HomeMy WebLinkAboutCT 03-02; CARLSBAD RANCH PA 5; PAVEMENT ANALYSIS FOR LOT 12; 2008-09-04crc.-02
Geotechnical Engineering
Construction Inspection
Materials Testing
Environmental
September 4, 2008
San Diego
Imperial County
7313 Carroll Road
Suite 9
San Diego, CA 92121
Tel: 858.537.3999
Fax: 858.537.3990
www.mtglinc.com
Mr. Bruce Zelenka
Grand Pacific Carlsbad, L.P. Project No. 1916-CO 1
5900 Pasteur Court, Suite 200 Log No. 08-1400
Carlsbad, CA 92008
Subject: Pavement Analysis for Lot 12
Carlsbad Ranch
Carlsbad, CA
Dear Mr. Zelenka:
In accordance with your request, we are providing this pavement analysis for the Carlsbad
Ranch Lot 12.
A total of three soil samples were obtained at different locations on the rough graded
subgrade planned to receive pavement. Resistance R-value testing was performed in
general accordance with Caltrans Test Method 301. The R-value results are summarized
below.
Sample No. Location. R-Value
-
1 East End Area 70
L 2 Middle Area 55
3 West End Area 53
Our engineering analysis for the asphalt concrete structural section was based upon the
standard design procedures for pavement as outlined in Caltrans Highway Design Manual.
Our analysis incorporates the Traffic Index provided in the project geotechnical report of
Leighton and Associates, Inc., dated April 11, 2005, a Traffic Index of 4.5 and 5.0 for
automobile parking and driveway, respectively. The minimum R-value of 53 was utilized in
the analysis.
With the above parameters, the pavement Section of 3 inches AC and 4 inches AB shown on
the approved plans is sufficiently adequate up to a Traffic Index of 6.0. However, based upon
the City of Carlsbad, Standard No. GS-17, the corresponding minimum pavement section
shall be 4 inches AC and 4 inches AB for a Traffic Index of 4.5 and 5.0.
Office Locations.
Orange County
Corporate Branch:
2992 E. La Palma Avenue
Suite A
Anaheim, CA 92806
Tel: 714.632.2999
Fax: 714.632.2974
Inland Empire
14467 Meridian Parkway
Building 2A
Riverside, CA 92518
Tel: 951.653.4999
Fax: 951.653.4666
DC/LA/Inland Empire
Dispatch
800.491.2990
San Diego Dispatch
888.844.5060
Fl
Carlsbad Ranch Lot 12 Project No. 1916-CO1
Carlsbad, CA Log No., 8-1400
Construction Considerations
The upper 12 inches of subgrade shall be compacted to a minimum of 95 percent relative
compaction based on ASTM D1557.
Base material shall conform to the requirements of Section 200-2 of the Standard
Specifications for Public Works Construction (SSPWC). The relative compaction of the base
material shall not be less than 95 percent per Test Method ASTM D1557.
Asphalt concrete shall be dense, hot-laid, hot mix asphalt plant mixes with a history of
satisfactory performance in geographical area where project is located and approved by
authorities having jurisdiction. Hot-mix asphalt paving materials, workmanship and other
requirements shall be in accordance with the state standard specifications or SSPWC.
Geotechnical Observation/Testing
The geotechnical consultant shall perform geotechnical observation and testing to ascertain
that conditions corresponds to the findings and conclusions and that construction conform
generally to the recommendations presented herein.
If you have any questions regarding this letter, please do not hesitate to contact us
immediately.
Respectfully Submitted,
MTGL, Inc. ' .57217 M EiP12l31(O1J Eduardo C. Dizon, PE
Project Engineer
CIVIV
cc: Davis Adams
Attachment: R-value Lab Test Reports
Computer Output Pavement Analysis
ACP Thickness
S -
File No.: 1916-CO1 Cllent:ICarlsbad Ranch Lot 12 Base
By:ED -- Date 9/4/2008 TI G1 Types G Types
0 2.50 1 1.0 "Aggregate Subbase
________ ______ 5 2.50 2 1.1 'Untreated A. B.
6 2.32 - 3 12 '.Lime Treated Base
Base Type: 12 7 2.14 4 1 1.7 Class A CTB
Base Type: "Untreated A. B 8 1 2.01 5 1.5 Class B CTB
-- BaseG1:1.1. . 9 1.89 6 1.2 ClassCCTB - _____
-..........................I ___.........._ ___ 10 1.79 7 1.0 Other Base R-Value: 78 11 1.71 ______ _____
12 1.64 ______
Full A.C. Sect F.S.:
0.2
0.1
13 1.57
14 1.52
______ ______ ______ ______
Expansive Swell Use Swell
Equilibrium_______ ____ Minimum Use Actual Minimum Use Reduced Full Sect Full Sect Reduced
Subgrader
- TI R-Value
GET,
(feet)
GE,
(feet)
GE
(feet) G1
T
(feet) (Inches)
GEac GEb Tb I Tb
(feet) (feet) (feet) (Inches)
I Subgradel Tac Tac
R-Value J feet) (inches)
Subgrade
R-Value
4.5 53.0 0.47 0.68 1 0.52 2.50 0.21 3.0 0.63 0.05 1 0.05 1.0 49.4 0.31 4.0 49.4
5.0 53.0
6.0 53.0
0.55
0.60
0.75 1
0.90
0.55 -.
0.62
2.50
2.32
0.22T3.0
0.27 3.0
0.63 0.13 0.12 1.5
0.58 0.32 . 0.29. 4.0
44.5 0.34 4.54
64.6 043 5.5 55.0
7.0 53.0 1 0.70 1.05 1 0.69 1 2.14 0.32 4.0 0.71 0.34 1 0.31 4.0 63.9 0.54 6.5 55.6
#DIV/0' #DIV/0!
Page 1
R-VALUE TEST REPORT,
100--
80
60—
>
40-
20 - --
0 U_l_L .L.LU LLLL IJJJ. .LLLL .LL.0 LLLL LLLL JJJJ. .LLLJ. LJ...LL L.LL.L .LLLL .LLU
800 700 600 500 400 300 200 100
Exudation Pressure - psi
Resistance R-Value and Expansion Pressure - Cal Test 301
Compact. Expansion Horizontal Sample Exud. R Density Moist. R No. Pressure Pressure Press. psi Height Pressure Value pcf / Value
- psi psi @160 psi i n. psi Corr.
1 350 116.9 8.5 0.36 34 2.61 716 70 72
2 350 114.1 9.3 0.30 37 1 2.64 1 318 67 70
3 350 109.2 11.9 0.00 40 2.66 215 65 69
Test Results Material Description
R-value at 300 psi exudation pressure = 70 SILTY SAND (SM), light brown
Project No.: 1916-COI Tested by: JS
ProJect:CARLSBAD RANCH - LOT 12 Checked by: JH
Location: EAST END AREA Remarks:
Sample Number: I Lab #848
Date: 9/4/2008
A-VALUE TEST REPORT
MTGL, Inc. Figure
R-VALUE TEST REPORT
.100 - --
80
60 -
40 HIIIIIIIIIEII cc
20
- 0 .LLLL i_I_U LL LL 1_LU. U_I_I. .LJ_LL LU..L LI_I_I. .1_I_I_I. i_I_LI
800 700 600 500 400 300 200 100
Exudation Pressure - psi
Resistance R-Value and Expansion Pressure - Cal Test 301
Compact. Expansion Horizontal Sample Exud. R Density Moist. R No. Pressure Pressure Press. psi Height Pressure Value PC f % Value
- . psi psi @ 160 psi In. psi Corr.
350 113,1 15.1 0.30 44 2.53 438 62 62
2 350 110.3 16.0 0.33 58 2.55 239 51 51
3 350 114.2 14.3 0.27 38 2.51 668 67 67
Test Results Material Description
R-value at 300 psi exudation pressure = 55 SILTY SAND (SM), light brown
Project No.: 1916-00I Tested by: JS
Project:CARLSBAD RANCH - LOT 12 . Checked by: JR
Location: MIDDLE AREA Remarks:
Sample Number: 2 Lab #849
Date: 9/4/2008
R-VALUE TEST REPORT
MTGL, Inc. Figure
R-VALUE TEST REPORT
100--
80—
-
60
CD
—
40 20 --
iLL! LU_I LLLL J_UJ. LIJJ. LLL.L LI_LI LI_U .LLLI .LLU .U_LL UJJ. JJJJ. LI_Li
800 700 600 500 400 300 200 100
Exudation Pressure - psi
Resistance R-Value and Expansion Pressure - Cal Test 301
No.
Compact.
Pressure
psi
Density
pcf
Moist. st.
%
Expansion
Pressure
psi
Horizontal
Press. psi
@160 psi
Sample
Height
in.
Exud.
Pressure
psi
R
Value
R
Value
Corr.
350 119.4 10.0 0.00 30 2.56 676 74 75
2 1 350 1 115.2 1 12.5 0.00 1 60 2.57 1 279, 1 49 1 51
3 350 118.2 11.7 0.00 38 1 2.55 1 438 L 67 J 67
Test Results Material Description
Rvalue at 300 psi exudation pressure = 53 SILTY SAND (SM), dark brown
Project No.: 1916-COI
Project:CARLSBAD RANCH- LOT 12
Location: WEST END AREA
Sample Number: 3
Date: 9/4/2008
Lab #850
Tested by: JS
Checked by: JH
Remarks:
Figure
R-VALUE TEST REPORT
MTGL, Inc.