Loading...
HomeMy WebLinkAboutCT 01-09; LA COSTA TOWN SQUARE COMMERCIAL; PAD CERTIFICATION; 2016-04-25Sincerely, .R'Obert D. Dentino Date RCE: 45629 - Expires: 12/31/2016 'EXCEL ENGINEERING (1o.O9 LEVIN & DENTINO INC. D.B.A. EXCEL ENGINEERING ESCONDIDO 440 State Place • Escondido, CA 92029 (760) 745-8118 • Fax 745-8134 April 25, 2016 RE: Certification of Pad Grade for the proposed Michael's Store with the exception of the loading dock area due to cutback (as shown on Building 15 Foundation Plan, sheet 15-S-200; between building grids 1 and 2), City of Carlsbad Drawing No. 409-4C, Project No. CT 0 1-09, Grading Plans for La Costa Town Square. To whom it my concern, Excel Engineering performed a field survey on April 25, 2016 to confirm finish pad grade for the referenced site. A minimum of 10 shots were taken and the finished pad grade is as follows: Pad Average Pad Elevation Design Pad Elevation Proposed Michael's Store 339.66 339.71 The maximum deviation from design to finish pad for said pad was found to be 0.10'. The pad is in substantial conformance with the approved grading plan. If you have any further questions or need any additional information do not hesitate to call. Q:\15\15060\Documents\certs\15O6OPAD CERT.doc