HomeMy WebLinkAboutCT 00-06; BRESSI RANCH; FLEXIBLE PAVEMENT RECOMMENDATIONS; 2006-03-206r 00 - op
Geotechnical Engineering
Construction Inspection
Materials Testing
Environmental
Office Locations
Orange County
Corporate Branch:
2992 E. La Palma Avenue
Suite A
Anaheim, CA 92806
Tel: 714.632.2999
Fax: 714.632.2974
March 20, 2006
Mr. Clint Fowler
Lusardi Construction Co.
1570 Linda Vista Drive
San Marcos, CA 92078
Subject: Flexible Pavement Recommendations
With Lime Treated Subgrade
Project No. 1446-A03
Log No. 06-368
San Diego
Imperial County
7313 Carroll Road
Suite G
San Diego, CA 92121
Tel: 858.537.3999
Fax: 858.537.3990
Central Dispatch
800.491.2990
www.mtglinc.com
Project: Loker Business Center
NWC Palomar Airport Road & Loker Avenue West
Carlsbad, CA
Permit No. CB052695
Dear Mr. Fowler:
We understand that the prepared subgrade under pavement is currently yielding or unstable
as a result of the recent rain. Due to the yielding subgrade, it is planned to treat the current
subgade soil with lime. In conjunction with this and as you requested, we have obtained a
representative soil samples on the current subgrade soil under proposed pavement for R-
value testing mixed with lime.
Laboratory Testing
Two soil samples were prepared mixed with 6 percent and 7 percent lime by weight and
the R-value testing was performed in general accordance with Caltrans Test Method 301.
The R-value results are summarized below.
Sample No. R-Value
With 6%lime 61
With 7 % lime 78
A higher R-value result was obtained for the soil mixed with lime compared to an untreated
soil that was previously tested resulting to a R-value of between 11 and 15 (MTGL, Inc.
report dated February 8, 2006). Our analysis presented in this report utilized a R-value of 61
(with 6 percent lime by weight).
Los Angeles
Ventura County
13010 San Fernando Road
Unit 1
Sylmar, CA 91342
Tel: 818.833.8100
Fax: 818.833.0085
Inland Empire
14320 Elsworth Street
Suite C1O1
Moreno Valley, CA 92553
Tel: 951.653.4999
Fax: 951.653.4666
Loker Business Center Project No. I446-A03
Carlsbad, CA Log No. 06-368
Pavement Structural Section
Our engineering analysis included a Traffic Indexex of 4.5, 6.0 and 7.0 for auto parking stalls,
auto driveways and fire lane/heavy trucks, respectively; which are consistent with the
recommendations of Geocon Inc. that were presented on their geotechnical report dated
December 17, 2003. Based upon our engineering analysis following the standard design
procedures for flexible pavement as outlined in Caltrans Highway Design Manual, the
required pavement sections are as follows:
Traffic Index R-Value w/ 6 Percent Asphalt Concrete Aggregate Base
Lime
4.5 Auto Parking 61 3.0 or 4.0 inches 0.0 inches *
Stall
6.0 Auto Driveway 61 3.0 inches 2.0 inches *
or or
4.0 inches 0.0 inches *
7.0 Fire Lane/Heavy 61 4.0 inches 2.0 inches *
Trucks
NOTE: * Do not conform with the minimum per Supplemental Standard No. GS-17 by
the City of Carlsbad. As such, the minimum structural section to be implemented to
conform with the Supplemental Standard No. GS-17 shall be as follows:
Traffic Index R-Value w/ 6 Percent Asphalt Concrete Aggregate Base
Lime
4.5 Auto Parking 61 4.0 inches 4.0 inches
Stall
6.0 Auto Driveway 61 4.0 inches 6.0 inches
7.0 Fire Lane/Heavy 61 4.0 inches 6.0 inches
Trucks
Lime Treatment
The extent of the lime treated subgrade should be at least 12 inches deep, but not to exceed
15 inches. Based upon the results of the R-value testing, we recommend at least a mixture
of 6 percent lime by weight. Preparation of subgrade, spreading and mixing lime,
spreading and compacting, and curing shall be in accordance with the Greenbook, Standard
2
Loker Business Center Project No. 1446-A03
Carlsbad, CA Log No. 06-368
Specifications for Public Works Construction (SSPWC) Section 301-5, 2006 Edition. A
specialty contractor with appropriate equipment is anticipated to perform the work.
Lime treated subgrade soil shall be compacted to at least 95 percent relative compaction
based on Test Method ASTM D1557.
Aggregate Base Material
Base material under pavement areas shall conform to the requirements of Caltrans Section 26
or Section 200-2 of the SSPWC. Base material shall be spread and compacted in layer not to
exceed 6 inches thick. Aggregate base shall be moisture conditioned to near optimum
moisture content during placement. The relative compaction of each layer of compacted base
material shall not be less than 95 percent per Test Method ASTM Dl 557. Compaction testing
shall be performed to verify compliance.
Asphalt Concrete
Asphalt concrete shall be dense, hot-laid, hot mix asphalt plant mixes with a history of
satisfactory performance in geographical area where project is located and approved by
authorities having jurisdiction. Hot-mix asphalt paving materials, workmanship and other
requirements shall be in accordance with Section 203-6 of the SSPWC.
Geotechnical ObservationlTesting
The geotechnical consultant shall perform geotechnical observation and testing to ascertain
that conditions corresponds to the findings and conclusions and that construction conform
generally to the recommendations presented herein.
If you have any questions regarding our report, please do not hesitate to contact this office.
We appreciate this opportunity to be of service.
Respectfully submitted,
MTGL, Inc.
Eduardo C. Dizon, RCE
Project Engineer
RCE 57217, Exp. 12/31/07
cc: Mr. Casey R. Arndt / City of Carlsbad
Attachment: R-Value Lab Result
3
R-VALUE TEST REPORT
100
80 -
------------- 60
a) -
Of
40
20
LU_L JJJJ JJJJ LLLL JJJI 0 .LLLL JJJJ. JJJJ JJJJ. 1.L.LL LLLL LLLL JJJJ. JJJJ.
800 700 600 500 400 300 200 100
Exudation Pressure - psi
Resistance R-Value and Expansion Pressure - Cal Test 301
No.
Compact.
Pressure
psi
Density
pcf
Moist.
%
Expansion
Pressure
psi
Horizontal
Press. psi
@ 160 psi
Sample
Height
in.
Exud.
Pressure
psi
R
Value
R
Value
Corr.
240 96.3 25.8 0.18 85 2.57 102 34 35
2 350 100.7 23.8 0.39 64 2.64 204 47 50
3 350 102.8 20.1 1.18 22 2.40 715 82 80
Test Results Material Description
R-value at 300 psi exudation pressure = 61 CLAY (CL), yellowish tan with 6% lime added
Project No.: 1446-A03
Project:Loker Business Park
Location: Main parking tot
Date: 3/19/2006
Tested by: SF1
Checked by: ED
Remarks:
Lab #0147
Figure
R-VALUE TEST REPORT
MTGL, Inc.
RESISTANCE R-VALUE TESTING RESULTS
(Cal Test 301)
Date:
Project No.:
Project:
Location:
Material Description:
Tested by:
Checked by:
Remarks:
3/19/2006
1446-A03
Loker Business Park
Main parking lot
CLAY (CL), yellowish tan with 6% lime added
JH
ED
Lab #0147
Compaction pressure (psi):
Wet weight (gins):
Dry weight (gins):
Tare weight (gins):
240
1341.1
1066.2
0.0
350
1320.0
1066.2
0.0
350
1280.0
1066.2
0.0
Moisture: 25.8 23.8 20.1
Exudation load (lbs.) : 1280 2560 8980
Exudation pressure (psi): 102 204 715
Total weight (gins.):
Mold weight (gins.):
3048.0
2021.0
3111.0
2025.0
3003.0
2026.0
aznplewéight (gins.): 1027.0 1086.0 977.0
Initial expansion (x10,000) :
Final expansion (xlO,000) :
0
6
0
13
0
39
Ixpansion pressure (psi): 0.18 0.39 1.18
Ph at 2000 lbs.:
D turns:
85
4.36
64
4.30
22
3.52
34 47 82
Height (in.): 2.57 2.64 2.40
)ry density (pcf) : 96.3 100.7 102.8
orrectedR: 35 50 80
R-Value at 300 psi exudation pressure = 61
MTGL, Inc.
R-VALUE TEST REPORT
100
- - -
80 -
60
a) -
40
20
0 :LLJ_L LLLL LLII ILLL .JJJJ. ..LLLL 1JJJ .LLII LLLJ. JJJJ LIJJ LLLL JJJJ. ±.L.LL
800 700 600 500 400 300 200 100
Exudation Pressure - psi
Resistance R-Value and Expansion Pressure - Cal Test 301
No.
Compact.
Pressure
psi
Density
pcf
Moist.
%
Expansion
Pressure
psi
Horizontal
Press. psi
@ 160 psi
Sample
Height
in.
Exud.
Pressure
psi
R
Value
R
Value
Corr.
350 92.4 18.8 1.42 19 2.40 715 86 85
2 350 105.5 20.6 0.52 21 2.45 379 83 83
3 350 104.6 21.5 0.82 39 2.66 250 70 73
Test Results Material Description
R-value at 300 psi exudation pressure = 78 CLAY (CL), grayish green with 7% lime
added
Project No.: 1446-A03
Project:Loker Business Park
Location: North west parking lot
Date: 3/19/2006
Tested by: JH
Checked by: ED
Remarks:
Lab #0148
Figure
R-VALUE TEST REPORT
MTGL, Inc.
RESISTANCE R-VALUE TESTING RESULTS
(Cal Test 301)
Date:
Project No.:
Project:
Location:
Material Description:
Tested by:
Checked by:
Remarks:
3/19/2006
144 6-A03
Loker Business Park
North west parking 1t
CLAY (CL), grayish green with
JH
ED
Lab #0148
7% lime added
Compaction pressure (psi) :
Wet weight (gins):
Dry weight (gins):
Tare weight (gins):
350
1300.0
1094.3
0.0
350
1320.0
1094.3
0.0
350
1330.0
1094.3
0.0
Moisture: 18.8 20.6 21.5
Exudation load (lbs.): 8980 4760 3146
Exudation pressure (psi): 715 379 250
Total weight (gins.):
Mold weight (gins.):
2891.0
2022.0
3045.1
2017.0
3146.0
2030.0
ampleweig1it (gins.): 869.0 1028.1 1116.0 7
Initial expansion (xlO,000) :
Final expansion (xlO,000) :
0
47
0
17
0
27
Expansion pressure (psi): 1.42 0.52 0.82
Ph at 2000 lbs.:
D turns:
19
3.09
21
3.31
39
3.30
86 83 70
Height (in.): 2.40 2.45 2.66
ry density (pcf): 92.4 105.5 104.6
orrectedR: 85 83 73
R-Value at 300 psi exudation pressure = 78
MTGL, Inc.