HomeMy WebLinkAboutCT 01-06; CALAVERA HILLS VILLAGE X; SECOND REVISED PAVEMENT DESIGN REPORT; 2004-05-14May 14, 2004
W.0. 3459-E-SC
Calavera Hulls II, LLC
Naonai City, California 91950 111 /J' 7%
Attention Mr. Don Mitchell
Subject Second Revised Pavement Design Report, Calavera Hills II, Village X, City of
Carlsbad, San Diego County, California
Dear Mr Mitchell
In accordance with your request, GeoSoils, Inc (GSl) has prepared preliminary design and
construction recommendations for asphalt concrete (AC) pavement at the subject site The
scope of services provided in preparation of this report included representative sampling
of the street subgrade, R-value testing, and engineering analysis of pavement design
PAVEMENT DESIGN
Pavement section design was performed in accordance with the California Department of
Transportation (Caltrans) Highway Design Manual of Instructions and the City of Carlsbad
Standard Drawings (see the Appendix) Pavement sections presented are based on the
. ....Aforementioned , criteria and resistance value (R-Value') data (see the attached
Figures -1 through 4), determined from soils exposed at, or near, final subgrade elevations
within the subject areas A-value testing was performed in accordance with the latest
revisions to the Department of Transportation, State of California, Material & Research Test
Method No 301 Pavement design was aided with the computer software programs PAVE
and NEWCON90
Is
Ap .
AGGREGATE
AC BASE
TRAFFIC SUBGRADE THICKNESS THiCkNES(2).
TRAFFIC AREA INDEX ,.:.RVALUE. . (lhche). :(lnches) .
Claywood Court . 5.0 27 4.0 4.0
Stations 1029 to 16+-00
Trailwood Court 5.0. 39 4.0 .4.0
Stations 10+220 to 19 .
Earthwood Court 5.0 . 54 4.0 4.0
Stations 10+-00 to -1 T+52 . . •
Cobblecreek Court 5.0 39 4.0 . 4.0
Stations 10 to 21
+00
Green briar, All Stations 5.0 39 '4.0 4.0
City minimum .
-.
Denotes Class 2 Aggregate Base ® >78, SE >25)
•
i J
ASPHALT CONCRETE PAVEMENT
Structural Section
R-values ranging from27to.54 were determined for subgrade soils onsite, and'used in
pavement design The recommended pavement sections are presented in the following
table
-f
All pávementinstallation, including preparation and compaction of subgrade, compaction
of base material, and placement and rolling of asphaltic concrete, shall be done in '-
accordance with the City guidelines and under the observation and testing of the project
geotechnical engineer. and/or City.
The recommended pavement sections are meant as minimums If thinner or highly
- variable pavement sections are constructed, increased maintenance and repair may be
needed. Positive site drainage shall be maintained at all times. Water shall not be allowed
to pond or seep into the ground. If planters or landscaping are adjacent to paved areas, -
measures shall be taken to minimize the potential for water to enter the pavement section:
If the ADT (average- daily traffic) orADTT (average daily truck traffic) increases beyond that
intended, as reflected by the traffic index(s) used for design, increased maintenance and
repair could be required for the pavement section
. - • - . .
Caiavera Hills ii, LLC . - . . .- . W.O. 3459-E-SC .
Caiavera Hills Ii, Village X T -. . . . May 14 2004
4 FiIe:e:\wp9\3400\3459e.x.rrpdr
.
. . - . • . ••
- Page 2
. -
GeoSoils Inc. - .
.
PAVEMENT GRADING RECOMMENDATIONS
General
All section changes shall be properly transitioned If adverse conditions are encountered
'.. during the preparation of subgrade materials, special construction methods may need to
be employed A GSI representative shall be present for the preparation of subgrade, base
rock, and asphalt concrete
Subgrade
Within street and parking areas, all surficial deposits of loose soil material shall be removed
and recompacted as recommended After the loose soils are removed, the bottom is to
be scarified to a depth of at least 12 inches, moisture conditioned as necessary, and
compacted to 95 percent of the maximum laboratory density, as determined by ASTM Test
Designation D-1 557
Deleterious material, excessively wet or dry pockets, concentrated zonesof oversized rock
fragments; and any other unsuitable materials encountered during grading shall be.,
removed. The compacted fill material shall then be broUght to the elevation of, the •''
proposed subgrade .for the pavement. The 'subgrade shall be proof-rolled in 'order to
....ensure a uniform firm and unyielding surface. All 'grading and fill placement shall be
observed by the project soil engineer and/or his representative
Base Rock
Compaction tests are required for the recommended base section.' Minimum relative'
compaction' required will be 95-percent of the laboratory maximum density as determined', .
by'ASTM Test Designation D-1557; Base aggregate shall' be.'in accordance with the
"Standard Specifications for Public Works Construction" (green book), 1997 edition, or
standard Caltrans Class 2 base rock (minimum R-value = 78)
Paving
Prime coat may be omitted if all of the following conditions are met
1 The asphalt pavement layer is placed within two weeks of completion of base
and/or subbase course
2 Traffic is not routed over completed base before paving
3 Construction is completed during the dry season of May through October.
4 The base is kept free of debris prior to placement of asphaltic concrete
Calavera Hills ii, LLC , ' ' ' ' ., . •: , W.O. 3459.E-SC '
Calavera Hills'll, Village X " ' , ;, " ' '' '. ' • , " May 14, 2004 • '
File e \wp9\34003459e x rrpdr Page 3
GeoSoils, Inc.
If construction is performed during the wet season of November through April, prime coat
may be omitted if no rain occurs between completion of base course and paving and the
time between completion of base and paving is reduced to three days, provided the base'
is free of loose soil or debris Where prime coat has been omitted and rain occurs, traffic
is routed over base course, or paving is delayed, measures shall be taken to restore base
course and subgrade to conditions that will meet specifications as directed by the soil
engineer.
Drainage
Positive drainage shall be. provided for all surface, water to drain toward the curb and
gutter, or to an approved drainage channel Positive site drainage shall be maintained at
all times Water shall not be allowed to pond or seep into the ground..If planters or
landscaping areadjacent to paved areas, measures shall be taken to minimize the
potential for water to enter the pavement section, such as cut-off walls, etc
LIMITATIONS
The materials encountered on the project site and utilized in our laboratory study are
believed to be representative of the total area However, variations from the anticipated
conditions and actual field conditions shall be expected'. 'Test excavations are reflective ..
of the soil and rock materials only .at the specific 'locationexplored. Site conditions may.
vary due to seasonal changes or other factors.
Since our study is based on the earth materials obtained in the field onsite, selective
laboratory testing, and engineering analyses; the conclusions and recommendations are .. '
professional opinions based upon those parameters These opinions have been derived
in accordance with the current standards .of practice and no warranty is expressed or,
implied Standards of practice are subject to change in time Overall, the enclosed results
represent our professional opinions and evaluations which were performed within the
constraints of ,a budget. .,GSI assumes no responsibility or liability for work or testing
performed by others
Caiavera Hills ii, LLC W.O. 3459-E-SC . ' Calavera Hills II Village X May 14 2004
File e \wp9\3400\3459e x rrpdr Page 4
GeoSoils, Inei
The opportunity to be of service is sincerely appreciated If you should have any questions,
please do not hesitate to contact our office o E'01,
ResPectfullY sub74
0 iv
GeoSoils, Inc (7 No 193 \ \ Reviewed by po cE473557
100~w
Robert GCnoFj< David WSk ell y
Engineering Geologist, 934 Civil Engineer, RCE 47857
RGC/J PF/D WS/J k
Attachments Figures 1 through 4 - R-value Test Results
Appendix -,References
Distribution (1) Addressee
(2) Jobsite, Attention Mr Tom LaMarca
(2) City of Carlsbad, Attention Mr Joe McMahon
Caiavera Hills ii, LLC W.0. 3459 E SC
Calavera Hills ii Village X May 14,-2004.'.
File e \wp9\3400\3459e x rrpdr Page 5
GeoSoils, Inc.
TEST SPECIMAN A B C 0
Compactor air pressure . PSI 280. 160 120
Waterádded . % 0.9 1.8 2.7.
Moisture at compaction % 8.0 8.9 9.9
Height of sample IN 2.32 2.36 2.42
Dry density . PCF 134.3 131.8 128.4
R-Value by exudation . 44 30 22
R-Value by exudation, corrected . 39 27 21
Exudation pressure PSI 498 310 186
Stability thickness . FT 0.651 0.81 . 0.90
Expansion pressure thickness FT 0.001 0.00 0.00
DESIGN CALCULATION DATA SAMPLE INFORMATION
Traffic index, assumed . 4.5
Gravel equivalent factor, assumed 1.25
Expansion, stability equilibrium 0-
R-Value by expansion NA
R-Value by exudation 27
R-Value at equilibrium . 27
Expansion, Stability Equilibrium
2.00
el
In Ii, a). 50
L;J
Sample Location: .Claywood Ct. 10+00-16+00
Sample Description: bark Gray Silty Gravel W/ Sand
Notes: Benchwood
45% Retained on 3/4 inch sieve
Test Method: Cal-Trans Test 301
R-Value By Exudation
80
70
60
50
a)
.40
30
.,I.
_______
['C
0.00 4-c--
0.00 0.50 1.00 1.50
Stability Thickness (ft)
R. VALUE TEST RESULTS GeoSoils, Inc.
5741 Palmer Way . . Project: MCMILLIN
Carlsbad, CA 92008
Telephone: (760) 438-3155 . Number: 3459X-E-SC
Fax: (760) 931-0915
. Date: Feb-04 Figure: 1
TEST SPF(IMAN A B C D
Compactor-air pressure PSI 350 240 20
Water added % 0.0 0.8 2.6
Moisture at compaction . 6.2 7.1 9.0
Height of sample IN 2.31 2.33 2.4
Dry density . . PCF 136.6 135.1 125.8
R-Valuebyexudation 61 41 13
R-Value by exudation, corrected . 56 37 13
Exudation pressure PSI 596 281 . 111
Stability thickness FT 0.45 0.68 1.00
Expansion pressure thickness FT 0.00 0.00 0.00
DESIGN CALCULATION DATA SAMPLE INFORMATION
Traffic index, assumed 4.5
Gravel equivalent factor, assumed 1.25
Expansion, stability equilibrium 0
R-Value by expansion NA
1
R-Value by exudation . 39
111-Value at equilibrium . 39
Expansion, Stability Equilibrium
Sample Location: Trailwood 10+00-19+30
Sample Description: Dark Gray Silty Gravel W/ Sand
Notes: . RV-2
36% Retained on 3/4 inch sieve
Test Method: Cal-Trans Test 301
R-Value By Exudation
80 -1 I I
2.00 70
60
50
30
20
0.00 -I'-
1:1
0.00 0.50 1.00 1.50 2.00 800 700 600 500 400 300 200 100 0
Stability Thickness (ft) Exudation Pressure (psi)
GeoSoils, Inc.
of]5741 Palmer Way
Carlsbad, CA 92008
Telephone: (760) 438-3155
Fax: (760) 931-0915
R - VALUE TEST RESULTS
Project: MCMILLIN
Number: 3459X-E-SC
Date: Feb-04 Figure: 2
TEST SPECIMAN A B C D
Compactor air pressure. PSI 350 350 350
Water added 1.7 2.6 3.8
Moisture at compaction % 8.0 9.0 10.4
Height of sample IN 2.31 2.33 2.53
Dry density PCF 137.4 135.9 124.4
R-Value by exudation : 89 79
R-Value by exudation, corrected 88 78 44
Exudation pressure PSI 691 463 243
Stability thickness FT 0.13 0.24 0.65
Expansion pressure thickness FT 0.00 0.00 0.00
DESIGN CALCULATION DATA
Traffic index, assumed 4.5
Gravel equivalent factor, assumed 1.25
Expansion, stability equilibrium 0
R-Value by expansion NA
R-Value by exudation 54
11-Value at equilibrium 54
Expansion, Stability Equilibrium
2.00
0.00 4-
0.00 0.50 1.00 1.50
Stability Thickness (ft)
GeoSoils, Inc.
5741 Palmer Way
6JiI Carlsbad, CA 92008
Telephone: (760) 438-3155
Fax: (760) 931-0915
R -VALUE TEST RESULTS.
Project: MCMILLIN
Number: 3459X-E-SC
Date: Feb-04 Fiqure: 3