HomeMy WebLinkAboutCT 01-05; CALAVERA HILLS VILLAGE W; ROUGH GRADE PAD CERTIFICATION LOTS 34-44, 75-85; 2004-11-12CT 01
HUNSAKER
.A &-ASSOCtATES
SAN DIEGO, INC. .
PLANNING -
ENGINEERING .
SURVEYING
IRVINE
LOS ANGELES
RIVERSIDE November 12, 2004 S
SAN DIEGO
City of Carlsbad .
. Engineering Department
1635 Faraday Avenue .
Carlsbad, CA 92008 . .
Attn: Grading Inspector . . . .
.5
Subject: Rough Grade Pad Certification
Project: Dwg: 4084A.
. Title: Calavera Hills Village W
Tract: 0105 . . .
Lots: 34 through 44 and 75 through 85 .
• I hereby approve the rough grading for the referenced pads in accordance with
m 1. y responsibilities under the City of Carlsbad Grading and Excavation Code.
Rough Grading has been completed within 0.1 of a foot of the approved grading
• plan designed elevations. The condition of the. pads at the time of our •
certification check was dirt with no swales, retaining walls, or landscaping.
Exp. 09/30/06
S
-_______ ..
DAVE HAMMAR Daniel P. Smith L.S. 685k • C,V%.
LEX WILLIMAN Huñsaker & Associates San Diego, Inc. • OF c-'°
ALISA VIALPANDO
DAN SMITH S
RAY MARTIN
10179 Huennekens St. S
San Diego, CA 92121 • . S •
5
(858) 558-4500 PH • . S •
.5
S (858) 558-1414 FX S S
www.HunsakerSD.com S S •
S MP:kc k:\0553\2004Vn46.doc
Inlo@HunsakerSD.com • w.o. 0553-182 11/12104 2:31 PM