HomeMy WebLinkAboutCT 03-01-03; LA COSTA RESORT & SPA PHASE 3; GEOTECHNICAL UPDATE; 2006-03-28Sladden Engineering u/o^^s3</^oooi /pc^f^ ^73/
6782 Stanton Avenue, Suite A, Buena Park, CA 90621 (714) 523-0952 Fax (714) 523-1369
114 South Caiifomla Avenue, Beaumont, CA 92223 (951) 845-7743 Fax (951) 951-845-8803
39-725 Garand Lane.. Suite G, Palm Desert, CA 92211 (760) 772-3893 Fax (760) 772-3895
March 28,2006 Project No. 444-3161
06-03-308
G Companies Construction, Inc.
1107 Quail Street
Newport Beach, Califomia 92660
Subject: Geotechnical Update
Project: Planning Area 2 Resort Villas
La Costa Resort & Spa
Costa Del Mar Road
Carlsbad, Califomia
Ref: Geotechnical Investigation Report prepared by Sladden Engineering dated
November 11,2004, Project No. 444-3161, Report No. 03-10-183.
As requested, we have reviewed the referenced Geotechnical Investigation report as it relates to
the design and cor\stmction of the resort villas complex proposed for Plarming Area 2 of the La
Costa Resort and Spa campus. Planning area 2 is located just north of the ballroom facility at the
La Costa Resort and Spa in the City of Carlsbad, Califomia. The proposed resort villas building
will include a subterranean parking level.
The referenced Geotechnical Investigation report includes recommendations for the design and
construction of the resort residential units including subterranean paridng levels. Based upon
our review of the referenced report, our involvement throughout the grading and construction of
the adjacent La Costa facilities and our recent site observations, it is our opinion that the
reconmiendations included in the above referenced report remain applicable for the proposed
Planning Area 2 resort residential units.
Because the excavation required to attain the subterranean parking level will result in the
removal of the potentially expansive surface soil, it is our opinion that foundations may be
designed in accordance with "very low" expansion category design criteria. Footings should
extend at least 18 inches beneath lowest adjacent grade. Isolated square or rectangular footings at
least 2 feet square may be designed using an allowable bearing value of 2500 poimds per square
foot. Continuous footings at least 12 inches wide may be designed using an allowable bearing
value of 2000 pounds per square foot. Allowable increases of 200 psf for each additional 1 foot of
width and 250 psf for each additional 6 inches of depth may be utilized if desired. The maximum
allowable bearing pressure should be 3000 psf. The allowable bearing pressures are for dead and
frequently applied live loads and may be increased by 1/3 to resist wind, seismic or other
transient loading.
March 31,2006 -2- Project No. 444-3161
06-03-308
The recommendations made in the preceding paragraph are based on the assumption that all
footings will be supported by properly compacted soils. Prior to the placement of the reinforcing
steel and concrete, we recommend that the footing excavations be inspected in order to verify
that they extend into the firm compacted soils and are free of loose and disturbed materials.
Settlements may result from the antidpated foundation loads. These estimated ultimate
settlements are calculated to be a maximum of 1 inch when using the recommended bearing
values. As a practical matter, differential settlements between footings can be assumed as one-
half of the total settlement. These elastic settlements are expected to occur during constiruction.
Proper compaction of die backfill soil adjacent to basement walls will be critical to limit potential
differential settlement of foundatior\s and slabs constructed adjacent to basement walls.
Resistance to lateral loads may be provided by a combination of friction acting at the base of the
slabs or foundations and passive earth pressure along tiie sides of tiie foundations. A coefficient
of friction of 0.40 between soil and concrete may be used for dead load forces only. A passive
earth pressure of 250 pounds per square foot, per foot of deptii, may be used along tiie sides of
footings that are poured against properly compacted native or approved import soils.
Basement walls and retaining walls will be required to accomplish tiie proposed constmction.
Cantilever retaining walls may be designed using "active" pressures. Active pressures may be
estimated using an equivalent fluid weight of 40 pcf for native backfill soils witii level free-
draining backfill conditions. For walls tiiat are resfarained, "at rest" pressures should be utilized
in design. At rest pressures may be estimated using an equivalent fluid weight of 60 pcf. Walls
should be provided with adequate waterproofing and drainage.
It is our opinion that the remedial grading recommended in tiie referenced report remains
appropriate. The remedial grading should include over-excavation of the surface soils and the
primary foundation bearing soil within the building areas.
The foundation areas should be cleared of any surface vegetation prior to grading. In order to
provide for firm and uniform fovmdation support, we recommend over-excavation and
recompaction. The foundation areas should be over-excavated to a depth of at least 3 feet below
existing grade or 2 feet below tiie bottom of tiie footings, whichever is deeper. The exposed
surface should then be scarified, moisture conditioned and compacted to a minimum of 90
percent relative compaction. The previously removed soils and fill material may then be placed
in thin lifts and compacted to at least 90 percent relative compaction.
It should be noted that the site is located witiiin a seismically active area of Southem Califomia
and it is likely tiiat the proposed stmctures will experience strong ground shaking as a result of
an earthquake event along one of the faults in the region during tiie expected life of tiie
development. As a minimum, stmctures should be designed based upon Seismic Zone 4 design
criteria included in tiie Uniform Building Code (UBC). The potential for liquefaction or otiier
geologic/seismic hazards occurring at the site is considered to be negligible.
Sladden Engineering
March 31,2006 -3-Project No. 444-3161
06-03-308
We appreciate the opporhanity to provide service to you on tiiis project, if you have any
questions regarding tiiis letter or the referenced reports please contact tiie undersigned.
Respectfully submitted,
SLADDENENGINEERING
Brett L. Anderson
Principal Engineer
SER/pc
Copies: 4/G Companies Constmction, Inc.
Sladden Engineering
March 31, 2006 -4-Project No. 444-3161
06-03-308
1997 UNIFORM BUILDING CODE INFORMATION
The Intemational Conference of Building Officials 1997 Uniform Building Code contains
substantial revisions and additions to the earthquake engineering section in Chapter 16.
Concepts contained in the updated code that will be relevant to construction of the proposed
stmctures are summarized below.
Ground shaking is expected to be the primary hazard most likely to affect the site, based upon
proximity to significant faults capable of generating large earthquakes. Major fault zones
considered to be most likely to create strong groimd shaking at the site are listed below.
Fault Zone
Approximate Distance
From Site
Fault Type
(1997 UBC)
Newport - Inglewood 16.8 km B
Rose Canyon Fault 8.8 km B
Based on our field observations and understanding of local geologic conditions, the soil profile
type judged applicable to tiiis site is SD, generally described as stiff or dense soil. The site is
located within UBC Seismic Zone 4. The following table presents additional coefficients and
factors relevant to seismic mitigation for new constmction upon adoption of the 1997 code.
Seismic
Source
Near-Source
Acceleration
Factor, Na
Near-Source
Velocity
Factor, Nv
Seismic
Coefficient
Ca
Seismic
Coefficient
Cv
Newport
Inglewood 1.0 1.0 0.44 Na 0.64 Nv
Rose Canyon
Fault 1.0 1.05 0.44 Na 0.64 Nv
Sladden Engineering
GEOTECHNICAL INVESTIGATION
PROPOSED RESORT VILLAS
LA COSTA RESORT & SPA
COSTA DEL MAR ROAD
CAKLSBAD, CALIFORNIA
-Prepared By-
Sladden Engineering
39-725 Garand Lane, Suite G
Palm Desert, California 92211
(760)772-3893
Sladden Engineering
6782 Stanton Ave., Suite A, Buena Park, CA 90621 (714) 523-0952 Fax (714) 523-1369
39-725 Garand Ln., Suite G, Palm Desert, CA 92211 (760) 772-3893 Fax (760) 772-3895
November 11, 2003 ProjectNo. 444-3161
03-10-183
La Costa Resort and Spa
KSL Development Corporation
2100 Costa Del Mar Road
Carlsbad, California 92009
Attention: Mr. Chevis Hosea
Project: Proposed Resort Villas
La Costa Resort & Spa
2100 Costa Del Mar Road
Carlsbad, California
Subject: Geotechnical Investigation
Presented herewith is the report of our Geotechnical Investigation prepared for the new resort villas
proposed for the La Costa Resort & Spa complex located at 2100 Costa Del Mar Road in the City of
Carlsbad, California. The preliminary plans indicate that the proposed resort villas will consist of 2
or 3 story structures with subterranean parking levels. This report was prepared in order to pro-vide
recommendations for design and construction of the proposed building foundations.
This report presents the results of our field investigation and laboratory testing along with
conclusions and recommendations for design and construction. This report completes our agreed
upon scope of services as described in our proposal dated July 30, 2003.
We appreciate the opportunity to provide service to you on this project. If you have any questions
regarding this report, please contact the vmdersigned
Respectfiilly submitted,
SLADDEN ENGI
Copies: 6/La Costa Resort and Spa
GEOTECHNICAL INVESTIGATION
PROPOSED RESORT VILLAS
LA COSTA RESORT & SPA
COSTA DEL MAR ROAD
CARLSBAD. CALIFORNIA
November 11, 2003
TABLE OF CONTENTS
INTRODUCTION 1
SCOPE OF WORK 1
PROJECT DESCRIPTION "' ' 1
REGIONAL SEISMICITY 2
LIQUEFACTION 2
SUBSURFACE CONDITIONS 2
CONCLUSIONS AND RECOMMENDATIONS '"Z". 3
Foundation Design 4
Settlements 4
Lateral Design 4
Retaining Walls 4
Expansive Soils 4
Concrete Slabs-on-Grade 5
Soluble Sulfates 5
Tentative Pavement Design 5
Shrinkage and Subsidence 6
General Site Grading 6
1. Clearing and Demohtion 6
2. Preparation of Building and Foundation Areas 6
3. Placement of Compacted Fill 6
4. Preparation of Slab and Pavement Areas 7
5. Testing and Inspection 7
GENERAL ZZ^ZZZZZ^Z. 7
APPENDIX A - Site Plan & Boring Logs
Field Exploration
APPENDIX B - Laboratory Testing
Laboratory Test Results
APPENDIX C - 1997 UBC Seismic Design Criteria
Sladden Engineering
November 11, 2003 -1- Project No. 444-3161
03-10-183
INTRODUCTION
This report presents the results of a Geotechnical Investigation performed in order to provide
recommendations for the design and construction of the proposed resort -villas and the various
associated site improvements. The La Costa Resort & Spa is located on the northeast corner of El
Camino Real and Costa Del Mar Road in the City of Carlsbad, California. It is proposed to construct
several multi-unit resort/residential buildings within the central portion of the La Costa Resort and
Spa complex. It is our understanding that the proposed resort villas will consist of 2 or 3 story
structures with subterranean parking levels. The plans indicate that the project wiU include
reconfigured driveways, walkways and parking areas and other related site improvements. A
preliminary site plan provided by the KSL Development Corporation was used during our
investigation.
SCOPE OF WORK
The purpose of our investigation was to determine certain engineering characteristics of the near
surface soils on the site in order to develop recommendations for foundation design and site
preparation. Our investigation included field exploration, laboratory testing, Hterature review,
engineering analysis and the preparation of this report. Evaluation of hazardous wastes was not
within the scope of services provided. Our investigation was performed in accordance with
contemporary geotechnical engineering principles and practice. We make no other warranty, either
express or impUed.
PROJECT DESCRIPTION
The La Costa Resort and Spa complex is located on the northeast corner of El Camino Real and
Costa Del Mar Road in the City of Carlsbad, CaUfornia. The proposed project wiU include the
construction of 11 resort/residential buildings along with various associated site improvements. The
associated improvements wiU include reconfigured walkways, driveways and parking areas,
landscaped areas and underground utiUties.
It is our understanding that the proposed resort/residential buildings will be of relatively Ughtweight
wood-frame and/or steel frame construction and wiU include subterranean parking levels. The
proposed resort/residential buildings will be supported by conventional shaUow spread footings and
concrete slabs on grade. Based upon preliminary foundation loading information pro-vided by KSL,
we assumed isolated column loads of up to 100 kips and waU loads of up to 5.0 kips per Unear foot for
the resort -viUas buildings. We also assumed isolated column loads of up to 50 kips and wall loads of
up to 3.0 kips per Unear foot for the proposed spa building. Grading is assumed to include
excavation for the proposed subterranean parking levels along with cutting and filUng of the surface
soils to construct level building pads and to provide for proper site drainage.
The proposed resort viUas wiU be constructed within the central portion of the La Costa Resort and
Spa complex in the vicinity of the new spa and ballroom buildings. The majority of the proposed
resort -viUas locations are concentrated within existing landscape areas but some existing structures
and improvements wUl be removed to accommodate the new buildings. The proposed building sites
and adjacent areas slope gently downward towards the south but some areas include irregular
topography related to pre-vious grading and landscaping. There are several existing buildings in the
area including the new baUroom and spa buildings as well as several older structures. There are
numerous underground utiUties servicing the existing buildings and transecting the new building
areas.
OI_JJ 17 !
November IL 2003 -2- Project No. 444-3161
03-10-183
REGIONAL SEISMICITY
A computer program was utiUzed to compile data related to earthquake fault zones in the region and
related seismic acti-vity that may affect the site. E.Q. Fault Version 3.00 (Blake 2000) provides a
compilation of data related to earthquake faults in the region. The program searches available
databases and provides both distances to causitive faults and the corresponding accelerations that
may be experienced on the site due to earthquake activity along these faults. The attenuation
relationship utilized for this project was based upon Boore (1997) attenuation curves. The output
data from this program is included in Appendix C. The information generated was utiUzed in our
liquefaction evaluation
As indicated on the summary page ofthe E.Q. Fault output data, the Rose Canyon fault is the closest
to the site (approximately 8.8 kilometers). The Newport-Inglewood (offshore) fault is located
approximately 16.8 kilometers west of the site. The maximum site acceleration is estimated to be
0.332g. This acceleration is based upon a maximum event of magnitude 6.9.
LIQUEFACTION
Liquefaction occurs with sudden loss of soil strength due to rapid increases in pore pressures within
cohesionless soils as a restdt of repeated cycUc loading during seismic events. Several conditions
must be present for Uquefaction to occur including! the presence of relatively shaUow groundwater,
generaUy loose soils conditions, the susceptibiUty of soils to Uquefaction based upon grain-size
characteristics and the generation of significant and repeated seismicaUy induced ground
accelerations. Liquefaction affects primarily loose, uniform grained cohesionless sands with low
relative densities.
As previously indicated the soils underlying the site consist primarily of a thin layer of sUty clays
and clayey sUts overlying dense sUty sands. Grovmdwater was encountered at varying depths within
several of our borings. The variable groundwater depths suggest that the water encountered
perched may be perched groundwater concentrated within more permeable silty sand and silt layers
. Based upon the prominence of non-Uquefiable sUts and clays and the dense conditions of the silty
sand layers, it is our opinion that the potential for Uquefaction occurring beneath the site is
neghgible.
SUBSURFACE CONDITIONS
The site soUs consist primarUy of a surface layer of sUty clays and clayey sands overlying native silty
sands, sandy sUts, sUty clays and clayey sUts. Silty clays and clayey sands were encountered within
the upper 5 to 10 feet within the majority of ovu: borings. The near surface sUty clay layers were
underlain primarUy by dense sUty sand, sandy sUt and sUty clay layers. The site soUs appeared
fairly consistent in composition but very iaconsistent in stratigraphy due to the varying grades
across the site.
The native soUs underlying the site were found to be firm throughout the depth of each of our
borings. The relatively undisturbed samples obtained indicated dry density varying from 93 to 123
pcf. Sampler penetration resistance indicates that density within the underlying native soUs
generaUy mcreases with depth. The soUs were found to be moist throughout the depth of our borings
but some nearly saturated soils were encountered. Laboratory testing indicates moisture content
varying from 1.0 to 37.0 percent.
cr» IJ c :
November 11, 2003 -3- Project No. 444-3161
03-10-183
Laboratory testing indicates that the surface soUs consist primarily of sUty clays that were found to
be moderately expansive. Expansion testing indicates an expansion index of 81 for the silty clays
that faUs within the "medium" expansion category in accordance with the Uniform BuUding Code
classification system. ConsoUdation testing indicates that the majority of the site soils are
susceptible to only minor consolidation and/or compression related settlements.
Groundwater was encountered within several of our borings at depths as shallow as 9 feet below the
existing groimd surface. The lack of groundwater within several of our borings suggests that the
groundwater encountered was perched groundwater concentrated within more permeable layers.
The possible presence of groundwater should be considered in foundation design and may impact
construction.
CONCLUSIONS AND RECOMMENDATIONS
Based upon our field investigation and laboratory testing, it is our opinion that the proposed resort
residential vUlas are feasible from a soil mechanic's standpoint provided that the recommendations
included in this report are considered in buUding foundation design and site preparation. Due to the
somewhat inconsistent condition of the near surface soUs and the possibUity of cut/fiU transitions in
some of the proposed buUding areas, remedial grading including overexcavation and recompaction of
the primary foundation bearing soUs is recommended. It is our opinion that remedial grading within
the proposed building areas should include the removal and recompaction of any compressible
surface soUs as weU as the primary foundation bearing soUs. Specific recommendations for site
preparation are presented in the Site Grading section of this report.
Groundwater was encountered within several of our borings at depths as shaUow as 9 feet below the
existing ground surface. Due to the dense condition of the sandy soUs underljdng the site, the
potential for Uquefaction affecting the site is considered to be neghgible. In our opinion, Uquefaction
related mitigation measures in addition to the site grading and foundation design recommendations
included in this report should not be necessary.
The site is located in a seismicaUy active area as is aU of Southern California. Design professionals
should be aware of the site setting and the potential for earthquake activity during the anticipated
life of the structure should be acknowledged. The accelerations that may be experienced on the site
(as previously discussed) should be considered in design. Seismic design parameters as outhned in
the 1997 UBC are summarized in Appendix C.
Caving did not occur within our borings but the potential for ca-ving should be considered within
deeper excavations. AU excavations should be constructed in accordance with the normal CalOSHA
excavation criteria. On the basis of our observations of the materials encountered, we anticipate
that the near surface clayey sUts and sUty sands wiU be classified by CalOSHA as Type B and Type
C soUs, respectively. Soil conditions should be verified in the field by a "Competent person"
employed by the Contractor.
The surface soils encountered during our investigation were found to be moderately expansive.
Laboratory testing indicated an Expansion Index of 81 for the near surface sUty clays and clayey
sUts which corresponds with the "medium" expansion category in accordance with UBC Standard 18-
2. Special expansive soU design criteria as outUned in the Uiuform BuUding Code should not be the
controlling factor m the design of foundations and slabs on grade for this project but should be
considered in design.
Ct^AJ^... TP
November 11, 2003 -4- Project No. 444-3161
03-10-183
The foUowing recommendations present more detaUed design criteria that have been developed on
the basis of our field and laboratory investigation.
Foundation Design: The results of our investigation indicate that either conventional
shaUow continuous footings or isolated pad footings that are supported upon properly
recompacted soUs, may be expected to provide satisfactory support for the proposed
residential structure foundations.
Footings should extend at least 18 inches beneath lowest adjacent grade. Isolated square or
rectangular footings at least 2 feet square may be designed using an aUowable bearing
pressure of 2500 pounds per square foot. Continuous footings at least 12 inches wide may be
designed using an aUowable bearing value of 2000 pounds per square foot. The allowable
bearing pressures may be increased by 200 psf for each additional one foot of width and 250
psf for each additional 6 inches of depth, if desired. The maximum aUowable bearing
pressure should be 3000 psf.
The aUowable bearing pressures are for dead and frequently appUed Uve loads and may be
increased by 1/3 to resist wind, seismic or other transient loading. Drainage firom the
buUding area should be rapid and complete.
The recommendations pro-vided in the preceding paragraph are based on the assumption that
all footings wUl be supported upon properly compacted soU. All grading should be performed
under the testing and inspection of the SoUs Engineer or his representative. Prior to the
placement of concrete, we recommend that the footing excavations be inspected in order to
verify that they extend into compacted soU and are free of loose and disturbed materials.
Settlements: Settlements resulting from the anticipated foundation loads and fUl placement
are expected to be mimmal. We estimate that ultimate settlements should be less than one
inch when using the recommended foundation bearing values. As a practical matter,
differential settlements between footings can be assumed as one-half of the total settlement.
Lateral Design: Resistance to lateral loads can be pro-vided by a combination of friction
acting at the base of the slabs or foundations and passive earth pressure along the sides of
the foundations. A coefficient of friction of 0.40 between soU and concrete may be used with
dead load forces only. A passive earth pressure of 250 pounds per square foot, per foot of
depth, may be used for the sides of footings that Eire poured against properly compacted
native soUs. Passive earth pressure should be ignored within the upper 1 foot except where
confined (such as beneath a floor slab).
Retaining WaUs: Retaining waUs wUl be necessary to accompUsh the proposed construction.
Lateral pressures for use in cantUever retaining waU design may be estimated using an
equivalent fluid weight of 40 pcf for level drained native backfill conditions. For waUs that
are to be restrained at the top (such as the subterranean parking level waUs), the equivalent
fluid weight should be increased to 60 pcf for level drained native backfiU conditions.
Backdrains should be provided for the fuU height of the waUs. The recommended lateral
pressures should also be appUcable for use in the design of temporary shoring systems, if
required
Expansive Soils: Due to the presence of "medium" expansion category soUs near the surface
throughout the majority of the site, special expansive soU design criteria should be
considered in the design of foundations and concrete slabs-on-grade. Due to the somewhat
variable conditions, expansion potential should be reevaluated after grading.
OJ t J ?— !
November 11, 2003 -5- Project No. 444-3161
03-10-183
Concrete Slabs-on-Grade: AU surfaces to receive concrete slabs-on-grade should be underlain
by a minimum compacted fill thickness of 12 inches, placed as described in the Site Grading
Section of this report. Where slabs are to receive moisture sensitive floor coverings or where
dampness of the floor slab is not desired, we recommend the use of an appropriate vapor
barrier or an adequate capiUary break. Vapor barriers should be protected by sand in order
to reduce the possibUity of puncture and to aid in obtaining uniform concrete curing.
Reinforcement of slabs-on-grade in order to resist expansive soil pressures wUl lUcely be
necessary. Slab reinforcement wUl also have a beneficial effect in containing cracking due to
concrete shrinkage. Temperature and shrinkage related cracking should be anticipated in
all concrete slabs-on-grade. Slab reinforcement and the spacing of control joints should be
determined by the Structural Engineer based upon post-grading expansion test results.
Soluble Sulfates: The soluble sulfate concentrations of the surface soils were determined to
be 774 and 1832 parts per milUon (ppm) which is considered potentiaUy corrosive with
respect to concrete. The use of Type V cement and specialized sulfate resistant concrete mix
designs may be necessary. The soluble sulfate content of the surface soUs should be
reevaluated after grading and appropriate concrete mix designs should be determined based
upon post-grading test results.
Tentative Pavement Design: AU paving should be underlain by a minimum compacted fill
thickness of 12 inches (excluding aggregate base). This may be performed as described in the
Site Grading Section of this report. Based upon the surface soU conditions observed, an R-
Value of approximately 30 is expected. Based upon a design R-Value of 30, a preliminary
pavement design section of 3.0 inches of asphalt on 6.0 inches of Class 2 base material is
recommended for parking areas and areas Umited to auto and Ught truck traffic (Traffic
Index = 5.0). In driveway areas and areas where hea-vy truck traffic is expected (Traffic
Index = 6.5), the pavement section should be increased to 4.0 inches of asphalt on 6.0 inches
of base material.
Pavement should be confined by curbs. Subgrade should be compacted to at least 90 percent
and base material should be compacted to at least 95 percent of maximum density. Final
design for asphalt pavement should be based upon R-Value testing performed after rough
grading.
Aggregate base should conform to the requirements for Class 2 Aggregate Base in Section 26
of CalTrans Standard Specifications, January, 1992. Asphaltic concrete should conform to
Section 39 of the CalTrans Standard Specifications. The recommended sections should be
provided with a uniformly compacted subgrade and precise control of thickness and
elevations during placement. Drainage from paved areas should be rapid and complete. It
should be noted that the pavement sections recommended above are minimum sections, if
heavfly loaded vehicles are expected to cross automobUe parking and dri-ving areas, thicker
pavement sections should be considered in these locations.
Pavement design sections are tentative and should be confirmed at the completion of site
grading when the subgrade soUs are in-place. This wiU include sampUng and testing of the
actual subgrade sofls and an analysis based upon the specific use.
November 11, 2003 -6- Project No. 444-3161
03-10-183
Shrinkage and Subsidence: Volumetric shrinkage of the material that is excavated and
replaced as controUed compacted fill should be anticipated. We expect that the shriiUcage
could vary from 10 to 15 percent. Subsidence of the surfaces that are scarified and
compacted should be between 1 and 2 tenths of a foot. This wUl vary depending upon the
type of equipment used, the moisture content ofthe soU at the time of grading and the actual
degree of compaction attained durmg grading. These values for shrmkage and subsidence
are exclusive of losses that wiU occur due to the site clearing, buUding demoUtion and the
removal of unsuitable materials.
General Site Grading: All grading should be performed in accordance with the grading
ordinance of the City of Carlsbad, CaUfornia. The foUowing recommendations have been
developed on the basis of our field and laboratory testing:
1. Clearing and DemoUtion: Proper clearing wUl be very important. AU previous
pavements, slabs, foundations, trees and the associated root systems should be
removed from the buUding areas. Underground utUities should also be removed from
the buUdmg areas. SoUs that are disturbed during site clearing and demohtion
operations should be removed and replaced as controUed compacted fill under the
direction of the SoUs Engineer.
2. Preparation of Building and Foimdation Areas: The remedial grading recommended
should include the overexcavation and recompaction of any compressible surface soUs
as weU as the primary foundation bearing sofls in order to pro-vide uniform
foundation support. Removals within the buUding areas should extend to a
minimum depth of 3 feet below existing grade or 3 feet below the bottom of the
footings, whichever ia deeper.
Subsequent to excavation, the exposed sofls should be scarified to a depth of 1-foot,
moisture conditioned and recompacted to at least 90 percent relative compaction!
Once cleaned of unsuitable material, the excavated sofls may then be replaced as
controUed compacted fiU.
3. Placement of Compacted FUl: PiU materials consisting of on-site soUs or approved
import soUs should be spread in shaUow Ufts at near optunum moisture content and
compacted to a mmimum of 90 percent relative compaction. Imported fiU material
shaU be of equal or greater quaUty than the native surface soils. The contractor shaU
notify the SoUs Engineer at least 48 hours in advance of importuig soUs in order to
provide sufficient time for the evaluation of proposed import materials. The
contractor shaU be responsible for deUvering material to the site that complies with
the project specifications. Approval by the SoUs Engineer wUl be based upon
material deUvered to the site and not the preUminary evaluation of import sources.
Our observations of the material encountered during our investigation indicate that
compaction wUl be most readUy obtauied by means of heavy rubber tu-ed grading
equipment and sheepsfoot compactors. A uniform and near optimum moisture
content should be maintained during fiU placement and compaction.
November 11, 2003 -7- Project No. 444-3161
03-10-183
4. Preparation of Slab and Paving Areas: AU surfaces to receive asphalt or concrete
paving and exterior concrete slabs-on-grade should be underlain by a mimmum
compacted fUl thickness of 12 inches. This may be accompUshed by a combination of
overexcavation, scarification and recompaction of the surface soUs, and the
placement of the excavated material as compacted enguieered fiU. Compaction of the
concrete slab areas should be to a minimum of 90 percent relative compaction
Compaction within the proposed pavement areas should be to a minimum of 95
percent relative compaction.
5. Testing and Inspection: During grading tests and observations should be performed
by the SoUs Engineer or his representative in order to verify that the grading is being
performed in accordance with the project specifications. Field density testing shaU
be performed in accordance with applicable ASTM test standards. The minimum
acceptable degree of compaction shall be 90 percent of the maximum dry density as
obtained by the ASTM D1557-91 test method. Where testing indicates insufficient
density, additional compactive effort shall be appUed untU retesting indicates
satisfactory compaction.
GENERAL
The fmdings and recommendations presented in this report are based upon an mterpolation of the
soU conditions between boruig locations and extrapolation of these conditions throughout the
proposed buUding area. Should conditions encountered during grading appear different than those
indicated in this report, this office should be notified.
This report is considered to be appUcable for use by La Costa Resort and Spa for the specific site and
project described herein. The use of this report by other parties or for other projects is not
authorized. The recommendations of this report are contingent upon monitoring of the grading
operations by a representative of Sladden Engineermg. AU recommendations are considered to be
tentative pending our review of the graduig operations and additional testing, if indicated. If others
are employed to perform any soU testmg, this office should be notified prior to such testing in order
to coordmate any required site visits by our representative and to assure indemnification of Sladden
Engineering.
We recommend that a pre-job conference be held on the site prior to the initiation of site grading
The purpose of this meeting wfll be to assure a complete understanding of the recommendations
presented m this report as they apply to the actual grading performed.
APPENDIXA
Site Plan
Borings Logs
Sladden Engineering
APPENDIXA
FIELD EXPLORATION
For our field investigation, 11 exploratory borings were excavated on September 3 and 4, 2003, using
a truck mounted hoUow stem auger rig (Mobile B6l). The approximate boring locations are
indicated on the site plan included in this appendix. Continuous logs of the materials encountered
were prepared during drUUng by a representative of Sladden Engineering. Boring logs are included
in this appendix.
Representative undisturbed samples were obtained within our borings by driving a thin-waUed steel
penetration sampler (CaUfornia spUt spoon sampler) or a Standard Penetration Test (SPT) sampler
with a 140-pound hammer dropping approximately 30 inches (ASTM D1586). The number of blows
required to drive the samplers 18 inches was recorded in 6-inch increments and blowcounts are
indicated on the boring logs.
The California samplers are 3.0 inches in diameter, carrying brass sample rings having inner
diameters of 2.5 inches. The standard penetration samplers are 2.0 inches in diameter with an inner
diameter of 1.5 inches. Undisturbed samples were removed from the sampler and placed in moisture
sealed containers in order to preserve the natural soil moisture content. Bulk samples were obtained
from the excavation spoUs and samples were then transported to our laboratory for further
observations and testing. Samples were then transported to our laboratory for further observations
and testing.
Sladden Engineering
LA COSTA RESORT - TENTATIVE TRACT MAP
cmr OF CARLSBAD, STA-TE OF (iALFORMA
,0T4_^; y
C O
• 1—4 •a O
o
l-l
• f—.
o
PQ
-o as
O Oj
I-. ca
4)
CO t;
ca
o c
ca O
cJ
ro o
c
ll u u c
'Bb a W
c u
CO
•a
Q
C
o
ta o o
ao
.fl
'C o CQ u
a
• 1—4 X O
IH
o
IU
La Costa Resort
N.E.C. EI Camino Real & Costa Del Mar Road / Carlsbad, California
Date; 9-3-03 Boring No. 1 - Lot 10 Job No.: 444-3161
ft'" a
r 10
15
20
25
30
O
B
an
o
s
10/13/19
8/26/37
i-15/16/21
h
35
40
45
1^
50
55
21/35/38
11/22/25
10/14/20
DESCRIPTION
Siity Clay: Brown,
slightly sandy
Silty Clay: Brown with
interbedded siity clayey sand layers
Silty Clay: Brown,
slightiy sandy
Silty Clay: Brown with
interbedded siity clayey sand layers
Clayey Sand: Brown,
slightly silty, fine grained
Silty Clay: Brown with
very silty sand layer 4" thick
6/9/13
9/11/16
12/14/15
H
'S
c/1
CL
CL
118
118
CL
CL
SC
CL
Silty Clay: Brown
Silty Clay: Brown,
slightly sandy
11/13/21
Silty Ciay: Brown
116
105
CL
CL
CL
^1 Recovered Sample
I I I Standard Penetration
Sample
01
'o
IS
13
14
23
25
28
21
30
CJ
Oi a
^6
REMARKS
82% passing #200
82% passing #200
86% passing #200
85% passing #200
39% passing #200
91% passing #200
Note: The stratification lines
represent the approximate
boundai-ies between the soil types;
the transitions may be graduaL
88% passing #200
87% passing #200
89% passing #200
95% passing #200
Total Depth = 51.5'
No Bedrock
No Groundwater
La Costa Resort
N.E.C. El Camlno Real & Costa Del Mar Road / Carlsbad, California
Date: 9-3-03 Boring No. 2 - Lot ll Job No.: 444-3161
10
15
20
25
30
35
40
45
50
o
B
CO
VO
12/17/20
13/40/45
11
21/33/30
17/20/36
55
I
15/27/36
15/22/35
DESCRIPTION
Clayey Sand: Brown,
slightiy silty, fme grained
H
*o
(Zl
SC
Silty Clay: Brown, sandy
Clayey Sand: Brown,
slightly silty
Sand: Grey brown, fine grained
trace silt, trace clay
RecQvered Sample
[ [ I Standard Penetration
Sample
CL
SC
SP
123
121
115
103
S
11
REMARKS
44% passing #200
79% passing #200
38% passing #200
26% passing #200
14% passing #200
16% passing #200
Total Depth = 31.5'
No Bedrock
No Groundwater
Note: The stratification lines
represent the approximate boundaries between the soil types;
the transitions may be gradual.
La Costa Resort
N.E.C. El Camino Real & Costa Del Mar Road / Carlsbad, California
Date: 9-3-03
a
PC
10
15
20
25
30
35
40
O
S
1/1
i
O
s
i-
12/13/17
14/20/27
Boring No. 3 - Lot 15
DESCRIPTION
Silty Clay: Brown,
slightly sandy
eu
H
o
00
CL
r
23/33/37
7/23/24
11/19/26
16/50-5"
45
50
55
Silty Clay: Brown, sandy
Clayey Sand: Brown, very clayey,
silty, fine grained
Silty Sand: Grey brown,
fine grained
Sand: Grey brown,
fine grained
IfH Recovered Sample
\y<C\ Unrecovered Sample
I [ I Standard Penetration
Sample
CL
SC
SM
SP
.-SO a y
<u
3 •H •<-'
112
120
115
17
12
15
Job No.: 444-3161
REMARKS
Scattered tree roots
83% passing #200
86% passing #200
46% passing #200
21% passing #200
6% passing #200
Total Depth = 31.5'
No Bedrock
No Groundwater
Note: The stratification lines
represent the approximate
boundaries between the soii types;
the transitions may be graduaL
La Costa Resort
N.E.C. EI Camino Real & Costa Del Mar Road / Carlsbad, California
Pate: 9-3-03 Boring N o. 4 - Lot 14 Job No.: 444-3161
il
10
15
20
25
30
35
40
45
O Xi
B u o U
vo
CO
O
mm
Cf?
5/10/16
9/13/18
I
14/20/27
14/24/30
15/26/26
7/15/16
DESCRIPTION
Silty Clay: Brown with
interbedded silty clayey sand layers
Silty Clay: Brown,
slightly sandy
a
H
'3
CO
CL
Clayey Silt: Brown, sandy
Silty Sand: Grey brown,
fine grained
Sand: Grey brown,
fine grained
Silty Sand: Grey brown,
fine grained
CL
ML
Q
<u
S
o
112
SM
SP
SM
107
115
94
IU Cu
05 e
19
21
15
12
REMARKS
73% passing #200
84% passing #200
78% passing #200
19% passing #200
6% passing #200
26% passing #200
Recovered Sample
I [ I Standard Penetration
Sample
so
55
Total Depth = 31.5'
No Bedrock
No Groundwater
Note: The stratification lines
represent the approximate
boundaries between the soil types;
the transitions may be graduaL
La Costa Resort
N.E.C. EI Camino Real & Costa Del Mar Road / Carlsbad, California
Pate: 9-3-03 Boring No. 5 - Lot 8 Job No.: 444-3161
o
Xi
B
CO
e
vo
GO
o
i-30/31/26
10
15
20
25
30
35 y
126/50-5
19/30/37
15/15/15
r
40
45
50
7/10/13
7/9/9
8/9/8
8/17/19
8/7/17
7/14/19
DESCRIPTION
Clayey Sand: Brown,
slightly silty, fine grained
Clayey Sand: Brown, fine to
coarse grained, silty
Sand: Brown, slightly silty,
slightly clayey, fine grained
Sand: Grey brown,
fine grained
Silty Sand: Grey brown,
fine grained
Silty Clay: Brown
u Cu >.
H
o
CO
SC
SC
SP/SM
.ac
D 3
SP
SM
CL
Silty Clay: Brown with
very silty fine grained sand
layer 2" thick
Silty Clay: Brown, stiff
Silty Clay: Brown with
very silty fine grained sand
layer 2" thick
Silty Clay: Brown, stiff
CL
CL
CL
102
102
100
102
a "
« E
22
CL
37
37
22
17
22
21
REMARKS
23% passing #200
11% passing #200
3% passing #200
26% passing #200
91% passing #200
92% passing #200
\/ Groundwater @ 33'
78% passing #200
93% passing #200
71% passing #200
92% passing #200
55
I Recovered Sample
[ I Standard Penetration
Sample
Note: The stratification lines
represent the approximate
boundaries between the soil types;
the transitions may be graduaL
Total Depth = 51.5'
No Bedrock
La Costa Resort
N.E.C. EI Camino Real & Costa Del Mar Road / Carlsbad, California
Pate: 9-3-03 Boring No. 6 - Lot 12 Job No.: 444-3161
a*"
QC CO
u o
o
fi
vo
cn DESCRIPTION a
E-
O CO
u Q
.ac
t3 3
4>
s •p"
a " REMARKS
Silty Clay: Brown, sandy CL
r 9/13/23 108 16
10
15
20
25
30
35
40
45
50
55
19/12/16
16/35/43
Clayey Silt: Brown with
thin interbedded silty fine
to coarse grained sand layers
ML 99 20
I 8/13/17
Silty Clay: Brown, sandy CL
20/34/50 Silty Clay: Brown, stiff CL
Clayey Silt: Brown with
clayey, silty fine grained sand
layer 6" thick
ML
9/16/17 Silty Sand: Grey brown,
fine grained
SM
im Recovered Sample
I J I Standard Penetration
Sample
114 16
115 17
14
82% passing #200
67% passing #200
85% passing #200
91% passing #200
51% passing #200
19% passing #200
Total Depth = 31.5'
No Bedrock
No Groundwater
Note: The stratification lines
represent the approximate
boundaries between the soil types;
the transitions may be gradual.
La Costa Resort
N.E.C. EI Camino Real & Costa Del Mar Road / Carlsbad, California
Pate: 9-4-03 Boring No. 7 - Lot 16 Job No.: 444-3161
cu"**
« fi Qc
o x:
B
CO
10
15
20
25
30
35
40
45
50
i
•FN
VO
CO
9/10/12
10/15/19
11 31/50-5"
15/18/18
19/25/25
50-4"
DESCRIPTION
Clayey Sand: Brown,
slightly silty, fine grained
Clayey Sand: Brovm, fine to
coarse grained, silty
Sand: Brown, slightly silty,
slightly clayey, fine grained
Sand: Brown, slightly silty,
slightly clayey, fine to
coarse grained with gravel
0)
'3
SC
SC
SP/SM
SP/SM
.-ac-
P 3
108
118
121
<u
a
o
10
10
10
a "
107 16
13
REMARKS
22% passing #200
24% passing #200
Groundwater @ 14' \7
14% passing #200
19% passing #200
13% passing #200
Unrecovered sample
Recovered Sample
I [ I Standard Penetration
Sample
i
55
Total Depth = 31.5'
No Bedrock
Note: The stratification lines
represent the approximate
boundaries between the soil types;
the transitions may be gradual.
La Costa Resort
N.E.C. El Camino Real & Costa Del Mar Road / Carlsbad, California
Pate: 9-4-03
a*"
QC
10
15
20
25
30
35
40
45
|1
^^•5/7/8
50
55
O
B
CO
0) u o U
vo
cn
O
CQ
16/17/8
11 9/9/12
6/10/11
i
%/T 6/10/10
6/11/13
4/6/6
7/8/10
5/6/6
Boring No. 8 - Lot 17
DESCRIPTION
Clayey Silt: Brown
(U
o
c/3
ML
Silty Clay: Brown with
slightly silty, slightly clayey
sand layer layer 6" thick
Silty Clay: Brown,
slightly sandy
Silty Clay: Brown
CL
CL
CL
u
Q
.-ac
D 3
100
108
114
111
Silty Clay: Brown, sandy
I Recovered Sample
I J I Standard Penetration
Sample
u 3
21
16
.EH *J
a
(U Cu
Pi B
^6
16
CL
17
18
19
16
21
23
Job No.: 444-3161
REMARKS
Note: The stratification lines
represent the apfiroximate
boundaries between the soil types;
the transitions may be graduaL
85% passing #200
\/ Groundwater @ 9'
71% passing #200
87% passing #200
93% passing #200
94% passing #200
91% passing #200
89% passing #200
94% passing #200
87% passing #200
83% passing #200
Total Depth = 51.5'
No Bedrock
La Costa Resort
N.E.C. El Camino Real & Costa Del Mar Road / Carlsbad, California
Pate: 9-4-03 Boring No. 9 - Lot 11 Job No.: 444-3161
Q^
o
B
CO o
fl
vo
O
DESCRIPTION CU >. H
*3
CO
La
Q
.-ac
P 3
s
o X3 u
D.
O
U
REMARKS
Silty Clay: Brown, sandy CL
10
15
20
25
30
35
40
45
50
55
ii
6/9/13
8/12/12
118
111
13
12
10/13/15 Silty Clay: Brown with
interbedded silty clayey sand layers
CL 10:5
20/50-5" Clayey Sand: Brown,
slightly silty, fine grained
SC 98
19/24/24 Sand: Grey brown,
slightly silty, fine grained
SP/SM
25/50-5"
Recovered Sample
I J I Standai'd Penetration
Sample
Asphalt 3" thick
82% passing #200
80% passing #200
68% passing #200
32% passing #200
10% passing #200
11% passing #200
Total Depth = 31.5'
No Bedrock
No Groundwater
Note: The stratification lines
represent the approximate
boundaries between the soil types;
the transitions may be gradual.
La Costa Resort
N.E.C. EI Camino Real & Costa Del Mar Road / Carlsbad, California
Pate: 9-4-03 Boring No. 10 - Lot 7 Job No.: 444-3161
(U fi
QC
o
xa B >, CO
vo
cn
&
o
s
DESCRIPTION
0) cu >. H
mm
'o
C/3
.ac
P 3
3
9
a
V Cll
^ B
^6
REMARKS
I /yvpi6/9/i3
10 10/17/26
11 16/19/29
20
25
30
35
40
45
50
55
|1 20/17/21
^j5/6/8
5/8/8
Silty Clay: Dark grey CL
115 15
Silty Clay: Brown, sandy CL 116 14
Silty Clay: Brown CL 96 25
Silty Clay: Dark grey CL 94 26
Silty Clay: Brown CL 29
29
86% passing #200
75% passing #200
93% passing #200
97% passing #200
95% passing #200
Groundwater @ 27' \/
88% passing #200
Recovered Sample
I Standard Penetration
Sample
Total Depth = 31.5'
No Bedrock
Note: The stratification lines
represent the approximate
boundaries between the soil types;
the transitions may be gradual.
La Costa Resort
N.E.C. EI Camino Real & Costa Del Mar Road / Carlsbad, California
Date: 9-4-03 Boring No. 11 - Lot 5 Job No.: 444-3161
« fi QC
o
e
tZ!
I
a
vo
en
O
DESCRIPTION
a Cu >>
H
o
CO
Q
.-ac-ts y P 3
ll s a
0) cu
Pi a
REMARKS
r 8/11/15
10
15
20
25
30
35
40
45
50
10/35/30
17/24/30
121/24/30
55
7/9/22
7/9/9
Silty Clay: Brown CL
108 17
Sand: Brown, slightly silty,
slightly clayey, fine grained
SP/SM 119
Sand: Grey brown,
slightly silty, fine grained
SP/SM 93
Sand: Grey brown,
fine grained
SP 97
Silty Clay: Brown, stiff
Silty Clay: Brown, sandy
m Recovered Sample
I [ I Standard Penetration
Sample
CL 29
CL
87% passing #200
15% passing #200
11% passing #200
4% passing #200
91% passing #200
Groundwater @ 27' -S^
82% passing #200
Total Depth = 31.5'
No Bedrock
Note: The stratification lines
represent the approximate
boundaries between the soil types;
the transitions may be gradual.
APPENDIX B
Laboratory Testing
Laboratory Test Results
.C/n A it att 17 wt frf M aatn wt rt
APPENDIX B
LABORATORY TESTING
Representative bulk and relatively imcUsturbed sod samples were obtained in the field and returned
to our laboratory for additional observations and testing. Laboratory testing was generally
performed in two phases. The first phase consisted of testing in order to determine the compaction of
the existing natural soU and the general engineering classifications of the soUs underlying the site
This testing was performed in order to estimate the engineering characteristics of the soil and to
serve as a basis for selecting samples for the second phase of testing. The second phase consisted of
soU mechanics testing. This testing including consoUdation, shear strength and expansion testing
was performed in order to provide a means of developing specific design recommendations based on
the mechanical properties of the soU.
CLASSIFICATION AND COMPACTIONTESTING
Unit Weight and Moisture Content Determinations: Each uncUsturbed sample was weighed and
measiu'ed in order to determine its unit weight. A smaU portion of each sample was then subjected
to testing in order to determine its moisture content. This was used in order to determine the dry
density of the sofl in its natural condition. The results ofthis testing are shown on the Boring Logs.
Maximum Density-Optimum Moisture Determinations: Representative soU types were selected for
maximum density determinations. This testing was performed in accordance with the ASTM
Standard D1557-91, Test Method A. The results of this testing are presented graphicaUy in this
appendix. The maximum densities are compared to the field densities of the soU in order to
determine the existing relative compaction to the sofl. This is shown on the Boring Logs, and is
useful in estimating the strength and compressibihty ofthe soU.
Classification Testing: SoU samples were selected for classification testing. This testing consists of
mechanical grain size analyses and Atterberg Limits determinations. These pro-vide information for
developing classifications for the soU in accordance with the Unified Classification System. This
classification system categorizes the soU into groups ha-ving simUar engineering characteristics. The
results of this testing are very useful in detecting variations in the soUs and in selecting samples for
further testing.
SOIL MECHANIC'S TESTING
Direct Shear Testing: Three bulk samples were selected for Direct Shear Testing. This testing
measures the shear strength of the soU under various normal pressures and is used in developing
parameters for foundation design and lateral design. Testing was performed using recompacted test
specimens, which were saturated prior to testing. Testing was performed using a stram controUed
test apparatus with normal pressures ranging from 800 to 2300 pounds per square foot.
Expansion Testing: Three bulk samples were selected for Expansion testing. Expansion testing was
performed in accordance with the UBC Standard 18-2. This testing consists of remolding 4-inch
diameter by l-inch thick test specimens to a moisture content and dry density corresponding to
approximately 50 percent saturation. The samples are subjected to a surcharge of 144 pounds per
square foot and aUowed to reach equiUbrium. At that point the specimens are inundated with
distiUed water. The linear expansion is then measured untfl complete.
ConsoUdation Testing: Eight relatively undisturbed samples were selected for consoUdation testing.
For this testing one-inch thick test specimens are subjected to vertical loads varying from 575 psf to
11520 psf appUed progressively. The consoUdation at each load increment was recorded prior to
placement of each subsequent load. The specimens were saturated at the 575 psf or 720 psf load
increment.
Sladden Eneineerine
Maximum Density/Optimum Moisture
Project Number:
ProjectName:
Lab ID Number:
Sample Location:
Description:
Maximuin Density:
Optimum Moisture
ASTM D698/D1557
444-3161
La Costa Villas
Bulk 1 @ 15-20'
Sandy Silt with Traces of Clay
123 pcf
9%
October 3, 2003
ASTMD-1557 A
Rammer Type: Machine
Sieve Size % Retained
3/4"
3/8"
#4
10 15
Moisture Content, %
X4».. r. Cl I _ J .1 T-.
Project Niunber:
ProjectName:
Lab ID Number:
Sample Location:
Description:
Maximum Density:
Optimum Moisture
Maximum Density/Optimum Moisture
ASTM D698/DI557
444-3161
La Costa Villas
Bulk 3 @ 25-30'
Sand
107 pcf
8%
October 3, 2003
ASTMD-1557 A
Rammer Type: Machine
Sieve Size % Retained
3/4"
3/8"
#4
Maximum Density/Optimum Moisture
ASTM D698/D1557
Project Number: 444-3161
La Costa Villas Project Name:
Lab ID Number:
Sample Location: Bulk 1 @ 1-5'
Description:
Maximum Density:
Optimum Moisture
Silty Sand with Traces of Clay
116 pcf
12%
October 3, 2003
ASTMD-1557 A
Rammer Type: Machine
Sieve Size % Retained
3/4"
3/8"
#4
Direct Shear ASTM D 3080-90
(modified for unconsolidated, undrained conditions)
Job Number 444-3161 October 3, 2003
Job Name La Costa Villas
Lab ID No.
Sample ID Bulk 1 @ 0-5'
Classification Sandy Silt with Traces of Clay
Sample Type Remolded @ 90% of Maximum Density
Initial Dry Density: 112.0 pcf
Initial Mosture Content: 9.0 %
Peak Friction Angle (0): 34°
Cohesion (c): 90 psf
Test Results 1 2 3 4 Average
Moisture Content, % 16.5 16.5 16.5 16.5 16.5
Saturation, % 88.5 88.5 88.5 88.5 88.5
Normal Stress, kips 0.151 0.301 0.603 1.206
Peak Stress, kips 0.135 0.351 0.504 0.891
• Peak Stress Linear (Peak Stress)
1-2 •
1.0 -
1-2 •
1.0 -
4
1-2 •
1.0 -
4
0.8 -
4
0.8 -
4
V) V)
a>
? 0.6-
4
V) V)
a>
? 0.6-
4
la
V JS
CO
0.4 -
4
la
V JS
CO
0.4 -1
4
0.2 -
< 1
4
0.2 -
4
• •
4
0.0 -
4 0.0 0.2 0. 4 0.
r
6 0.
'formal Stress
8 1. 0 1. 2 1. 4
Direct Shear ASTM D 3080-90
(modified for unconsolidated, undrained conditions)
Job Number 444-3161 October 3, 2003
Job Name La Costa Villas
Lab ID No.
Sample ID Bulk 3 @ 25-30
Classification Sand
Sample Type Remolded @ 90% of Maximum Density
Initial Dry Density: 95.1 pcf
Initial Mosture Content: 8.0 %
Peak Friction Angle (0): 37°
Cohesion (c): 130 psf
Test Results 1 2 3 4 Average
Moisture Content, % 26.6 26.6 26.6 26.6 26.6
Saturation, % 93.1 93.1 93.1 93.1 93.1
Normal Stress, kips 0.151 0.301 0.603 1.206
Peak Stress, kips 0.099 0.405 0.765 0.954
1.2
1.0
0.8
u
CO
0.6
0.4
0.2
0.0
0.0
Peak Stress —— Linear (Peak Stress)
0.2 0.4 0.6 0.8
Normal Stress
1.0
»
i
(
%
1.2 1.4
Direct Shear ASTM D 3080-90
(modified for unconsolidated, undrained conditions)
Job Number 444-3161 October 3, 2003
Job Name La Costa Villas
Lab ID No.
Sample ID Bulk 7 @ 0-5'
Classification Silty Sand with Traces of Clay
Sample Type Remolded @ 90% of Maximum Density
Initial Dry Density: 102.3 pcf
Initial Mosture Content: 12.0%
Peak Friction Angle (0): 26°
Cohesion (c): 80 psf
Test Results 1 2 3 4 Average
Moisture Content, % 24.4 24.4 24.4 24.4 24.4
Saturation, % 101.5 101.5 101.5 101.5 101.5
Normal Stress, kips 0.151 0.301 0.603 1.206
Peak Stress, kips 0.162 0.207 0.396 0.675
1.2
1.0
0.8
^ 0.6
Ol
0.4
0.2
0.0
0.0
• Peak Stress Linear (Peak Stress)
4-
0.2 0.4 0.6 0.8
Normal Stress
1.0 1.2 1.4
One Dimensional Consolidation
ASTM D2435 & D5333
Job Number: 444-3161
Job Name: La Costa Villas
Sample ID: Boring 1 (g 15'
Soil Description: Sandy Silt
October 3, 2003
Initial Dry Density, pcf: 114.5
Initial Moisture, %: 14
Initial. Void Ratio: 0.456
Specific Gravity: 2.67
% Change in Height vs Normal Presssure Diagram
—«—Before Saturation A • After Saturation
O • Rebound —•— Hydro Consolidation
One Dimensional Consolidation
ASTM D2435 & D5333
Job Number: 444-3161
Job Name: La Costa Villas
Sample ID: Boring 1 @ 20'
Soil Description: Silty Sand
October 3, 2003
Initial Dry Density, pcf: 105.1
Initial Moisture, %: 9
Initial Void Rafio: 0.587
Specific Gravity: 2.67
% Change in Height vs Normal Presssure Diagram
0 Before Saturation A After Saturation
0 Rebound —•—Hydro Consolidation
-4
-5
-6
-7
-8
-9
-10
0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0
One Dimensional Consolidation
ASTM D2435 &. D5333
Job Number: 444-3161
Job Name: La Costa Villas
Sample ID: Boring 2 @ 5'
Soil Description: Silty Sand
October 3, 2003
Initial Dry Density, pcf: 122.8
Initial Moisture, %>: 9
Inifial Void Ratio: 0.357
Specific Gravity: 2.67
% Change in Height vs Normal Presssure Diagram
-10
0.0
• Before Saturation
• Rebound
0.5 1.0 1.5 2.0
• After Saturation
•Hydro Consolidation
2.5 3.0 3.5 4.0 4.5 5.0
One Dimensional Consolidation
ASTM D2435 & D5333
Job Number: 444-3161
Job Name: La Costa Villas
Sample ID: Boring 2 @ 10'
Soil Description: Silty Sand
October 3, 2003
Inifial Dry Density, pcf: 116.8
Initial Moisture, %; 11
Inifial Void Rafio: 0.427
Specific Gravity: 2.67
% Change in Height vs Normal Presssure Diagram
-3
-6
-7
-10
-•— Before Saturation
-o— Rebound
• After Saturation
• Hydro Consolidation
0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 5.0
One Dimensional Consolidation
ASTM D2435 & D5333
Job Number: 444-3161
Job Name: La Costa Villas
Sample ID: Boring 3 @ 15'
Soil Description: Silty Sand
October 3, 2003
Initial Dry Density, pcf: 120.3
Initial Moisture, %: 12
Initial Void Ratio: 0.386
Specific Gravity: 2.67
% Change in Height vs Normal Presssure Diagram
-10
0.0
Before Saturation
Rebound
-ir— After Saturation
-•—Hydro Consolidation
1.0 2.0 3.0 4.0 5.0 6.0 7.0
One Dimensional Consolidation
ASTM D2435 & D5333
Job Number: 444-3161
Job Name: La Costa Villas
Sample ID: Boring 3 @ 20'
Soil Description: Sandy Silt
October 3, 2003
Initial Dry Density, pcf: 113.5
Initial Moisture, %>: 15
Initial Void Ratio: 0.469
Specific Gravity: 2.67
% Change In Height vs Normal Presssure Diagram
-5
-6
-10
0.0 1.0
Before Saturation
Rebound
2.0 3.0
• After Saturation
• Hydro Consolidation \
4.0 5.0 6.0 7.0
One Dimensional Consolidation
ASTM D2435 & D5333
Job Number: 444-3161
Job Name: La Costa Villas
Sample ID: Boring 8 (g 15'
Soil Description: Silty Sand
October 3, 2003
Initial Dry Density, pcf: 108.2
Initial Moisture, %: 16
Initial Void Ratio: 0.541
Specific Gravity: 2.67
% Change in Height vs Normal Presssure Diagram
-3
-5
-6
-7
-8
-10
Before Saturation
Rebound
•After Saturation
-Hydro Consolidation
0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 5.0
One Dimensional Consolidation
ASTM D2435 & D5333
Job Number: 444-3161
Job Name: La Costa Villas
Sample ID: Boring 8 @ 20'
Soil Description: Silty Sand
October 3,2003
Initial Dry Density, pcf: 110.6
Initial Moisture, %: 18
Initial Void Ratio: 0.507
Specific Gravity: 2.67
% Change in Height vs Normal Presssure Diagram
-4
-6
-7
-8
-9
•10
• Before Saturation
• Rebound
-A— After Saturation
-•— Hydro Consolidation
0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 5.0
One Dimensional Consolidation
ASTM D2435 & 053 3 3
Job Number: 444-3161 October 3, 2003
Job Name: La Costa Villas
Sample ID: Boring 10 @ 15'
Soil Description: Silty Clay
Initial Dry Density, pcf: 94.3
Initial Moisture, %: 25
Initial Void Ratio: 0.767
Specific Gravity: 2.67
% Change in Height vs Normal Presssure Diagram
• Before Saturation
•Rebound
After Saturation
Hydro Consolidation
One Dimensional Consolidation
ASTM D2435 & D5333
Job Number: 444-3161
Job Name: La Costa Villas
Sample ID: Boring 10 (§ 20'
Soil Description: Silty Clay
October 3, 2003
Initial Dry Density, pcf: 92.2
Initial Moisture, %: 26
Initial Void Ratio: 0.807
Specific Gravity: 2.67
% Change in Height vs Normal Presssure Diagram
• Before Saturation
•Rebound
• After Saturation
• Hydro Consolidation
One Dimensional Consolidation
ASTM D2435 & D5333
Job Number: 444-3161
Job Name: La Costa Villas
Sample ID: Boring 11 @ 5'
Soil Description: Sandy Silt
October 3, 2003
Initial Dry Density, pcf: 105.1
Initial Moisture, %: 17
Initial Void Ratio: 0.586
Specific Gravity: 2.67
% Change in Height vs Normal Presssure Diagram
• Before Saturation
•Rebound
-After Saturation .
•Hydro Consolidation
0-5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 5.0
One Dimensional Consolidation
ASTM D2435 & D5333
Job Number: 444-3161
Job Name: La Costa Villas
Sample ID: Boring 11 @ 10'
Soil Description: Silty Sand
October 3, 2003
Initial Dry Density, pcf: 118.0
Initial Moisture, %: 7
Initial Void Ratio: 0.412
Specific Gravity: 2.67
% Change in Height vs Normal Presssure Diagram
-d— Before Saturation
-&— Rebound
•Ar— After Saturation
-•— Hydro Consolidation
00 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 5.0
Gradation
ASTMC117&C136
Project Number:
Project Name:
444-3161
La Costa Villas
Sample ID: Bulk 1 @ 15-20'
Sieve Sieve Percent
Size,in Size, mm Passing
1" 25.4 100
3/4" 19.1 100
1/2" 12.7 100
3/8" 9.53 100
#4 4.75 100
#8 2.36 100
#16 1.18 100
#30 0.60 100
#50 0.30 97
#100 0.15 84
#200 0.074 58
Project Number:
Project Name:
Sample ID:
444-3161
La Costa Villas
Bulk 3 (5) 25-30'
Gradation
ASTMC117&C136
Sieve Sieve Percent
Size, in Size, mm Passing
1" 25.4 100
3/4" 19.1 100
1/2" 12.7 100
3/8" 9.53 100
#4 4.75 100
#8 2.36 100
#16 1.18 100
#30 0.60 100
#50 0.30 100
#100 0.15 48
#200 0.074 9
100
90
80
70
60
.s "c/i cn cij 50
40
30
20
10
0
• • • It
100.0 10.0 1.0 0.1
Sieve Size, mm
0.0 0.0
Gradation
ASTMC117&C136
Project Number:
Project Nai-ne:
444-3161
La Costa Villas
Sample ID: Bulk 7 @ 1-5'
Sieve Sieve Percent
Size, in Size, mm Passing
1" 25.4 100
3/4" 19.1 100
1/2" 12.7 100
3/8" 9.53 100
#4 4.75 97
#8 2.36 96
#16 1.18 93
#30 0.60 88
#50 0.30 78
#100 0.15 63
#200 0.074 48
Gradation
ASTMC117&C136
Project Number:
ProjectName:
444-3161
La Costa Villas
Sample ID: Boring 7 @ 5'
Sieve Sieve Percent
Size, in Size, mm Passing
1" 25.4 100
3/4" 19.1 100
1/2" 12.7 100
3/8" 9.53 100
#4 4.75 98
#8 2.36 93
#16 1.18 86
#30 0.60 75
#50 0.30 54
#100 0.15 31
#200 0.074 22
Expansion Index
ASTM D 4829/UBC 29-2
Job Number:
Job Name:
Lab ID:
Sample ID:
Soil Description:
444-3161
La Costa Villas
Date:
Tech:
10/3/03
Jake
Bulk 1 @ 0-5'
Sandy Silt vdth Traces of Clay
WtofSoil + Ring: 595.0
Weight of Ring: 179.0
WtofWet Soil: 416.0
Percent Moisture: 8%
Wet Density, pcf: 126.0
Dry Denstiy, pcf: 116.7
% Saturation: 48.7
Expansion Rack #
Date/Time 10/7/03 11:50 a.m.
Initial Reading 0.500
Final Reading 0.581
Expansion Index
(Final - Initial) X 1000
81
EI Sladden Engineering Revised 12/10/02
Expansion Index
ASTM D 4829/UBC 29-2
Job Number:
Job Name:
Lab ID:
Sample ID:
Soil Description:
444-3161
La Costa Villas
Bulk 3 (al 25-30'
Sand
Date:
Tech:
10/3/03
Jake
WtofSoil + Ring: 620.0
Weight of Ring: 179.0
WtofWet Soil: 441.0
Percent Moisture: 6%
Wet Density, pcf: 133.6
Dry Denstiy, pcf: 126.1
% Saturation: 48.1
Expansion Rack#
Date/Time 10/6/03 8:00 a.m.
Initial Reading 0.500
Final Reading 0.501
Expansion Index
(Final - Initial) x 1000
El Sladden Engineering Revised 12/10/02
Expansion Index
ASTM D 4829/UBC 29-2
Job Number:
Job Name:
Lab ID:
Sample ID:
Soil Description:
444-3161
La Costa Villas
Date:
Tech:
10/3/03
Jake
Bulk 7 (fli 0-5'
Silty Sand with Traces of Clay
WtofSoil + Ring: 565.0
Weight of Ring: 179.0
WtofWet Soil: 386.0
Percent Moisture: 11%
Wet Density, pcf: 117.0
Dry Denstiy, pcf: 105.4
1% Saturation: 49.6 1
Expansion Rack #
Date/Time 10/9/03 7:30 a.m.
Initial Reading 0.500
Final Reading 0.542
Expansion Index
(Final - Initial) X 1000
42
EI Sladden Engineering Revised 12/10/02
ANAHEIM TEST LABORATORY
3008 S. ORANGE A-VEKUE
SANTA ANA. CALIFORNIA 92707
PHONE (714) 549-7267
TO. SLADDEM ENGINEERING:
6782 STANTON AVE, SUITE A
BUENA PARK, CA. 90621
ATTN: BRETT/DAVE
DATE: 9/22/03
P.O. No. Chain of Custody
Shipper No.
LQl3.No. A-3815 1-2
Soeclflcalion:
Material: SOIL
PROJECT: #444-3161
ANALYTICAL REPORT
CORROSION SERIES
SUMMARY OF DATA
pH SOLUBLE SULFATES
per CA. 417
ppra
SOLUBLE CHLORIDES MIN. RESISTIVITY
per CA. 422 per CA. 643
ppm ohm-cm
#1 B-7 e 1'-5' 6.5 774
#2 B-1 @ 15'-20' 6.6 1,832
304
364
600 max
600 max
APPENDIX C
1997 UBC Seismic Design Criteria
mwt iron ttn
I
I
1997 UNIFORM BUILDING CODE SEISMIC DESIGN INFORMATION
The Intemational Conference of Building Officials 1997 Uniform Building Code contains
substantial revisions and additions to the earthquake engineering section in Chapter 16. Concepts
contained in the 1997 code that wiU be relevant to construction of the proposed structures are
summarized below.
Ground shaking is expected to be the primary hazard most likely to affect the site, based upon
proximity to significant faults capable of generating large earthquakes. Major fault zones
considered to be most likely to create strong ground shaking at the site are listed below.
Fault Zone
Approximate Distance
From Site
Fault Type
(1997 UBC)
Newport - Inglewood 16.8 km B
Rose Canyon Fault 8.8 km B
Based on our field observations and understanding of local geologic conditions, the soil profile
type judged appUcable to this site is SD, generally described as stiff or dense soil. The site is
located within UBC Seismic Zone 4. The following table presents additional coefficients and
factors relevant to seismic mitigation for design is accordance with the 1997 code.
Near-Source Near-Source Seismic Seismic
Seismic Acceleration Velocity Coefficient Coefficient
Source Factor, Na Factor, Nv Ca Cv
Ne-wport 1.0 1.0 0.44 Na 0.64 Nv
Inglewood
Rose Canyon Fault 1.0 1.05 0.44 Na 0.64 Nv
Sladden Eneineerine
***********************
* *
* EQFAULT *
* *
•> Version 3.00 *
* *
***********************
DETERMINISTIC ESTIMATION OF
PEAK ACCELERATION FROM DIGITIZED FAULTS
JOB NUMBER: 544-2063
DATE: 06-23-2002
JOB NAME: Costa Del Mar Road / Carlsbad
CALCULATION NAME: Test Run Analysis
FAULT-DATA-FILE NAME: CDMGFLTE.DAT
SITE COORDINATES:
SITE LATITUDE: 33.0889
SITE LONGITUDE: 117.2678
SEARCH RADIUS: 100 mi
ATTENUATION RELATION: 5) Boore et al. (1997) Horiz. - SOIL (310)
UNCERTAINTY (M=.Median, S=Sigma) : M Number of Sigmas: 0.0
DISTANCE MEASURE: cd_2drp
SCOND: 0
Basement Depth: 5.00 km Campbell SSR: Campbell SHR:
COMPUTE PEAK HORIZONTAL ACCELERATION
FAULT-DATA FILE USED: CDMGFLTE.DAT
MINIMUM DEPTH VALUE (km): 0.0
EQFAULT SUMMARY
DETERMINISTIC SITE PARAMETERS
Page
ESTIMATED MAX. EARTHQUAKE EVENT
APPROXIMATE
ABBREVIATED DISTANCE MAXIMUM 1 PEAK EST. SITE
FAULT NAME mi (km) EARTHQUAKE 1 SITE INTENSITY
MAG . (Mw) 1 ACCEL, g MOD.MERC.
ROSE CANYON 5. 5 ( 8. 8) 6 . 9 1 0 .332 IX
NEWPORT-INGLEWOOD (Offshore) 10. 4 ( 16. 8) 6 . 9 1 0 .220 IX
CORONADO BANK 20. 6 ( 33. 2) 7 . 4 1 0 . 173 VIII
ELSINORE-TEMECULA 24 . 8 { 39. 9) 6 . 8 1 0 .110 VII
ELSINORE-JULIAN 24 . 8 ( 39. 9) 7 . 1 1 0 . 129 VIII
ELSINORE-GLEN IVY 38. 6 ( 62. 1) 6 .8 1 0 . 078 VII
EARTHQUAKE VALLEY 40. 3 { 64 . 8) 6 .5 1 0 .065 VI
PALOS VERDES 41. 1 { 66. 1) 7 . 1 1 0 .087 VII
SAN JACINTO-ANZA 47. 7 ( 76. 7) 7 .2 1 0 .082 VII
SAN JACINTO-SAN JACINTO VALLEY 49. 3 ( 79. 4 ) 6 . 9 1 0 .068 VI
SAN JACINTO-COYOTE CREEK 50. 8 ( 81. 8) 6 . 8 1 0 .063 VI
NEWPORT-INGLEWOOD (L.A.Basin) 52. 2 ( 84 . 0) 6 . 9 i 0 . 065 VI
CHINO-CENTRAL AVE. (Elsinore) 52. 8 ( 84 . 9) 6 . 7 1 0 .071 VI
ELSINORE-COYOTE MOUNTAIN 53. 1 { 85. 5) 6 . 8 1 0 .061 VI
WHITTIER 57 . 0 ( 91. 8) 6 . 8 1 0 .058 VI
COMPTON THRUST 61. 8 ( 99. 5 ) 6 .8 1 0 .066 VI
SAN JACINTO - BORREGO 62. 6 ( 100. 8) 6 . 6 1 0 .048 VI
SAN JACINTO-SAN BERNARDINO 64. 1 ( 103. 2) 6 .7 1 0 .050 VI
ELYSIAN PARK THRUST 64. 5 ( 103. 8) 6 . 7 i 0 .061 VI
SAN ANDREAS - San Bernardino 67. 4 ( 108. 4) 7 .3 1 0 .066 VI
SAN ANDREAS - Southern 67 . 4 ( 108 . 4) 7 . 4 1 0 .070 VI
SAN JOSE 73. 8 ( 118. 8) 6 .5 1 0 .049 VI
SAN ANDREAS - Coachella 73. 8 ( 118. 8) 7 . 1 1 0 .055 VI
PINTO MOUNTAIN 74. 0 ( 119. 1) 7 .0 1 0 .052 VI
CUCAMONGA 76. 2 ( 122. 7) 7 0 1 0 . 062 VI
SIERRA MADRE 76. 5 ( 123. 1) 7 . 0 1 0 .062 VI
SUPERSTITION MTN. (San Jacinto) 78 . 2 ( 125. 8) 6 . 6 1 0 .041 V
BURNT MTN. 78. 5 ( 126. 3) 6 . 4 1 0 .037 V
NORTH FRONTAL FAULT ZONE (West) 79. 5( 128. 0) 7 .0 1 0 .060 VI
EUREKA PEAK 81. 2 ( 130. 7) 6 . 4 1 0 .036 V
ELMORE RANCH .81. 9 ( 131. B) 6 6 1 0 .039 V
CLEGHORN •81. 9{ 131. 8) 6 5 1 0 .037 V
NORTH FRONTAL FAULT ZONE (East) 82. 7 ( 133. 1) 6 .7 1 0 .050 VI
SUPERSTITION HILLS (San Jacinto) 83. 0 ( 133. 5) 6 . 6 1 0 .039 V
LAGUNA SALADA 84 . 1 ( 135. 3) 7 0 1 0 .048 VI
SAN ANDREAS - 1857 Rupture 85. 7 ( 138. 0) 7 .8 1 0 .071 VI
SAN ANDREAS - Mojave 85. 7 ( 138. 0) 7 . 1 1 0 . 049 VI
RAYMOND 85. 9( 138. 2) 6 . 5 1 0 .044 VI
CLAMSHELL-SAWPIT 86. 1 ( 138. 5) 6 .5 1 0 .044 VI
VERDUGO 88. 4 ( 142 . 3) 6 . 7 1 0 .047 VI
DETERMINISTIC SITE PARAMETERS
Page
ABBREVIATED
FAULT NAME
LANDERS
HOLLYWOOD
HELENDALE - S. LOCKHARDT
BRAWLEY SEISMIC ZONE
LENWOOD-LOCKHART-OLD WOMA
SANTA MONICA
EMERSON So. - COPPER MTN.
JOHNSON VALLEY (Northern)
MALIBU COAST
IMPERIAL
1 1 ESTIMATED t-^AX. EARTHQUAKE EVENT
1 APPROXIMATE
1 DISTANCE
1 APPROXIMATE
1 DISTANCE 1 MAXIMUM 1 PEAK EST. SITE
1 mi (km) EARTHQUAKE 1 SITE INTENSITY
1 MAG.(Mw) 1 ACCEL, g MOD.MERC.
===== 1 ============== ========== 1 ========== =========
1 89.1( 143.4) 7.3 1 0.053 VI
I 90.4{ 145.5) 6.4 1 0.040 j V
1 91.5( 147,3) 7 . 1 1 0.047 1 VI
1 92.1( 148.2) 6.4 1 0.032 1 V
SPRGSI 94.8( 152.5) 7.3 i 0.051 1 VI
1 95.2( 153.2) 6.6 1 0.043 1 VI
1 96.8( 155.8) 6.9 1 0.040 1 V
1 97.3 ( 156.6) 1 6.7 0.036 1 V
I 97.9( 157.6)1 6.7 0.044 1 VI
I 99.2 ( 159.6) 1 7.0 0.042 1 yj
******************************.^**i,j,*^,.i,^^^j^^.
-END OF SEARCH- 50 FAULTS FOUND WITHIN THE SPECIFIED SEARCH RADIUS.
THE ROSE CANYON FAULT IS CLOSEST TO THE SITE.
IT IS ABOUT 5.5 MILES (8.8 km) AWAY.
LARGEST MAXIMUM-EARTHQUAKE SITE ACCELERATION: 0.3317 g
1100
1000
900
800 --
700 --
600
500
400 --
300
200
100 --
CALIFORNIA FAULT MAP
Costa Del Mar Road / Carlsbad
-100
-400 -300 -200 -100 100 200 300 400 500 600
STRIKE-SLIP FAULTS
5) Boore et al. (1997) Horiz. - SOIL (310)
M=5 M=6 M=7 M=8
v2
c o
'-4—«
CO
CD
o o
<
,001
10 100
Distance fadistl (km)
DIP-SLIP FAULTS
5) Boore et al. (1997) Horiz. - SOIL (310)
M=5 W\=6 W\=7 M=8
c o
CO
0
CD o o
<
1
.1
,01 -=
,001 -k
10 100
Distance fadistl (km)
BLIND-THRUST FAULTS
5) Boore et al. (1997) Horiz. - SOIL (310)
iVI=5 IV1=6 M=7 M=8
c q '•*->
CO
0)
0 o o
<
,001
10 100
Distance fadistl (km)
MAXIMUM EARTHQUAKES
Costa Del Mar Road / Carlsbad
c o
CO
i_
0
0 o o
<
1 -=
1
01 -=
.001 4t
1 10
Distance (mi)
100
EARTHQUAKE MAGNITUDES «& DISTANCES
Costa Del Mar Road / Carlsbad
1 10
Distance (mi)
100
Sladden Engineering
77-725 Enfield Lane, Suite 100, Palm Desert, CA 92211 (760) 772-3893 Fax (760) 772-3895
6782 Stanton Ave., Suite A, Buena Park, CA 90621 (714) 523-0952 Fax (714) 523-1369
450 Egan Avenue, Beaumont, CA 92223 (951) 845-7743 Fax (951) 845-8863
15438 Cholame Road, Suite A, Victorville, CA 92392 (760)962-1868 Fax (760) 962-1878
September 11, 2006 P'-oje^* No. 444-3161
*^ 06-09-892
G Companies Construction, Inc.
1107 Quail Street RECEIVED
New^port Beach, California 92660 FEB 0 2 2007
Subject: Geotechnical Addendum/Update
ENGINEERING
Project: Planning Area 2 Resort Villas DEPARTMENT
La Costa Resort & Spa
Costa Del Mar Road
Carlsbad, California
Ref: Geotechnical hivestigation Report prepared by Sladden Engineering dated
November 11, 2003, Project No. 444-3161, Report No. 03-10-183.
As requested, -we have reviewed the referenced Geotechnical Investigation report as it relates to
the design and construction of the resort villas complex proposed for Planning Area 2 of the La
Costa Resort and Spa campus. Planning Area 2 is located just north of the existing ballroom
facility at the La Costa Resort and Spa in the City of Carlsbad, California. The proposed Planning
Area 2 Resort Villas project will consist of 2 or 3 story wood-frame struchires with slab on grade
construction.
The referenced Geotechnical Investigation report includes recommendations for the design and
construction of similar resort residential units. Based upon our review of the referenced report,
our involvement throughout the grading and conshniction of the adjacent La Costa facilities, our
recent site observations and our understanding of the proposed project, it is our opinion that the
recommendations included in the above referenced report remain applicable for the proposed
Planning Area 2 resort residential units.
Because the proposed use of slab on grade construction, it is likely that potentially expansive
surface soil will be encountered at the planned elevation. Because the recommended remedial Ji*
grading will result in significant mixing and blending of the surface soil, it is our opinion that \J
foundahons should be designed based upon post-grading expansion test results. For preliminary QJ
design purposes, footings should extend at least 18 inches beneath lowest adjacent grade. «^
Isolated square or rectangular footings at least 2 feet square may be designed using an allowable ^
bearing value of 2500 pounds per square foot. Continuous footings at least 12 inches wide may W
be designed using an allowable bearing value of 2000 pounds per square foot.
3
September 11, 2006 -2- Project No. 444-3161
^ 06-09-892
Allowable increases of 200 psf for each additional 1 foot of width and 250 psf for each additional
6 inches of depth may be utilized if desired. The maximum allowable bearing pressure should be
3000 psf. The allowable bearing pressures are for dead and frequently applied live loads and
may be increased by 1/3 to resist wind, seismic or other transient loading.
The recommendations made in the preceding paragraph are based on the assumption that all
footings will be supported by properly compacted soils. Prior to the placement of the reinforcing
steel and concrete, we recommend that the footing excavations be inspected in order to verify
that they extend into the firm compacted soils and are free of loose and disturbed materials.
Settlements may result from the anticipated foundation loads. These estimated ultimate
settlements are calculated to be a maximum of 1 inch when using the recommended bearing
values. As a practical matter, differential settlements between footings can be assumed as one-
half of the total settlement. These elastic settlements are expected to occur during conshuction.
Resistance to lateral loads may be provided by a combination of friction acting at the base of the
slabs or foundations and passive earth pressure along the sides of the foundations. A coeffident
of friction of 0.40 between soil and concrete may be used for dead load forces only. A passive
earth pressure of 250 pounds per square foot, per foot of depth, may be used along the sides of
footings that are poured against properly compacted native or approved import soils.
Retaining walls may be required to accomplish the proposed construction. Cantilever retaining
walls may be designed using "active" pressures. Active pressures may be estimated using an
equivalent fluid weight of 40 pcf for native backfill soil with level free-draining backfill
conditions. For walls that are resti-ained, "at rest" pressures should be utilized in design. At rest
pressures may be estimated using an equivalent fluid weight of 60 pcf. Walls should be provided
with adequate waterproofing and drainage.
It is our opinion that the remedial grading recommended in the referenced report remains
appropriate. The remedial grading should include over-excavation of the surface soil and the
primary foundation bearing soil within the building areas.
The foundation areas should be cleared of any surface vegetation prior to grading. In order to
provide for firm and uniform foundation support, we recommend over-excavation and
recompaction. The foundation areas should be over-excavated to a depth of at least 3 feet below
existing grade or 2 feet below the bottom of the footings, whichever is deeper. The exposed
surface should then be scarified, moishare conditioned and compacted to a minimum of 90
percent relative compaction. The previously removed soils and fill material may then be placed
in thin lifts and compacted to at least 90 percent relative compaction.
Sladden Engineering
September 11, 2006 Project No. 444-3161
06-09-892
It should be noted that the site is located within a seismically active area of Southern Califomia
and it is likely that the proposed structures will experience strong ground shaking as a result of
an earthquake event along one of the faults in the region during the expected life of the
development. As a minimum, structures should be designed based upon Seismic Zone 4 design
criteria included in the Uniform Building Code (UBC). The potential for liquefaction or other
geologic/seismic hazards occurring at the site is considered to be negligible.
We appreciate the opportunity to provide service to you on this project, if you have any
questions regarding this letter or the referenced report please contact the undersigned.
Respectfully submitted,
SLADDEN ENGINEERING
Brett L. Anc
Principal Engineer
SER/pc
Copies: 2/G Companies Construction, Inc.
1/Gin Wong Associates
Iff ohn A. Martin & Associates
Sladden Engineering
September 11, 2006
-4-
P^ojectJVo.444.3jgj
06-09-892
Groundshaking,-,,, ' ^° ^construction
Proximity to IgniZT ^"'"ary hazard
— F^iili. / Anr»».«.—"T^ ^ • •
_FroinSite
J6£]an
_a997UBQ
B
-?2HiL?one
J!!:[evvport - Tn^i
LfeCanyonFau]^
^ ^ 2;0Jan /
Seismic
—^Source
Newport
I ^°^f Canyon ' Fault
^fear-Source
Acceleration
1.0
Near-Source
Velocity Seismic
Coefficient
Ca
Seismic
Coefficient
Cv