HomeMy WebLinkAboutCT 03-02; CARLSBAD RANCH PA 5; PAD CERTIFICATION; 2014-07-16C'Th3-o2
Geotechl nkai Engin eering
Construction thspection
Materials Testing
Envfronuidntal
Otncr LorviloNs
July 16, 2014
SDiuo
hIpRE%t Cot vrt
6295 Ferris Square
Suite C
San Dego,CA 92121
Tel: 858.537.3909
Fax: 858.537.3990
MTGL Project No: 1916A09
MTGL Log No: 14-561
Grand Pacific Resorts, Inc.
5900 Pasteur Court, Suite 200
Carlsbad, California 92008
Attention: Mr. Houston Arnold
Subject: BUILDING PAD CERTIFICATION - VILLA 59
Marbrisa Resorts
Carlsbad, California
ORANGE Coti'T
CORPORATE BRANd,
2992 E, U PlIr.3 Avenue
Suite A
Anaheim. CA 92806
Tel: 714.632.2999
Fax: .714.632.2974
Dear Mr. Arnold:
Per your request, we have prepared this letter to certify that remedial grading for Villa
59 building pad at the Marbrisa Resorts was accomplished in general accordance with
the approved plans, specifications and geotechnical investigation.
I7'LVfl E\IPiRh Remedial grading consisted of over-excavation of five feet of soil from finished pad
14467 Meridian Purtway elevation. The excavated soils were then moisture conditioned and compacted to a Building 2A
Riveide.CA 92518 I minimum of 95 percent of the maximum dry density as determined by ASTM B 1557.
Tel: 951653,4999
Fav, 431653.4606 I We observed grading at the site from July 1 to July 10, 2014. Based on our
observations and the results of our tests the building pad construction complies with
INDIO the project approved documents.
44917 Golf Centcr Piwy
Suite
liid, CA 92201 We appreciate this opportunity to be of continued service to you. Should you have any
questions regarding the information contained herein, please contact us at your earliest Ni~.760 342.4525
convenience.
OC/L-Vlit..'wExlriutE
D!SPTCU I Respectfully submitted, .
800,491 2990 1 MTGL, Inc.
DuCo DISPY%TCII
838:844 5060
Sam E. Valdez, RCE 56226, ROE 2813
Vice President Chief Engineering CAL
www,t2linc.crn
EXCEL ENGINEERING LEV1N & DENTINO INC. O.B.A. EXCEL ENGINEERING'
ESCONDIDO 440 State Place • Escondido, CA 92029 (760) 745-8118 'Fax 745-8134
July 15, 2014
RE: Certification of Pad Grade for Villas 59 and 60 of the City of Carlsbad Drawing No. 428-
9G, Project No. CT 03-02, Grading Plans for Carlsbad Ranch, Planning Area No. 5, Resort Site -
Phase 2
To whom it my concern,
Excel Engineering performed a field survey on July 14, 2014 to confirm finish
pad grade for the referenced site. A minimum of 9 shots were taken and the finished pad
grade is as follows:
Villa Pads Average Pad Elevations Design Pad Elevations
59 190.11 190.10
60 190.01 189.96
The maximum deviation from design to finish pad for said pad was found to be 0.09'. The pad is
in substantial conformance with the approved grading plan.
If you have any further questions or need any additional information do not hesitate to call.
Sincerely,
Michael D. Levin, PLS
Q:\I 1\I 10O8Docs\PAD CEflTSPAD CERT VILLAS 5960 . 07•1520144cc