September 30, 2004
W.O. 4254-C-SC
Brookfield Homes
12865 Pointe Del Mar, Suite 200
Del Mar' California 92014
Attention: Ms. Ten McHugh
Subject: Geotechnical Update for Phase 2, Lots 59 through 68, and Lots 103 Through
113, and Phase 3, Lots 45 through 58, and 69 through 74, Village W,
Calavera Hills II, City of Carlsbad, San Diego County, California
Dear Ms. McHugh:
In accordance with your request, GeoSoils, Inc. (GSI). has reviewed the referenced reports
(see the Appendix) with respect to as graded site conditions and has prepared this update
report. Grading and processing of original ground within the subject building pads was
observed and selectively tested by a representativeof GSI during the earthwork phase of
development for the subject property. Based on our observations and testing, the site is
considered suitable for Its intended use. Geotechnical observations and testing completed
during site grading, and completed by this office, is summarized in GSI (2004). As of this
date, the site has not changed significantly since the completion of grading and the
issuance of GSI (2004); thus, the findings, conclusions, and recommendations presented
in our referenced reports (see the Appendix), including GSI (1999, 2004), are generally
considered valid and applicable with respect to the construction and development of the
subject building pads. Based on the duration ottime following pad completion, prewetting
Is reccommended as indicated in GSI (1999, 2004).
Inasmuch as our study is based upon our review, engineering analyses, and laboratory
data, these conclusions and recommendations are professional opinions. These opinions
have been derived in accordance with current standards of practice, and no warranty is
express or implied. Standards of practice are subject to change with time. GSI assumes
no responsibility or liability for work or testing performed by others, or their, inaction; or
work performed when GSI Is not requested to be onsite to evaluate if our
recommendations have been properly, implemented. Use of this report constitutes an
agreement and consent by the user to all the limitations outlined above, notwithstanding
any other agreements that may be in place. In addition, this report may be subject to
review by the controlling authorities,
GeoSoils
SENTBYGEOSOILG, INC.; 7609310915; OCT-1-04 2 O2PM, PAGE 414
APPENDIX ,
REFERENCES
GeoSoils, Inc., 2004, Interim report of rot.igh (mass) grading, Phase 2, Lots 59 through 68,
'I and Lots 103 through 113, and Phase 3, Lots 45 through 58, and 69 through 74,
Calavera Hills II, Village W, City of Carlsbad; San Diego County, California,
W.O. 4254-B-SC, dated September 29. .
.1999; Update of geotechnical report, Calavera Hills; Village W, City of Crlsbad,
Califomia,W.O. 2750-A-SC, dated October 22.
International, Confeence of Building Officials, 2001, Califonia building code, California
Codeof Regulations, Title 24, Part,?, Volume 2, Adopted November 1.
1997, Uniform BuildingCode
4
- 4 -
-U
-
•
- U U • U
Sr r
U 7 • - ••
- U-
-
GeoSoils, Inc.