Loading...
HomeMy WebLinkAboutCT 02-27; LA COSTA FAIRWAYS; LIMITED SUMMARY REPORT OF GEOTECHNICAL TESTING AND OBSERVATION SERVICES DURING POST-GRADING; 2007-06-29CrO-.2-7 r SuMiiLY REPORT OF GEOTECHNICAL AND OBSERVATION SERVICES DURING POST GRADING OPERATIONS LA COSTA FAIRWAYS CARLsBAD, CALIFORNIA, G E 0 T E K GEOTECHNICAL I ENVIRONMENTAL MATERIALS GeoTek, Inc. 1384 Poinsettia Avenue, Suite A,Vista, CA 92081-8505 760-599-0509 Office 760-599-0593 Fax www.geotekusa.com June 29, 2007 Project No.: 2611SD3 PAR DEVELOPMENT 421 C Street, Suite 300 San Diego, California 92011 Attention: Mr. Ruben Carillo Subject: Limited Summary Report of Geotechnical Testing and Observation Services During Post-Grading Operations La Costa Fairways Carlsbad, California Reference: Interim Report of Geotechnical Testing and Observation Service during Earthwork Construction Buildings Al, Al and Bi, B2 for La Costa Fairways, Carlsbad, California by Geotelç Inc., Project No. 2611 SD3, dated June 19, 2006. Dear Mr. Carillo: This report presents a summary of the observation and testing services provided by GeoTek, Inc. during the earthwork portion of construction activities for the subject project subsequent to rough grading of the site. The observation and testing services reported herein were performed between September 14, 2005 and December 13 2006. We performed observation and testing services for rough grading at the site and have presented our results in the reference document. The specific items under the purview of this report are as follows: Observation of foundation excavations for building pads and retaining walls at the subject site. Our observations indicate that the foundations extend to the minimum embedment and width and into adequate bearing strata as recommended in the project soils report. Observation and testing services during the backfill of retaining walls at the site. Prior to backfihling, wall drains were observed. Field density tests indicate backfill soils were compacted to a minimum relative compaction of 90 percent. Observation and testing services during utility trench backfill including that for sewer, storm drain, and water. Field density tests indicate backfill soils were compacted to a minimum relative compaction of 90 percent. GEOTECHNICAL I ENVIRONMENTAL MATERIALS Par Development June 29, 2007 La Costa Fairways Project: 2611 SD3 Limited Summary Report of Geotechnical Observations and Testing Page Observation and testing of the processing of the subgrade soils along Camino Abierto. Subgrade soils were processed to a depth of approximately 12 inches and materials greater than six (6) inches removed or broken down prior to compaction. Field density tests indicate subgrade soils were compacted to a minimum relative compaction of 95 percent. Observation and testing of placement of aggregate base for Carnino Abierto and curb and gutter. Field density tests indicate aggregate base were compacted to a minimum relative compaction of 95 percent. Observation and testing of placement of asphalt concrete paving. Test results were compared to the Hveem density provided by the material supplier. Field density tests indicate asphalt concrete was compacted to a minimum relative compaction of 95 percent. It should be noted that core densities might vary from field density test results. LABORATORY TESTING PROCEDURES The laboratory maximum dry density and optimum moisture content for representative soil types were determined in general accordance with test method ASTM D-1557. Table 1 presents the soil types tested for this project. FIELD TESTING PROCEDURES Field density testing was performed using nuclear gauge in accordance with ASTM D-2922 or sand cone in accordance with (ASTM D-1556). Where relative compaction was below the percentage considered as passing (as indicated above) or the moisture content was lower than acceptable, the contractor was notified. The area represented by failing test was reworked by the contractor and then retested. Field density test results are presented on Tables 2 through. 7. GEOTECHNICAL I ENVIRONMENTAL I MATERIALS (I Par Development June 29, 2007 La Costa Fairways S Project: 2611SD3 Limited Summary Report of Geotechnical Observations and Testing Page 4 CONCLUSIONS AND RECOMMENDATIONS In our opinion, the footings observed are in substantial conformance with the recommendations of the above referenced project plans and applicable provisions of the 2001 California Building Code. Based on our observations, the subject retaining walls and site utilities appear to have been ackfllled in accordance with the approved soils report. The construction of Camino Abierto was performed in accordance with the approved soils report. It is our opinion that the test results presented herein should be considered representative of the level of compaction achieved during earthwork construction for the onsite improvements between the dates of September 14, 2005 and December 13 2006. Our findings were made, and recommendations prepared in conformance with generally accepted professional engineering practices and no further warranty is implied nor made. This report is subject to review by the controlling authorities for this project. GeoTek, Inc. accepts, neither responsibility nor liability for work, testing or recommendations performed or provided by others. We appreciate the opportunity to be of continued service. Please do not hesitate to call our Office if there are any questions or if we may be of further service. Respectfully Submitted, GeoTek, Inc. Timothy E. Metcalfe, CEG 1142, Exp. 4/30/08 Principal Geologist Senior Geotechnical Engineer JDTFM/lg Distribution: (3) Addressee End: Figure 1 - Wall Density Test Location Plan Table 1— Summary of Laboratory Maximum Dry Density Tables 2 through 7— Summary of Field Density Tests G:\Projects\Projecfs 2000 to 2999Projects 2600 to 2649t2611SD3'Par'La costa\2611_Final-wall.u:il-pave.doc GEOTECHNICAL I ENVIRONMENTAL I MATERIALS Par tevelopfl%ent June 29, 2007 La Costa Fairways Project: 2611 SD3 Limied Summary Report of Geotechnical Observations and Testing Page 4 TABLE 1 SUMMARY OF LABORATORY MAXIMUM DRY DENSITY AND OPTIMUM MOISTURE CONTENT TEST RESULTS (ASTM 01557) S.il Type Description Maximum Dry Density (PCF) Optimum Moisture Content (%) A Pale olive clayey SAND with silt 122 11 V2 B Gray-brown clayey SAND 124 12 C Olive-brown clayey SAND 123 12 D Shading Sand . 129 1/2 9 E Aggregate Base 134 8. AC1 Asphalt *151.3 - * H'..eem provided by material supplier I t GEOTECHNICAL I ENVIRONMENTAL I MATERIALS GeoTek, Inc. June 2007 Par Development La Costs Fairways Project No.: 2611-SD3 Carlsbad, CA Page 1 of 5 TABLE 2 SUMMARY OF FIELD DENSITY TESTS WALL RACKFILL 20a Retest of 20 34 17.1 114.0 B 123.0 N 93 9/21/06 21 Bulding A2 south wall SG 15.1 118.0 B 123.0 __.j_ 91 22 Bulding A2 west wall 33 14.3 108.5 B 123.0 N 88 23 Bulding A2 west wall SG 15.3 110.8 B 123.0 N 90 22a Retest of22 33 16.7 110.7 B 123.0 N 90 9/22/06 24 Bulding Al east wall SG 1 16.8 110.7 B 123.0 1 N 90 9/25/06 25 Bulding Al east wall 36 14.8 111.8 B 123.0 N 91 26 Bulding Al southeast wall 36 14.3 111.6 B 123.0 N 91 27 Bulding Al southwest wall 36 15.0 112.0 B 123.0 JL. 91 - 28 IBulding Alwest wall 36 14.7 112.2 B 123.0 N 91 9/25/06 29 Bulding Al west wall 38 14.7 1 111.9 B 123.0 N 91 30 Bulding Al southwest wall 38 14.9 112.2 B 123.0 1 N 91 31 BuldingAl southeast wall 38 14.5 112.1 B 123.0 N 91 32 Bulding Ai east wall 38 15.0 111.7 - B 123.0 N 91 9127/06 33 Bulding Al southeast wall 40 14.5 111.9 B 123.0 N 91 34 Bulding At southwest wall 1 40 1 14.8 111.7 1 B 123.0 N 91 35 Bulding Al east wall 40 15.3 112.3 B 123.0 N 91 36 Bulding Al west wall . 40 15.1 112.0 B 123.0 N 91 I Note: N = Nuclear Gauge Test I SC = Sand Cone Test SG = SubGrade Test All elevations are approximate Far Development La Costa Fairways Carlsbad, CA GeoTek, Inc. June 2007 Project No.: 2611-SD3 Page 20f5 TABLE 2 SUMMARY OF FIELD DENSITY TESTS WALL BACKFILL DATE Test °. Location Elevl Do Moisture Content (%) Dry Density (pet) Soil ° Maximum Density (pcf) Test Type Relative Compaction (%) 9/28/06 37 Bulding Al east wall 42 14.9 111.6 B 123.0 N 91 38 Bulding All southeast wall 42 15.3 111.9 B. 123.0 N 91 39 Bulding Al southwest wall 44 15.0 1 111.4 B 123.0 N 91 40 Bulding Al west wall 44 15.5 111.8 B 123.0 N 91 9I9l06 41 42 Bulding Al Slope Face at the W Side of Wall Buldlng.A1 Slope Face at the W Side of Wall 43 41 15.3 15.0 111.7 111.4 B B 123.0 123.0 N N 91 91 43 Bulding Al Slope Face at the W Side of Wall 38 15.6 111.6 B 123.0 N 91 12113/06 4.4 Bulding B2 southwest corner 1 22.5 12.9 110.9 B 123.0 N 90 45 1 Bulding 132 southwest corner 24.5 13.2 1 111.8 B 123.0. N 91 46 113ulding 132 southwest corner 26.5 13.6 111.3 B 123.0 N 91 47 1 Bulding B2 southwest corner 27.5 14.3 112.3 B 123.0 N 91 I Par Development GeoTek,1nc; - June 2007 La Costa Fairways Project No.: 261 1-S03 Carlsbad, CA Page 3 of 5 TABLE 3 SUMMARY OF FIELD DENSITY TESTS SEWER -WATER - STORM DRAIN TRENCH BACKFILL DATE TestNeet No. Location o. pth Molstum (%) Content Type Dry (pci) Soil IM Test Type Relative Compaction ---M- 111 Lateral Sewer Line A 9/14/05 2+05 34.0 15.3 117.2 A 122.0 N 96 112 Lateral Sewer Line A 1+70 34.0 15.8 116.5 A 122.0 N 95 -- 113 Lateral Sewer Line A 1+27 33.0 15.4 116.9 A 122.0 N 95 114 Lateral Sewer Line A 2+05 36.0 16.3 117.2 A 122.0 N 95 -- 115 Lateral Sewer Line A 1+70. 36.0 15.7 115.9 A 122.0 N 95 116 Lateral Sewer Line A 1+30 35.0 15.8 116.2 A 122.0 N 95 9/15/05 117 Sewer Line A 1+10 33.5 15.8 110.8 A 122.0 N 90 -- 118 Sewer Line A 1+20 35.3 1 15.4 110.6 A 122.0 N 90 119 Sewer Line A 1+75 36.0 15.4 109.9 A 122.0 N 90 120 Sewer Line A 1+55 33.8 14.7 113.2 A 122.0 N 92 -- 121 Sewer Line A 1+45 35.0 14.2 113.6 A 122.0 N 93 9/16/05 122 Sewer Line A 1+05 33.0 16.2 110.2 A 122.0 N 90 -- 123 Sewer Line A 1+90 35.5 15.5 109.8 1 A 122.0 N 90 124 Lateral Sewer Line A 3+09 24.0 17.4 109.5 A 122.0 N 89 -- 124A Retest of 124 3+09 24.0 16.9 109.9 A 122.0 N 90 125 Lateral Sewer Line A 2+96 23.0 15.3 110.4 A 122.0 N 90 126 Lateral Sewer Line A 2+96 26.5 15.4 113.2 A 122.0 N 92 -- 127 Sewer Line B . 3+10 24.0 15.0 111.6 A 122.0 N 91 -- 128 Sewer Line B 3+40 26.9 15.8 110.5 A 122.0 N 90 -- 129 Lateral Sewer Line B 1+32 27.0 15.4 110.8 A 122.0 N 90 9/19/05 131 ISewer Line B 3+20 24.6 15.8 111.1 A 122.0 N 91 -- 132 Sewer Line B 3+25 27.0 16.7 108.2 A 122.0 N 88 -- 132A Retest of# 132 3+25 27.0 17.0 111.7 A 122.0 N 91 -- 133 Storm Drain 1+50 24.0 15.7 111.9 A 122.0 N 91 134 Storm Drain - 1445 27.0 148 112.7 A 122.0 N 92 135 Storm Drain 1+47 29.6 14.2 113.8 A 122.0 N. 93 -- 136 -Storm Drain 2+05 19.0 15.8 109.9 A 122.0 N 90 9/20/05 137 Sewer Line B 1+80 17.0 19.0 111.0 A 122.0 N 90 9/21/05 138 Sewer Line B 1+85 15.5 16.2 112.8 A 122.0 N 92 -- 139 Sewer Line B 1+85 17.0 16.8 113.6 A 122.0 N 93 -- 140 Sewer Line B 1+80 15.0 16.2 113.0 A 122.0 N 93 141 Sewer Line B 1+55 22.0 15.7 112.0 A 122.0 N 92 -- 142 ISewer Line B 1+45 27.0 15.9 113.2 1 A 122.0 1 N 93 9/27/05 143 MH Sewer Line B 2.96 21.0 14.2 112.0 A 122.0 N 91 - 144 MH Sewer Line B 3+52 22.6 14.4 112.4 A 122.0 N 91 - 145 MH Sewer Line B 3+52 25.0 13.9 113.1 A 122.0 N 92 146 MH Sewer Line B 2+32 25.0 15.1 112.7 A 122.0 N 91 -- 147 MH Sewer Line B 3+52 27.0 14.2 113.8 A 122.0 N 93 148 MH Sewer Line B . 2+32 29.5 14.7 113.6 A 122.0 N 93 - 149 MH Sewer Line B . 2+17 30.0 14.2 113.8 A 122.0 N 93 9128/05 150 MH Sewer Line B 2+96 23.0 1 15.3 112.1 A 122.0 N 91 - 151 MH Sewer Line-B 2+96 25.0 14.8 113.6 A 122.0 N 92 -- 152 MH Sewer Line B . 2+96 28.0 14.3 114.7 A 122.0 N 94 153 MH Sewer Line B 4+46 15.2 14.6 115.1 A 122.0 N 94 154 lMH Sewer Line B 4+46 16.5 14.7 114.7 A 122.0 N 94 -- 155 MH Sewer Line B 4+46 18.0 14.6 114.3 A 122.0 N 94 156 MH Sewer Line B S 4+46 18.9 15.0 113.9 A 122.0 N 93 09/30/05 157 Storm Drain 2+30 23.0 16.8 110.4 A 122.0 N 90 158 Storm Drain 1+85 25.5 14.4 -115.8 A 122.0 N 94 159 Storm Drain 2+10 27.1 15.6 110.8 A 122.0 N 91 160 iStorm Drain 1+20 1 24.8 14.1 113.2 1 A 122.0 1 N 92 161 Storm Drain 1+22 1 . 27.3 1 13.6 113.7 A 122.0 N 93 10/03/05 162 Storm Drain 1+22 24.0 14.3 109.3 A 122.0 N 89 162A Storm Drain 1+22 24.0 12.9 114.9 A 122.0 N 94 Per Development La Costa Fairways Carlsbad, CA (aeOleK, Inc. June 2007 Project No.: 261 1-SD3 Page 4of5 TABLE 3 SUMMARY OF FIELD DENSITY TESTS SEWER - WATER - STORM DRAIN TRENCH BACKFILL 0/24I05 189 IWateineA I 2+13 33,6 15.8 -. 117.2 A 122.0 N 96 -- 190 Waterline A 1+90 32.0 15.9 109.5 A 122.0 N 89 191 Waterline A 4+25 27.0 13.9 116.7 A 122.0 N 95 -- 192 Waterline A 4+20 29,0 14.2 117.5 A 122.0 N 96 193 Waterline A- lateral 4+08 29.0 14.3 117.9 A 122.0 N 96 - 194 lWatedine A - lateral 4+02 29.0 1 14.9 118.3 1 A 122.0 1 N 96 - 195 lWatedine A 3+60 27.4 15.6 118.0 A 122.0 N 96 -- 196 Waterline A 3+30 27.6 14.6 117.7 A 122.0 N 96 197 Waterline A 3+18 26.8 15.6 117.2 A 122,0 N 96 190A Retest of #190 1+90 32.0 15.4 116.9 A 122.0 N 95 2/24106 198 Sewer lateral - pad B-2 4+25 19.0 12.4 101.1 122.0 ...JL 91 199 Sewer lateral - pad B-i 4+92 1 18.0 13.2 112.0 1 A 122.0 1 N 92 200 Sewerlateral - padB-i . 4+60 19.0 12.0 113.2 A 122.0 N 93 201 Sewer lateral -pad B-2 3+90 -18.0 13.8 110.4 A 122.0 N 91 7117/06 202 Waterline A 1+50 38.0 5.7 115.7 D 129.5 Sc 89 9/08/06 203 Retest of# 202 I 1+50 38.0 14.0 119.8 B 124.5 ISC 95 I Note: N = Nuclear Gauge Test I .SC= Sand Cone Test SG = Subgrade Test All elevations are approximate I . Par Development La Costa Fairways Carlsbad, CA I GeoTek, Inc. TABLE 4 SUMMARY OF FIELD DENSITY TESTS CAMINO ABIERTO - PRIVATE STREET - SURGRAflE June 2007 Project No.: 2611-SD3 Page 5 of 5 DATE Test 0. Location St.. No. Depth Elevl Content Moisture Dry Density Soil Type Maximum natty (pci) Test Type Relative Compaction 9/14/05 1 Private Street-Caul de Sac-N - reworked 3+10 SO 11.4 114.0 B 123.0 N 93 2 Private Street-Caul de Sac-S - reworked 2+60 SG 10.5 103.9 B 123.0 N 85 3 Private Street-Center Portion -reworked 2+15 SG 13.6 110.2 B 123.0 N 89 4 Private Street-Southern Portion - reworked 1+60 SO 9.4 115.3 B 123.0 N 94 10/16/06 5 Retest of#4 1+60 SG 14.9 117.8 B 123.0 N 96 6 Retest of#3 2+15 SO 14.8 117.1 B 123.0 N 92 7 Retest of #2 2+60 SO 14.8 118.9 B 123.0 N 95 8 Retest of#i 3+10 SG 15.1 118.5 B 123.0 N 96 10/26/06 '8x Private Street-entrance 1+35 50 13.1 117.0 A 123.0 N 95 9 Retest of #6 2+15 SO 13.7 117.8 A 123.0 N 96 10 1 Private Street - entrance 1+35 50 12.3 117.6 A 123.0 N 96 TABLES SUMMARY OF FIELD DENSITY TESTS CAMINO ARIERTO - PRIVATE STREET. RASE (RAflF DATE Test No. Location St.. No. Elov/ Depth More istu Content (%) Dry Density (pci) soil Type Maximum Density (pci) Test Type Relative Compaction (%) 10/27106 11 Camino Abierto 1+35 BO 4.5 129.0 E 134.0 N 96 12 Camino Ablerto 1+40 BG 3.4 131.3 E 134.0 N 98 13 lCaminoAbierto 1+35 BG 6.4 131.0 E 134.0 ' N 98 11/06106 14 Camino Abierto 1+45 80 5.0 128.3 E 134.0 N 96 -- 15 CarninoAblerto 1+70 BG 5.2 129,1 E 134.0 N 96 -- 16 CamlnoAblerto 2+00 BG 5.5 130.1 E 134.0 N 97 17 Camino Ablerto 2+30 BG 6.1 127.9 E 134.0 N 95 18 Camino Ablerto 2+55 1 BC 6.3 128.8 E .134.0 N 96 19 Camino Ablerto '2+90 BG 5.8 1 128.1 1 E 1 134.0 N 96 -- 20 Camino Abierto . . 3+00 BG 6.0 129.8 E 134.0 N 97 21 lCaminoAblerto 3+10 BG 5.8 129.0 1 E 1 134.0 N 96 TALt5 SUMMARY OF FIELD DENSITY TESTS CAMINO ARIERTO - PRIVATE STREET ASPIIAl T DATE Test Location St.. No. Elev/ Moisture Content Wet Density Soil Maximum Test - Relative Compaction No. Depth Typo Density (Pd) Typo (%) (pci) - (%) 11/07/06 1 CaminoAbierto 3+00 AC N/A 146.9 AC 151.3 N 97 -- 2 Camino Ablerto ' 2+50 AC ' N/A 145.0 AC 151.3 N 96 TABLE 7 SUMMARY OF FIELD DENSITY TESTS CAMINO ARIERTfl - PRIVATE STREET. CIIRR A (iI.rrFR DATE - Test No. Location St., No. Elevl Depth Moisture Content (%) Dry Density Type Soil (pci) Maximum Density (pci) Test Type Relative Compaction (%) 10/18/06 1 E Side-Entrance 1+60 BG 8.9 127.6 E 134.0 N 95 2 E Side-W of Pad A-i 2+10 BC 7.6 129.4 E 134.0 N 97 3 1 E Side of Cul De Sac-W of Pad A-2 2+70 BG 8.0 128.0 E 134.0 N 1 96 4 N Side of Cul De Sac ' 3+30 BG 8.4 128.5 E 134.0 ' N 96 5 W Side-W Side of Pad A-2 2+50 BG 7.7 129.6 E 134.0 N 97 -- 6 W Side 2+15 BG 8.2 127.8 E 134.0 N 95 7 W Side-W of Pad A-I 1+70 BG 7.6 128,9 E 134.0 N 96 Note: N = Nuclear Gauge Test SG = Subgrade Test All elevations are approximate