Mr. Joe McMahon
City of Carlsbad
Engineering Inspections Department
1200 Carlsbad 'Village Drive
Carlsbad, CA 92008
Re: Northpointe West
Pad Certification- Building 1
Dear Mr. McMahon:
We have reviewed the pad grades for the above site. The finished floor as shown on the plan is
266.90. The final structural building section has been determined to be 9". Therefore, the pad
should be 266,15. The pad elevation shown on the plan, 266.48, was obtained during the design
process and should be within 0.1' of 266.15. Pursuant to field data, as shown by the attached
drawing, the pad is within this tolerance and is therefore acceptable.
We hereby certify that the pad elevation conforms with the approved grading plan.
Sincerely,
Robert C. Imsande, RCE 25609
Cc: Brace Smits, Lusardi Construction Co.
Z:\Z\waid\PRQJçOO. I I-ccdfBIdI.DOC
7801 Mission Center Court, Suite 100 • San Diego, California 92108 . (619) 296-5565 • Fax (619)296-5564
LOT
1305 le
26606
1304
266.13
1303
054 266,13
1302 (cjf 2662
)ib 2 1294—e66,23
PROPOSED
LOT LINE FF= 266.90
PAD-266.4ft
PAD=266.15
7
266,20.
WFROM K&S ENGINEERING* PHONE NO. : 619 296 5564 Jun. 03 202 05:13PM PB
____ K&S ENGINEERING - FAN
EIvEDV4iPIannir Engneerr Surveying 'j
June 3, 2002
Mr. Joe McMahon
City of Carlsbad
Engineering Inspections Department
1200 Carlsbad Village Drive
Carlsbad, CA .92008
Re: Nortbpointe West
Pad Certification- Building 8
Dear Mr. McMahon:
We have reviewed the pad grades for the above site. The finished floor as shown on the plan is
273.90. The final structural building section has been determined to be 9". Therefore, the pad
should be 273.15. The pad elevation shown on the plan, 273.15, was obtained during the design
process and should be within 0.1' of 273.15. Pursuant to field data, as shown by the attached
drawing, the pad is within this tolerance and is therefore acceptable.
We hereby certify that the pad elevation confc)rxns with the approved grading plan.
Sincerely,
fl6/74r4
"Robert C. Inn-an e, RCE 25609
Cc: Bruce Smits, Lusardi Construction Co.
I flpf-WdOOC
7801 Mission Center Court, Suite 100 • San Diego, California 92108 • (619) 296-5565 • FaX (619) 296-5564
FROM : K&S ENGINEERING PHONE NO. : 619 296 5564 Jun. 03 2002 0513PM PS
MT 77...
273e4
QR4~4
BLDG
FF=273.90
PAD273.48 2 PAD=273.15
7
___ 6
___
__LOTS FF273.91e7e .J
PAD273.15
I (
I1u
FROM : K&S ENGINEERING PHONE NO. : 619 296 5564 Jun. 03 2002 05: 11PM P4
K&S ENGINEERING
Planning Engineering SurveyIrg
June 3, 2002
Mr. Joe McMahon
City of Carlsbad
Engineering Inspections Department
1200 Carlsbad Village Drive
Carlsbad, CA 92008
Re: Northpointe West
Pad Certification- BUilding
Dear Mr. McMahon:
We have reviewed the pad grades for the above site. The finished floor as shown on the plan is
271.40. The final structural building section has been determined to be 9". Therefore, the pad
should be 27065. The pad elevation shown on the plan, 270,65, was obtained during the design
process and should be within 0i' of 270.65. Pursuant to field data, as shown by the attached
drawing, the pad is within this tolerance and is therefore acceptable.
We hereby certify that the pad elevation conforms with the approved grading plan.
Sincerely,
Irp, "~ Or 5 0 As
Cc: Bruce Smits, Lusardi Construction Co.
Z:D,,-Zw'nIPROJEC1\00-I I I\pd-ccb1Bdg6.DOC
7801 Mission Center Court, Suite 100 • San Diego, California 92108 . (619) 296-5565 • Fax (619) 296-5564
FROM : KS ENGINEERING PHONE NO. : 619 296 5564 Jun. 03 2002 05: 11PM P5
p
FROM : KS ENGINEERING PHONE NO. : 619 296 5564 Jun. 03 202 5:12PM PG
K&S ENGINEERING
Planning Engineering Surveying
June 3, 2002
Mr. Joe McMahon
City of Carlsbad
Engineering Inspections Department
1200 Carlsbad Village Drive
Carlsbad, CA 92008
Re: Northpointe West
Pad Certification- BuildIng 7
Dear Mr. McMahon:
We have reviewed the pad grades for the above site. The finished floor as shown on the plan is
273.90. The final structural building section has been determined to be 9". Therefore, the pad
should be 273.15. The pad elevation shown on the plan, 273.15, was obtained during the design
process and should be within 0.1' of 273.15. Pursuant to field data, as shown by the attached
drawing, the pad is within this tolerance and is therefore acceptable.
We hereby certify that the pad elevation conforms with the approved grading plan.
Sincerely,,
~ ~ a.; V. ~—~ -
Cc: Bruce Smits, Lusardi Construction Co.
ZntiZ\*o1d¼PR0JECY\00-I I I\pd-cernI.fIdg7.DOC
7801 Mission Center Court, Suite 100 • Son Diego, California 92108 . (619) 296-5565 . Fax (619) 296-5564
.1
FROM : K&S ENGINEERING PHONE NO. : 619 296 5564 Jun. 03 2002 05:12PM P7
I, /N
273,24
273,14
FF=273.90 273.18
PAD= 2-73.4&
PAD=273.15 r9a
7
7
273.08 1?63 273.06
LOTB FF273.9'
PAD=273.4 24 PAD=27315 )8(1276
BLDG
'FROM : KS.S ENGINEERING PHONE NO. : 619 296 5564 Jun. 03 202 5:1pM P2
1f K&$ ENGINEERING
Planning Engineering Sc'evng
June 3, 2002
Mr. Joe McMahon
City of Carlsbad
Engineering Inspections Department
1200 Carlsbad Village Drive
Carlsbad, CA 92008
Re: Northpomte West
Pad Certification- BUil4i1$i
Dear Mr. McMahon:
We have reviewed the pad grades for the above site. The finished floor as shown on the plan is
271.40. The final structural building section has been determined to be 9". Therefore, the pad
should be 270.65. The pad elevation shown on the plan, 270.65, was obtained during the design
process and should be within 0.1' of 270.65. Pursuant to field data, as shown by the attached
drawing, the pad is within this tolerance and is therefore acceptable.
We hereby certify that the pad elevation conforms with the approved grading plan.
Sincerely,
Cc: Bruce Smits, Lusardi Construction Co.
Z:DnInZ\wordpROJ IcemfJdg.DOc
7801 Mission Center Court, Suite 100 • San Diego, California 92108 • (619) 296-5565 'Fax (619)296-5564
BLDG 6
4313 70.61
70.69
FF= 271.40
PAD-270.gs-
PAD=270.65
27067
19 L016
OF
FF=24o
773 PAD-27O.9&
-, Bm5
PAD=270.65
. ,•
1i /0,74
£d NdTT: £ (1r 09S 96Z 6T9 : 0N 3NOHd
7
7
FA
FROT : K&S ENGINEERING PHONE NO. : 619 296 5564 May. 30 202 02:54PM P2
I ;3'A
K&S ENGINEERING
.0
Pleinnirig E ncci rg
May 30, 2002
Mr. Joe McMahon
City of Carlsbad
Engineering inspections Department
1200 Carlsbad Village Drive
Carlsbad, CA 92008
Re: Northpointe West
Pad Certification- Building 4
Dear Mr. McMahon:
We have reviewed the pad grades for the above site. The
f
i
n
i
s
h
e
d
f
l
o
o
r
a
s
s
h
o
w
n
o
n
t
h
e
p
l
a
n
i
s
268.60. The final structural building section has been determ
i
n
e
d
t
o
b
e
9
"
.
T
h
e
r
e
f
o
r
e
,
t
h
e
p
a
d
should be 267.85. The pad elevation shown on the plan, 268.18, was obtain
e
d
d
u
r
i
n
g
t
h
e
d
e
s
i
g
n
process and should be within 0.1' of 267.85. Pursuant to field data, as shown by the attached
drawing, the pad is within this tolerance and is therefore ac
c
e
p
t
a
b
l
e
.
We hereby certify that the pad elevation conforms with the ap
p
r
o
v
e
d
g
r
a
d
i
r
*
g
p
l
a
n
.
Sincerely,
- .—
A IIL.Ld
,01 ITI~
Cc: Bruce Smits, Lusardi Construction Co.
Z\WotPKQjCjoøt, -0eflff4g4MQC
7801 MIssion Center Court, Suite 100 e San DIego. CalifornIa 92108 (619) 296-5565 • Fax (619) 296-5564
FROM K&S,ENI3INEERING PHONE NO. 619 296 5564 May. 30 2002 02:54PM P3.
PAD268.l 8
)8(766 A(767
LOT 3 67.89 e67.6
(799
e6 7
FF=268.60
PAD 1 8,
:pfr/
..: .''." .
'- -. '4
K&S ENGINEERING
Planning Engineering Surveying
May 28, 2002
Mr. Joe McMahon
City of Carlsbad
Engineering Inspections Department
12.00 Carlsbad Village Drive
Carlsbad, CA 92008
Re: Northpointe West
Pad Certification- Building 2
Dear Mr. McMahon:
c
We have reviewed the pad grades for the above site. The finished floor as shown on the plan is
266.90. Thefinal structural building section has been determined to be 9". Therefore, the pad
should be 266.15. The pad elevation shown on the plan, 266.48, was obtained during the design
process and should be within 0.1' of 266.15. Pursuant to field data, as shown by the attached
drawing, the pad is within this tolerance and is therefore acceptable.
We hereby certify that the pad elevation conforms with the approved grading plan.
Sincerely,
Robert C. Imsande, RCE 25609
N25$Q9 E 124I.O
Cc: Bruce Smits, Lusardi Construction Co.
Z Data L\ orthPROJCT\OO I I I \pad-cenif-Bldgl DOC
7801 Mission Center Court, Suite 100 • San Diego, California 92108 • (619) 296-5565 • Fax (619) 296-5564
q,
K&S ENGINEERING
Planning Engineering Surveying
May 28, 2002
Mr. Joe McMahon
City of Carlsbad
Engineering Inspections Department
1 200 Carlsbad V111ae Dn
Carlsbad, CA 92008
Re: Northpointe West . •,
Pad Certification- Building 3
Dear Mr. McMahon-
We have reviewed the pad grades for the above site. The finished floor as shown on the plan is
268.60. The final structural building section has been determined to be 9". Therefore, the pad
should be 267.85. The pad elevation shown on the plan, 268.18, was obtained during the design
process and should be within 0.1' of 267.85. Pursuant to field data, as shown by the attached
drawing, the pad is within this tolerance and is therefore acceptable.
We hereby certify that the pad elevation conforms with the approved grading plan. '
Sincerely,
FE
Robert C Imsande, RCL 25609