity of material and
moisture throughout.
5.2 Moisture Conditioning: Fill soils should be watered, dried-back, blended and/or mixed, as
necessary to attain a uniform moisture content near optimum.
5.3 Compaction of Fill: After each layer has been evenly spread, moisture-conditioned and
mixed, it should be uniformly compacted to no less than 90 percent of maximum dry density
(unless otherwise specified). Compaction equipment should be adequately sized and be
either specifically designed for soil compaction or of proven reliability, to efficiently achieve
the specified degree and uniformity of compaction.
5.4 Fill Slopes: Compacting of slopes should be accomplished in addition to normal
compacting procedures, by backrolling of slopes with sheepsfoot rollers at increments of 3
to 4 feet in fill elevation gain, or by other methods producing satisfactory results. At the
completion of grading, the relative compaction of fill out to the slope face would be at least
90 percent.
5.5 Compaction Testing: Field tests of the moisture content and degree of compaction of the
fill soils should be performed at the consultant's discretion based on file dconditions
encountered. In general, the tests should be taken at approximate intervals of 2 feet in
vertical rise and/or 1,000 cubic yards of compacted fill soils. In addition to, on slope faces,
as a guideline approximately one test should be taken for every 5,000 square feet of slope
face and /or each 10 feet of vertical height of slope.
6.0 Subdrain Installation
Subdrain systems, if recommended, should be installed in areas previously evaluated for suitability
by the geotechnical consultant, to conform to the approximate alignment and details shown on the
plans or herein. The subdrain location or materials should not be changed or modified unless
recommended by the geotechnical consultant. The consultant however, may recommend changes
in subdrain line or grade depending on conditions encountered. All subdrains should be surveyed
by a licensed land surveyor I civil engineer for line and grade after installation. Sufficient time shall
be allowed for the survey, prior to commencement of filling over the subdrains.
7.0 Excavation
Excavations and cut slopes should be evaluated by a representative of the geotechnical consultant
(as necessary) during grading. If directed by the geotechnical consultant, further excavation,
overexcavation and refilling of cut areas and/or remedial grading of cut slopes (i.e. stability fills or
slope buttresses) may be recommended.
8.0 Quantity Determination
For purposes of determining quantities of materials excavated during grading and/or determining
the limits of overexcavation, a licensed land surveyor I civil engineer should be utilized.
SIDE HILL STABILITY FILL DETAIL
FINISH ED SLOPE FACE
PROJECT 1 TO 1 LINE
FROM TOP OF SLOPE TO
OUTSIDE EDGE OF KEY
OVERBURDEN OR
UNSUITABLE
MATERIAL
I .
EXISTING GROUND __.-
SURFACE), _...-_.---
...,........ /
./'
...,/ ..,...,...
./" ........ / ..,......-
// ~_....
// / / FINISHED CUT PAD
./ /
PAD OVEREXCAVATION DEPTH
AND RECOMPACTIONI MAY BE
RECOMMENDED BY THE
GEOTECHNICAL CONSULTANT
BASED ON ACTUAL FIELD
CONDIT.IONS--ENCOUNTERED.
COMPETENT BEDROCK OR
MATERIALAS EVALU~TED
BY THE GEOTECHNICAL
CONSULTANT
NOTE: Subdrain details and key width recommendations to be provided based
on exposed subsurface conditions
STABILITY FILL I BUTTRESS DETAIL
FILTER FABRIC
ENVELOPE (MIRAFI
1 -40N OR APPROVED
EQUIVALENT)*
OUTLET PIPES
-4" ~ NONPERFOAATEO PIPE.
100' MAX. O.C. HORIZONTALLY,
30' MAX. O.C. VERTICALLY
SEE T-CONNECTJON
DETAIL
e• MIN.
COVER
si;.:;;NT
"'. 16
PERFORATED
PIPE
4" MIN.
BEDDING
SUBDRAIN TRENCH DETAIL
NOTES:
SEE SUBDAAIN TRENCH
DETAIL
LOWEST SUBOAAIN SHOULD
BE SITUATED AS LOW AS
POSSIBLE TO ALLOW
SUITABLE OUTLET
r---,. 1 0' MIN. PERFORATED t-.L_j EACH SIDE PIPE~CAP
NON-PER FORA
OUTLET PIP
T-CO.NNECTION DETAIL
*IF CAL TRANS CLASS 2 PERMEABLE
MATERIAL IS USED IN PLACE OF
3/4"-1·1/2" GRAVEL, FILTER FABRIC
MAY BE DELETED
SPECIFICATIONS FOR CALTRANS
CLASS 2 PERMEABLE MATERIAL
U.S. Standard
Sieve Size : Passing
1 ,, 100
J/4° 90-100
3/8" 40-100
No. 4 25-40
No. 8 18-33
No. 30 5-15
No. SO 0-7
No. 200 0-3
Sand Equiva1ent>75
For buttress dlmenslona, see geotechnical report/plans. Actual dimensions of buttress and aubdrain
ma~ be changed by the geotechnical consultant based on field conditions.
SUBDRAIN INSTALLATION-Subdraln pipe should be Installed with perforations down as depicted.
At locations recommended by the geotechnical consultant, nonperforated pipe should be Installed
SUBDRAIN TYPE-Subdraln type should be Acrylon trlle Butadiene Styrene (A.S.S.), Polyvinyl Chloride
(PVC) or approved equivalent. Class 125,SDR 32.5 should be used for maximum fill depths of 35 teet.
Claaa 200, SDR 21 should be used tor maximum fiJI depths of 100 feet.
FILL SLOPE
KEY AND BENCHING DETAILS
PROJECT 1 TO 1 LINE
2' MIN.L15' MIN.;----1
KEY lLOWEST~
DEPTH BENCH
(KEY)
FILL-OVER-CUT SLOPE
--_. ------··~15!-MIN;---J 2' LOWEST . I
MIN. BENCH D~~~H (KEY)
CUT SLOPE
(TO BE EXCAVATED
PRIOR TO FILL
PLACEMENT) ~/~
EXISTING //
GROUND // SURFACE~// 'Z
// ~~~? CUT SLOPE
CUT-OVER-FILL SLOPE /
/ L. 1.1.'"' (TO BE EXCAVATED
PRIOR TO FILL
PLACEMENT)
PROJECT 1 TO 1
LINE FROM TOE
OF SLOPE TO
COMPETENT
MATERIAL
~~--~~ REMOVE
UNSUITABLE
'MATERIAL
ROCK DISPOSAL DETAIL
PIN18H GRADE
DETAIL
TYPICAL PROFILE ALONG WINDROW
1) Rock with maximum dimensions greater than 6 inches should not be used within 10 feet
vertically of finish grade (or 2 feet below depth of lowest utility whichever Is greater),
and 15 feet horizontally of slope faces.
2) Rocks with maximum dimensions greater than 4 feet should not be utilized in fills.
3) Rock placement, flooding of granular soil, and fill placement should be observed by the
geotechnical consultant.
4) Maximum size and spacing of windrows should be in accordance with the above details
Width of windrow should not exceed 4 feet. Windrows should be staggered
vertically (as depicted).
5) Rock should be placed in excavated trenches. Granular soil (S.E. greater than or eQual
to 30) should be flooded in the windrow to completely fill voids around and beneath
rocks.
APPENDIX C
ENGINEERING DESIGN GROUP
2121 MONTIEL ROAD PHONE: (760) 839-7302
SAN MARCOS, CALIFORNIA 92069 FAX: (760) 480-7477
CONe OR CMU -----,~r---,.<.-..r'----,141
RET WALL PER
PLAN 4 DETAILS
I-IYDROTITE WATER-
STOPS AT COLO-
JOINTS PER~
INSTALLATION
INSTRLJCTIONS
SLA6 4 VAPOR
6ARRIERPER
PLAN 4
DETAILS
MINIMUM WATERPROOFING
oPEC/FICA TIONo (NOT TO SCALE)
CD
0
®
®
0
FOAM UV PROTECTION SOARD PER
MANLFACTURER'S SPECIFICATION
(iRACf' PROCOR FLUID-APPLIED
WA TERPROOFINGt INST ALLEO PER
MANLFACTURER'S SPECIFICATIONS
4 EXTEND 6EI-IIND CEMENTITOUS
SACKER SOARD.
(iRACf' I-IYDROOUCT 22(1)
INST ALLEO PER MANLFACTURER'S
SPECIFICATIONS OVER
FLUID-APPLIED WATERPROOFINGI
TERMINATION 6AR PER
MANLFACTURER'S
SPECIFICATIONS --------'
FILTER FA6RIC WI 6" MIN LAP
314" GRAVEL (I SF I FT)
4" OIA PERFORATED DRAIN LINE (SC/-1 4fl) OR
EQUIV J PERFORATIONS ORIENTED OOIJI.I I%
MINIMUM (iRAOIENT TO SUIT A6LE OUTLET -
EXACT PIPE LOCATION TO 6E DETERMINED
6Y SITE CONSTRAINTS
® 4" TALL CONCRETE CANT • FT(i I WALL
CONNECTION (LINDER WATERPROOFING).
SLOPE TO 6ACI<. EDGE OF FOOTING.
® ca1PACTEO 6ACI<FILL 9(1)% MIN RELATIVE
COMPACTION IN ALL OTI-IER AREAS U.O.N.
6" MAX LIFTS. ONLY Ll(ii-ITUEI(ii-IT
l-lANO-OPERA TEO EQUIPMENT 8/-IALL 6E USED
WITt-liN 3 FEET OF TI-lE 6ACI<. FACE OF WALL.