HomeMy WebLinkAboutCT 03-02; Carlsbad Ranch PA 5 - Event Gardens; SUBSURFACE INVESTIGATION MARBRISA RESORTS- EVENT GARDENS, GRAND PACIFIC RESORTS, CARLSBAD, CALIFORNIA - DWG 428-9I, GR 16-22; 2016-06-20OFFICE LOCATIONS
OR~'\GECOliNTY
CORPORATE 8RAi'<CH
~992 E. La Palma Avenue
Suite A
Anaheim, CA 92806
Tel: 714.632.2999
Fax: 714.6322974
SA 'I DIEGO
I\1PERIAI.COl':'ln ·
6295 Ferris Square
Suite('
San Diego. CA 92121
Tel: 858537.3999
Fax: 858.537.3990
I 'lLANO E\IPIRE
1446 7 Mendinn Parkway
Building'2A
Ri\ erside. ('A 92518
Tel: 951.653.4999
Fax: 951.653.4666
1'1010
44917 Golf Center Pkwy
Suite I
Indio. C A 9220 I
Tel 760J42.4677
Fax: 760342.4525
OC/LA/1:-/L,\NO E\IPIRE
DISPATCH
800.491.299()
S \'I DIEGO OISP\TCH
~~~.844 5060
~-..,w.mtglinc.com
I
Geotechnical Engineering
------~C:::....,onstruction Inspection
I .... ?•r:t-/f:tJI'••I
t-~···---
/ Materials Testing
q t:~ _,, •-_j Environmental
RECEIVED
AUG 0 2 2016
NO DEVELOPMENT
ENG NEERING
SUBSURFACE INVESTIGATION
Marbrisa Resorts -Event Garden
Grand Pacific Resorts
Carlsbad, California
Prepared For:
Grand Pacific Resorts
5900 Pasteur Court, Suite 200
Carlsbad, California 92008
Prepared By:
MTGL, Inc.
6295 Ferris Square, Suite C
San Diego, California 92121
June 20, 2016
MTGL Project No. 1916B11
MTGL Log No. 16-616
0 1<1\t,f I 1>1 '1\
( <I Kf'IOK Ill 1\11\ 't It
I I I I \ ·" '•
I I • '~"' ... I
I ~ 4 • ... .,, ., I
.... , lllffll
J\ff'f HI\ I (<II 'I\
., I~ 'I I
I \1 "I I III'IHI
• ·' \I_,, 1: u I ~''
II I lu
I~ 1·1ok I \ 'I ·
'I ....
hill II
~ ' (I I I ( I I I I 11~
It I < ''
I '
I,
I 11 11 \(\I \\II I III'IHI
lll'f' If t II
I I '
" I\ 1111 I .t Ill I I If II
il! I
June 20, 2016
Grand Pacific Resorts
5900 Pasteur Court, Suite 200
Carlsbad, California 92008
Attention: Mr. Houston Arnold
(;cotechnical Engineering
(~onstruction Ins1>ection
i\ tate rials Testing
EnYiron1nental
MTGL Project No. 1916B 11
MTGL Log No. 16-616
Subject: SUBSURFACE INVESTIGATION
Marbrisa Resorts-Event Garden
Grand Pacific Resorts
Carlsbad, California
Dear Mr. Arnold:
In accordance with your request and authorization we have completed a Subsurface
Investigation for the subject site. We are pleased to present the following report
which addresses both engineering geologic and geotechnical conditions including a
description of the site conditions, results of our field exploration and laboratory
testing, and our conclusions and recommendations for grading.
Based on our investigation, the site will be suitable for development, provided the
recommendations presented herein are incorporated into the plans and specifications
for the proposed grading. Details related to geologic conditions, site preparation,
and construction considerations are also included in the subsequent sections of this
report.
We appreciate this opportunity to be of continued service and look forward to
providing additional consulting services during the planning and construction of the
project. Should you have any questions regarding this report, please do not hesitate
to contact us at your convenience.
Respectfully submitted,
MTGL,Inc.
Page i of iii
Marbrisa Resorts -Phase ill Event Gardens -Subsurface Investigation
Carlsbad, California
TABLE OF CONTENTS
MTGL Project No. 1916Bll
MTGL Log No. 16-602
1.00 INTRODUCTION ......................................................................................................................... l
1.01 SITE DESCRIPTION AND PLANNED GRADING ................................................................................ 1
1.02 SCOPE OF WORK ........................................................................................................................... 1
1.03 FIELD INVESTIGATION ................................................................................................................... 1
1.04 LABORATORYTESTING ................................................................................................................. 2
2.00 FINDINGS ...................................................................................................................................... 3
2.01 SITE GEOLOGIC CONDITIONS ........................................................................................................ 3
2.02 GROUNDWATER CONDITIONS ....................................................................................................... 3
3.00 CONCLUSIONS ........................................................................................................................... 4
3.01 GENERAL CONCLUSIONS ............................................................................................................... 4
4.00 RECOMME-NDATIONS ............................................................................................................. 5
4.01 EXCAVATION CHARACTERISTICS/SHRINKAGE ............................................................................. 5
4.02 SITE CLEARING RECOMMENDATIONS ........................................................................................... 5
4.03 SITE GRADING RECOMMENDATIONS ............................................................................................ 5
4.04 COMPACTIONREQUIREMENTS ...................................................................................................... 6
4.05 FILL MATERIALS··························································································································· 6
4.06 SLOPES .......................................................................................................................................... 6
4.07 EXISTING SUBDRIANS ................................................................................................................... 7
4.08 MOISTURE SENSITIVE SOILS/WEATHER RELATED CONCERNS .................................................... 7
4.09 TEMPORARY EXCAvATIONS AND SHORING .................................................................................. 7
4.10 UTILITY TRENCHES ....................................................................................................................... 9
4.11 SITE DRAINAGE············· .............................................................................................................. 1 0
4.12 GEOTECHNICAL OBSERVATION/TESTING OF EARTHWORK OPERATIONS .................................. 10
5.00 LIMITATIONS ........................................................................................................................... 11
ATTACHMENTS:
Figure 1 -Site Plan
Appendix A -References
Appendix B -Field Exploration Program
Appendix C -Laboratory Test Procedures
Appendix D -Standard Earthwork and Grading Specifications
Page ii of iii 6295 Fenis Square, Suite C
San Diego, CA 92121
(858) 537-3999
Marbrisa Resorts -Phase III Event Gardens -Subsurface Investigation
Carlsbad, California
1.00 INTRODUCTION
MTGLProjectNo. 1916Bll
MTGL Log No. 16-602
In accordance with your request and authorization, MTGL, Inc. has completed a Subsurface
Investigation for the subject site. The following report presents a summary of our findings,
conclusions and recommendations based on our investigation, laboratory testing, and engineering
analysis.
1.01 Site Description and Planned Grading
The Event Garden is located within Grand Pacific Resorts in Carlsbad, California. The Event
Garden is south of the existing Sheraton Carlsbad Resort and Spa building. The site was previously
graded as part of mass grading operations in 2006 (Leighton and Associates, 2006). Currently the
site is relatively level with landscaping throughout. There are ascending slopes on the northern and
eastern borders of the site. The planned grading at the site is to import soil from grading activities
associated with Marbrisa Phase Ill and raise the site to an elevation of approximately 232 feet mean
sea level (MSL).
1.02 Scope ofWork
The scope of our geotechnical services included the following:
• Review of geologic, ground water and geotechnical literature.
• Logging, sampling and backfilling of three (3) exploratory borings drilled with an 6-inch
diameter hollow stem auger drill rig to a maximum depth of 1912 feet below existing grades.
Appendix B presents a summary of the field exploration program.
• Laboratory testing of representative samples.
• Geotechnical engineering review of data and engineering recommendations.
• Preparation of this report summarizing our findings and presenting our conclusions and
recommendations for the proposed construction.
1.03 Field Investigation
Prior to the field investigation, a site reconnaissance was performed by a geologist from our office to
mark the boring locations, as shown on the Site Plan (Figure 1 ), and to evaluate the borings locations
with respect to obvious subsurface structures and access for the drilling rig. Underground Service
Alert was then notified of the marked location for utility clearance.
Page 1 ofll
6295 Ferris Square, Suite C
San Diego, CA 92121
(858) 537-3999
Marbrisa Resorts -Phase III Event Gardens -Subsurface Investigation
Carlsbad, California
MTGL Project No. 1916Bll
MTGL Log No. 16-602
Our subsurface investigation consisted of drilling test borings utilizing a limited access drill rig
equipped with a 6-inch diameter hollow stem auger. See Appendix B for further discussion of the
field exploration including logs of test borings.
Borings were logged and sampled using Modified California Ring (Ring) and Standard Penetration
Test (SPT) samplers at selected depth intervals. Samplers were driven into the bottom of the boring
with successive drops of a 140-pound weight falling 30 inches. Blows required driving the last 12
inches of the 18-inch Ring and SPT samplers are shown on the boring logs in the "blows/foot"
column (Appendix B). SPT was performed in the borings in general accordance with the American
Standard Testing Method (ASTM) Dl586 Standard Test Method. Representative bulk soil samples
were also obtained from our borings.
Each soil sample collected was inspected and described in general conformance with the Unified
Soil Classification System (USCS). The soil descriptions were entered on the boring logs. All
samples were sealed and packaged for transportation to our laboratory.
1.04 Laboratory Testing
Laboratory tests were performed on representative samples to verify the field classification of the
recovered samples and to determine the geotechnical properties of the subsurface materials. All
laboratory tests were performed in general conformance with ASTM or State of California Standard
Methods. The results of our laboratory tests are presented in Appendix C of this report.
Page 2 ofll
6295 Fcnis Square, Suite C
San Diego, CA 92121
(858) 537-3999
Marbrisa Resorts -Phase III Event Gardens -Subsurface Investigation
Carlsbad, California
2.00 FINDINGS
2.01 SITE GEOLOGIC CONDITIONS
MTGL Project No. 1916Bll
MTGL Log No. 16-602
As observed during this investigation, the site is underlain by previously placed engineered fill
materials over Tertiary-aged Santiago Formation (Tsa). Logs of the subsurface conditions
encountered in our borings are provided in Appendix B. Generalized descriptions of the materials
encountered during this investigation are presented below.
Previously placed fill soils were encountered in all borings and extended up to 15 feet below existing
grade. As observed in our borings, the fill materials consisted of Silty Sand (SM). The fills ranged
in color from medium yellow brown, and yellow to orange brown. In general, the sands were
medium grained, moist, and medium dense to dense. Some clay was encountered within the fill
materials. The fills were placed as part of previous mass grading operations and are documented in
the Leighton and Associates As-Graded Report (2006). The fill soils area considered suitable for
support of any additional soil loading in their current condition.
Tertiary-aged Santiago Formation was encountered throughout the site below the previous placed
fill materials. The Santiago Formation material encountered consisted of Poorly Graded Sandstone
'SP' which was pale yellow gray to white, and yellow white with orange fracture staining. The
Poorly Graded Sandstone was fine grained, moist, and weakly to moderately cemented. In general,
the sandy materials of the Santiago Formation are considered suitable for support of structural
loading in their current condition.
2.02 Groundwater Conditions
Groundwater was not encountered in any of the three borings excavated for this investigation. It
should be recognized that excessive irrigation, or changes in rainfall or site drainage could produce
seepage or locally perched groundwater conditions within the soil underlying the site.
Page 3 ofll
6295 F enis Square, Suite C
San Diego, CA 92121
(858) 537-3999
Marbrisa Resorts -Phase ill Event Gardens -Subsurface Investigation
Carlsbad, California
3.00 CONCLUSIONS
3.01 GENERAL CONCLUSIONS
MTGLProjectNo. 1916Bll
MTGL Log No. 16-602
Given the findings of the investigation, it appears that the site is suitable for the proposed grading.
Based on the investigation, it is our opinion that the proposed development is safe against landslides
and settlement provided the recommendations presented in our report are incorporated into the
design and construction of the project. Grading and construction of the proposed project will not
adversely affect the geologic stability of adjacent properties. The nature and extent of the
investigation conducted for the purposes of this declaration are, in our opinion, in conformance with
generally accepted practice in this area. Therefore, the proposed project appears to be feasible from
a geologic standpoint. There appears to be no significant geologic constraint onsite that cannot be
mitigated by proper planning, design, and sound construction practices. Specific conclusions
pertaining to geologic conditions are summarized below:
• The potential for landslides to occur is considered low if the remedial recommendations
presented herein are incorporated.
• The on-site fill materials are considered suitable for structural support of new fill soils in
their present condition. Recommendations are presented in the following sections for
grading at the site.
Page 4 ofll
6295 Ferris Square, Suite C
San Diego, CA 92121
(858) 537-3999
Marbrisa Resorts -Phase ill Event Gardens -Subsurface Investigation
Carlsbad, California
4.00 RECOMMENDATIONS
MTGL Project No. 1916Bll
MTGL Log No. 16-602
Our recommendations are considered minimum and may be superseded by more conservative
requirements of the architect, civil engineer, building code, or governing agencies. In addition to the
recommendations in this section, additional general earthwork and grading specifications are
included in Appendix D.
4.01 EXCAVATION CHARACTERISTICS/SHRINKAGE
Our exploratory borings were advanced with little difficulty within the fill soils and no oversize
materials were encountered in our subsurface investigation. Accordingly we expect that all earth
materials will be rippable with conventional heavy duty grading equipment with experienced
operations and that oversized materials are not expected.
Shrinkage is the decrease in volume of soil upon removal and recompaction expressed as a
percentage of the original in-place volume, which will account for changes in earth volumes that will
occur during grading. Bulking is the increase in volume of soil upon removal recompaction
expressed as a percentage of the original in-place volume. Our estimate for shrinkage of the onsite
fill soils are expected to range from 5 to 10 percent. It should be noted that bulking and shrinkage
potential can vary considerably based on the variability of the in-situ densities of the materials in
question.
4.02 SITE CLEARING RECOMMENDATIONS
All surface vegetation, trash, debris, asphalt concrete, portland cement concrete and underground
pipes should be cleared and removed from the proposed construction site. Underground facilities
such as utilities may exist at the site. Depressions resulting from the removal of foundations of
existing structures, buried obstructions and/or tree roots should be backfilled with properly
compacted material. All organics, debris, trash and topsoil should be removed from the grading area
and hauled offsite.
4.03 SITE GRADING RECOMMENDATIONS
Remedial grading for new fills soils should include removal of 12 inches of soil from existing grade.
The exposed excavation bottom should be scarified 8 to 12 inches, moisture conditioned, and
compacted to a minimum of 90 percent of the maximum dry density as determined by ASTM Test
Method D1557 at a moisture content that is slightly above optimum moisture content. Prior to
Page 5 ofll
6295 Fenis Square, Suite C
San Diego, CA 92121
(858) 537-3999
Marbrisa Resorts -Phase ill Event Gardens -Subsurface Investigation
Carlsbad, California
MTGL Project No. 1916Bll
MTGL Log No. 16-602
performing scarification and re-compaction of the excavated subgrade, the area should be proof
rolled with a fully loaded water truck to help identify any areas which may require additional
remedial grading.
4.04 COMPACTION REQUIREMENTS
All fill materials should be compacted to at least 90 percent of maximum dry density as determined
by ASTM Test Method D1557. Fill materials should be placed in loose lifts, no greater than 8
inches prior to applying compactive effort. All engineered fill materials should be moisture-
conditioned and processed as necessary to achieve a uniform moisture content that is slightly above
optimum moisture content and within moisture limits required to achieve adequate bonding between
lifts.
4.05 FILLMATERIALS
Fill material should have an expansion index of less than 50, shall not contain rocks or lumps of a
greater dimension than 4 inches, and be compacted to a minimum of 90 percent of the maximum dry
density at a moisture content that is slightly above optimum moisture content.
4.06 SLOPES
Grading at the site will include construction of a variety of minor fill slopes. We recommend that
slopes be inclined no steeper than 2:1 (horizontal to vertical). Fills over sloping ground should be
constructed entirely on prepared bedrock. In areas where the existing ground surface slopes at more
than a 5:1 gradient, it should be benched to produce a level area to receive the fill. Benches should
be wide enough to provide complete coverage by the compaction equipment during fill placement.
Slopes constructed at 2: 1 or flatter should be stable with regard to deep seated failure with a factor of
safety greater than 1.5, which is the generally accepted safety factor. However, all slopes are
susceptible to surficial slope failure and erosion, given substantial wetting of the slope face.
Surficial slope stability may be enhanced by providing proper site drainage. The site should be
graded so that water from the surrounding areas is not able to flow over the top of the slopes.
Diversion structures should be provided where necessary. Surface runoff should be confined to
gunite-lined swales or other appropriate devises to reduce the potential for erosion. It is
recommended that slopes be planted with vegetation that will increase their stability. Ice plant is
generally not recommended.
Page 6 ofll
6295 Fenis Square, Suite C
San Diego, CA 92121
(858) 537-3999
Marbrisa Resorts -Phase lli Event Gardens -Subsurface Investigation
Carlsbad, California
4.07 Existing Subdrians
MTGL Project No. 1916Bll
MTGL Log No. 16-602
The As-Graded report shows subdrains located within the slopes that border the site on the north and
east. The subdrains were installed with the intent of capturing excess water that may accumulate on
the highly expansive clay layer. If subdrains are damaged during grading operations they should be
repaired to allow for continuing excess water to be removed from the site.
4.08 MOISTIJRE SENSITIVE SOILS/WEATHER RELATED CONCERNS
The upper soils encountered at this site may be sensitive to disturbances caused by construction
traffic and to changes in moisture content. During wet weather periods, increases in the moisture
content of the soil can cause significant reduction in the soil strength and its support capabilities. In
addition, soils that become excessively wet may be slow to dry and thus significantly delay the
progress of the grading operations. Therefore, it will be advantageous to perform earthwork
activities during the dry season. Much of the on-site soils may be susceptible to erosion during
periods of inclement weather. As a result, the project Civil Engineer/ Architect and Grading
Contractor should take appropriate precautions to reduce the potential for erosion during and after
construction.
4.09 Temporary Excavations and Shoring
Short term temporary excavations in existing soils may be safely made at an inclination of 1 : 1
(horizontal to vertical) or flatter. If vertical sidewalls are required in excavations greater than 3 feet
in depth, the use of cantilevered or braced shoring is recommended. Excavations less than 3 feet in
depth may be constructed with vertical sidewalls without shoring or shielding. Our
recommendations for lateral earth pressures to be used in the design of cantilevered and/or braced
shoring are presented below. These values incorporate a uniform lateral pressure of 72 psf to
provide for the normal construction loads imposed by vehicles, equipment, materials, and workmen
on the surface adjacent to the trench excavation. However, if vehicles, equipment, materials, etc. are
kept a minimum distance equal to the height of the excavation away from the edge of the excavation,
this surcharge load need not be applied.
Page 7 ofll
6295 Ferris Square, Suite C
San Diego, CA 92121
(858) 537-3999
Marbrisa Resorts -Phase lli Event Gardens -Subsurface Investigation
Carlsbad, California
MTGL Project No. 1916B 11
MTGL Log No. 16-602
H
P = 30 H psi 72 osf
P Total= 72 psf + 30 H psf
SHORING DESIGN : LATERAL SHORING PRESSURES
Design of the shield struts should be based on a value of 0.65 times the indicated pressure, Pa, for
the approximate trench depth. The wales and sheeting can be designed for a value of 2/3 the design
strut value.
STRUTS
(typ.)
UNDISTURBED
SOIL
BEDDING Pa = 30 Hsh psf
HEIGHT OF SHIELD, Hsh = DEPTH OF TRENCH, D1 , MINUS DEPTH OF SLOPE, H1
TYPICAL SHORING
DETAIL
Placement of the shield may be made after the excavation is completed or driven down as the
material is excavated :from inside of the shield. If placed after the excavation, some over-excavation
may be required to allow for the shield width and advancement of the shield. The shield may be
placed at either the top or the bottom of the pipe zone. Due to the anticipated thinness of the shield
walls, removal of the shield after construction should have negligible effects on the load factor of
pipes. Shields may be successively placed with conventional trenching equipment.
Page 8 ofll
6295 Ferris Square, Suite C
San Diego, CA 92121
(858) 537-3999
Marbrisa Resorts -Phase III Event Gardens -Subsurface Investigation
Carlsbad, California
MTGL Project No. 1916Bll
MTGL Log No. 16-602
Vehicles, equipment, materials, etc. should be set back away from the edge of temporary
excavations a minimum distance of 15 feet from the top edge of the excavation. Surface waters
should be diverted away from temporary excavations and prevented from draining over the top of
the excavation and down the slope face. During periods of heavy rain, the slope face should be
protected with sandbags to prevent drainage over the edge of the slope, and a visqueen liner placed
on the slope face to prevent erosion of the slope face.
Periodic observations of the excavations should be made by the geotechnical consultant to verify
that the soil conditions have not varied from those anticipated and to monitor the overall condition of
the temporary excavations over time. If at any time during construction conditions are encountered
which differ from those anticipated, the geotechnical consultant should be contacted and allowed to
analyze the field conditions prior to commencing work within the excavation. All CaVOSHA
construction safety orders should be observed during all underground work.
4.10 Utility Trenches
All CaVOSHA construction safety orders should be observed during all underground work. All
utility trench backfill within street right of way, utility easements, under or adjacent to sidewalks,
driveways, or building pads should be observed and tested by the geotechnical consultant to verify
proper compaction. Trenches excavated adjacent to foundations should not extend within the
footing influence zone defined as the area within a line projected at a 1: 1 (horizontal to vertical)
drawn from the bottom edge of the footing. Trenches crossing perpendicular to foundations should
be excavated and backfilled prior to the construction of the foundations. The excavations should be
backfilled in the presence of the geotechnical engineer and tested to verify adequate compaction
beneath the proposed footing.
Utilities should be bedded and backfilled with clean sand or approved granular soil to a depth of at
least 1-foot over the pipe. The bedding materials shall consist of sand, gravel, crushed aggregate, or
native, free draining soils with a sand equivalence of not less than 30. The bedding should be
uniformly watered and compacted to a firm condition for pipe support.
The remainder of the backfill shall be typical on-site soil or imported soil which should be placed in
lifts not exceeding 8 inches in thickness, watered or aerated to near optimum moisture content, and
mechanically compacted to at least 90% of maximum dry density (ASTM D1557).
Page 9 ofll
6295 Ferris Square, Suite C
San Diego, CA 92121
(858) 537-3999
Marbrisa Resorts -Phase III Event Gardens -Subsurface Investigation
Carlsbad, California
4.11 Site Drainage
MTGL Project No. 1916B 11
MTGL Log No. 16-602
The site should be drained to provide for positive drainage away from structures in accordance with
the building code and applicable local requirements. Unpaved areas should slope no less than 2%
away from structure. Paved areas should slope no less than 1% away from structures. Concentrated
roof and surface drainage from the site should be collected in engineered, non-erosive drainage
devices and conducted to a safe point of discharge. The site drainage should be designed by a civil
engmeer.
4.12 Geotechnical Observation/Testing of Earthwork Operations
The recommendations provided in this report are based on preliminary design information and
subsurface conditions as interpreted from the investigation. Our preliminary conclusion and
recommendations should be reviewed and verified during site grading, and revised accordingly if
exposed Geotechnical conditions vary from our preliminary findings and interpretations. The
Geotechnical consultant should perform Geotechnical observation and testing during the following
phases of grading and construction:
• During site grading and over-excavation.
• During excavation and backfilling of all utility trenches
• During processing and compaction of the sub grade for the access and parking areas and
prior to construction of pavement sections.
• When any unusual or unexpected Geotechnical conditions are encountered during any
phase of construction.
Page 10 ofll
6295 Fcnis Square, Suite C
San Diego, CA 92121
(858) 537-3999
Marbrisa Resorts -Phase ill Event Gardens -Subsurface Investigation
Carlsbad, California
5.00 LIMITATIONS
MTGL Project No. 1916Bll
MTGL Log No. 16-602
The findings, conclusions, and recommendations contained in this report are based on the site
conditions as they existed at the time of our investigation, and further assume that the subsurface
conditions encountered during our investigation are representative of conditions throughout the site.
Should subsurface conditions be encountered during construction that are different from those
described in this report, this office should be notified immediately so that our recommendations may
be re-evaluated.
This report was prepared for the exclusive use and benefit of the owner, architect, and engineer for
evaluating the design of the project as it relates to geotechnical aspects. It should be made available
to prospective contractors for information on factual data only, and not as a warranty of subsurface
conditions included in this report.
Our investigation was performed using the standard of care and level of skill ordinarily exercised
under similar circumstances by reputable soil engineers and geologists currently practicing in this or
similar localities. No warranty, express or implied, is made as to the conclusions and professional
advice included in this report.
This firm does not practice or consult in the field of safety engineering. We do not direct the
Contractor's operations, and we are not responsible for their actions. The contractor will be solely
and completely responsible for working conditions on the job site, including the safety of all persons
and property during performance of the work. This responsibility will apply continuously and will
not be limited to our normal hours of operation.
The findings of this report are considered valid as of the present date. However, changes in the
conditions of a site can occur with the passage of time, whether they are due to natural events or to
human activities on this or adjacent sites. In addition, changes in applicable or appropriate codes
and standards may occur, whether they result from legislation or the broadening of knowledge.
Accordingly, this report may become invalidated wholly or partially by changes outside our control.
Therefore, this report is subject to review and revision as changed conditions are identified.
Page 11 ofll
6295 Fenis Square, Suite C
San Diego, CA 92121
(858) 537-3999
FIGURES
KEY:
~-3 ~ Boring Number and approximate location
1" = 30'
REFERENCE: Minor Grading Plans for: Marbrisa Event Gardens, Sheet 6, by Excel Engineering, 2016.
SITE PLAN
PROJECT NO. 1916811
MTGL, INC Log No. 16-602
FIGURE 1
APPENDIX A
REFERENCES
Marbrisa Resorts -Phase III Event Gardens -Subsurface Investigation
Carlsbad, California
APPENDIX A
REFERENCES
MTGL Project No. 1916Bll
MTGL Log No. 16-602
California Building Standards Commission (2013). 2013 California Building Code, July 2013.
Excel Engineering (2016). Minor Grading Plans for: Marbrisa Event Garden, 6 Sheets, June 10.
Excel Engineering (2006). 'As-Built' Grading Plans for: Carlsbad Ranch, Planning Area No. 5,
Resort Site-Phase 1, Project No. CT 03-02, Drawing No. 428-9A, Sheets 11 , 12, 13, 15, and
17.
Kennedy, Michael P. and Siang Tan (2005). Geologic Map of the Oceanside 30' x 60 '
Quadrangle, California, USGS Digitally Prepared.
Leighton and Associates (2006). As-Graded Geotechnical Report of Rough Grading and Fine
Grading, Hotel One, Resort and Conference Facilities, Sales Building, and Villas No. 52
through 56, Lots 10, 11, and a portion of Lot 1, Grand Pacific Carlsbad, California, Project
Number 040575-005, August 2.
Leighton and Associates (2005). Geotechnical Investigation, Proposed 53-Acre Resort
Development-Phase 1, Carlsbad Ranch, Planning Area No. 5, Carlsbad, California, Project
No. 040575-003, April 11.
Page AI 6295 Fenis Square, Suite C
San Diego, CA 92121
(&5&) 537-3999
APPENDIXB
FIELD EXPLORATION PROGRAM
Marbrisa Resorts -Phase ill Event Gardens -Subsurface Investigation
Carlsbad, California
APPENDIXB
FIELD EXPLORATION PROGRAM
MTGLProjectNo. 1916Bll
MTGL Log No. 16-602
The subsurface conditions for this Geotechnical Investigation were explored by excavating three
(3) exploratory borings. The exploratory borings were excavated using a limited access drill rig
with a 6-inch diameter hollow-stem-auger to a maximum depth of 1912 feet below existing grade.
The approximate locations of the borings and test pits are shown on the Site Plan (Figure 1 ). The
field exploration was performed under the supervision of our geologist who maintained a
continuous log of the subsurface soils encountered and obtained samples for laboratory testing. All
drive samples were obtained by SPT or California Tube Sampler.
Subsurface conditions are summarized on the accompanying Logs of Borings. The logs contain
factual information and interpretation of subsurface conditions between samples. The stratum
indicated on these logs represents the approximate boundary between earth units and the transition
may be gradual. The logs show subsurface conditions at the dates and locations indicated, and may
not be representative of subsurface conditions at other locations and times.
Identification of the soils encountered during the subsurface exploration was made using the field
identification procedure of the Unified Soils Classification System (ASTM D2488). A legend
indicating the symbols and definitions used in this classification system and a legend defining the
terms used in describing the relative compaction, consistency or firmness of the soil are attached in
this appendix. Bag samples of the major earth units were obtained for laboratory inspection and
testing, and the in-place density of the various strata encountered in the exploration was determined
The exploratory borings were located in the field by using cultural features depicted on a
preliminary site plan provided by the client. Each location should be considered accurate only to
the scale and detail of the plan utilized.
The exploratory borings were backfilled in accordance with State of California regulations which
incorporated compacting soil cuttings and bentonite chips.
Page B-1 6295 Ferris Square, Suite C
San Diego, CA 92121
(858) 537-3999
Marbrisa Resorts -Phase lli Event Gardens -Subsurface Investigation
Carlsbad, California
MTGL Project No. 1916Bll
MTGL Log No. 16-602
Description
Boulders
Cobbles
Gravel Coarse
Fine
Coarse
Sand Medium
Fine
Fines
UNIFIED SOIL CLASSIFICATION SYSTEM
GRAVELS
are more than half of
coarse fraction larger
than #4 sieve
SANDS
are more than half of
coarse fraction larger
than #4 sieve
Clean Gravels (less
than 5% fines)
Gravels with fines
Clean Sands (less
than 5% fines)
Sands with fines
SILTS AND CLAYS
Liquid Limit
Less than 50
SILTS AND CLAYS
Liquid Limit
Greater than 50
Highly Organic Soils
GRAIN SIZE
Sieve Size Grain Size
GW
GP
GM
GC
sw
SP
SM
sc
ML
CL
OL
MH
CH
OH
PT
Well-graded gravels, gravel-sand mixtures,
little or no fines
Poorly-graded gravels, gravel-sand mixtures,
little or no fines
Silty Gravels, poorly-graded gravel-
sand-silt mixtures
Clayey Gravels, poorly-graded gravel-
sand-clay mixtures
Well-graded sands, gravelly sands,
little or no fines
Poorly-graded sands, gravelly sands,
little or no fmes
Silty Sands, poorly-graded sands-
gravel-clay mixtures
Clayey Sands, poorly-graded sand-
gravel-silt mixtures
Inorganic clays oflow to med plasticity,
gravelly, sandy, siltv, or lean clays
Inorganic clays of low to med plasticity,
gravelly, sandy, silty, or lean clays
Organic silts and clays
oflowolasticitv
Inorganic silts, micaceous or diatomaceous
fine sands or silts
Inorganic clays of high plasticity,
fat clavs
Organic silts and clays of medium
to high plasticity
Peat, humus swamp soils with
high organic content
SIZE PROPORTION
Approximate Size Trace-Less than 5%
>12" >12" Larger than basketball-sized Few -5%to 10%
3"-12" 3"-12" Fist-sized to basketball-sized Little -15% to 20%
%"-3" %"-3" Thumb-sized Some-30% to 45%
#4 -%" 0.19"-0.75" Peat-sized to thumb-sized Mostly -50% to 100%
#10-#4 0.079" -0.19" Rock salt-sized to pea-sized MOISTURE CONTENT
#40-#10 0.0 17" -0.079" Sugar-sized to rock salt-sized Dry -Absence of moisture
#200-#40 0.0029" -0.0 17" Flour-sized to sugar-sized Moist-Damo but not visible
Passing #200 <0.0029" Flour-sized or smaller Wet- Visible free water
CONSISTENCY FINE GRAINED SOILS RELATIVE DENSITY COARSE GRAINED SOILS
Apparent SPT Mod CA Sampler Apparent
Density (Blows/Foot) (Blows/Foot) Density
Very Soft <2 <3 Very Loose
Soft 2-4 3-6 Loose
Firm 5-8 7-12 Medium Dense
Stiff 9-15 13-25 Dense
Very Stiff 16-30 26-50 VervDense
Hard >30 >50
Page B-2
SPT
(Blows/Foot)
<4
4-10
11-30
31-50
<50
Mod CA Sampler
(Blows/Foot)
<5
5-12
13-35
36-60
<60
6295 Ferris Square, Suite C
San Diego, CA 92121
(858) 537-3999
BORING NO. B-1
Logged by: BMH Date Drilled: 5/31/2016
Method of Drilling: 6-inch diameter hollow-stem auger Elevation: -227ft
1-w w Li:" I=' LL ..J ..J c n:: a. a. 0
!!:.. w ::E ::E !!:.. w
J: a. <( <( ~ n:: DESCRIPTION LAB TESTS 1-U) U) U) ::I a. ;: w ~ ii) 1-
w > U)
0 ..J z 0 c ii: ::I w ..J ::E al c al c
r-1 FILL: Silty Sand (SM), medium yellow brown, fine to medium, moist, Maximum Density &
medium dense, slightly clayey. Optimum Moisture
r-2
r-3 r--
r-4 35 CAL 116 12.1
f-5 '--Yellow to orange brown, scattered small fragments of clay.
r-6
f-7 27 ~ 116 12.5
f-8
f-9
f-10
11 18 ISPT
12
r-13
14
15 SANTIAGO FORMATION (Tsal: Poorly graded Sandstone 'SP', pale yellow gray
to white, fine grained, moist, weak to moderately cemented.
16 r--
17 54 CAL --4.2
f-18 Boring terminated at 17 feet
No groundwater encountered
f-19 Backfilled on 5/31/16
f-20
f-21
r-22
r-23
f-24
f-25
r-26
r-27
f-28
29
30
PROJECT NO. 1916811 A LOG OF BORING PAGE B-1
BORING NO. B-2
Logged by: BMH Date Drilled: 5/31/2016
Method of Drilling: 6-inch diameter hollow-stem auger Elevation: -227ft
1-w w u::-~ I=" II.. ...J ...J Q: Q. Q. (,) !!-
!:!:.. w ::E ::E e:.. w
J: Q. c( c( ~ Q: DESCRIPTION LAB TESTS 1-U) U) U) :::1
Q. 3: w ::.:: (i) 1-w > U)
0 ...J z 0 c iii: :::1 w ...J ::E al c al c
FILL: Silty Sand (SM), medium yellow brown, fine to medium, moist,
1 medium dense, slightly clayey.
2
3
4
5 40 CAL 119 11 .8 Yellow to orange brown, scattered small fragments of clay.
Maximum Density &
6 Optimum Moisture
7
8
9 1--
10 35 CAL 115 14.0
11
12
13
14 -
f-15 35 ~ SANTIAGO FORMATION !Tsal: Poorly graded Sandstone 'SP', pale yellow gray
f-16 to white, fine Qrained, moist, weakly to moderately cemented.
f-17 Boring terminated at 16 feet
No groundwater encountered
f-18 Backfilled on 5/31/16
19
20
21
22
23
24
25
26
27
28
r-29
r-30
PROJECT NO. 1916811 A LOG OF BORING PAGE B-2
BORING NO. B-3
Logged by: BMH Date Drilled: 5/31/2016
Method of Drilling: 6-inch diameter hollow-stem auger Elevation: -225ft
1-w w u:-~ I=' II. ..J ..J
0:: a. a. 0 e...
!:!:. w :::!!: :::!!: e:. w
J: a. ol( ol( ~ 0:: DESCRIPTION LAB TESTS 1-f/) f/) f/) :::1
a. 3': w lit: u; 1-w > f/)
0 ..J z 0 c ..J iii: :::1 w
al c al c :::!!:
FILL: Silty Sand (SM), medium yellow brown, fine to medium, moist, medium
1-1 dense, slightly clayey.
1-2
1-3
1-4 r--
1-5 31 CAL 114 11.3 Yellow to orange brown, scattered small fragments of clay.
1-6
1-7
1-8
1--
1-9 30 ~ 118 14.3
1-10 r--
1-11
1-12
1-13
1-14
1-15 SANTIAGO FORMATION CTsa): Poorly Graded Sandstone 'SP', yellow gray
1-16 to white, fine grained, moist, weakly to moderately cemented.
47 ..!!!!.
1-17
1-18 r--Yellow white with orange fracture staining.
1-19 53 ...;.
1-20 Boring terminated at 19.5 feet
1-21 No groundwater encountered
Backfilled on 5/31/16
1-22
1-23
1-24
1-25
1-26
1-27
1-28
1-29
1-30
PROJECT NO. 1916811 • LOG OF BORING PAGE B-3
All ~·,··till.. L•c'
APPENDIXC
LABORATORY TEST PROCEDURES
APPENDIXC
LABORATORY TESTING PROCEDURES
1. Classification
Soils were classified visually, generally according to the Unified Soil Classification
System. The test resultant soil classifications are shown on the Boring Logs and Test Pit
Logs in Appendix B.
2. In-Situ Moisture/Density
The in-place moisture content and dry unit weight of selected soil samples were determined
using relatively undisturbed samples from the Cal Tube Sampler. The dry unit weights and
moisture contents are shown on the Boring Logs in Appendix B.
3. Maximum Density
Maximum density tests were performed on a representative bag sample of the near surface
soils in accordance with ASTM Dl557. Test results are presented on the table below.
Sample Description Location
B-1 at 0 to 5' Silty Sand (SM) -Medium yellow
brown
B-2 at 4' to 10' Silty Sand (SM) -Medium yellow
brown
Page C-1
Maximum Dry
Density (pet)
130.3
130.7
Optimum Moisture
Content(%)
9.6
9.6
6295 Fcnis Square, Suite C
San Diego, CA 92121
(858) 537-3999
I
APPENDIXD
STANDARD GRADING SPECIFICATIONS
6295 Fenis Square, Suite C
San Diego, CA 92121
(858) 537-3999
I
Marbrisa Resorts -Phase III Event Gardens -Subsurface Investigation
Carlsbad, California
APPENDIXD
MTGL Project No. 1916Bll
MTGL Log No. 16-602
GENERAL EARTHWORK AND GRADING SPECIFICATIONS
GENERAL
These specifications present general procedures and requirements for grading and earthwork as
shown on the approved grading plans, including preparation of areas to be filled, placement of fill,
installation of subdrains, and excavations. The recommendations contained in the attached
geotechnical report are a part of the earthwork and grading specifications and shall supersede the
provisions contained herein in the case of conflict. Evaluations performed by the Consultant
during the course of grading may result in new recommendations, which could supersede these
specifications, or the recommendations of the geotechnical report.
EARTHWORK OBSERVATION AND TESTING
Prior to the start of grading, a qualified Geotechnical Consultant (Geotechnical Engineer) shall be
employed for the purpose of observing earthwork procedures and testing the fills for conformance
with the recommendations of the geotechnical report and these specifications. It will be necessary
that the Consultant provide adequate testing and observation so that he may determine that the
work was accomplished as specified. It shall be the responsibility of the Contractor to assist the
Consultant and keep them apprised of work schedules and changes so that he may schedule his
personnel accordingly.
It shall be the sole responsibility of the Contractor to provide adequate equipment and methods to
accomplish the work in accordance with applicable grading codes or agency ordinances, these
specifications and the approved grading plans.
Maximum dry density tests used to determine the degree of compaction will be performed in
accordance with the American Society for Testing and Materials Test Method (ASTM) 01557.
PREPARATION OF AREAS TO BE FILLED
Clearing and Grubbing: All brush, vegetation and debris shall be removed or piled and otherwise
disposed of.
Page D-1
6295 Fenis Square, Suite C
San Diego, CA 92 I 2 I
(858) 537-3999
Marbrisa Resorts -Phase III Event Gardens -Subsurface Investigation
Carlsbad, California
MTGL Project No. 1916Bll
MTGL Log No. 16-602
Processing: The existing ground which is determined to be satisfactory for support of fill shall be
scarified to a minimum depth of 12 inches. Existing ground, which is not satisfactory, shall be
overexcavated as specified in the following section.
Overexcavation: Soft, dry, spongy, highly fractured or otherwise unsuitable ground, extending to
such a depth that surface processing cannot adequately improve the condition, shall be
overexcavated down to firm ground, approved by the Consultant.
Moisture conditioning: Overexcavated and processed soils shall be watered, dried-back, blended,
and mixed as required to have a relatively uniform moisture content near the optimum moisture
content as determined by ASTM Dl557.
Recompaction: Overexcavated and processed soils, which have been mixed, and moisture
conditioned uniformly shall be recompacted to a minimum relative compaction of 90 percent of
ASTMD1557.
Benching: Where soils are placed on ground with slopes steeper than 5:1 (horizontal to vertical),
the ground shall be stepped or benched. Benches shall be excavated in firm material for a
minimum width of 4 feet.
FILL MATERIAL
General: Material to be placed as fill shall be free of organic matter and other deleterious
substances, and shall be approved by the Consultant.
Oversize: Oversized material defmed as rock, or other irreducible material with a maximum
dimension greater than 12 inches, shall not be buried or placed in fill, unless the location, material,
and disposal methods are specifically approved by the Consultant. Oversize disposal operations
shall be such that nesting of oversized material does not occur, and such that the oversize material
is completely surrounded by compacted or densified fill. Oversize material shall not be placed
within 10 feet vertically of finish grade or within the range of future utilities or underground
construction, unless specifically approved by the Consultant.
Import: If importing of fill material is required for grading, the import material shall meet the
general requirements.
Page D-2
6295 Ferris Square, Suite C
San Diego, CA 92121
(~5~) 537-3999
Marbrisa Resorts -Phase III Event Gardens -Subsurface Investigation
Carlsbad, California
FILL PLACEMENT AND COMPACTION
MTGLProjectNo. 1916Bll
MTGL Log No. 16-602
Fill Lifts: Approved fill material shall be placed in areas prepared to receive fill in near-horizontal
layers not exceeding 6 inches in compacted thickness. The Consultant may approve thicker lifts if
testing indicates the grading procedures are such that adequate compaction is being achieved with
lifts of greater thickness. Each layer shall be spread evenly and shall be thoroughly mixed during
spreading to attain uniformity of material and moisture in each layer.
Fill Moisture: Fill layers at a moisture content less than optimum shall be watered and mixed, and
wet fill layers shall be aerated by scarification or shall be blended with drier material. Moisture
conditioning and mixing of fill layers shall continue until the fill material is at uniform moisture
content at or near optimum.
Compaction of Fill: After each layer has been evenly spread, moisture conditioned, and mixed, it
shall be uniformly compacted to not less that 90 percent of maximum dry density in accordance
with ASTM D1557. Compaction equipment shall be adequately sized and shall be either
specifically designed for soil compaction or of proven reliability, to efficiently achieve the
specified degree of compaction.
Fill Slopes: Compacting on slopes shall be accomplished, in addition to normal compacting
procedures, by backrolling of slopes with sheepsfoot rollers at frequent increments of 2 to 3 feet as
the fill is placed, or by other methods producing satisfactory results. At the completion of grading,
the relative compaction of the slope out to the slope face shall be at least 90 percent in accordance
with ASTM D1557.
Compaction Testing: Field tests to check the fill moisture and degree of compaction will be
performed by the consultant. The location and frequency of tests shall be at the consultant's
discretion. In general, these tests will be taking at an interval not exceeding 2 feet in vertical rise,
and/or 1,000 cubic yards of fill placed. In addition, on slope faces, at least one test shall be taken
for each 5,000 square feet of slope face and/or each 10 feet of vertical height of slope.
SUBDRAIN INSTALLATION
Subdrain systems, if required, shall be installed in approved ground to conform to the approximate
alignment and details shown on the plans or herein. The subdrain location or materials shall not be
changed or modified without the approval of the Consultant. The Consultant, however, may
recommend and, upon approval, direct changes in subdrain line, grade or materials. All subdrains
Page D-3
6295 Ferris Square, Suite C
San Diego, CA 92121
(858) 537-3999
Marbrisa Resorts-Phase ill Event Gardens -Subsurface Investigation
Carlsbad, California
MTGL Project No. 1916Bll
MTGL Log No. 16-602
should be surveyed for line and grade after installation and sufficient time shall be allowed for the
surveys, prior to commencement of fill over the subdrain.
EXCAVATION
Excavations and cut slopes will be examined during grading. If directed by the Consultant, further
excavation or overexcavation and refilling of cut areas, and/or remedial grading of cut slopes shall
be performed. Where fill over cut slopes are to be graded, unless otherwise approved, the cut
portion of the slope shall be made and approved by the Consultant prior to placement of materials
for construction of the fill portion of the slope.
Page D-4
6295 Ferris Square, Suite C
San Diego, CA 92121
(tl5tl) 537-3999
OFFICE LOCATIONS
SAN DIEGO
l~lPERlt\1. COUNTY
6295 ferris Square
Suite C
San Diego, CA 92121
Tel: 858.537 . .3999
Fnx: 858.537.3990
ORANGE COUNTY
CORI'ORA TE BRANCII
2992 E. La Palma Avenue
Suite A
Anaheim, CA 92806
Tel: 714.632.2999
Fax: 714.632.2974
INLAND EMPIRE
14467 Meridian P~rkway
Building 2A
Riverside, CA 92518
Tel: 951.653.4999
fax: 951.653.4666
INiliO
44917 Golr Center Pkwy
Suite 1
Indio. CA 92201
Tel: 760.342.4677
Fax: 760.342.4525
OC/LA/INLA:'<D EMPIRE
DISI'ATCII
800.491 .2990
SAN l>JEGO DtSP•\ TCIJ
888.844.5060
www.mtglinc.com
August 2, 2016
Geotechnical Engineering
Construction Inspection
~-.t-;_j_C_O_R_D __ c_·~-, P-i __, Materials Testin~
1 -'?il1J.ri:tdJ __ q f b 1 t._ Environmental
,d' ' ' p ___ ·_' _' ___ --·--· ~ ___J
Grand Pacific Resorts, Inc.
5900 Pasteur Court, Suite 200
Carlsbad, California 92008
MTGL Project No: 1916Bll
MTGL Log No: 16-1291
Attention: Mr. Houston Arnold
Subject:
Reference:
REVIEW OF GRADING PLANS
Marbrisa Resorts -Event Garden
Grand Pacific Resorts
Carlsbad, California
MTGL, Inc. (2016). Subsurface Investigation, Marbrisa Resorts -
Events Garden, Grand Pacific Resorts, Carlsbad, California, MTGL
Project No. 1916Bl1, Log No. 16-616, June 20.
MTGL, Inc. (2016). Grading Recommendations -Events Garden,
Marbrisa Resorts -Phase Ill, Grand Pacific Resorts, Carlsbad,
California, MTGL Project No. 1916Bll, Log No. 16-602, May 31.
Excel Engineering (20 16). Minor Grading Plans for: Marbrisa Event
Gardens, 6 Sheets, June 10.
Dear Mr. Arnold:
Per your request, we have reviewed the referenced Grading Plans prepared by Excel
Engineering for the Events garden located at the Marbrisa Resorts in Carlsbad,
California for general conformance to the geotechnical recommendations presented in
our referenced report and letter. Based upon our review of the plans, it is our opinion
that the geotechnical recommendations presented in the referenced documents have
been properly incorporated into the plans. For retaining walls, San Diego Regional
Drawing C-5 is appropriate for use in level backfill areas and Drawing C-6 is
appropriate for sloping backfill areas. The soil design parameters identified in
Drawing C-7 are considered appropriate for use at the site.
We appreciate this opportunity to be of continued service to you. Should you have any
questions regarding the information contained herein, please contact us at your earliest
convenience.
Respectfully submitted,
MTGL,Inc. R ,fVED
~ (~ SEP 072016
Sam E. ~z, RCE 56226, RGE 2813
Vice President I ChiefEngineerin AND 0[\ .-::LOPMENT