September 5, 2006
Project No.: 3 103 SD3
Trans West Housing, Inc.
10721 Treena Street, Suite 200
San Diego, CA 92131
Attention: Mr. Paul O'Boyle
Subject: Geotechnical Update
Black Rail TM No. 2-026
Carlsbad, California
References:
1) Preliminary Geotechnical Investigation, Proposed 17-Lot Subdivision, Black' Rail Road, APN
215-080-20, 21, 28 Carlsbad, California, dated May 22, .2003, by Vinje and Middleton
Engineering. Inc. . .
2). Rough Grading Plans for Black Rail-16, CT 03-06, Carlsbad, California, undated, by Excel
Engineering, Inc. . . . . . . .
Dear Mr. O'Boyle:
In. accordance with your request, we have performed a site reconnaissance on September 6, 2006
for the subject site and found that the existing site conditions are generally the same as those
described in the above-referenced soils report. Therefore, the recommendations presented in the
report are considered valid and applicable to the proposed site development. Any deviation from
the said recommendations contained in the referenced report, will be based upon actual field
conditions observed during site grading and will be documented in the final soils report.
Henceforth, we assume the responsibility of the Geotechnical Engineer of Record on this project.
The opportunity to be of service is greatly appreciated. If you have any questions
report or if we may be of further assistance, please do not hesitate 'to contact the u
Respectfully Subm
X
nc.
Blake,
, Exp. 1
Senior Project Ma
Distribution: (4) Addressee
G:\Projects\Projects 3000 to 3999\Projects 3100 to 3 149\3 103SD3'Transwest Black Rail\update report.doc
ARIZONA . . cALIFORNIA ' IDAHO
LU No. 2468 ivv/4/JJ
NteoF CM.l'
William R. Morrison,
GE 2468, Exp. 12/31/06.
Senior Engineer '
NEVADA