HomeMy WebLinkAboutCT 00-20; FOX MILLER PROPERTY; PAVEMENT RECOMMENDATIONS SALK AVE; 2006-05-23c1 co •2-O
* GEOCON
* INCORPORATED
GEOTECHNICAL CONSULTANTS
Project No. 07238-42-03
May 23, 2006
H. G. Fenton Company
7577 Mission Valley Road, Suite 200
San Diego, California 92108
Attention: Mr. Allen M. Jones, AICP
Subject: FOX MILLER PROPERTY
SALK AVENUE 7+50 TO 27+50
CARLSBAD TRACT C.T. 00-20
CARLSBAD, CALIFORNIA
PAVEMENT RECOMMENDATIONS
Gentlemen:
In accordance with your request, we have performed supplemental geotechnical services for the
subject roadway within the Fox Miller property, Tract C.T. 00-20 in Carlsbad, California. The scope
of our services included obtaining representative subgrade samples within the street and performing
Resistance Value (R-Value) and Sand Equivalent tests. The purpose of our work was to provide
pavement design recommendations. To aid in preparing this letter, we have reviewed the
improvement plans entitled Improvement Plans for: Fox Miller Property, prepared by O'Day
Consultants, City of Carlsbad approval date January 11, 2006, and our report entitled Update
Geotechnical Investigation, Carlsbad Tract CT-00-20, Carlsbad, California, prepared by Geocon,
Incorporated, dated April 22, 2004 (Project No. 07238-42-01).
Subgrade soils in the Fox Miller property are predominantly clayey silt with a trace of fine sand, and
exhibit relatively low to moderate R-Value characteristics. Based on field observations and laboratory
tests in the project, subgrade materials possess an expansion potential of "medium" (Expansion Index
between 50 and 90) as defined by Uniform Building Code (UBC) Table 18-I-B.
Geocon Incorporated has performed R-Value and Sand Equivalent testing on samples of subgrade
materials obtained from the referenced street in order to provide recommended structural pavement
sections for Salk Avenue between Stations 7+50 to 27+50 in the Fox Miller Property (C.T. 00-20) in
Carlsbad, California. The surface samples were collected at our discretion at approximately 300 foot
spacing based on observed soil conditions. Results of the R-Value and Sand Equivalent tests are
summarized on Table I below.
6960 Flanders Drive • San Diego, California 92121-2974 0 Telephone (858) 558-6900 0 Fax (858) 558.6159
TABLE I
SUMMARY OF R-VALUE AND SAND EQUIVALENT TEST RESULTS
Sample Number Sample Location/Represents R-Value Sand Equivalent
R-3 Salk Avenue 7+50 to 10+50 16 13
R-4 Salk Avenue 10+50 to 13+50 10 12
R-5 Salk Avenue 13+50 to 16+50 17 17
R-6 Salk Avenue 16+50 to 19+50 17 16
R-7 Salk Avenue 19+50 to 22+50 18 13
R-8 Salk Avenue 22+50 to 25+50 18 15
R-9 Salk Avenue 25+50 to 27+50 17 16
Calculations to determine pavement section recommendations utilized the R-Values above and a
Design by the project civil engineer. Design procedures provided by the
California Department of Transportation Highway Design Manual, Section 608.4, and the City of
Carlsbad Minimum Structural Standard GS-17 were utilized to calculate the structural pavement
sections. Based upon these criteria, we have calculated the following pavement sections shown on
Table II.
TABLE II
RECOMMENDED STRUCTURAL PAVEMENT SECTION
Street Name and Station Design R-Value Asphalt Concrete (inches) Class 2 Base (inches)
Salk Avenue 7+50 to 10+50 16 4.0 15
Salk Avenue 10+50 to 13+50 10 4.0 16.5
Salk Avenue 13+50 to 16+50 17 4.0 14.5
Salk Avenue 16+50 to 19+50 17 4.0 14.5
Salk Avenue 19+50to22+50 18 4.0 14.5
Salk Avenue 22+50 to 25+50 18 4.0 14.5
Salk Avenue 25+50 to 27+50 17 4.0 14.5
Prior to placing aggregate base materials, the subgrade should be scarified to a depth of at least 12
inches; moisture conditioned and compacted to at least 95 percent of relative compaction. Base
materials should also be compacted to at least 95 percent of relative compaction.
Class 2 aggregate base should conform to Section 26-1.02A of the Standard Specifications of the
Stale of California, Department of Transportation (Caltrans). Asphalt concrete should conform to
Section 203-6 of the Standard Specifications for Public Works Construction (Greenbook). Asphalt
concrete should be compacted to at least 95 percent of Hveem maximum density.
Approved structural pavement sections will be provided by the City of Carlsbad. Copies of this letter,
including pavement section calculations and the R-Value and Sand Equivalent data sheets are being
Project No. 07238-42-03 - 2 - - May 23, 2006
provided to the City of Carlsbad Public Works Department for their review and subsequent pavement
section determination.
Should you have questions regarding this letter, or if we may be of further service, please contact us
at your convenience.
Very truly yours,
GEOCON INCORPORATED
Idn y . Mikesell
GE25 3 -----
No.2533
EXP.
c
EXP.O6m ))) ly F. Rzonca
CEG 1191
RCM:GFR:anh
Enclosures: R-Value Data Sheets
Sand Equivalent Sheets
(2) Addressee
(2) J. T. Kruer & Company
Attention: Mr. Chuck Knight
(2/del) J. T. Kruer & Company, Jobsite Trailer
Attention: Mr. Chuck Sanfilippo
Project No. 07238-42-03 - 3 - May 23,
FIGURE 1
PAVEMENT SECTION CALCULATIONS
FOX MILLER PROPERTY, CARLSBAD, CALIFORNIA
Salk Avenue 7+50 to 10+50
Use subgrade R-Value = 16.0
Traffic Index (TI) = 7.5
Methodology = CALTRANS Highway Design Manual Section 608.4
GE for AC = (0.0032)( 7.5)(100-78.0) = .53 feet
from Table 608.413 Highway Design Manual
GE = .53 feet for AC yields actual thickness = 3.15 inches
Use AC thickness = 4.0 inches
GE for AC thickness used = .67 feet
GE for base = (0.0032)( 7.5)(100-16.0) - .67 = 1.35 feet
from Table 608.413 Highway Design Manual with GF for Class 2 base = 1 .1
Base thickness = 14.68 inches
Use base thickness = 15 inches
Design Street Structural Section
Asphalt Concrete Thickness = 4.0 inches.
Class 2 Aggregate Base Thickness = 15 inches.
Salk Avenue 10+50 to 13+50
Use subgrade R-Value = 10.0
Traffic Index (TI) = 7.5
Methodology = CALTRANS Highway Design Manual Section 608.4
GE for AC = (0.0032)( 7.5)(100-78.0) = .53 feet
from Table 608.413 Highway Design Manual
GE = .53 feet for AC yields actual thickness = 3.15 inches
Use AC thickness = 4.0 inches
GE for AC thickness used = .67 feet
GE for base = (0.0032)( 7.5)(100-10.0) - .67 = 1.49 feet
from Table 608.413 Highway Design Manual with GF for Class 2 base = 1 .1
Base thickness = 16.25 inches
Use base thickness = 16.5 inches
Design Street Structural Section
Asphalt Concrete Thickness = 4.0 inches.
Class 2 Aggregate Base Thickness = 16.5 inches.
Project No. 07238-42-03 May 23, 2006
FIGURE 1 (Continued)
PAVEMENT SECTION CALCULATIONS
FOX MILLER PROPERTY, CARLSBAD, CALIFORNIA
Salk Avenue 13+50 to 16+50, 16+50 to 19+50, and 25+50 to 27+50.
Use subgrade R-Value = 17.0
Traffic Index (TI) = 7.5
Methodology = CALTRANS Highway Design Manual Section 608.4
GE for AC = (0.0032)( 7.5)(100-78.0) = .53 feet
from Table 608.4B Highway Design Manual
GE = .53 feet for AC yields actual thickness = 3.15 inches
Use AC thickness = 4.0 inches
GE for AC thickness used = .67 feet
GE for base = (0.0032)( 7.5)(100717.0) - .67 = 1.32 feet
from Table 608.4B Highway Design Manual with GF for Class 2 base = 1 .1
Base thickness = 14.42 inches
Use base thickness = 14.5 inches
Design Street Structural Section
Asphalt Concrete Thickness = 4.0 inches.
Class 2 Aggregate Base Thickness = 14.5 inches.
Salk Avenue 19+50 to 22+50 and 22+50 to 25+50
Use subgrade R-Value = 18.0
Traffic Index (TI) = 7.5
Methodology = CALTRANS Highway Design Manual Section 608.4
GE for AC = (0.0032)( 7.5)(100-78.0) = .53 feet
from Table 608.4B Highway Design Manual
GE = .53 feet for AC yields actual thickness = 3.15 inches
Use AC thickness = 4.0 inches
GE for AC thickness used = .67 feet
GE for base = (0.0032)( 7.5)(100-18.0) - .67 = 1.30 feet
from Table 608.4B Highway Design Manual with GF for Class 2 base = 1 .1
Base thickness = 14.16 inches
Use base thickness = 14.0 inches
Design Street Structural Section
Asphalt Concrete Thickness = 4.0 inches.
Class 2 Aggregate Base Thickness = 14.0 inches.
Project No. 07238-42-03 May 23, 2006
Exudation Pressure '2O(5
Exudation PSI ; O
Stability Ph 12
Turns Displacement
R-Value ) 5
Corrected R-Value ,( S
Thick by Stab./Foot
Expansion Reading
Thick/Exp. Press/Foot
Moisture Content
Dry Density
I ioo
w
50
40
80
70
60
30
20
10
0
800
---
-- --
------
----------------
__pp___ ------
-
---------- --- ---------------
--------------
----
------
------
--------------
---------------
------- ------
KAI
--- ,-,—=— -----__
d= turn displacement
Ph= reading at 2000
R=100- ' 100
(2.51d)[(160/Ph-1)+1
R-Value by Expansion 3'7 70 600 50 400 300 200 100 0 R-Value by Exudation /7
.!!IPRESSURE(PSI) H R-Value by Equilibrium- V -
I,LO Ti
/,(/-
ri
)D\
IS z5
. I
SAMPLE DESCRIPTION: '
Stab/ft.
2 1.5 1
3/4,,
3/8"
#4
Tot
Wt. Ret. I % Ret. IBatch Wt. I % Used I Batch
GEOCON
0 R - Value Data Sheet.
Project Name ) I Project No '
Location / - ., 2 4 Sample No
Mold
Wet Wt
Dry Wt .1
Batch Weight - -. .
Humidifying Moisture -
% Moist: IOZ Moisture Added LL. T2
Setup By Date
7( Soil 'rMold Is 7l9
Mold "7T-4 '$ ' 'i -T/
Camp By
Stab, By: Date:
Caic By Date
Soil f) /O /O
Foot P1 )'D 2L?
Heigof Sample
GEOCON-
0 R Value Data Sheet
Project Name: Project No.: 7' 8 .-
Location: SmnlNn DLJ
Mold I
Wet Wt:
Dry Wt: J % Moist i 3
Set up By 'Date -"
Corn By:
Stab, Pj Date3/ /O
Calc. By: Date:
Wt. Ret. Ret. Batch Wt. % used Batch
3133
3ZD0
Batch Weight
Humidifying MOisture 4 £'.,:
Moisture Aded /O I %Z
SoihMold
Mold WPII Z11
Soil Ø // h7c L
Foot PSI ( S 100 70
_____ ______
Height of Sample Z ,5-R- Z.53 1.55
Exudation Pressure ,005 70
Exudation PSI 9 O 50
Stability Ph
Turns Displacement
:;
R-Value P-I L)
Corrected R-Value #4 L
Thick by Stab /Foot ? •Z Tot
?1' \S
Expansion Reading L I, 7j2,
Thick/Exp. Press/Foot I - / .'- SAMPLE DESCRIPTION L
Moisture Content
A~o Dry Density " ' "- -
100
70
50
50
40
20
1:
Stab/ft.
215 1 05 0
__-_.______
07ij,
0.5 .
±1 I — -
IIII1LII.JIIIIIlI}IIH E EE = H± :LIJ:i J: 15 EE EEE EEE E
Z,11 ILL LL IJ I _i_30. EIEIEE EE JLL 2
= d= turn displacement
Ph= reading at 2000 LjH
800 700 600 506 400 300 200 100 0
EXUDATION PRESSURE (PSI)
-- ---------J r' t.
R.-Value by Exudation
R-Value by Equilibrium
GEOCON
INC,OR P0 R A T ED
Project Name:
0 R - Value Data Sheet
Project No. :'7 -
- - - I k I fJ L %laULILJII._.jq\ /•8 f rfr ( L./b.QdUlpI INU.
Mold V ) I PL
Wet Wt:
Dry Wt:
% Moist 7 l'
Setup Date
Comp By 7'e G
Stab. By: Datej
Caic. By: Date:
___________ ______ ______ _____ ______
Wt Ret % Ret Batch Wt.. %Used Batch
Batch Weight n012 12,64)
Humidifying Moisture Lj i7 4'i3
Moisture Added
Soil -r Mold '1'!
Mold ((2 1 2 2f(
Soil ik /OS
__-
Foot PSI 1U&
Height of Sample
Exudation Pressure 7 XL) :•C() (:)
______ ______
Exudation PSI -/()
Stability Ph
Turns Displacement L( 0°) 3/4"
R-Value 2?_ .1 S
Corrected R-Value 2 -'a_ lb
Thick by Stab/Foot
_____ h ç•- L12\
_____ ______
Tot 1 71-73
Expansion Reading
Thick/Exp. Press/Foot (Z) (0C 27 SAMPLE DESCRIPTION:
Moisture Content 2.J17: ,2,,
..• Oy <c7-- /
Dry Density
100
80
70
60
w
50
10
Stab/ft
2 1.5\_1 0.5 0
1!IIiJ
05
77
CL
15
::
d= turn displacement
Ph= reading at 2000
R10.0- 100
(2.5/d)[(160/Ph-1]+-1
PVIiit h, Fwn nn I
20
-i-.i -
____
--1- _____ _____ -H--- —j----- ----
GEOCON
0 IN CO HP ORATE D
Project Name: \-ox I '1ft.(- Project No.: G/l-°
Location: 1\ i\-\re.- 1-oo Sample No.
R-Value Data Sheet
Mold
Wet Wt: 56o .
Dry Wt: 4(
% Moist:
Setup By: C Date: 5//oI
Comp By
Stab. By: tC} Date: SI,2I
Caic. By: Date:
Wt. Ret. Ret. Batch WI_1%_Used Batch
Batch Weight 1-0 -" l )_
Humidifying Moisture 'I3
Moisture Added ' I 20 - , L( 'I
Soil + Mold
Mold 2 /71 /(. '71)7
Soil /od7f 'C?D
Foot PSl ig 7i
Height of Sample 7 Z
Exudation Pressure
Exudation PSI {
Stability Ph 1% i" /6'
Turns Displacement '-f.i.3 I(4 JO 3/4" ? 0.7
R-Value fc, 3/8' 417 P 77 75
Corrected R-Value (7 / 7 —j #4 / . / ...! f.. /
Thick by Stab./Foot Tot 33
Expansion Reading
Thick/Exp. Press/Foot SAMPLE DESCRIPTION: f\L- 64iJ
Moisture Content '- _______ _______ _______
(S ' - " -'&i•e c'
Dry Density
100
80
70
5
40
20
10
0
- Stab/ft. 2 1.5 1 0.5 0
- - - - - -
EFEE
'El !E11
0.5
'I
60
CL
0
2 EE
____
d= turn displacement
Ph= reading at 2000
R=100- 100
(2 5/d)[(160/P1 ]1
R_VnItip 1w Ernnsinn
—H --
___
GEOCON O-w R -Value Data Sheet
Project Name:ty rLL:*<. Project No.:. -
nrtin Jz: ' Sample No. Q7
Mold .
.Wt:
Dry Wt L( d
% Moist: ..:...
Set up By:
Stab. 0-iC)-' Date: V
Cac. By: Date:
___________
Batch Weight Wet
Humidifying Moisture - L
Moisture Added 10 2,-j ,.o I C
Soil + Mold
Mold '7O ?IZO.7 7 'j7"/
Soil I't /!
Foot PSI PSi . < 2O I
Height of Sample 2'I Y?D
Exudatibn Pressure 4(3 ç/')
______ ______
Exudation PSI 17 o 7.72. 'i'-iO -
Wt. Ret. % Ret. Batch Wt. % Used Batch
Stability Ph N I.. Ui', ._L. \1
Turns Displacement '-i. JO V 3/4
R-Value (7 7 (9 3/8" -.3
Corrected R-Value 7 #4 *VV• .D
______
C. :. _____
Thick by Stab/Foot (9 12,Z Tot ..
Expansion Reading L4
Thick/Exp. Press/Foot 37 I 3 .7 SAMPLE DESCRIPTION
Moisture Content 7Lf2
Dry Density 97.
70
60
50
4
::
20
10
— Stab/ft 2 1.5 1 0.5 0 100 ._______ - - i
90
80
0.5 TFL I
- — - lei I rT = = — — — EEEEEEEEEEEEEEEE :T::: --L+4--1
-----
__ EEEEEEEEEEEE EEEEEE
EW
:
1.5
A U
I d= turn displacement
Ph= reading at 2000
R=100- 100
(2.5/d)[(160/Ph-1 +1
R-Vlue by Exoansion 221
iT = - - --- - - -
___ ___ ___ ___
800 700 600 500. 400 1300 ., 00 100 0 RLVaIue by Exudation
EXUDATION PRESSURE (PSI) R-Value by Equilibrium
d= turn displacement
Ph= reading at 2000
R100- 100
(2.5/d)[(160/Ph-1A+1
R-Value by Expansion
R-Value by Exudation
R-Value by Equilibrium L
GEOCON INCORPORATEr)0
Project Name: /
R Value Data Sheet
Project No.: -
Location: cAt iC A Sample
Mold
Wet Wt: C.
Dry Wt: -Lc/
% Moist: /))
Batch Weight .
Humidifying Moisture
Moisture Added .. 7>'
Soil + Mold ."q r Moid:..
Soil /c /102. I /(C{
Foot PSI
Height of Sample
Set up By: Date:
Stab, By: (,,U Cu Date:
Caic. By: Date:
Exudation Pressure
Wt. Ret. % Ret. Batch Wt. % Used Batch Exudation PSI SZ3 7/ .
Stability Ph jQ' j'2 -.\
Turns Displacement 14.3i { .71,) ',
R-Value 'Z.'- (C 3'8" cH
Corrected R-Value It #4
Thick by Stab/Foot iiO7 •hii"?.9 /it 5 Tot
Expansion Reading
Thick/Exp. Press/Foot 27 LI 7 SAMPLE DESCRIPTION:
Moisture Content
Dry Density
Stablft
2 1.5 1 0.5 0
90
80
70
60
UJ
50 >
:
40
30
20
10
__ 0 t 800 700 600 500 400 300 200
EXUDATION PRESSURE (PSI)
100
------ ----w---------- --- - --------— ------
---------------
---------------
---------- ----
-----
---------------
--------- ------
------
-------==----
===----.
____ L. ---=--==— I
100 0
GEOCON
INCORPORATED 0-v R -Value Data Sheet
ProjectName: g&7c. /7tie— ProjectNo.: - L2 - 412
Location: 61 /( i/r. 2_ i .Samle No.
Mold
Wet Wt
Dry Wt:
% Moist: 7,
Set up By fV) IK Date
Comp By: Lu
Stab. By: Date:.j1
Caic. By: Date:
Wt. Ret. % Ret. Batch Wt. % Used Batch
7204-5
-
Batch Weight 12-6'0 jZo ,' 2 i2V (Z
Humidifying Moisture &)C >
Moisture Added T (O 1'
Soil +Mold
Mold
Soil 'Ot IC 'f
Foot PSI
Height of Sample
Exudation Pressure LU.XO :OC
Exudation PSI / 0
Stability Ph 17-1 1 6, I DS
Turns Displacement 'l , 'O &4. O 3,-7 1 3/4
R-Value .. 3/8"
Corrected R-Value 16 ) #4 .
Thick by Stab/Foot I, Ii lO Tot
Expansion Reading
Thick/Exp. Press/Foot (D C.7 I 2..) SAMPLE DESCRIPTION: /11 I' 02YK Oi -
Moisture Content 2-LL 2.Z ?)
Dry Density (c2 ?,a )f(c .': '
100
go
80
70
CC
Stab/ft-
2 1.5 1 0.5 0
LI L_LL
- r-------
-
- - -
- 05
I J .1A I I -
-
60--.—_
---.,
1 J1i — 50__
- LL 15
40
30
t
I d= turn displacement
Ph= reading at 2000
R=10.0- 100 /
(2.5/d)[(160/Ph-1J+1
RX2111P h, Fyrncinn
20 — - - — —l--- -
-r---
-.- —H
tO
0 .
800 700 600 500 400 boo
EXUDATION PRESSURE (PSI)
200 100 0
.7 r'
R- Value byExudátion 1.
R-Value by Equilibrium
L'GEOCON INCORPORATED JOG NAME' foi Hiter
FILE NO /2j -/2 -o3
/
DATE ____ SAND EQUIVALENT TEST.
cq
SAMPLE NUMBER
POINT NUMBER 1 2 1. 2 1 2 .1 2 1 2 1 2
STAnr 0 2. 4 6 8 10
SHAKE 10
12
12 14 16 18 20
SET DOW11 14 16
36
1i
18 20 22
32 34 38 40 42
A. CLAY hEIGhT 21
/;
)z,7 / 12 12 6, I2(7 145 121 S7 J2(( 12
U. SAND HEIGHT ) // 22._.
C. SAND EQUIVALENT (DiA) H' i5 1G /5
SAND EQUIVALENT (AVG. c) / - V
SAMPLE DESCI1IPTION
-'
h.
Th- .- - -S
I /
LGEP.CON INCORPORATED
J
FILE 140
DATE_. SAND EQUIVALENT JEST.
SAMPLE NUMBER
.
POINT NUMBER 1 2 1 . 2 1 2 1 2 1 2 1 2
SfAnf 0 2. 4 6 8 .10
10 12 14 16
18
18 20
SET DOW11 12 14 .16 20
40
22
42
FIEAD 32 34 36 38
CLAY HEIGHT jg /47
SAND HEIGHT . c
SAND EQUIVALENT (hA)
-
SAND EQUIVALENT (AVG.C)
SAMPLE DESCRIPTION