Loading...
HomeMy WebLinkAboutCT 02-28; La Costa Condominiums; As-Built Report Banich, Powers, Calso Landslide; 2008-09-29ANICH, POWERS, ALSO LANDSLIDE • ...Ir.__jer29,2008 EN. 23280.01 4- iS5*« , ift _ w - 22725 Old Canal Rd. Suite 112 Yorba Linda, CA 92887 San Diego, CA92121 5600 Spring Mtn. Rd. 712 Fifth Street, Suite 201 Suite B Las Vegas, NV 89146 Davis, CA 95616 American Geotechnical Inc. SOIL, KtUNUAriON & GEOLOGIC STUDIES American GeotechnicaUnc SOIL, FOUNDATION AND GEOLOGIC STUDIES September 29, 2008 File No. 23280.01 Mr. Rob Slempa Construction Inspector CITY OF CARLSBAD 5950 El Camino Real Carlsbad, California 92008-8802 Subject: AS-BUILT REPORT Landslide Stabilization Banich, Powers, Calso Landslide 2416 Sacada Circle Carlsbad, California Dear Mr. Slempa: In accordance with the request of our client, we have prepared this report that deals with the as-built conditions for the landslide stabilization for the project referenced above. During the repair, the entire landslide was removed and the slope was rebuilt using compacted fill. This report also presents the results of our compaction tests performed during the rebuilding of the slope. In our opinion, the rebuilt slope has a factor of safety in excess of 1.5 for both gross and surficial slope stability. We appreciate the opportunity to be of service. If you should have any questions or concerns, please do not hesitate to contact our office. Respectfully submitted, AMERICAN GEOTECHNICAL, INC. Gregory W. Axten President/CEO G.E.103 GWA/KRR: kb Distribution: Mr. Rob Slempa - (2) Mr. Greg Lindhoff, Lighthouse Ventures - (3) Mr. Reza Bionki, D. J. Scheffler, Inc. - (1) Mr. John Strohminger, O'Day Consultants - (1) Kevin R. Rogers Chief Geologist C.E.G. 2425 Via Mail Only Via Mail Only Via Mail Only Via Mail Only 22725 Old Canal Road, Yorba Linda, CA 92887 - (714) 685-3900 - FAX (714) 685-3909 5764 Pacific Center Blvd., Suite 112, San Diego, CA 92121 (858) 450-4040 - FAX (858) 457-0814 712 Fifth Street, Suite B, Davis, CA 95616 - (530) 758-2088 - FAX (530) 758-3288 5600 Spring Mountain Road, Suite 201, Las Vegas, NV 89146 - (702) 562-5046 - FAX (702) 562-2457 American GeotechnicaLInc SOIL, FOUNDATION AND GEOLOGIC STUDIES TABLE OF CONTENTS Page 1.0 INTRODUCTION 1 2.0 SCOPE OF SERVICES 1 3.0 GEOLOGIC OBSERVATIONS DURING CONSTRUCTION 2 4.0 LANDSLIDE STABILIZATION 4 4.1 Construction of Tieback Walls 4 4.2 Removal of Landslide and Reconstruction of the Slope 4 4.3 Back-Cut Slope Failures 5 4.4 Drainage Systems 5 4.5 Compaction Tests 6 4.6 Monitoring During Repair 7 4.7 Slope Stability Analyses 7 5.0 CONCLUSIONS 8 6.0 CLOSURE 9 APPENDIX A References APPENDIX B Compaction Testing APPENDIX C Laboratory Testing APPENDIX D Slope Stability Analyses APPENDIX E Monitoring During Repair APPENDIX F Field Memos APPENDIX G Site Photographs PLATE 1 Borrow Pit Area PLATE 2 Test Locations SHEETS 1 - 6 As-Built Plans - •-*- ^>£^ "? 22725 Old Canal Road, Yorba Linda, CA 92887 - (714) 685-3900 - FAX (714) 685-3909 5764 Pacific Center Blvd., Suite 112, San Diego, CA 92121 (858) 450-4040 - FAX (858) 457-0814 712 Fifth Street, Suite B, Davis, CA 95616 - (530) 758-2088 - FAX (530) 758-3288 5600 Spring Mountain Road, Suite 201, Las Vegas, NV 89146 - (702) 562-5046 - FAX (702) 562-2457 IHAmerican Geotechnicaljnc. File No. 23080.01 September 29, 2008 Page 1 1.0 INTRODUCTION The purpose of this report is to describe the as-built repair for the stabilization of the slope at the Banich, Powers, and Calso properties. The repair only addresses the area of the recent failures affecting the Banich, Powers, and Calso properties, and as such, does not provide stability for other areas or failures affecting other adjacent properties. Although there is not a landslide within the Cerra property, the existing drainage system at the Cerra property was tied into the new drainage system constructed during the landslide repair. A listing of our prior reports dealing with this project is presented in Appendix A. Our main report presenting our landslide stabilization recommendations is titled "Landslide Stabilization Recommendations, Banich, Powers, Calso Landslides, 2416 Sacada Circle, Carlsbad, California," dated March 27, 2007. 2.0 SCOPE OF SERVICES Our scope of services for the repair portion of the project has included the following: • Site Inspections: During the excavation of the landslide and reconstruction of the slope, the field technician, engineering geologist, and soils engineer performed site inspections. Field memos prepared during the site inspections are presented in Appendix F. • Compaction Testing: The compaction testing was performed on the fill materials placed during the reconstruction of the slope. The results of the compaction tests are presented in Appendix B. Test locations are shown on Plate 2. • Laboratory Testing: Various laboratory tests were performed during the repair, including laboratory maximum dry density tests and direct shear tests. Results of the laboratory testing are presented in Appendix C. • Slope Stability Analyses: Additional slope stability analyses were performed and the results are discussed in Section 4.7 of this report. • Preparation of As-Built Plans: In conjunction with our soil report, changes made during construction are noted on the as-built plans. HAmerican Geotechnical, Inc. File No. 23080.01 September 29, 2008 Page 2 3.0 GEOLOGIC OBSERVATIONS DURING CONSTRUCTION As described in our previous reports, the subject site is underlain by two geologic formations and some existing artificial fill that underlies the slope face and the Banich, Powers, and Cerra building pads placed during original grading of the site. The upper section of the slope is underlain by variably oxidized and moderately indurated white and yellow-orange sandstone and siltstone of the Santiago formation. The lower section of the slope is underlain by highly fractured dark green to brown and gray mudstone and clayey siltstone of the Delmar formation. The building pads at the top of the slope are underlain with sandy fill and the slope face is mantled with an existing stability fill derived from both the Santiago and Delmar formations. The landslide that is the subject of this repair ruptured primarily within the fractured Delmar Mudstone but carried with it some of the existing fill material that mantled the slope face and top of the slope. A licensed engineering geologist from our staff observed and documented the exposed geologic conditions and provided recommendations for landslide removals, the keyway depth, and placement of the back drains during the reconstruction of the slope. The geologic conditions encountered and the as-built slope repair details are illustrated on the cross section contained within the As-Built Plans. The primary geologic conditions and observations made during the repair effort are summarized as follows: 1. Removal of Landslide: After the tieback walls were installed, the slope surface was excavated from the top to the bottom. Based on geologic observations, the entire landslide was removed during this process. The extent of the back-cut and removals are shown on the As-Built Plans cross section. 2. Bottom of Key: The bottom of the key was deepened relative to the proposed design so that it was founded in intact, very well cemented and very hard, gray fine-grained Sandstone contained within the lower section of the Delmar formation. The location, length and width of the as-built key generally matched the proposed design - only the key depth was changed. 3. Groundwater: Groundwater seepage was observed at two locations/elevations during the repair. Moderate to heavy seepage was observed within the borrow pit area "A" (see Plate 1) located on the CALSO property sheet pad west of the slope repair. This seepage occurred at about 10 to 11 feet below the sheet pad surface and appeared to be the result of groundwater perching on top of the less permeable Delmar formation mudstone. The seepage developed standing water within the bottom of the borrow pit overnight. We also observed an ancient landslide rupture surface in the sidewalls of borrow pit "A" and the observed seepage is probably associated with the ancient landslide. These observations prompted our recommendation to immediately backfill the borrow pit to prevent reactivation of the ancient landslide. HAmerican Geotechnicaljnc. File No. 23080.01 September 29, 2008 Pages Within the repair area itself, groundwater seepage was observed at an approximate elevation of 158.5 feet about half way up the slope just below the contact between the Santiago formation sandstone and the underlying Delmar formation mudstone. As in borrow pit "A", this seepage appeared to be the result of groundwater percolating through the Santiago formation sandstone and perching on top of the relatively less permeable Delmar formation mudstone. A back drain was installed to intercept the seep zone. Contact Between Sandstone and Mudstone: The geologic contact between the Santiago formation sandstone and the underlying Delmar formation mudstone was observed at an elevation of about 170.0 feet. A thin, remolded clay seam occurs at the contact, which could be an ancient landslide rupture surface. A four to six-inch thick band of orange oxidation staining occurs just above the contact, which probably formed as a result groundwater perching on top of the contact. Back-cut Failures: Three back-cut failures developed during construction. The back-cut failures occurred approximately along the contact between the Santiago formation sandstone, the underlying Delmar Formation, and the existing stability fill that mantled the slope face. The back-cut failures likely occurred due to a combination of the following factors: inadequate strength of the existing slope face stability fill, seepage along the contact between the two geologic formations and the slope face stability fill, low shear strength of the ancient remolded clay seam at the contact, and the steep angle of the backcut (49 degrees) that was required to remove all of the recent landside debris and which was steeper than initially planned due to the tie-back walls being pushed out further towards the slope face to prevent undermining of the Banich/Powers residences. The back cut failures were removed and replaced with compacted fill during the repair. Appendix G presents photographs of the backcut failures. Tension soil cracks developed along the upper section of the slope just east and outside of the repair grading limits (see the As-Built Plans for their location). The tension cracks appear to have occurred in response to the temporary loss of support during the excavation and landslide removal stage of the slope repair. The temporary loss of soil support has been restored with the completion of the slope repair hence the section of slope with the soil cracks was not altered or repaired. In addition, the overall stability of the slopes adjacent the current repair will be improved as part of the remedial grading and tie-back installation planned for the proposed La Costa Condo development of the CALSO property. HAmerican Geotechnical, Inc. File No. 23080.01 September 29, 2008 Page 4 4.0 LANDSLIDE STABILIZATION The landslide stabilization was started in October 2007 and at the time of preparation of this report, had been nearly completed. The main contractor of the repair of the landslide was D. J. Scheffler, Inc. The following sections present details on the landslide stabilization. 4.1 Construction of Tieback Walls We have prepared an interim repair report dated June 23, 2008 titled "Interim Repair Report - Tieback Walls, La Costa Condominiums - Landslide Stabilization, Banich, Powers, Calso Landslide, Carlsbad, California." The June 23, 2008 report contained ourtieback testing results and field memos dealing with the construction of the three tieback walls. As indicated in our June 23, 2008 report, the three tieback walls were completed in conformance with the plans and specifications. For further details on the construction of the tieback walls, see our report dated June 23, 2008. Because of the very steep upper portion of the landslide, compounded by the necessity to remove the backyard improvements below the Banich and Powers homes, it was advised during construction that the three tieback walls could be moved downward and outward relative to their original proposed locations. This adjustment resulted in the tiebacks being placed in a somewhat easier area to access and the saving of the Banich and Powers rear yard improvements. Review of the cross sections in the slope areas indicates that the mass of fill replaced in the upper slope area may have been reduced slightly as well. A construction plan change was submitted to the City of Carlsbad and the revised plans showed the as-built locations of the three tieback walls. We also prepared a response to third-party review as part of the plan change process (see Appendix A for our report dated April 29, 2008). 4.2 Removal of Landslide and Reconstruction of the Slope After the three tieback walls were installed, the slope below the tieback walls was excavated and the entire landslide was removed. The soil that was generated during this process was stockpiled on the La Costa Condominiums property. The next step was the excavation of the key and construction of a drainage system located at the back of the key. The bottom of the key was founded in cemented and un-weathered formational material. After completion of the key, the key was backfilled with granular material. This material was obtained from two borrow areas shown on Plate 1. The granular material was placed in thin lifts and compacted to a relative compaction of at least 90%. HAmerican Geotechnical, Inc. File No. 23080.01 September 29, 2008 Page 5 The granular material was placed from the key bottom to an elevation of about 141 feet. At this elevation, the on-site granular material was exhausted and the remainder of the slope was constructed using the on- site clayey soil. Because the on-site clayey soil had lower shear strength than the granular material, layers of geogrid (Synteen SF35 or equivalent), spaced at 18 inches vertical spacing, were installed starting at an elevation of 141 feet. The geogrid was placed from elevation 141 feet to essentially the top of slope. Because of this changed condition, we have performed additional slope stability analyses, which will be discussed in Section 4.7. When the repair reached near the top of slope, a large void was discovered beneath the patio. The cause of the soil void was unknown but it possibly could have developed due to soil erosion along a drain line or soil erosion caused by water percolating through cracks in the top of slope patio. In any event, the void was filled in with cement slurry per our recommendations. 4.3 Back-Cut Slope Failures A relatively steep excavation was needed in order to remove the entire landslide. The three tieback walls provided support for the upper portion of the slope. However, the mid and lower parts of the back-cut were unsupported. During reconstruction of the slope, three slope failures developed in the back-cut. Pictures of these slope failures are presented in Appendix G. The most significant back-cut slope failure developed near the center of the back-cut, with the other two slope failures occurring on both sides of the main failure. Fortunately, the three tieback walls prevented these slope failures from progressing up-slope and impacting the residences. These three slope failures were completely removed during the reconstruction of the slope. This process involved benching into the hillside until the entire failure mass was removed. The three slope failures were replaced with properly compacted fill. 4.4 Drainage Systems The subsurface drain system that was constructed at the site consisted of the following: 1. Key Drain: A key drain was constructed at the back of the key way. The key drain consisted of a perforated pipe that was sloped downward to the west. The drain line was surrounded by gravel, which was in turn surrounded by a geotextile. HAmerican Geotechnicaljnc. File No. 23080.01 September 29, 2008 Page 6 The key drain was connected to a tight line, which exited the key way at the northwest corner (elevation 115.4 feet). The line was extended beyond the key way and a seepage trench was constructed. Figure 1 shows a detail of the seepage trench. 2. The seepage trench is intended to be a temporary outflow area for groundwater seepage and when the La Costa Condominiums are constructed, this tight line must be connected to the storm drain. 3. Chimney Drains: Starting at the key drain and continuing up the entire back-cut, five chimney drains were installed. The chimney drains consisted of a permeable geocomposite that allows for groundwater to flow into the system and then flow downward to the back-drains. Near the top of the slope (i.e. elevation 194 feet), the number of chimney drains was reduced to four. 4. Back-drains: Including the key drain, a total of six back-drains were installed during reconstruction of the slope. The construction of the back-drains were essentially the same as the key drain described in Item No. 1, except that the tight lines were daylighted out the face of the slope. The surface drainage system that was constructed at the site consisted of the following: 1. Concrete V-Ditches: Per the plans, concrete V-ditches were constructed to collect surface runoff from the slope face. The ditches direct the flow of water to an energy dissipater located at the toe of the slope. 2. Top-of-Slope Drain Outlets: There were several drain outlets located at the top-of-slope. These drain outlets allowed water to flow off the top-of-slope patios and over the top-of-slope. These drain outlets were tied to a tight line that was constructed at the top-of-slope. The tight line runs parallel to the top-of-slope and then it transfers water to surface drain lines that were constructed on both sides of the repaired area. These surface lines allow the runoff to drain into a concrete V-ditch. 4.5 Compaction Tests During reconstruction of the slope, compaction tests were performed by using the nuclear device (ASTM D 2922 and D 3017) and the sand cone apparatus (ASTM D 1556). The results of our compaction tests are presented in Appendix B. Eighty-four compaction tests were taken during the reconstruction of the slope. The locations of these eighty-four compaction tests are shown on Plate 2. We performed four laboratory compaction tests in order to determine the laboratory maximum dry density. Backdrain 6' stub (not perforated) 8' perforation pipe Gravel, filter fabric Drain pipe outlet elevation 120.5' Plan View Sketch not to scale: American Geotechnical, Inc. La Costa Condos Seepage Trench Detail RN. 23280.01!Figure 1 HAmerican Geotechnical, Inc. File No. 23080.01 September 29, 2008 Page? Results of these tests are presented in Appendix C. As shown by the data in Appendix B, some tests recorded failing values of relative compaction. When this occurred, we required the grading contractor of apply additional compaction energy to the failing lift of fill. This was accomplished by having the contractor roll the compaction equipment back and forth on top of the lift of fill, in order to densify the soil. We then re- tested the fill and in all cases obtained relative compaction values in excess of 90%. 4.6 Monitoring During Repair During the repair process, we monitored an inclinometer (AGI-1 B) that was installed at the top-of-slope above the repair area. We monitored this inclinometer during the entire removal of the landslide and reconstruction of the slope. In our opinion, negligible slope movement occurred during the repair process. The results of the inclinometer monitoring are presented in Appendix E. We also installed four crack monitoring gauges on cracks located in the patio area at the top-of-slope. As shown in Appendix E, three of the four crack monitoring gauges showed negligible movement during the repair. However Crack Monitoring AGCP-2 did record movement, which occurred during the filling of the large void beneath the patio as described in Section 4.2 4.7 Slope Stability Analyses Additional slope stability analyses have been performed. During reconstruction of the slope, we obtained representative samples of the granular material used below elevation 141 feet and of the clayey soil used above elevation 141 feet. We performed shear strength tests on compacted soil specimens and the test results are presented in Appendix C. Gross slope stability analyses were then performed and the results are presented in Appendix D. The first sheet in Appendix D shows our input data for the slope stability computer program. The second sheet in Appendix D presents the slope stability analysis, where the factor of safety for gross slope stability is 1.558. In our opinion, the actual gross slope stability of the reconstructed slope is higher than this value because our analysis did not include the strengthening effect of the geogrid and the three tieback walls constructed near the top of slope. In any event, it is our opinion that the factor of safety for gross stability of the repair slope is in excess of 1.5. HAmerican Geotechnical, Inc. File No. 23080.01 September 29, 2008 PageS The third sheet in Appendix D presents our analysis for surficial slope stability. The factor of safety is 1.262, however, this analysis does not include the strengthening effect of the geogrid. In our report dated March 27, 2007, we have presented surficial slope stability calculations that show the factor of safety will be in excess of 1.5 for a geogrid spacing of 18 inches. Thus in our opinion, the factor of safety for surficial slope stability is also in excess of 1.5. 5.0 CONCLUSIONS The following are our conclusions: 1. Construction of Tieback Walls: To support the upper part of the slope, three tieback walls were constructed. The construction of these tieback walls has been described in our report dated June 23, 2008. In our opinion, the three tieback walls were completed in conformance with the revised plans and specifications. 2. Removal of Landslide and Reconstruction of the Slope: During the repair, the entire landslide was removed and replaced with properly compacted fill. During the rebuilding of the slope, three slope failures developed in the back-cut area. These three slope failures were also removed during the reconstruction of the slope and replaced with properly compacted fill. The fill placed during the reconstruction of the slope was compacted to a minimum relative compaction of 90%. 3. Areas of Uncompacted Fill: There are two main areas of uncompacted fill as shown on Plate 1. These two areas are the locations of the excavated borrow material (i.e. granular soil). During construction of the building pads for La Costa Condominiums, these two areas must be over- excavated and replaced with compacted fill. The backfill for the seepage trench (see Figure 1) also consists of uncompacted fill, which must be removed and properly compacted when the drain line is connected to the storm drain. 4. Construction Changes: There were construction changes during both the construction of the three tieback walls and the reconstruction of the slope. The construction changes for the three tieback walls have been discussed in our report dated June 23, 2008 (see Appendix A). The main construction change that occurred during the reconstruction of the slope was the use of geogrid above an elevation of 141 feet because the on-site granular material had been exhausted. HAmerican Geotechnical, Inc. File No. 23080.01 September 29, 2008 Page 9 Other construction changes included: (1) a change in elevation of the bottom of the key way to make sure the key bottom was in un-weathered formational material, (2) the angle of inclination of the back-cut was changed as dictated by the removal of the landslide, and (3) the placement of the back-drains were based on site conditions and groundwater observations. 5. Slope Stability Analyses: During the reconstruction of the slope, we performed additional shear strength testing and slope stability analyses. Based on these engineering analyses, it is our opinion that the rebuilt slope has a factor of safety for gross stability and surficial stability in excess of 1.5. 6. Project Completion: The slope repair work has been essentially completed. At the time of preparation of this report, the only work remaining was the landscaping of the slope face and the installation of an irrigation system for the upper part of the slope. 6.0 CLOSURE The grading work as described in this report is intended to stabilize the slope at the area described in this report. No repair work was performed at areas outside the limits as defined in this report. As such, no warranty in any respect is made as to the performance of the slope outside the area of repair. If any slope movement or other types of damage occur to areas outside the area of repair, the geotechnical consultant should be contacted for review. The contents of this report have been prepared using standard geotechnical engineering principles and practices. The work has been performed in accordance with the standard of practice for geotechnical engineers practicing in this or similar areas. No warranty is expressed or implied. American Geotechnical, Inc. SOIL, FOUNDATION AND GEOLOGIC STUDIES APPENDIX A - REFERENCES 1. "Interim Repair Report - Tieback Walls, La Costa Condominiums - Landslide Stabilization, Banich, Powers, Calso Landslide, Carlsbad, California," prepared by American Geotechnical, dated June 23, 2008. File No. 23280.02. 2. "Response to Third-Party Review, Landslide Stabilization, Banich, Powers, and Calso Landslide, Carlsbad, California," prepared by American Geotechnical, dated April 29, 2008. File No. 23080- 01R. 3. "Third-Party Review of Construction Revision, Landslide Stabilization, Banich, Powers, Calso Landslide, 2416 Sacada Circle, Carlsbad, California," prepared by Testing Engineers of San Diego, dated April 9, 2008, Contract No. 148589. 4. "Landslide Stabilization Recommendations, Banich, Powers, Calso Landslides, 2416 Sacada Circle, Carlsbad, California," prepared by American Geotechnical, dated March 27, 2007. File No. 23080.02. 22725 Old Canal Road, Yorba Linda, CA 92887 - (714) 685-3900 - FAX (714) 685-3909 5764 Pacific Center Blvd., Suite 112, San Diego, CA 92121 (858) 450-4040 - FAX (858) 457-0814 712 Fifth Street, Suite B, Davis, CA 95616 - (530) 758-2088 - FAX (530) 758-3288 5600 Spring Mountain Road, Suite 201, Las Vegas, NV 89146 - (702) 562-5046 - FAX (702) 562-2457 American Geotechnical, Inc. SOIL, FOUNDATION AND GEOLOGIC STUDIES APPENDIX B - COMPACTION TESTING 22725 Old Canal Road, Yorba Linda, CA 92887 - (714) 685-3900 - FAX (714) 685-3909 5764 Pacific Center Blvd., Suite 112, San Diego, CA 92121 (858) 450-4040 - FAX (858) 457-0814 712 Fifth Street, Suite B, Davis, CA 95616 - (530) 758-2088 - FAX (530) 758-3288 5600 Spring Mountain Road, Suite 201, Las Vegas, NV 89146 - (702) 562-5046 - FAX (702) 562-2457 Project Name: La Costa Condos Start Date: June 26, 2008 File No. 23280.01 TEST NO. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 DATE 06/26/08 06/26/08 06/26/08 06/27/08 06/27/08 06/27/08 06/27/08 06/27/08 06/27/08 06/27/08 06/27/08 06/27/08 06/28/08 06/28/08 06/28/08 06/30/08 06/30/08 06/30/08 06/30/08 07/01/08 07/01/08 07/01/08 07/01/08 Elevation (ft) 120.0 120.0 121.0 124.0 126.0 126.0 128.0 131.0 132.0 132.0 135.0 135.0 138.0 139.0 140.0 141.0 142.0 143.0 144.0 146.0 147.5 149.0 150.5 SOIL TYPE Light brown sand Light brown sand Light brown sand Light brown sand Light brown sand Light brown sand Light brown sand Light brown sand Slightly silty sand Slightly silty sand Slightly silty sand Slightly silty sand Slightly silty sand Slightly silty sand Slightly silty sand Sand/clay mix Sand/clay mix Sand/clay mix Sand/clay mix Sand/clay mix Sand/clay mix Sand/clay mix Sand/clay mix LABORATORY MAXIMUM DRY DENSITY (ocf) 120.7 120.7 120,7 120.7 120.7 120.7 120.7 120.7 118.3 118.3 118.3 118.3 118.3 118.3 118.3 115.8 115.8 115.8 115.8 115.8 115.8 115.8 115.8 FIELD DRY DENSITY (pcf) 106.6 110.9 111.4 111.7 106.7 112.6 111.9 113.4 101,0 107.7 102.5 106,9 106.8 109.4 111.3 114.5 106.6 107.6 106.6 108.2 106.9 107.7 107.2 MOISTURE (%) 15.7 14.3 14.6 13.1 13.3 12.0 13.0 11.7 16.6 14.1 18.0 17.8 15.9 14.6 13.8 14.4 20.4 19.9 19.8 18.9 17.5 18.7 19.6 RELATIVE COMPACTION (%) 88.3 91.9 92.3 92.6 88.4 93.3 92.8 94.0 85.4 91.1 86.7 90.4 90.3 92.5 94.1 98.9 92.1 92.9 92,1 93.4 92.3 93.0 92.6 REQUIRED COMPACTION (%) 90 90 90 90 90 90 90 90 90 90 90 90 90 90 90 90 90 90 90 90 90 90 90 TEST METHOD NU NU NU NU NU NU NU NU NU NU NU NU NU NU NU NU NU NU NU NU NU NU NU REMARKS Fail Pass - Retest of # 1 Pass Pass Fail Pass - Retest of # 5 Pass Pass Fail Pass - Retest of # 9 Fail Pass - Retest of # 11 Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass NU = Nuclear Gauge SC = Sand Cone I I Project Name: La Costa Condos Start Date: June 26, 2008 File No. 23280.01 TEST NO. 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 DATE 07/01/08 07/01/08 07/01/08 07/02/08 07/02/08 07/02/08 07/02/08 07/02/08 07/02/08 07/02/08 07/03/08 07/03/08 07/03/08 07/03/08 07/07/08 07/07/08 07/01/08 07/07/08 07/07/08 07/08/08 07/08/08 07/08/08 07/08/08 Elevation (ft) 151.5 151.5 151.5 153.0 153.0 153.0 154.0 154.0 155.5 157.0 158.0 158.5 158.5 160.0 161.5 161.5 162.5 164.0 165.5 167.0 168.5 170.0 171.5 SOIL TYPE Sand/clay mix Sand/clay mix Sand/clay mix Sand/clay mix Sand/clay mix Sand/clay mix Sand/clay mix Sand/clay mix Sand/clay mix Sand/clay mix Sand/clay mix Sand/clay mix Sand/clay mix Sand/clay mix Sand/clay mix Sand/clay mix Sand/clay mix Sand/clay mix Sand/clay mix Sand/clay mix Sand/clay mix Sand/clay mix Grey/green clay LABORATORY MAXIMUM DRY DENSITY (pcf) 115.8 115.8 115.8 115.8 115.8 115.8 115.8 115.8 115.8 115.8 115.8 115.8 115.8 115.8 115.8 115.8 115.8 115.8 115.8 115.8 115.8 115,8 115.8 FIELD DRY DENSITY (pcf) 102.8 106.5 104.0 101.4 109.2 111.2 106.4 105.4 105.3 105.8 111.1 106.2 105.2 107.4 102.5 104.6 104.9 104.3 105.4 108.2 105.5 106.9 109.9 MOISTURE (%) 18.4 18.7 19,1 21.1 19.3 12.0 18.8 19.3 20.5 19.0 17.5 19,4 17.6 20.4 21.4 21.4 21.2 20.6 17.1 20.1 18.6 18.5 18.7 RELATIVE COMPACTION (%) 88.8 92.1 90.0 87.7 94.4 96.0 91.9 91.1 91.0 91.4 95.9 91.8 90.8 92.8 88.6 90.3 90.6 90.1 91.0 93.5 91.1 92.3 94.9 REQUIRED COMPACTION (%) 90 90 90 90 90 90 90 90 90 90 90 90 90 90 90 90 90 90 90 90 90 90 90 TEST METHOD NU NU NU NU NU SC NU NU NU NU NU NU SC NU NU NU NU NU NU NU NU NU NU REMARKS Fail Pass Pass - Retest of # 24 Fail Pass - Retest of # 27 Pass Pass Pass Pass Pass Pass Pass Pass Pass Fail Pass -Retest of # 38 Pass Pass Pass Pass Pass Pass Pass NU = Nuclear Gauge SC = Sand Cone Project Name: La Costa Condos Start Date: June 26, 2008 File No. 23280.01 TEST NO. 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 DATE 07/08/08 07/09/08 07/09/08 07/09/08 07/09/08 07/09/08 07/09/08 07/09/08 07/10/08 07/10/08 07/10/08 07/10/08 07/10/08 07/10/08 07/11/08 07/11/08 07/11/08 07/11/08 07/14/08 07/14/08 07/14/08 07/14/08 07/14/08 Elevation (ft) 172.5 174.0 175.0 175.0 175.0 176.5 178.0 179.5 181.0 182.5 184.0 185.5 187.0 188.5 189.0 190.0 190.5 191.0 192.5 194.0 194.0 195.5 197.5 SOIL TYPE Grey/green clay Sand/clay mix Grey/green clay Grey/green clay Grey/green clay Grey/green clay Grey/green clay Grey/green clay Grey/green clay Grey/green clay Grey/green clay Grey/green clay Grey/green clay Grey/green clay Grey/green clay Grey/green clay Grey/green clay Grey/green clay Grey/green clay Grey/green clay Grey/green clay Grey/green clay Grey/green clay LABORATORY MAXIMUM DRY DENSITY (ocf) 115.8 115.8 115.8 115.8 115.8 115.8 115.8 115.8 115.8 115.8 115.8 115.8 115.8 115.8 115.8 115.8 115.8 115.8 115.8 115.8 115.8 115.8 115.8 FIELD DRY DENSITY (pcf) 105.6 108.5 110.1 108.5 107.1 108.5 107.7 106.3 107.4 104.3 105.1 104.7 107.1 106.9 101.0 105.3 104.3 106.3 105.9 102.5 105.2 105.6 104.7 MOISTURE (%) 18.0 19.1 19.1 19.4 15.1 19.6 19.2 18.9 19.0 17.7 18.9 19.5 18.6 16.7 20.2 19.0 17.6 19.7 17.7 19.3 18.1 18.6 18,3 RELATIVE COMPACTION (%) 91.2 93.8 95.1 93.8 92.5 93.8 93.0 91.8 92.7 90.1 90.8 90.4 92.6 92.4 87.3 91.0 90.1 91,9 91.5 88.6 90.9 91.2 90,5 REQUIRED COMPACTION (%) 90 90 90 90 90 90 90 90 90 90 90 90 90 90 90 90 90 90 90 90 90 90 90 TEST METHOD NU NU NU NU SC NU NU NU NU NU NU NU NU NU NU NU NU NU NU NU NU NU NU REMARKS Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Fail Pass - Retest of # 61 Pass Pass Pass Fail Pass - Retest of # 66 Pass Pass NU = Nuclear Gauge SC = Sand Cone I I Project Name: La Costa Condos Start Date: June 26, 2008 File No. 23280.01 TEST NO. 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 DATE 07/14/08 07/15/08 07/15/08 07/15/08 07/15/08 07/16/08 07/16/08 07/16/08 07/17/08 07/17/08 07/17/08 07/17/08 07/18/08 07/28/08 07/28/08 Elevation (ft) 199.0 201.0 201.0 202.0 204.5 206.0 207.5 209.0 210.5 210.5 213.0 214.0 214.5 171.0 175.0 SOIL TYPE Grey/green clay Grey/green ciay Grey/green clay Grey/green clay Grey/green clay Grey/green clay Grey/green clay Grey/green clay Grey/green clay Grey/green clay Grey/green clay Grey/green clay Grey/green clay Grey/green clay Grey/green clay LABORATORY MAXIMUM DRY DENSITY (pcf) 115.8 115.8 115.8 115.8 115.8 115.8 115.8 115.8 115.8 115.8 115.8 115.8 115.8 115.8 115.8 FIELD DRY DENSITY (pcf) 105.5 104.6 105.4 106.9 108.7 107.2 104.8 108.0 102.7 104.5 105.2 105.2 107.8 104.2 108.2 MOISTURE (%) 18.8 18.1 17.2 17.2 18.0 18.0 19.8 18.9 19.1 20.0 17.9 19.7 17.8 17.4 17.9 RELATIVE COMPACTION (%) 91.1 90.3 91.0 92.3 93.9 92.6 90.5 93.3 88.7 90.2 90.9 90.9 93.1 90.0 93.5 REQUIRED COMPACTION (%) 90 90 90 90 90 90 90 90 90 90 90 90 90 90 90 TEST METHOD NU NU NU NU NU NU NU NU NU NU NU NU NU NU NU REMARKS Pass Pass Pass Pass Pass Pass Pass Pass Fail Pass - Retest of # 78 Pass Pass Pass Pass* Pass* = Slope Face Tests NU = Nuclear Gauge SC = Sand Cone American GeotechnicaLInc SOIL, FOUNDATION AND GEOLOGIC STUDIES APPENDIX C - LABORATORY TESTING 22725 Old Canal Road, Yorba Linda, CA 92887 - (714) 685-3900 - FAX (714) 685-3909 5764 Pacific Center Blvd., Suite 112, San Diego, CA 92121 (858) 450-4040 - FAX (858) 457-0814 712 Fifth Street, Suite B, Davis, CA 95616 - (530) 758-2088 - FAX (530) 758-3288 5600 Spring Mountain Road, Suite 201, Las Vegas, NV 89146 - (702) 562-5046 - FAX (702) 562-2457 American Geotechnicaljnc. SOIL, FOUNDATION AND GEOLOGIC STUDIES LABORATORY TEST PROCEDURES Particle Size Analysis Particle size analyses were performed in accordance with ASTM method of test D 422. Both mechanical and hydrometer procedures were utilized. Test results are shown on the sheet titled Gradation Curves. Atterberq Limits The liquid limit and the plastic limit were performed in accordance with ASTM method of test D 4318. Test results on summarized on the sheet titled Gradation Curves Laboratory Maximum Dry Density The laboratory maximum dry density and optimum moisture content were determined by using ASTM method of test D 1557, method A (Modified Proctor). Test results are shown on the sheets titled Moisture- Density Relationships. Direct Shear Direct shear tests were performed on samples compacted to a relative compaction of 92% at optimum moisture content. Soil samples were allowed to soak for about 24 hours while under the confining pressure specified for testing. Consolidated drained conditions were approximated by using a slow, strain-controlled approach, similar to that outlined in ASTM method of test D 3080. Test results are shown on the enclosed shear strength plots. 22725 Old Canal Road, Yorba Linda, CA 92887 - (714) 685-3900 - FAX (714) 685-3909 5764 Pacific Center Blvd., Suite 112, San Diego, CA 92121 (858) 450-4040 - FAX (858) 457-0814 712 Fifth Street, Suite B, Davis, CA 95616 - (530) 758-2088 - FAX (530) 758-3288 5600 Spring Mountain Road, Suite 201, Las Vegas, NV 89146 - (702) 562-5046 - FAX (702) 562-2457 1 p E R C E N T F 1 N E R B Y W E 1 G H T • U.S. SIEVE OPENING IN INCHES 6 4 3 2 1.5 ] 3/4 1/23/8 3 00 95 90 85 80 75 70 65 60 55 50 45 40 35 30 25 20 15 10 i 1 1 1 1 U.S. SIEVE NUMBERS I HYDROMETER 4 6 810,41620 30 40 50 70100]40200r T 1'~Tt- 1 . 1 "i \ 1 , 1^ \ ^^_ *\ *\ *, >INx \ \ •I 100 10 1 0.1 0.01 GRAIN SIZE IN MILLIMETERS COBBLES GRAVEL coarse Specimen Identification Site Specimen Identification Site fine SAND coarse medium fine Classification M( SANDY LEAN CLAY(CL) DlOO(mm) 4.75 D60(mm) 0.02 D30(rr 0.002 m) D10(mm) % PROJECT Banich Slope Repair \ \ ^ 0.001 SILT OR CLAY :% LL 48 Gravel 0.0 PL 17 %Sand 32.0 PI 30 Cc %Silt 35.1 Cu %Clay 32.9 JOB NO. 23280.02 DATE 07/28/08 GRADATION CURVES ^(American Geotechnical, Inc L. J 135 133 131 129 127 125 123 121 119 D R 117 Y D ll5 E N 113 S Y 109 P 0 107u n d 105 s p 103 r 101 C 99 u bi 97 c F 95 o 93 t 91 89 87 85 83 81 79 77 75C . f /^ \ \ \ /— \ \ \ \ /• '^ y\ \\\ \ \ '.j \\ \\ \/ \\ \\/\ \ V * /v\ "• k\ V\ — ^ V L\ \ s\ \ s \ Job No. Project: Sa Descripti( -^\\ V\ ^ 23280.01 Date 02/22/08 La Costa Condos(Banich) mple location jn of Material Test Method f Site light brown silty sand ASTMD 1557-02, "A" TES1 Maximum Optimum W \ ^ V k\ v \ S,\ \\ \\ \ . \ \ •RESU Dry Dens ater Cont< CURVES OF 1000/FOR SPECIFIC GR, \~\ \\ \ •.. \ . 5 10 15 20 25 30 WATER CONTENT (Percent) \, \ \V\ \~\x\••. \ . ^ 35 MOISTURE-DENSITY RELATIONSHIP ISAmerican Geotechnical, Inc F.N. 23280.01 February 2008 LTS itv 120.7PCF ;nt 11.5% 'e SATURATION WITY EQUAL TO: - 2.80 2 70 2.60 \V ~^VV rs. \ X. '\ X•-. --v . N. N 40 45 ! J 135 133 131 129 127 125 123 121 119 D R 117 Y D "5 E N 113 S },„ Y 109 P 0 107u n d 105 p 'OS e r 101 c 99u b j 97 c F 95 oo 9, t 9 89 8 8 8 8 7 7 7 1 / / f \ / \ J \ ^v.f \ / fl \ N \ \ \ Job No. Project: t ^ 23280.01 Date 09/10/08 La Costa Condominiums Sample location A. Description of Material sand/clay mixture-ereenish/erev \-A \ V1 \\ \ \ \V \ \ \\ Test Method sandv rlav ASTMD] 557-02, "A" TEST RESULTS Maximum Dry Density 1 1 8.3 PCF Optimum Water Content 1 2.0 % \\ \V \ \\ \ VV X \> \ \ CURVES OF 100% SATURATION FOR SPECIFIC GRAVITY EQUAL TO: v - 2.80 V ^ 70x \ ^'/U k \ .... 9 f.(] '•• \ \ \ \Ai . N\ L_ ''-A'•• y \ ^•-. x-. \'•. ~T. v. -^--\V '• ^ v\ \ ^ N ^ \X 'X \ \ 0 5 10 15 20 25 30 35 40 45 WATER CONTENT (Percent) MOISTURE-DENSITY RELATIONSHIP ^American Geotechnical, Inc F.N. 23280.01 September 2008 135 133 131 129 127 125 123 121 119 D R 117 Y D "5 E N 113 S!„, Y 109 P 0 107u n d 105 s p '03 e r 101 C 99 u hi 97 c F 95 o o 93 1 9 89 87 85 83 8 79 77 7 \\ \ ^ t&** \\ \ ; \ \ \ \ \ \ \ ^ \ \ ^ \-\\,-• ^ \A\ \ Job No. Project: « Descrip \\ \ \i \ \ \ 1 \ \\ k \ V\ VS 23280.02 Date 07/01/08 Banich Slope Repair sample locatioi tion of Materia Test Method \\ N \ \\ \\\ \ N Op \\ \ \ T Site 1 greenish grey clay w/sand. fill #2 ASTMD 1557-02, "A" TEST RESULTS laximum Dry Density 1 1 5.8 PCF timmn Water Content 1 5.5 % CURVES OF 100% SATURATION FOR SPECIFIC GRAVITY EQUAL TO: , - 2.80 — K -• 270\ \ v- \ ••- 2 60'•• x \\ \XXV'••• v\L_ s \ '•• V \X'•• y X '• ''>_^•• ^"\N^ \ X-KvK"• ^r i 0 5 10 15 20 25 30 35 40 45 WATER CONTENT (Percent) MOISTURE-DENSITY RELATIONSHIP ^American Geotechnical, Inc F.N. 23280.02 July 2008 135 133 131 129 127 125 123 121 119 D R 117 Y D "5 E N 113 S >' Y 109 P 0 107u n d 105 s P 103 e r 101 c 99u b i 97 c F 95 0 J t 9 89 87 85 8: 8 79 77 75 \\ \ / \ \ // \ \ \ y \ \ \ / \\ \ \it V / r \ • \ \ ) \ VI / \\ \ \ Job No. Project: « Descrip \\ \ ^ \ \ \ k \ \ \ \\ , \S. s ' 1 23280.02 Date 07/09/08 Banich Slope Repair Sample locatioj tion of Materia Test Method \V \ \ \ \\ \\ ^\ N Op \l \ \ \ \ i Site! 1 greenish grey clayey sand, fill #3 ASTMD1 557-02, "A" TEST RESULTS laximum Dry Density 1 1 5.8 PCF timum Water Content 1 5.0 % CURVES OF ]00% SATURATION FOR SPECIFIC GRAVITY EQUAL TO: , - 2.80 \ -• 0 7fi\ \ " \ •••• 7 6,0 '•- N \\\ \\ '\ '•. \ , : A X \N X\'•• v ^^."^ X ^^\• ^. N-.XV '•• "--k '•"• X-k••• S-^K 0 5 10 15 20 25 30 35 40 45 WATER CONTENT (Percent) MOISTURE-DENSITY RELATIONSHIP ^American Geotechnical, Inc F.N. 23280.02 July 2008 C\J 15 J2co IO T5 .8OroQ. oO en _ (0 <D o> Q. ^O Su_ 'o03 CMX3X. CO CO O CO CMm X o ooo ooooo ooo CM V) (/) SV) "ro OOO O in ooo ooo CO oooCM ooo (jsd) i|)6uaj)s 2.0In ™U CNJO5 II COCOcu<D-a O) OJ cd ID X CD OOOIT) _CC O -6 C CO C/) D)C 0) ^—'(f) 1_ CO0) OOO OOOCO OOO(M (0 V)(f)0) V) ~COE O O O O O O CO O O O CM OOO Osd) American GeotechnicaLInc SOIL, FOUNDATION AND GEOLOGIC STUDIES APPENDIX D - SLOPE STABILITY ANALYSES Sheet 1: Cross-section of the repaired slope showing the input data for the slope stability analysis Sheet 2: Slope stability analysis for gross slope stability (F.S. = 1.558) Sheet 3: Slope stability analysis for surficial slope stability - no geogrid (F.S. = 1.262) 22725 Old Canal Road, Yorba Linda, CA 92887 - (714) 685-3900 - FAX (714) 685-3909 5764 Pacific Center Blvd., Suite 112, San Diego, CA 92121 (858) 450-4040 - FAX (858) 457-0814 712 Fifth Street, Suite B, Davis, CA 95616 - (530) 758-2088 - FAX (530) 758-3288 5600 Spring Mountain Road, Suite 201, Las Vegas, NV 89146 - (702) 562-5046 - FAX (702) 562-2457 .Lm_LLU_l it O CM*—: 7^ LJ-£ -§- w m£ o cu en•£ en jz .-<5 CD o .cS Q O D-! CD O !c: Q O CL 11-5s %£CO CD O5 D O CD§in•DIg•dv.2 c E.COO (D« .C0) OO O CD o a> ^~ a> .n .u^J CD O _C2 Q O CL "DCWg- CO2 c .<u o ^O O CL CQCD o jrQ O CL O* 2 c"3 0) O JZ2 D O D.COJDOen 2-1 1'E .2I Wo•o§5^,O o _„ CO COJS <M CCO CO ^~O OvJ ,CD American Geotechnical, Inc. SOIL, FOUNDATION AND GEOLOGIC STUDIES APPENDIX E - MONITORING DURING REPAIR 22725 Old Canal Road, Yorba Linda, CA 92887 - (714) 685-3900 - FAX (714) 685-3909 5764 Pacific Center Blvd., Suite 112, San Diego, CA 92121 (858) 450-4040 - FAX (858) 457-0814 712 Fifth Street, Suite B, Davis, CA 95616 - (530) 758-2088 - FAX (530) 758-3288 5600 Spring Mountain Road, Suite 201, Las Vegas, NV 89146 - (702) 562-5046 - FAX (702) 562-2457 CO'x^CD£3010^** o COCMCO <M COlilis.O Si! .5M CM CM !co T^ oj co h-co is. js. p: ft oi I ' i r—\d- - ' n <} G' 1 . T 1 i: :. . • .' . : . '. J•^0•• • • : • : • • ir, . - _ ^ " — > ^H, !a— D . E- a a =^f— =<^ f^^.§CD o o oCM CD 1 Oco O CM M- CO CO O CM "tf CD CO O*? T- 1— T— 1— t— CM ooooCMCDowI;•g0)E0)oCO QL Q 0) 1 O CO'x DO CD oco CMcoCM oo8§CM O O ^ CO T- CD N co co coo o oO O Or\j c\i CM c\j CD CO O u| CM CD 00 OCM CO° 8CM CD O Ed e oo O ;=: OCMd % 0)ECD 8Q. W O d 9> jo 1 d o LLJ c b<sLU (0 0§ < co CMCOCO. 00 2 roCD +<CD« w'xCOCD"iooooCMCOCM ooooCM CO CO 00 00§000;0 O OCM CM CM CM^? CD CO -i-i- v- T- co CM CO CO <M CD CO in - CM COo 8CMCMCD2 £5 2E0)o_CO Q.en QO -x CD h -5 0<M oCM O CO'x CD O O00 CM COCM CO CO GO GO GO§0000o o o oCM CM CM CM CM i- •* CD CO T- 1- T- -1- T- CO Q)O_CO Q. 2 Q 9 > oCM oCO CM CD oo o1 139) Ul C\J CD CO OCM 0 o I o 0- £2. < « 1 , CM <CD« Tel: 310-319-9807 Fax: 310-319-9827 1-800-244-7241 CRACK MONITOR PROGRESS SHEET Project: Location of Monitor:fldU. t ' 20mm 10 dan — Tin III in nn in nn Date of Reading: 20mm 10 HTT — g III Illl i in nn in Date of Reading: 20mm 10 till Illl nn Mil nn i in in Date of Reading: 10 20 in in n MI III Illl llbb llff ) 10 20 II Illl II Illl III nn llbt llff 3 10 20 II III II Illl nn Illl llbfc llff 7-1 1-06 - O 20mm 10 0 10 20 till nil Illl Illl Illl Illl I II || III Illl II Illl Illl Illl llbt — llff Date of Reading: 20mm 10 0 10 20 till flll Illl Illl Illl Illl Illl I II I 11 Illl II , Illl Illl Illl llbt llff Date of Reading: Notes ^r-og />o c {,'&-<>% f° M, 7-7-0% -lo- 08 7-/£•<$« AJb ril i 20mm 10 0 10 20 till flll Illl Illl nn UN- Ill 1 III 1 i nn i nn nn Illl llbb llff Date of Reading: 20mm 10 0 10 20 till flll Illl Illl nn i mi n l II I III Mil UN Illl Illl llbt llff Date of Reading: 20mm 10 0 10 20till flU Illl Illl Illl II Illl Illl II III II III Illl Illl llbt — llff Date of Reading: 20mm 10 0 10 20 till Bll Illl Illl Illl II ill. Ill || Illl Illl Illl Illl II bt llff Date of Reading: 20mm 10 0 10 20 till — • flll Illl MM Illl Illl Illl 1111 nn n nn Illl nn llbt = llff Date of Reading: Coeff. of Thermal Expansion 3.80 X 10 -5 in/in/degree F T6.84 X 10 -5mm/mm/degree Q HII Illlllllll llff lltt 3 en po I BAftere 3o3 O3 O §R*epoxy cures, cut clear tapeove from front of monitor.05 8»Wate^3on H-'3MM ^+ (» la ta S'S'S'S'rrrS: CCH COa «T3 (X0 C X 0 to c CTQ^ CO B 1 §• 5" O CO WCO O O n»o»t*o33o ts; qP g8 I 8 P "3 8 2a OJ>Ci 3 ^• CTQ goo o3.-o w UJ 1!TO cr as,S§ 8*^ 2- g |f 45 °^ B. X S" K) JSC^«Sn 5 i•§ g.mnutes™nutes24 hours:O-> t-^o o M K&:So ,_,n» 3 I- | 2Ol(/3 Iia- g 3. 0 N> O" 5o is 0\o *% S.SK § 2 § S: £.11 ? g<»(»,!-» § i-C/3 2o"1w SO 3M< | HH 909 ation InstructionsVI &>?5s- ^w w•s r S eVJ C30 ^ SV! Ow ^5? 61 S.O S Avongard Products, U.S.AP.O. Box 7548, Santa Monica CA 9TOLL-FREE ORDER LINE - (800)6td75487241 Tel: 1-800-244-7241 Fax: 949-497-1991 CRACK MONITOR PROGRESS SHEET Project: Location of Monitor: n — 20mm 10 id — 5 II M Ml TT Date of Reading: 20mm 10 dd In II III I I Date of Reading: 20mm 10 C id — — liL III III I I Date of Reading: 20mm 10 ( dd lii II III I I I Date of Reading: -/ 20mm 10 C dd — — in II II TTTTTT I Date of Reading: -. Coeff. of ) 10 20 II I 1 bt — ff fe'18'Ofc 10 20 II II 1 I tt ff 10 20 III II I II I tt — ff 10 20 III II II 1 1 bt — — Iff ) 10 20 II II 1 bfc — hT 7-I1- 3% Thermal Expans f~ ^ 0-r~> ion Notes nUted oh jl H ' vj|L.M 7-1 8- 08 Ab c=e J? •*-£•£ 20mm 10 0 till 111 Mil MM MM MM Date of Reading: 77 10 20 I I JILlil t III! MM II bt — llff 20mm 10 0 Date of Reading:_ 7-ZI-6& 20mm 10 0 BTTnTTTmTTM 0 20rnTTiE MM llffl 0 20 MTT1TE lff Date of Reading: 20mm 10 0 10 20 til J1? 5 I I II tt IMIIlllllMMIlllllllllllMMllllff Date of Reading: 20mm 10 0 10 20 HITTMTTTTTTMT1 \\\ TTTTTTTT ME r TllllllllllllllllllllllllllllMllllllff Date of Reading: ±111==—iiKM nN mm...L...L...r"lltt^~=iIIF T31-1OOQh-l O (/) «1 «3B'Oof"^ oo• 2or^-CD !»«>o0ao3 O|-b i—t-O1-1 o 3 Oior oni-* Ss TO H § o oo ^crn> D. O bo O en t? Oo x3 "<!s s ^o a O CL Ill••mmen en P"H.cfOPex3ocro oocr o> & cj^r«^3 CL O CX O^ r^ O p § «j^ o K> a- ?l § CTQh-^ fc^t« c 3^H* • 3- 3' lu n> 8 oc» O3ooo o3 -CfQ XId. op- «> a O O ^O hfO ooCD 3-(^ h-i CO W5 65t±>2,3 b o' no3o3o3 ^ 3o3 so 0 U)2 8 >K>O5. 3• OQOCL-cr 3- °O TO L>J h-i U) U)2H--3C 1 (-A 2 h-t>C3Cr^n t/5 PC/3 CD a'51 Fn> S CO r^* On> »-f ^^ C/2H ^^r^ croo 3 1-11-1CL 3 OJ M, ao^^SOox g ^ § K) «, osr §5' S5§ h-h, !.S3|»C « a ti i— '^i-by. 33^ja^oft'h-. 0i I «> rK o "T3& S g §= nffiobdr.»w3 EPOADHESIVE5 e. •° = O h-.3 ^ nSoPC o"1 HH 005«•*• &STrf-N*.os HH SC/5«•+•"1Cor*-M. Os V) 2 >s* w§ 9» ^w S^ r® o•a Sw g"S 2P^ in ui 3 P.O. Box 7548, Santa MTOLL-FREE ORDER LINEca80CA) 244 Tel: 1-800-244-7241 Fax: 949-497-1991 CRACK MONITOR PROGRESS SHEET Project: Location of Monitor:^Ji/o -^ J (yc ^ i y 20mm 10 till ITTTTTII ITT Date of Reading: 20mm 10 M MM I ) 10 20 TTTT mTITTTTTE III llff O ) 10 20 II \\\\ Mil ME mi mi MM iiff Date of Reading: 20mm 10 0 10 20 EBTTTTTTTTTT MM MM ITT TIE Mil MM llff Date of Reading: 20mm 10 Pff 0 10 20 Tffl fllllllllllllllllllllllllllllllllllllff Date of Reading: 20mm 10 0 10 20 33TT TTTT TITT TNT TTTI 1TTTTE Notes j, r' \V-ao 7-&-a& X T? A/o Illllllllllllllllllllllllllllllllllffl Date of Reading: N- 20mm 10 0 10 20 idll — 1 1 Mil mi INI MM 1 1 mi Mil III! II 1 ME — Iff Date of Reading: 20mm 10 0 10 20 idll — flll MM II I MM III III MM III MM III! II E — Ill Date of Reading: 20mm 10 0 10 20 idll — flll III! I II MM MM II INI I III III! MM II E — llff Date of Reading: 20mm 10 0 10 20 35 till — flll MM I II I I II II " I, MM I II II I II I ME — llff Date of Reading: 20mm 10 0 10 20 dd I _ in I I I | ITTTTTl II I I1TI ill mi III nil ME — llff Date of Reading: Coeff. of Thermal Expansion 3.80 X 10 -5 in/in/degree F (6.84 X 10 -5mm/mm/degree C) ±111E~=^fill "7":|:;f:In 1 nit5=—E~^ IIF T3 OO ^ OCD <""f t^ w- 3 Oi-h 3o3 h-*-r^o o After epoxy cures, cut clear taremove from front of monitorpe3CL 00n>TOOnH"3en 00 no> H^ CA CD «T3 CLO CX Ov; «• o ET § ^c/> ^ ^P- 3* § Crq h-J ftj™ c 3 eraCDh—' • h-t> S ^ H-,h-* "^J CD L/iCD H-v> O*+>3l-tO3 O ^S P D. <T> P- c/3 > CD1 5- CD t/3 8 a 00 I'IQ ^ n>3 fF"^r& 0 Q 00 H-' 0) O. <! ^^H &^Q &3 £5 £3 £3 pp Cj 1— K 1— K h- K 1— KV5 <"*• «~^ '~^ r^o n> n> n nH "I H| P-t HJ 2. to ON u> H-g- j^ O o O a g* 3 3 3O »-•• h-- *-"C 3 3 3a c c cC/3 r^ (-h r-t" n n ntn on &o ffiPHCL P IT D ^^ On> H1' o p J f) ^T' ^0ort r §>. <^ •^ • r5" ,oo 1 4^nCDP3oCDo to O T3 O bo -J ON L*J -t^ O U)g ptr fcr ft ?§ g 51 I" G 0 <J> O tir: ^ CD ^ 3 CD o 3 0 2>Oo p.-o cr O3.3.' °H?. CDO H-.Og a Si OJ ^3 H^ O 3 O «o o o5 •a C O ^3 3 CD O § £' a, § O tr 5- ^s T S - § O P. CD O3 ffiOooroOGOnw EPOXY ADHESIVEn«aO nstallation Instructions71 ^-» bCJ^ nc 2 ff ^I1 r ^ oo x g^<* o Fte P.O. Box 7548, Santa Monica CATOLL-FREE ORDER LINE - (800) 2^O P -QTQgO hb ^»- P. ^I? *O & IP-c :o »p^-C/l" p»PbO) > ~ Tel: 310-3)9-9807 Fax: 310-319-9827 1-800-244-7241 CRACK MONITOR PROGRESS SHEET Project: JS*N^ a 6^ £>'( 20mm 10 ±lll ^ flll Illl Illl MM Illl III Illl Date of Reading: 20mm 10 I 10 20 Illl u | Illl Illl MM Illl lltt = llff £-/3-oB I 10 20 20mm 10 0 10 20 till — nil III! till III! Illl till 1 Illl 1 III Illl III Illl Illl Illl llbt — llff Date of Reading: 20mm 10 0 10 20 ±111 — flll Illl Illl Illl Illl II || II 1 II 1 II Illl II Illl Illl Mil lltt = llff Date of Reading: 20mm 10 0 10 20 tjll — flll Illl Illl Illl 1 (III 1 III 1 III 1 II Illl ii INI Illl Illl llbt = llff Date of Reading: ill —^i- — flM Illl Illl Illl Illl Illl Illl Date of Reading: Illl Illl INI INI mi Illl lltt —* — — llff 7'i(-0e Notes -20-08 7-7- 08 - e>8 A/o No 20mm 10 0 10 20 till E flit Illl Illl nil ill Mil III Illl Illl Illl Illl Illl Illl lltt ^ llff Date of Reading: 20mm 10 0 10 20 fr- £ ddll = ^Rll Illl Illl Illl III Illl III I III I III Illl Illl Illl Illl lltt ^ llff Date of Reading: 20mm 10 0 10 20 till = E nil mi mi mi i Illl I III II Ml II II Illl II nil MM Illl lltt i nffff Date of Reading: 20mm 10 \ x r _- * 0 10 20 1? EE tin — flu MM Illl Illl III Illl II I Illl I III Illl Illl Illl lltt = llff § Date of Reading: 20mm 10 0 10 20 till - flll Illl Illl Illl Illl Mil Illl Illl III Illl \\\\ Illl Illl lltt = llff Date of Reading: Coeff. of Thermal Expansion 3.80 X 10 -5 in/in/degree F (6.84 X 10 -5mm/mm/degree C) ±111————-—E^~ — fill *T3 C3-<- *S c co C CO H Ifr* £ cH k> r H c 1- c | 3a ITKt> t-, V jffS IB 1/3 >—1^1 K> C § 3•d52. will ||i4 s— "3— "— g_ CL~ cf::: O::: -' 3• • - — o= <§~~ CD- 8 III UK w F-J-oo C --4 C7\ ? |£ s£ r 12 •§§• • • 2 «S « S"2 3 x e t3* o *!3 n> > 3* 1 8 -"*> O J3 • O3 3. j» ^ p- > 0 0 £• 5 3 »« C CfPi o f PI t»: p ?r «» ci si." oj H era3 o ^ B. " > n> 3 "T3 3 p oa. ^-^ o ^ EC O ^ 1... Ji| 2 S 5 " 8 OT P' 2. K) 0\ «*) N- ff 0g • *• o o o 2 ^5 111" Itco wa w J -O CT\ OJ >— • (-» t/< 3 Ji. o U) U) >* 5^ ' If «" SToo en O3 orePp | •- r0w 2. < ? t— 'S1 U> 4^. OJ NJ >-»^2; 9 22> O ^2OO C COrt 0- cnPfiji p^. ^T1 '*• sr< r^ . vj srCE?T -. OS£R s= ^-sW ft3 ^ 3 S * . N^- ^"Ojr- hS; sr'CJ'CJ^ tT 5,CO O ^3 M^ ? o S5 i?*coo n» 'Orota 2. ^^ss. S- P ao S g> §^ o' 5 ^|. SI S |-CDS ^c? 2 £J2O CD 3 "• O o3 o o S- o o o1 ^ i 5 ? a «3. :! S rf 2. '2H" H* S- O w S»o 3 |- ^ £H ^ t32 o OOT a. I a- § 8 3^ 6* 1 3 1.•t ^ < C-CO ^^^ y> -fc» u> K> H— ^ >-0 T3'X3> ISC ?? <!5^ 3 g ET»5 ^ ^ ° ^6- i 8- & 1. Sn 3S • ° * rS^^ ^V B 2.'1 1 ? 5-^ •§ ! Is*rt P KO ^3 CDoo••I 1 s-a *i &r;? B- i-| t i| 1 f |8- 5- 1i i |l 1 1» s 8 a eg i 3 8 § £ -S •§00 ^ O O MSi II. * 1| r « § « 1 > S!=r:g-a5-tr>g-'TiC2<3§ B y B g £. §^°S3cf3 S o &8 | 8- 8- & K | 8- g i g-s g- ^S fis-ol. « 11 o ";|i?!ifi?Ii1 J!fU5«t=|£ & i S * 5 3 -° 1 * 1 i^ ' § | 3 |N eg 3 g S § r^_i ^"t ^ ^j f3 h—«» *T ^ .^ g 1 f if jl ^ |l| ^ ^ O^S'OTP* o*noS <*^'~t>^'&S3 >-•• >3 ST. S. » K- 1 § §' | ^ " " ^ ' §' "^. ^ ' *? *^ ^ Kw:LoS o•S Msd St/^ crS ^-\ wd aS 0^ 2. j ^^~ ••"Ti ^"^ ta<s sw 0 9•— •*-KO•1 ^_^[nstallation InstructionsEPOXY ADHESIVEABOWE"5-MinuteEts IT* 8 oV! 00 W5 gx 2& T« (In 3.•• l»ttfeL JHH PP^2rU **jS.£- I1 -p™» fc*^f^1"^M •• Kfc ** > *vongard Products, U.S.A.,P.O. Box 7548, Santa Monica CA 904TOLL-FREE ORDER LINE - (800) 244 -l!f-!-" r*- _£ S *. to fttk i» b IP- IK,'•b Hfe pp •&-. i» te American GeotechnicaLInc SOIL, FOUNDATION AND GEOLOGIC STUDIES APPENDIX F - FIELD MEMOS 22725 Old Canal Road, Yorba Linda, CA 92887 - (714) 685-3900 - FAX (714) 685-3909 5764 Pacific Center Blvd., Suite 112, San Diego, CA 92121 (858) 450-4040 - FAX (858) 457-0814 712 Fifth Street, Suite B, Davis, CA 95616 - (530) 758-2088 - FAX (530) 758-3288 5600 Spring Mountain Road, Suite 201, Las Vegas, NV 89146 - (702) 562-5046 - FAX (702) 562-2457 American Geotechnicaljnc SOIL, FOUNDATION AND GEOLOGIC STUDIES AS - BUILT BANICH SLOPE REPAIR DETAILS & OBSERVATIONS Elevation Notes: @ 120.6' Bottom of key at SE corner of backcut founded on very hard cemented fine-grained sandstone, the key back drain outfall pipe exits the key at the NW corner at approximately 115.4' elevation, five (5) chimney drains initially spaced 16.5' apart horizontally extend up the backcut to be tied into the burrito back drains @ 140.0' Second back drain installed and the spacing between the vertical chimney drains was reduced due to the narrowing of the repair width @ 141.0' Sandy fill material was exhausted and use of onsite sandy clay mix was used as backfill with geogrid spaced every 18.0" vertically (2 roll width wide, approximately 26.0') @ 146.0' Geogrid width was reduced to 1 roll width (13.0') to allow for lower v-ditch construction @ 147.5' Geogrid width was increased again to 2 roll widths (approximately 26.0') @ 149.0' Third back drain was installed, set-back from finish slope face, approximately 35.0' @ 158.5' Fourth back drain was installed just below seep zone within green/gray highly fractured mudstone, set-back from finish slope face, approximately 37.0' @ 161.5' Repair bench width from finished slope face to back cut, approximately 37.0' @ 168.5' Geogrid width reduced to 1 roll width (13.0') due to narrowing of repair bench width @ 170.0' Contact between dark gray mudstone and overlying mottled orange and white sandstone, attitude: N60E/60NW, there is a thin clay gouge layer with polished slicken sides at contact that appears to possibly be an ancient landslide shear, 2 in- grading failures occurred on the repair back-cut (49° cut) during the landslide removal phase, appear to have failed along this contact, there is an approximate 4-6" thick orange band of oxidation stains within the sandstone above the contact (i.e. from seepage perching on top of contact) @ 171.5' Fill material changes to primarily gray-green clay material with minor sand, repair bench width approximately 27.0' from finish slope to back-cut @ 175.0' Fifth back drain installed just above upper v-ditch level @ 181.0' The repair bench is 12.5' wide from finish slope face to back-cut @ 191.0' Sixth back drain installed at 18.0" below bottom of lowest tie back wall @ 194.0' Chimney drains reduced in number from 5 to 4 @ 207.0' Seventh back drain installed at base of upper tie-back wall 22725 Old Canal Road, Yorba Linda, CA 92887 - (714) 685-3900 - FAX (714) 685-3909 5764 Pacific Center Blvd., Suite 112, San Diego, CA 92121 (858) 450-4040 - FAX (858) 457-0814 712 Fifth Street, Suite B, Davis, CA 95616 - (530) 758-2088 - FAX (530) 758-3288 5600 Spring Mountain Road, Suite 201, Las Vegas, NV 89146 - (702) 562-5046 - FAX (702) 562-2457 American Geotechnical Q TRANSMITTAL FORM AFIELD MEMO Q INTER OFFICE MEMO Q INTRA OFFICE MEMO TO: _ DATE: FILE NO. SUBJECT: L& Cost* C&nAot /' a // -thef (£•(•&/* /7-/I /zzhar <$vos f/t,tf.,<. are h&d <H*Q y- di-lcJitf ~~ A '&T-&K. b FROM-all /I,A /flM. OFFICE: Q 22725 Old Canal Road -Yorba Linda, C A 92887 (714)685-3900 Pacific Center Boulevard-Suite 112 - San Diego, CA 92121 (858) 450-4040 / \ American Geotechnical Q TRANSMITTAL FORM OTIELD MEMO Q INTER OFFICE MEMO Q INTRA OFFICE MEMO TO: _ DATE: FILE NO. SUBJECT: 77 /h T ZGL/fa Of ^£cucf 5 '. 6J~ CtJ n (cJ, trrtfaQ ^L^- UJf/l LukuA" MC. kej?n .^W //7 A^P^ C^L^ L rr &*£> r -v -tff kvi r\a 5 4c/bw({4ec( a bfc/ cr ne //i •/g rr OS / f ^,,, , , , ~ , &/GI i -WViT 4) (~O lo /£ yv? /Q^tn ^g 'fct ^*e*S\ CG^fgIT t~^ T FROM: »« OFFICE: Q 22725 Old Canal Road -Yorba Linda, CA 92887 (714)685-3900 Pacific Center Boulevard-Suite 112 - San Diego, CA 92121 (858) 450-4040 American Geotechnical Q TRANSMITTAL FORM Q INTER OFFICE MEMO QTFIELD MEMO a INTRA OFFICE MEMO TO:DATE:f- FILE NO. SUBJECT: 01 A. _<xejf \Jtef. -He a MC at A .kLt/S 0 -HJ f.h0H /7>/ngy <y '\AMk4eXi \AMk racket M/OS LA. mc -H^L rif /TTew Q -e f f/ff /)f&!ieJLrJL /*0 Cjj- il. T/)K fftftjIeJMiddle(/n e^^a of 4-k. 0.4 In- Lci i ,r FROM: OFFICE: Q 22725 Old Canal Road - Yorba Linda, CA 92887 (714)685-3900 Pacific Center Boulevard-Suite 112 - San Diego, CA 92121 (858) 450-4040 American Geotechnical TRANSMITTAL FORM INTER OFFICE MEMO StlELD MEMO Q INTRA OFFICE MEMO TO:DATE: ~7'ZB'O8 FILE NO. ttZ8&' 01 SUBJECT: -at FROM:f /g>^A . OFFICE: Q 22725 Old Canal Road -Yorba Linda, CA 92887 (714)685-3900 J2-5764 Pacific Center Boulevard-Suite 112 - San Diego, CA 92121 (858) 450-4040 American Geotechnical Q TRANSMITTAL FORM Q INTER OFFICE MEMO FIELD MEMO Q INTRA OFFICE MEMO TQ: SUBJECT: <FILE NO. i /"r (( arii 0 c( . ^ > ^/fw^^TAac /<» c/ i) U-J Ll A. 3,.^ - ro r^ re. - r , c 4 -,' p FROM: OFFICE: Q 22725 Old Canal Road - Yorba Linda, CA 92887 (714)685-3900 5764 Pacific Center Boulevard-Suite 112 - San Diego, CA 92121 (858) 450-4040 American Geotechnical Q TRANSMITTAL FORM Q INTER OFFICE MEMO TO: SUBJECT:<L^<^ / j -J— /"W'v n/l cf X?-j- rrr *< MEMO INTRA OFFICE MEMO DATE: FILE NO. <2L>+'~fcr yLhp , ^^f FROM: OFFICE: Q 22725 Old Canal Road - Yorba Linda, CA 92887 (714)685-3900 £3^5764 Pacific Center Boulevard-Suite 112 - San Diego, CA 92121 (858) 450-4040 r American Geotechnical Q TRANSMITTAL FORM a INTER OFFICE MEMO TO: SUBJECT:v\c< ut .77 C*OL*JC&,^. Jv^ Qf ;+gd l r&^svyjP fjT^ AFIELD MEMO Q INTRA OFFICE MEMO DATE: ~7-/6-<3g FILE NO. 7> in - "fer . 77\g. rtJA&d 7/r L. FROM: OFFICE: Q 22725 Old Canal Road - Yorba Linda, CA 92887 (714)685-3900 J3C5764 Pacific Center Boulevard-Suite 112 - San Diego, CA 92121 (858) 450-4040 J ••\ J American Geotechnical .4* Q TRANSMITTAL FORM Q INTER OFFICE MEMO TO: ^ff IELD MEMO Q INTRA OFFICE MEMO DATE: 7-/7- FILE NO. SUBJECT: <$ <^Wt ^ //Lewds/ide. /<4i/)au^ #/• nastutJk_r_r- iL, 7~-fid. ft'l/iSK fla /ruiOn .-HA u t- ler 4-ie. to- L>J\-t-re . V—#? farted a. /d /n fa tiUiJiwn't AMU / L&mnd CUAG( / yj \_ f S net . ' rtsn /, 3' ^c.for FROM:AiU4/f l-4o i* VUfc/ff. up OFFICE: Q 22725 Old Canal Road -Yorba Linda, CA 92887 (714)685-3900 Q 5764 Pacific Center Boulevard-Suite 112 - San Diego, CA 92121 (858) 450-4040 American Geotechnical -Ml Q TRANSMITTAL FORM a INTER OFFICE MEMO TO:Scr &fIELD MEMO QINTRA OFFICE MEMO DATE: 7- /£ FILE NO.O\ SUBJECT: -HK> / &"w xj m faf 7 *7 "fC GG^G(& ~ /»0<ii mas in- o/fatJ a _ •fro /?) 0 .__ ff<r \ J-/n //// r0n FROM: AA <I*JLL -Ho toll fa tied. i Co/fc AWi" OFFICE: Q 22725 Old Canal Road - Yorba Linda, CA 92887 (714)685-3900 4 Pacific Center Boulevard-Suite 112 - San Diego, CA 92121 (858) 450-4040 American Geotechnical •M Q TRANSMITTAL FORM Q INTER OFFICE MEMO TO: FIELD MEMO QINTRA OFFICE MEMO DATE: FILE NO SUBJECT:£" Ci. o b.l k , A \/ o // A\ u s r • Wv sj S "f" r o u rr ^ e. A- - - u' r^ > ^ ,/ - f A r e r ' >4 AAv <L r-( "/e.. r g, f- g FROM: ' / OFFICE: ^Q 22725 Old Canal Road - Yorba Linda, CA 92887 (714)685-3900 . 5764 Pacific Center Boulevard-Suite 112 - San Diego, CA 92121 (858) 450-4040 American Geotechnical Q TRANSMITTAL FORM Q INTER OFFICE MEMO TO: AFIELD MEMO a INTRA OFFICE MEMO DATE: FILE NO. SUBJECT:e-f- i/oft // oe>rsc*ifixi -i-lv /$ (T^ ^)(^ LOG/I.&z Tfrwd f 'foujr' tor /h n Me. farA FROM: OFFICE: Q 22725 Old Canal Road -Yorba Linda, CA 92887 (714)685-3900 Pacific Center Boulevard-Suite 112 - San Diego, CA 92121 (858) 450-4040 American Geotechnical Q TRANSMITTAL FORM Q INTER OFFICE MEMO MEMO a INTRA OFFICE MEMO TO:DATE: 7 FILE NO. 2 $ 3 84 SUBJECT:a e/ -me. -t-le !>€( rt nub Kw 4e$h< i. -teit t+fasted a be.(rr ic. FROM:zAcx1L OFFICE: Q 22725 Old Canal Road - Yorba Linda, CA 92887 (714)685-3900 ^5^5764 Pacific Center Boulevard-Suite 112 - San Diego, CA 92121 (858) 450-4040 American Geotechnical Q TRANSMITTAL FORM a INTER OFFICE MEMO AFIELD MEMO Q INTRA OFFICE MEMO TO: SUBJECT: DATE: 7~//- O8 FILE NO. ^328d>. a I -t-ho. -f-hg.gt^y -Hi x^ / FROM:-*Lhj~^*If OFFICE: Q 22725 Old Canal Road - Yorba Linda, C A 92887 (714)685-3900 4 Pacific Center Boulevard-Suite 112 - San Diego, CA 92121 (858) 450-4040 American Geotechnical Q TRANSMITTAL FORM a INTER OFFICE MEMO FIELD MEMO Q INTRA OFFICE MEMO TO:Q SUBJECT:ctv l&C S b- VsTT P CAi gftq -r yU FILE NO. f iP W/Kli>v. — <r ^ oi OFFICE: Q 22725 Old Canal Road - Yorba Linda, CA 92887 (714)685-3900 Q 5764 Pacific Center Boulevard-Suite 112 - San Diego, CA 92121 (858) 450-4040 American Geotechnical Q TRANSMITTAL FORM Q INTER OFFICE MEMO .SHIELD MEMO a INTRA OFFICE MEMO TO:DATE: 7- ? • OB FILE NO. 2,3286. oi SUBJECT:/ L FROM: t /A Ofcil /-/Q Iu>e is ^/er / OFFICE: Q 22725 Old Canal Road - Yorba Linda, CA 92887 (714)685-3900 Q 5764 Pacific Center Boulevard-Suite 112 - San Diego, CA 92121 (858) 450-4040 American Geotechnical Q TRANSMITTAL FORM a INTER OFFICE MEMO 14 FIELD MEMO Q INTRA OFFICE MEMO SUBJECT: FROM: oP Woscy -T<^ FILE (sJh o rc_<XwL.cA /\£> /| — OFFICE: Q 22725 Old Canal Road - Yorba Linda, CA 92887 (714)685-3900 Q 5764 Pacific Center Boulevard-Suite 112 - San Diego, CA 92121 (858) 450-4040 American Geotechrtical Q TRANSMITTAL FORM Q INTER OFFICE MEMO TO:C^&lso i^PlELD MEMO Q INTRA OFFICE MEMO DATE: "7- G-O8 FILE NO. P!J SUBJECT:iv\c, ^u/io/ . /+ added is- FROM:^ 901k OFFICE: Q 22725 Old Canal Road - Yorba Linda, CA 92887 (714)685-3900 Pacific Center Boulevard-Suite 112 - San Diego, CA 92121 (858) 450-4040 American Geotechnical TRANSMITTAL FORM INTER OFFICE MEMO /AFIELD MEMO 'a INTRA OFFICE MEMO FILE NO.. Q/ SUBJECT:3JEC -Iti -fo 0 /Kore." /( ~ '5" ^>K-_S j /111 ..CE^ OFFICE: Q 22725 Old Canal Road -Yorba Linda, C A 92887 (714)685-3900 Q 5764 Pacific Center Boulevard-Suite 112 - San Diego, CA 92121 (858) 450-4040 American Geotechnical Q TRANSMITTAL FORM a INTER OFFICE MEMO MEMO INTRA OFFICE MEMO TO: SUBJECT: DATE: "7- 7- FILE NO. 2,3 /iff J l . -fesk Os^d haJ / cf-L* UJtu FROM: OFFICE: a 22725 Old Canal Road -Yorba Linda, CA 92887 (714)685-3900 £3^5764 Pacific Center Boulevard-Suite 112 - San Diego, CA 92121 (858) 450-4040 American Geotechnical Q TRANSMITTAL FORM a INTER OFFICE MEMO TO: /AFIELD MEMO a INTRA OFFICE MEMO SUBJECT: <0o^r Co/t::r*^K DATE: FILE NO jf <a. ^ JIE <J^j1s<^ S/^<L fffcdvrs ^ > 31 OFFtfCE: Q 22725 Old Canal Road - Yorba Linda, CA 92887 (#14) 685-3900 Q 5764 Pacific Center Boulevard-Suite 112 - San Diego, CA 92121 (858) 450-4040 American Geotechnical Q TRANSMITTAL FORM Q INTER OFFICE MEMO &f IELD MEMO QINTRA OFFICE MEMO TO: SUBJECT: DATE: ,<.. A/& FROM: OFFICE: Q 22725 Old Canal Road - Yorba Linda, CA 92887 (714)685-3900 X0I5764 Pacific Center Boulevard-Suite 112 - San Diego, CA 92121 (858) 450-4040 American Geotechnical Q TRANSMITTAL FORM a INTER OFFICE MEMO TO:C/\ SUBJECT: \3>gu\CcJ\, SUp Hr o>yf Ju<_iL (gfuSlrg—- fl <5L vye-rJr^ MEMO INTRA OFFICE MEMO o e-fin FILE NO. 33380.0-^ jf f -Ir/ .// to K> —v OFFICE: Q 22725 Old Canal Road-Yorba Linda, CA 92887 (714)685-3900 Q 5764 Pacific Center Boulevard-Suite 112 - San Diego, CA 92121 (858) 450-4040 American Geotechnical Q TRANSMITTAL FORM Q INTER OFFICE MEMO TO:CJOL iso AFIELD MEMO Q INTRA OFFICE MEMO DATE: 7-7-08 FILE NO. ?/3P.,SQ SUBJECT: )j2G4-(\SLP h/ll nur \<OfL\L~ rolliing., our c * d&t for/wed Q<,fe.a 44^ n/g re.4-e.f4-. g / /r r?</er r . f-f- FROM: OFFICE: Q 22725 Old Canal Road - Yorba Linda, CA 92887 (714)685-3900 Q 5764 Pacific Center Boulevard-Suite 112 - San Diego, CA 92121 (858) 450-4040 American Geotechnical Q TRANSMITTAL FORM Q INTER OFFICE MEMO TO: TELD MEMO QINTRA OFFICE MEMO DATE: FILE NO. SUBJECT:Slo /l/f tUQ-A. op 44* *- vSOJ/ 4t-CJy <5"l< OFFICE: Q 22725 Old Canal Road - Yorba Linda, CA 92887 (714) 685-3900 Q 5764 Pacific Center Boulevard-Suite 112 - San .Diego, CA 92121 (858) 450-4040 J American Geotechnical •m Q TRANSMITTAL FORM Q INTER OFFICE MEMO TO: Q1FIE SUBJECT: FIELD MEMO QINTRA OFFICE MEMO DATE: "?-/- FILE NO. FROM:- •^I'rA^i (/" ' OFFICE: Q 22725 Old Canal Road -Yorba Linda, CA 92887 (714)685-3900 "5764 Pacific Center Boulevard-Suite 112 - San Diego, CA 92121 (858) 450-4040 American Geotechnical Q TRANSMITTAL FORM Q INTER OFFICE MEMO TO: FIELD MEMO Q INTRA OFFICE MEMO FILENO.a33gO.Q3. SUBJECT:.5/0 gc. a f (5 /) U) do FROM: OAT// is j'/c ye. cK / AgCa o .j" OFFICE: Q 22725 Old Canal Road - Yorba Linda, CA 92887 (714)685-3900 Q 5764 Pacific Center Boulevard-Suite 112 - San Diego, CA 92121 (858) 450-4040 American Geotechnical Q TRANSMITTAL FORM a INTER OFFICE MEMO TO: SHIELD MEMO Q INTRA OFFICE MEMO DATE: SUBJECT:rog , r>& ' f-VVfl I^WQ FILE NO. 4-f- hou* K 4 FROM: OFFICE: Q 22725 Old Canal Road - Yorba Linda, CA 92887 (714)685-3900 Q 5764 Pacific Center Boulevard-Suite 112 - San Diego, CA 92121 (858) 450-4040 American Geotechnical Q TRANSMITTAL FORM a INTER OFFICE MEMO TO: FIELD MEMO a INTRA OFFICE MEMO FILE NO. SUBJECT: .M /A 3 FROM. OFFICE: Q 22725 Old Canal Road -Yorba Linda, CA 92887 (714)685-3900 Q 5764 Pacific Center Boulevard-Suite 112 - San Diego, CA 92121 (858) 450-4040 American Geotechnical Q TRANSMITTAL FORM a INTER OFFICE MEMO TO: MEMO INTRA OFFICE MEMO DATE:- O& FILE NO. SUBJECT: FROM: OFFICE: Q 22725 Old Canal Road - Yorba Linda, CA 92887 (714)685-3900 4 Pacific Center Boulevard-Suite 112 - San Diego, CA 92121 (858) 450-4040 American Geotechnical Q TRANSMITTAL FORM a INTER OFFICE MEMO T0: AFIELD MEMO Q INTRA OFFICE MEMO SUBECT: one." "T we. ir" -fer FROM: DATE. FILE NO a. Q..U g " <• UCP Ks ' -' o>v /to m OFFICE: Q 22725 Old Canal Road - Yorba Linda, CA 92887 (714)685-3900 Q 5764 Pacific Center Boulevard-Suite 112 - San Diego, CA 92121 (858) 450-4040 American Geotechnical Q TRANSMITTAL FORM a INTER OFFICE MEMO SHIELD MEMO Q INTRA OFFICE MEMO TO:DATE: FILE NO. 13080. SUBJECT:/V <*/• m r, ra^l fef -H&. ftiatf TNL nrt{iS gv? r>& u&t. TAg./; fer -Ha "T -m? cs&ck <yn pstk'a'.OTQc/y Q+all. Yew*-f-M 4^9. JAM. >n1.4 I f\*jbz brf FROM: OFFICE: Q 22725 Old Canal Road - Yorba Linda, CA 92887 (714)685-3900 Q 5764 Pacific Center Boulevard-Suite 112 - San Diego, CA 92121 (858) 450-4040 American Geotechnical Q TRANSMITTAL FORM Q INTER OFFICE MEMO TO: SUBJECT:K AFIELD MEMO Q INTRA OFFICE MEMO DATE: FILE NO. . > '„C • /. ' j ( o /a " /n FROM:s ^ OFFICE: Q 22725 Old Canal Road -Yorba Linda, CA 92887 (714)685-3900 Q 5764 Pacific Center Boulevard-Suite 112 - San Diego, CA 92121 (858) 450-4040 American Geotechnical »m TRANSMITTAL FORM INTER OFFICE MEMO TO: [AFIELD MEMO QINTRA OFFICE MEMO DATE: FILE NO. 33*30 SUBJECT:Slop AU.. XI re-*-^fe /?> o-E 44 4 S£//" /fo/f-y-0 g -ffe. /te. e,r P 'e^ hc-*srr'*£j£ iV A-ik 4f:cU v/ ', FROM: ^ K . Jfitiy •€ >S<OV n,/ /c,c, OFFICE: Q 22725 Old Canal Road -Yorba Linda, CA 92887 (714)685-3900 Q 5764 Pacific Center Boulevard-Suite 112 - San Diego, CA 92121 (858) 450-4040 American Geotechnical Q TRANSMITTAL FORM a INTER OFFICE MEMO AFIELD MEMO Q INTRA OFFICE MEMO TO:DATE:-08 FILE NO. SUBJECT: \iA o K9 jL<*jouuL> QS natc^t: d TG irt •$ tA" v ~T"naT'or -f-ke ~ 4-/T i rr> WSLeJ, .<T/ ' t> rt(( A Octet/ Dt //I &kt2* s v • Tr FROM: JS ^A^ OFFICE: a 22725 Old Canal Road -Yorba Linda, CA 92887 (714)685-3900 Pacific Center Boulevard-Suite 112 - San Diego, CA 92121 (858) 450-4040 American Geotechnical Q TRANSMITTAL FORM a INTER OFFICE MEMO TO: C.ALS® AFIELD MEMO Q INTRA OFFICE MEMO FILE NO. SUBJECT: 5<u\.; A.,'HCy ^'-h o T" 0* j l ie, iM4*JltcL. 4 T" <\// or ^M FROM:^fc fc f ' OFFICE: Q 22725 Old Canal Road - Yorba Linda, CA 92887 (714)685-3900 Q 5764 Pacific Center Boulevard-Suite 112 - San Diego, CA 92121 (858) 450-4040 American Geotechnical Q TRANSMITTAL FORM a INTER OFFICE MEMO AFIELD MEMO a INTRA OFFICE MEMO TO: SUBJECT:j 5*7 £>fcjl>a"to. ftvj 7£' -rt* A0'--3 r^, FILE NO. a3 ^80. 03. 4V ^ l/«4° OFFICE: Q 22725 Old Canal Road -Yorba Linda, C A 92887 (714)685-3900 Q 5764 Pacific Center Boulevard-Suite 112 - San Diego, CA 92121 (858) 450-4040 American Geotechnical tm TRANSMITTAL FORM INTER OFFICE MEMO l&pIELD MEMO Q INTRA OFFICE MEMO TO: SUBJECT: FILE NO. pc /AW K^ MC.A ZQO& FROM: OFFICE: Q 22725 Old Canal Road - Yorba Linda, CA 92887 (714)685-3900 Q 5764 Pacific Center Boulevard-Suite 112 - San Diego, CA 92121 (858) 450-4040 American Geotechnical Q TRANSMITTAL FORM a INTER OFFICE MEMO TO: SUBJECT: QK ,-H AFIELD MEMO D INTRA OFFICE MEMO FILE NO. (/ M FROM:>c rJ OFFICE: Q 22725 Old Canal Road - Yorba Linda, CA 92887 (714)685-3900 Q 5764 Pacific Center Boulevard-Suite 112 - San Diego, CA 92121 (858) 450-4040 American Geotechnical Q TRANSMITTAL FORM Q INTER OFFICE MEMO Q FIELD MEMO a INTRA OFFICE MEMO TO: CA U50 DATE:/°L FILE NO. SUBJECT: /; t •*? \*L * "<•- f •• . •' i'^ *.. i JL // f • /,Y>\^ f/. ( '/^Je r ^c.-'«- *• ''' '''''AC .' /;'• A, f. pif- /i'/^/jc- .oTfo^ •/!-<•- FROM:c/ OFFICE: Q 22725 Old Canal Road -Yorba Linda, C A 92887 (714)685-3900 Q 5764 Pacific Center Boulevard-Suite 112 - San Diego, CA 92121 (858) 450-4040 American Geotechnical Q TRANSMITTAL FORM a INTER OFFICE MEMO TO: SUBJECT: I ' •• ' ' • /) /K€. FIELD MEMO INTRA OFFICE MEMO DATE:)£>, Zoo§ FILE NO. & or -4o /a ^M.o. c/J Wtf FROM:P.. OFFICE: a 22725 Old Canal Road -Yorba Linda, CA 92887 (714)685-3900 Q 5764 Pacific Center Boulevard-Suite 112 - San Diego, CA 92121 (858) 450-4040 American Geotechnical Q TRANSMITTAL FORM Q INTER OFFICE MEMO TO: /AFIELD MEMO Q INTRA OFFICE MEMO FILE NO. 333^0' 411 SUBJECT: JT fi j K v. iv\..t A iX K . /1 <r> }K r J A, fC-A.. FROM: OFFICE: Q 22725 Old Canal Road - Yorba Linda, C A 92887 (714)685-3900 Q 5764 Pacific Center Boulevard-Suite 112 - San Diego, CA 92121 (858) 450-4040 American Geotechnical, Inc. SOIL, FOUNDATION AND GEOLOGIC STUDIES APPENDIX G - SITE PHOTOGRAPHS 22725 Old Canal Road, Yorba Linda, CA 92887 - (714) 685-3900 - FAX (714) 685-3909 5764 Pacific Center Blvd., Suite 112, San Diego, CA 92121 (858) 450-4040 - FAX (858) 457-0814 712 Fifth Street, Suite B, Davis, CA 95616 - (530) 758-2088 - FAX (530) 758-3288 5600 Spring Mountain Road, Suite 201, Las Vegas, NV 89146 - (702) 562-5046 - FAX (702) 562-2457 Project: 23280-01 Roll: 22 Serial: 13 Frame: 13 Photographer: B. Day Date Taken: 2008-06-27 Address: La Costa Condominiums Slope failure at west side of repair. Project: 23280-01 Roll: 22 Serial: 14 Frame: 14 Photographer: B. Day Date Taken: 2008-06-27 Address: La Costa Condominiums Slope failure at center of back-cut. I Project: 23280-01 Roll: 22 Serial: 55 ;: 55 Photographer: B. Day Date Taken: 2008-06-27 Address: La Costa Condominiums Slope failure at center of back-cut. Project: 23280-01 Roll: 22 Serial: 56 Frame: 56 Photographer: B. Day Date Taken: 2008-06-27 Address: La Costa Condominiums Slope failure at center of back-cut. Project: 23280-01 Roll: 22 Serial: 57 Frame: 57 Photographer: B. Day Date Taken: 2008-06-27 Address: La Costa Condominiums Slope failure at center of back-cut. Project: 23280-01 Roll: 22 Serial: 58 Frame: 58 Photographer: B. Day Date Taken: 2008-06-27 Address: La Costa Condominiums Slope failure at center of back-cut. Project: 23280-01 Roll: 27 Serial: 7 Frame: 7 Photographer: 3. Sprey Date Taken: 2008-06-29 Address: La Costa Condominiums Slope failure at center of back-cut. Project: 23280-01 Roll: 27 Serial: 8 Frame: 8 Photographer: J. Sprey Date Taken: 2008-06-29 **• Address: La Costa Condominiums Slope failure at east side of repair.