Loading...
HomeMy WebLinkAboutCT 02-23; Villages of La Costa the Greens Pt 2; Villages of La Costa the Greens Pt 2; 1999-03-01APPENDIX B LABORATORY TESTING Laboratory tests were performed in accordance with the generally accepted test methods of the American Society for Testing and Materials (ASTM) or other suggested procedures. Selected relatively undisturbed drive samples and chunk samples were tested for their in-place dry density and moisture content, shear strength, expansion and consolidation characteristics. The results of our laboratory tests are presented in tabular and graphical forms hereinafter. The in- place density and moisture characteristics are also presented on the logs on of test trenches and borings. d 0i 0 TABLE B-I SUMMARY OF LABORATORY MAXIMUM DRY DENSITY AND OPTIMUM MOISTURE CONTENT TEST RESULTS ASTM D 1557 Sample No. Description Maximum Dry Density (pcf) Optimum Moisture Content (% dry wt) LB 1-2 Yellowish brown, Silty, fine to coarse SAND 120.4 12.0 LB 1-11 Grayish green, Sandy CLAY 113.5 16.5 LB 3-3 Greenish gray, Silty CLAY 112.2 17.0 LB 9-4 Greenish gray, Silty CLAY 115.8 15.4 LB 10-2 Light gray, Silty, fine SAND 114.0 14.2 T23-2 Dark grayish brown, Sandy CLAY 122.0 11.4 T24-2 Reddish brown. Clayey, fine SAND 123.0 U.O T85-1 Dark olive-brown, Sandy CLAY 121.1 12.4 T 108-1 Reddish brown, Silty, fine to medium SAND 123.9 10.0 Project No. 06403-12-01 -B-1 -March 24, 2000 0 TABLE B-II SUMMARY OF DIRECT SHEAR TEST RESULTS Sample No. Dry Density (pcf) Moisture Content (%) Unit Cohesion (psf) Angle of Shear Resistance (degrees) LB 3-3* 100.5 17.7 610 27 LB 5-4 U7.2 16.7 610 29 LB 10-2* 103.1 13.9 460 35 LB 1-3 124.8 10.8 1020 43 LB i-4 112.2 20.2 830 15 LB 1-9 117.7 16.2 200 38 *Saii5)les remolded to 90 percent relative density at or near optimum moisture content m TABLE B-lll SUMMARY OF LABORATORY EXPANSION INDEX TEST RESULTS Sample No. Moisture Content Dry Density (pcf) Expansion Index Sample No. Before Test (%) After Test (%) Dry Density (pcf) Expansion Index LB 1-2 9 20.9 114.3 6 LB 18-9 11.3 30.3 105.1 57 LB 1-11 14.2 34.6 96.8 62 T23-2 10.1 29.3 109.5 55 T85-1 10.0 28.9 110.1 57 T 103-2 12.1 32.4 103.0 70 ProjectNo. 06403-12-01 -B-2-March 24,2000 PROJECTNO. 06403-12-01 GRAVEL SAND SILT OR CLAY COl^RSE FINE tlEDIUn FINE SILT OR CLAY U. S. STANDARD SIEVE SIZE 100 90 80 X 70 CD H UJ OQ g 50 H h. H 40 UJ u Ul 30 20 10 0 1-1/2" 3/4" 10 1 0.1 GRAIN SIZE IN MILLIMETERS 0.01 0.001 m SAMPLE Depth (ft) CLASSIFICATION SATWC LL PL PI • SB3-2 10.0 (CL) Yellowish-brown, Sandy CLAY III SB4-2 10.0 (SM) Dark yellowish-brown, Silty SAND m A SB6-2 10.0 (SM) Dark yellowish-orange, Silty SAND GRADATION CURVE VILLAGES OF LA COSTA - THE GREENS CARLSBAD, CALffORNU LCG Figure B-1 PROJECTNO. 06403-12-01 GRAVEL SAND SILT OR CLAY COURSE FINE :or=iRSE MEDIUM FINE SILT OR CLAY U. S. STANDARD SIEVE SIZE X CD H UJ 3 > OC hi Z H LX. LU U OC hi 100 90 80 70 60 50 40 30 20 10 0 3' M/2" 3/4- 3/8" 10 1 Q.l GRAIN SIZE IN MILLIMETERS 0.01 0.001 m SAMPLE Depth (ft) CLASSIFICATION VATWC LL PL H 0 • SB7-3 15.0 (SM) Light olive-brown, Silty SAND SB8-2 10.0 (CL) Yellowish-brown. Sandy CLAY m • SB8-4 20.0 (CL) Dark yellowish-orange, Sandy CLAY GRADATION CURVE VILLAGES OF LA COSTA - THE GREENS CARLSBAD, CALIFORNIA LCG Figure B-2 PROJECTNO. 06403-12-01 GRAVEL SAND SILT OR CLAY COl=lRSE FINE :OARSE MEDIUM FINE SILT OR CLAY U. S. STANDARD SIEVE SIZE CD H LU > ta K hi z H LU L) OC LU 100 90 80 70 60 50 40 30 20 10 0 3" M/2" 3/4" 3/8" 10 10 16 30 20 40 1 60 100 200 0.01 0.001 GRAIN SIZE IN MILLIMETERS SAMPLE Depth (ft) CLASSIFICATION VAT WC LL PL PI SBlO-3 15.0 (SM) Yellowish-brown, Silty SAND 23.7 GRADATION CURVE VILLAGES OF LA COSTA - THE GREENS CARLSBAD, CALIFORNIA LCG Figure B-3 PROJECTNO. 06403-12-01 z o H I-<C o H _l O CO z o u Z LU CJ OC LU Q. SAMPLE NO. SB3-3 -4 -2 10 12 0.1 10 100 APPUED PRESSURE (ksf) Initial Dry Density (pcf) 107,0 Initial Water Content (%) 22.6 Initial Saturation (%) 100-H Sample Saturated at (ksf) 0.5 CONSOLIDATION CURVE VILLAGES OF LA COSTA - THE GREENS CARLSBAD, CALIFORNIA LCG Figure B-4 PROJECTNO. 06403-12-01 o o cn z o CJ LU U cn hi Q_ SAMPLE NO, SB7^ -4 -2 10 12 0.1 10 100 APPLIED PRESSURE (ksf) Initial Dry Density (pcf) 92.4 Initial Water Content (%) 5.4 Initial Saturation (%) 18.1 Sample Saturated at (ksf) 0.5 CONSOLIDATION CURVE VILLAGES OF LA COSTA - THE GREENS CARLSBAD, CALIFORNIA LCG Figure B-5 PROJECrr NO. 06403-12-01 o Q H -J O CO z o u LU L) OS LU a. SAMPLE NO. SB8-3 -4 -2 10 12 0.1 10 100 APPLIED PRESSURE (ksf) Initial Dry Density (pcf) 113.9 Initial Water Content {%) 18.2 Initial Saturation (%) 1004- Sample Saturated at (ksf) .5 CONSOLIDATION CURVE LCG VILLAGES OF LA COSTA - THE GREENS CARLSBAD, CALIFORNIA Figure B-6 PROJECTNO. 06403-12-01 o o cn o lU CJ a: LU a. SAMPLE NO. SBlO-3 -4 -2 10 12 0.1 10 100 APPLIED PRESSURE (ksf) Initial Dry Density (pcf) 106.7 Initial Water Content (%) 23.7 Initial Saturation (%) lOO-h Sample Saturated at (ksf) 0.5 CONSOLIDATION CURVE VILLAGES OF LA COSTA - THE GREENS CARLSBAD, CALIFORNIA LCG Figure B-7 PROJECTNO. 06403-12-01 z o H I-« O H _l O O) z o a z Ul u LU a. SAMPLE NO. SBU-2 -4 -2 10 12 0.1 10 100 APPLIED PRESSURE (ksf) Initial Dry Density (pcf) 116,5 Initial Water Content (%) 17.2 Initial Saturation (%) 100-i- Sample Saturated at (ksf) .5 CONSOLIDATION CURVE VILLAGES OF LA COSTA - THE GREENS CARLSBAD, CALIFORNIA LCG Figure B-8 c T O CO O z o s < O •z. o [S < SAMPLE NO. SB3-3 APPLIED PRESSURE 2180 2200 2220 2240 2260 2280 2300 2320 2340 (ksf) s 10 12 V TIME (Minutes) SAMPLE NO. SB7-4 APPLIED PRESSURE (ksf) 2370 ^ 2380 T O T: 2390 2400 2410 2420 2430 10 12 V TIME (Minutes) m 0 GEOCON INCORPORATED O •m 0 GEOTECHNICAL CONSULTANTS 6960 FLANDERS DRIVE - SAN DIEGO, CAUFORNIA 92121-2974 PHONE 619 558-6900 • FAX 619 558-6159 AS/RSS DSK/EOOOO TIME RATE CURVE VILLAGES OF LA COSTA - THE GREENS CARLSBAD, CALIFORNIA DATE 03-24-2000 PROJECT NO. 06403 - 12 - 01 FIG. B-9 &403TR/RSS o CO o < T o CO O z o s a: < SAMPLE NO. SB10-3 APPLIED PRESSURE (ksf) 2425 2455 2485 2 2515 2545 ^5: SAMPLE NO. 10 12 V TIME (Minutes) APPLIED PRESSURE (ksf) 10 V 12 TIME (Minutes) GEOCON INCORPORATED O GEOTECHNICAL CONSULTANTS 6960 FUNDERS DRIVE - SAN DIEGO, CALIFORNIA 92121-2974 PHONE 619 558-6900 - FAX 619 558-6159 AS/RSS DSK/EOOOO TIME RATE CURVE VILLAGES OF LA COSTA - THE GREENS CARLSBAD, CALIFORNIA DATE 03-24-2000 PROJECT NO. 06403-12 - 01 FIG. B-10 6403TR1 / RSS c O CO z Q < Q to CD Z Q S OC _J < Q SAMPLE NO. SB11 -2 2320 2330 2340 2350 2360 2370 2380 APPLIED PRESSURE 2 (ksf) V, 10 12 V TIME (Minutes) SAMPLE NO. SB11 -2 2410 ^ 2420 .£ T O APPLIED PRESSURE 4 (ksf) 2430 2450 2460 2470 2480 i \ L. \ \ _ _ V _ s V 10 12 TIME (Minutes) GEOCON ^ INCORPORATED GEOTECHNICAL CONSULTANTS 6960 FLANDERS DRIVE • SAN DIEGO, CAUFORNIA 92121 - 2974 PHONE 619 558-6900 - FAX 619 558-6159 TIME RATE CURVE GEOCON ^ INCORPORATED GEOTECHNICAL CONSULTANTS 6960 FLANDERS DRIVE • SAN DIEGO, CAUFORNIA 92121 - 2974 PHONE 619 558-6900 - FAX 619 558-6159 VILLAGES OF LA COSTA - THE GREENS CARLSBAD, CALIFORNIA AS/RSS DSK/EOOOO DATE 03-24-2000 PROJECT NO. 06403 - 12 - 01 FIG. B-11 e403TR2/RSS APPENDIX C BORING AND TRENCH LOGS AND CONE PENETROMETER TESTS FROM PRELIMINARY SOIL AND GEOLOGIC INVESTIGATION FOR LA ^. COSTA - NORTHWEST AREA, CARLSBAD, CALIFORNIA, PREPARED BY GEOCON INCORPORATED, DATED NOVEMBER 11, 1988 (PROJECT NO. D-4230-H01) •I And PRELIMINARY RIPPABILITY STUDY. LA COSTA NORTHWEST, * CARLSBAD, CALIFORNIA, PREPARED BY GEOCON * INCORPORATED, DATED SEPTEMBER 25,1996 (PROJECT NO. D- m. 4230-12-03). " FOR m VILLAGES OF LA COSTA - THE GREENS m CARLSBAD, CALIFORNIA m 0 PROJECT NO. 06403-12-01 •m File No. November D-4230-H01 11, 1988 BORn'lG 1 .DATE nHHiPn in/s/aa EQUIPMENT E-lOO 30" Rotary Bucket =3 MATERIAL DESCRIPTION ALLUVIIM Soft, wet, very dark brown, Sandy CLAY Soft* wet, dark reddlsh-brown, Sandy CLAY PUSE 12" 112.5 :>ULK 16.6 SfclPT.^ PUSH ' 12" L08.8 tUSH - 12" L07.1 water table rising (caving) Jledium dense, x^et, gray, slightly, Silty fine to medium SAND 12" clean sand PUSH '18" 97.3 Soft, wet, dark reddish-brown, Sandy CLAY BORING TERMINATED AT 21.0 FEET (REFUSAL) 0 19.6 i :i.i 30.1 Figure A-1, Log of Test Boring 1 SAMPLE SYMBOLS • _ SAMPLING UNSUCCESSFUL * |]_STANOABD PENeTfUTlON TEST • — DRIVE SAMPLE {UNOISTURBEOI H DISTURBED OR BAG SAMPLE B — CHUNK SAMPL€ X. _ WATER TABLE OR SEEPAGE m NOTE THE LOG OF SUBSURFACE CONOITIONS SHOWN HEREON APPLIES ONLYATTHE3PECIRCBOfllNGOBTB£(CH LOCATl^^^ ATTHEDATEINDVCATEDJTISNO^^ File No. November D-4230-H01 11, 1988 BORING 2 ELEVATION 125 .DATE nnii I Fn 10/5/88 EQUIPMENT E-IQO 30" ?.Qtary Bucket ill UJO lu' IV EC' m - m MATERIAL DESCRIPTION ALLUVIUM Soft, moist, dark broxm, Sandy CLAY becomes orange-yellow-brown, wet becomes dark reddish—brown strong seepage - water table caving Loose, saturated, light brown, coarse SAND Soft, saturated, dark brorra, Sandy CLAY BORING TEiiMINATED AT 14.0 FEET (REFUSAL) PUSH 12" 110.1 BULK 16.5n PUSH 12" 99.0 SAMPLE 0 24.Ota 3 Figure A-2, Log of Test Boring 2 SAMPLE SYMBOLS D SAMPLING UNSUCCESSFUL S „ OlSTURSEO OR BAG SAMPLE CsTANOARO PENETRATION TEST B... CHUNK SAMPLE • _ DRIVE SAMPLE (UNOISTURSED) Z. WATER TABLE OR SEEPAGE ^ File NO. D-4230-H01 November 11. 1988 BORING 3 gi guATiriM 155 .DATE npii I en 10/5/88 EQUIPMENT ?:-lQQ 30" Rotary Bucket IP Si . 0 MATERIAL DESCRIPTION ALLUVIUM Soft, wet, dark brown, Sandy CLAY 2 - - 4 - 6 . 8 - - 10- -12- 14- - 16- - 18- - 20- Loose, wet, light brown-orange, very Clayey fine SAND Soft, wet to saturated, mottled olive- orange, Sandy-Gravelly CLAY isolated 12" rock DELMAR FOFMATION Hard, moist, medium olive, very Clayey SILTSTONE, massive •PUSH 12" L09.8 PUSH •1/3" 16.5 Lll.O BULK 21 6" .13.2 17.2 AMPLE 17.4 .18.6 BULK 15.3 SAMPLE - 22 BORING TERMINATED AT 22.0 FEET ^ Figure A-3, Log of Test Boring 3 • _ SAMPUNG UNSUCCESSFUL B-STANOAflO PENETRATION TEST • _ ORWE SAMPLE (UNOISTURBEDl SAMPLE SYMBOLS DISTURBED OR BAG SAMPLE B-CHUNKSAMPL* ^, WATER TABLE OR SEEPAGE _ N0T£ TH ATTHEDATE File No. November D-4230-H01 U, 1988 - BORING 4 ELEVATION .DATE nniLLED Tfl/q/Hfl EQUIPMENT E-IQO 30" Rotary Bucket zu: Oft. 5s r MATERtAL DESCRIPTION f B4-1 6 8 . 10 . 12 . B4-2 . B4-3 CL ALLUVIUM Stiff, moist, dark grayish-brown, Sandy CLAY 111.] 15.7 becomes very moist I, PUSH 12" strong seepage (in sand) water table (caving) 103 lULK SU \ B4-4 _ 14 . - 18 . - 20 CL \ Loose, saturated, light bro^m, coarse * SA2ID PUSH h 12" Soft, wet, dark bra\ra, Sandy CLAY 20.:-' StoLE" ' fa* 105.3 21.: BORING TERMINATED AT 20.0 FEET (REFUSAL) Figure A-4, Log of Test Boring 4 SAMPLE SYMBOLS • SAMPLING UNSUCCESSFUL B—STANDARD PENETRATIOM H OrSTURBED OR BAG SAMPLE B—CHUNK SAMPL€ TEST B DRIVE SAMPLE (UNOISTURBEOI X _ WATER TABLE OR SEEPAGE NOTE THE LOG OF SUBSURFACE CONOITtONS SHOWN HEREON APPLIES ONLY "THE SPECIFIC80RING ORTRWCH LOCA ATTHEOATEiNOtCATEDJT^ File No. D-4230-H01 November 11, 1988 P BORnTG 5 ELEVATION 120 .DATE DRILLED. 10/5/88 EQUIPMENT E-lOO 30" Rotary Bucket lit iji ZU. 3Z MATERIAL DESCRIPTION - 2 . _ 4 . 6 . 8 . . 10- - 12. - 14. 16 18 B5-1 B5-2 B5-3 CL SW CL SW ALLUVIUM Soft, moist, dark brown, Sandy CLAY becomes wet strong seepage; water table (caving) Loose, saturated, light brown, coarse SAND Soft, wet to saturated, medium brot-m, 1^ Sandy CLAY \ Loose, saturated, light brown, coarse SAND BORING TERMINATED AT 18.0 FEET (REFUSAL) ^*USH 12" 02.6 10.3 1/12' 10.8 19.0 1/12" 05.8 21.4 Figure A-5, Log of Test Boring 5 SAMPLE SYMBOLS • — SAMPLING UNSUCCESSFUL E ^.STANOARO PENETRATION TEST IS DISTURBED OR BAG SAMPLE B. CHUNK SAMPL-E • DRIVE SAMPLE (UNOISTURBEDI X _ WATER TABLE OR SEEPAGE wn-TB TuCLnrnP«tiiS«;iIBFirPCONOmQNSSHOWNHEREONAPPUESONLYATTHESPEClFICBORINOOflTRENCHLOCAT10NANO ^?T%0ATE?N°D?CAT^a1V^ File No. D-4230-H01 November 11. 988 ta . BORING 6 ELEVATION 122 .DATE DRILLED 10/6/88 EQUIPMENT E-IOQ 30" Rotary Bucket Zu. as Si-.-3Z =8 . 0 MATERIAL DESCRIPTION . 2 - - 4 - . 6 - 8 . B6-1 - 10 - B6-2 - 12 - - 14 - 16 - - 18 - - 20 - •;t;i;;i: •lA-x '•yi:\. SM ALLUVIUM Loose to medium dense, humid, tan, silty fine SAND with some clay Medium dense, slightly moist, tan, Silty fine SAUD with little clay, small chunks, of alluvium in sandy matrix 0 ••J*. '•'•.1. •>;.r •Pi:-. 106.7 13.S 111.0 18. B6-3 110.4 18.0^ A.\:A strong seepage (caving) BORING TERMINATED AT 19.0 FEET Figure A-6, Log of Test Boring 6 SAMPLE SYMBOLS Q SAMPLING UNSUCCESSFUL S _ DISTURBED OR BAG SAMPLE E..STAN0ARO PENETRATION TEST B« CHUNK SAMPL€ • _ DRIVE SAMPLE (UNOISTURBEDI WATER TABLE OR SEEPAGE ^ NOTE THE LOGOFSUBSURFACE CONDITIONS SHOWN HEREON APPLIES 0NLYATTHESPECIFIC80H1NQ0RTRENCH LOCATION AND ATTHE OATH INOICA TED. ITISNCTWARRANTEDTO BE REPRESENTATIVEOFSUBSURFACECONOmONSATOTHER LOCATIONS AND TIMES File No.D-4230-HOl November 11. 1988 £ - ta 3s; BORING 7 ELEVATION 300 .DATE DRILLED. 10/6/88 EQUIPMENT E-lOO 30" Rotary Bucket •-<n2 Zu. 25 . 0 MATERIAL DESCRIPTION . 2 . _ 4 , 5 - - 8 - - 10- - 12 - _ 14 - - 16- - 18- - 20 - 22 - 24 - 26 28 30 B7-1 ::ri;y: hAA. 'A'XA •'AyM ••\:A\- ivi -i;.- B7-2 lyi • . •. • V :•/:•• .••"•,••> V.-: ••;x - • • • "''^ B7-3 AIM v.v.v .* •:y.:. jr. SM TORREY SANDSTONE Loose, dry, tan, Silty fine SAND Dense, damp, tan, Silty, fine to medium \ SANDSTONE, cemented I cobbles becomes gray, less cemented depositional contact: N30E75E ML Hard, moist, gray. Clayey SILTSTONE SC Very dense, slightly moist, gray. Clayey fine SANDSTONE becomes light blush gray and slightly cemented .— becomes light greenish gray 10/ 6" 112.2 6.7 10/ 11" 108.4 16.5 15/ 6" 109.3 7.1 BORING CONTINUED NETT PAGE SAMPLE SYMBOLS SAMPLING UNSUCCESSFUL B—.STANDARD PENETRATION TEST DRIVE SAMPLE (UN0ISTUR6ED) SAMPLE SYMBOLS B_ CHUNK SAMPL£ WATER TABLE OR SEEPAGE MOTS THeLOGOFSUBSURFACECONDITIONSSHOWNHEflEONAPPLIESONLYATTHESPECIFICBORINGOHTRENCHLOCATIONANO IjTrHEWTk?NO?"TED^^^^^^^ File No. D-4230-H01 November 11, 1988 Si S in la ' BORING 7 (CONTINUED) ELEVATION DATE DRILLED IQ/6/88 EQUIPMENT III Zu. Sr.- 11 r - 30. MATERIAL DESCRIPTION . 32- - 34- . I.- - 36. ,1 • - 38- 40. :•. 1 k 42-1 B7-4 ••^•AV: 'A^X. AAA- Dense, moist, greenish-gray, Silty fine SANDSTONE t B7-5 - 44- 13/ 6" 103.7 7.8 ^ becomes light bluish-green gray SULK SIVMPLE •iMVl:: yAA: strongly cemented - 46-BORING TERMINATED AT 45.0 FEET Figure A-8, Log of Test Boring 7 ,- »w..nA<v. « D SAMPLING UNSUCCESSFUL SAMPLE SYMBOLS S DISTURBED OR BAG SAMPLE C. STANDARD PENETRATION TEST B _ CHUNK SAMPLE 1 „ DRIVE SAMPLE (UNOISTURSED) X _ WATER TABLE OR SEEPAGE NOTE THELOGOFSuaSURFACSCONDITIONSSHOWNHEREONAPPLlESONLYATTHESPECIFICaORINGORTRENCMLOCATIONANO ATTHE DATE INDICATED. IT1SNOTWARRANTED TO BE REPRESENTATtVEOFSUaSUBFACECONDITIONSATOTHEflLOCATIONSANO TIMES File No. D-4230-H01 November 11, 1988 X _ o z IU > S o c BORING 8 ei P\/ATinN 305 OATE non i en 10/7/88 PENETRATION RESISTANCE BLOWS/FT i: in zu: go is tm> s * 1 $ 1 P cO'i'BMPWT E-lOO 30" Rotary Bucket PENETRATION RESISTANCE BLOWS/FT > a a is 0 MATERIAL DESCRIPTION m _2 B8-1 :fy}-: T.'l--.l:: SM-GM TERRACE DEPOSIT Very dense, moist, light reddish-brown, very gravelly Silty coarse SANDSTONE, grit pebble size gravel. BULK 3AMPLI _4 , -1 1— sharp depositional contact: N50W,15SW m •••.ri*'; rp p urn "rm -6 . .8 . B8-2 B8-3 'k-yr. ^'yAA.: SM TORfiEY SANDSTONE . Very dense, moist,- light tan, Silty fine SANDSTONE, massive, some orange, laminated thin beds 10/ -11" 116,9 BULK 7.3 SAMPLi m' _10 . : :'i'--VV-,1 All -ll - # 1 T I 1 • -14 . Ml _16 . B8-4 15/ " 10" 124.2 5.0 m -18 -- ^; i -20 - •AA-y'-: .'.. 'i-1*.' - mm -22 - ;•!:•'.•'•• .••t.VLVi".* ••|-.u-:.r-'. - -24 - :";r-.-i:-i'; 'AA:K SMzSC. Very hard, moist, light tan, olive, orange, Silty very fine SANDSTONE, some clay - 0 m m -26 . -28 . B8-5 B8-6 'A-:]:-\: ''\\::(A 1 I 1 1 bedding N45W,3NE 1 \ \ bedding N10E,8W less clay • 15 119.6 BULK 7.8 SAMPLE 0 30 AA:^A Figure Ar9, Log of Test Boring 8 BORING CONTINUED NEXT PAGE SAMPLE SYMBOLS D SAMPUNG UNSUCCESSFUL E—STANDARD PENETRATION TEST S DISTURBED OR BAG SAMPLE B—CHUNK SAMPLC • DRIVE SAMPLE (UNOISTURBEDt ^ . WATER TABLE OR SEEPAGE NOTP THELaGQFSuaSURFACECONOITIONSSHOWNMEREONAPPLIESONLYATTHeSPECIFICBORINQORTReNCHLOCATIONAND File No. D-4230-H01 November 11, 1983 r f_ 5S it BORING 8 (CONTINUED) ELEVATION DATE DRILLED. 10/7/88 EQUIPMENT ill *-<aS "552 zu. UJ<J SB =8 30 .32 .34 .36 .38 -40 . -42 . -44 . -46 . -48 . MATERIAL DESCRIPTION -50 - .sharp depositional contact with hematite band in sandstone, 1/8-1/2" wide, no shearing N70E,11S T Very hard, moist, light olive-green. Clayey SILTSTONE nearly horizontal 10 112,7 JULK 15.5»| SktlPLI.p Very dense, moist, light tan-white, Silty fine SANDSTONE, cross-bedded and massive 1 \\:;\A. ysA AiAj rA^yJr. dark brown layer 6" thick above cemented layer cemented sandstone layer 12" thick, calcium carbonate cement -52 -BORING TERMINATED AT 51.0 FEET Figure A-10, Log of Test Boring 8 SAMPLE SYMBOLS D SAMPLING UNSUCCESSFUL S DISTURBED OR BAG SAMPLE STANDARD PENETRATION TEST B « CHUNK SAMPLE • DRIVE SAMPLE {UNDISTURBED) X « WATER TABLE OR SEEPAGE N0T£ THE LOG OF SUBSURFACE CONDITIONS SHOWN HEREON APPLIES ONLY ATTHE SPECIFICBORING ORTRENCH LOCATION ANO ATTHE DATE INDICATED. IT tS NOT WARRANTED TO BE REPRESENTATIVE OF SUBSURFACE CO NOmONS AT OTHER LOCATIONSANO TIMES 0 File No. D-4230-H01 November 11, 1988 at in— <» ^3 BORING 9 245 ELEVATION. .DATE DRILLED. 10/6/88 EQUIPMENT E-lOO 30" Rotary Bucket pi is- Zti. uiO is - 0 MATERIAL DESCRIPTION .2 - - 4 - - 6 - - 8 - . 10 - - 12 - - 14 - B9-3 - 16 - - 18 - - 20 - - 22 - 24 - B9-4 h 26 H 28 30 SC TOPSOIL Loose, damp, dark brown, Silty-Clayey fine SAND SM TORREY SANDSTONE Dense, moist, light brown-orange, Silty fine SANDSTONE, some clay, fracturing mostly massive A\\A ':-S-\A: \A'A'X •VlM':!'. A-'-\A. •':Kt:i: '{AA 114.6 IBULK : 15,1 AMPLE nearly horizontal bedding 110.9 17.0 seepage, slow, spotty seepage, slow 1^ sharp depositional bedding/contact I j horizontal 110.5 17.6 DELMAR FORMATION Hard, wet, medium to light olive. Clayey SILTSTONE, massive, little fracturing ML Figure A-11, Log of Test Boring 9 BORING CONTINUED NEXT PAGE 0 SAMPLE SYMBOLS n SAMPLING UNSUCCESSFUL B—STANDARD PENETRATION TEST 1« DRIVE SAMPLE tUNOISTURSIOI SAMPLE SYMBOLS n SAMPLING UNSUCCESSFUL X _ WATER TABLE OR aEtPAQB S DISTURBED OR BAG SAMPLE B.CHUNK 3AMPL€ X _ WATER TABLE OR aEtPAQB NOTE THE LOG OFSUSSURFACeCONOlTlONSSHOWN HEREON APPLIESONLYATTHESPeCIFlCBORiNGORTHENCH LOCATION AND ATTHE DATEINOICATED.ITISNOTWARRANTED TO BE REPRESENTATIVEOFSUBSUHFACSCONOmONSATOTHER LOCATIONS AND TIMES File No. November D-4230-H01 11. 1988 Cz*** 33 . BORING 9 (CONTINUED) ELEVATION DATE DRILLED, in/fi/88 EQUIPMENT zu. ii r, w 30 MATERIAL DESCRIPTION - 32 - . 34 - B9- B9--6 r - 36 - [7 I > CL-ML Hard, moist, dark gray-olive, Silty CLAYSTONE to very Clayey SILTSTONE, contains lignitlc material 10 115.0 IBULK 3 AMPLE BORING TERMINATED AT 35.0 FEET Figure A-12, Log of Test Boring 9 m SAMPLE SYMBOLS 0 SAMPLING UNSUCCESSFUL S — DISTURBED OR BAG SAMPLE D~STANOARO PENETRATION TEST B.-.CHUNK SAMPL€ • — DRIVE SAMPLE tUNOiaTURSCOt | % WATER TABLE OR aeCRAGK i* NOTE THE LOG OFSUBSURFACECONDmONS SHOWN HEREON APPLIES ONLY ATTHESPECIFIC BORING OR TRENCH LOCATION AND ATTHE DATE INDICATED. ITISNOTWARRANTEDTO BE REPRESENTATIVEOFSUBSUflFACCCONOITlONSATOTHERLOCATIONSANOTlMEa File No. D-4230-H01 November 11, 1988 BORING 10 ELEVATION. 150 .DATE DRILLED, 10/6/88 EQUIPMENT F-inn ?n" -Hti^L-ot- Ik m zw is is MATERIAL DESCRIPTION mi . 8 . - 10 . r2. 14 , - 16 . _ 18 - •m 0 - 20 . - 22 - - 24 - - 26 . 28 30 Ax A BlO-3 i-'T'f.- AVX\ .K-\:A Lt:.\A^ A SM-SC UNDOCUMENTED FILL Loose to medium, damp, medium-dark brown, mottled Silty, Clayey fine SAND fl.22.0 BULK 8.3 SAMPLE CL Soft, wet, dark-medium olive-brown, mottled Sandy CLAY Irregular, but sharp fill/formation contact slopes in SE direction no debris or strong odors 3M-SW DELMAR FORMATION Dense, moist, light tan-olive, meditam to coarse, Silty SANDSTONE Irregular, but sharp deposition-contacts, nearly horizontal 127.6 3.8 CL Hard, moist, medium olive-green, Silty CLAYSTONE, massive, blocky 6-8" calciimi carbonate cemented layer ,— 1^ becomes medium, light olive, more fractured ,( random slickensided surfaces slight seepage 14 IL22.1 BULK 12.6 SAMPLE Figure A-13, Log of Test 10 BORING CONTINUED NEXT PAGE SAMPLE SYMBOLS SAMPLING UNSUCCESSFUL B« STANDARD PENETRATION TEST IS — DISTURBED OR BAG SAMPLE B — CHUNK SAMPLE • — ORtVt 9AMPL8 (UNOtSTUffUO) ^ WATER TABLE OR aCtFAGt NOTE: THELOG OFSUBSURFACECONDmONS SHOWN HEREON APPLIES ONLY ATTHESPECIFlCBOfllNQ OR TBENCHLOCATION AND ATTHEOATElNOICATEaiTISNOTWARRANTEDTOaEflEPReSENTATlVEOFSUBSUflFACECONOITIONSATOTHERLOCATXJNSANDTlMEl File No. D-4230-H01 November 11, 1988 r _ at at— t BORING 10 (CONTINUED) ELEVATION DATE DRILLED- EQUIPMENT ii Ztb UJO DC I.: =8 30 MATERIAL DESCRIPTION 32. 34. 36 . BORING TERMINATED AT. 35.0 FEET he Figure A-14, Log of Test Boring 10 - ov^wB/-^. Q«-SAMPLING UNSUCCESSFUL ' SAMPLE SYMBOLS IS DISTURBED 0R.BAG SAMPLE B»STAN0ARO PCNETRATiaN TEST B—.CHUNK SAMPLE 1» DRIVC SAMPLE (UNOISTUMID) £ » WATER TABLE OK SEtPAQE NOTE THE LOGOFSUBSURFACE CONDITIONS SHOWN MGREONAPPLIES ONLY ATTHE SPECIFIC BORING ORTRENCH LOCATION ANO ATTHE DATE INDICATED. IT IS NOTWABHANTED TO 86 REPRESENTATTVEOFSUBSURFACECONOmONSATOTHER LOCATIONS AND TIMES. File No. D-4230-H01 November 11, 1988 BORING 11 ELEVATION 3QQ .DATE DRILLED IQ/m/fia EQUIPMENT E-inn. ^0" Mnf^-ry hi Si 53 MATERIAL DESCRIPTION TOPSOIL Soft, moist, dark brown. Gravelly CLAY •PUSH J.0" 1/4" 104.9 20,1 DELMAR FORMATION Soft, moist, light olive mottled white, Silty CLAYSTONE, highly fractured, weathered .PUSH 6" 2/6" 96.5 BULK 26.5 3AI-IPLE m 0 gypsum seam in bedding N50E,22NW, potential shear filling becomes firmer, with yellow-green,banding mottling bedding-plane shear N5SE,15NW, Js" remolded slickensided orange/olive clay with gypsum, throughgoing 106.8 20.8 m 0 0 becomes harder, blocky sharp depositional contact, but with thin 1/16" orange remolded clay seam, N50W,6**SW Moist to wet, light olive-tan, slightly Silty coarse SANDSTONE strong seepage /, becomes clean sand A h— rocks 123.6 11.6 i—j^i^—1 r I -1 • r> ^ . Figure A-15, Log of Test Boring 11 BORING CONTINUED NEXT PAGE SAMPLE SYMBOLS ° " UNSUCCESSFUL ' S DISTURBED OR BAG SAMPLE c STANDARD PENETRATION TEST 1 — DRIVE SAMPLE lUNOISTURBEOl CHUNK SAMPL€ 5- — WATER TABLE OR SEEPAGE NOTS. THE LOGOFSUBSURFACECONOITIONSSHOWN HEREON APPLIESONLYATTHESPECIFICBORING ORTRENCH LOCATION ANO ATTHEDATElNOICATE0.lTtSNOTWAflRANTE0TOBEREPH£SENTATIVEOFSUBSUHFACECONOITI0NSATOTHEfl LOCATIONSANO TIMES File No. D-4230-H01 November 11. 1988 z ^ 53 BORING 11 (CONTINUED) ELEVATION. .DATE DRILLED, 10/10/88 EQUIPMENT —ins Zu: wo ii I -30 MATERIAL DESCRIPTION " A-. -32 - contact not visible because of water SANTIAGO PEAK VOLCANICS Very dense, moist, dark brown, gray, green porphyritic VOLCANIC ROCK, slight to moderate fracturing BORING TERMINATED AT 31.5 FEET (REFUSAL) 1 ' m • tm '\ -0 1 Figure A-16, Log of Test Boring 11 SAMPLE SYMBOLS Q SAMPLING UNSUCCESSFUL S DISTURBED OR BAG SAMPLE E-.STANDARD PENETRATION TEST B—.CHUNK SAMPLE • DRIVE SAMPLE [UNOISTURBEDI 2. _^ WATER TABLE OR SEEPAGE N0T£THEL0G0FSUBSURFACEC0N0lTI0NSSH0WNHERE0NAPPLlES0NLYATTHESP€CIFICa0fllN60RTflENCHL0CAT10N^^^^ ATT^eDATErNDlCATEDJTISNOTWARRANTEDTOBEnePRESENTATIVEOFSUBSURFACECONO^^^^ File No. D-4230-H01 November 11, 1988 BORING 12 ei gy/ATinKJ 215 .DATE nan i Pn 10/7/RS EQUIPMENT E-lOO 30" Rotary Bucket ill Zu: _ 0 MATERIAL DESCRIPTION •m m - 2 . - 4 . 6 8 -10- - 12- - 14- - 16- - 18- - 20. 22- U 24- V - 26- B12-4 ylL-CL Vl-i-T- .•i;iM.- prrr 1 SM TORREY SANDSTONE Dense, moist, tan, Silty fine SANDSTO?IE r nearly horizontal depositional contact DELMAR FORMATION Hard, moist, olive-orange, mottled. Clayey SILTSTONE — bedding horizontal SM Dense, moist, light olive-tan, Silty fine to medium SANDSTONE, interbedded thin siltstone beds cemented zone CL Very hard, moist, olive mottled with yellow-orange, Silty CLAYSTONE \\— cemented zones becomes brown — olive BORING TERMINATED AT 25.0 FEET 07.0 20,3 iULK £ AMPT^ 116.0 8.0 5/ 5" 111.6 9.3 Figure A-17, Log of Test Boring 12 SAMPLE SYMBOLS • — SAMPLING UNSUCCESSFUL E_STAN0AR0 PENETRATION TEST • _ DRIVE SAMPLE (UNOISTURBEDI a _ DISTURBED OR SAG SAMPLE B«CHUNK SAMPL£ ^-. WATER TABLE OR SEEPAGE SA^T^?NS^^^^^ File No. D-4230-H01 wr m 8 in in — <in P • BORING 13 Fl FVATiriN 325 .DATE riHiiiFn 10/10/88 EQUIPMENT E-IQO 30" Rotary Bucket ii r - 0 MATERIAL DESCRIPTION 2 . 4 . 8 . . 10- . 12. . 14- A'- B13-1 i ir- •.I- A A A •A'. •*.'".• A': B13-2 _Bi3-3 R:> - 18- - 20- - 22- - 24- -B13-4 - 26- - 28- 30 M." 1:: •H; SM-ML TORREY SANDSTONE Dense, moist, light tan, Silty very fine SANDSTONE, to Sandy SILTSTONE; laminated to massive with orange banding u_bedding N45W,7SW r T 115.9 7,0 r contact sharp, N45W,15''SW ML Hard, moist, light olive-tan. Clayey SILTSTONE Dense, moist, light tan, Silty very fine SANDSTONE to Sandy SILTSTONE, laminated to massive SM-ML 11 113.7 bULK - 11 •greenish-gray zone 16.0 I 3AMPL>- 112.1 10.5 Figure A-18, Log of Test Boring 13 BORING CONTINUED NEXT PAGE SAMPLESYMBOLS D SAMPLING UNSUCCESSFUL S _ DISTURBED OR BAG SAMPLE B^STANDARO PENETRATION TEST B CHUNK SAMPL€ • DRIVE SAMPLE (UNOISTURBEDI X. WATER TABLE OR SEEPAGE NOTE THELOG QF SUBSURFACE CONDITIONS SHOWNHEREON APPLIES ONLY ATTHE SPECIFIC B0R1NG0RTRENCH LOCATION AND *TTHE DATE INDICATED ITIS NOTWABRANTED TO BE REPHESENTATIVEOF SUBSURFACE CONDITIONSATOTHERLOCATIONSAND TIMES File No. D-4230-H01 November U, 1988 r _ ^ —. Us 3" BORING 13 (CONTINUED) ELEVATION DATE DRILLED. EQUIPMENT zu: 3Z =3 . 30 MATERIAL DESCRIPTION - 32 - - 34 - 36 38' - 40 - - ^4^2 - - 44 - rX- ;.V. 'A: A: XI. r 41 46 48 - 50 - - 52 - - 54 - B13-5 • y B13-6 a:- B13-7 - 56 ML slight seepage slight seepage bedding horizontal -strong seepage •IL-CL sharp deposition contact, nearly horizontal 106,1 19.8 DELMAR FORMATION Hard, moist, dark olive to brown, very Clayey SILTSTONE, calcium carbonate cemented lenses dark brown cemented fossil zone approx. 8" thick horizontal beds Very hard, dark greenish-gray to gray. Clayey to Sandy SILTSTONE; scattered coal fragments, carbonaceous BORING TERMINATED AT 56.0 FEET 30/ 7" 138.5 BULK 6.8 fiAMPLE Figure A-19, Log of Test Boring 13 SAMPLE SYMBOLS • — SAMPLING UNSUCCESSFUL * B —STANOARO PENETRATION TEST H — DISTURBED OH BAG SAMPLE B — CHUNK SAMPL€ • . DRIVE SAMPLE (UNOISTURBEOI Z. _ WATER TABLE OR SEEPAGE fm wnre THP i nr nF«!MS«!ii«PACe CQN01TIONS3HOWN HEREON APPLIESONLYATTHESPECIFICBORINGOHTRENCH LOCATION AND :?THVDATE^?D?ire"^^^^^^ File No. D-4230-H01 November 11, 1988 £ z"* at 01 — Klli 8^ BORING 14 ELEVATION 245 n.TPnp.MPn 10/12/88 EQUIPMENT E-lOO 30" Rotary Bucket zu. M ^ ii I MATERIAL DESCRIPTION :y?'x-. ••i-.-i">:- 10 12. 14. 16. 18. 20. - 22. _ 24 - 26 28 30 SM CL DELMAR FORMATION Dense, moist, light tan, Silty medium to coarse SANDSTONE, massive friable 21,1 roots Hard, moist, light-medium olive-green, very Sandy CLAYSTONE, fractured with random slickensides surface fractured on north side of hole, no continuous plane 119.4 JULK r m r. 6.6p. r I 0 t 0' 1 m 14.3"| S|A1-IPLE» m becomes light gray and less fractured becomes dark gray 119.0 14.i BORING CONTINUED NEST PAGE^ Figure A-20, Log of Test Boring 14 SAMPLE SYMBOLS • — SAMPLING UNSUCCESSFUL B_STANDARD PENETRATION TEST • — ORWE SAMPLE (UNDISTURBED) X _ WATER TABLE OR SEEPAGE 0 Ik H DISTURBED OR BAG SAMPLE B-CHUNK SAMPLE NOTE. THELOG 0FSU8SURFACE CONDITIONS SHOWN HEREON APPLIESONLYATTHESPECIFICBOHINGORTRENCHLOCATION^^^ ATTHEOATEINDICATED. ITISNOTWARRANTEDTO BE REPRESENTATIVEOFSUBSUflFACeCONOITIONSATOTHERLOCATlONS AND TIMES 0 File No. D-4230-H01 November U, 1938 33 . BORING 14 (COirriNUED) ELEVATION DATE DRILLED. EQUIPMENT Pzt zti: 3Z OS 30 32_ 34^ 36 38 _ 40. 44. 46. * L 48 4 0 L 50. 52. L 54. 56. 58 60 MATERIAL DESCRIPTION CL — becomes more sandy B14-5 CL-CH Very hard, moist, medium olive-green, Silty CLAYSTONE sandstone lenses with seepage undulating contact, dipping approximately 5" at slope SM B14-6 If-."!-'-!-: B14-7 Very dense, moist, orange-tan, Silty fine to medium SANDSTONE, fining upwards sequence becomes medium-grained, has "cannonball" concretion on N side of hole becomes coarse to very coarse Ii— rip-up clasts .contact irregular, channeled •1V. j I Hard, moist, gray-blue, very Sandy 1 ' SILTSTONE A:-i:\: B14-8 I SM-ML ;:t::'yi: .•|:;.lvi- SM Very dense, slightly moist, orange tan, Silty fine to coarse SANDSTONE scour surface approximately N25E20NW, slight seepage Stiff, very moist, gray-blue with iron staining, Sandy SILTSTONE, fractured near top, no through going remolded zone ML 13 119.5 13.6 21/ 10" 128.7 9.8 iULK SAMPLE 15/ 7" L26.7 10.6 Figure A-21, Log of Test Boring 14 BORING CONTINUED NEXT PAGE ^ I SAMPLE SYMBOLS ^ ~ UNSUCCESSFUL DISTURBED OR BAG SAMPLE E—STANDARD PENETRATION TEST B_ CHUNK SAMPLC • DRIVE SAMPLE (UNOISTURBEDI X WATER TABLE OR SEEPAGE NOTE. THE LOG OF SUBSURFACE CONDITIONS SHOWN HEREON APPLIES ONLY ATTHESPECtFICSORING ORTRENCH LOCATION ANO ATTHEDATE INDICATED ITISNOTWARRANTEDTO BE BEPRESENTATIVEOFSUBSUHFACECONDlTlONSATOTHEfl LOCATIONSANO TIMES File No. D-4230-H0 November 11, 1988 5 0) in— BORING 14 (CONTINUED) ELEVATION DATE ORILLEP 10/12/88 EQUIPMENT m tut t zu. 60 62 - - 64 - - 66 - - 68 - MATERIAL DESCRIPTION - 70 CL Hard, moist, olive green, Silty CLAYSTONE with shiny parting surfaces 14 115.0 16.7 JULK £ AMPLE ML Hard, moist, gray blue, very clayey SILTSTONE with trace fine sand, fissile J V BORING TEBMINATED AT 70.0 FEET Figure A-22, Log of Test Boring 14 0 SAMPLE SYMBOLS D SAMPLING UNSUCCESSFUL ' CsTANOARD PENETRATION TEST 1 DRIVE SAMPLE [UNDISTURBED) 0 SAMPLE SYMBOLS D SAMPLING UNSUCCESSFUL ' X WATER TABLE OR SEEPAGE S DISTURBED OR BAG SAMPLE CHUNK SAMPt£ X WATER TABLE OR SEEPAGE 0 NOTE THE LOGOFSUBSURFACECONOmONS SHOWN HEREON APPL1ES0NLYATTHE3PEC1FICBOHINGORTR6NCHL0CATIONAND ATTHE DATE INDICATED. ITISNOTWARRANTEDTO BE REPRESENTATWEOFSUBSURFACECONDITIONSATOTHEH LOCATIONS ANO TIMES 0 im File No. D-4230-H01 November 11, 1988 Ess at- 52 BORING 15 ELEVATION. 305 .DATE nniLi Pn 10/12/88 EQUIPMENT 30" Rotary Bucket z"3 zu: (c>-- VIC =3 - 0 MATERIAL DESCRIPTION 'Ml'; 2 4- 6- h 8- 10- - 12- - 14- - 16- - 18- - 20- - 22- - 24- - 26- B15-1 I A ! A I / i A I ^1 B15-2 B15-3 B15-4 - 28--B15-5 • I I - 30- CL TOPSOIL Hard, slightly moist, brown, Sandy CLAY with SILT fractures CL-ML DELMAR FORMATION Hard, moist, light olive, Silty CLAYSTONE to very Clayey SILTSTONE 3/12" 107.9 18.3 Bedding nearly horizontal Bedding N60W, 53X7 ML Hard, moist, light orange/olive-mottled. Clayey SILTSTONE; some very fine SAND 3/12" r Bedding nearly horizontal 108.4 BULK 19.5 SAMPLE CL . Hard, moist, olive-mottled, Silty CLAYSTONE; yellow-white gypsum stringers; slight to moderate fracturing , Few steep hematite-filled fractures; N40E, 85SE (joints) Cemented zone (calcium carbonate cement about 12" fossil shells) Remolded CIAY seam 1/8-1/4" thick; N60E 2''S 2/0" SM- SC Dense, moist, light olive-tan Silty fine to medium SANDSTONE; some CLAY (No s. imple) 113,2 13.8 Figure A-23, Log of Test Boring 15 (Boring 15 Continued next page) SAMPLE SYMBOLS G SAMPLING UNSUCCESSFUL E_«.STANOAHO PENETRATION TEST 1 DRIVE SAMPLE (UNDISTURBED) SAMPLE SYMBOLS G SAMPLING UNSUCCESSFUL X „ WATER TABLE OR SEEPAGE S DISTURBED OR BAG SAMPLE 'EM_CHUNK SAMPL€ X „ WATER TABLE OR SEEPAGE NOTE THE LOGOFSUBSURFACE CONDITIONS SHOWN HEREON APPLIES ONLY ATTHESPECIFICBORINGORTRENCH LOCATION ANO ATTHE DATEINOICATED. IT IS NOTWABRANTED TO SEREPRESENTATIVEOFSUBSURFACECONDlTIONSATOTHERLOCATIONSANDTlMEa File No. D-4230-H01 November 11, 1988 BORING 15 (Continued) ELEVATION DATE DRILLED 10/12/88 EQUIPMENT 30" Rotary Bucket —inS zu: -32 MATERIAL DESCRIPTION Hard, moist, olive-brown mottled Silty, Sandy CLAYSTONE >— Remolded CLAY seam 1/8-1/4" thick; 3*SW; throughgoing gypsum 0 m Hard, moist, mediumr-olive, silty CLAYSTONE; abundant gypsum seams; random fracturing Remoded CLAY seam 1/8-3/4" thick; NlOW, 5°SW, throughgoing, i:rf.th large crystals of gypsum within gouge Dense, moist, light orange-tan, medium SANDSTONE . Contact nearly horizontal; sharp ^^j depositional Hard, moist, dark olive-brown mottled with yellow, Silty CLAYSTONE; gypsum seams, random fracturing; fossiliferous and carbonaceous Becomes very dark olive/black and carbonaceous, seepages of slight to moderate flow Remolded CLAY seams 1/4-1/2"; N20W,5"*SW at contact . 5 106.6 IBULK 20. rP" AMPL^ IP' 92.0 [BULK a 29.1- AMPL., r Very dense, dark gray, cemented, fine Silty SANDSTONE; fossiliferous Cemented zone; C&CO^+ BORING TERMINATED AT 59 FEET (REFUSAL) Figure A-24, Log of Test Boring 15 0 SAMPLE SYMBOLS O-SAMPUNG UNSUCCESSFUL* D» STANDARD PENETRATION TEST M DRIVE SAMPLE (UNOISTURSED) S DISTURBED OR BAG SAMPLE B_ CHUNK SAMPLE ^ » WATER TABLE OR SEEPAGE 0 NOTE THELOG OF SUBSURFACE CONDITIONS SHOWN HEREON APPLIES ONLY ATTHESPEOFIC BORING ORTRENCH LOCATION AND ATTHE DATEINDlCATEO. ITISNOTWARRANTEDTO BE REPRESENTATIVE OFSUBSURFACECONOtTIONSATOTHER LOCATIONSANO TIMES 0 File No. D-4230-H01 November 11. 1988 r ^ i M BORING 16 ELEVATION. 300 DATE npii I P.n 10/13/88 EQUIPMENT E-lOO, 30" Rotary Bucket Zib ii §8 MATERIAL DESCRIPTION r 2 - 4 - 6 - - 8 - 10 - - 12 - [-f.-|;.v.-•.•I-:L-:I- ••r.-r.".':-, :r:r.-.i: t:i::l-': B16-1 .--^ - 14- - 16- - 18- - 20- - 22 - 24 - 26 - 28 B16-2 jpta-: ::i-r/i-: ::V.-lH': CL SM ML 1TOPSOIL * hard, humid, brown, Sandy CLAY, highly il fractured becomes very stiff and slightly moist ijjELMAR FORMATION U Very dense, humid, light gray-blue, very Silty \\ fine SANDSTONE; iron-stained, carbonate, 11 weath^^g at top 1 bedding N20W10S — strongly iron-stained SM hard, slightly moist, light grey-blue. Clayey SILSTOtTE, iron-stained, fissile, hematite filled joint N4SE82E layer of stiff, moist, orange Sandy SILTY, friable, fossiliterous; N20W10S bottom contact iron-stained, Sandy with fossils PUSH 7" • 1 93.4 29.5 y stiff, moist, orange-brown. Clayey SILT, --Mlt^ ^ f ossiliterous, ^ cemented lenses \'— iron-stained, fossiliterous , rip-up clast of grey-blue SILSTONE scour contact 10 r \ very dense, humid, light tan, very Silty 1 fine SANDSTONE, iron-stained in places I \i— iron-stained 1— thinly bedded, dipping approximately lO'S iron-stained, lenses of friable, organic rich SILT with gypsum stringers 18.0 14.0 Figure A-25, Log of Test Boring 16 (Boring 16 continued next page) m SAMPLE SYMBOLS • _ SAMPLING UNSUCCESSFUL E STANDARD PENETRATION TEST 1 DRIVE SAMPLE (UNOISTURBEDI m SAMPLE SYMBOLS &_CHUNK SAMPLE X ^ WATER TABLE OR SCEPAGE File No. November D-4230-H01 11, 1988 BORING 16 (Continued) ELEVATION DATE HRli LEO 10/13/88 EQUIPMENT —laS £ zti: Si.-3Z 0 t MATERIAL DESCRIPTION scoured contact, generally horizontal . 9 BULK SAMPL hard, slight moist to moist, light blue-grey Sandy SILSTONE very stiff, moist, reddish-brown, Silty CLAYSTONE many non-continuous remolded planes with gypsum, general orientation N5W7S continuous medium stiff, very moist, grey remolded CLAY N30W5S becomesjorganic rich, gypsum and sulfur-rich 15 117.8 BULK t 0 t m 15.1 r 5AMPL] 0 I very dense, very moist, grey Silty fine to meditim SANDSTONE, slight seepage very strong cemented BORING TERMINATED AT 40 FEET (REFUSAL) Figure A-26, Log of Test Boring 16 m SAMPLE SYMBOLS SAMPLING UNSUCCESSFUL DISTURBED OR BAG SAMPLE .E—.STANDARD PENETRATION TEST B_ CHUNK SAMPL-fi 1 DRIVE SAMPLE (UNOISTURBEOt X „ WATER TABLE OR SEEPAGE lb 1 NOTE THELOG OF SUBSURFACE CONDITIONSSHOWNHEREON APPLIES ONLY ATTHESPECIFIC BORING OR TRENCHLOCATION AND ATTHEDATE INDICATED. ITIS NOTWARRANTED TO BE REPRESENTATlVEOFSUBSUflFACECONOITlONSATOTHER LOCATIONS ANO TIMES. File No. D-4230-H0I November 11, 1988 S3 P BORING 17 Fl FVATinN ^60 .DATE narLLEn 10/13/88 EQUIPMENT H-lOO, 30" Rotary Bucket ii zu: 3Z . 0 MATERIAL DESCRIPTION - 2 - - 4 - 317-1 - 6 - - 8 - -10 - - 12 - - 14 - 16 - - 18 -B17-2 B17-3 - 20 - 22 - 24 - - 26 • 28 - CL TOPSOIL Soft,, dry, dark brown Sandy CLAY CL DELMAR FORMATION Hardy moist, light olive-brown mottled Sandy-Silty CLAYSTONE; abundant gypsum SM- SC contact bedding NlOElONtT Dense, moist, light tan-olive Silty-Clayey coarse SANDSTONE CL Hard, moist, light olive Sandy CLAYSTONE; highly fractured, multiple oriented slickensided surfaces SC- SM Dense, moist, light tan-orange Silty fine to medium SANDSTONE SM Dense, moist, light tan-orange Silty fine to medium SANDSTONE bedding N40W, 9*'NE 111.2 17.1 124.5 11.9 Figure A-27, Log of Test Boring 17 BORING CONTINUED NEXT PAGE ^ . n« • o Q SAMPLING UNSUCCESSFUL ' SAMPLE SYMBOLS S — DISTURBED OR BAG SAMPLE STANDARD PENETRATION TEST B ... DRIVE SAMPLE (UNOISTURSED) CHUNK SAMPLE ^ — WATER TABLE OR SEEPAGE NOTE. THE LOGOFSUBSURFACE CONOITIONSSHOWNHEREONAPPLIES ONLY ATTHeSPEClFICBOniNGORTRENCH LOCATION AND ATTHEOATEINDICATED. ITIS NOTWARRANTED TO BE REPRESENTATIVEOFSUBSURFACECONDITIONSATOTHER LOCATIONS ANO TIMES File No. D-4230-H01 November 11, 1988 BORING 17 (CONTINUED) ELEVATION : DATE DRILLED. EQUIPMENT PI zu. ii r fiZ i . Si MATERIAL DESCRIPTION 30 U 32 A 34 36 38 h 40 H B17-4 becomes moist to wet strong seepage J— irregular contact; remolded CLAY seam, E-W, 8'N; throughgoing Hard„ moist-wet, medium to dark-olive, Sandy CLAYSTONE 'l remolded CLAY seam 1/8-1/4" thick, N45E, BULK AMPL r I m X T i - 42 BORING TERMINATED AT 42 FEET 0 Bi' I* ii i m » m Figure A-28, Log of Test Boring 17 SAMPLE SYMBOLS n SAMPLING UNSUCCESSFUL [S DISTURBED OH BAG SAMPLE E_STAHOAflO PENETRATION TEST CHUNK SAMPLE • —. DRIVE SAMPLE (UNOISTURBEDI X. _ WATER TABLE OR SEEPAGE „-„ Of-nc«iin<!tiQPArprnNQmONSSH0WNHERE0NAPPLIES0NLY ATTHESPECIFICBORINGORTRENCH LOCATION ANO ^°TH\^iTE?^D?CATED^^^^^^^^ 0 File No. D-4230-H01 November 11. 1988 at- nu • TRENCH 1 ELEVATION 110 EQUIPMENT DATE DRILLED. JD555 24" Track Backhoe 10/10/88 Zu. two ii MATERIAL DESCRIPTION 2 - 4 ,- 6 - 8 - 10 - 12 - pip .'.r-i:-!-; CL SM s>i i-tr COLLUVIUM Hard, slightly moist, dark gray, Silty CLAY, with fine sand, highly fractured DELMAR FORMATION Dense, humid, light olive, Silty fine SANDSTONE, highly fractured, carbonate in joints Very dense, humid, light olive, Silty fine SANDSTONE, with areas of fine to coarse sand, iron staining becomes tan, fine to medium coarse WEATHERED SANTIAGO PEAK Hard, slightly moist, olive and brown, Sandy CLAY with unweathered chiuiks of SANTIAGO PEAK, some shiny parting surfaces TRENCH TERMINATED AT 11.0 FEET 'igure A-29 Log of Test Trench 1 SAMPLE SYMBOLS O SAMPLING UNSUCCESSFUL (S — DISTURBED OR SAG SAMPLE I].STANDARD PENETRATION TEST B_ CHUNK SAMPLE H . DRIVE SAMPLE [UNOtSTURBED) X „ WATER TABLE OR SEEPAGE NOTE. THE LOG OFSUBSURFACECONDmONS SHOWN HEREON APPLIES ONLV ATTHESPECIFIC BORING ORTRENCH LOCATION ANO ATTHE DATE INDICATED. IT ts NOTWABRANTED TO BE REPRESENTATIVE 0FSU8SURFACEC0NDITI0NSAT0THER LOCATIONS AND TIMES. File No. D-4230-H01 November 11, 1988 Q ^ TRENCH 2 ELEVATION_ 275 .DATE npti I Fn 10/10/88 EQUIPMENT JD555 24" Track Backhoe Si zu; UJU MATERIAL DESCRIPTION _ 2 . - 4 . L 6 . . 8 . * V.-. CL GC COLLUVIUM Hard, damp, dark bro^TO, Sandy CLAY and Santiago Peak boulders WEATHERED SANTIAGO PEAK Very firm, moist, brown, Sandy CLAY, with pieces of Santiago Peak SANTIAGO PEAK Excavates to very dense, damp, orange-tan. Clayey COBBLES with some samd and boulders Santiago Peak jointed with some surfaces dipping out of slope TRENCH TERMINATED AT 7.5 FEET TRENCH 3 Elev. 245' _ 0 - 4 - 6 CL CL COLLUVIUM Hard, humid, gray, Sandy CLAY with some Santiago Peak cobbles GC Very stiff, very moist, dark brown, Sandy CLAY with some Santiago Peak cobbles SANTIAGO PEAK Excavates to very dense, moist, green and orange. Clayey COBBLES TRENCH TERMINATED AT 5.0 FEET Figure A-30 Log of Test Trenches 2 and 3 SAMPLE SYMBOLS • _ SAMPLING UNSUCCESSFUL D 4-3TAN0ARO PENETRATION TEST H DISTURBED OR BAG SAMPLE CHUNK SAMPL£ • DRIVE SAMPLE lUNOtSTURBEO) ?• _ WATER TABLE OR SEEPAGE File No. D-4230-H01 November 11, 1988 1^ t/3 Hoi TRENCH 4 ELEVATION 210 .DATE nRiiiPn 10/10/83 EQUIPMENT JD555 24" Track Backhoe Zu: §8 MATERIAL DESCRIPTION . 2 . 4 , _ 6 _ 0 ML DELMAR FORMATION Very firm, slightly moist, light gray- green. Clayey SILTSTONE, fractured SM Very dense, humid, light gray-green, Silty fine SANDSTONE iwht.few fine to coarse patches. Iron stained, with clay along some joints TRENCH TERMINATED AT 6.0 FEET TRENCH 5 Elev. 265 -2 - . 4 - ^ 6 - - 8 COLLUVIUM CL CL 1 Very firm, slightly moist, reddish brown, \ Sandy CLAY "becomes very stiff and moist, with Santiago Peak cobbles CL ML WEATHERED SANTIAGO PEAK . Very stiff, moist, olive, Sandy CLAY Very firm, moist, olive-green and orange, Silty CLAY iwth littie Santiago Peak cobble Very firm, moist, light greenish-gray. Clayey SILT with little fine sand, cobbles of Santiago Peak Volcanics TRENCH TERMINATED AT 8.0 FEET Figure A-31 Log of Test Trenches 4 and 5 SAMPLE SYMBOLS D SAMPLING UNSUCCESSFUL [S ~ DISTURBED OR BAG SAMPLE E—STANDARD PENETRATION TEST B« CHUNK SAMPL£ I _ DRIVE SAMPLE (UNDISTURBED) X WATER TABLE OR SEEPAGE NOTE THELOGOFSU8SURFACECONDIT10NSSHOWNHEREONAPPL16SONLY ATTHESPECIFIC BORINGOHTRSNCHLOC^ ATTHE DATElNOrCATCD.IT^ File No. November D-4230-H01 11, 1988 a> — TRENCH 6 ELEVATION. 130 .DATE DRILLED, 10/11/88 EQUIPMENT JD555 24" Track Backhoe ill zu. u«o El-' 3Z =8 - 0 MATERIAL DESCRIPTION - 2 - - 4 - 6 - 8 - 10 - _/• - 12 - - 14 - - 16 6-1 - 18 - 20 I I GC-SC CL CL ML CL ML FILL Loose, damp, orange-tan. Clayey SAND and BOULDERS Stiff, moist, olive^green, Silty CLAY with small chunks of unweathered Delmar Stiff, moist, orange-brown, Sandy CLAY with some GRAVEL, chunks of Delmar & Eocene materials Stiff, moist, light olive-green. Clayey SILT with little SAND, GRAVEL Stiff, moist, grey & green, Sandy CLAY Stiff to very stiff, moist, light olive- green with some grey, very Clayey SILT with little SAND and GRAVEL TRENCH TERMINATED AT 18 FEET Figure A-32. Log of Test Trench 6 10.7 SAMPLE SYMBOLS • _ SAMPLING UNSUCCESSFUL D —STANDARD PENETRATION TEST H DISTURBED OR BAG SAMPLE B — CHUNK SAMPLE • DRIVE SAMPLE (UNOISTURBEDI % WATER TABLE OR SEEPAGE wnTc THE LOGOFSuaSunFACSCONOITlONSSHOWNHEREONAPPLrESONLYATTHESPECIFIC80RINGORTRENCHLOCATIONAN^ lJ?T'HEOATE?NO?"reDSS^^^^ * File No. D-4230-H01 November 11, 1988 ££3 TRENCH 7 ELEVATION. EQUIPMENT DATE DRILLED. JD555 24" Track Backhoe 10/11/88 m Si zo: is - 0 MATERIAL DESCRIPTION - 2 - - 4 - » - 6 - - 8 - -10 - L 14 - 16 -m i -C - I- 18 H -I -;- 20 H CL FILL Very firm to hard, slightly moist, tan, very Sandy CLAY with pieces of wire, plastic bags, concrete CL GC-SC GC-CL Medium stiff, very moist, light green, Silty CLAY with little GRAVEL, SAND Dense, slightly moist, brown. Clayey SAND and GRAVEL Very stiff, moist, light green with brown, Silty CLAY and GRAVEL MJ/ Very stiff, moist, light green, Silty CLAY, highly fractured with SAND Becomes blue-green and with GRAVEL TRENCH TERMINATED AT 17 FEET 'Figure A-33, Log of Test Trench 7 SAMPLE SYMBOLS n SAMPLING UNSUCCESSFUL S DISTURBED OR BAG SAMPLE |]_STANOARO PENETRATION TEST B» CHUNK SAMPLE • DRIVE SAMPLE lUNOISTURBEOl WATER TABLE OR SEEPAGE NOTE. THELOGOFSuaSURFACECONDlTIONSSHOWNHEREONAPPLlESONLYATTHESPECIFICBOflINGORTRENCHLOCATIONANO ATTHE DATE INDICATED. rTlS NOTWARRANTED TO BE HEPRESENTATIVEOF SUBSURFACE CON0IT1ON5AT0THER LOCATIONS ANDTIMES File NO. D-4230-H0I November 11, 1988 in ~,ia ^3 TRENCH 8 ELEVATION. 135 .DATE n«n,Pn lO/U/SS EQUIPMENT J13555 24" Track Backhoe wo OR: - 0 MATERIAL DESCRIPTION 2 - - 4 - - 6 - - 8 - -10 - -12 - -14 - - 16 - . '.v. ' T8- T8-2 -18 - - 20 - GC-CL FILL Hard, damp, orange-brown, Sandy CLAY and GRAVEL SC Medium dense, moist,.tan, very Clayey, fine to medium SAND with some GRAVEL, lenses of black organic material Ul.O BULK X 0 15. ^ SAMPlJii| Becomes grey-blue SM CL Meditmi dense, moist, yellow-tan, Silty, fine to medixHH SAND:.with some SILT, lenses of black organic material Stiff, very moist, grey. Gravelly CLAY with lenses of black organic material Becomes grey-blue TRENCH TERMINATED AT 16% FEET Figure A-34, Log of Test Trench 8 SAMPLE SYMBOLS Q SAMPLING UNSUCCESSFUL [S DISTURBED OR BAG SAMPLE 13—STANDARD PENETRATION TEST B —CHUNK SAMPLE • — DRIVE SAMPLE (UNOISTURBEDI 2. _ WATER TABLE OR SEEPAGE ^ NOTE THELOGOFSUQSURFACeCONOITIONSSHOWNHERSONAPPLIESONLYATTHESPECIFICaORINGORTBENCHLO^ ATTHEDATEINOlCATED-ITlSNOTWABRANTEDTOeEREPHESENTATIVEOFSUSSURFACECONOITIONSATOTHERLOCATlONS AND TIMES File NO. D-4230-H01 November 11, 1988 'Us U 1^ u TRENCH 9 ELEVATION. 135 .DATE DRILLED. 10/11/88 EQUIPMENT JD555 24" Track Backhoe Bye zu: 3Z is - 0 MATERIAL DESCRIPTION W 2 - 4 - 6 - - 8 - -10 - -12 - -14 - -16 - -18 - -20- - l" * i!>- r. SC FILL ML Loose, humid, tan. Clayey SAND with GRAVEL Very firm, moist, tan and. blue-green. Clayey SILT with chunks of CLAY, SAND, organic material CL SC Stiff, very moist, blue-green and black, Silty CLAY Very firm, moist, blue-green. Clayey SAND with pebbles, and chunks of organic material Becomes more Sandy TRENCH TERMINATED AT I6J5 FEET Figure A-35, Log of Test Trench 9 SAMPLE SYMBOLS O —. SAMPLING UNSUCCESSFUL S _ DISTURBED OR BAG SAMPLE EI STANDARD PENETRATION TEST B_CHUNK SAMPL£ • DRIVE SAMPLE (UNDISTURBED) Z. „ WATER TABLE OR SEEPAGE NOTE. THELOG OF SUBSURFACE CONDITIONS SHOWN HEREON APPLIES ONLY ATTHESPECIFICBORINGORTRENCH LOCATIONANO ATTHE DATE INDICATED. IT IS NOTWARRANTED TO BE REPHESENTATlVEOFSUBSUHFACECONOmONSATOTHEfl LOCATIONS AND TIMES File No. D-4230-H01 November 11. 1988 2 . 4 - 6 . 8 . - 10 - 12 - 14 - 16 \XXX: l"-r-vi.^ •.'•K-l.-i: SM CL TRENCH 10 ELEVATION DATE noH • cn 10/10/88 EQUIPMENT JD555 24" Track Backhoe MATERIAL DESCRIPTION ALLUVIUM Loose, moist, dark brown, Silty fine SAND, roots, voids becomes wet strong seepage Soft, saturated, medium brown, Sandy CLAY sit zu. TRENCH TERMINATED AT 16.0 FEET Figure A-36, Log of Test Trench 10 a>^ <t OZ I SAMPLE SYMBOLS • SAMPLING UNSUCCESSFUL H DISTURBED OR BAG SAMPLE I]-—STANDARD PEWeTRATION TEST B» CHUNK SAMPLE m DRIVE SAMPLE {UNDlSTURBEDt — WATER TABLE OR SEEPAGE NOTE File No. D-4230-H01 November 11, 1988 TRENCH 11 ELEVATION. 125 .DATE nnn Lgn 10/10/88 EQUIPMENT '113555 24" Track Backhoe Zu. ii MATERIAL DESCRIPTION CL ALLUVIUM Soft, moist, dark brown, Sandy CLAY Tll-1 10 12 14 •>-:.• •.*. . 16, CL Stiff, moist to wet, medium light brown, Sandy CLAY 106.2 14.7 SC Dense, moist to wet, light brown-tan. Clayey fine SAND TRENCH TERMINATED AT 16.0 FEET m Figure A-37, Log of Test Trench 11 0 SAMPLE SYMBOLS • _ SAMPLING UNSUCCESSFUL I]_3TANDAR0 PENETRATION TEST DRIVE SAMPLE (UNOISTURBEDI DISTURBED OR BAG SAMPLE mi —. CHUNK SAMPL€ WATER TABLE OR SEEPAGE NOTE THE LOGOFSUaSURFACECONOmONS SHOWN HEREONAPPLIESONLYATTHESPECIFICSORING ORTRENCH LOCATIONANO ATTHE DATE INDICATED. IT IS NOTWARRANTED TO BE REPHESENTATIVEOF SUBSURFACECONDITIONSATOTHEH LOCATIONS AND TIMES File No. D-4230-H01 November 11, 1988 I _ in — as TRENCH 12 ELEVATION '. 110 EQUIPMENT _DATE nniLLgp 10/11/88 JD555 24" Track Backhoe —atS zu. MATERIAL DESCRIPTION 4 6 8 . 10. 12. 14, 16. CL ALLUVIUM Soft, moist, dark brown, Sandy CLAY becomes wet strong seepage Loose, saturated, light brown, Silty fine SA^ID TRENCH TERMINATED AT 15.0 FEET Figure A-38, Log of Test Trench 12 0 SAMPLESYMBOLS • -SAMPLING UNSUCCESSFUL DISTURBED OR BAG SAMPLE D STANDARD PENETRATION TEST B« CHUNK SAMPLE 1 .» DRIVE SAMPLE (UNDISTURBED) Z. _ WATER TABLE OR SEEPAGE 0 w NOTE. THE LOG OF SUBSURFACE CONDITIONS SHOVtfNHEREONAPPLlES ONLY ATTHE SPECIFIC BORING ORTRENCH LOCATION AND ATTHE DATE INDICATED. IT IS NOTWARRANTED TO BE REPHESENTATIVEOFSUBSURFACECONDITIONSATOTHER LOCATIONSANO TIMES File No. D-4230-H01 November 11, 1988 X _ TRENCH 13 ELEVATION. 100 .DATE DRILLED. in/n/flfl EQUIPMENT JD555 Track Backhoe ill t zu: OS 3H MATERIAL DESCRIPTION - 2 . _ 4 _ 6 . L 8 : . 10, CL ALLUVIUM Soft, wet, dark brown, Sandy CLAY very strong seepage; filled to 8* in less than 2 minutes SW Loose, saturated, light brown, fine to coarse SAND, friable TRENCH TERMINATED AT 10.0 (REFUSAL) Figure A-39, Log of Test Trench 13 SAMPLE SYMBOLS Q _ SAMPUNG UNSUCCESSFUL S DISTURBED OR BAG SAMPLE |]_STANOARO PENETRATION TEST CHUNK SAMPL£ • DRIVE SAMPLE tUNOISTURBEDt 5 — WATER TABLE OR SEEPAGE NOTE THELOG OFSUBSURFACECONDmONS SHOWNHEREON APPLIES ONLY ATTHESPEaFICBOHINGORTRENCHL ATTHEDATErNDlCATEDJTISNO^^^ File No. D-4230-H01 November 11, 1988 m Ess in at-<ai 1^ . TRENCH 14 ELEVATION 170 DATE nnii i FD 10/11/88 EQUIPMENT JD555 24" Track Backhoe zu. ^ ife IP \0 MATERIAL DESCRIPTION - * - :i>i/io SM-SP ALLUVIUM Loose, damp, light brown-tan, slightly Silty fine SAND 8 . 10. . 12. _ 14. - 16. T14-1 SM Medium dense, moist; light brown, Silty fine SAND, roots, voids, blocky _ 18 3M-SP Medium dense to dense, moist,, tan, slightly Silty fine SAND TRENCH TERIIINATED AT 18.0 FEET 0 r .0 t 0 r '0 r m '0 r 0 m Figure A-40, Log of Test Trench 14 SAMPLE SYMBOLS n SAMPLING UNSUCCESSFUL S DISTURBED OR BAG SAMPLE |]«.STANDARO PENETRATION TEST B— CHUNK SAMPL£ • DRIVE SAMPLE (UNOISTURBEOt Z. „ WATER TABLE OR SEEPAGE :0 •0 I w 'm w 0 NOT= THE LOG OFSUBSURFACECONDtTIONSSHOWN HEREON APPLIES ONLY ATTHESPECIFICBORINGORTRENCHLOCATION ANO ATTHE DATE INDICATED. ITIS NOTWARRANTED TO BE REPRESENTATIveOFSUBSURFACECONOmONSATOTHER LOCATIONS ANO TIMES rniCTIDN RESISTANCE TSF(KC/CH*J 0 1 2 3 4 5 6 7 8 9 10 11 12 19 U- IS- IS m X -*20-m at "2H 22 2a 24- 25- 26- 27- 2a- 28- 90- 91- 92- 89- 84- 95- 86- 87- 98 n 0 10 IS 20 2S 90- 85 40 45 SO ss X 60 m 65 m 75 BO- BS 90 85 100 105 lio- ns 120 125 CONE nESISTDNCE TSF (KG/CM"I SOIL COLUMN • • • V • • > • t • • • FRICTION ftRTIQ m q < 2 • • • • • • -J il 1; " "J -ta —. la m r Q t 2 - 9 - 4 5 6 h 7 8 - 9 iO il i2 iS •14 HS 16 i7 iB i9 -20 m •31 -2 \z •29 ^4 -2S -26 ^7 2B ao 41 42 93 44 -as 36 •37 48 PROJECT I LA COSTA RANCH NW PnaJECT NUMBER I B9-230-1702 INSTRUMENT NUMBERi piscKEOBB D»TEi 10-05-iaflfl B torporahon PROBE: CPTrl t i i J i k III hi II t 1 I i I 0 l- 2- 9- 4 5 m » 7- a 8H m -I m „ 8 CA 10 11 12H 19 14 15 FniCTION nCSISTANCE TSF m/CH*) 6 4 2 0 0-J 1 1 1 1 Ii. ..J i 10 15 ^25 ni m -^90 95 40 45 50 CONE nESISTANCE TSF (KC/CH») SO iqO ISO 200 2^0 3{] SAIL COLUHN 0 950 40O ( I I 11 .1 -i—1- rniCTION RATIO IX} 2 4 4 4 J 4 1—3 1—4- 0 PROJECTtLA COSTA RANCH NW PROJECT NUMBER: B9-230-1702 INSTRUMENT NUMBER: F1SCKE0B8 DATES 10-05-19B8 Uc Earth Technohgy Corporation CONE PENETROMETER TEST PROBE:CPT-2 I I t I I I i It i I i I I I I I I ft i I I I i & i I i FRICTION RESISTANCE TSF (KG/CM*I 0 H 2 9- 4- 5- S 6H -i z z 8-m -< 3) 8 CO 10 IH 12 19 14 IS T 0 10 15 S20 z25 90 85 40 45 SO CONE RESISTANCE TSF(KC/CM») SOIL COLUHN 50 iqo ISO 200 2 ) < > i i 0 3Q0 350 400 FRICTION RATIO •» 1 10 iS r 0 t • 2 - 3 - 4 - S 20 ^5 2 m 40 45 AO 45 —t r 7 B SO m h 9 » CA 10 11 i2 i3 i4 IS m PROJECT! LA COSTA RANCH NW PROJECT NUMBER:89-230-1702 INSTRUMENT NUMBER! F15CKE0BB DflTEs I0-0S-19B9 Jfic far/A Technology Corporation CONE PENETROMETER TEST PROBE: CPT-3 FRICTION RESISTANCE CONE RESISTANCE 0 t 2 8 4 5 6 7 8 9 10 11 12 18 U 15 18 17 I 1 |l8- !l8- 320H 3 "an 32 23 24- 2S- 26- 27- 26- 28- 90- 91- 32- 99- 34- 33- 96- 97- 36- m 6 4 2 50 1 qo I so 2 0 : ^° . . ? qo 9 ^0. . . 41] • ) 1 - ——— •' - • • • > • S-^— • • * • • • • SOIL COLUHN FRICTION RATIO m PROJECT! LA COSTA RANCH NW PROJECT NUMBER I 89-230-J 702 INSTRUMENT NUMBERi FISCKEOBB DflTEi 10-06-1988 FRICTION RESISTANCE TSF IKG/CM*) m 6 m a 8 ID 11- 12- 13- 14- 15- 04 10 15 :25 m rrj 90 35- 40 45 50 CONE RESISTANCE TSF tKG/CH»I ISO 2Q0 2S0 300 350 SOIL COLUHN 4Q0 Q FRICTION RATIO IX\ 2 4 6 8 400 PROJECT!LA COSTA RANCH NW PROJECT NUMBERS 89-230-1702 INSTRUMENT NUMBER: FISCKEOBB DftTE: 30-06-19BB ' The forth Technohgy Corporation CONE PENETROMETER TEST PROBE: CPT-5 FRICTION RESISTANCE TSF (KC/CH* J 10- 11- 12- 19- 14 15 95- 40 45 SO CONE RESISTANCE SOIL TSF CKC/CH*) COLUHN SO 100 ISO 200 250 300 350 400 FRICTION RATIO tXi 45 -40 45 SO iO 11 12 ri3 14 400 PROJECT! LA COSTA RANCH NW PROJECT NUMBERS 89-230-1702 INSTRUMENT NUMBERsFISCKHOSB DflTEi10-06-1988 The Earth Technology Corporation CONE PENETROMETER TEST PROBE: CPTr-6 FRICTION flESISTANCE TSF(KC/CH»J CONE RESISTANCE TSF (KG/CH"J m 6 7- 3 8H m 30 9- 10- 11- 12- 13- 14- 15- SOIL COLUMN FRICTION RATIO IX) PROJECTS LA CGSTA RANCH NW PROJECT NUMBERS 89-230-1702 INSTRUMENT NUMBERs FISCKEOSS DflTEi 10-06-1988 ' The Earth Technology Corporation CONE PENETROMETER TEST PROBE: CPT-7 0 1 2 3H 4 5i 6 7 3 8H m —t 31 9-u 10- 11- 12- 13 14 15 FRICTION RESISTANCE CONE RESISTANCE SfllL TSF(KC/CM» J TSF (KG/CH*) COLUHN 8 4 2 0 SO iqo 1^0 2qa 2so aqo aso 4qo Q 0 1 . -1 1 p—1, •,,T..i,.i 1 1 I I I 10 is S20 TI ^25 30 3S 40 45 50 r t— 1 .t .l i .4 i..*.^ FRICTION RATIO XX\ 2 4 6 6 400 r 0 - I • 2 - 3 4 h 5 h 7 m -i m 931 Ul 10 11 i2 -13 14 45 PROJECTS LA CUSI'A RANCH NW PROJECT NUMBER!89-230-1702 INSTRUjl^N^gNygl^Rs FISCKEOBB The Earth Technology Corporation CONE PENETROMETER TEST PROBE: CPT-8 0 H 2 3- 4- S- T 0 m 61 no 7- ^ ZD 9- 10 llH 12 19H 14 IS 10 IS S20 TI 2S 30 3S- 40 45 SO FRICTION RESISTANCE TSF(KC/CH* J 8 4 2 0 CONE RESISTANCE TSF IKG/CH* J 150 2Q0 2S0 SOIL COLUHN 300 350 400 FRICTION RATIO (X) 2 4 0 400 PROJECT: LA COSTA RANCH NW PROJECT NUMBERS 89-230-1702 INSTRUMENT NUMBER s FISCKEOBB DATE: 10-06-1988 The Earth Technology Corporation CONE PENETROMETER TEST PROBE: CPT-9 Q 1 2 9 4 5 6 7 6 9 10 11 12- 13- U IS 16 17 o m X Sl9-i -420 m 3 "21 22 23- 24- 25 26 27- 26- 20- 80 31 92 39 84 '35 36 87 36 10 15 20 25 40 45 50 55 o m TJ X BO z n! 6S m 70 7S 60 85 80 85 100 105 110 J(5 120 FRICTION RESISTANCE TSF (KG/CH"J 6 4 2 0 SO IQQ CONE RESISTANCE TSF (KC/CH*1 ISO 2Q0 250 • • • J • • • • • • -< • } • < • • • •--• • • • • • ; • 300 950 SOIL COLUHN 400 Q FRICTION RATIO 2 4 6 0 - S - 15 - 25 10 20 SO as 40 45 SO - 55 o m TJ 60 X TI fiS m m r ^ - I - 2 9 4 - S - 6 - 7 0 - 9 iO 11 i2 iS i4 iS i6 i7 I I IB - 70 75 80 BS 90 85 hlSx m 100 iOS ilO its 120 400 i2S a -20 ^1 -22 -23 -24 -23 -36 •21 ^8 ^8 40 41 42 ^3 ^4 45 48 4? -38 m 31 m PROJECT? LA COSTA RANCH NW PROJECT NUMBER I 89-230-1702 INSTRUMENT NUMBERi FISCKEOBB DflTEi 10-06-1988 e The Earth Technology Corporation CONE PENETROMETER TEST PROBE: CPTrlO 0-1 1 2 9H 4 S 8 7 X 8 ni -I m a 8 CA 10 11 12 19 14 15 10 IS S20 TI ^25 -n m m -30 8S- 40 45 SO FRICTION RESISTANCE TSF(KC/CH* J 6 4 2 0 50 < CONE RESISTANCE TSF(KC/CH* J IQO 150 200 250 900 I I I I ~y—r~i SOIL COLUHN 950 400 Q FRICTION RATIO IX\ 3 4 4 < -J J • 4——< 4- Q -15 •20 S Tl 10 - Q - I 2 3 4 h 5 h 8„ m 40 43 40 45 SO - 7 r 83= m m 9 31 10 hii 12 13 U IS 400 PROJECTS LA COSTA RANCH NW PROJECT NUMBERS 89-230-1702 INSTRUMENT NUMBERs FISCKEOBB OflTEs 10-06-1988 The Earth Technology Corporation CONE PENETROMETER PROBE: CPT-II TEST FRICTION RESISTANCE TSF (KG/CH'J 0- l- 2- 3 4 5 6 7 8 9H 10 11 12 19 14 ISH IB 17 18 218- -i20 m 1 22 29 24 25 26 H 27 28 28 90 31 9? 33 H 34 sis'H 36 37 38 10 15 20 25 90 3S 40 45 50 SS X 60 ni 65 m 70- 75 BO- BS 80 8S 100 105 no U8 120 125 CONE RESISTANCE ®PJ.b.. TSF (KG/CH") COLUHN 100 150 200 2SQ 300 350 4Q0 Q FRICTION RATIO 2 4 6a - s - IQ - 25 - 30 15 20 35 40 45 - SO - 55 60 r 0 - 1 - 2 9 4 - 5 - 6 - 7 8 ' 9 10 -11 -12 -13 •14 -15 -16 -17 -18 65 m m 70 ^1 -22 H6^ zr m -20 m 60 85 90 05 100 -lOS -110 -tiS 120 125 -24 ^S ^6 ^7 ^8 -26 40 41 42 43 44 45 46 47 48 400 PROJECT SLA COSTA RANCH NW PROJECT NUMBER1B9-230-1702 INSTRUMENT NUMBERipjscKEOBB OflTEsio-OB,]gRR /A« Earth Technology mm Corporation CONE PENETROMETER TEST PROBE: CPTrl2 CONE PENETROMETER TEST DATA 1 SQUNDIN6 : I PROJECT i ! PROJECT No: 1 TEST DATE ; CPT-2 UA CQ5TA RANCH NU a9-23a-i7a2 10-35-1988 LOCATION : INSTRUMENT : ELECTRONICS: OPERATOR I CARLSBAD' CA FlSCKEaSS Tl EC/MS/EC/MS DEPTH CONE FRICTION RATIO PORE CONDUCTIVITY EXCIT (ft) (tsf) (psi) (uMHOS/ciil (vdc) a.aa a.a a.aa a.aa NA NA la.aa i.ao 28.9 a.54 1.88 NA NA ta.aa 2.aa 19.3 a.78 4.86 NA NA la.aa 3.aa 26.2 1.77 6.75 NA NA la.aa 4.aa 27.1 1.43 5.28 NA NA la.ea S.BQ 23.9 1.77 7.41 NA NA la.aa aM &.aa 24.8 1.74 7.aa NA NA la.ae 7.aa 23. a 1.94 8.45 NA NA iB.aa •m a.aa 19.4 1.61 B.3B NA NA la.Ba 9.aB 21.7 1.2a 5.54 NA NA IB.aa m la.aa 26.7 1.54 5.77 NA NA la.aa ii.ea 27.2 1.51 5.55 NA NA la.ae 12.aa 26.3 1.68 6.39 NA NA IB.aa 13.aa 2a. 3 1.61 7.94 NA NA IB.aa 0'' 14.aa 23.5 1.41 5.99 NA NA la.aa is.aa 21.7 1.45 6.66 NA NA le.BB 16.aa 22.6 1.45 6.39 NA NA la.aa m 1 17.QB 24.9 1.41 5.67 NA NA IB.aa •• iB.aa 19.4 1.11 5.71 NA NA IB.aa 19.aa 33.7 1.72 5.11 NA NA IB.aa 2a.aa 24.7 1.42 5.75 NA NA la.aa '*<• .' 21.aa 23.6 1.25 5.38 NA NA la.BB 22.aa 16.3 1.12 6.S6 NA NA la.aa m -23.aa 2B.a 1.15 5.77 NA NA IB.aa 24.aa 25.a 1.29 5.15 NA NA IB.BB 25.aa 21.3 i.a5 4.93 NA NA IB.aa 26.aa 24.1 1.19 4.93 NA NA la.BB 27.aa 26.9 1.39 5.19 NA NA 18.aa m 28. aa 39.7 2.45 6.16 NA NA la.ea 29. aa 53. I 3.13 5.89 NA NA la.aa 3a.aa 26,4 1.16 4.39 NA NA la.aa 31. aa 29.2 1.26 4.33 NA NA IB.aa m • 32.aa 4a.7 1.16 2.86 NA NA la.aa 33.aa 26.5 1.37 5.17 NA NA -IB.aa 34.aa 38.6 1.64 5.36 NA NA la.BB *!•• 35.aa • 32.5 1.51 4.64 NA NA la.aa 36.aa 12.7 a.59 4.65 NA NA 18.aa 37. aa 21.9 1.2B 5.49 NA NA 18,88 38.aa 29.3 1.48 5.B5 NA NA la.aa •«l • 39.aa 27.a 1.75 6.43 NA NA 18.aa 4a.aa 27. a 1.62 5,98 NA NA la.aa m 41.aa 42.2 2.84 6.73 NA NA IB.aa 42. aa 43. aa sa.a 3.62 7.25 NA NA la.ae 42. aa 43. aa 36.2 1.42 3.91 NA NA 18.aa •mm 44.aa 36.2 1.42 3.91 NA NA la.aa 45.aa 47.7 3.22 6.74 NA NA 18.aa m 46.aa 97.8 1.62 . 1,66 NA NA IB.aa 47. aa 37.2 1.69 4,56 NA NA IB.aa 48.aa 117.5 i.aa 1.53 NA NA IB.aa 49.aa 78.5 3.a2 3.85 NA NA IB.aa m . sa.aa 193.8 13.68 7.86 NA NA la.aa S The IkTtti Technology Corporation CONE PENETROMETER TEST DATA SOUNDINS ! CPT-3 PROJECT : LA COSTA RANCH NU PROJECT No: B9-23fl-17B2 TEST DATE : 18-85-1988 LOCATION : INSTRUMENT ; ELECTRONICS: OPERATOR : CARLSBAD CA F15CKEB88 Tl Ecyns/Ec/HS DEPTH CONE 'FRICTION RATIO PORE CONDUCTIVITY EXCIT at) (tsf) (tsf) il) (pal) tuNHOS/ca} tvdc) a.aa a.a a.aa a.aa NA NA . -18.88 i.aa 31.7 a.41 1.28 NA NA la.ea 2.aa 28.9 8.37 1.28 2.26 NA NA la.BB 3.aa 35.B B.81 1.28 2.26 NA NA iB.ee 4.aa 38.3 1.42 4.68 NA NA le.aa s.aa 28.8 a.71 2.52 NA NA le.ea 6.aa 34.4 e.B7 2.54 NA NA 18.aa 7.88 27.5 2.26 8.22 NA NA le.aa e.BB 25.7 2.82 7.87 NA NA IB.aa 9.88 21.1 1.41 6,69 NA NA 18.ea 18.aa 21.1 1.44 6.84 NA NA la.aa U.BB 19.7 1.31 6.62 NA NA IB.aa 12,88 21.6 1.27 5.89 NA NA 18.aa 13.aa 26.6 2.18 7.87 NA NA 18.aa 14.aa 38.3 2,36 7.77 NA NA la.aa is.aa 23.4 1.57 6.72 NA NA 18.BB 16,aa 24.8 1.81 7.38 NA NA IB.BB 17.aa 25.3 2.25 8.91 NA NA IB.aa 18.aa 23.9 2.2B 9.56 6.53 NA NA 18.88 19.aa 23.a i.sa 9.56 6.53 NA NA IB.aa 2B.Ba 22.a 1.4B 6.33 NA NA 18.88 21.88 37.7 1.94 5.15 NA NA la.aa 22. aa 34. a 1.49 4.4a NA NA IB.BB 23. aa 45.5 2.IB 4.63 NA NA iB.ea 24.aa 23.8 1.36 5.91 NA NA 18.88 25.aa 22. a 1,59 7.22 NA NA IB.BB 26.88 26.6 1.69 6.36 NA NA -18.aa 27. aa 26.6 1.52 5.71 NA NA 18.aa 28,aa 49.1 2.81 5.72 NA NA 18.88 29. aa 46.S 2.47 5,27 NA NA IB.aa 38.aa 51.9 3.84 5.87 NA NA IB.BB 31.aa 6B.6 2.23 3.68 NA NA IB.aa 32.88 64.7 3.41 5.27 NA NA IB. 88 33.aa 88.2 2.33 2.64 NA NA IB.aa 34.aa 3a.8 1.B2 5.9B NA NA 18.88 35.aa 29.4 1.61 5,48 NA NA 18.88 36.88 53.3 2.Ba 5.25 NA NA IB.BB 37.88 78^7 4,32 6.11 NA NA 18.88 3B.ea 78.7 4.53 6.48 NA NA IB.aa 39.BB 59.7 3.74 6.27 NA NA IB.BB 4B.Ba 45.5 3.86 6-74 NA NA IB.aa 41.88 54.2 2.59 4.77 NA NA IB.aa 42.88 65.2 3.26 5.81 NA NA 18.88 43.88 73.5 3.98 5.41 NA NA IB.aa 44.88 52.B 2.96 5.68 NA NA 18.88 45.BB 164.4 9.88 5,96 NA NA -18.88 S The £art/i Technology Cor pont ion CONE PENETROMETER TEST DATA SOUNDINS : CPT-6 PROJECT : LA COSTA RANCH NW PROJECT NQ: 39-238-1732 TEST DATE : 13-86-1988 LOCATION : INSTRUMENT ; ELECTRONICS: OPERATOR 1 CARLSBAD CA Fi5CiC£aea Tl EC/MS/EC/MS DEPTH CONE FRICTION RATIO PORE CONDUCTIVITY EXCIT (ft) (tsf) itsi) U) (psi) (uNHOS/COi} tvdc) — a.aa a,a a.aa a.aa NA NA 18.aa i.aa 66.1 I.aa 2-72 NA NA 18.aa 2.83 66.1 4.62 6-99 NA NA 18.88 3.aa ia2.3 6.83 6.67 NA NA la.aa 4.88 9a.B 6.22 &.8S NA NA 18.aa S.BB 68.3 3.88 5.68 NA NA IB.BB 6.88 61.8 4.66 7.54 NA NA 18.8B 7.88 63.6 3.95 6.28 NA NA 18,88 B.BB 62-9 3.44 4,15 NA NA la.aa 9.88 63.1 4.97 7.87 NA NA la.aa 18.BB 69,5 5.14 7-39 NA NA 18.aa ** 11.aa 77,7 4.7B 6.84 NA NA 1B.B8 12.88 62.1 4.87 7.84 NA NA 18.88 13.88 42.7 3.89 9.89 NA NA 18.aa 14.88 36.3 3.14 8.65 NA NA 18.88 •mm is.aa 4a. 4 3.17 7.86 NA NA 18,88 16.aa 28,9 2.16 7.47 NA NA IB.BB 17.88 29.8 2.26 7.59 NA NA 18.ae IB.BB 31,1 2.48 7.71 NA NA 18.88 19.88 27.9 2.87 7.43 NA NA 18,88 28.aa 3B.9 2.81 7-22 NA NA -la.aa 21.88 42.5 3.18 7.49 NA NA 18.aa — . 22.BB 44.B 1.99 4.46 HA NA 18.88 23.88 52.1 3.84 5.83 NA NA la.aB iiUI 24.aa 31.4 2.23 7.12 NA NA IB.aa 25.88 48.1 2.34 S. 83 NA NA IB.aa 26.88 37.3 2.17 S.B2 NA NA 18.88 27.88 48.7 3.15 6.47 NA NA IB.aa 2B.8B 21.2 1.42 6.73 NA NA la.aa S The fart/) Technology Corporation CONE PENETROMETER TEST DATA SOUNDING : CPT-II PROJECT : LA COSTA RANCH NU PROJECT No: 89-238-1782 TEST DATE ; 18-36-1983 LOCATION ; CARLSBAD CA INSTRUMENT : FlSCKEBaa ELECTRONICS: Tl OPERATOR : EC/MS/EC/MS DEPTH CONE FRICTION RATIO PORE ttsO (7,) (psi) a.a a.aa 8.88 NA 48.7 8.71 1.46 NA 41.3 8.54 B.37 1.31 NA 38.7 8.54 B.37 1.21 NA 44.9 8.61 1.35 NA 48.6 8.61 1.25 NA 49.9 a.81 1,62 NA 68.a a.91 1.52 NA 78.6 e.9B 1.39 NA 87.1 1.56 1.79 NA 89.3 1.35 1.51 NA 88.6 1.25 1.55 NA 7B.7 1.59 2.82 NA 88.8 1.62 1.32 NA 97,5 2.16 2.22 NA 96.1 2.SB 2.63 NA 93.4 1.72 1.84 NA 133.3 2.36 2.ea NA B5. 1 2.36 2.7a NA 74.3 1.62 2. ts NA 68.2 1.14 1.89 NA 63.5 1.17 1.71 NA 68.8 1.14 1.67 NA 78.1 1.14 1.46 NA 66.1 3.21 4.35 NA 113.4 3.21 2.71 NA 119.8 2.78 2.25 NA 94. 1 2.46 2.61 NA 86.7 1.98 2,29 NA 234. 1 4.29 1.33 NA 111.5 4.56 4.89 NA 185.3 3.3B 3.15 NA 98.1 3,34 3.4a NA 37. I 2.32 2.66 NA 38.2 2.42 3.82 NA 66.S 2.33 4.23 NA B9,3 2.88 2.33 NA 52.1 3.37 6.47 NA 91.1 2.88 2,28 NA 99.4 1.98 1.99 NA 75.9 2.14 2.82 NA 79. 1 1.87 2.37 NA 78.4 1.68 2.27 NA 62.5 1,29 2.87 NA SB.6 2.51 4,97 NA 6a.7 2.84 3,36 NA 124.5 2.38 1.91 NA 97.4 3.46 3,56 NA 141.4 1.83 1,38 NA CONDUCTIVITY EXCIT (uMHQS/cn) (vdc) a.aa I.aa 2.38 3.38 4.aa 5.83 6.33 7,aa 8.83 9.88 18. aa 11.38 12.aa 13.33 14.88 15.88 16.BB 17.88 IB.aa 19. BB 28.88 21.88 22.38 23.88 24.33 25.83 26.88 27.88 28.38 29,33 33. aa 31.88 32,88 33,83 34.88 35.83 36,88 37.aa 38,83 39.88 48,83 41,88 42.88 43,88 44,38 45,33 46.88 47.88 48.83 NA NA NA NA NA NA NA NA HA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 18.88 ia,aa 18.88 IB.BB la.aa 13.33 18.88 -IB.BB 13.88 18.83 18.88 IB.BB 18.88 18.38 13.88 18.83 18.88 18.BB 13.BB 18.88 la.aa 13,aa IB.aa IB.BB 18.BB 18.38 18.88 18.33 18,83 18.aa 18.88 18,83 18.38 18.aa 18.88 18.88 18.38 IB.aa 13.88 18,ae ia,ae IB.aa la.BB 18.ae 18.ae ia.ee 18.aa 13.33 18.83 The Earth Technology Corporation CONE PENETROMETER TEST DATA 1 SOUNDING : CPT-12 " I PROJECT : LA COSTA RANCH NU I PROJECT No: 89-238-1782 i TEST DATE : 13-36-1933 LOCATION : INSTRUMENT : ELECTRONICS: OPERATOR : CARLSBAD CA FiscKEaae Tl EC/MS/EC/MS DEPTH CONE FRICTION RATIO PORE CONDUCTIVITY EXCIT (ft) (taf) Usi) (Z) (psi) (uHHOS/ca) (vdc) a.aa a.a B.BB 8.88 NA NA IB.aa I.aa 48.4 1.12 2.77 NA NA 13.33 2.33 4B,9 B.BS 2.88 NA NA 13.33 3,aa 45.8 2.58 5.73 NA NA IB.BB 4.38 23.5 2.43 8.78 NA NA 13. 83 s.ae 17.B 1.36 6.23 NA NA 13,33 6,83 17,5 1.B6 6.Q3 NA NA la.aa 7.83 11,5 B.75 6.51 NA NA 13.aa 8. 83 8.3 8.41 4.95 NA NA 18.88 m 9.88 9.7 a.41 4.25 NA NA 18.88 la.aa 14,3 8.82 5,73 6.54 NA NA 18.aa 11. BQ 19.8 1.38 5,73 6.54 NA NA IB.88 12.88 13.9 1.16 8,37 NA NA 18.88 mm' 13.BB 11.1 B.75 6,78 NA NA 18.33 14.33 ia,7 8.75 7.87 NA NA 18.ae \ 15.88 17.6 a.99 5.65 NA NA IB.aa •' 16.38 17.1 8.96 5.61 NA NA 18.aa 17.38 2 1.37 6.17 NA NA 18.38 MM 18.83 23.1 1.58 6.51 NA NA IB.83 19.33 13.8 8.89 6.87 NA NA 13.83 -~ ' 28.88 14.3 a.93 6.25 NA NA 13.33 21.33 16,7 8.76 4,55 NA NA 18.aa urn' 22.aa 17,6 1.48 7.97 NA NA 18.88 23,33 12,1 8.67 5.53 NA NA 18.aa 24.83 15.B a.B3 5.24 NA NA 18.88 IM« 25, aa IB. 1 3.83 4.58 NA NA 18.38 26.88 27.7 1,75 6.29 NA NA 18.33 27.83 26.8 1.75 6.51 NA NA 13.33 23.88 38.3 1.33 4.91 NA NA 18.88 ™. 29.33 34.2 1.75 5.11 NA NA 18.88 38.88 24.1 8.97 4.81 NA NA 18.88 31. ae 31.5 1.38 4.37 NA NA IB.aa 32.88 48.9 2.29 4.69 NA NA IB.BB 33.88 26.8 1.31 5.84 NA NA 18.33 34. BB 111.4 3.38 3,83 NA NA 18.83 35.88 52.6 2.67 5,37 NA NA IB.BB 36.38 49.4 2.16 4.37 NA NA -13.88 37.aa 75.1 i.ia 1.56 NA NA ta.aa •~. 38.ea 94.8 1.35 1.43 NA NA 18.88 39.aa 47.6 2.16 • 4.54 NA NA ta.aa 48.ae 35.7 1.99 5.58 NA NA 18.ae 41.aa ies.9 8.88 a.76 NA NA IB.aa 42.88 198.4 3.93 2.86 NA NA -iB.ae 43.88 63.7 2.6B 4.39 NA NA la.aa 44.88 ISI.9 8,B1 a.53 NA. NA la.ea 45. aa 111.5 2.61 2,34 NA NA ta.aa 46.aa 22.4 8.40 1.78 NA NA -18.88 -47.aa 22,9 a.81 3.53 NA NA 18.ae 48.33 53,2 B.94 1.73 NA NA IB.BB 49.83 53.2 2.74 4.71 NA NA ta.aa sa.aa 44.8 2.74 6.24 NA NA ta.aa ' 51.33 59.6 1.52 2.55 NA NA 13.33 52.83 34.4 1.22 3.54 NA NA IB.aa 53.38 29.8 B.98 3.29 NA NA 13.33 54.88 15.1 8.54 3.57 NA NA 18.88 55.38 17.8 ' 8.48 2.39 NA NA 13.33 56.88 14.7 8.54 3.69 NA NA IB.BB 57.88 14.2 8,73 5.48 NA NA 18.38 ss.ea 178.3 4.82 2.36 NA NA 18.88 59.BB 36.B 1.43 1.64 NA NA IB.aa SS The fartA Techno logy Corporation File No. D.4230-H01 November 11, 1988 TABLE I Summary of Direct: Shear Tesc Results Sample No. Dry- Dens ity ncf Moisture Content % Unit Cohesion nsf Angle o£ Shear Resistance Deerees B7-2 108.4 16.5 1160 27 B8-7 112.7 15.5 1420 30 B9-5 1115.0 15.1 290 35 Bll-2 95.9 26.5 250 29 B14-5 119.5 13.6 730 28 *B15-8 92.0 29.1 190 10 B16-3 107.5 18.9 990 27 *B17-1 111.2 17.1 700 16 * Residual Shear November U, 1988 LABORATORY REPORT Telephone (619) 425-1993 Established 1928 CLARKSOH LABORATORY AND SUPPLY INC. 350 Trousdale Dr. Chula Vista, Ca. 92010 ANALYTICflL AND CCNSDLTING CBEMISTS Date: 10/18/88 Purchase Order Nturiaer: 4230-€01 Account NOdDer: TO: . . * ] . GEOOCN BC. M 9530 DCWDY DRIVE SfiN DIBQO, CA. 92126 ^ Laboratory Ndnijer: S02054 Qistaners Phone Nd: 695-2880 Sanple Designation: *— .it Cne soil sanple marked job nane La Costa NW file ^ . #4230-fi01 sanple #B15-9. • ANRLKIS: By Ttest Method No. Calif. 643-C October 2, 1972 State of California Departraait of Public Works Division of Highways ^ Materials and Research Dqjartment Method for Estimating the Service Life of Metal Culverts. SflMELE M. Efi 3.3 Water iftdded (ml) Resistivity (ohtf-cm) 0 4110 50 1450 50 • 490 50 270 - 50 .380 50 _ 280 ^ . 50 250 "•U'' 50 250 ~ 50 250 Less than 5 years to perforation for a 16 to 8 gauge metal culvert. File No. D-4230-H01 November U. 1988 o < Q -J O CO z o o m o cc Lli a. SAMPLE NO. B4-4 1 ATER ADC I 1 \ 1 \ i 1 1 1 i r If Ik Q.1 0.5 1.0 5.0 iao APPLIED PRESSURE (ksf) sao ioao 0 » 0 Ik INITIAI. DRY DENSITY 105.3 ( pcf ) INITIAL WATER CONTENT 21.2 (%) INITIAL SATURATION 92.6 ( % ) SAMPLE SATURATED AT 0.3 (ksf) CONSOLIDATION CURVE LA COSTA RANCH - NORTHWEST AREA CARLSBAD, CALIFORNIA Figure B-2 W w 0 0 III tixe wo. u-ifr^JU-tiUi SAMPLE NO. B6-3 Z o < 9 -j' o CO z o o 1-z lli o cc UJ 0. ai 0.5 1.0 5.0 iao APPLIED PRESSURE (ksf) sao ioao INITIAL DRY DENSITY 110.4 Cpcf} INITIAL WATER CONTENT 18-0 (%} INITIAL SATURATION 87.5 (%) SAMPLE SATURATED AT O.S (ksf ) « CONSOLIDATION CURVE L LA COSTA RANCH - NORTHWEST AREA CARLSBAD, CALIFORNIA •'.gure B-3 File No. D-4230-H01 Noveniber 11. 1988 < g o CO z o 1-z UJ o a: UJ a. SAMPLE NO. B2-3 0.1 0.5 1.0 5.0 iao APPLIED PRESSURE (ksf) sao 1CXX0 INITIAL DRY DENSITY 99.0 <PC*) INITIAL WATER CONTENT 24.0 ( % ) INITIAL SATURATION 85.0 ( % ) SAMPLE SATURATED AT 0.5 (ksf)* w 4 CONSOLIDATION CURVE LA COSTA RANCH - NORTHWEST AREA CARLSBAD, CALIFORNIA W Figure B-1 0 ProjectNo. 04230-12-03 September 25, 1996 Morrow Development c/o Villages of La Costa Post Office Box 9000-685 Carlsbad, California 92078-9000 Attention: Mr. Fred Arbuckle Subject Gentlemen: LA COSTA NORTHWEST . CARLSBAD, CALIFORMA PRELIMINARY RTPPABILITY STUDY In accordance with you request, we have performed the initial phase of a preliminary rippability study for the subject property. The purpose of this study was to provide an initial evaluation of the potential difficulty in excavations during grading within the portion of the project imderlain by rock. The Santiago Peak Volcanics (Jsp) are exposed along the upper slopes in the southeast comer of the site. Ten seismic refraction traverses were conducted on September 23 and 25, 1996. The approximate locations of the seismic lines are shown on the attached Site Plan, Figure 1. The results of the survey indicated a variable but relatively shallow depth of rippable materials. The interpreted depths are present in the summary in Table I and on Figure 1. This rock formation is characterized as highly variable in depth of decomposition. While seismic studies are a suitable method of evaluation, the actual extent of rippability may exceed the interpreted depth where fracturing within the rock is present It is our experience that where the fracturing is extensive, gradmg may be possible although more difHcult Grading in this condition requires an extensive soaking to soften the fracture zones. It is recommended that a second phase of the rippability study be unplemented. This could consist of either trenching or borings utilizing an air track drill. The latter is less intrusive and would not result in the extent of disturbance associated with the trenching. If you have any questions regarding this letter, or if we may be of fiirther service, please contact the undersigned at your convenience. Very truly yours, GEOCON INC L RCE 22527^ AS:DFL:slc (6/del) Addressee -TABLE! SEISMIC TRAVERSES" Seismic - Traverser AveragfrVelacx^ (ft/sec) Average Depths Length or Traverse Approxinuite Maxinniir Depdr Explored • Dt:. (ft) S-1 4198 10619 — 14-17 — 100 30 S-2 3178 9976 — 5-6 — 100 30 S-3 3403 8868 — 2-10 — 100 30 S-4 5192 32685 — 22 100 30 S-5 1791 8019 — 4-8 — 100 30 S-6 1459 3639 10989 2-3 12-24 100 30 S-7 3430 18373 16-21 _ 100 30 S-3 2981 32156 — 19-21 — 100 30 S-9 1411 4581 9055 3-7 12-24 100 30 S-IO 2378 12892 — 4-8 — 100 30 NOTE: Vl y2 V3 Dl D2 » Velocity in feet per second of first layer of materials =« Second layer velocities =• Third layer velocities ^ Depth in feet to base of first i^er » Depth to base of second l^er For mass grading, materials with velocities of less than 4S00 fps are geneiaUy rippable with a 09 CateipiUar Tractor equipped with a single shank hydraulic ripper. Velocities of 4S00 to S500 fps indicate marginal ripping and blasting. Velocities greater than 5500 fps generally require pre-blasting. For trenching, materials with velocities less dian 3800 fps are generally rippable depending upon the degree of fracturing and the presence or absence of boulders. Velocities between 3800 smd 4300 fps generally indicate marginal ripping, and velocities greater than 4300 f^is generally indicate non-rippable conditions. The above velocities are based on a Kohring 505. The reported velocities represent average velocities over the length of each traverse, and should not generally be used for subsurface interpretation greater than 100 feet &om a traverse. m ProjectNo. 04230-12-03 September 25, 1996 0 w m p 0 0 0 APPENDIX D SELECTED BORING LOGS FROM GEOTECHNICAL INVESTIGATION FOR RANCHO CARRILLO PROJECT— MAJOR ROADS, CARLSBAD. CALIFORNIA. PREPARED BY GEOCON INCORPORATED, DATED JANUARY 15, 1993 (PROJECT NO. 04787-12-01). FOR VILLAGES OF LA COSTA - THE GREENS CARLSBAD, CALIFORNIA PROJECT NO. 06403-12-01 . AOJECT NO. 04787-12-01 )EPTH IM -FEET SAMPLE NO. SOIL CLASS (USCS) BORING SBMIO ELEV. (MSL) 111 EQUIPMENT DATE COMPLETED 4/27/92 MAYHEW 1000 ROTARY M a H m > go - 0 MATERIAL DESCRIPTION roK^oiL Finn, damp, dark brown, Sandy CLAY I V r 12 I 14 •| 18 r ^ 2 H :r: • ;8 - CL CL SBMlOl -1 10 -SBMIO I SBMlOl -3 !0 - 22 - "1- • • - 24 H I SBMIO -4 26 - SBMlOl! -5 I 28 - CL-SC SC I SP-SC ALLUVIUM Finn, wet, dark brown, Sandy CLAY -Water table after stabilizing at 4 feet Becomes loose, saturated, light brown, fine Clayey SAND and Sandy CLAY -Becomes very light brown with lenses of slightly clayey sand at 15 feet Becomes light brown, fine to coarse. Clayey SAND with little, fine gravel 120:5" 10 TT TTZy Becomes medium dense, saturated, light brown, medium to coarse, slighdy clayey SAND to Clayey SAND TT Figure A-15 Log of Boring SBM 10, page 1 of 2 OtCM SAMPLE SYMBOLS • ... SAMPLING UNSUCCESSFUL E ... STANOAilD PENETRATION TEST ^ ... OISTURSED OR SAG SAMPLE 0... CHUNK SAMPLE ,. DRIVE SAMPLE (UNDISTURBED) ., UATER TABLE OR SEEPAGE TE: THE LOG OF SUBSURFACE CONOITIOMS SHOWN HEREON APPLIES ONLY AT THE SPECIFIC BORING OR TREHCH LOCATION AND AT THE DATE INDICATED. IT IS NOT UARRANTED TO BE REPRESENTATIVE OF SUBSURFACE CONDITIONS AT OTHER LOCATIONS AMD TIMES. PROJECTNO. 04787-12-01 •r m m DEPTH IN FEET SAMPLE NO. > a Q o -T" P M -I SOIL CUSS CUSCS) BORING SBMIO ELEV. (MSL) 111 EQUIPMENT DATE COMPLETED 4/27/92 MAYHEW 1000 ROTARY 3 ^ h > a o IU -5 h SBMIU -6 MATERIAL DESCRIPTION IT - 32 - [„: I- 3.-1 ... - 42 - I 44 - I- 46 - SBMIO -7 SBMIO -8 SBMIO -9 CL GC GC Very stiff, saturated, green, Sandy CLAY -Becomes gravelly at 32 feet TTIT TST • Very dense, saturated, yeUowish brown, Qayey SAND and gravel TT Becomes very dense, green, Sandy CLAY with gravel and cobbles "50/3' "50/3* BORING TERMINATED AT 46J FEET REFUSAL ^igure A-16 Log of Boring SBM 10. page 2 of 2 CRQR ^^SAMPLE SYMBOLS • ... SAMPLING UNSUCCESSFUL D... STANDARD PENETRATIOM TEST • ... DRIVE SAMPLE (UNDISTURBED) ... DISTURBED OR BAG SAMPLE S... CHUNK SAMPLE I ... UATER TABLE OR SEEPAGE lOTE: THE LOG OF SUBSURFACE CONDITIONS SHOUN HEREON APPLIES QNLT AT THE SPECIFIC BORING OR TRENCH LOCATION AND AT THE DATE INDICATED. IT IS MOT UARRANTED TO BE REPRESENTATIVE OF SUBSURFACE CONDITIONS AT OTHER LOCATIONS AND TIMES. 0 0 - PROJECT NO. 04737-12-01 BORING SBM 11 ELEV. (MSL) 110 EQUIPMENT DATE COMPLETED 4/28/92 MAYHEW 1000 ROTARY " V « a MATERIAL DESCRIPTION Fnx Firm, damp, yellowish brown, Sandy CLAY with desiccation cracks ALLUVIUM Stiff, moist, yeUowish brown mottled, Sandy CLAX Becomes alternating stiff, yellowish brown Sandy CLAY and medium dense, brown. Clayey SAND Becomes loose to medium dense, saturated, yeUowish brown mottled, fine to medium, CHayey SAND alternating with slightly clayey SAND, with little gravel Very stiff, wet, light green, Sandy CLAY 15 lll.l TT T05T 32 Figure A-17 Log of Boring SBM 11, page 1 of 2 CROR SAMPLESYMBOLS CI SAMPLING UNSUCCESSFUL B ... STANDARD PENETRATION TEST 1... DRIVE SAMPLE CUNOISTURSED) I ^ ... DISTURBED OH BAG SAMPLE 0 ... CHUNK SAMPLE I ... WATER TABLE OR SEEPAGE TE: THE LOG OF SUBSURFACE CONDITIONS SHCUN HEREON APPLIES ONLY AT THE SPECIFIC SORING OR TRENCH LOCATION AND AT THE DATE INDICATED. IT IS MOT WARRANTED TO BE REPRESENTATIVE OF SUBSURFACE CONDITIONS AT OTHER LOCATIONS AND TIMES. PROJECT NO. 04787-12-01 lb .0 '0 0- 0 DEPTH IN FEET SAMPLE NO. SOIL CLASS CUSCS} BORING SBM 11 ELEV. (MSL) 110 EQUIPMENT DATE COMPLETED 4/28/92 MAYHEW 1000 ROTARY hi V 30 32 - 34 - 36 - 38 - 40 - 42 - 44 - 46 - 48 - 50 - SBMir -6 MATERIAL DESCRIPTION SBMII -7 CL-SC Becomes alternating of green mottled, fine to medium Clayey SAND and very dark brown, Sandy CLAY SBMll -8 SBMll -9 SBMll -10 SP-SC Becomes medium dense, saturated, ^ray, fine to medium slightiy clayey SAND with carbon flecks and fine voids; more clayey in places CL WEATHERED DELMAR FORMATION Dense, wet, light green mottled. Clayey SAND and grayish brown, Sandy CLAY CL -Becomes very stiff, wet, light green with dark red staining, slightly sandy CLAY, fractured with trace of fine gravel CL DELMAR FORMATION Hard, moist, light green, slightly sandy CLAY with trace of fine gravel BORING TERMINATED AT 51.5 FEET •igure A-18 Log of Boring SBM 11, page 2 of 2 TT 75T 37 0 lb w (ft 0 0 •1 0 0 IK 30 107.3 21.7 46 0 0 0 0 0 CROR IF h ''•i'' SAMPLE SYMBOLS • ... SAMPLING UNSUCCESSFUL C... STANDARD PENETRATION TEST • ... DRIVE SAMPLE CUNOISTURSED) DISTURBED OR BAG SAMPLE ^ ... CHUNK SAMPLE Z ... UATER TABLE OR SEEPAGE NOTE: THE LOG OF SUBSURFACE CONDITIONS SHOUN HEREON APPLIES ONLY AT THE SPECIFIC BORING OR TRENCH LOCATION ANO AT-THE DATE INDICATED. IT IS NOT UARRANTED TO SE REPRESENTATIVE OF SUBSURFACE CONDITIONS AT OTHER LOCATIONS AND TIMES. 0 to PROJECT NO. 04787-12-01 ' I DEPTH I IN FEET SAMPLE MO. SOIL CUSS (USCS) BORING BM34 ELEV. (MSL) 210 EQUIPMENT _DATE COMPLETED 1/15/92 E-lOO BUCKET RIG Z Ml Q H ^ t- EE n 0. ^ > Q 0 2 4 6 8 10 12 14 16 18 20 22 24 - 26 - 28 - MATERIAL DESCRIPTION BM34 -1 BM34 -2 SM ML SM SM BM34 -5 BM34 -6 BM34 CL SM m CL SM CL DELMAR FORMATION Dense, damp, light to orange-brown, Silty, fine SANDSTONE -1.5 X 1 foot highly cemented concretion in south side boring at 5 feet -Sharp irregular, near horizontal contact Dense, damp, liglir green' Clayey SILTSTONE: thinly bedded -Gradational contact "Dense" damp,"irght to~medluin bfownr SiTty." ~ fine to medium SANDSTONE: several I to 2 inch interbedded green claystone lenses with orange oxide -1 X 1.5 foot highly cemented concretion at 9 feet -10 inch X 2 foot highly cemented concretion 10.5 feet -Continuous well cemented from 12 to 13.3 feet with shells -Becomes fine to coarse at 14 feet -Irregular near horizontal contact Sliff fo very stiff, "damp," lig"ht green, Sandy CLAYSTONE: gypsum fracture fillings, orange oxide staining -Gradational contact De"nse, damprifght* gray to" llg"ht g««n. Silty, fine to coarse SANDSTONE: massive • -Sharp, slightly irregular, near horizontal contact Very sdfT,"damp~to "moIsTrirghf greeif," Silty CLAYSTONE: moist along contact at 24 feet, thinly bedded with orange oxide along bedding -Irregular, near horizontal contact 'l5e"nse" dimp.irgTit gray.'SIlty" Tfne "to medium SANDSTONE 110.9 122.1 6.7 12.8 123.9 7.6 - Figure A-86 Log of Boring BM 34, page 1 of 2 CROR •T ^SAMPLE SYMBOLS ^ '" SAMPLING UNSUCCESSFUL B ... STANDARD PENETRATION TEST I ^ ... DISTURBED OR BAG SAMPLE E ... CHUNK SAMPLE Z ,. DRIVE SAMPLE (UNDISTURBED) .. UATER TABLE OR SEEPAGE :TE: THE LOG OF SUBSURFACE CONDITIONS SHOWN HEREON APPLIES ONLY AT THE SPECIFIC BORING ORTRENCH LOCATION AMD AT THE DATE INDICATED. IT IS NOT WARRANTED TO BE REPRESENTATIVE OF SUBSURFACE CONDITIONS AT OTHER LOCATIONS AND TIMES. PROJECTNO. 04787-12-01 r DEPTH IN FEET SAMPLE NO. SOIL CLASS (USCS) BORING BM34 ELEV. (MSL) 210 EQUIPMENT _DATE COMPLETED 1/15/92 E-lOO BUCKET RIG H ^ k H § IL to IU gr U* (L ^ go O 30 32 - 34 - 36 - 38 - 40 - 42 - 44 - 46 BTOT -8 BM34 -9 BM34 -10 MATEIUAL DESCRIPTION -:>harp irregular contact NZi;. ONW BM34 -11 BM34 I CL SM -1/8 to 1/4 inch moist to damp clay at contact Very stiff to hard, damp to moist, dark green CLAYSTONE: micaceous from 28.2 to 32 feet, thinly bedded below 32 feet -Gradational contact *l5ense" climp,~irgtr green~ io'lTglif Brown, Silty, fine to medium SANDSTONE: massive with abundant cross bedding, orange oxide staining -Becomes fine to coarse at 36 feet -Cross beds NlOW. 15SW at 37 feet -8 inch thick continuous highly weathered concretionary bed at 42 feet; irregular shape, some dark brown clay developed from weathering within the concretion, clay not continuous 115.3 BORING TERMINATED AT 46 FEET Figure A-87 Log of Boring BM 34, page 2 of 2 CROR SAMPLE SYMBOLS • ... SAMPLING UNSUCCESSFUL C ... STANDARD PENETRATION TEST @ ... DISTURBED OR BAG SAMPLE ^ ... CHUNK SAMPLE ,. DRIVE SAMPLE (UNDISTURBED) WATER TABLE OR SEEPAGE m NOTE: THE LOG OF SUBSURFACE CONDITIONS SHOWN HEREON APPLIES ONLY AT THE SPECIFIC BORING ORTRENCH LOCATION AND AT THE DATE INDICATED. IT IS NOT WARRANTED TO BE REPRESENTATIVE OF SUBSURFACE CONDITIONS AT OTHER LOCATIONS AND TIMES. APPENDIX E SLOPE STABILITY ANALYSES for VILLAGES OF LA COSTA - THE GREENS CARLSBAD, CALIFORNIA PROJECT NO. 06403-12-01 Project No. 06403-12-01 Village of La Costa - Greens Cut Slope 1 1.871 PL ^ 280 C .9 260 ^ 240 ^ 220 LU 200 -Qcf Ts Bedding Plane Shear (B.P.S.)- ' ' 0 50 100 150 200 250 300 350 400 Distance (ft) 450 500 550 600 Description Unit Weight (pcO Friction Angle (degrees) Cohesion (psf) Qcf 130 25 300 Ts 130 30 300 B.P.S. 130 10 100 File Name: La Costa GreensWLCI.sip Figure E-2 ProjectNo. 06403-12-01 Village of La Costa - Greens Cut Slope 2 2.278 30 280 C 260 O ••B 240 03 § 220 HI 200 ^ ' •.^ '-''^-Bedriing Plane Sheaf (B P.S ) ' - 0 50 100 150 200 250 300 350 400 Distance (ft) Description Unit Weight (pcO Friction Angie (degrees) Cohesion (psf) Qcf 130 25 300 Ts 130 30 300 B.P.S. 130 10 100 450 500 550 600 File Name: La Costa Greens\VLC2.slp Figure E-3 ProjectNo. 06403-12-01 Village of La Costa - Greens Cut Slope 3 PL • L 220 I-200 180 c • o 160 U—• CD 140 > CD 120 LU 100 0 2.167 Ts" ' Bedciing'Plane vShear (B.P.S ) ' 100 150 200 250 300 350 Distance (ft) 40C 450 500 Description Unit Weight (pcf) Friction AngI (degrees) > Cohesion (psf) Qcf 130 25 300 Ts 130 30 300 B.P.S. 130 10 100 lOO File Name: La Costa GreensWLCS.sIp Figure E-4 Project No. 06403-12-01 Village of La Costa - Greens Cut Slope 4 c o CO > 0) LU 260 240 22 200 180 160 140 120 10d 80 60 1.797 Ts 0 50 100 150 200 250 300 350 400 Distance (ft) 450 500 550 600 650 Description Unit Weight (pcf) Friction AngI (degrees) i Cohesion (psf) Ts 130 30 300 Fault 130 10 100 File Name: La Costa Greens\VLC4.slp Figure E-5 Project No. 06403-12-01 220 200 ^ 180 c O 160 "S 140 5 120 LU 100 Tt Village of La Costa - Greens Cut Slope 5 1.731 il Bedding Plane'Shear (B.'P.S.) ' Description Unit Weight (pcf) Friction Angi (degrees) } Cohesion (psf) Qcf 130 25 300 Ts 130 30 300 B.P.S. 130 10 100 ^Qcf 0 50 100 150 200 250 300 350 400 Distance (ft) 450 500 550 600 File Name; La Costa GreensWLCS.sIp Figure E-6 APPENDIX F RECOMMENDED GRADING SPECIFICATIONS for VILLAGES OF LA COSTA - THE GREENS CARLSBAD, CALIFORNIA PROJECT NO, 06403-12-01 RECOMMENDED GRADING SPECIFICATIONS 1. GENERAL 1.1. These Recommended Grading Specifications shall be used in conjunction with the Geotechnical Report for the project prepared by Geocon Incorporated. The recom- mendations contained in the text of the Geotechnical Report are a part of the earthwork and grading specifications and shall supersede the provisions contained heremafter in the case of conflict 1.2. Prior to the commencement of graduig, a geotechnical consultant (Consultant) shall be employed for the purpose of observing earthworic procedures and testing the fills for substantial conformance with the recommendations of the Geotechnical Report and these specifications. It will be necessary that the Consultant provide adequate testing and observation services so that he may determine that, in his opinion, the work was performed in substantial conformance with these specifications. It shall be the responsibility of the Contractor to assist the Consultant and keep him apprised of work schedules and changes so that personnel may be scheduled accordingly. 1.3. It shall be the sole responsibility of the Contractor to provide adequate equipment and methods to accomplish the work in accordance with applicable grading codes or agency ordinances, these specifications and the approved grading plans. If, in the opinion of the Consultant, unsatisfactory conditions such as questionable soil materials, poor moisture condition, inadequate compaction, adverse weather, and so forth, result in a quality of work not in conformance with these specifications, the Consultant will be empowered to reject the work and recommend to the Owner that construction be stopped until the unacceptable conditions are corrected. 2. DEFINITIONS 2.1. Owner shall refer to the owner of the property or the entity on whose behalf the grading work is being performed and who has contracted with the Contractor to have grading performed. 2.2. Contractor shall refer to the Contractor performing the site grading work. 2.3. Civil Engineer or Engineer of Work shall refer to the California licensed Civil Engineer or consulting firm responsible for preparation of the grading plans, surveying and verifying as-graded topography. GI rev. 8/98 2.4. Consultant shall refer to the soil engineering and engineering geology consulting firm retained to provide geotechnical services for the project. 2.5. Soil Engineer shall refer to a California licensed Civil Engineer retained by the Owner, who is experienced ui the practice of geotechnical engineering. The Soil Engineer shall be responsible for having qualified representatives on-site to observe and test the Contractor's work for conformance with these specifications. 2.6. Engineering Geologist shall refer to a California licensed Engineering Geologist retained by the Owner to provide geologic observations and recommendations during the site grading. 2.7. Geotechnical Report shall refer to a soil report (including all addenda) which may include a geologic reconnaissance or geologic mvestigation that was prepared specifically for the development of the project for which these Recommended Grading Specifications are intended to apply. 3. MATERIALS 3.1. Materials for compacted fill shall consist of any soil excavated fi:om the cut areas or imported to the site that, in the opinion of Hie Consultant, is suitable for use in construction of fills. In general, fill materials can be classified as soil fills, soil-rock fills or rock fills, as defined below. 3.1.1. Soil fills are defined as fills containing no rocks or hard lumps greater than 12 inches in maximum dimension and containing at least 40 percent by weight of material smaller than 3/4 mch in size. 3.1.2. Soil-rock fills are defined as fills containing no rocks or hard lumps larger than 4 feet in maximum dunension and containing a sufHcient matrix of soil fill to allow for proper compaction of soil fill around the rock fiagments or hard lumps as specified in Paragraph 6.2. Oversize rock is defined as material greater than 12 inches. 3.1.3. Rock fills are defined as fills containing no rocks or hard lumps larger than 3 feet in maximimi dimension and containing littie or no fines. Fines are defined as material smaller than 3/4 inch in maximum dimension. The quantity of fines shall be less than approximately 20 percent of the rock fill quantity. GI rev. 8/98 3.2. Material of a perishable, spongy, or otherwise unsuitable nature as determined by the Consultant shall not be used in fills. 3.3. Materials used for fill, either imported or on-site, shall not contain hazardous materials as defined by the California Code of Regulations, Tide 22, Division 4, Chapter 30, Articles 9 and 10; 40CFR; and any other applicable local, state or federal laws. The Consultant shall not be responsible for the identification or analysis of the potential presence of hazardous materials. However, if observations, odors or soil discoloration cause Consultant to suspect the presence of hazardous materials, the Consultant may request fi-om the Owner the termination of grading operations within the affected area. Prior to resuming grading operations, the Owner shall provide a written report to the Consultant mdicating that the suspected materials are not hazardous as defined applicable laws and regulations. 3.4. The outer 15 feet of soil-rock fill slopes, measured horizontally, should be composed of properly compacted soil fill materials approved by the Consultant. Rock fill may extend to the slope face, provided that the slope is not steq)cr than 2:1 (horizontal:vertical) and a soil layer no thicker than 12 inches is track-walked onto the face for landscaping purposes. This procediu^ may be utilized, provided it is acceptable to the governing agency. Owner and Consultant 3.5. Representative samples of soil materials to be used for fill shall be tested in the laboratory by the Consultant to determine the maximum density, optimum moisture content, and, where appropriate, shear strength, expansion, and gradation characteristics of the soil. 3.6. During grading, soil or groundwater conditions other than those identified m the Geotechnical Report may be encountered by the Contractor. The Consultant shall be notified immediately to evaluate the significance of the unanticipated condition 4. CLEARING AND PREPARING AREAS TO BE FILLED 4.1. Areas to be excavated and filled shall be cleared and grubbed. Clearing shall consist of complete removal above the ground surface of trees, stumps, brush, vegetation, man-made structures and similar debris. Grubbing shall consist of removal of stumps, roots, buried logs and other unsuitable material and shall be performed in areas to be graded. Roots and other projections exceeding 1-1/2 inches in diameter shall be removed to a depth of 3 feet below the surface of the ground. Borrow areas shall be grubbed to the extent necessary to provide suitable fill materials. GI rev. 8/98 4.2. Any asphalt pavement material removed during clearing operations should be properiy disposed at an approved o£F-site facility. Concrete fiagments which are fi^e of reinforcing steel may be placed in fills, provided they are placed in accordance with Section 6.2 or 6.3 of this document 4.3. After clearing and grubbing of organic matter or other unsuitable material, loose or porous soils shall be removed to the depth recommended in the Geotechnical Report The depth of removal and compaction shall be observed and approved by a representative of the Consultant The exposed surface shall then be plowed or scarified to a minimum depth of 6 inches and until the surfece is fiee fi-om uneven features that would tend to prevent uniform compaction by the equipment to be used. 4.4. Where the slope ratio of the original ground is steeper than 6:1 (horizontal:vertical), or where recommended by the Consultant, the original ground should be benched in accordance with the following illustration. TYPICAL BENCHING DETAIL Rnish Grade Original Gnwnd Rnish Slope Suiface Remove All Unsuitable Material As Recommended By Soil Engineer Slope To Be Such That Sloughing Or Sliding Does Not Occur See Note 1 See Note 2- No Scale DETAIL NOTES: (1) Key width "B" should be a minimum of 10 feet wide, or sufficiently wide to permit complete coverage with die compaction equipment used. The base of the key should be graded horizontal, or mclined slightly into tiie natural slope. (2) The outside of the bottom key should be below the topsoil or unsuitable surficial material and at least 2 feet into dense formational material. Where hard rock is exposed in the bottom of the key, tiie depth and configuration of the key may be modified as approved by the Cnsniltant. GI rev. 8/98 4.5. After areas to receive fill have been cleared, plowed or scarified, the surface should be disced or bladed-fay the Contractor until it is uniform and free from large clods. The area should then be moismre conditioned to achieve the proper moisture content, and compacted as recommended in Section 6.0 of these specifications. 5. COMPACTION EQUIPMENT 5.1. Compaction of soil or soil-rock fill shall be accomplished by sheepsfoot or segmented-steel wheeled rollers, vibratory rollers, multiple-wheel pneumatic-tired rollers, or otiier types of acceptable compaction equipment. Equipment ^hall be of such a design that it will be capable of compacting the soil or soil-rock fill to the specified relative compaction at the specified moisture content 5.2. Compaction of rock fills shall be performed in accordance with Section 6.3. 6. PLACING, SPREADING AND COMPACTION OF FILL MATERIAL 6.1. Soil fill, as defined in Paraph 3.1.1, shall be placed by the Contractor in accordance with the following recommendations: 6.1.1. Soil fill shall be placed by the Contractor in layers that, when compacted, should generally not exceed 8 inches. Each layer shall be spread evenly and shall be thoroughly mixed during spreading to obtain uniformity of material and moisture in each layer. The entire fill shall be constructed as a imit m nearly level lifts. Rock materials greater than 12 inches in maximum dimension shall be placed in accordance with Section 6.2 or 6.3 of these specifications. 6.1.2. In general, the soil fill shall be compacted at a moisture content at or above the optimum moisture content as determined by ASTM D1557-91. 6.1.3. When the moisture content of soil fill is below that specified by the Consultant, water shall be added by the Contractor until the moisture content is in the range specified. 6.1.4. When the moisture content of the soil fill is above the range specified by the Consultant or too wet to achieve proper compaction, the soil fill shall be aerated by the Contractor by blading/mixing, or other satisfactory methods until the moisture content is within the range specified. GI rev. 8/98 6.1.5. After each layer has been placed, mixed, and spread evenly, it shall be thoroughly compacted by the Contractor to a relative compaction of at least 90 percent. Relative compaction is defined as the ratio (expressed in percent) of the in-place dry density of the compacted fill to the maximum laboratory dry density as determined in accordance witii ASTM 01557-91. Compaction shall be continuous over the entire area, and compaction equipment shall make sufficient passes so that the specified minimum relative compaction has been achieved throughout the entire fill. 6.1.6. Soils having an Expansion Index of greto tiian 50 may be used m fills if placed at least 3 feet below finish pad grade and should be compacted at a moisture content generally 2 to 4 percent greater than the optimum moisture content for the material. 6.1.7. Properly compacted soil fill shall extend to the design surface of fill slopes. To achieve proper compaction, it is recommended that fill slopes be over-built by at least 3 feet and then cut to the design grade. This procedure is considered preferable to track-walking of slopes, as described in the following paragraph. 6.1.8. As an alternative to over-building of slopes, slope faces may be back-rolled with a heavy-duty loaded sheepsfoot or vibratoiy roller at maximum 4-foot fill height intervals. Upon completion, slopes should then be track-walked with a D-8 dozer or similar equipment, such tiiat a dozer track covers all slope surfaces at least twice. 6.2. 5b//-TOC^fill, as defined in Paragraph 3.1.2, shall be placed by the Contractor in accordance with the following recommendations: 6.2.1. Rocks larger than 12 mches but less than 4 feet in maximum dimension may be incorporated into the compacted soil fill, but shall be limited to the area measured 15 feet mmimum horizontally fi'om the slc^e face and 5 feet below finish grade or 3 feet below the deepest utility, whichever is deeper. 6.2.2. Rocks or rock firagments up to 4 feet in maximum dimension may either be individually placed or placed in wmdrows. Under certain conditions, rocks or rock firagments up to 10 feet in maximum dimension may be placed using similar methods. The acceptability of placing rock materials greater than 4 feet in maximum dimension shall be evaluated during grading as specific cases arise and shall be approved by the Consultant prior to placement. GI rev. 8/98 6.2.3. For individual placement, sufficient space shall be provided between rocks to allow for passage of compaction equipment. 6.2.4. For windrow placement, the rocks should be placed in trenches excavated in properly compacted soil fill. Trenches should be approximately 5 feet wide and 4 feet deep in maximum dimension. The voids around and beneath rocks should be filled with approved granular soil having a Sand Equivalent of 30 or greater and should be compacted by flooding. Windrows may also be placed utilizing an "open-face" metiiod in lieu of the trench inx)cedure, however, this method should first be approved by the Consultant 6.2.5. Windrows should generally be parallel to each other and may be placed either parallel to or perpendicular to the fece of the slope depending on the site geometry. The minimum horizontal spacing for windrows shall be 12 feet center-to-center with a 5-foot stagger or offset fi-om lower courses to next overlying course. The minimum vertical spacing between windrow courses shall be 2 feet from the top of a lower windrow to the bottom of the next higher windrow. 6.2.6. All rock placement, fill placement and fiooding of approved granular soil in the windrows must be continuously observed by tiie Consultant or his representative. 6.3. RockGWs, as defined in Section 3.1.3., shall be placed by the Contractor in accordance with the following recommendations: 6.3.1. The base of the rock fill shall be placed on a sloping surface (minimum slope of 2 percent, maximum slope of 5 percent). The surface shall slope toward suitable subdramage outiet facilities. The rock fills shall be provided with subdrains during construction so that a hydrostatic pressure buildup does not develop. The subdrains shall be permanentiy connected to controlled drainage facilities to control post-construction infiltration of water. 6.3.2. Rock fills shall be placed in lifts not exceeding 3 feet Placement shall be by rock trucks traversing previously placed lifts and dumpmg at the edge of the currentiy placed lift. Spreadmg of tiie rock fill shall be by dozer to facilitate seating of the rock. The rock fill shall be watered heavily during placement. Watering shall consist of water trucks traversing in fi-ont of tiie current rock lift face and spraying water continuously during rock placement. Compaction equipment with compactive energy comparable to or greater tiian that of a 20-ton steel vibratory roller or other compaction equipment providing suitable energy to achieve the ~~ ' GI rev. 8/98 required compaction or deflection as recommended in Paragraph 6.3.3 shall be utilized. The number of passes to be made will be determined as described in Paragraph 6.3.3. Once a rock fill lift has been covered witii soil fill, no additional rock fill lifts will be permitted over the soil fill. 6.3.3. Plate bearing tests, in accordance with ASTM D1196-64, may be performed in both tiie compacted soU fill and m the rock fill to aid in determining the number of passes of tiie compaction equipment to be performed. If performed, a minimum of three plate bearing tests shall be performed in the properly compacted soil fill (minimum relative compaction of 90 percent). Plate bearing tests shall then be performed on areas of rock fill having two passes, four passes and six passes of the compaction equipment, respectively. The number of passes required for the rock fill shall be determined by comparing the results of the plate bearing tests for the soil fill and the rock fill and by evaluating the deflection variation with number of passes. The required number of passes of the compaction equipment will be performed as necessary until the plate bearing deflections are equal to or less than that determined for the properly compacted soil fill. In no case will the required number of passes be less than two. 6.3.4. A representative of the Consultant shall be present during rock fill operations to verify that tiie minimum number of "passes" have been obtained, that water is being properly applied and that specified procedures are being followed. The actual number of plate bearing tests will be determuied by the Consultant during grading. In general, at least one test should be performed for each approximately 5,000 to 10,000 cubic yards of rocjtfill placed. 6.3.5. Test pits shall be excavated by tiie Contractor so that the Consultant can state that, in his opinion, sufficient water is present and that voids between large rocks are properly filled with smaller rock material. In-place density testing will not be required in the rock fills. 6.3.6. To reduce the potential for "piping" of fines into the rock fill from overlymg soil fill material, a 2-foot layer of graded filter material shall be placed above the uppermost lift of rock fill. The need to place graded filter material below the rock should be determined by the Consultant prior to commencing grading. The gradation of the graded filter material will be determined at the time tiie rock fill is being excavated. Materials typical of tiie rock fill should be submitted to the Consultant in a timely manner^ to allow design of the graded filter prior to the commencement of rock fill placement GI rev. 8/98 6.3.7. All rock fill placement shall be continuously observed during placement by represeritatives of the Consultant 7. OBSERVATION AND TESTING 7.1. The Consultant shall be the Owners representative to observe and perform tests during clearing, grubbing, filling and compaction operations. In general, no more tiian 2 feet in vertical elevation of soil or soil-rock fill shall be placed without at least one field density test being performed within that mterval. In addition, a minimum of one field density test shall be performed for every 2,000 cubic yards of soil or soil-rock fill placed and compacted. 7.2. The Consultant shall perform random field density tests of the compacted soil or soil-rock fill to provide a basis for expressing an opinion as to whetiier tiie fill material is compacted as specified. Density tests shall be performed in tiie compacted materials below any disturbed surface. When tiiese tests indicate tiiat the density of any layer of fill or portion thereof is below that specified, tiie particular layer or areas represented by tiie test shall be reworked until the specified density has been achieved. 7.3. During placement of rock fill, die Consultant shall verify tiiat the minimum number of passes have been obtained per tiie criteria discussed in Section 6.3.3. The Consultant shall request the excavation of observation pits and may perform plate bearing tests on tiie placed rock fills. Tlie observation pits will be excavated to provide a basis for expressing an opmion as to whether tiie rock fill is properly seated and sufficient moisture has been applied to the material. If performed, plate bearing tests will be performed randomly on the surface of the most-recently placed lift Plate bearing tests will be performed to provide a basis for expressing an opinion as to whether the rock fill is adequately seated. The maximum deflection m the rock fill determined in Section 6.33 shall be less than tiie maximum deflection of the properly compacted soil fill. When any of the above criteria indicate that a layer of rock fill or any portion thereof is below that specified, the affected layer or area shall be reworked until the rock fill has been adequately seated and sufficient moismre applied. 7.4. A settiement monitoring program designed by tiie Consultant may be conducted in areas of rock fill placement. The specific design of tiie monitoring program shall be as recommended in the Conclusions and Recommendations section of the project Geotechnical Report or in the final report of testing and observation services performed during grading. GIrev. 8/98 7.5. The Consultant shall observe the placement of subdrains, to verify that the drainage devices have been placed and constmcted in substantial conformance with project specifications. 7.6. Testing procedures shall conform to the following Standards as appropriate: 7.6.1. Soli and Soil-Rock Fills: 7.6.1.1. Field Density Test, ASTM DI556-82, Density of Soil In-Place By the Sand-Cone Method. 7.6.1.2. Field Density Test Nuclear Mefliod, ASTM D2922-81, Density of Soil and Soil-Aggregate ht-Place by Nuclear Methods (Shallow Depth). 7.6.1.3. Laboratory Compaction Test, ASTM D1557-91, Moisture-Density Relations of Soils and Soil-Aggregate Mixtures Using 10-Pound Hammer and 18-Inch Drop. 7.6.1.4. Expansion Index Test Uniform Building Code Standard 29-2, Expansion Index Test. 7.6.2. Rock Fills 7.6.2.1. Field Plate Bearing Test ASTM Dl 196-64 (Reapproved 1977) Standard Method for Nonrepresentative Static Plate Load Tests of Soils and Flexible Pavement Components, For Use in Evaluation and Design of Airport and Highwc^ Pavements. 8. PROTECTION OF WORK 8.1. During construction, the Contractor shall properly grade all excavated surfaces to provide positive drainage and prevent ponding of water. Drainage of surface water shall be controlled to avoid damage to adjoining properties or to finished work on the site. The Contractor shall take remedial measures to prevent erosion of freshly graded areas until such time as permanent drainage and erosion control features have been installed. Areas subjected to erosion or sedunentation shall be properly prepared in accordance with the Specifications prior to placing additional fill or structures. 8.2. After completion of grading as observed and tested by the Consultant no further excavation or filling shall be conducted except in conjunction with the services of the Consultant. GI rev. 8/98 9. CERTIFICATIONS AND FINAL REPORTS 9.1. Upon completion of tiie work, Contractor shall fiimish Owner a certification by tiie Civil Engineer stating tiiat the lots and/or buildmg pads are graded to within 0.1 foot vertically of elevations shown on the grading plan and that all tops and toes of slopes are within 0.5 foot horizontally of the positions shown on the grading plans. After installation of a section of subdrain, the project Civil Engineer should survey its location and prepare an as-built plan of the subdrain location. The project Civil Engmeer should verify tiie proper outiet for the subdrains and the Contractor should ensure that the drain system is free of obstructions. 9.2. The Owner is responsible for furnishing a final as-graded soil and geologic report satis&ctory to tiie Expropriate governing or accepting agencies. The as-graded report should be prepared and signed by a California licensed Civil Engineer e:q)erienced in geotechnical engineering and by a California Certified Engineering Geologist indicating that the geotechnical aspects of the grading were performed in substantial conformance with the Specifications or approved changes to the Specifications. GI rev. 8/98