Loading...
HomeMy WebLinkAboutCT 01-09; LA COSTA TOWN SQUARE COMMERCIAL; PAD COMPACTION; 2016-04-25Lu I SDVOSB.DVBE - April 25, 2016 c1-O.o1 SCST, Inc. Corporate Headquarters 6280 Piverdale Street San Diego, CA 92120 P 619.280.4321 T 877.215.4321 F 619.280.4717 W www.scst.com SCST No. 150536N.2 Report No. 2 Mr. Paul Mears Construction Manager Terramar Retail Centers 5973 Avenida Encinas, Suite 300 Carlsbad, California 92008 Subject: PAD COMPACTION LA COSTA TOWN SQUARE BUILDING 15- MICHAELS T.I. 3445 VIA MONTEBELLO CARLSBAD, CALIFORNIA Reference: "Summary As-Graded Report and Supplemental Geotechnical Recommendations, La Costa Towne Square- Lot 15 Commercial Development, La Costa Avenue, Carlsbad, California"; prepared by SCST, Inc.; dated January 8, 2016 (SCST 150536N.1-1). Dear Mr. Arriaga: In accordance with your request, SCST, Inc. (SCST) provided geotechnical observation and compaction testing during earthwork preparation for the subject previously mass graded building pad. The tested fill and subgrade material exceeded the 90% relative compaction specification. Based on our testing, the grading operation was performed in general accordance with our recommendations (referenced), the project specifications and local grading ordinances. If you have any questions regarding this document, please contact us at 61 9.280.43 Respectfully Submitted, 9 O<\ "1C % SCST, INC. co 0 fn Ex Thomas "Hig igginbotham Scott Vacula, PE C72600 OF C Project Manager Senior Engineer TH :SV:aw:th (1) Addressee via e-mail at: Pmears@terramarcenters.com Moo LIU WL '?? 4 It I ll1Ua aw 1"i"11 pi RJQRJ @1111 fiv r ' NJ RJA 00. .1i R R1 JAV lit Pit, ItA U q d OWN" 1111g 48l'A 111-asin 11m; Jill 11111,; 141 it NO W11 i"a' 11 I1114,ik AIN JtVH LA cOsTArTO.wN—SQUARE BUILDING I15C:HAEL'S 1.1. '' a S