HomeMy WebLinkAboutCT 02-16; ROBERTSON RANCH; PAVEMENT DESIGN REPORT; 2008-10-10(Jç02.—Lca
S9 0
Geotechnical • Geologic • Coastal • Environmental
5741 Palmer Way Carlsbad, California 92010 • (760) 438-3155 • FAX (760) 931-0915
October 10, 2008
W.O. 5353-El-SC
Brookfield San Diego Builders, Inc.
12865 Pointe Del Mar, Suite 200
Del Mar, California 92014
Attention: Mr. Greg McDonnell
Subject: Pavement Design Report, Glen Avenue, Station 26 to the Cul Du Sac,
Robertson Ranch East Village, City of Carlsbad, San Diego County,
California
Dear Mr. Pevney:
In accordance with your request, GeoSoils, Inc. (GSI) has prepared preliminary design and
construction recommendations for asphalt concrete (AC) pavement at the subject site. The
scope of services provided in preparation of this report include a review of the referenced
reports and documents (see the Appendix), an evaluation of the pavement section for the
subject area, and preparation of this report.
PAVEMENT DESIGN
Pavement section evaluation was based on traffic index (TI) values provided by (O'Day
Consultants, personal communications). Pavement sections were evaluated in accordance
with the California Department of Transportation (Caltrans) Highway Design Manual of
Instructions and the City of Carlsbad Standard Drawings (see the Appendix). Pavement
sections presented are based on the aforementioned criteria and resistance value (R-value)
data (see table), evaluated from soils exposed at, or near, final subgrade elevations within
the subject areas. R-value testing was performed in general accordance with the latest
revisions to the Department of Transportation, State of California, Material & Research Test
Method No. 301.
ASPHALT CONCRETE PAVEMENT
Structural Section
Traffic Indices (TI) were provided by the project civil engineer (O'Day Consultants, personal
communication) as 5.0 for the subject traffic areas. .11-values (see Plates 1 through 3) '
ranging from 6 to 20 were obtained for representative subgrade soils onsite and used in
pavement design. The recommended pavement sections are presented in the following
table: . .'
.
APPROXIMATE
:
TRAFFIC
:.::.: •.
SUBGRADE
:.:....(....A.;C:.....:
THICKNESS
: .MEGA, i
BASE THICKNESS""
TRAFFIC AREA INDEX'1 R-VALUE (Inches) (inches) ., • ,
iGlen Avenue, Stations 26 5.0 9 4.0 8.0(2)*
to 28+50
Glen Avenue, Stations 28+L0 5.0 6 4.0 8.5*
to31'2 ' . -.
[Glen Avenue, Stations31 5.0 1.20
Cul Du Sac
4.0
. .
Per O'Day Consultants, (personal communication) .
(2) Exceeds City minimum . )3) Dnotes Class 2 Aggregate Base R >78, SE >25) . -
(4) GSI does not recommend using less than 6 inches of AB, although 5 inches was calculated
* Exceeds Caltrans requiremehts . .
-.
All pavement instalIatiön, includin preparation and compactionof subgrade, oorripaction
of base material, and placement and rolling of asphaltic concrete, shall be done in
accordance with the City guidelin'e's, and under the observation and testing of the project
geotechnicàl engineer and/or the City. ltshoIjld be noted that subgrade lime treatment
was previously waived by the City for the construction of pavement in the ,Calaèra
HiIIs/Robertsori•Ranáh area (GSI;-2007a, 2007b, 2007c, 2004a,2004b, and 2004c). It is
therefore anticipated that lime stabilization ii!I nbt be pertorriied for the current road
construction; It should also be noted that the pavementthections presented for low R-value
subgrades exceed the 'minimum design thickness, using Caltrans design methodology,
by an additional 1 inch of base, for these relatively onerous subgrade conditions It is
recommended that irrigation water not be alloWed to enter these low R-value soils, or -
distress.,
The recommended pavement sections are rrieaht as minimums. If thinner orhighIy
variable pavement sections are constructed, increased maintenance 'and repair may be
needed...The recommended pavement sections provided above are intended as a
minimum guideline If thinner or highly variable pavement sections are constructed,
increased maintenanbe and repair could be expected If the ADT (average daily traffic) or
- Brookfield San Diego Builders,Inc.
Glen Ave., Robertson Ranch East Village.
File:e:\wp9\5300\5353e1 .pdr
GeoSoils, Inc.
W.05353-E1-SC
October 10, 2008
Page
ADTT (average daily truck traffic) increases beyond that intended, as reflected by the TI
used for design, increased maintenance and repair could be required for the pavement
section. Consideration should be given to the increased potential for distress from overuse
of paved street areas by heavy equipment and/or construction related heavy traffic
(e.g., concrete trucks, loaded supply trucks, etc.), particularly when the final section is not
in place (i.e., topcoat). Best management construction practices should be followed at all
times, especially during inclement weather.
PAVEMENT GRADING RECOMMENDATIONS
General
All section changes shall be properly transitioned. If adverse conditions are encountered
during the preparation of subgrade materials, special construction methods may need to
be employed. A GSI representative shall be present for the preparation of subgrade, base
rock, and asphalt concrete.
Subgrade
Within street and parking areas, all surficial deposits of loose soil material shall be removed
and recompacted as recommended. After the loose soils are removed, the bottom is to
be scarified to a depth of at least 12 inches, moisture conditioned as necessary, and
compacted to 95 percent of the maximum laboratory density, as determined by ASTM test
designation D 1557.
Deleterious material, excessively wet or dry pockets, concentrated zones of oversized rock
fragments, and any other unsuitable materials encountered during grading shall be
removed. The compacted fill material shall then be brought to the elevation of the
proposed subgrade for the pavement. The subgrade shall be proof-rolled in order to
ensure a uniform firm and unyielding surface. All grading and fill placement shall be
observed by the project soil engineer and/or his representative.
Base Rock
Compaction tests are required for the recommended base section. Minimum relative
compaction required will be 95 percent of the laboratory maximum density as determined
by ASTM test designation D 1557. Base aggregate shall be in accordance with
Section 26 of Caltrans Standard specifications (California Department of Transportation,
2006), for Caltrans Class 2 aggregate base.
Brookfield San Diego Builders, Inc.
Glen Ave., Robertson Ranch East Village
File: e:\wp9\5300\5353e1 .pdr
GeoSoils, Inc.
W.O. 5353-El-SC
October 10, 2008
Page 3
Paving
Prime coat may be omitted if all of the following conditions are met:
The asphalt pavement layer is placed within two weeks of completion of base
and/or subbase course.
Traffic is not routed over completed base before paving.
Construction is completed during the dry season of May through October.
The base is kept free of debris prior to placement of asphaltic concrete.
If construction is performed during the wet season of November through April., prime coat
may be omitted if no rain occurs between completion of base course and paving and the
time between completion of base and paving is reduced to three days; provided the base
is free of loose soil or debris. Where prime coat has been omitted and rain occurs, traffic
is routed over base course, or paving is delayed, measures shall be taken to-restore base
course and subgrade to conditions that will meet specifications as directed by the soil
engineer.
Drainage
Positive drainage shall be provided for all surface water to drain toward the curb and
gutter, or to an approved drainage channel. Positive site drainage shall be maintained at
all times. Water shall not be allowed to pond or seep into the ground. If planters or
landscaping are adjacent to paved areas, measures shall be taken to minimize the
potential for water to enter the pavement section, such as cut-off walls. etc.
OTHER DESIGN PROFESSIONALS/CONSULTANTS
The design civil engineer shall review the recommendations provided herein, incorporate
those recommendations into their plans, and by explicit reference, make this report part
of their project plans.
LIMITATIONS
The materials encountered on the project site and utilized for our analysis are believed
representative of the area; however, soil and bedrock materials vary in character between
excavations and natural outcrops or conditions exposed during mass grading. Site
conditions may vary due to seasonal changes or other factors.
Brookfield San Diego Builders, Inc. W.O. 5353-El-SC
Glen Ave., Robertson Ranch East Village . October 10, 2008
File: e:\wp9\5300\5353e 1.pdr Page 4
GeoSoils, Inc.
- p
Inasmuch as our study is based upon our review and engineering analyses and laboratory
data, the conclusions and recommendations are professional opinions. These opinions
have been derived in accordance with current standards of practice, and no warranty is
express or implied. Standards of practice are subject to change with time. GSI assumes
no responsibility or liability for work or testing performed by others, or their inaction, or
work performed when GSI is not requested to be onsite, to evaluate if our
recommendations have been properly implemented. Use of this report constitutes an
agreement and consent by the user to all the limitations outlined above, notwithstanding
any other agreements that may be in place. In addition, this report may be subject to
review by the controlling authorities.
The opportunity to be,of service is greatly appreciated. If you have any questions, please
do not hesitate to call our office.
Respectfully submi
GeoSoils, Inc.
Robert G. Crism 0 :/'1
Engineering Geologi , 34
RGC/ATG/JPF/jk
inarew i. uuatein
Geotechnical Engineer, GE 2320
Attachments: Plates 1 through-3 - R-value Test Results.
Appendix - References
Distribution: (4) Addressee
IU
Brookfield San Diego Builders, Inc.
Glen Ave., Robertson Ranch East Village
File: e:\wp9\5300\5353e1 .pdr
GeoSoils, Inc.
W. 0. 5353-El -SC
October 10, 2008
Page 5
TEST SPECIMEN A P r n
Compactor air. pressure PSI 140 110 80
Water added % 3.4 5.1 6.8
Moisture at compaction % 17.0 19.0 21.0
Height of sample......... _IN------.2.5 2.52 2.53.
Dry density PCF 111.5 107.1 103.3
RVaIue by exudation 13 9 7
R-Value by exudation, corrected 13 9 7
Exudation pressure PSI 496 323 161
Stability thickness FT 1.89 1.98 2.021
Expansion pressure thickness FT 0.70 0.37 0.001
DESIGN CALCULATION DATA
Traffic index, assumed 8.5
Gravel equivalent factor, assumed 1.25
Expansion, stability equilibrium 0
R-Value by expansion NA
R-Value by exudation 9
R-Value at equilibrium 9
Expansion, Stability Equilibrium
3.00
2.50
2.00
>,
Cl) Cl) 1.50 a)
0
i-1.00
I- a) >
0050
c.ot I'' I I I I I I I I I I I I
0.00 0.50 1.00 1.50 2.00 2.50 3.00
Cover Thickness by Expansion Pressure (ft)
SAMPLE INFORMATION
Sample Location: RV-1, 26+30-28+50
Sample Description: Gray Sandy Clay
Notes:
0% Retained on 3/4 inch sieve
0
GeoSoils, Inc. R - VALUE TEST RESULTS
5741 Palmer Way Project: BROOKFIELD
Carlsbad CA 92008
Telephone: (760) 438-3155 Number: 5353-El-SC
Fax: (760) 931-0915
Date: Oct-08 Plate: 1
TEST SPECIMEN A R C fl
Compactor air pressure PSI 280 80 80
Water added % 2.4 5.9 7.3
Moisture at compaction % 14.0 18.0 19.5
Height-of sample.. _IN......2.47 .2.552.57
Dry density PCF 119.0 109.4 107.5
R-Value by exudation 22 7 6
R-Value by exudation, corrected 22 7 6
Exudation pressure PSI 787 330 188
Stability thickness FT 1.70 2.021 2.051
_ Expansion pressure thickness FT 2.13 0.57 0.10
DESIGN CALCULATION DATA
Traffic index, assumed 8.5
Gravel equivalent factor, assumed 1.25
Expansion, stability equilibrium 1.77
R-Value by expansion 19
R-Value by exudation 6
R-Value at equilibrium 6
Expansion, Stability Equilibrium
3.00
2.5O
In in 1.50
i-1.00
0050
0.00 I" I I I I I I I I1 1I I I I I1 1I I I I 1 I
0.00 0.50 1.00 1.50 2.00 2.50 3.00
Cover Thickness by Expansion Pressure (ft)
SAMPLE INFORMATION
Sample Location: RV-2, Glen Av.
Sample Description: Gray Sandy Clay
Notes: 28+50-31+00
-
0% Retained on 3/4 inch sieve
GeoSoils, Inc.
?S 5741 Palmer Way
Carlsbad CA 92008
Telephone: (760) 438-3155
Fax: (760) 931-0915
R- VALUE TEST RESULTS
Project: BROOKFIELD
Number: 5353-El-SC
Date: Oct-08 Plate: 2
-
I.
Traffic index, assumed 8.5
Gravel equivalent factor, assumed 1.25
Expansion, stability equilibrium 0
R-Value by expansion NA
R-Value by exudation 20
R-Value at equilibrium 20
Expansion, Stability Equilibrium
2.00
1.50
U, U) 1.00 a)
C.)
0.50
:.00l'I1 I III I II! liii 1 11111
0.00 0.50 1.00 1.50 2.00
Cover Thickness by Expansion Pressure (ft)
TEST SPECIMEN A B C D
Compactor air pressure PSI 260 220 130
Water added % 1.5 2.1 2.4
Moisture at compaction % 11.5 12.2 12.5
. . 2.44.-. .2.5.2.45.
Dry density PCF 123.9 122.0 121.0
R-Value by exudation 23 21 14
Height.ofsample..........................................JN...
R-Value by exudation, corrected 22 21 14
1.87.
Exudation pressure PSI 475 330 193
Stability thickness FT 1.66 1.72
Expansion pressure thickness FT 0.33 0.20 0.00
DESIGN CALCULATION DATA SAMPLE INFORMATION
GeoSoils, Inc.
77 5741 Palmer Way
Carlsbad, CA 92008
' Telephone: (760) 438-3155
Fax: (760) 931-0915
R - VALUE TEST RESULTS
Project: BROOKFIELD
Number: 5353-El-SC
Date: Oct-08 Plate: 3
APPENDIX
REFERENCES
California Department of Transportation, 2006, Caltrans, Standard specifications, May
printi.ng.
Carlsbad, City of, 1993, Standards for design and construction of public works
improvements in the City of Carlsbad.
GeoSoils, Inc., 2007a, Pavement design report, Improvement of "loop" roads, Wind Trail
Way, Glen Avenue, and Hilltop Street, Robertson Ranch East Village, City of
Carlsbad, San Diego County, California 5384 oct 31, 2007
2007b, Pavement design report, Improvement (widening) of College Boulevard
(Stations 103-+35 to 118), and Cannon Road (Stations 127 to 159), City of
Carlsbad, San Diego County, California, W.O. 5354-E-SC, dated September 18.
2007c, Review of R-value data, Improvement (widening) of College Boulevard
(Stations 103 to 118+10), and Cannon Road (Stations 127 to 159), City of
Carlsbad, San Diego County, California, W.O. 5354-E-SC, dated September 4.
2004a, Revised pavement design report, College Boulevard Stations 78 to
Reach C, Calavera Hills II, Carlsbad, San Diego County, California,
W.O. 4028-E-SC, dated April 19, 2004, by GeoSoils, Inc.
2004b, Revised pavement design report, College Boulevard Stations 101+75 to
118 -i0 Reach B, Calavera Hills II, Carlsbad, San Diego County, California,
W.O. 4029-.E-SC, dated April 23.
2004c, Third revision of pavement design report, Calavera Hills II, Cannon Road
Stations 125 to 164", City of Carlsbad, San Diego County, California,
W.O. 4030-E-SC, dated May 14.
NEWCON90, 1991 Computer program for the determination of asphalt pavement sections,
version: April 30.
State of California, Department of Transportation, 2006, Highway design manual of
instructions, sixth edition, September printing.
GeoSoils, Inc.