HomeMy WebLinkAboutCT 02-24; VILLAGES OF LA COSTA GREENS 1.11, 1.13, 1.14; PAVEMENT RECOMMENDATIONS COLDSTONE ROAD; 2004-12-27Cl- O2-'2-'-
GEOCON
INCORPORATED
Project No. 06403-52-16A
December 27, 2004
GEOTECHNICAL CONSULTANTS 0
John Laing Homes
6183 Paseo Del Norte, Suite 160
Carlsbad, California 92009
Attention: Ms. Liz Albano
Subject: ..VILLAGES OF LA COSTA - THE GREENS NEIGHBORHOOD 14'
GOLDSTONE ROAD STATION 9+00 TO 13+00
CARLSBAD, CALIFORNIA
PAVEMENT RECOMMENDATIONS
Dear Ms. Albano:
In accordance with your request, we have performed supplemental geotechnical services for the
subject roadway within Villages of La Costa - The Greens development. The scope of our services
included obtaining representative subgrade soil samples within the street areas and performing
Resistance Value (R-Value) tests. The purpose of our work was to provide pavement design
recommendations. To aid in preparing this letter, we have reviewed the improvement plans entitled
Improvement Plans for. La Costa Greens - Neighborhood 1. 11, 1. 13, 1.14, prepared by Hunsaker
and Associates (Drawing No. 406-3), City of Carlsbad approval dated May 6, 2004, and our report
entitled Update Geotechnical Report, Villages of La Costa - The Greens, Neighborhoods 1. 11, 1. 13,
and 1. 14, Carlsbad, California, dated July 28, 2004 (Project No. 06403-52-16).
Subgrade soils in the area are predominately sandy clays and silty sand, and typically exhibit
relatively low R-Value characteristics. Based on field observations and previous laboratory tests,
subgrade materials possess an expansion potential of "low" to "medium" (Expansion Index of 90 or
less) as defined by Uniform Building Code (UBC) Table 18-I-B. R-Value laboratory tests were
performed in accordance with ASTM D 2844-01 (California Test Method No. 301) and the
laboratory test results are presented on Table I.
Based on conversations with Hunsaker and Associates, the project civil, engineer, we understand that
a Traffic Index (TI)6f.5:0 has been assigned to the Goldstone Road. Based on the above information
and laboratory testing, we recommend the pavement sections indicated on Table II. Pavement section
calculations were performed in accordance with California Department of Transportation Highway
Design Manual; Section 608.4 and the City of Carlsbad Minimum Structural Standard GS-17.
Pavement section calculations are presented on Figure 1. These recommended sections should be
considered preliminary with final sections to be determined and approved by the City of Carlsbad.
As indicated on Table I, the R-Value laboratory test results for Sample Nos.tR77añdR8 iefë1es
¶Iith 12 It is our understanding that the City of Carlsbad requires testing for lime treatment of
subgrade soils when the R-Value is less than 12. Therefore, additional laboratory testing was
performed to assess the actual amount of lime required to effectively treat the subgrade soils. We
selected 'a sample of a similar soil type from an adjacent roadway section (Sample No. R-4,
Goldstone Road) with the R-Value test result of 5.
6960 Flanders, Drive U San Diego, California 92121.2974 U Telephone (858) 558.6900 0 Fax (858) 558.6159
The laboratory test method was based on Texas Method; which consists Of performing a series of
Plasticity Index (P1) tests at different lime contents until the PT stabilizes Table III shows the result of
the P1 tests versus lime content. It' is our opinion that 3.5 percent Quick Lime by dry weight (or 4.5
percent hydrated lime) is required to stabilize clayey subgrade'. Supplemental R-Value testing of theā¢
lime treated materials. shows that the R-Value increased to 70 Table IV provides alternative
recomn'iendéd pavement sections thai incorprate a lime-treated subgrade. The minimum thickness of
lime-treated subgrade is estimated to be 6 inches.
It has been oir experience that lime treatment is most effective when used in situations where clays
of "high" expansion potential (Expansion Index of 90 of higher) are present. Due to the presence of
silty lands and clays with "low' to 'medium___expansion potential, (itTiñiiöiffOTh' 71
are recommending4he .implementation. of-th
onalpavemenftion recommendations provided'on-T
Prior to placing base material for roadways as well as curb and gutter, we recommend the upper
12 inches of subgrade be scarified, moisture conditioned as necessary, and compacted to a dry density
of at least 95 percdnt of the laboratory maximum dry density near to slightly above optimum moisture
content' in accordance with ASTM D 1557-02: In addition, the Class 2 aggregate base; should be ,
compacted to a dry density of at least 95 percent of the laboratory maximum dry density near to
slightly above optini'um moisture content.
Asphalt concrete should be compacted to a deiisity of at least 95 percent Of the laboratory Hveem
density in accordance with ASTM. D 2726-00. The upper 12 in'hes of subgrade beneath areas to
receive concrete sidewalks should be 'compacted to a dry density of 90 percent of the laboratory
maximum 'dry density near to slightly above optimum moisture content. Fill soil and base lift
thickness should not exceed 6.inches. Class 2 aggregate base and asphalt concrete should conform to
the City of Carlsbad specifications.
The performance of asphalt concrete pavement is highly dependent on providing positiie surface
drainage away' from the edge of the pavement. Ponding of water 'on 'or adjacent to the pavement will
likely result in pavement distress and subgrade failure. To reduce the occurrence for such situations,
we recommend that a minimum drainage gadient of 1 percent be maintained for pavement surfaces.
Drainage form landscaped areas should be directed to controlled drainage structures.
Should you have any questions regarding this correspondence, or if we may be of further' service,
please contact the undersiged at your convenience.
Very truly yours,
GEOCON iNCORPORATED ; ?9'°S/o . 2 ,.'Ro
Ui Exp. 6130106
Shane Rodacker CC rn
RCE 63291
VIL
(2) Addressee . .'.
(1) Hunsaker and Associates
Attention: Mr. David Blalock
(3/del) John Laing Homes
% Devenco; La Costa Greens Jobsite
Attention: Mr. Will Bigler
Project No. 06403T5216A -2 - December 27, 2004
TABLE I
SUMMARY OF R-VALUE TEST RESULTS
ASTM D 2844-01 (CALIFORNIA TEST METHOD NO. 301)
Sample No. Location R-Value
R-7 Goldstone Road - Station 9+00 to. 11+00 8
R-8 Goldstone Road - Station 11+00 to 13+00 5
(11) (inches)
/ - (inches)
Goldstone Road - Station 9+00 to 11+00 5.0 4 ;Vg
Goldstone Road -Station 11+00 to 13+00 5.0 4 \ 8
TABLE III'
SUMMARY OF PLASTICITY INDEX VS. LIME CONTENT
SAMPLE NO. R-4 - GOLDSTONE ROAD
Plasticity Index (Fl) Percent Lime
29 0
22 . . 3
19 4
18 . . 5
16 6
TABLE IV
ALTERNATIVE PAVEMENT SECTION RECODAfI -4E-TREATED SUBGRADE
Lraffic Asphalt Class 2 Minimum
Location Concrete Aggregate Lime-Treated
inches) Base Subgrade
(inches) . (inches)
Goldstone Road - Station 9+00 t.H0 5.0 4 4 6
Goldstone Road - Station p.'56to 13+00 5.0 4 6
TABCE 11
PAVEMENT SECTION RECOMMENDATIONS
Traffic Index Asphalt Concretl Location ,,..,. I ... . i Aggregate Base
Class 2
/
Project No. 06403-52-16A . December 27, 2004
FIGURE 1
PAVEMENT SECTION CALCULATIONS
VILLAGES OF LA COSTA - THE GREENS
Goldstone Road - Station 9+00 to 11+00
Use subgrade R-Value = 8.0
Traffic Index (TI) =- 5.0
Methodology = Caltrans HighwayDesign Manual Section 608.4
Safety Factor = 0.2 - Applied to Asphalt Concrete (AC)
GE for AC = (0.0032)(5.0)(100-78.0)+0.2 = .55 feet
from Table 608.4B Highway Design Manual
GE = .55 feet for AC yields actual thickness = 2.65 inches
Use 4.0 inches of AC - City Minimum y
GE for 4.0 inches of AC =.83 feet
GE for base = (0.0032)(5.0)(100- 8.0) - .83 = .64 feet
from Table 608.4B Highway De Manual with GF for Class 2 base =
Base thickness = 6.97 inches'
Use base thickness = 7.0 inches
Design Street Structural Section
Asphalt Concrete Thickness= 4.0 inches
Class 2 Aggregate Base Thickness =00 inches.
B'
Goldstone Road - Station 11+00 to 13+00
Use subgrade R.-Value = 5.0
Traffic Index (TI) = 5.0
Methodology = Caltrans Highway Design Manual Section 608.4
Safety Factor = 0.2 - Applied to Asphalt Concrete (AC)
GE for AC = (0.0032)(5.0)(100-78.0)+0.2 = .55 feet
from Table 608.4B Highway Design Manual
GE = .55 feet for AC yields actual thickness = 2.65 inches
Use 4.0 inches of AC - City Minimum
GE for 4.0 inches of AC = 83 feet
GE for base = (0.0032)(5.0)(100- 5.0) - .83 = .69 feet
from Table 608.4B Highway Design Manual with GF for Class 2 base = 1.1
Base thickness = 7.49 inches
Use base thickness = 8.0 inches
*** Design Street Structural Section
Asphalt Concrete Thickness = 4.0 inches.
Class 2 Aggregate Base Thickness = 8.0 inches.
Project No. 06403-52-16A December 27, 2004