HomeMy WebLinkAboutCT 00-02; CALAVERA HILLS PHASE 2; DESILTING BASIN CERTIFICATION; 2003-03-03C-roo-o2-
C 0 N S U L T A N -r S
--
Civil Engineering Surveying
April 3, 2003
J.N.: 98-1020-1
Via:'Fax
Mr. Joe McMahon
City of Carlsbad
5950 El Camino Real
Carlsbad, CA 92008
RE: Ca1avera Hills II Desilting Basin
Dear Mr. McMahon:
Based on a field survey performed by O'Day Consultants on March 31, 2003, I have
determined that the existing desilting basin located at the north end of Village W of
Calavera Hills is built in accordance with the State Water Resources Control Board's
requirements for sediment control as specified in the fact sheet for the Water Quality
Order 99-08 DWQ.
Very truly yours,
ESSIo O'DAY CONSULTANTS, INC.
ca C60 23 ca M
cc EXP _ Keith Hansen
Registered Civil Engineer
KIH:eg
C')ay :c is tuns Ii;. E-mail: oday@o6ayconsultniis.corii
2710 Loker Avenue West, Suite 100 Website: wvvw,odaycoiisultanls.ccii:
Carlsbad. Calitomia. 920066603 • Tel: 760931.7700 Fax: 760931.8680