HomeMy WebLinkAboutCT 01-06; CALAVERA HILLS VILLAGE X; REVISED PAVEMENT DESIGN REPORT; 2004-03-04CTO-O,
ZNC
FILE
RJCONTaL,cflQJ
I
Geotechnical -..Geologic - Environmental.
5741 Palmer Way • Carlsbad California 92008 • (760) 438-3155 • FAX (760) 9311-0915
March 4, 2004
W.'0. 3459-E-SC
Calavera Hulls II, LLC
2727 Hoover Avenue
National City, California 91950
, Attention: Mr. Don Mitchell
Subject: Revised Pavement Design Report, Calavera Hills II, Village X City of
Carlsbad, San ,Diego County, California
Dear Mr. Mitchell
In accordance with your request, GeoSoils, Inc. (GSi) has prepared revised preliminary
.
' design .and construction recommendations for asphalt concrete (AC) pavement at the.
subject site'. The scope of services provided in. preparatioA of this report included
representative sampling of the streetsubgrade, R-value testing, and engineering analysis
of pavement design. The purpose of this revision was to.update our previous report (GSI,
2004) with respect to current street names. ' ' . . •' , '
PAVEMENT DESIGN ' •
Pavement section design was performed in accordance with the 'California Department of
Transportation (Caltráns) Highway Design Manual of Instructions and the City of Carlsbad
Standard Drawings (see the Appendix). Pavement sections' presented are based on the
aforementioned criteria . and resistance value (R-value) data (see the attached
Figures 1. Through 4),, determined from soils exposed at, or near, final subgrade elevations
within the subject areas. R-value testing was performed in accordance' with the latest
revisions to the Department of Transportation, State of California, Material & Research Test
Method No. 301. Pavement design was aided with the computer software programsPAVE
• and NEWCON90.. •' •• . • • • • ' • '
ASPHALT CONCRETE PAVEMENT
Structural Section /
R-values ranging from 27 to 54 were determined for subgrade soils onsite, and used in
pavement design. The recommended pavement sections are presented in the following
!)able*. .
.
AC AGGREGATE BASE
TRAFFIC SUBGRADE THICKNESS THICKNESS 2
TRAFFIC AREA INDEX R-VALUE (Inches)". . - '.(lnches)
Basin Road . ..5.0 27 4.0 4.0
Stations .1122to_13
Crater Rim Road . 5.0 39 . .. . 4.0 . 4.0
Stations 10+22 to 19
Ravine Drive 5.0 54 4.0 . 4.0
+50 Stations 109 to 17-
Pleasant Vale Drive 5.0 27 4.0 4.0
Stations 9 to 1 622 .
Pleasant Vale Drive 5.0 27 4.0 . . 4.0
Stations 16 to 22
Gentle Knoll Street, . . 5.0 39 4.0 4.0
Stations 1 O+io to 20+Z5
Rift Road . 5.0 39 4.0 4.0
Stations 10 to 13-
City minimum . . .
Denotes Class 2 Aggregate Base ® >78, SE >25)
All pavement installation, including preparation and compaction of subgrade, compaction
of base material, and placement and rolling of asphaltic concrete, should be done in .
accordance with the City guidelines and under the observation and testing of the project
geotechnicaIengineer and/or City. . .
•. The recommended pavement sections are meant as minimums. If thinner or highly
variable pavement sections are constructed, increased maintenance and repair may be
needed. Positive site drainage should be maintained at all times. Water should not be
allowed to pond or seep into the ground. If planters or landscaping are adjacent to paved
areas, measures should.be taken to minimize the potential for water to enter the pavement
section. If the ADT (average daily traffic) or ADTT (average daily truck traffic) increases
Calavera Hills II, LLC . • W.O. 3459-E-SC
Calavera Hills II, Village x • March 4, 2004
FiIe::\wp9\3400\3459e.x.rpdr • • - Page 2 GeoSoits, Inc. .
.
•
SS\ -
beyond that intended, as reflected by the traffic index(s) used for design, increased
inaintenanbe' and repair could be required for the pavement section. -
.. PAVEMENT GRADING RECOMMENDATIONS . . '.
- e
General
All section changes should be properly transitioned; If adverse conditions areencountered
during the preparation of subgrade materials, special construction methods may need to
.......be employed. 'A GSI representative- should, be present for the preparation, of subgrade,
base rock, and asphalt concrete
-
Subgrade
Within Street and parking areas, all' 'surficial deposits of loose soil material should be
reffioved, and .recompacted. as recommended. After the loose soils are removed, the
bottom is to be scarified to a depth of approximately 6 inches, moisture conditioned as
necessary, and compacted to 95 percent of 'the maximum laboratory density, as
determined by ASTM Test Designation D-1 557
Deleterious material, excessively wet or dry pockets, concentrated zones of-oversized rock
( ' fragments, and any other unsuitable materials, encountered during grading should be
removed'. The compactédk fill material should then be brought to the elevation ofthe
proposed subgrade for the pavement. The subgrade should. be proof-rolled in' order to
ensure a uniform firm and unyielding surface.' 'All grading and fill placement should be
observed by the project soil engineer and/or his representative
Base Rock
Compaction" tests. are reqUFrd'fbr the recommended 'base section. ' Minim' um relative'
compaction required will be 95 percent of the laboratory maximum density as determined
byASTM Test Designation D-1557. Base aggregate should be in accordance'with the'
"Standard Specifications'for Public Works Construction" (green book), 1997 edition, or
standard Caltrans Class 2 base rock (minimum R-value = 78).
Paving, • •' ' . . S '. .,
0
7.' '• .
Prime coat may be omitted if all of the following conditions are met
1. . The 'asphalt paernent layer isplaced within two weeks of completion of bae/ .
and/or, subbase course. •
',' 'S •' ' • . '0 • ' '.
. 0 0
2 Traffic is not routed over completed base before paving
Calavera Hills il, LLC I WO. 3459 E SC
Caiavera Hilis'il, Village ,X - ' . ' 0 ' • ' ;' • March, 4, '2004
' 0
Fiie:e:\wp9\3400\3459e.x.rpdr •
0
, ,
' 0
. •
' -
'.
Page 3
GeoSoils, Inc.
f
/
3( Construction is completed during the dry season of May through October
4 The base is kept free of debris prior to placement of asphaltic concrete
If construction is performed during the wet season of November through April, prime coat
may be omitted if no rain occurs between co'mpletio'n of base course and paving and the.
time between completion of base and paving is reduced to three days, provided the base
is free of loose soil or debris Where prime coat has been omitted and rain occurs, traffic
is routed over base course, or paving is delayed, measures shall be taken to restore base
course and subgrade to conditions that will meet specifications as directed by the soil
engineer
H' Drainage '. ' : ' " :'
•
' Positive drainage should be provided for all surface water to drain toward the, curb and
gutter, or to an approved drainage channel.' Positive site drainage should be maintained
At all times. Water should not be allowed to pond or seep into the ground..,,If planters or, •
landscaping are adjacent to paved areas, measures should be taken to minimize the
potential fdr water to enter the pavement section, such, as cut-off walls, etc.'
LIMITATIONS
,•
' ' ' '
The materials encountered on the project site and utilized in our laboratory study are
believed to be representative of the total area. However, variations from the anticipated
conditions and actual field conditions should be expected Test excavations are reflective
' , of the soil and rock Materials'only at the specific location explored. Site conditions may
vary due to seasonal changes or other factors. •
• '; '
, • Since our study is. based on the earth 'materials obtained in the field onsite, selective'
" laboratory testing, and engineering analyses, the conclusions and recommendations are
professional opinions based upon those parameters These opinions have been derived
in accordance' with the currentstandards of practice and no warranty is expressed or
implied. Standards-of practice are subject to change in time. Overall, the enclosed results'
'represent our professional opinions and" evaluations, Which were' performed within the
constraints of a budget. GSI assumes no responsibility or liability for work or testing'
performed by others. . , '
•, '','• ' ' • •'•• ' .'
Calavera Hills II, LLC • ' ' ' ' W.O•.' 3459-E-SC
'• ''
Caiavera Hills Ii, Village .X - , ' " • ' '' ' 'March 4, 2004
File: e:\wp9\34OO\3459e.xrpdr ' ' ' -.' ' ' ,' ". '
'•
Page 4 '
Inc. GeoSoils,
\ c;
The opportunity to be of service is greatly appreciated If you have any questions, please
do not hesitate to call our office
Respectfully su bmitted/\ . . .•
1 1
GeoSoils, Ind.eviewed by
12 il HO.
,!
Robert'G Crisman David W Skelly
Engineering.Geologist, CEG1,934 Civil Engineer,.RCE 47857
RGC/J PF/D WS/Jk/J h
m Attachents Figures 1 through 4 - R-value Test Results
Appendix - References
DistribUtion: (2) Addressee : S
S .'. . (2) Jobsite, Attention: Mr. To LaMarca
.
(1) McMillin. Companies, Attention: Mr. .Russ Sheldon. .
.5 I .5 •55 S 5 5
.: . . .
.5
5 5 .
.
S
...
.7 • ... -
S. S
S.. . S
SSS •I.
•
Caiavera.HiHs ii, LLC . . . S W.0 3459-E-SC
: Calavera Hills Ii, Village X S
: . March 4, 2004
File:e:\wp9\3400\3459e.x.rpdr . S . • . - . . .,. Page 5
GeoSoiNs, Inc.
GeoSoils, Inc.
çT 5741 Palmer Way
l, $i. Carlsbad, CA 92008
Telephone: (760) 438-3155
Fax: (760) 931-0915
R - VALUE TEST RESULTS
Project: MCMILLIN
Number: 3459X-E-SC
Date: Feb-04 Figure: 1
TEST SPEC IMAN A' ' B C D
Compactor air pressure ' PSI 280 160 120
Water added % ' 0.9 1.8 2.7
Moisture at compaction ' , % 8.0 8.9 9.9
'Height of sample ' ' ,IN 2.32 2.36 2.42
Dry density ' ' PCF '134.3 131.8 128.4
R-Value by exudation , , 44 30 22 -
R-Value by exudation, corrected' ' ' ' 39 ' 27 ' 21
Exudation pressure , PSI , ' , 498 310 186
Stability thickness ' FT 0.65 0.81 0.90
Expansion pressure thickness ' FT 0.00 , 0.00 0.00 -
DESIGN CALCULATION DATA
Traffic index, assumed 4.5
Gravel equivalent factor, assumed 1.25
Expansion, stability equilibrium 0
R-Value by expansion NA
R-Value by exudation , 27
R-Value at equilibrium 27
Expansion, Stability Equilibrium
2.00
SAMPLE INFORMATION
Sample Location: Claywood Ct. 10+00-16+00
Sample Description: Dark Gray Silty Gravel W/ Sand
Notes: Benchwood
45% Retained on 3/4 inch sieve
Test Method: Cal-Trans Test 301
R-Value By Exudation
80 -
70--
60-
50--
40
-------------
C)
C) > :-•
tic
4--1
0.00 0.50 ' 1.00 , 1.50 2.00
Stability Thickness (if) Noll
101711
GeoSoils, Inc.
5741 Palmer Way
Carlsbad, CA 92008
Telephone: (760) 438-3155
Fax: (760) 931-0915
R - VALUE TEST RESULTS
Project:
,
MCMILLIN
Number: 3459X-E-SC
Date: Feb-04 ' Figure: 2
TEST SPECIMAN A B C D
Compactor air pressure PSI . 350 240 20
Water added % 0.0 0.8 2.6
Moisture at compaction % 6.2 .7.1 9.0
Height of sample IN 2.31 2.33 2.4
Dry density PCF 136.6 135.1 125.8
R-Value by exudation 61 41 13
R-Value by exudation, corrected 56 37 13
Exudation pressure PSI 596 281 111
Stability thickness FT 0.45 0.68 1.00
Expansion pressure thickness FT 0.00 0.00 0.00
DESIGN CALCULATION DATA
Traffic index, assumed 4.5
Gravel equivalent factor, assumed 1.25
Expansion, stability equilibrium 0
R-ValUe by expansion NA
R-Value by exudation . 39
R-Value at equilibrium 39
Expansion, Stability Equilibrium
2.00
SAMPLE INFORMATION
[s]il IflhIII'''I''
S (*1
'fl1Tr1 :1TT Ftlr.i
0.00 -!'-
0.00 0.50 1.00 1.50 2.00
Stability Thickness (ft)
GeoSoils, Inc.
ç5741 Palmer Way
H.. Carlsbad,, CA 92008 . Telephone: (760) 438-3155
Fax: (760) 931-0915
R - VALUE TEST RESULTS
Project: MCMILLIN
Number: 3459X-E-SC
Date: Feb-04 Figure: 3
TEST SPECIMAN A B C D
Compactor air pressure PSI 350 350 350
Water added % 1.7 2.6 3.8
Moisture at compaction % 8.0 9.0 10.4
Height of sample IN 2.31 2.33 2.53
Dry density PCF 137.4 135.9 124.4
R-Value by exudation . 89 79 44
R-Value by exudation, corrected 88 78 44
Exudation pressure PSI 691 463 243
Stability thickness FT 0.13 0.24 0.65
Expansion pressure thickness FT 0.00 0.00 0.00
DESIGN CALCULATION DATA
Traffic index, assumed 4.5
Gravel equivalent factor, assumed 1.25
Expansion, stability equilibrium 0
R-Value by expansion. NA
R-Value by exudation 54
R-Value at equilibrium 54
SAMPLE INFORMATION
Sample Location: Earthwood Ct. 10+00-17+50
Sample Description: '' Dark Gray Silty Gravel W/ Sand
Notes: RV-3
40% Retained on 3/4 inch sieve
Test Method: Cal-Trans Test 301
R-Value By Exudation
2.00
Expansion, Stability Equilibrium
0.00 4-
0.00 0.50 1.00 1.50 2:00
Stability Thickness (ft)
0
TEST SPECIMAN A B C D
Compactor air pressure PSI 350 240 130
Water added % 1.3 2.2 3.0
Moisture at compaction % 7.1 8.1 9.0
Height of sample IN 2.31 2.37 2.44
Dry density PCF 136.9 132.9 129.1
R-Value by exudation •65 46 32
R-Value by exudation, corrected 60 42 30
Exudation pressure PSI 509 339 210
Stability thickness FT 0.40 0.62 0.78
Expansion pressure thickness FT 0.00 0.00 0.00
DESIGN CALCULATION DATA
Traffic index, assumed 4.5
Gravel equivalent factor, assumed 1.25
Expansion, stability equilibrium 0
R-Value. expansion NA
R-Value by exudation 39
R-Value at equilibrium 39
Expansion, Stability Equilibrium
2.00
SAMPLE INFORMATION
0.00 -1.-
0.00 0.50 1.00 1.50
Stability Thickness (ft)
0
GeoSoils, Inc. R - VALUE TEST RESULTS
ç 5741 Palmer Way Project: MCMILLIN
114!. Carlsbad, CA 92008
Telephone: (760) 438-3155 Number: 3459X-E-SC
Fax: (760) 931-0915
Date: Feb-04 Figure: 4