HomeMy WebLinkAboutCE 83-21; CALAVERA HILLS SUBDIVISION; SEWER LIFT STATION STUDY; 1984-04-20(' 0'
CALAVERA HILLS -VILLAGE 0 & P-l, UNIT 12
Sewer Lift Station Study
Prepared For:
Pacific Scene Inc.
3900 Harney Street
San Diego, California 92110
Prepared By: .
Rick Engineering Company
5620 Friars Road
San Diego, California 92110
Job No. 9114
February 17, 1984
Revised
April 20, 1984
APPROVED
','
•
-The purpose of this study is to determine the average d~ily
discharge and the peak discharge which should be used for the
design of the sewer lift station. This study will a1&0 be used
to proportion the costs associated with the sewer lift station
between the property owners whose property is served by the lift
station.
The area that will be served by the lift station is presently
owned by two property owners. They are:
Pacific Scene Inc.
3900 Harney Street
San Diego, CA 92110
CESCO Development Corp.
110 West "C" St.
Suite 1220
San Diego, CA 92101
, , ,,~, . '. ,-
•
SUMMARY
Below are the total design flows as well as the flows contributed
by each property owner.
Pacific Scene Inc. -Contributive Discharge
Average Daily Discharge ------~---------------0.l4 MGD
Peak Discharge -------------------------------0.34 MGD
CESCO Development Corp. -Contributive Discharge
Average Daily Discharge ----------------------0.08 MGD
Peak Discharge -------------------------------0.21.AGD
TOTAL DISCHARGE
Average Daily Discharge ---------------------~ 0.22 MGD
Peak Discharge -------------------------------0.55 MGD
2
;,.,
CALCULATIONS
Pacific Scene Inc.
Village
o & P-l
N
L-1
TOTAL D.U.
Dwelling Unit
406
25
120
551
•
Average Daily Flow = 551 x 247 = 0.14 MGD
Peak Flow = 2.5 x 0.14 = 0.34 MGD
Cesco Development Corp.
Village
M
Q
L-2
TOTAL D.U.
Dwelling Unit
40
204
90
334
Average Daily Flow 334 x 247 = 0.08 MGD
Peak Flow = 0.08 x 2.5 = 0.21,MGD
TOTAL FLOW
Average Daily Flow = 0.14 + 0.08 = 0.22 MGD
Peak Flow = 0.34 + 0.21 = 0.55'MGD
3
NOTES
1. Demand and peak ing factors used are per City o·f Carlsbad
Standards.
2. Dwelling Unit count for Village 0 and P-l are per approved
Tentative Map of Carlsbad Tract 83-21.
3. Dwelling Unit count for Village Nand M are maximum al~owed
per the Calavera Hills Master Plan.
4. Dwelling Unit count for L-l are calculated using 15 PU/Ac.
This is used in lieu of 20 DU/Ac. per the CalaveraHills
Master Plan because of rough terrain.
5. Dwelling Unit count for Villages Q and L-2 are per infor-
mation received from C.W. Christensen and Associates. (Se.e
attached letter).
4
p.
CHARLES W. CHRISTENSEN
& ASSOCIATES
CIVIL ENGINEERS
444 WEST C STREET
SUITE 400
SAN DIEGO
CALIfORNIA 92101
(6I9123l· 7191
April 13, 1984
Mr. Cal Frey
CESCO DEVELOPMENT COMPANY
110 west "C" Street, Suite 1220
San Diego, California 92101
Subject: Sewage Flow to Proposed pump Station
in Village 0 and P-l
Dear Cal,
The 204 units of Village Q added to the 90 units
possible in Village L-2 will sewer to the pro-
posed pump station in Villages 0 and P-l. The
204 living units of Village Q will be single
family detached on small lots. The 90 possible
units in village L-2 are multi-family with pro~
bably 4 to 8 living units per building.
If I can be of further assistance please do not
hesitate to contact me.