HomeMy WebLinkAboutCT 03-02; CARLSBAD RANCH PA 5; ROUGH GRADE PAD CERTIFICATION FOR LOT 1 HOTEL 2; 2007-01-11C11 03-62
EXCEL ENGINEERING LEVIN & DEN TINO INC. D.B.A. EXCEL ENGINEERING
ESCONDIDO 440 State Place • Escondido, CA 92029 (760) 745-8118 • Fax 745-1890
January 11, 2007
RE: Rough Grade Pad Certification for Lot 1-Hotel 2 Basement Level, City of Carlsbad Drawing
No. 428-9A, Project No. CT 03-02, Grading Plans for Carlsbad Ranch, Planning Area No. 5,
Resort Site - Phase 1
To whom it my concern,
Excel Engineering performed a field survey on January 10, 2007 to confirm the
rough grade pad for the referenced site. A maximum of 15 shots was taken. The finished
pad grade is as follows:
Pad Elevations Design Elevation
Hotel 2 Basement Level varies: 222.97 - 224.34 varies: 222.62 - 224.42
The area being certified hereon is the building area of the pad at the basement floor elevation;
elevation varies and is a 7" section per site superintendent.
The maximum deviation from design to finish pad for said pad was found to be 0.1'. The pad is
in substantial conformance with the approved grading plan.
If you have any further questions or need any additional information do not hesitate to call.
Sincerely,
Pichael D. Levin, PLS
( 7 D. Lin
EKi43..Q2__ )
Q:05\05060\docs\rg-padcert hote12-basement.doc