,•. Subject : Final Grading Report, Proposed Ocean Breeze Condominiums, 3416 Garfield
Street, Carlsbad, San Diego County, California
References 1 "Preliminary. Geotechnical investigation Proposed Condominium Development
3416 Garfield Street, Carlsbad, California," P.N. 21137-01, dated March 19, 2001, by Earth
Technics.
2. "Change of Geotechnicál Consultant of Record, Proposed Ocean Breeze Condomihiurns,
3416 Garfield Street,. Carlsbad, California 92008," W.O. 3471 -B-SC, . dated
. . November 21, 2002, by GeoSoils, inc.
Dear Mr. Richardson:, . . .. . •'. ' .' . .
In accordance with your request, GeoSoils, Inc. (GSI), is providing this summary report for
grading performed at the subject site. Our scope of work included observations during site
excavation (on a part-time basis), analysis of data, and preparation of this summary report. ' •
Unless superseded by recommendations presented herein, the' conclusions and
recommendations contained in the referenced reports remain pertinent and applicable, and
should be appropriately implemented. ' • ' ' ' ' ' '
Grading Of original ground within the building pad, and 5 feet out from the building footprint
at the subject site, was observed by a representative of GSI, during the earthwork phase of
development for the, subject property. Grading consisted of excavation and export of'
..material from the site. Excavation was performed to competent bearing strata according
to : recommendations in the referenced reports and .our site observations and
recommendations No fill was placed onsite
The work performed is in general conformance with the recommendations contained in the
referenced report, and with the grading ordinance of the County of San Diego, California
Earthwork operations' started on November 25, 2002 and were completed on ,
December, .2, 2002.. Earthwork was.: performed in . general accordance 'with ,the .
recommendations "presented in the referenced report and our field recommendations.
Based on the observations and testing (probing) performed by GSI, it is our opinion that the