Loading...
HomeMy WebLinkAboutCT 03-06; BLACKRAIL 16; GEOTECHNICAL UPDATE; 2006-09-05. cro3bc,, . O 1384 Poinsettia Ave., Suite A Vista, CA 92081-8505 "5 (760) 599-0509 FAX (760) 599-0593 bEK, INCO Geotechnical. Environmental Materials September 5, 2006 Project No.: 3 103 SD3 Trans West Housing, Inc. 10721 Treena Street, Suite 200 San Diego, CA 92131 Attention: Mr. Paul O'Boyle Subject: Geotechnical Update Black Rail TM No. 2-026 Carlsbad, California References: 1) Preliminary Geotechnical Investigation, Proposed 17-Lot Subdivision, Black' Rail Road, APN 215-080-20, 21, 28 Carlsbad, California, dated May 22, .2003, by Vinje and Middleton Engineering. Inc. . . 2). Rough Grading Plans for Black Rail-16, CT 03-06, Carlsbad, California, undated, by Excel Engineering, Inc. . . . . . . . Dear Mr. O'Boyle: In. accordance with your request, we have performed a site reconnaissance on September 6, 2006 for the subject site and found that the existing site conditions are generally the same as those described in the above-referenced soils report. Therefore, the recommendations presented in the report are considered valid and applicable to the proposed site development. Any deviation from the said recommendations contained in the referenced report, will be based upon actual field conditions observed during site grading and will be documented in the final soils report. Henceforth, we assume the responsibility of the Geotechnical Engineer of Record on this project. The opportunity to be of service is greatly appreciated. If you have any questions report or if we may be of further assistance, please do not hesitate 'to contact the u Respectfully Subm X nc. Blake, , Exp. 1 Senior Project Ma Distribution: (4) Addressee G:\Projects\Projects 3000 to 3999\Projects 3100 to 3 149\3 103SD3'Transwest Black Rail\update report.doc ARIZONA . . cALIFORNIA ' IDAHO LU No. 2468 ivv/4/JJ NteoF CM.l' William R. Morrison, GE 2468, Exp. 12/31/06. Senior Engineer ' NEVADA RECEIVED SEP 28 2006 ENOAINEERI N G DEPARTMEN T 4\.