CIVIL. GEO TECHNICAL. & QUALITY ENGINEERING
FOUNDATION DESIGN • LAND SURVEYING • SOIL TESTING
CONSTRUCTION MANAGEMENT A INSPECTION
CLIENT: TALLMAN
PROJECT: TAL 900
DATE: 29 SEPT. 2000
MR. & MRS. JEFF TALLMAN
1833 South Coast Highway
Oceanside, CA. 92054
Subject: Results of Compaction Testing and Inspections during Rough Grading for
the lot located at 2339 Pio Pico Drive, Carlsbad, CA. (APN: 156-350-09)
Dear Mr. Mrs. Tallman:
Pursuant to your request, we have completed our Inspection and Compaction
Testing of the rough grading operations for the subject parcel. Locations of our
Field Density Tests are shown on Enclosure (1), and the results of these tests are
detailed on Enclosure (2).
Site preparation, compaction, testing, and inspections were accomplished
between September 5 and 29, 2000. Based on our observations and testing, it is our
opinion that the work performed during that period was in general conformance
with the City of Carlsbad Grading Ordinance and the Approved Grading Plan and is
considered adequate for its intended use.
On September 5, 2000, grading began on the subject lot with the contractor
removing some shrubs and the surface vegetation. All debris was removed from the
pad grading area.
On this date, the contractor excavated for a supporting shear key at the toe of
the westerly facing fill slope for the house pad by removing the loose topsoil
materials to an approximate depth of 2 to 3 feet below the existing surface, where
firm natural ground was encountered. Fill material, native silty sands, generated
from excavations made along the easterly portion of the pad and imported silty
sands, was then watered and recompacted on the house pad. The contractor placed
and compacted the native and imported soils on this fill pad until the design finish
grades were achieved.
1611-A SO. MELROSE DRIVE #285, VISTA, CA 92083-5497 • 760-945-3150 • FAX: 760-945-4221
P& P I3tigjiiiecriiigj, tue.
\ CIVIL. CEO TECHNICAL. & QUALITY ENGINEERING
FOUNDATION DESIGN • LAND SURVEYING • SOIL TESTING
CONSTRUCTION MANAGEMENT & INSPECTION
During the rough grading operation, the contractor over-excavated and
recompacted the soils in the upper 3 feet in the cut portion of the pad to achieve a
uniform fill blanket to help mitigate the effects of differential settlement.
Density was achieved by the use of a D-4 bulldozer and a small trackloader
compacting the soil as fill was placed in thin lifts. Since the existing and imported
soils varied in moisture content, the contractor had to spend additional time and
effort in his mixing operation in order to ensure near-optimum moisture and proper
compaction in the fill material.
As indicated by our Compaction Test Results, Enclosure (2), density tests
performed in the fill soils used for the construction of the house pad indicated over
90% relative compaction as compared to the Maximum Dry Density per ASTM
Test Procedure D 1557-91.
In general, the native and imported materials exposed at finish grades are
considered to have a low expansion potential according to Table 1 8AIB of the
Uniform Building Code.
Foundations shall be sized and constructed in accordance with the
recommendations found in the latter part of this Report. For foundation design
purposes, an allowable bearing strength of 1750 psf may be utilized for all
continuous or spread footings founded in dense native soils compacted to 90%
relative compaction per ASTM D 1557-91. This design bearing value is in
accordance with the Uniform Building Code.
It is recommended that the continuous perimeter foundations and concrete
slabs for a light weight, wood framed, stucco type structure shall be constructed and
reinforced in accordance with the following minimum design criteria:
a. The continuous perimeter foundations shall extend a minimum depth of 24
inches and a minimum width of 15 inches into the compacted fill soils for a two
story structure and a minimum depth of 18 inches and a minimum width of 12
inches for a single story as measured from the lowest adjacent grade. The
continuous foundations shall be reinforced with at least four No. 4 steel bars, two
bars shall be placed 3 inches from the top of the foundation and the other bars shall
be placed 3 inches from the bottom. As an alternative, two No. 5 rebars, one top
and one bottom, may be used in leu of the No. 4 rebars.
1611-A SO. MELROSE DRIVE #285, VISTA, CA 92083-5497 9 760-945-3150 • FAX: 760-945-4221
P&
I Eiigitieeriiig, file.
CIVIL. CEO TECHNICAL, & QUALITY ENGINEERING
FOUNDATION DESIGN • LAND SURVEYING • SOIL TESTING
CONSTRUCTION MANAGEMENT & INSPECTION
Footings which span from native material to compacted fill soils, where
applicable, shall be reinforced with a minimum of one additional No. 5 steel bar top
and bottom to control potential differential movement extending 10 feet on either
side of the daylight line.
Footings placed on or adjacent to fill slopes shall have a minimum
horizontal distance of seven feet (7) from the bottom edge of the footings to the
face of the slope.
All concrete slabs shall be a minimum of four inches in thickness, and
reinforced with a minimum of No. 3 steel rebars at 18 inches on center both ways
and placed in the center of the slab. The steel bars shall be wire tied to the
perimeter foundation steel and bent downward into the foundations at 18 inches on
center to a depth of 3 inches from the bottom. Where moisture sensitive flooring is
anticipated and in order to minimize vapor transmission, an impermeable membrane
(ie: visqueen) shall be placed over 2 inches of non-expansive sandy soil. The
visqueen shall be covered with 2 inches of sand or decomposed granite to protect it
during construction and the sand should be lightly moistened just prior to placing
concrete. All concrete used on this project shall have a minimum compressive
strength of 2500 psi unless otherwise stated on the Building Plan.
These foundation recommendations are minimum design requirements for the
soils encountered during grading; however, actual foundations shall be designed by
the Structural Engineer for the expected live and dead loads, and for wind and
seismic loads.
Findings of this Report are valid as of this date; however, changes in
conditions of a property can occur with passage of time, whether they be due to
natural process or works of man on this or adjacent properties. In addition, changes
in applicable or appropriate standards occur whether they result from legislation or
broadening of knowledge. Accordingly, findings of this Report may be invalidated
wholly or partially by changes outside our control. Therefore, this Report is subject
to review and should not be relied upon after a period of one year.
In the event that any changes in the nature, design, or location of buildings
are planned, the conclusions and recommendations contained in this Report shall
not be considered valid unless the changes are reviewed and the conclusions of this
Report are modified or verified in writing.
3
1611-A SO. MELROSE DRIVE #285, VISTA, CA 92083-5497 • 760-945-3150 9 FAX 760-945-4221
Etiginecriug, Ijic.
CIVIL. GED TECHNICAL, & QUALITY ENGINEERING
FOUNDATION DESIGN • LAND SURVEYING • SOIL TESTING
CONSTRUCTION MANAGEMENT & INSPECTION
This Report is issued with the understanding that it is the responsibility of the
owner or of his representative to ensure that the information and recommendations
contained herein are called to the attention of the project Architect and Engineer
and are incorporated into the plans. Further, the necessary steps shall be taken to
ensure that the contractor and subcontractors carry out such recommendations in the
field.
The Soil Engineer has prepared this Report for the exclusive use of the client
and authorized agents. This Report has been prepared in accordance with generally
accepted soil and foundation engineering practices. No other warranties, either
expressed or implied, are made as to the professional advice provided under the
terms of this agreement, and included in the Report.
B & B Engineering Inc. and Associates appreciate this opportunity to be of
service. Should you have any questions regarding this project, please do not
hesitate to contact us.
Sincerely,
OFESS,0
C.
RGE 127
Exp. 121/O1
CH
/;h4ur C. Beard RC
Chief Engineer
El
1611-A SO. MELROSE DRIVE #285, VISTA, CA 92083-5497 • 760-945-3150 • FAX: 760-945-4221
14LVC ; Eiiqiiieei•iiiq, Inc.
CIVIL, CEO TECHNICAL, & QUALITY ENGINEERING
FOUNDATION DESIGN • LAND SURVEYING • SOIL TESTING
CONSTRUCTION MANAGEMENT & INSPECTION
CLIENT: TALLMAN
PROJECT: TAL FTG
DATE: 6 OCT. 2000
CITY OF CARLSBAD
1635 Faraday Avenue
Carlsbad, CA. 92008-7314
Attention: Engineering/inspection Departments
Subject: Soils Engineer Certification for the project located at 2339 Pio Pico Drive,
Carlsbad, CA.(APN: 156-350-09)(CDP 99-18)(Dwg 388-1A)
Gentlemen:
Pursuant to the City of Carlsbad requirements, this letter will serve as
confirmation that the foundation plans and specifications have been reviewed for
the subject project. We have determined that the recommendations in our.
Preliminary Geotechnical Soils Investigation Report dated 27 June, 1998, have been
properly incorporated into the construction documents.
,çOFESSi0'
ROE 127
E.1v1/oi
OF CA0*
Sincerely,
,ArthurC. B-e gr-8 RCE RGE
Chief Engineer
1611-A SO. MELROSE DRIVE #285, VISTA, CA 92083-5497 9 760-945-3150 • FAX: 760-945-4221
NOT
01/
V
O'
110.55
/ I
\ ,r k, Z TGIO. / 5 PRIVATE UTILITY EA5E/TENT a lola,
5
/
112.27
RTH BERM
Of SLOPE
- \Ng 9 0554 51F
- \ N
TN,/ON- ( .7 \ Asphalt
65
APN 156-351-05
10 •APPROXIMATE LOCATION OF FIELD DENSITY TESTS
PLOT PLAN
OWNER: t'112., I MV-5 JE. TAWft)A\) i" IP eIP
LOCATION: 39 p) PIC Di2.Ii1E IP&IPIsIIfJllIecrIIIg,mc.
CIVIL, GEOTECHNICAL, & QUALITY ENGINEERS
C tL..S A 0 C 4. 1Y • STRUCTURAL ENGINEERING • LAND SURVEYING
,-•.. • PERCOLATION & SOIL TESTING
A. P. N. : 3 SO ' 9. -CONSTRUCTION MANAGEMENT & INSPECTION
PROJECT:Ti4L 900 DATE: 9190clo .
ENCLOSURE (1)
ç ,.•'.
CLIENT:TALLY1Ar'J
itSO L11 Y mccrilml iliC.
GEOTECHNICAL, & QUALITY ENGINEERS
D SURVEYING STRUCTURAL ENGINEERING • LAN
PERCOLATION 6 SOIL. TESTING
CONSTRUCTION MANAGEMENT 6 INSPECTION
P3ECT: A'L- 990 flOJE: EP7 9
Test
No.
Test
Date
Test
Location
Test
El/Depth
Soil
Type
Dry Density, pcf Moisture, % Relative
Compaction
Retest
No. Field Maximum Field Opt.
L 9/7 /-/O(J56 0 4 //9 I 32 .., 8,8 .67
/I,i',
I, 95
/25,7-j it 9,3
9/if 15 /23 /3o5 9,3 /thO 94
/2/3 io.i 9
ii " ii v 1Z9,Z
______ /O. 90
ii ' /Z9.7 /019
*
COMPACTION CURVE DATA
SOIL TYPE AND DESCRIPTION 0 OPTIMUM
MOISTURE%
MAXIMUM DRY
DENSITY (pcf)
A, 74-1V - A137- 840uiA) 5'/-P ,1-1JL .
S. 74-fl). - 8iJ
0 /0,0 .• : / O. 5
COMPACTION TEST DATA 0 ENCLOSURE (Z)