HomeMy WebLinkAboutCT 02-16; ROBERTSON RANCH; PAD CERTIFICATION; 2010-12-13O'74
C 0 N S U L T A N T S
Civil Engineering •s Surveying .
December 13, 2010
J.N.: 09-1271-04
City of Carlsbad
Building Department
1635 Faraday Avenue
Carlsbad, CA 92008
RE: Robertson Ranch PA 18, Grading Plan Drawing No. 453-813 Pad Certification
Dear Sits:
Based on our fi6l&stwvey of December 10, 2010,: the rough grading of the pads for Lots 270
through 274 and 294 through 298 of Gradmg Plan 453-8B have been substantially completed in
accordance with the approved grading plan to the approximate final elevation The final
elevations are certified to a tolerance of plus or minus 0 1 feet and the horizontal location is
certifie& for apprôxitháte location.
Very truly yours,
O'DAY CONSULTANTS, INC.
Tim Carroll
Project Manager
TC/prn
cc: MikeMcMillen, William Lyon Homes
1101213_PAD_City
O'Day Consultants Inc.
2710 Loker Avenue West, Suite 100
Carlsbad, Califoinia 92010-6609
E-mail: oday@odayconsultants.com
Website: www.odayconsultants.com
Tél: 760.931.7700 Fax: 760.931.8680