Date: September 10, 2003
To:
Re:
Farber Family Partnership
Attention: Curtis Farber
140 IVIarine View Avenue #220
Solana Beach, CA 92075
Proposed Multi-family Development to Be Located at 1100 Las Flores Drive,
City of Carlsbad, California.
Subject: Updated Soils Report
Reference: "GEOTECHNICAL INVESTIGATION AND FOUNDATION RECOMMENDATIONS FOR
PROPOSED MULTI-FAMILY DEVELOPMENT, TO BE LOCATED AT 1100 LAS FLORES
DRIVE, CITY OF CARLSBAD, CALIFORNIA.", Project No: 002486-1, clated December 22,
2000, by Engineering Design Group.
GENERAL
In accordance with your request, we have reviewed the above referenced Geotechnical
Investigation report and provided the following updated recommendations forthe proposed
development. Our update is based on our review of the above referenced report and site
reconnaissances of the property. Based on our conversations with the project developer
it is anticipated that the proposed new improvements will consist ofthe following:
Design and construction of new multi unit condominium complex
Partially subterranean parking garage.
Miscellaneous walkway and common area improvements.
UPDATE RECONNAISSANCE
Representatives of Engineering Design Group visited the subject property on September
9, 2003 and found the condition of the residential property to be generally similar to that
described in our above referenced geotechnical report. Based on our site reconnaissance,
\\Maln\file on main\J0BS\1 JOBS\2000\002486-1, FARBER-MULTI-FAMILY DEV, F110
Page No. 1 of 8
Project No. 002486-1
iS FLORES DRIVE, CARLSBAD - UPDATE.wpd
IV
the recommendations of our above referenced report forthe property remain pertinent and
applicable to the property, with the following amended updates:
I) 7776 building Architect, or waterproofing subcontractor, shall design a retaining wall
and slab waterproofing system to adequately prevent water intrusion into the
subterranean garage per the design expectations of the developer. The details
provided in our referenced report are minimum guidelines only, intended to
address hydrostatic buildup issues behind the retaining elements. Upgraded
waterproofing elements may Include Firestone EPM liner in Ileu of visqueen, pea
gravel underlayment in Ileu of sand, water retarding admixtures, slab underdrain
systems, surface sealants, etc. The design of the subterranean water proofing
system for this development is beyond the scope ofthis report.
II) The foundation section of our report is updated as follows:
FOUNDATIONS
1. Footings bearing in competent formational materials or compacted and
certified fill maybe designed utilizing maximum allowable soils pressure of
2,000 psf
2. Seismic Design Parameters:
Seismic Zone Factor 4
Soil Profile Type
(Table 16-J) s.
Near Source
Distance
(Distance to Closest
Active Fault)
7.5 l<m
Rose Canyon
Seismic Source Type
(Table 16-U)
, B
Bearing values may be increased by 33% when considering wind, seismic, or other
short duration loadings.
3. The following parameters should be used as a minimum, for designing
footing width and depth below lowest adjacent grade:
Page No. 2 of 8
\\Main\file on mainUOBSM JOBS\2000\002486-1, FARBER-MULTI-FAMILY DEV, F1100 LAS FLORES DRIVE. CARLSBAD°'upb2aE^
No. of Floors
Supported
Minimum Footing Width *Minimum Footing Depth
Below Lowest Adjacent Grade
1 18 inches 18 inches
2 18 inches 18 inches
3 18 inches 24 inches
4. All footings should be reinforced with a minimum of two #5 bars at the top
and two #5 bars at the bottom (3 inches above the ground). For footings
over 30 inches in depth, additional reinforcement, and possibly a stemwall
system will be necessary. This detail should be reviewed on a case by case
basis by our office prior to construction.
5. All isolated spread footings should be designed utilizing the above given
bearing values and footing depths, and be reinforced with a minimum of #5
bars at 12 Inches o.c. in each direction (3 inches above the ground).
Isolated spread footings should have a minimum width of 24 inches.
6. For footings (including siteVetaining wall footings) and all other cosmetically
sensitive improvements adjacent to slopes, a minimum 12 feet horizontal
setback in formational or certified fill material should be maintained. A
setback measurement should be taken at the horizontal distance from the
bottom of the footing or improvement to slope daylight. Where this
condition can not be met it should be brought to the attention of the
Engineering Design Group for review.
7. All excavations should be performed in general accordance with the contents
of this report, applicable codes, OSHA requirements and applicable city
and/or county standards.
8. All foundation subgrade soils and footings shall be pre-moistened a minimum
of 18 inches in depth prior to the pouring of concrete.
9. Concrete for building foundations should have a minimum compressive
strength of2,500 psi in 28 days.
Page No. 3 of 8
Project No. 002486-1
\\Main\file on mainUOBSM JOBS\2000\002486-1, FARBER-MULTI-FAMILY DEV, Fl 100 LAS FLORES DRIVE, CARLSBAD - UPDATE.wpd
II) The concrete slabs section of our report is updated as follows:
CONCRETE SLABS ON GRADE
1. Concrete slabs on grade ofthe garage should have a minimum thickness of
5 inches (6 inches at garage and driveway locations) and should be
reinforced with #4 bars at 18 inches o.c. placed at the midpoint ofthe slab.
All concrete shall be poured per the following:
• Slump: Between 3 and 4 Inches maximum
• Aggregate Size: 3/4 -1 inch
• Air Content: 5 to 8 percent
• Moisture retarding additive in concrete at moisture sensitive areas.
• Water to cement Ratio -0.5 maximum
2. All required fills used to support slabs, should be placed in accordance with
the grading section of this report and the attached Appendix B, and
compacted to 90 percent Modified Proctor Density, ASTM D-1557.
3. A uniform layer of 4 inches of clean sand is recommended under the slab in
order to more uniformly support the slab, help distribute loads to the soils
beneath the slab, and act as a capillary break. In addition, a visqueen layer
(10 mil) should be placed mid-height in the sand bed to act as a vapor
retarder. As an upgrade, an Firestone EPM liner may be used instead of
visqueen
4. Adequate control joints should be installed to control the unavoidable
cracking of concrete that takes place when undergoing its natural shrinkage
during curing. The control joints should be well located to direct unavoidable
slab cracking to areas that are desirable by the designer.
5. All subgrade soils to receive concrete flatwork are to be pre-soaked to 2
percent over optimum moisture content to a depth of 18 inches.
6. Brittle floor finishes placed directly on slab on grade floors may crack if
concrete is not adequately cured prior to installing the finish or if there is
minor slab movement. To minimize potential damage to movement sensitive
flooring, we recommend the use of slip sheeting techniques (linoleum type)
which allows for foundation and slab movement without transmitting this
movement to the floor finishes.
Page No. 4 of 8
Project No. 002486-1
\\Maln\file on mainVJOBSM JOBS\2000\002486-1, FARBER-MULTI-FAMILY DEV, Fl 100 LAS FLORES DRIVE, CARLSBAD - UPDATE.wpd
Prior to placement of any moisture sensitive floor finishes, the flooring
contractor shall conduct vapor emission testing, per ASTM standards, to
determine the suitability of the concrete for the proposed flooring type.
Where emission rates exceed the manufactures specifications, a concrete
sealant product shall be utilized.
Exterior concrete flatwork and driveway slabs, due to the nature of concrete
hydration and minor subgrade soil movement, are subject to normal minor
concrete cracking. To minimize expected concrete cracking, the following
may be implemented:
• Concrete slump should not exceed 4 inches.
• Concrete should be poured during "cool" (40 - 65 degrees) weather
if possible. If concrete is poured in hotter weather, a set retarding
additive should be included in the mix, and the slump kept to a
minimum.
• Concrete subgrade should be pre-soaked prior to the pouring of
concrete. The level of pre-soaking should be a minimum of 2% over
optimum moisture to a depth of 18 inches.
• Concrete may be poured with a 10 inch deep thickened edge.
• Concrete should be constructed with tooled joints or sawcuts (1 inch
deep) creating concrete sections no larger than 225 square feet. For
sidewalks, the maximum run between joints should not exceed 5 feet.
For rectangular shapes of concrete, the ratio of length to width should
generally not exceed 0.6 (i.e., 5 ft. long by 3 ft. wide). Joints should
be cut at expected points of concrete shrinkage (such as male
corners), with diagonal reinforcement placed in accordance with
industry standards.
• Drainage adjacent to concrete flatwork should direct water away from
the improvement. Concrete subgrade should be sloped and directed
to the collective drainage system, such that water is not trapped
below the flatwork.
• The recommendations set forth herein are intended to reduce
cosmetic nuisance cracking but will not prevent concrete
cracking. The owner should be aware all concrete, because of it's
cementitious nature, will to some degree shrink and crack. The
amount, location and impact on the cosmetic flnish, of cracking can
be reduced by design philosophy and construction. The project
concrete eontractorls ultimately responsible for concrete quality and
performance, and should pursue a cost-beneflt analysis of these
recommendations with the owner & general contractor, and other
options available in the industry, prior to the pouring of concrete.
Page No. 5 of 8
ProjectNo. 002486-1
\\Main\file on mainUOBSM JOBS\2000\002486-1, FARBER-MULTI-FAMILY DEV, Fl 100 LAS FLORES DRIVE, CARLSBAD - UPDATE wpd
Additionally, the project owner should be made fully aware of
expected performance of concrete flnishes, so as to avoid follow up
calls regarding minor concrete cracking.
II) The retaining wall section of our report is updated as follows:
RETAINING WALLS
Retaining walls up to 8 feet may be designed and constructed in accordance with
the following recommendations and minimum design parameters:
1. Retaining wall footings should be designed in accordance with the allowable
bearing criteria given in the "Foundations" section ofthis report, and should
maintain minimum footing depths outlined in "Foundation" section of this
report.
2. Unrestrained cantilever retaining walls should be designed using an active
equivalent fluid pressure of 35 pcf This assumes that granular, free draining
material will be used for backflll, and that the backflll surface will be level.
For sloping backflll, the following parameters may be utilized:
Backflll Sloping
Condition
2:1 Slope 1.5:1 Slope
Active Fluid
Pressure
50 pcf 65 pcf
Any other surcharge loadings shall be analyzed in addition to the above values.
3. Ifthe tops of retaining walls are restrained fl-om movement, they should be
designed for a uniform soil pressure of 65 psf
4. Passive soil resistance may be calculated using an equivalent fluid pressure
of 300 pcf This value assumes that the soil being utilized to resist passive
pressures, extends horizontally 2.5 times the height ofthe passive pressure
wedge of the soil. Where the horizontal distance of the available passive
pressure wedge is less than 2.5 times the height ofthe soil, the passive
pressure value must be reduced by the percent reduction in available
horizontal length.
5. A coefflcient of friction of 0.35 between the soil and concrete footings may
be utilized to resist lateral loads In addition to the passive earth pressures
above.
Page No. 6 of 8
Project No. 002486-1
\\Maln\flle on mainUOBSM JOBS\2000\002486-1, FARBER-MULTI-FAMILY DEV, F1100 LAS FLORES DRIVE, CARLSBAD - UPDATE.wpd
6. Retaining walls should be braced and monitored during compaction. If this
cannot be accomplished, the compactive effort should be included as a
surcharge load when designing the wall.
7. All walls shall be provided with adequate back drainage to relieve hydrostatic
pressure, and be designed in accordance with the minimum standards
contained in the "Retaining Wall Drainage Detail", Appendix D. Area drains
should not be connected to French Drain System behind retaining wall. Wall
waterprooflng systems shall be designed by the building Architect.
8. Retaining wall backflll should be placed and compacted in accordance with
the "Earthwork" section of this report. Backflll shall consist of a non-
expansive granular, free draining material.
IV) The construction observation and testing section of our report is updated as follows:
CONSTRUCTION OBSERVATIONAND TESTING
The recommendations provided in this report are based on subsurface conditions,
our review of the site and knowledge of the area. Interpolated subsurface
conditions must be verifled in the fleld during construction. The following items shall
be conducted prior/during construction by a representative of Engineering Design
Group (under separate contract) in order to verify compliance with the geotechnical
and civil engineering recommendations provided herein, as applicable.
1. Review of flnal project grading and foundation plans prior to construction.
2. Attendance of a pre-grade/pre-construction meeting prior to the start of
construction.
3. Observation of removal bottom (parking garage subgrade).
4. Observation and testing of any flil placement, including utility trenches and
retaining wall backflll.
5. Final review of onsite drainage systems.
The project soils engineer may at their discretion deepen footings or locally
recommend additional steel reinforcement to upgrade any condition as deemed
necessary during site observations.
The fleld inspection protocol, as outlined above, is a requirement of this report.
Engineering Design Group assumes no liability for structures constructed utilizing
this report not meeting this protocol. In the event fleld inspection work is conducted
by others, they shall assume sole responsibility for work conducted and certify the
suitability of soils for building support.
Page No. 7 of 8
Project No. 002486-1
\\Main\file on mainUOBSM JOBS\2000\002486-1, FARBER-MULTI-FAMILY DEV, F1100 LAS FLORES DRIVE, CARLSBAD - UPDATE wpd
If you have any questions regarding this report, or if we can be of further service, please
do not hesitate to contact us. We hope the report provides you with necessary information
to continue with the development of the project.
Sincerely,
ING DESIGN GROUP
California RCE #47672
California RGE #2590
Califonria CEG #2263
Page No. 8 of 8
Project No. 002486-1
\\Main\file on mainUOBSM JOBS\2000\002486-1, FARBER-MULTI-FAMILY DEV, F1100 LAS FLORES DRIVE, CARLSBAD - UPDATE.wpd
ENGINEERING " " " ^ '
IDESIGN GROUP •1 GEOrECHNOL. CIVIL, SIBUCIUBAL & AflCHITECruflW CtWSULlASTS rOfl flfSIDEHIIAL & COMMERCIAL CONSTRUCTION
2121 Montiel Road, San Marcos, California 92069 • (760) 839-7302 • Fax: (760) 480-7477 • E-mail: ENGDG@aol.com
GEOTECHNICAL INVESTIGATION AND FOUNDATION RECOMIVIENDATIONS
FOR PROPOSED MULTI-FAMILY DEVELOPMENT,
TO BE LOCATED AT 1100 LAS FLORES DRIVE,
CITY OF CARLSBAD, CALIFORNIA
Project No. 002486-1
December 22, 2000
PREPARED FOR:
Curtis Farber
c/o FARBER FAMILY PARTNERSHIP
140 Marine View Avenue, #220
Soiana Beach, CA 92075
TABLE OF CONTENTS
Paqe
SCOPE 1
SITE AND PROJECT DESCRIPTION 1
FIELD INVESTIGATION 1
SUBSOIL CONDITIONS 2
GROUNDWATER 2
LIQUEFACTION 3
CONCLUSIONS AND RECOMMENDATIONS 4
GENERAL 4
EARTHWORK . 4
FOUNDATIONS 6
CONCRETE SLABS ON GRADE 8
RETAINING WALLS 9
SURFACE DRAINAGE 11
CONSTRUCTION OBSERVATION AND TESTING 11
MISCELLANEOUS 12
ATTACHMENTS
Site Vicinity Map Figure No. 1
Site Location Map Figure No. 2
Site Plan/Location of Exploratory Test Pits Figure No. 3
Logs of Exploratory Test Pits Figures No. 4-5
References Appendix A
General Earthwork and Grading Specifications Appendix B
Testing Procedures Appendix C
SCOPE
This report gives the results of our geotechnical investigation for the property located at the
end of Las Flores Drive in the City of Carlsbad, California. (See Figure No. 1, "Site Vicinity
Map", and Figure No. 2, "Site Location Map"). The scope of our work, conducted on-site
to date, has included a visual reconnaissance ofthe property and neighboring properties,
a limited subsurt'ace investigation of the property, field analysis and preparation of this
report presenting our findings, conclusions, and recommendations.
SITE AND PROJECT DESCRIPTION
The subject property consists of an generally irregularly shaped lot located north of Las
Flores Drive, in the City of Carlsbad, California. The site is bordered to the north by a
custom developed residence, to the east by the Interstate 5 freeway, to the west by a
descending slope onto neighboring driveway and Jefferson Street, and to the south by Las
Flores Drive. The overall topography of the site area consists of gentle hillside coastal
terrain. The subject site consists of a developed lot with an existing one story single family
home.
Based on our conversations with the project architect, and our review ofthe preliminary site
plan, it is anticipated that the proposed new improvements will consist of th'e following;
> Design and construction of eleven new multi-family units.
>- Design and constmction of subterranean garages.
FIELD INVESTIGATION
Our field investigation ofthe property, conducted December 18, 2000, consisted of a site
reconnaissance, site field measurements, observation of existing conditions on-site and
on adjacent sites, and a limited subsurface investigation of soil conditions. Our subsurface
investigation consisted of visual observation of two exploratory test pits, logging of soil
types encountered, and sampling of soils for laboratory testing. The locations of the test
pits are given in Figure No. 3, "Site Plan/Location of Exploratory Test Pits". Logs of the
exploratory Test Pit excavations are presented in Figures No. 4-5, "Test Pit Excavations".
FARBER DEVELOPMENT ' Job No. 002486
1100 U\S FLORES DRIVE, CARLSBAD, CALiFORNIA Page 1
ENGINEERING DESIGN GROUP
GEOTECHNICAL. CIVIL, STRUCTURAL i ARCHITECTURAL CONSULTAfn-S
SUBSOIL CONDITIONS
Materials consisting of topsoil and weathered slightly silty sandy fill material underlain by
sandstone, was encountered during our subsurface investigation ofthe site. Soil types
within ourtest pit excavations are described as follows:
Topsoil/Fill:
Topsoil/fill materials extended to depths ranging between 35-36 inches
below adjacent grade. Toposil/fiil materials consist of dark brown, moist,
medium dense, slightly silty sand with small rootlets. Topsoil/fill
materials are not considered suitable for the support of structures,
but may be used as compacted fill during grading. Slightly silty sand
materials classify as SW-SM according to the Unified Classification
System, and based on visual observation and our experience, possess
expansion potentials in the low range.
Sandstone
Sandstone material was found to underlie the fill material within our the
test pit excavations. Sandstone materials consisted of brown to rust
brown, slightly moist, dense, sandstone. Sandstone materials are
considered suitable for the support of structures and structural
improvements, provided the recommendations of this report are
followed. Sandstone materials classify as SW according to the Unified
Classification System, and based on visual observation and our
experience, possess expansion potentials in the low range.
For detailed logs of soil types encountered in our test pit excavations, as well as a
depiction of our test pit locations, please see Figure No. 3, "Site Plan/Location of
Exploratory Test Pits", and Figures No. 4-5, "Test Pits Excavations".
GROUND WATER
Ground waterwas not encountered during oursubsurface investigation ofthe site. Ground
water is not anticipated to be a significant concern to the project provided the
recommendations of this report are followed.
FARBER DEVELOPMENT Job No. 002486
1100 LAS FLORES DRIVE, CARLSBAD, CALiFORNIA Page 2
ENGINEERING DESIGN GROUP
GEOTECHNICAL, CIVIL. STRUCTURAL i ARCHITECTURAL CONSULTANTS
LIQUEFACTION
It is our opinion that the site could be subjected to moderate to severe ground shaking in
the event of a major earthquake along any ofthe faults in the Southem California region.
However, the seismic risk at this site is not significantly greaterthan that ofthe surrounding
developed area.
Liquefaction of cohesionless soils can be caused by strong vibratory motion due to
earthquakes. Research and historical data indicate that loose, granular soils underlain by
a near-surface ground water table are most susceptible to liquefaction, while the stability
of most silty clays and clays is not adversely affected by vibratory motion. Because ofthe
dense nature of the soil materials underlying the site and the lack of near surface
water, the potential for liquefaction or seismically-induced dynamic settlement at the
site is considered low. The effects of seismic shaking can be reduced by adhering to the
most recent edition of the Uniform Building Code and current design parameters of the
Structural Engineers Association of California.
FARBER DEVELOPMENT Job No. 002486
1100 LAS FLORES DRIVE, CARLSBAD, CALIFORNIA Page 3
ENGINEERING DESIGN GROUP
GEOTECHNICAL. CIVIL, STRUCTURAL & ARCHITECTURAL CONSULTANTS
CONCLUSIONS AND RECOMMENDATIONS
GENERAL
In general, it is our opinion that the proposed construction, as described herein, is feasible
from a geotechnical standpoint, provided that the recommendations of this report and
generally accepted construction practices are followed.
The following recommendations should be considered as minimum design parameters, and
shall be incorporated within the project plans and utilized during construction, as
applicable.
EARTHWORK
Where slab on grade flooring systems are proposed for the new improvements, fill material
found to mantle the site will require removal and re-compaction during grading within the
areas of improvement. Based on our investigation, as a minimum required removals
shouid extend through fill profiles, anticipated to be approximately 3 feet deep, and to a
minimum distance of 5 feet outside the footprint ofthe proposed stmcture (where possible).
Based upon our understanding ofthe proposed subterranean garages, it is anticipated that
garage floors will be founded into competent formational material. Where any cut/fill
transitions occur entire building pad should be undercut to create a uniform compacted fill
pad. Special structural consideration should be made for foundations that may span into
retaining wall backfill wedges, especially in the area of subterranean garage walls . Such
conditions should be reviewed by our office priorto constmction. Where removals can not
be made as described above, the non conforming condition should be brought to the
attention ofthe Engineering Design Group in writing so modified recommendations may
be provided.
In order to confirm soil conditions obsen/ed during the field investigation, all undercuts
should be observed by Engineering Design Group prior to recompaction of any fill soils.
1. Site Preparation
Prior to any grading, areas of proposed improvement should be cleared
of surface and subsurface organic debris (including topsoil). Removed
FARBER DEVELOPMENT Job No. 002486
1100 U\S FLORES DRIVE, CARLSBAD, CALIFORNIA Page 4
ENGINEERING DESIGN GROUP
GEOTECHNICAL, CIVIL, STRUCTURAL i ARCHITECTURAL CONSULTANTS
debris should be properly disposed of off-site prior to the commencement
of any fill operations. Holes resulting from the removal of debris, existing
structures, or other improvements which extend below the undercut
depths noted, should be filled and compacted using on-site material ora
non-expansive import material.
2. Removals
Fill soils found to mantle the site in our exploratory test pits (i.e., upper
approximately 3 feet), are not suitable for the structural support of
buildings or improvements in their present state, and will require removal
and re-compaction in areas of proposed slab on grade fioors or other
settlement sensitive locations. In general, grading should consist ofthe
excavation of a keyway at the base of any proposed fill slopes, keyway
cambered into slope to a minimum depth of 18 inches into competent
formational soil profiles, scarification of keyway bottom, benching, and re-
compaction of fill materials to 90 percent relative compaction per ASTM
1557-91 (See Appendix B for grading detailing). Excavated fill materials
are suitable for re-use as fill material during grading, provided they are
cleaned of debris and oversize material in excess of 6 inches in diameter
(oversized material is not anticipated to be of significant concern) and are
free of contamination. Improvements should be constmcted on uniform
buiiding pad. Where a cut/fill transition occurs, the building pad should
be undercut to a minimum of 3 feet, to a distance of 5 feet outside
building perimeter, where possible.
Removals and undercuts should extend a minimum of 5 feet beyond
the footprint of the proposed structures and settlement sensitive
improvements. Where this condition cannot be met it should be
reviewed by the Engineering Design Group on a case by case basis.
Removal depths should be visually verified by a representative of
our firm prior to the placement of fill.
3. Fills
Areas to receive fill and/or structural improvements should be scarified to
FARBER DEVELOPMENT Job No. 002486
1100 LAS FLORES DRIVE, CARLSBAD, CALIFORNIA Page 5
ENGINEERING DESIGN GROUP
GEOTECHNICAL. CIVIL. STRUCTURAL i ARCHITECTURAL CONSULTANTS
a minimum depth of 12 inches, brought to near optimum moisture
content, and re-compacted to at least 90 percent relative compaction
(based on ASTM D1557-91). Compacted fills should be cleaned of loose
debris, oversize material in excess of 6 inches in diameter, brought to
near optimum moisture content, and re-compacted to at least 90%
relative compaction (based on ASTM Dl 557-91). Surficial, loose or soft
soiis exposed or encountered during grading (such as any undocumented
or loose fill materials) should be removed to competent formational
material and properly compacted prior to additional fill placement.
Fills should generally be placed in lifts not exceeding 8 inches in
thickness. Ifthe import of soil is planned, soils should be non-expansive
and free of debris and organic matter. Priorto importing, soils should be
visually observed, sampled and tested at the borrow pit area to evaluate
soil suitability as fill.
FOUNDATIONS
We anticipate that the proposed foundation system for the structures will slab on grade
and perimeter footing foundation system.
1. Footings bearing in competent formational materials or compacted fill may be
designed utilizing maximum allowable soils pressure of 2,000 psf.
Seismic Design Parameters:
Seismic Zone Factor 4
Soil Profile Type
(Table 16-J)
Sd
Near Source
Distance
(Distance to Closest
Active Fault)
15 km
Rose Canyon
Seismic Source Type
(Table 16-U)
D
FARBER DEVELOPMENT
1100 LAS FLORES DRIVE, CARLSBAD, CALiFORNIA
ENGINEERING DESIGN GROUP
GEOTECHNICAL, CIVIL, STRUCTURAL & ARCHITECTURAL CONSULTANTS
Job No. 002486
Page 6
Bearing values may be increased by 33% when considering wind, seismic, or
other short duration loadings.
The following parameters should be used as a minimum, for designing footing width
and depth below lowest adjacent grade:
No. of Floors
Supported
Minimum Footing Width 'Minimum Footing Depth
Below Lowest Adjacent Grade
1 15 inches 18 inches
2 15 inches 18 inches
3 18 inches 24 inches
5. All footings shouid be reinforced with a minimum of two #4 bars at the top and two
#4 bars at the bottom (3 inches above the ground). For footings over 30 inches in
depth, additional reinforcement, and possibly a stemwall system will be necessary.
This detail should be reviewed on a case by case basis by our office prior to
construction.
6. All isolated spread footings should be designed utilizing the above given bearing
values and footing depths, and be reinforced with a minimum of #4 bars at 12
inches o.c. in each direction (3 inches above the ground). Isolated spread footings
should have a minimum width of 24 inches.
7. For footings adjacent to slopes, a minimum 15 feet horizontal setback in formational
material or properly compacted fill should be maintained. A setback measurement
should be taken at the horizontal distance from the bottom of the footing to slope
daylight. Where this condition can not be met it should be brought to the attention
of the Engineering Design Group for review.
6. All excavations should be performed in general accordance with the contents of this
report, applicable codes, OSHA requirements and applicable city and/or county
standards.
7. All foundation subgrade soils and footings shall be pre-moistened a minimum of 18
inches in depth prior to the pouring of concrete.
FARBER DEVELOPMENT
1100 LAS FLORES DRIVE, CARLSBAD. CALIFORNIA
ENGINEERING DESIGN GROUP
GEOTECHNICAL, CIVIL, STRUCTURAL & ARCHITECTURAL CONSULTANTS
Job No. 002486
Page 7
CONCRETE SLABS ON GRADE
Concrete slabs on grade should use the following as the minimum design parameters:
1. Concrete slabs on grade ofthe building slabs should have a minimum thickness of
4 inches (5 inches at garage and driveway locations) and should be reinforced with
#4 bars at 24 inches o.c. placed at the midpoint of the slab.
All concrete shall be poured per the following:
• Slump: Between 3 and 4 inches maximum
Aggregate Size: 3/4 -1 inch
Air Content: 5 to 8 percent
Moisture retarding additive in concrete at moisture
sensitive areas.
Water to cement Ratio - 0.5 maximum
2. All required fills used to support slabs, should be placed in accordance with the
grading section ofthis report and the attached Appendix B, and compacted to 90
percent Modified Proctor Density, ASTM D-1557.
3. A uniform layer of 4 inches of clean sand is recommended under the slab in order
to more uniformly support the slab, help distribute loads to the soiis beneath the
slab, and act as a capillary break. In addition, a visqueen layer (10 mil) should be
placed mid-height in the sand bed to act as a vapor retarder.
4. Adequate control joints should be installed to control the unavoidable cracking of
concrete that takes place when undergoing its natural shrinkage during curing. The
controi joints should be well located to direct unavoidable slab cracking to areas that
are desirable by the designer.
5. All subgrade soils to receive concrete flatwork are to be pre-soaked to 2 percent
over optimum moisture content to a depth of 18 inches.
6 Brittle floor finishes placed directly on slab on grade floors may crack if concrete is
not adequately cured priorto installing the finish or if there is minor slab movement
To minimize potential damage to movement sensitive flooring, we recommend the
use of slip sheeting techniques (linoleum type) which allows for foundation and slab
FARBER DEVELOPMENT Job No. 002486
1100 LAS FLORES DRIVE, CARLSBAD, CALIFORNiA Page 8
ENGINEERING DESIGN GROUP
GEOTECHNICAL, CIVIL, STRUCTURAL i ARCHITECTURAL CONSULTANTS
movement without transmitting this movement to the floor finishes.
7. Exterior concrete flatwork and driveway slabs, due to the nature of concrete
hydration and minor subgrade soil movement, are subject to normal minor concrete
cracking. To minimize expected concrete cracking, the following may be
implemented:
Concrete slump should not exceed 4 inches.
Concrete should be poured during "cool" (40 - 65 degrees) weather if
possible. If concrete is poured in hotter weather, a set retarding additive
should be included in the mix, and the slump kept to a minimum.
Concrete subgrade should be pre-soaked prior to the pouring of concrete.
The level of pre-soaking should be a minimum of 2% over optimum moisture
to a depth of 18 inches.
Concrete may be poured with a 10 inch deep thickened edge.
Concrete should be constructed with tooled joints or sawcuts (1 inch deep)
creating concrete sections no larger than 225 square feet. For sidewalks,
the maximum run between joints should not exceed 5 feet. For rectangular
shapes of concrete, the ratio of length to width should generally not exceed
0.6 (i.e., 5 ft. long by 3 ft. wide). Joints should be cut at expected points of
concrete shrinkage (such as male corners), with diagonal reinforcement
placed in accordance with industry standards.
Drainage adjacent to concrete flatwork should direct water away from the
improvement. Concrete subgrade should be sloped and directed to the
collective drainage system, such that water is not trapped beiow the flatwork.
The recommendations set forth herein are intended to reduce cosmetic
nuisance cracking. The project concrete contractor is ultimately responsible
for concrete quality and performance, and should pursue a cost-benefit
analysis of these recommendations, and other options available in the
industry, prior to the pouring of concrete.
RETAINING WALLS
Retaining walls are not anticipated for construction ofthe additions, but retaining walls up
to 6 feet may be designed and constructed in accordance with the following
recommendations and minimum design parameters:
1. Retaining wall footings should be designed in accordance with the allowable bearing
FARBER DEVELOPMENT Job No. 002486
1100 LAS FLORES DRIVE, CARLSBAD, CALIFORNIA Page 9
ENGINEERING DESIGN GROUP
GEOTECHNICAL, CIVIL, STRUCTURAL & ARCHITECTURAL CONSULTANTS
criteria given in the "Foundations" section of this report, and should maintain
minimum footing depths outlined in "Foundation" section ofthis report.
2. Unrestrained cantilever retaining walls should be designed using an active
equivalent fluid pressure of 35 pcf. This assumes that granular, free draining
material will be used for backfill, and that the backfill surface will be level. For
sloping backfill, the foliowing parameters may be utilized:
Condition 2:1 Slope 1.5:1 Slope
Active 50 65
Any other surcharge loadings shall be analyzed in addition to the above values.
3. If the tops of retaining walls are restrained from movement, they should be
designed for an additionai uniform soil pressure of 7XH psf, where H is the height
of the wall in feet.
4. Passive soil resistance may be calculated using an equivalent fluid pressure of
300 pcf. This value assumes that the soil being utilized to resist passive pressures,
extends horizontally 2.5 times the height ofthe passive pressure wedge ofthe soil.
Where the horizontal distance ofthe available passive pressure wedge is less than
2.5 times the height of the soil, the passive pressure value must be reduced by the
percent reduction in available horizontal length.
5. A coefficient of friction of 0.35 between the soil and concrete footings may be
utilized to resist lateral loads in addition to the passive earth pressures above.
6. Retaining walls should be braced and monitored during compaction. If this cannot
be accomplished, the compactive effort should be included as a surcharge load
when designing the wail.
7. All walls shall be provided with adequate back drainage to relieve hydrostatic
pressure, and be designed in accordance with the minimum standards contained
in the "Retaining Wall Drainage Detail", Appendix B. Surface area drains and
other drainage systems should not be tied to retaining wall back drain systems.
8. Retaining wall backfill should be placed and compacted in accordance with the
"Earthwork" section of this report. Backfill shall consist of a non-expansive
FARBER DEVELOPMENT Job No. 002486
1100 LAS FLORES DRIVE, CARLSBAD, CALIFORNIA Page 10
ENGINEERING DESIGN GROUP
GEOTECHNICAL, CIVIL, STRUCTURAL & ARCHITECTURAL CONSULTANTS
PROJECT NAME: FARBER - LAS FLORES DEELOPMENT
PROJECT NO: 002486
EQUIPMENT: HAND DUG
LOGGED BY: EER
DATUM: EXISTING GRADE = 0.0'
ELEVATION: SEE MAP
TEST PIT NO; 1.
FIGURE: C, I ENGINEERING PROPERTIES
DATE LOGGED: 12/18/00 DESCRIPTION: SEE MAP
SOILTYPE GEO. ATT.
TOPSOIUFILL
0-34" Dark brown, dry, medium dense, slightly silly sand with small rootlets
SANDSTONE
34-38" Rust brown to brown, slighlly moist, dense slightly silly sandstone.
UCSC
SW-SM
SW-SM
SAMPLES OTHER
GRAPHIC REPRESENTATION: SURFACE SLOPE: 0% +- TREND: N/A
—r
-reTAb-BEPTH—3B"-
NO GROUNDWATER
Sll f SAIIU CIAY COIITACr
FRACtURC SEEPAGE POCKETS OF GRAVEL ROOTLET BULK SAk,IPI.E CEMENTED ZOI IE ROOTLET
IUI> BbDOIIM |C)< COIIIACI ilf jOltll (F)< FRACTURE ICS) > OAV itu*
UC • UIICOttfUlEU COI^RE&SICII (TSF | El • EXPANSIOII mOEX
PROJECT NO: 002486
EQUIPMENT: HAND DUG
(v(i_n I uwoocu DY: ttK
DATUM: EXISTING GRADE = 0.0'
ELEVATION: SEE MAP
TEST PIT NO: 1
FIGURE: A ENGINEERING PROPERTIES
DATE LOGGED: 12/18/00 DESCRIPTION: SEE MAP UCSC SAMPLES OTHER
SOIL TYPE GEO. ATT.
1 TOPSOIL/FILL
0-35" Dark brown, moist, medium dense, slighlly silty sand with small
rootlels. SW-SM
2 SANDSTONE
35-40" Rust brown lo brown, moist, dense slightly silty sandstone. SW-SM
GRAPHIC REPRESENTATION: SURFACE SLOPE: 0%+- TREND; N/A
6
7
TOTAL DEPTH = 40"
NO GROUNDWATER
SILT
SWIO CkAY CONTACT
FRACTURE SEEPAOE PClCKETSOFOKAvei ROOTtET
IKUHSAMIIb CEMEIIIEU2Ullb RCOIIEI
IBI • UEOCUNG (Ci- CONTACT (J|> JOINT |F)> FRACTURE ICS) > ClAV SEAM
UC • UtICOHFlHEO COMPRESSIONITSF) El • EXPANSIOH INDEX
SITE PLAN - LOCATION OF EXPLORATORY TEST PITS
#1 - APPROXIMATE LOCATION OF EXPLORATORY TEST PITS
1 PROJECT NAME FARBER DEVELOPMENT j
1 PROJECTADDRESS 1100 LAS FLORES DRIVE. CITY OF CARLSBAD. CALIFORNIA |
1 PROJECT NUMBER ENGINEERING DESIGN GROUP
GEOTECHNICAL. CIVIL. STRUCTURAL « ARCNTECTURAL CONSULTANTS 310 W. U» Vilealos BM,. SUM A. San Marcos. CA 92069
Phone: (760)7S2-7aTO Fw; (760)752-7092
FIGURE 1
1 002486-1
ENGINEERING DESIGN GROUP
GEOTECHNICAL. CIVIL. STRUCTURAL « ARCNTECTURAL CONSULTANTS 310 W. U» Vilealos BM,. SUM A. San Marcos. CA 92069
Phone: (760)7S2-7aTO Fw; (760)752-7092
FIGURE 1
1 002486-1
ENGINEERING DESIGN GROUP
GEOTECHNICAL. CIVIL. STRUCTURAL « ARCNTECTURAL CONSULTANTS 310 W. U» Vilealos BM,. SUM A. San Marcos. CA 92069
Phone: (760)7S2-7aTO Fw; (760)752-7092 3 1
nMaintfilelFonnsM FRMVFARBER - LAS FLORE S - LOCATION OF TEST PITS,v.pil
SITE LOCATION MAP
PROJECT NAME
PROJECTADDRESS
FARBER DEVELOPMENT
1100 LAS FLORES DRIVE, CITY OF CARLSBAD. CALIFORNIA
PROJECT NUMBER
002486-1
ENGINEERING DESIGN GROUP
GEOTECHMCAL. CML. STRUCTURAL S ARCMTECTURAL CONSULTAIWS
810 w Los vaieaios Blvd.. Suite A. San Marcos, CA 92069
Ptwoa: (760)752-7010 Fax (7«0)7S2-7092
FIGURE
WMamWIeiFormsM FRIWFARBtH - LAS FLORES - LOCATION OF TEST PITS.wpd
SITE VICINITY MAP
PROJECT NAME
PROJECT ADDRESS
FARBER DEVELOPMENT
1100 LAS FLORES DRIVE. CITY OF CARLSBAD. CALIFORNIA
PROJECT NUMBER
002486-1
ENGINEERING DESIGN GROUP
GEOTECHNICAL. CIVU.. STRUCTURAL ft ARCHITECTURAL CONSULTANTS
110 W, LOS VaMcHos BM.. Suila A. San Marcos. CA 92069
Phona: (760)752-7010 Fax; (760)752-7092
FIGURE
1
\\Ma««HelFonnsH FRM*AR8ER - LAS FLOBES - LOCATION OF TEST PITS.v^
warranties of the accuracy of these recommendations, beyond the limits of the obtained
data, is herein expressed or implied. This report is based on the investigation at the
described site and on the specific anticipated constmction as stated herein. If either of
these conditions is changed, the results would also most likely change.
Man-made or natural changes in the conditions of a property can occur over a period of
time. In addition, changes in requirements due to state of the art knowledge and/or
legislation, are rapidly occurring. As a result, the findings ofthis report may become invalid
due to these changes. Therefore, this report for the specific site, is subject to review and
not considered valid after a period of one year, or if conditions as stated above are altered.
It is the responsibility of the owner or his representative to ensure that the information in
this report be incorporated into the plans and/or specifications and constmction of the
project. It is advisable that a contractor familiar with constmction details typically used to
deal with the local subsoil and seismic conditions, be retained to build the structure.
Ifyou have any questions regarding this report, or if we can be of further service, please
do not hesitate to contact us. We hope the report provides you with necessary information
to continue with the development of the project.
Sincerely,
ENGINEERp«S'D|SieN-GR€>UP
Steven Norris-
California RCE #47672
.-y.-'i-- • •"-•- <- .•
VC^ Ex;:. -.2-^ u
^•.'C .T- .-.•.\ \=-v.:>i.'
FARBER DEVELOPMENT Job No. 002486
1100 LAS FLORES DRIVE, CARLSBAD. CALIFORNIA Page 13
ENGINEERING DESIGN GROUP
GEOTECHNICAL. CIVIL. STRUCTURAL i ARCHITECTURAL CONSULTAMTS
granular, free draining material.
SURFACE DRAINAGE
Adequate drainage precautions at this site are imperative and will play a critical role on the
future performance of the dwelling and improvements. Under no -cu™
water be allowed to pond against or adjacent to foundation walls, or tops of slopes. The
Trou d surface surrounding proposed improvements shouid be
nature, and slope to drain away from the stmcture in a directions, ^ —^^^^J^^^
of 2% for a horizontal distance of 7 feet (where possible). Area drains or surface swales
should then be provided to accommodate mnoff and avoid any P^"^;"^
gutters and downspouts shall be installed on the new and «>^f "9 ^^^'^f,"^^^ .""^^^^^^^
to the area drain system. All drains should be kept clean and unclogged '"^lud "9^^^^^^
and downspouts. Area drains should be kept free of debns to allow for proper drainage.
During periodsofheavy rain, theperformanceofalldrainagesystems should b^^^^^^
Problems such as gullying or ponding should be corrected as f P°fj'^'^^^^^^^^
leakage from sources such as water lines should also be repaired as soon as possible^
In addftion Trrigation of planter areas, lawns, or other vegetation, located adjacent to the
foundation or exterior flat work improvements, should be strictly controlled or avoided.
CONSTRUCTION OBSERVATION AND TESTING
The recommendations provided in this report are based on subsurface ^o^f
by our investigation of the project area. Interpolated subsurface c°"ditions should be
verified in the field during constmction. The following items shall be conducted PnorA^^unng
constmction by a representative of Engineering Design Group in orderto verify comphance
with the geotechnical and civil engineering recommendations P^o^'^f^^^ere^n,^^^^^
applicable The project stmctural and geotechnical engineers may upgrade any condition
as deemed necessary during the development of the proposed ,mprovement(s).
1 Attendance of a pre-constmction meeting prior to the start of work
2. Review of finai approved stmctural plans priorto the start of work, for compliance w.th
geotechnical recommendations.
3. Observation of keyway bottom prior to scarification.
Job No. 002486
FARBER DEVELOPMENT Page 11
1100 LAS FLORES DRIVE. CARLSBAD. CALIFORNIA ^D^MTD
ENGINEERING DESIGN GROUP
GEOTECHNICAL. CIVIL. STRUCTURAL & ARCHITECTURAL CONSULTANTS
APPENDIX -A-
APPENDIX A
REFERENCES
1. California Department of Conservation, Division of Mines and Geology, Fault-Rupture
Zones in California, Special Publication 42, Revised 1990.
2. Greensfelder, R.W., 1974, Maximum Credible Rock Acceleration from Earthquakes in
California: California Division of Mines and Geology, Map Sheet 23.
3. Hart, Michael, June 17,1994, Geologic Investigation, 7505 Hillside Drive, La Jolla, CA,
File No: 153-94.
4. Engineering Design Group, Unpublished In-House Data.
5. Ploessel, M.R., and Slosson, J.E., 1974, Repeatable High Ground Acceleration from
Earthquakes: California Geology, Vol. 27, No. 9, P. 195-199.
6. State of California, Fault Map of California, Map No: 1, Dated 1975.
7. State of California, Geologic Map of California, Map No: 2, Dated 1977.
APPENDIX -B-
GENERAL EARTHWORK AND GRADING SPECIFICATIONS
1.0 General Intent
These specifications are presented as general procedures and recommendations for
grading and earthwori< to be utilized in conjunction with the approved grading plans.
These general earthwork and grading specifications are a part of the
recommendations contained in the geotechnical report and shall be superseded by
the recommendations in the geotechnical report in the case of conflicL Evaluations
performed by the consultant during the course of grading may result in new
recommendations which could supersede these specifications or the
recommendations of the geotechnical report. It shall be the responsibility of the
contractor to read and understand these specifications, as well as the geotechnical
report and approved grading plans.
2.0 Earthwork Observation and Testina
Prior to the commencement of grading, a qualified geotechnical consultant should be
employed for the purpose of observing earthwork procedures and testing the fills for
conformance with the recommendations of the geotechnical report and these
~ specifications. It shall be the responsibilify of the contractor to assist the consultant
and keep him apprised of wori< schedules and changes, at least 24 hours in advance,
so that he may schedule his personnel accordingly. No grading operations should be
performed without the knowledge of the geotechnical consultant. The contractor shall
not assume that the geotechnical consultant is aware of all grading operations.
It shall be the sole responsibilify of the contractor to provide adequate equipment and
methods to accomplish the work in accordance with applicabie grading codes and
agency ordinances, recommendations in the geotechnical report, and the approved
grading plans not withstanding the testing and observation of the geotechnical
consultant. If, in the opinion of the consultant, unsatisfactory conditions, such as
unsuitable soil, poor moisture condition, inadequate compaction, adverse weather,
etc., are resulting in a qualify of work less than recommended in the geotechnical
report and the specifications, the consultant will be empowered to reject the work and
recommend that construction be stopped until the conditions are rectified.
Maximum dry density tests used to evaluate the degree of compaction should be
performed in general accordance with the latest version of the American Sociefy for
Testing and Materials test method ASTM D1557.
-1-
3.0 Preparation of Areas to be Filled
3.1 Clearing and Grubbing: Sufficient brush, vegetation, roots and all other
deleterious material should be removed or properly disposed of in a method
acceptable to the owner, design engineer, governing agencies and the
geotechnical consultant.
The geotechnical consultant should evaluate the extent of these removals
depending on specific site conditions. In general, no more than 1 percent (by
volume) of the fill material should consist of these materials and nesting of
these materials should not be allowed.
3.2 Processing: The existing ground which has been evaluated by the
geotechnical consultant to be satisfactory for support of fill, should be scarified
to a minimum depth of 6 inches. Existing ground which is not satisfactory
shouid be overexcavated as specified in the following section. Scarification
should continue untii the soils are broken down and free of large clay lumps or
clods and until the working surface is reasonably uniform, flat, and free of
uneven features which wouid inhibit uniform compaction.
3.3 Overexcavation: Soft, dry, organic-rich, spongy, highly fractured, or otherwise
unsuitable ground, extending to such a depth that surface processing cannot
adequately improve the condition, should be overexcavated down to
competent ground, as evaluated by the geotechnical consultant. For purposes
of determining quantities of materials overexcavated, a licensed land
surveyor/civil engineer should be utilized.
3.4 Moisture Conditioning: Overexcavated and processed soils should be watered,
dried-back, blended, and/or mixed, as necessary to attain a unifonm moisture
content near optimum.
3.5 Recompaction: Overexcavated and processed soils which have been properly
mixed, screened of deleterious material, and moisture-conditioned should be
recompacted to a minimum relative compaction of 90 percent or as otherwise
recommended by the geotechnical consultant.
-2-
3.6 Benching: Where fills are to be placed on ground with slopes steeper than 5:1
(horizontal to vertical), the ground should be stepped or benched. The lowest
bench should be a minimum of 15 feet wide, at least 2 feet into competent
material as evaluated by the geotechnical consultant Other benches should
be excavated into competent material as evaluated by the geotechnical
consultant. Ground sloping flatter than 5:1 should be benched or otherwise
overexcavated when recommended by the geotechnical consultant.
3.7 Evaluation of Fill Areas: All areas to receive fill, including processed areas,
removal areas, and toe-of-fill benches, should be evaluated by the
geotechnical consultant prior to fill placemenL
4.0 Fill Material
4.1 General: Material to be placed as fill should be sufllciently free of organic
matter and other deleterious substances, and should be evaluated by the
geotechnical consultant prior too placement. Soils of poor gradation,
expansion, or strength characteristics should be placed as recommended by
the geotechnical consultant or mixed with other soiis to achieve satisfactory fill
material.
4.2 Overside: Oversize material, defined as rock or other irreducible material with
a maximum dimension greater than 6 inches, should not be buried or placed
in fills, unless the location, materials, and disposal methods are specifically
recommended by the geotechnical consultant Oversize disposal operations
should be such that nesting of oversize material does not occur, and such that
the oversize material is completely surrounded by compacted or densified fill.
Oversize material should not be placed within 10 feet vertically of finish grade,
within 2 feet of future utilities or underground construction, or within 15 feet
horizontally of slope faces, in accordance with the attached detail.
4.3 Import: If importing of fill material is required for grading, the import material
should meet the requirements of Section 4.1. Sufficient time should be given
to allow the geotechnical consultant to obsen/e (and test, if necessary) the
proposed import materials.
5.0 Fill Placement and Compaction
5.1 Fill Lifts: Fill material should be placed in areas prepared and previously
evaluated to receive fill, in near-horizontal layers approximately 6 inches in
compacted thickness. Each layer should be spread evenly and thoroughly
mixed to attain uniformify of material and moisture throughout
5.2 Moisture Conditioning: Fill soils should be watered, dried-back, blended,
and/or mixed, as necessary to attain a unifonm moisture content near optimum.
5.3 Compaction of Fill: After each layer has been evenly spread, moisture-
conditioned, and mixed, it should be uniformly compacted to not less than 90
percent of maximum dry densify (unless otherwise specified). Compaction
equipment should be adequately sized and be either specifically designed for
soil compaction or of proven reliability, to efficiently achieve the specified
degree and unifonmify of compaction.
5.4 Fill Slopes: Compacting of slopes should be accomplished, in addition to
nonnal compacting procedures, by backrolling of slopes with sheepsfoot rollers
at increments of 3 to 4 feet in fill elevation gain, or by other methods producing
satisfactory results. At the completion of grading, the relative compaction of
the fill out to the slope face wouid be at least 90 percent.
5.5 Compaction Testing: Field tests of the moisture content and degree of
compaction of the fill soils should be performed at the consultant's discretion
based on field conditions encountered. In general, the tests should be taken
at approximate intervals of 2 feet in vertical rise and/or 1,000 cubic yards of
compacted fill soils. In addition, on slope faces, as a guideline approximately
one test should be taken for each 5,000 square feet of slope face and/or each
10 feet of vertical height of slope.
6.0 Subdrain Installation
Subdrain systems, if recommended, should be installed in areas previously evaluated
for suitabilify by the geotechnical consultant, to confonn to the approximate alignment
and details shown on the plans or herein. The subdrain location or materials should
not be changed or modifled unless recommended by the geotechnical consultant
The consultant, however, may recommend changes in subdrain line or grade
depending on conditions encountered. All subdrains should be sun/eyed by a
licensed land surveyor/civil engineer for line and grade after installation. Sufficient
time shall be allowed for the survey, prior to commencement of filling over the
subdrains.
7.0 Excavation
Excavations and cut slopes should be evaluated by a representative of the
geotechnical consultant (as necessary) during grading. If directed by the geotechnical
consultant, further excavation, overexcavation, and refilling of cut areas and/or
remedial grading of cut slopes (i.e., stabilify fills or slope buttresses) may be
recommended.
8.0 Quantify Determination
For purposes of determining quantities of materials excavated during grading and/or
determining the limits of overexcavation, a licensed land surveyor/civil engineer
should be utilized.
MINIMUM RETAINING WALL WATERPROOFING
&: DRAINAGE DETAIL
FINAL WATERPROOFING SPECIFICATIONS & DETAILS TO BE PROVIOED
BY PROJECT ARCHITECT
TOP OF RETAINING WALL
MASTIC TO 8E APPLIED TO TOP OF WALL
MASTIC TYPE WATER PROOFING (HLM 5000 CR EQUIV)
INSTALLED PER MANUFACTURES
SPECIFICATIONS dc PROTECTED WITH
BACKER BOARD (ABOVE MIRADRAIN) MASTIC NOT TO BE
EXPOSED TO SUNUGHT
SOIL BACKnLL, COMPACTED TO 90S
REL-ATIVE COMPACTION
PER REFERENCE #1
:NO MIRADRAIN (top)
RETAINING WALL
PROPOSEO SLOPE 9ACKCUT
PER OSHA STANDARDS
OR PER ALTERNATIVE SLOPING
PLAN. OR PER APPROVEO
SHORING PLAN
COMPACTED RLL
OR BEDROCK
FILTER FABRIC ENVELOPE
(MIRAFI 14.0N- OR
APPROVED EOUIVALENT)
12" MIN. LAP
2/< - 1 1/2' CLEAN
GRAVEL
*'X*' (45d) CONCRETE CANT
O FOOTING/WALL CONNECTION
(UNDER WATER PROORNG)
4' (MIN.) DIAMETER
PERFORATED PVC PIPE
(SCHEDULE 40 OR EQ.)
WITH PERFORATIONS
ORIENTED DOWN AS
DEPICTED MIN. 2%
GRADIENT TO SUITABLE
OUTLET.
END MIRADRAIN (bottom)
•COMPETENT BEDROCK OR FILL MATERIAL
AS EVALUATED BY THE GEOTECHNICAL
CONSULTANT
PROJECT NUMBER
PROJECT NAME
1 ROJECT ADDRESS
DRAWN BY:
SCALE; r=r-o''
ENGINEERING
DESIGN GROUP
810 WEST LOS VALLECITOS BLVD.
SUITE "A"
SAN MARCOS, CA 92069
(760) 752-7010 FAX (760) 752-7092
DETAIL/FIGURE
NUMBER
DATE
iL
No surchargt ioadj wittiin ;his
aru for lavtl baclcfill ijasign.
Lina af undisturbad natural soil
Filter Material, 1" max. crushed
aggregate, 4 cu. ft. per 4" dia.
drain or I cu. ft. per ft. of open
head jointi.
4" dia. drain with 1/4" galv. wire- meih
screen 8' • 0" on centers, or one row
horizontally of open head joints.
TYPICAL SECTION
Mortar or cast-in-placa concrate
Finished ground line
9" 112" block wall
— 'JOHT
Vertical reinf.
Grout filled block cells
Horizontal reinf. thru
bond beam block
Venical reinf.
Top of footing
CAP DETAIL
2" X 4" (nominal) key
KEY DETAIL
NOTES:
1.. All masonry retaining walls shall be constructed with cap. key and
drainage details as shown hereon.
2. 4" diemetar drain may be formed by placing a block on it's side.
THE ENQINEERINQ DESIQN QROUP
RETAINING WALL DETAiL
JOfMft I
OESIGN CONDITIONS: INSPECTIONS:
Walls ara to ba usad for tha loading conditions shown for
each type wall. Design H shall not be exceeded.
Footing key is required except as shown otherwise or when
found unnecessary by the Engineer.
Special footing design is required where foundation material
is uncapable of supporting toe pressure listed in table.
OESIGN OATA:
Reinforced Concrete:
Fc
Fs
1200 psi
20,000 psi
F'c
n
3000 psi
10
Reinforced Masonry:
F'm
Fs
600 psi
20.000 psi
Fm 200 psi
50
Earth • 120 pcf and Equivalent Fluid Pressure " 36 psf
per foot of height Walls shown for VA:] unlimited
sloping surcharge are designed in accordanca with
Rankline's formula for unlimited sloping surcharge with
a D " 33* 42:
REINFORCEMENT:
Intermediate grade, hard grade, or rail steel deformation shall
confonn to ASTM A615, A616, A617. Bars shall lap 40
diametan, whera spliced, unless otherwise shown on the plans.
Bends shall conform to the Manual.of Standard Practice, A.C.I.
Backin; for hooks is four diamsters. All bar embedments are
ciear distances to outside of bar. Spacing for parailei bars is
center to center of ban.
MASONRY:
All reinforced masonry retaining walls shall be constructed of
regular or light weight standard units conforming to the
"Standard Specifications for Public Works Construction."
JOINTS:
Vertical control joinn shall be placid at 32 foot intervals
msimurn. Jomts shall bc designed to resist shear and
other lataral forces while permitting longitude movement.
Virtical expansion joints shall be placed at 95 foot inter-
vals maximum.
CONCRETE:
Footing concrete shall be 560-C-3250, using B aggregate
when placing conditions permit.
BACKFILL:
No backfill material shall be placed against masonry retaining
walls until grout has reached design strength or until grout has
cured for a minimum of 28 days. Compaction of backfill
material by jetting or ponding with water will not be permitted.
Each layer of backfill shall be moistened as directed by the
Engineer and thoroughly tamped, rolled or otherwise compacted
until the relative compaction is not less than 90%.
FENCING:
Safety fencing shall be installed at the top of the wall as
required by the agency.
Call for inspections as follovvs:
A. When the footing has been formed, with the steel tied
securely in finai position, and is ready for the concrete
to be placed.
8. Where cleanout holes are not provided:
(1) After the blocks have been laid up to a height of
4', or full height for walls up to 5', with steel in
place but before the grout is poured, and
(2) After the first lift is properly grouted, the blocks
have been laid up to the top of the wall with the
steei tied securely In piace but before the upper
lift is grouted.
Where cleanout holes are provided:
After the blocks have been laid up to the top of
the wall, with the steel tied securely in place, but
before grouting.
C. After grouting is compiete and after rock or rubble wall
drains are In place but before earth backfill is placed.
0. Final mspection when all work has been completed.
CONCRETE GROUT AND MORTAR MIXES:
Concrete grout shall attain a minimum compressive strength of
2,000 psi in 28 days and morur shall attain 1,800 psi in 28 days.
All cafls shall be filled with grout. Rod or vibrate grout
within 10 minutes of pouring to insure -consolidation. Bring
grout to a point 2" from the top of masonry units when
grouting of second lift is to be continued at another time.
MORTAR KEY:
To insure proper bonding between the footing and the first
course of block, a mortar key shall be formed by embedding
a flat 2X4 flush with and at tha top of the freshly poured
footing. The 2X4 shouid be removed after ths concrete has
started to harden (approximately 1 hour).
A mortar key may be omitted if the first course of block is
set into the fresh concrete when the footing is poured, and a
good bond is obtained..
WALL DRAINS:
Wall drains shall be provided in accordance with Standard
Drawing C-8.
SOIL:
All footings shall extend at least 12 inches into undisturbed
natural soil or approved compacted fill. Soil should be dampened
prior to placing concrete in footings.
THE ENQINEERINQ DESIQN QROUP
RETAINING WALL DETAIL
joa NOl ricuti NOi
•Edgt of Footing
r v/////////W//////r\ ,.v.
<>
11/2:1 sloping backfill or
250 psf. live load surcharge
PLAN
H- 5' • 4"
TYPICAL SECTION
over 3' - 8"
H= 3' • 8"
rr
11/2:1 sloping backfill or
250 psf. live load surcharge
oo !_•,<•
mortar cap
# 4 total 2
3
Key
' 'rf' ' ^2"x 12" key
V" # 4 @ 12"
f l^^#4liil2"
Horizontal reinf. not shown
ELEVATION
-(a) bars
# 4 total 3
J
I W/2
W
TYPICAL SECTION
3' • 8" max.
NOTES
1. See Standard Drawings C-7 and C-8 for
additional notes and details.
2. Fill all block cells with grout.
DIMENSIONS AND REINFORCING STEEL
H (max) 5' - 4" 3' • 8"
T (min) 0'- 10" 0'- 10"
W (min) 5' • 0" 3' • 9"
\A\ bars / 4 @ 15"
(B) ban / 5 ® 16" # 4 @ 15"
max. toe
prass. (ptf) 700 550
THE ENQINEERINQ DESIQN QROUP
RETAINING WALL DETAIL
SIDE HILL STABILITY FILL DETAIL
EXISTINQ GROUND
SURFACE-
FINISHED SLOPE FACE
PROJECT 1 TO 1 LINE
FROM TOP OF SLOPE TO
OUTSIDE EDQE OF KEY
OVERBURDEN OR
UNSUITABLE
MATERIAL
2' i 15' MIN. MIN. LOWEST
KEY BENCH
OEPTH (KEY)
PAO OVEREXCAVATION DEPTH
AND RECOMPACTION MAY BE
RECOMMENOED BY THE
GEOTECHNICAL CONSULTANT
BASED ON ACTUAL FIELD
CONDITIONS ENCOUNTERED.
-COMPETENT BEDROCK OR
MATERtAL AS EVALUATED
BY THE QEOTECHNICAL
CONSULTANT
NOTE: Subdrain details and key width recommendations to be provided based
on exposed subsurface conditions
CANYON SUBDRAIN DETAILS
EXISTINa
GROUND SURFACE
§;^^:^^^c-i>-:-z>c o M P A C T E O_ F IL Ljj^2-:rd^ii>::|^
REMOVE
UNSUITABLE
MATERIAL
SUaORAIN
TRENCH
SEE BELOW
a' MIN. OVERLAP
SUBDRAIN TRENCH DETAILS
FILTER FABRIC ENVELOPE
(MIRAFI 140N OR APPROVED
EQUIVALENT)*
6' MIN. OVERLAP
6' MIN.fF
COVER =
4' MIN. BEDDING
3M'-l-1/2' CLEAN
QRAVEL <91t.3/ft. MIN.)
6' ^ MIN.
PERFORATED
PIPE
* . .' • -ll 3/4'-1-1/2' CLEAN
• . Q ^GRAVEL
"^~ryr.'; wt?nx. MIN.)
*IF CALTRANS CLASS 2 PERMEABLE
MATERIAL IS USED IN PLACE OF
3/4-1-1/2' QRAVEL. FILTER FABRH
MAY BE DELETED
DETAIL OF CANYON SUBDRAIN TERMINAL
DESIGN FINISH
QRADE
EI^OMPACTEIJ
SUBDRAIN
TRENCH
SEE ABOVE
NONPERFORATED 6' 0 MIN.
PERFORATED
6' 0 MIN. PIPE
SPECIFICATIONS FOR CALTRANS
CLASS 2 PERMEABLE MATERIAL
.S. Standard
Sieve Size 5 Passina
I" 100
3/4" 90-100
3/8" -lO-lOO
No. 4 25-40
No. 8 13-33
No. 30 5-15
No. 50 0-7
No. 200 0-3
Sand Equivalent >75
Subdrain ahould be conatructed only on competent material aa evaluated by the geotechnical
conauitant.
SUBDRAIN INSTALLATION Subdrain pipe ahould be inatalled with perforatlona down aa depicted.
At locationa recommended by the geotechnical conauitant, nonperforated pipe should be Inatalled.
SUBDRAIN TYPE-SubdraIn fype should be Acrylonitrile Butadiene Styrene (A.8.S.), Polyvinyl
Chloride (PVC) or approved equivalent. Claaa 129, SDR 32.5 should be used for maximum
fill depths of 39 feet. Class 200, SOR 21 should be uaed for maximum fill depths of 100 feet.
STABILITY FILL / BUTTRESS DETAIL
OUTLET PIPES
4' 0 NONPERFORATED PIPE.
100' MAX. O.C. HORIZONTALLY
30' MAX. O.C. VERTICALLY CUT
ATTER
SEE SUBDRAIN TRENCH
DETAIL
LOWEST SUBDRAIN
BE SITUATED AS
POSSIBLE TO A
SUITABLE OU
SHOULO
LOW AS
LLOW
TLET
KEY WIDTH
AS NOTED OM GRADING PLANS
19' MIN.
PERFORATED
PIPE
NON-PERFORATED
OUTLET PIPE
CAP
T-CONNECTION DETAIL
6' MIN
OVERLAP
3/4'-1-1/2'
CLEAN GRAVEL
(3ft.3/ft. MIN.)
4' S5
NON-PERFORATED
PIPEN^
FILTER FABRIC
ENVELOPE (MIRAFI
140N OR APPROVEO
EQUIVALENT)*
SEE T-CONNECTION
DETAIL
a' MIN.
COVER
PERFORATED
PIPE
4* MIN.
BEDDING
SUBDRAIN TRENCH DETAIL
*IF CALTRANS CLASS 2 PERMEABLE
MATERIAL IS USED IN PLACE OF
3/4'-1-1/2' GRAVEL. FILTER FABRIC
MAY BE DELETED
SPECIFICATIONS FOR CALTRANS
CLASS 2 PERMEABLE MATERIAL
U.S. Standard
Sieve Size % Passinq
1" 100
3/1" 90-100
3/8" <iO-iOO
No. 4 25-40
No. 8 13-33
No. 30 5-15
No. 50 0-7
No. 200 0-3
Sand Equivalent>75
NOTES:
Fo
u I ts:
or buttress dimensions, see geotechnical report/plans. Actual dimensions of buttress and subdram
«y be changed by the geotechnical consultant based on field conditions.
SUBDRAIN INSTALLATION-Subdrain pipe should be Installed with perforations *" '^•f'^
At locationa recommended by the geotechnical consultant, nonperforated pipe should be Installed
SUBDRAIN TYPE-SubdraIn type ahould be Acrylon trile Butadiene Styrene (A.B.S.), Polyvinyl CMo^"^«
(PVC) or approved equivalent. Class 125,SOR 32.9 should be used for maximum fill depths o» 35
Class 200,S0R 21 should be used for maximum fill depths of 100 feet.
KEY AND BENCHING DETAILS
FILL SLOPE PROJECT 1 TO 1 LINE
FROM TOE OF SLOPE
TQ COMPETENT MATERIAL
EXISTING
GROUND SURFACE-
''^'^Triur REMOVE
UNSUITABLE
\ MATERIAL
BENCH
2' MIN.^-—19' MIN.-
KEY LOWEST
OEPTH BENCH
(KEY)
FILL-OVER-CUT SLOPE
EXISTINQ
GROUND SURFACE
REMOVE
UNSUITABLE
MATERIAL
CUT SLOPE
(TO BE EXCAVATED
PRIOR TO FILL
PLACEMENT)
EXISTING
GROUND
SURFACE-
CUT-OVER-FILL SLOPE
CUT SLOPE
(TO BE EXCAVATED
PRIOR TO FILL
PLACEMENT)
PROJECT 1 TO 1
LINE FROM TOE
OF SLOPE TQ
COMPETENT
MATERIAL
REMOVE
UNSUITABLE
MATERIAL
BENCH
S?»_MIN SS^-f
T h—19* MIN. -
2' MIN.1 LOWEST
KEY DEPTH jj^g^J^
NOTE: Back drain may be recommended by the geotechnical consultant based on
actual field conditions encountered. Bench dimension recommendations may
alao be altered based on field conditions encountered.
ROCK DISPOSAL DETAIL
FINISH GAADE
SLOPE FACE
•OVERSIZE WINDROW
GRANULAR SOIL (S.E.2 30) TQ BE
DENSIFIED IN PLACE BY FLOODING
DETAIL
TYPICAL PROFILE ALONG WINDROW
1) Rock with maximum dimensions greater than 6 inches should not be used within 10 feet
vertically of finish grade (or 2 feet below depth of lowest utility whichever is greater),
and 15 feet horizontally of slope faces.
2) Rocks with maximum dimensions greater than 4 feet should not be utilized in fills.
3) Rock placement, flooding of granular soil, and fill placement should be observed by the
geotechnical consultant.
4) Maximum size and spacing of windrows should be in accordance with the above details
Width of windrow should not exceed 4 feet. Windrows should be staggered
vertically (as depicted).
5) Rock should be placed in excavated trenches. Granular soil (S.E. greater than or equal
to 30) should be flooded in the windrow to completely fill voids around and beneath
rocks.
APPENDIX -C-
LABORATORY TESTING PROCEDURES
Direct Shear Test Direct sfiear tests are performed on remolded and/or relatively undisturbed
samples wliich are soal<ed for a minimum of 24 hours prior to testing. After transferring the
sample to the shearbox, and reloading, pore pressures are allowed to dissipated for a period of
approximately 1 hour prior to appiication of shearing force. The samples are sheared in a motor-
driven, strain controlled, direct-shear testing apparatus. After a travel of approximately 1/4 inch,
the motor is stopped and the sample is allowed to "relax" for approximately 15 minutes. Where
applicable, the "relaxed" and "peak" shear values are recorded. It is anticipated that, in a majority
of samples tested, the 15 minutes relaxing ofthe sample is sufficient to allow dissipation of pore
pressures set up due to application of the shearing force. The relaxed vaiues are therefore
judged to be good estimations of effective strength parameters.
Expansion Index Tests: The expansion potential of representative samples is evaluated by the
Expansion Index Test, U.B.C. Standard No. 29-2. Specimens are molded under a given
compactive energy to approximately the optimum moisture content and approximately 50 percent
saturation. The prepared 1-inch thick by 4-inch diameter specimens are loaded to an equivalent
144 psf surcharge and are inundated with tap water for 24 hours or until volumetric equilibrium
is reached.
Classification Tests: Typical materials were subjected to mechanical grain-size analysis by
wet sieving from U.S. Standard brass screens (ASTIVI D422-65). Hydrometer analyses were
performed where appreciable quantities of fines were encountered. The data was evaluated in
determining the classification of the materials. The grain-size distribution curves are presented
in the test data and the Unified Soii Classification is presented in both the test data and the boring
logs.