Loading...
HomeMy WebLinkAboutCT 02-28; La Costa Condominiums; Slope Compaction Requirements; 2010-12-09VeyifBl Testing Engineers - Vertical Five Geotschnicat, Consf/udion Inspection & Mafeifate Tesffng Consufiante December 9. 2010 Contract No.: 148513.32 Mr. Frank Jimeno, P.E. City of Carisbad Public Worl<s - Engineering Division 1635 Faraday Avenue Carisbad, CA 92008 Subject: Third-Party Review of Slope Compaction Requirements, Proposed La Costa Condominiums, Carlsbad, Caiifornia References: 1. "Compaction Requirements for Slope Reconstruction, Proposed La Costa Condominiums. Lot 185, La Costa Avenue South - Unit 1, Carlsbad Tract No. 02-28, Carisbad, California", prepared by American Geotechnica! inc., File No. 23280-12. dated October 21, 2010. 1. "Alternate Landslide Remedial Recommendations, Proposed La Costa Condominiums, Lot 185, La Costa Avenue Soutii - Unit 1, Carlsbad Tract No. 02-28, Carisbad, California", prepared by American Geotechnical Inc., File No. 23280.01, dated March 11, 2009. Dear IVIr. Jimeno: As requested Testing Engineers - Vertical Five (TE), has performed a geotechnical review of the subject slope compaction requirements as presented in reference 1. The purpose of the review was to provide an opinion on whether the geotechnical aspects of the project been identified and appropriately addressed in the project geotechnical documents. This letter presents the results of our third-party review. Our review is based on geotechnical data presented in the project geotechnical documents and our professional judgment. We have not performed subsurface investigation, laboratory testing or independent geotechnical analysis for the project. Results of Review In the above referenced letter (reference 1). the project geotechnical consultant has recommended that the earthwork compaction requirements for graded slopes be reduced from a minimum of 90% relative compaction (based on ASTM D-1557) to a minimum of 85%. The referenced letter does not provide revised stability calculations or the results of laboratory tests of samples of the onsite soils with which to base the revised compaction recommendations. Based on the results of our third-party review, it is our opinion that there are geotechnicaliy-related issues that should be addressed by the project geotechnical consultant Our enumerated comments relating to the reduced slope compaction recommendations are presented as follows: 1. The original slope stability analyses for the slope construction assumed that fill would be compacted to a minimum of 90% relative compaction (ASTM D-1557). Those analyses used assumed soil strength and unit weight factors associated with onsite fill soils compacted to 90%. Fill soils compacted to 85% relative compaction would have 7895 Convoy Court. Suite 18, San Dlego, OA 92111 + Phone (858) 715-5800; Fax (858) 715-5810 + www.Verllcal-V.com A subsidiary of Vertical Five, inc. - Offices Nationwide Proposed La Costa Condominium Project Cartlsbad, California Proposal No.: 3802.10.235 lower shear strength parameters and by definition lower unit weight than the same soils compacted to 90%. It is our opinion that the geotechnical consultant should comment on the reduction in assumed soil strength and unit weight associated with the revised compaction recommendations. The consultant's comments should be based on results of laboratory shear tests on samples of the onsite soils remolded to 85% relative compaction. The consultant should also provide revised slope stability analyses for the project that use the reduced soil strength and unit weight values. The analyses should also reflect any revisions in the buttress or finished slope geometries. It is our opinion that the manufacturer of the geogrids used in the slope reconstruction should comment on the applicability/suitability of the use of their product in slopes where soil compaction is less than 90%. Testing Engineers - Vertical Five appreciates being of service to you in this matter. If you have any questions or require additional information, please do not hesitate to contact either of the undersigned at (858) 715-5800. Respectfully submitted, Testing Enginbers - Vertical Cailos E. Acero, RCE Project Engineer Gene Custenborder, CEG Principal Engineering Geologist CA/GC:ws Distribution: (1) Addressee (via e-mail) V^cst f-ggj/^g Engineers - Veriical Five