Loading...
HomeMy WebLinkAboutCT 01-05; CALAVERA HILLS VILLAGE W; GEOTECHNICAL UPDATE FOR PHASE 4; 2004-11-11CTO-O5 - 4 Geotechnical Geologic Environmental - t 5741 Palmer Way • Carlsbad, California 92008 • (760)438-3155 • FAX(760)931-0915 ; - - November 11 -2004 - - - - W 0 4254-C-SC Brookfield Homes 12865 Pointe Del Mar, Suite 200 Del Mar, California 92014 Attention:.Ms Teri McHugh Subject:,., Geotechnical Update for Phase 4, Lots 34 through 44, and Lots 75 through 85, Village W, Calavera Hills II, Carlsbad, San Diego County, California Dear Ms McHugh In accordance with your request, GeoSoils, Inc (GSI) has reviewed the referenced reports (see the Appendix) with respect to as graded site,conditions and has prepared this update report Grading and processing of original ground within the subject building pads was observed and selectively tested by a representative of GSI during the earthwork phase of i--: -dèvelopmñt forth ubject property. Based on our observations and testing, the site is - f. considered s'uitable for its intended residential use. Geoteôhnical observations and testing completed during site grading, and completed by this office, is summarized in GSI (2004a) As of this date, the site has not changed significantly since the completion of grading and the issuance of GSI (2004a), thus, the findings, conclusions, and recommendations presented in our referenced reports (see the Appendix), including GSI (1999 and 2004a), are generally considered valid and applicable with respect to the construction and development of the subject building pads Based on the duration of time following pad completion, prewetting is recommended, as indicated in GSI (1999 and 2004a) * Inasmuch as our study is based upon our rview, engineering analyses, and laboratory dat, these conclusions and recommendations are professional opinions. These .opinions have been derived in accordance with current standards of practice, and no warranty is express or implied Standards of practice are subject to change with time GSI assumes no responsibility or liability for work or testing performed by others, or their inaction, or work performed when GSI is not requested to be onsite to evaluate if our recommendations have been properly implemented Use of this report constitutes an agreement and consent by the user to all the limitations outlined above, notwithstanding any other'agreements that may be in place In addition, this report may be subject to review by the controlling authorities. .1 F 4 / .• •- - - • • .•. - . The opportunity to be of service is greatly appreciated. If you have any questions, please do not hesitate to call our office Respectfully submitt0 E04 . cr., No eo Soils, Inc. 19 3 -4 71257 CO : ,0 0% ::ma: IL Engineering Geologist, C 4' Civil Engineer, RCE 7857 RC/DWS/JPF/Jk Attachment- Appendix -. References Distribution (4) Addressee - - S - S L. S -. S 'S S SS S •. S -, - 5 .5 - - Brookfield Homes .- S W.O. 4254-C-SC -' Village W, Phase 4, Caiavera Hills • 'November 11, 2004 File:e:\wp9\4200\4254c.guf4. -- - - -: 4 Page .2 - GeoSoils, Inc. • -S ,