Loading...
HomeMy WebLinkAboutCT 03-13; BLACK RAIL RIDGE; STORM WATER MANAGEMENT PLAN; 2004-08-02I I I I I I I I I I I I I I I I I I I I I ENGINEERING Professional Civil Engineer and Land Surveyor STORM WATER MANAGEMENT PLAN for CT 03·13 • Black Rail Ridge Subdivision Prepared for: Mayfair Hom~s 3443 Camino Del Rio South, Suite 312 San Diego, CA 92108 (619) 280-5777 Project Site Address S.W. Corner, Black Rail Road & PoinseHia, Carlsbad, CA 92009 Prepared by: Michael L. Benesh, R.C.E. 37893 Date: August 2, 2004 600 s. ANDREASEN DRIVE' SUITE E • ESCONDIDO, CA 92029 PHONE: 760 741-3577 • FAX 760 897-2165 • E-MAIL: MLBENESH@PACBELL.NET I I I I I I .1 I I I I I I I I I I I II storm water Management Plan (SWMP) CT 03-13 -Black Rail Ridge Subdivision Contents Section 1. Introduction .................................................................................. 11 •••••••••••• 3 Section 1.01 Introduction .......................................................................................... 3 Section 2. Project ......................................................................................................... 3 Section 2.0 1 Description ............................................................................................ 3 Section 2.02 Topography and Land Use .............................................................. .4 Section 2.03 Hydrologic Unit Contributions ........................................................... 4 Section 3. Water Quality Environment ...................................................................... 4 Section 3.01 Beneficial Uses ..................................................................................... 4 3.01.1 Inland Surface Waters ........................................................................ 6 3.01.2 Groundwater ....................................................................................... 6 Section 3.02 303(d) Status ......................................................................................... 6 Section 4. Characterization of Project Runoff .......................................................... 6 Section 4.01 Existing and Post Construction Drainage ....................................... 6 Section 4.02 Post-Construction Expected Discharges ........................................ 8 Section 4.03 3.3 Soil Characteristics ........................................................................ 9 Section 5. Mitigation Measures To Protect Water Quality ....................................... 9 Section 5.01 Construction BMPs .............................................................................. 9 Section 5.02 Post-construction BMPs .................................................................... 1 0 5.02.1 Site Design BMPs ................................................................................ 10 5.02.2 Source Control BMPs ........................................................................ 10 5.02.3 Treatment Control BMPs .................................................................. 10 5.02.3(i) Sio-Filters ....................................................................................... 11 5.02.3 (i){a) Appropriate Applications and Siting Constraints: ......... 11 Section 6. Operation and Maintenance Program ....................... ~ ............................ 13 Section 6.01 Sio-Filters .............................................................................................. 13 6.01.1 Inspection Frequency ...................................................................... 1-3 6.01.2 Aesthetic and Functional Maintenance ...................................... 13 6.01.2(i) Aesthetic Maintenance ............................................................ 13 6.01.2(ii) Functional Maintenance .......................................................... 14 6.01.2 (ii}(a) Preventive Maintenance .................................................... 14 6.01.2 (ii) (b) Corrective Maintenance .................................................... 15 6.01.3 Maintenance Frequency ................................................................ 15 August 2, 2004 Pagei C:\Project Documents\Land Projects 2005\04-sdll 0 -CT03-13\SWMP .doc I I I I I I I I I I I I I I I I I I I Engineering storm Wafer Management Plan (SWMP) CT 03-J3 -Black Rail Ridge Subdivision 6.01.4 Debris and Sediment Disposal ........................................................ 1 6 Section 7. Mechanisms to Assure Maintenance ..................................................... 16 Section 7.01 Section 7.02 Section 7.03 Section 7.04 Stormwater Ordinance Requirement: .......................................... 16 Notice to Purchasers ........................................................................ 1 6 Subdivision Public Report ................................................................ 16 Funding: ............................................................................................... 17 Section 8. Section 9. Summary Conclusions ............................................................................ 17 Certification ............................................................ l1li •••••••••••••••••••••••••••••••• 18 Attachment A -Vicinity Map ...................................................................................•.......... A-l AHachment B .. Site Plan ....................................................................................................... 8-1 AHachment C -Computation Sheet for Runoff Coefficients ........................................... C-l AHachment D -Drainage Study ..........................................................•.............................. D-1 August 2, 2004 Pageii C:\Project Documenls\Lcnd Projects 2005\04-sdll 0 -CT03-13\SWMP.doc I I I I I I I I I I I I I I I II I I I Section 1. Introduction Section 1.01 Introduction storm Wafer Management Plan (SWMP) CT 03-J 3 -Black Rail RIdge Subdlvls10n Per the National Pollution Discharge Elimination System {NPDES) permit (Order No. 2001-01 NPDES No. CAS0108758) the City of Carlsbad requires development and significant redevelopment. that fall under the category of "priority projects" I include Best Management Practices (BMP's) be incorporated to ensure that those projects reduce potential urban pollutant runoff to the maximum extent practicable (MEP). . The purpose of this SWMP is to address the water qualify impacts from the proposed improvements on the Black Rail Ridge Subdivision. Best Management Practices (BMP$) will be utilized to provide a long-term solution to water quality. This SWMP is also intended to ensure the effectiveness of the BMPs through proper maintenance that is based on long-term fiscal planning. The SWMP is subject to revisions as needed by the engineer. Section 2. Project Section 2.01 Description The project is a 3.6 acre site located in the City of Carlsbad I California. The site is bordered by Black Rail Road on the East, Triton Street on the South and Poinsettia Lane on the North. The site is adjacent to single family homes on the South and North. To the East of the project is a church site and to the West of the project is agricultural land with greenhouses. The proposed project will subdivide the existing parcel of land into 11 lots of approximately one-quarter acres each. Construction will include street and utility improvements along Black Rail Road, Poinsettia Lane, and Triton Street, as well as on- site grading to create building pads. The amount of anticipated grading is approximately 12/000 cubic yards. August 2. 2004 Page 3 C:\Project Documents\Land Projects 2005\04-sdll 0 -CT03-13\SWMP .doc I I I I I I I I I I I I I I I I I I I Section 2.02 Topography and Land Use Storm Wafer Management Plan (SWMP) CT 03-J 3 -Black Rai' Ridge Subdivision The site is currently being used for agricultural purposes, specifically as a nursery, and has no permanent structures. The surface of the land falls from the East to the West, with Black Rqil Road being the high side of the site. Storm water runoff currently drains across the site to the westerly property line via sheet flow and concentrated flow in the unimproved Triton Street. From there, it continues across the neighboring properties in a similar manner until it reaches a natural drainage area on the southerly side of Poinsettia approximately 600 feet West of the site. Through a series of storm drain culverts and natural drainage areas the strom water runoff from this site eventually reaches the Batiquitos Lagoon arid the Pacific Ocean. After development, the existing storm drain system in Poinsettia Lane will be extended to the westerly border of the site. The storm drain system outlets into the natural drainage area 600 feet west of the site. Section 2.03 Hydrologic Unit Contributions The project is located in the Batiquitos watershed and in the Carlsbad hydrologic unit (904.51). The project drains via surface flow to the west, and eventually, through a series of storm drain culverts and natural drainage areas the strom water runoff from this site eventually reaches the Batiquitos Lagoon and the Pacific Ocean. Section 3. Water Quality Environment Section 3.01 Beneficial Uses The beneficial uses for the hydrologic unit are included in Tables 3.1 and 3.2. These tables have been extracted from the Water Quality Control Plan for the San Diego Basin. The beneficial uses are defined as follows: • MUN -Municipal and Domestic Supply: Includes uses of water for community, military, or individual water supply systems including, but not limited to, drinking water supply. August 2, 2004 Page 4 C:\Project Documenls\Land Projects 2005\04-sdll 0 -CT03-13\SWMP.doc I I I I I I I I I I I I I II I I I I I Engineering storm Wafer Management Plan (SWMP) CT 03-J 3 -Black Rail Ridge Subdivision • AGR -Agricultural Supply: Includes uses of water for farming, horticulture, or ranching including, but not limited to, irrigation, stock watering, or support of vegetation for range grazing. • IND -Industrial Services Supply: Includes uses of water for industrial activities that do not depend primarily on water quality including, but not limited to, mining, cooling water supply, hydraulic conveyance, gravel washing, fire protection, or oil well re-pressurization. • BIOL -Preservation of Biological Habitats of Special Significance: Includes uses of water that support designated areas or habitats. • EST -Estuarine Habitat: Includes uses of water that support estuarine ecosystems, including but not limited to preservation or enhancement of estuarine habitats, vegetation, fish, shellfish, or wildlife. • MAR -Marine Habitat: Includes uses of water that support marine ecosystems, including but not limited to preservation or enhancement of marine habitats, vegetation, fish, shellfish, or wildlife. • MIGR -Migration of Aquatic Organisms: Includes uses of water that support habitats necessary for migration, acclimatization between fresh and salt water, or other temporary activities by aquatic organisms, such as anadramous fish. • RARE -Rare, threatened or endangered species: Includes uses of water necessary, alleast in part, for the survival and successful maintenance of plant or animal species established under State or Federal Law as rare, threatened or endangered. • RECl -Contact Recreation: Includes uses of water for recreational activities involving body contact with water, where ingestion of water is reasonably possible. These uses include, but are not limited to, swimming, wading, water-skiing, skin and SCUBA diving, surfing, white water activities, fishing, or use of natural hot springs. • REC2 -Non-Contact Recreation: Includes the uses of water for recreational involving proximity to water, but not normally involving body contact with water, where ingestion of water is reasonably possible. These uses include, but are not limited to, picnicking, sunbathing, hiking, camping, boating, tide pool and marine life study, hunting, sightseeing, or aesthetic enjoyment in conjunction with the above activities. • SPWN -Spawning, reproduction or early development: Includes uses of water that support high quality aquatic habitats suitable for reproduction and early development of fish. • WILD -Wildlife Habitat: Includes uses of water that support terrestrial ecosystems including, but not limited to, preservation and enhancement of terrestrial habitats, vegetation, wildlife, (e.g., mammals, birds, reptiles, amphibians, invertebrates), or wildlife water and food sources. August 2, 2004 Page 5 C:\Project Documenfs\Lond Projects 2005\04-sdll 0 -CT03-13\SWMP.doc I I I I I I I I I I I I I I I ! I I I I storm Wafer Management Plan (SWMP) CT 03-J 3 -Black Rail Ridge Subdivision 3.01. J Inland Sul1ace Waters Inland Surface waters have the following beneficial uses as shown on Table 3.1. Table 3.1-Beneficial Uses for Inland Surface waters Hydrologic Unit AI: w -N Z Q Z AI: ...... AI: <.-' AI: U u 3: :':) <.-' Q 0 I-<t ...... z V) i <t w w A. -=e <C -&iii w =e AI: AI: AI: V) 3: 904.51 • • • • • • • • • • Existing Beneficial Use 3.01.2 Groundwater Groundwater beneficial uses includes areas shown in Table 3.2. Table 3.2 -Beneficial Uses for Groundwater Hydrologic Unit I:t:: w -N Z Q Z AI: ...... I:t:: = <.-' Q 0 I-<C <.-' AI: U u 3: ...... z V) i <C w w a.. -:e <C -;; w =e I:t:: I:t:: I:t:: V) 3: 904.51 • • • • Existing Beneficial Use Section 3.02 303( d) Status According to the California 2002303{d) list published by the San Diego Regional Water Quality Control Board, the water bodies that are associated with this project are not impaired. Section 4. Characterization of Project Runoff Section 4.01 Existing and Post Construction Drainage The proposed project will not significantly alter drainage patterns on the site or the surrounding area. The Storm water discharge points will not divert runoff from existing conditions. August 2, 2004 Page 6 C:\Project Documents\Lcnd Projects 2005\04-sdll 0 -CT03-13\SWMP.doc I I I I I I I I I I I I I I I I I I I storm Wafer Management Plan (SWMP) CT 03-J 3 -Black Rail Ridge Subdivision While there will be a substantial increase to the amount of impervious area, a large part of the increase is accounted for by the widening of Black Rail Road, Poinsettia Lane and the construction of Triton Street. Black Rail Road will be increased in width by about 4 feet and curb gutter and sidewalk will be installed. Poinsettia Lane will be increased in width by about 14 feet and curb gutter and sidewalk will be installed. Triton Street, which is currently only partially improved, will be 32 feet in width of AC pavement, curb, gutter and sidewalk. This increase in pervious area will be offset by the inclusion of vegetated swales along the north side of the property which will slow the runoff and increase the time of concentration for the site. Approximately 0.7 acres of open ground will be covered by the single-family residences and appurtenant driveways and an additional 0.6 acres of open ground will be paved for the above mentioned street improvements. Thus, the impervious area on the site will increase from 0.3 acres to 1.3 acres. This change in land use will increase the composite runoff coefficient, of the project, from C=0.36 to C=0.52. Also, the total 10 year peak flow rate will increase from 3.8 cfs under the existing condition to 6.2 cfs under the proposed condition. A detailed description of the drainage patterns and flows are discussed in the Drainage Report submitted to the City of Carlsbad. A copy of this report is included in Attachment D to this report. See Table 4.1 and Attachment C for Impervious area calculations. Table 4.1 -Impervious Areas & Runoff Coefficients Construction site area 3.6 acres Percentage impervious area before construction 10 % Runoff coefficient before construction (1) 0.36 Percentage impervious area after construction 37 % Runoff coefficient after construction (l) 0.52 Anticipated off-site storm water flow on to the 0 cfs construction site (1) Calculations are shown in Attachment C The runoff from this site both in the existing state and the proposed development is directed to the same outflow. Most of the current runoff discharges via sheet flow across the property to the West, which, like this site, is currently rural residential «0.5 Units/Acre). The existing semi-natural environment serves as a bio-filter for the runoff August 2, 2004 Page 7 C:\Project Documents\Lond Projects 2005\04-sdll 0 -CT03-13\SWMP.doc I I I I I I I I I I I I II i II I I I I I storm Wafer Management Plan (SWMP) CT 03-J 3 -Black Rail Ridge Subdivision generated from the area. A similar quantity of post-construction runoff will be directed through an on-site vegetated swale prior to discharging into a storm drain system. The remainder of the runoff, predominantly originating on the pavement on Triton Street, will be directed via curb and gutter westerly on Triton Street where it will be picked up by the storm drain system. The storm drain system outlets into the natural drainage area westerly of the site. Refer to the Site Map in Attachment B for post construction BMP locations. Summaries of the post-construction water quality flows are included in Table 4.2. The flows were developed using the 85th Percentile Precipitation map developed by the County, which was obtained from the website http://www.co.san- diego.ca.us/dpw /Iand/flood.htm Table 4.2 -Post Construction Water Quality Flows. Outfall Tributary Area Ql0 QWQ (Acres) A (Triton Street) 1.6 3.3 0.24 B (Open 2.0 2.8 0.23 Space) (1) Calculations are shown in Attachment 0 Section 4.02 Post-Construction Expected Discharges There are no sampling data available for the existing site condition. In addition, the project is not expected to generate significant amounts of non-visible pollutants. However, the following constituents are commonly found on similar developments and could affect water quality: • Sediment discharge due to construction activities and post-construction areas left bare. • Nutrients from fertilizers • Trash and debris deposited in drain inlets. • Hydrocarbons from paved areas. • Pesticides from landscaping and home use. August 2, 2004 Page 8 C:\Pro/ect Documents\Land Projects 2005\04-sdll0 -CT03-13\SWMP .doc I I I I I I I I I I I I I I I I I I I storm Wafer Management Plan (SWMP) CT 03-J 3 -Slack Rail Ridge Subdivision Section 4.03 3.3 Soil Characteristics The project area consists of soil group C with a minimum saturated infiltration rate of 6.3 mm/h. The project will not have slopes steeper than 2:1. All slopes will include slope protection for construction and post-construction. (Note: Information regarding soil conditions is also available in the Soil Survey, San Diego Area, California, US Department of Agriculture, 1973.) Section 5. Mitigation Measures To Protect Water Quality To address water quality for the project, BMPs will be implemented during construction and post-construction. Section 5.01 Construction 8MPs A detailed description of the construction BMPs is included in the SWPPP and the Grading Plans for this project. A summary of the included BMPs is as follows: • SS-l, Scheduling • SS-3, Hydraulic Mulching • SS-4, Hydroseeding • SS-9, Earth Dikes/Drainage Swales & Lined Ditches • SS-10, Outlet Protection/ Velocity Dissipation Devices • SC-l, Silt Fence • SC-4, Check Dams • SC-5, Fiber Rolls • SC-7, Street Sweeping and Vacuuming • TC-1, Stabilized Construction Entrance • TC-3, Entrance/Outlet Tire Wash • WE-1, Wind Erosion Control • NS-l, Water Conservation Practices • NS-2, Dewatering Operations • NS-3, Paving and Grinding Operations August 2, 2004 Page 9 C:\Project Documents\Land Projects 2005\04-sdll 0 -CT03-13\SWMP .doc I I I I I I I I I I I I I I I I . 1 I I storm Wafer Management Plan (SWMP) CT 03-J 3 -Black Rail Ridge Subdivision Engineering • NS-6, Illicit Connection/Illegal Discharge Detection and Reporting • NS-7, Potable Water/Irrigation • WM-l, Material Delivery and Storage • WM-2, Material Use • WM-4, Spill Prevention and Control Section 5.02 Post-construction 8MPs Pollutants of concern as noted in Section 4 will be addressed through three types of BMPs. These types of BMPs are site design, source control and treatment control. 5.02.1 Site Design BMPs The project is designed to minimize the use of impervious areas. Streets and building pad areas have been designed to meet the minimum City Standard widths. All slopes will be landscaped and irrigated. The landscaping will consist of both native and -non- native plants. The goal is to achieve plant establishment expeditiously to reduce erosion. The irrigation system for these landscaped areas will be monitored to reduce over irrigation. Also, riprap will be placed at lined ditch outfalls to reduce velocities. 5.02.2 Source Control BMPs Source control BMPs will consist of measures to prevent polluted runoff. This program will include an educational component directed at each homeowner. The homeowners will receive a set of brochures developed by the County's Environmental Health Department. These will include the following: • Storm water Runoff Pollution Fact Sheet. • Storm water Runoff Pollution Prevention Tips for Homeowners. • Storm water Pollution Prevention Yard Work (Landscaping, Gardening, Pest Control). • Storm water Pollution Prevention Pet Waste. • Storm water BMP Swimming Pool and Spa Cleaning. 5.02.3 Treatment Control BMPs The following treatment control BMPs will be implemented to address water quality: • Bio-Filters (Vegetated buffer strips and swales) Placements of the BMPs are noted on the Project Site Plan (Attachment B) . August 2, 2004 Page 10 C:\ProJect Documents\Land Projects 2005\04-sdll 0 -CT03-13\SWMP.doc I I I I I I I I I I I I I I I I I II I N ~J Engineering 5.02.3(1) Bio-Filters storm Wafer Management Plan (SWMP) CT 03-J 3 -Black Rail Ridge Subdivision Bio-filtration swales are vegetated channels that receive directed flow and convey storm water. A schematic illustration of bio-filter is shown in Figure 5.1 . Pollutants are removed by filtration through the grass, sedimentation, adsorption to soil particles, and infiltration through the soil. Swales are mainly effective at removing debris and solid particles, although some dissolved constituents are removed by adsorption onto the soil. 5.02.3 (i)( a) Appropriate ApplicaHons and SiHng Constraints: Swales and strips should be considered wherever site conditions and climate allow vegetation to be established and where flow velocities are not high enough to cause scour. Even where strips cannot be sited to accept directed sheet flow, vegetated areas provide treatment of rainfall and reduce the overall impervious surface. FACTORS AFFECTING PRELIMINARY DESIGN: Swales have two design goals: l} maximize treatment, 2) provide adequate hydraulic function for flood routing, adequate drainage and scour prevention. Treatment is maximized by designing the flow of water through the swale to be as shallow and long as site constraints allow. Recommended minimum length for treatment purposes is 100 feet. Also, the maximum recommended width is 10 feet and the maximum recommended depth of flow is 4 inces. Swales should also be sized as a cbnveyance system calculated according to County procedures for flood routing and scour. To maximize treatment efficiency, strips should be designed to be as long (in the direction of flow) and as flat as the site will allow. A minimum of 15 feet in length in the direction of flow is recommended for treatment purposes. The area to be used for the strip should be free of gullies or rills that can concentrate overland flow and cause erosion. Vegetation mixes appropriate for various climates and locations will be developed by landscape staff. Table 3.3.1 summarizes preliminary design factors for bio-filtration. August 2, 2004 Page 11 C:\ProJect Documents\Lcnd Projects 2005\04-sdll0 -CT03-13\SWMP.doc I I I I I I I I I I I I I I I I I I I August 2, 2004 Storm Wafer Management Plan (SWMP) CT 03-J 3 -Black Rail Ridge Subdivision 4:1 MIN. SIDE SLOPE 6" FREEBOARD _____ JZ__ _ ______ _ ________ I DESIG FLOW DEPTH WA TER QUALITY FLOW DEPTH *------Wmml------~ SECTION No SCALE SECTION No SCALE ENGINEERED CHECK DAN (50'oc) Figure 5-1 -Vegetated Swale Page 12 C:\ProJect Documents\Land Projects 2005\04-sdll 0 -CT03-13\SWMP .doc I I I I I I I I I I I I I I I :1 I I I ~I·U. t :~} t:.J Storm Wafer Management Plan (SWMP) CT 03-13 -Black Rail Ridge SubdIvIsion Engineering Section 6. Operation and Maintenance Program The operation and maintenance requirements for each type of BMP is as follows: Section 6.01 Bio-Filters The operational and maintenance needs of a Swale are: • Vegetation management to maintain adequate hydraulic functioning and to limit habitat for disease-carrying animals. • Animal and vector control. • Periodic sediment removal to optimize performance. • Trash, debris, grass trimmings, tree pruning, and leaf collection and removal to prevent obstruction of a Swale and monitoring equipment. • Removal of standing water, which may contribute to the development of aquatic plant communities or mosquito breeding areas. • Preventive maintenance on sampling, flow measurement, and associated BMP equipment and structures. • Erosion and structural maintenance to prevent the loss of soil and maintain the performance of the Swale. 6.01.1 Inspection Frequency The facility will be inspected and inspection visits will be completely documented: • Once a month at a minimum. • After every large storm (after every storm monitored or those storms with more than 0.50 inch of precipitation.) • On a weekly basis during extended periods of wet weather. 6.01.2 Aesthetic and Functional Maintenance Aesthetic maintenance is important for public acceptance of stormwater facilities. Functional maintenance is important for performance and safety reasons. Both forms of maintenance will be combined into an overall Stormwater Management System Maintenance. 6.01.2(i) Aesthetic Maintenance The following activities will be included in the aesthetic maintenance program: • Grass Trimming. Trimming of grass will be done on the Swale, around fences, at the inlet and outlet structures, and sampling structures. August 2, 2004 Page 13 C:\Project Documents\land Projects 2005\04-sdll 0-CT03-13\SWMP.doc I I I I I I I I I I I I I I I I I I I storm Wafer Management Plan (SWMP) CT 03-J 3 -Black Rail Ridge Subdivision • Weed Control. Weeds will be removed through mechanical means. Herbicide will not be used because these chemicals may impact the water quolity monitoring. 6.01.2(6) Functional Maintenance Functional maintenance has two components: Preventive maintenance Corrective maintenance 6.01.2 (iI)( a) Preventive Maintenance Preventive maintenance activities to be instituted at a Swale are: • Grass Mowing. Vegetation seed mix within the Swale is designed to be kept short to maintain adequate hydraulic functioning and to limit the development of faunal habitats. • Trash and Debris. During each inspection and maintenance visit tb the site, debris and trash removal will be conducted to reduce the potential for inlet and outlet structures and other components from becoming clogged and inoperable during storm events. .• Sediment Removal. Sediment accumulation, as part of the operation and maintenance program at a Swale, will be monitored once a month during the dry season, after every large storm (0.50 inch), and monthly during the wet season. Specifically, if sediment reaches a level at or near plant height, or could interfere with flow or operation, the sediment will be removed. If accumulation of debris or sediment is determined to be the cause of decline in design performance, prompt action (Le., within ten working days) will be taken to restore the Swale to design performance standards. Actions will include using additional fill and vegetation and/or removing accumulated sediment to correct channeling or ponding. Characterization and Appropriate disposal of sediment will comply with applicable local, county, state, or federal requirements. The swale will be regraded, if the flow gradient has changed, and then replanted with sod. • Removal of Standing Water. Standing water must be removed if it contributes to the development of aquatic plant communities or mosquito breeding areas. • Mechanical and Electronic Components. Regularly scheduled maintenance will be performed on fences, gates, locks, and sampling and monitoring equipment in accordance with the manufacturers' recommendations. Electronic and mechanical components will be operated during each maintenance inspection to assure continued performance. • Fertilization and Irrigation. The vegetation seed mix has been designed so that fertilization and irrigation is not necessary. Fertilizers and irrigation will not be used to maintain the vegetation. • Elimination of Mosquito Breeding Habitats. The most effective mosquito control program is one that eliminates potential breeding habitats. August 2, 2004 Page 14 C:\ProJect Documents\Land Projects 2005\04-sdll 0 -CT03-13\SWMP.doc I I I I I I I I I I I I I I I I I I I Engineering 6.01.2 (Ii)(b) Corrective Maintenance Storm Wafer Management Plan (SWMP) CT 03-J 3 -Black Rail Ridge Subdivision Corrective maintenance is required on an emergency or non-routine basis to correct problems and to restore the intended operation and safe function of a Swale. Corrective maintenance activities include: • Removal of Debris and Sediment. Sediment, debris, and trash, which impede the hydraulic functioning of a Swale and prevent vegetative growth, will be removed and properly disposed. Temporary arrangements will be made for handling the sediments until a permanent arrangement is made. Vegetation will be re- established after sediment removal. • Structural Repairs. Once deemed necessary, repairs to structural components of a Swale and its inlet and outlet structures will be done within 10 working days. Qualified individuals (Le., the designers or contractors) will conduct repairs where structural damage has occurred. • Embankment and Slope Repairs. Once deemed necessary, damage to the embankments and slopes of Swales will be repaired within 10 working days). • Erosion Repair. Where a reseeding program has been ineffective, or where other factors have created erosive conditions (Le., pedestrian traffic, concentrated flow, etc.), corrective steps will be taken to prevent loss of soil and any subsequent danger to the performance of a Swale. There are a number of corrective actions than can be taken. These include erosion control blankets, rip-rap, sodding, or reduced flow through the area. Designers or contractors will be consulted to address erosion problems if the solution is not evident. • Fence Repair. Repair of fences will be done within 30 days to maintain the security of the site. • Elimination of Animal Burrows. Animal burrows will be filled and steps taken to remove the animals if burrowing problems continue to occur (filling and compacting). If the problem persists, vector control specialists will be consulted regarding removal steps. This consulting is necessary as the threat of rabies in some areas may necessitate the animals being destroyed rather than relocated. If the BMP performance is affected, abatement will begin. Otherwise, abatement will be performed annually in September. • General Facility Maintenance. In addition to the above elements of corrective maintenance, general corrective maintenance will address the overall facility and its associated components. If corrective maintenance is being done to one component, other components will be inspected to see if maintenance is needed. 6.01.3 Maintenance Frequency The maintenance indicator document, included as Appendix B, lists the schedule of maintenance activities to be implemented at a Swale. August 2, 2004 Page 15 C:\ProJect Documents\Lond Projects 2005\04-sdll 0 -CT03-13\SWMP.d<;>c I I I I I I I I I I I I I I I I I I I storm water Management Plan (SWMP) CT 03-J 3 -Black Rail Ridge Subdivision • After every large storm (after every storm monitored or those storms with more than 0.50 inch of precipitation). • On a weekly basis during extended periods of wet weather. • On a monthly basis during the non-rainy season or periods of dry weather. 6.01.4 Debris and Sediment Disposal Waste generated at the vegetated swale on lot 12 is ultimately the responsibility of the Homeowners Association. Vegetated buffer strips on each residential lot will be maintained by the individual homeowners. Disposal of sediment, debris, and trash will comply with applicable local, county, state, and federal waste control programs. Section 7. Mechanisms to Assure Maintenance This section is intended to provide information regarding the ability of the owner/developer to ensure the construction and maintenance of post-construction BMPs. Section 7.01 Stormwater Ordinance Requirement: The City of Carlsbad requires this ongoing maintenance. In the event that the mechanisms below prove ineffective, or in addition to enforcing those mechanisms, civil action, criminal action or administrative citation could also be pursued for violations of the ordinance. Section 7.02 Notice to Purchasers. Developers are required to provide clear written notification to persons acquiring land upon which a BMP is located, or others assuming a BMP maintenance obligation, of the maintenance duty. Section 7.03 Subdivision Public Report Tentative Map and Tentative Parcel Map approvals will be conditioned to require that, prior to approval of a Final or Parcel Map, the subdivider shall provide evidence to the Director of Public Works, that the subdivider has requested the California Department of Real Estate to include in the public report to be issued for the sales of lots within the subdivision, a notification regarding the maintenance requirement. (The requirement for this condition would not be app.licable to subdivisions which are August 2, 2004 Page 16 C:\ProJect Documents\Land Projects 2005\04-sdll0-CT03-13\SWMP.doc I I I I I I I I I I I I I I I I II I I I ;'~ ID<"J ., !,- ~~ J"; Engineering storm Wafer Management Plan (SWMP) CT 03-J 3 -Black Rail Ridge Subdivision exempt from regulation under the Subdivided Lands Act, or for which no public report will be issued.) Section 7.04 Funding: The homeowners association will be funded through monthly fees paid by the homeowners as outlined in the public report to be issued for the sales of lots within the subdivision. Section 8. Summary Conclusions This SWMP has been prepared in accordance with the applicble City of Carlsbad requirements. This SWMP has evaluated and addressed the potential pollutants associated with this project and their effects on water quality. A summary of the facts and findings associated with this project and the measures addressed by this SWMP is as follows: • The beneficial uses for the receiving waters have been identified. None of these beneficial uses will be impaired or diminish due to the construction and operation of this project. • The Black Rail Ridge Subdivision project will not significantly alter drainage patterns on the site. • Open areas and slopes will be landscaped to reduce or eliminate sediment discharge. • The vegetated swales proposed as part of the project will provide some mitigation of the increased peak flows by detaining flows, reducing the velocities, and providing opportunities for infiltration. • The proposed construction and post-construction BMPs address mitigation measures to protect water quality and protection of water quality objectives and beneficial uses to the maximum extent practicable. August 2, 2004 Page 17 C:\Project Documents\Land Projects 2005\04-sdll0-CT03-13\SWMP.doc I I I I I I I I I I I I I I I ! I I I I Engineering Section 9. Certification storm Water Management Plan (SWMP) CT 03-J 3 -alack Rail Ridge Subdivision This storm Water Management Plan has been prepared under the direction of the following Registered Civil Engineer. The Registered Civil Engineer attests to the technical information contained herein and the engineering data upon which recommendationsl conclusionsl and decisions are based. Michael L. Benesh l RCE 37893 EXp. 3/31 /d'f August 2, 2004 C:\ProJect Documents\land Projects 2005\04-sdllO-CT03-13\SWMP.doc Page 18 POOR QUALITY ORIGINAL S I I I I I I I I I I I I I I I I I I I E';' ,', " ;; /J ~ '1iW ' Engineering storm Wafer Management Plan (SWMP) CT 03-J 3 -Black Rail Ridge Subdivision Attachment A -Vicinity Map Black Rail Ridge Subdivision Portion of U.S.G.S Encinitas Quadrangle August 2, 2004 PageA-1 C:\Project Documenls\Lond Projects 2Q05\04-sdll 0 -CT03-13\SWMP.doc I storm Wafer Management Plan (SWMP) I CT 03-J 3 -Black Rail Ridge Subdivision Engineering I AHachment B -Site Plan I I I I I I I I I I I I I I II August 2, 2004 Page 8-1 ! C:\ProJect Documents\Land Projects 2005\04-sdl10 -CT03-13\SWMP.doc I I I I I I I I I I I I I I I I I I I :1 SCALE: /"=100' --~~--------------------~ ---LANE , __ --.------.--------1---- ---=t-T I -----T"----" 1------f IltD BIO-FILTER LOCATION (TYf) VEGETATED FILTER STRIP INCORPORATED IN FRONT YARD LANDSCAPING Engineering Profossional CitJil Engineers anti Land SIIfV!Yors 600 South ADdrcucn Dmc, SuiIc B. BacoDdIdo, CA 92029 Phoac 7(1) 741-3577 P.AX7(1) 897-2165 B-Md: ~ ONSTRUCTION SITE PERIMETER CT 03-/3 SWMP SITE PLAN SHEET I OF I .------------------------------ I I I I I I I I I I I I I I I II I ·1 I storm Wafer Pollution Prevention Plan (SWPPP) CT03-13 -Black Rail Ridge Subdivision Engineering Affachment C -Computation Sheet for Runoff Coefficients Total Site Area 3.6 Acres .....................................................................•...................... (A) existing Site Conditions Impervious Areal (B) ....................................................................................... 0.36 Acres % Impervious Area (BI A) .............................................................................................. 10 Runoff Coefficient4 .................................................................................................... 0.36 Proposed Site Conditions Impervious Areal (F) ........................................................................................ 1.33 Acres % Impervious Area (F/ A) ........................................................................................... 0.37 Runoff Coefficient4 .................................................................................................... 0.52 Notes: 1. Includes paved areas, areas covered by buildings and other impervious areas. 2. 95% assumed. 3. Includes areas of vegetation, unpaved soil areas, and other pervious areas. 4. Runoff Coefficient per Table 3-1, San Diego County Hydrology Manual. August 2, 2004 Page C-1 C;lProject DocumentslLand Projects 2005\04·sd11 0 • CT03-13ISWMP.doc I I I I I I I I I I I I I :1 I :1 I I I I ~~~J Engineering Affachment 0 -Drainage Study August 2, 2004 C;\Project Documents\Land Projects 2005\Q4.sd110 -CT03-13\SWMP.doc storm Wafer Pollution Prevention Plan (SWPPP) CT03-13 -alack Rail Ridge Subdivision Page 0-1 I I I I I I I I I I I I I I I I I I I ENGINEERING Professional Civil Engineer and Land Surveyor DRAINAGE STUDY TENTATIVE MAP CT 03-13 BLACK RAIL RIDGE SUBDIVISION 600 S. ANDREASEN DRIVE· SUITE E • ESCONDIDO, CA 92029 PHONE: 760 741-3577 • FAX: 760 897-2165 • E-MAIL: MLBENESH@PACBELL.NET I I I I I I I I I I I I I I I I I I I Purpose CT 03-13 Drainage Study August 2, 2004 Page 1 The purpose of this Drainage Study is to determine and compare the Pre-Development and Post-Development ultimate storm £lows for the proposed project, and to determine the Water Quality Design Storm flows for the developed site. Ultimate Storm £lows will be based on the 10 year and 100 year 6 hour storm as defined in the San Diego County Hydrology Manual. Water Quality Treatment Design Storm Flows will be based a storm event of 0.2 in/hr., which approximates an 85th percentile storm event. Site Description The proposed site consists of approximately 3.6 acres and adjoins Black Rail Road to the East, Poinsettia Lane to the North and Triton Street to the South. Currently the site is used for a plant nursery. There are no existing permanent structures. The proposed development is an 11 lot subdivision. There are no existing off-site storm £lows entering the site. The storm runoff from the site, currently sheet £lows across the westerly property line to the adjoining properties. Ultimately, all the runoff from this and adjacent sites ends up in a natural drainage area 600' westerly of this site. After development, a storm drain system will carry the runoff from this site to the natural channel Ifydrology The Rational Method as outlined in the San Diego Hydrology Manual is used to determine peak flows. Initial time of concentration, Ti is derived from Table 3-2 for the undeveloped site and for the developed site. Travel time is determined using either Figure 3-4 (for the undeveloped site), Figure 3-6 (for street flows) of the manning equation for trapezoidal channels for flows in earth or concrete swales. Soil Type for the site is Type B per the latest San Diego County Soils Group Map. Table 1 -Anticipated vs. Existing 10 year Storm Flows Drainage Facility Existing Condition Proposed Proposed Flow from site, Q10 Development Flow Development Flow, Q2 (CFS) from site, Ql0 (CFS) (CFS) Triton Street -3.3 2.0 Westerly Property Line -2.8 2.4 Total 4.4 6.1 4.4 Desigll qf Vegetated Swale (Lots 1-5) Ideally, vegetated swales should be used on sites with slopes of less than 4 percent; runoff velocities within channels can become too high on steeper slopes, causing erosion and inhibiting infiltration and filtering in the swale. Swale bottoms should not exceed 8 feet in width, with 4H:1V or flatter side slopes. The depth of the swale should carry the anticipated 10-year storm 600 S. ANDREASEN DRIVE· SUITE E • ESCONDIDO, CA 92029 PHONE: 760 741-3577 • FAX: 760 897-2165 • E-MAIL: MLBENESH@PACBELL.NET I I I I I I I I I I I I I I I I I cr 03-13 Drainage Study August 2, 2004 Page 2 runoff with approximately 6 inches of freeboard. Typically, the swale should be designed to convey the runoff from a 2-year storm event, without erosion. Table 2 summarizes the results of the hydrology and hydraulic calculations for the proposed vegetated swale in Drainage Area 2c. Table 1 Hydrologic and Hydraulic Results for Proposed Vegetated Swale, Area 2c " § II '+1 i ~ ........ .E 0 .~ ~ u ~ Q '" '" s 8 = en ~ ~ ..... .E ~ '" ~ = ...... U 0 0 0 ~ '" <:<S" '0 0 :! cJ ,.e.. ~ ::s ~ l \:l:: I:t .e;. 0 8 0 & '0 0 J 0 ~ \:l:: ~ ~ o:S ~ ·m 0 I'< ~ ~ J ~~ ~ fr ~ Q ::E Q ::E Water Quality Storm, 1.97 0.46 9.7 0.2 0.18 0.4 0.6 (1=0.2 in/hr.) 2-Year Storm 1.97 0.46 9.7 2.23 2.0 1.5 1.8 10-Year Storm 1.97 0.46 9.7 3.09 2.8 1.9 2.1 The total depth of the swale varies but is at least l' below the pad grades. The bottom width of the swale is approximately 8 feet, with a 2:1 slope against Poinsettia Lane, and a slope of approximately 4:1 on the southerly side. A general rule of thumb for sizing vegetated swales. as noted in the information included in Appendix A, is one percent of the area that drains into the swale. For the proposed swale on this project, the area required would be approximately 1180 square feet, or a swale 8 feet wide by 148 feet long, The actual dimensions of this sWale will be 8 feet wide by 290 feet long Based on the maximum velocity expected for the design storm, and the length of the swale, the hydraulic residence time for runoff flowing through the swale is approximately 8 minutes. 600 S. ANDREASEN DRIVE· SUITE E • ESCONDIDO, CA 92029 PHONE: 760 741-3577 • FAX: 760 897-2165 • E-MAIL: MLBENESH@PACBELL.NET I I I I I I I I I I I I I I I I I Tc & Imp Area Calculati01JS Node 100 -101 Area = 0.24 Ac Imp Area = 0.12 Ac % Imp = 0.12/0.24 = 50% Slope = 77.0-72.5/156 = 3% Ti = 6.0 min. Li = 90' Using. Tc = 6 min. A = 90/156 * 0.24 = 0.14 I = 6.56 in/hr C=0.60 Then Q = 0.6 cfs Assuming £low of Q/2 for each side of the lot Channel Calculator Given Input Data: Shape ........................... Trapezoidal Solving for ..................... Depth of Flow Flowrate ........................ 0.3000 cfs Slope ........................... 0.0300 ft./ft. Manning's n ..................... 0.0200 Height .......................... 6.0000 in Bottom width .................... 0.0000 in Left. slope ...................... 0.0200 ft./ ft. Right slope ..................... 0.0200 ft./ ft. Computed Results: Depth ........................... 0.8039 in Velocity ........................ 1.3370 fps Flow area ....................... 0.2244 ft2 Flow perimeter .................. 80.4031 in Hydraulic radius ................ 0.4019 in Top width ....................... 80.3871 in Area ............................ 12.5000 ft2 Perimeter ....................... 600.1200 in Percent full .................... 13.3978 % Then V= 1.3 fps Tt= (156-90)/(1.3*60) = 0.8 min. Tc = 6.0 + 0.8 = 6.8 min. Node 101 -102 Area = 1.40 Ac Imp Area = 0.70 Ac % Imp = 0.7/1.4 = 50% Slope = 72.5-36.7/565 = 6% CT 03-13 Drainage Study August 2, 2004 Page 3 600 S. ANDREASEN DRIVE· SUITE E • ESCONDIDO, CA 92029 PHONE: 760 741-3577 • FAX: 760 897-2165 • E-MAIL: MLBENESH@PACBELL.NET I I I I I I I I I I I I I I I I I I I Assuming Avg Q = 1.4*3/2 + 0.9 =3 cfs V = 5.2 fps (Fig: 3.6) Tt = 565/ (5.2*60)=1.8 min. Node 200 -102 Area = 0.83 Ac Imp Area = 0.54 Ac % Imp = 0.53/0.83 = 64% use 65% Node 300 -301 Area = 0.58 Ac Imp Area = 0.20 Ac % Imp = 0.20/0.58 = 34% use 35% Slope = 67.0-64.0/200 = 1.5% use 2% Ti = 7.8 min. (fable 3-2, interpolated between 30% and 40% Imp.) Li = 80' Using: Tc = 7.8 min. A = 80/200 * 0.58 = 0.23 I = 5.54 in/hI: C =0.52 Then Q = 0.7 cfs Assuming flow of Q/2 for each side of each lot: Channel Calculator Given Input Data: Shape ........................... Trapezoidal Solving for ..................... Depth of Flow Flowrate ........................ 0.2000 cfs Slope ........................... 0.0150 ft/ft Manning's n ..................... 0.0200 Height .......................... 6.0000 in Bottom width .................... 0.0000 in Left slope ...................... 0.0200 ft/ ft Right slope ..................... 0.0200 ft/ft Computed Results: Depth ........................... 0.7863 in Velocity ........................ 0.9316 fps Flow area ....................... 0.2147 ft2 Flow perimeter .................. 78.6469 in Hydraulic radius ................ 0.3931 in Top width ....................... 78.6312 in Area ............................ 12.5000 ft2 Perimeter ....................... 600.1200 in Percent full .................... 13.1052 % Use V= 1 fps Tt= (200-80)/(1*60) = 2.0 min. Tc = 7.8 + 2.0 = 9.8 min. 600 S. ANDREASEN DRIVE' SUITE E • ESCONDIDO, CA 92029 CT 03-13 Drainage Study August 2, 2004 Page 4 PHONE: 760 741-3577 • FAX: 760 897-2165 • E-MAIL: MLBENESH@PACBELL.NET I I I I I I I I I I I I I I I I I I I Node 301-302 Area = 0.27 Ac Open Space/Landscape area, use 0% Imp. Ignore Length of Downdrain in determining Tt. Assuming Avg Q = 0.27*1/2 + 1.3 =1.45 cfs (1 cfs/ac -open space) Manning Pipe Calculator Given Input Data: Shape ........................... Elliptical Solving for ..................... Depth of Flow Minor axis ...................... 24.0000 in Major axis ...................... 36.0000 in Flowrate ........................ 1.4500 cfs Slope ........................... 0.0200 ft./ft. Manning's n ..................... 0.0150 Computed Results: Depth ........................... 3.0212 in Area ............................ 4.7124 ft2 Wetted Area ..................... 0.3435 ft2 Wetted Perimeter ................ 24.9215 in Perimeter ....................... 95.1927 in Velocity ........................ 4.2214 fps Hydraulic Radius ................ 1.9847 in Percent Full .................... 12.5882 % Full flow Flowrate .............. 46.6548 cfs Full flow velocity .............. 9.9005 fps Use V= 4.2 fps Node 302 -303 Area = 1.12 Ac Imp Area = 0.15 Ac % Imp = 13% use 20% Ignore Length of Downdrain in determining Tt. Assuming Avg Q = 1.12*2/2 + 1.6 =2.7 cfs (2 cfs/ac) Channel Calculator Given Input Data: Shape ........................... Trapezoidal Solving for ..................... Depth of Flow Flowrate ........................ 2.7000 cfs Slope ........................... 0.0200 ft./ft. Manning's n ..................... 0.0200 Height .......................... 6.0000 in Bottom width .................... 96.0000 in Left. slope ...................... 0.5000 ft./ ft. Right slope ..................... 0.2500 ft./ft. Computed Results: Depth ........................... 1.5128 in Velocity ........................ 2.5564 fps 600 S. ANDREASEN DRIVE· SUITE E • ESCONDIDO, CA 92029 CT 03-13 Drainage Study August 2, 2004 Page 5 PHONE: 760 741-3577 • FAX: 760 897-2165 • E-MAIL: MLBENESH@PACBELL.NET I I I I I I I I I I I I I I I I I I I Flow area ....................... 1.0562 ft2 Flow perimeter .................. 105.6200 in Hydraulic radius ................ 1.4400 in Top width ....................... 105.0766 in Area ............................ 4.7500 ft2 Perimeter ....................... 134.1550 in Percent full .................... 25.2128 % Use V= 2.6 fps Storm Drain f!ydraulic Grade line Calculatio1ls cr 03-13 Drainage Study August 2, 2004 Page 6 Hydraulic grade line calculations are based on the Mannings equation. Outlet losses are based on the velocity head. In cases of subcritical flow, the grade line is calculated in an upstream direction for the reach adding friction loss to the downstream grade line elevation. In the case of supercritical flow; the grade line is based on an assumption of critical depth at the manhole or Catch Basin outlet and flow in the downstream pipe is assumed to be normal depth for the reach. Catch Basin Capacity -T fito1l Street In the interim condition, with the berm installed at the West end of Triton Street to direct the street flow across the street from the South, the catch basin will operate in a sump condition. Ultimately, when Triton is widened to its full 40' width and a catch basin is installed to pick up the South side flows, the catch basin will operate in an intercept condition. Interim Condition: Q100=7.8 cfs L=14' S= 0.01 Local Depression = 0.33' Therefore: Depth @ Inlet = (QI (L *3.0)) 2/3 = 0.33' Ultimate Condition Q100=4.9 cfs L=14' S= 0.01 Local Depression = 0.33' Depth of Flow in Gutter = 0.38' (Using Figure 3-6) Capacity = 0.7(0.33+0.38) 3/2 (14)=5.9 cfs > 4.9 cfs Capacity of Type F AC Dike Q100 = 7.8-4.9 = 2.9 cfs S = 0.04 Therefore: Channel Calculator Given Input Data: Shape ........................... Trapezoidal 600 S. ANDREASEN DRIVE· SUITE E • ESCONDIDO, CA 92029 PHONE: 760 741-3577 • FAX: 760 897-2165 • E-MAIL: MLBENESH@PACBELL.NET I I I I I I I I I I I I I I I I I I I Solving for ..................... Depth of Flow Flowrate ........................ 2.9000 cfs Slope ........................... 0.0400 ft./ ft. Manning's n ..................... 0.0175 Height .......................... 6.0000 in Bottom width .................... 0.0000 in Left. slope ...................... 0.3000 ft./ ft. Right slope ..................... 0.0200 ft./ ft. Computed Results: Depth ........................... 2.1486 in Velocity ........................ 3.3921 fps Flow area ....................... 0.8549 ft2 Flow perimeter .................. 114.9312 in Hydraulic radius ................ 1.0712 in Top width ....................... 114.5943 in Area ............................ 6.6667 ft2 Perimeter ....................... 320.9406 in Percent full .................... 35.8107 % Depth of Flow = (2.15/12) = 0.18' < 0.5' OK HGL @ existing Manhole -Sta 0+00 From Dwg, No. 360-3B, Ql00 existing at outlet of SD = 12.7 cfs. Adding Q from site and ignoringTc variations, Qtotal = 12.7 + 10.2 = 22.9 cfs Section Downstream of Pipe = 2.5' Wide Rectangular channel, s=0.02 Therefore: Channel Calculator Given Input Data: Shape ........................... Rectangular Solving for ..................... Depth of Flow Flowrate ........................ 22.9000 cfs Slope ........................... 0.0200 ft./ ft. Manning's n ..................... 0.0150 Height .......................... 30.0000 in Bottom width .................... 30.0000 in Computed Results: Depth ........................... 11.7142 in Velocity ........................ 9.3835 fps Flow area ....................... 2.4405 ft2 Flow perimeter .................. 53.4284 in Hydraulic radius ................ 6.5775 in Top width ....................... 30.0000 in Area ............................ 6.2500 ft2 Perimeter ....................... 90.0000 in Percent full .................... 39.0474 % Depth Down Stream of Outlet = (11.7/12) = 1.0' Assume Hgl @ outlet = soffit of pipe = 309.50 Therefore: 600 S. ANDREASEN DRIVE· SUITE E • ESCONDIDO, CA 92029 CT 03-13 Drainage Study August 2, 2004 Page 7 PHONE: 760 741-3577 • FAX: 760 897-2165 • E-MAIL: MLBENESH@PACBELL.NET I I I I I I I I I I I I I I I I Manning Pipe Calculator Given Input Data: Shape ........................... Circular Solving for ..................... Friction Slope Diameter ........................ 18.0000 in Depth ........................... 18.0000 in Flowrate ........................ 22.9000 cfs Manning's n ..................... 0.0150 Computed Results: Slope ........................... 0.0633 ftlft Area ............................ 1.7671 ft2 Wetted Area ..................... 1.7671 ft2 Wetted Perimeter ................ 56.5487 in Perimeter ....................... 56.5487 in Velocity ........................ 12.9587 Cps Hydraulic Radius ................ 4.5000 in Percent Full .................... 100.0000 % Full flow Flowrate .............. 22.9000 cfs Full flow velocity .............. 12.9587 fps Sf, flowing full = 0.063 V= 13.0 fps HGL @ S'ly Inlet = 309.50 + (0.063)(51.79) = 312.76' Inlet Loss = 1.2 V2/2g = 3.15' HGL upstream = 312.76 + 3.15 = 315.91' Q upstream = 7.3 + 10.2 = 17.5 cfs Therefore: Manning Pipe Calculator Given Input Data: Shape ........................... Circular Solving for ..................... Friction Slope Diameter ........................ 18.0000 in Depth ........................... 18.0000 in Flowrate ........................ 17.5000 cfs Manning's n ..................... 0.0150 Computed Results: Slope ........................... 0.0370 ftlft Area ............................ 1.7671 ft2 Wetted Area ..................... 1.7671 ft2 Wetted Perimeter ................ 56.5487 in Perimeter ....................... 56.5487 in Velocity ........................ 9.9030 fps Hydraulic Radius ................ 4.5000 in Percent Full .................... 100.0000 % Full flow Flowrate .............. 17.5000 cfs Full flow velocity .............. 9.9030 fps Sf, flowing full = 0.0370 V upstream = 9.90 fps HGL @ Proposed Manhole = 315.91 +,28.38(0.037) = 316.96' 600 S. ANDREASEN DRIVE' SUITE E • ESCONDIDO, CA 92029 CT 03-13 Drainage Study August 2, 2004 Page 8 PHONE: 760 741-3577 • FAX: 760 897-2165 • E-MAIL: MLBENESH@PACBELL.NET I I I I I I I I I I I I I I I I I HGL @ Manhole-Sta 2+42.64 Q downstream = Q upstream = 10.2 cfs Invert Downstream of manhole = 328.50' 18" RCP s=0.0802 Therefore: Manning Pipe Calculator Given Input Data: Shape ........................... Circular Solving for ..................... Depth of Flow Diameter ........................ 18.0000 in Flowrate ........................ 10.2000 cfs Slope ........................... 0.0802 ft/ ft Manning's n ..................... 0.0150 , Computed Results: Depth ........................... 7.8685 in Area ............................ 1.7671 ft2 Wetted Area ..................... 0.7425 ft2 Wetted Perimeter ................ 26.0054 in Perimeter ....................... 56.5487 in Velocity ........................ 13.7371 fps Hydraulic Radius ................ 4.1115 in Percent Full .................... 43.7141 % Full flow Flowrate .............. 25.7815 cfs Full flow velocity .............. 14.5893 fps Critical Information Critical depth .................. 15.4735 in Critical slope .................. 0.0095 ft/ft Critical velocity ............... 6.0257 fps Critical area ................... 1.6928 ft2 Critical perimeter .............. 41.2213 in Critical hydraulic radius ....... 5.9134 in Critical top width .............. 18.0000 in Specific energy ................. 3.5883 ft Minimum energy .................. 1.9342 ft Froude number ................... 3.4285 Flow condition .................. Supercritical Supercritical flow condition, assume Dc at outlet. Dn = 7.9/12 = 0.66' Vn = 13.7 fps Dc=15.5/12 = 1.29' Vc=6.0 fps Outlet Loss = 1.2v2/2g = 0.67' HGL @ Manhole = 328.50 + 0.67 + 1.29 = 330.46' 600 S. ANDREASEN DRIVE' SUITE E • ESCONDIDO, CA 92029 CT 03-13 Drainage Study August 2, 2004 Page 9 PHONE: 760 741-3577 • FAX: 760 897-2165 • E-MAIL: MLBENESH@PACBELL.NET I I I I I I I I I I I I I I I I :1 I I HGL @ CB -St04+ 30.80 Q downstream = 10.2 cfs Q upstream = 7.8 cfs Invert Downstream of CB = 332.45' 18" RCP s=0.02 Therefore: Manning Pipe Calculator Given Input Data: Shape ........................... Circular Solving for ..................... Depth of Flow Diameter ........................ 18.0000 in Flowrate ........................ 10.2000 cfs Slope ........................... 0.0200 ft/ ft Manning's n ..................... 0.0150 Computed Results: Depth ........................... 12.0925 in Area ............................ 1.7671 ft2 Wetted Area ..................... 1.2624 ft2 Wetted Perimeter ................ 34.5880 in Perimeter ....................... 56.5487 in Velocity ........................ 8.0799 fps Hydraulic Radius ................ 5.2557 in Percent Full .................... 67.1805 % Full flow Flowrate .............. 12.8747 cfs Full flow velocity .............. 7.2856 fps Critical Information Critical depth .................. 15.4735 in Critical slope .................. 0.0095 ft/ft Critical velocity ............... 6.0257 fps Critical area ................... 1.6928 ft2 Critical perimeter .............. 41.2213 in Critical hydraulic radius ....... 5.9134 in Critical top width .............. 18.0000 in Specific energy ................. 2.0217 ft Minimum energy .................. 1.9342 ft Froude number ................... 1.5617 Flow condition .................. Supercritical Supercritical flow condition, assume Dc at outlet. Dn = 12.09/12 = 1.01' Vn = 8.1 fps Dc=15.5/12=1.29' Vc=6.03 fps Outlet Loss = 1.2v2/2g = 0.68' HGL @ CB = 332.45 + 0.68 + 1.29 = 334.42' 600 S. ANDREASEN DRIVE· SUITE E • ESCONDIDO, CA 92029 cr 03-13 Drainage Study August 2, 2004 Page 10 PHONE: 760 741-3577 • FAX: 760 897-2165 • E-MAIL: MLBENESH@'PACBELL.NET I I I I I I I I I I I I I I I I I I I HGL@CB-Sta4+30.80 Q downstream = 7.8 cfs Invert Downstream of CB = 333.15' 18" RCP s=0.005 Depth of Water @ 4+32.30 = 334.42-332.57 = 1.85' Therefore: Manning Pipe Calculator Given Input Data: Shape ........................... Circular Solving for ..................... Friction Slope Diameter ........................ 18.0000 in Depth ........................... 18.0000 in Flowrate ........................ 7.8000 cfs Manning's n ..................... 0.0150 Computed Results: Slope ........................... 0.0073 ftl ft Area ............................ 1.7671 ft2 Wetted Area ..................... 1.7671 ft2 Wetted Perimeter ................ 56.5487 in Perimeter ....................... 56.5487 in Velocity ........................ 4,4139 fps Hydraulic Radius ................ 4.5000 in Percent Full .................... 100.0000 % Full flow Flowrate .............. 7.8000 cfs Full flow velocity .............. 4.4139 fps Critical Information Critical depth .................. 13.2558 in Critical slope .................. 0.0087 ft/ft Critical velocity ............... 5.5102 fps Critical area ................... 1.4155 ft2 Critical perimeter .............. 36.7860 in Critical hydraulic radius ....... 5.5412 in Critical top width .............. 18.0000 in Specific energy ................. 1.7344 ft Minimum energy .................. 1.6570 ft Froude number ................... 0.5916 Flow condition .................. Subcritical Subcritical flow condition. Sf flowing full = 0.0073 V=4,41 fps HGL Downstream of CB = 334.42 + (0.0073)(116.41) = 335.27' Outlet Loss = = 1.2v2/2g = 0.36' HGL @ CB = 335.27 + 0.36 = 335.63' TC @ Inlet = 337.10 CF = 6" + 4" = 10" =0.83' Freeboard = 337.10 0.83 335.63 600 S. ANDREASEN DRIVE· SUITE E • ESCONDIDO, CA 92029 CT 03-13 Drainage Study August 2, 2004 Page 11 = 0.64' PHONE: 760 741-3577 • FAX: 760 897-2165 • E-MAIL: MLBENESH@PACBELL.NET I I I I I I I I I I I I I I I I I I I San Diego County Soils Group Map Group A GroupB Group C GroupD Undetermined Unknown 600 s. ANDREASEN DRIVE· SUITE E • ESCONDIDO, CA 92029 PHONE: 760 741-3577 • FAX: 760 897-2165 • E-MAIL: MLBENESH@PACBELL.NET ------------------- Rational Method Calculation Form Project: CT 03-13 Drainage Soil & A C CA I:CA I Frequency 100 Year Post-Development Q Slope Section Area Development Acres In.lHr. CFS 100-101 B -50'10 Imp 0.24 0.58 0.14 0.14 6.05 0.8 B -50'10 Imp 0.06 112 St 101-102 1.40 0.58 0.81 0.95 5.20 4.9 200-102 B -65'10 Imp 0.83 0.67 0.56 1.51 5.20 7.8 0.005 21" RCP 300-301 B -35'10 Imp 0.58 0.48 0.28 0.28 4.78 1.3 0.02 301-302 B -0'Yo Imp 0.27 0.25 0.07 0.35 4,60 1.6 D-75 Swale 302-303 B -20'Yo Imp 1.12 0.38 0.43 4:14 0.02 0.77 3.2 Conf 303 Qn See SD County Hydrology Manual 10.2 Qu See SD County Hydrology Manual 9.4 303 Qn 4.44 2.28 10.2 " ,'.' . '. , .' .;;:~}:.\.:.~.:.:, V L T '/Sec. Ft. Min. 5.2 565 1.8 4.5 120 0.4 4.2 150 0.6 2.6 290 1.9 SumT 6.8 8.6 8.6 9.1 9.8 10.4 12.3 10.9 Calculated by MB Date:2 August 2004 Remarks See Tc Cales. Fig. 3.6, See Cales S 'Iy Side Triton Conf@ 303 See Tc Cales. 2'Yo V-Gutter 2'10 Swale -Conf 303 Te=[(I(CA)7.44P6 )/Q]1.55 I ; ------------------- Rational Method Calculation Form Project: CT 03-13 Drainage SoU & A Area Development Acres 100-101 B -50% Imp 0.24 101·102 B -50'Yo Imp 1.40 200-102 B -65'Yo Imp 0.83 300-301 B -35'Yo Imp 0.58 301-302 B -O'Yo Imp 0.27 302-303 B -20% Imp 1.12 C CA l:CA I In./Hr. 0.58 0.14 0.14 3.89 0.58 0.81 0.95 3.34 0.67 0.56 1.51 3.34 0.48 0.28 0.28 3.07 0.25 0.07 0.35 2.96 0.38 0.43 0.77 2:66 Conf 303 Qn See so County Hydrology Manual QT2 See SO County Hydrology Manual 303 Qn 4.44 2.28 ........ " ::~ ~::~!:: '" ';0 Frequency 10 Year Post-Development Q Slope Section CFS 0.5 3.2 0.06 112 St 5.0 0.005 21" RCP 0.9 1.0 0.02 0-75 0.02 Swale 2.1 6.6 6.1 6.6 V L '/Sec. Ft. 5.2 565 4.5 120 4.2 150 2.6 290 T SumT Min. 1.8 6.8 8.6 0.4 8.6 9.1 9.8 0.6 10.4 1.9 12.3 10.9 Calculated by MB Date:2 August 2004 Remarks See Te Cales. Fig. 3.6, See Cales S 'Iy Side Triton Conf @ 303 See T e Cales. 2'Yo V-Gutter 2'Yo Swale -Conf 303 Te=[(I(CA)7.44P6)/Q]1.55 ~ ----------~ ----- I , ~~-----~~~-~-~-~-----------------------------..... ------------------- Rational Method Calculation Form Project: CT 03-13 Drainage Soil & A Area Development Acres 100-101 B -50% Imp 0.24 101-102 B -50'Yo Imp 1.40 200-102 B -65% Imp 0.83 300-301 B -35,},o Imp 0.58 301-302 B -O'Yo Imp 0.27 302-303 B -20'Yo Imp 1.12 C CA ~CA I In.lHr. 0.58 0.14 0.14 2.81 0.58 0.81 0.95 2.41 0.67 0.56 1.51 2.41 0.48 0.28 0.28 2.22 0.25 0.07 0.35 2.14 0.38 0.43 0.77 1.92 Conf 303 Qn See SD County Hydrology Manual QT2 See SD County Hydrology Manual 303 Qn 4.44 2.28 . , . . . ~ '\ ~ ' .. ', ': ~ Frequency 2 Year Post-Development Q Slope Section CFS 0.4 2.3 0.06 112 St 3.6 0.005 21" RCP 0.6 0.02 D-75 0.7 0.02 Swale 1.5 4.7 4.4 4.7 V L '/See. Ft. 5.2 565 4.5 120 4.2 150 2.6 290 T SumT Min. 1.8 6.8 8.6 8.6 0.4 9.1 9.8 0.6 10.4 1.9 12.3 10.9 Calculated by MB Date:2 August 2004 Remarks See Te Cales. Fig. 3.6, See Cales S 'Iy Side Triton Conf@ 303 See Te Cales. 2% V-Gutter 2'Yo Swale -Conf 303 Tc=[(I(CA)7.44P6)/Q]1.55 I I I I , ------------------- Rational Method Calculation Form Project: CT 03·13 Drainage Soil & A Area Development Acres Area A B -10% Imp 3.58 . ·;,·:--.:i .... C CA :ECA 0.32 1.15 1.15 .,." I Frequency 100 Year Pre·Development Q Slope Section In.IHr. CFS 4.54 5.2 .. V L '/See. Ft. T SumT Min. 10.6 Calculated by MB Date:2 August 2004 Remarks L= 675' Slope::: 7"10 Table 3-2 (Interpolated) Lm:::l00', Ti:::7.4 Min Tt= 3.2 Min (Fig 3-4) Tc:::7.4+3.2=10.6 ! I , ------------------- Rational Method Calculation Form Project: CT 03·13 Drainage Soil & A Area Development Acres Area A B -1010 Imp 3.58 . .:~. :/~~·i?~ ... , .. , C CA I:CA I hl.lHr. 0.32 1.15 1.15 2.92 .. ' . . .. Frequency 10 Year Pre.Development Q Slope Section CFS 3.3 V L T '/See. Ft. Min. SumT . 10.6 Calculated by MB Date:2 August 2004 Remarks L = 675' Slope = 7% Table 3"2 (Interpolated) Lm=100', Ti=7,4 Min Tt= 3.2 Min (Fig 3-4) Tc=7.4+3.2=10.6 1 ! ---~ , ------------------- \,'-.J \:) ( ( COUNTY OF SAN DIEGO DEPARTMENT OF SANITATION , FLOOD CONTROL 10-YEAR 6·HOU~ PRECIPITATIOr-J r16-ISGPLUVIAlSlof 1Q-YEAR (}-UaUn 45' -I 'lo!~~ .' 30 1 I I ' " -( h lJJ " j IS' I 1'''\ 1 ... 1-1 3)' 4S' 1 I . .. I J ._.-.... __ ..... --_. --...-. .--. , . _ . ., PNlI'l"d by t1.S, DEPARTME~T OF COM~ERCE NATIONAl., OCEANIC ANI) /t.1' l()IU'rnUjl~ ADMINISTRATION SP!:CfAt. 'STUDfU DltANCU. O"Ief: OF I OROLOOY, HATIONAI. W£ATHllt IlltVJCI 30 I I '~ .. ---. IISQ Its' 30' 15' 1170 :.:;, "', 45' 30', ( IS' 116- ------------------- .... ' ... =r~ --o 1 . , COi./i\lTY OF SAN OIEGO. • DEPARTMENT OF SANITATION So FLOOD CONTROL 10-YEAR 24-HOUR PRECIPITATION '-20./ ISOPlUVIAlS bf 10-YEAR 24 .. HOUR 45' ;p"> < '.\f{~ '~ 151 1'1---:-+----1 33· 4S' I ~ U.S. DEPARTMEfi'I' OF COMMERCE NATION AL OCEANIC AND "TI.lO!IJIIlItRIC !'.RWl"ISTRATIOH 30'4·1---I------iI---_i-____ t-____ ~-_ n6° 45' 30' lS' 117° tiS I 30' , IS' Jl6° -------------------) COUNTY OF SAN DIEGO . DEPARTMENT OF S~~tTATrON & FLOOD CONTROL J 2-YEAR 6-HOUR PRECIPITATIO~l ;-10-ISOPLUVIALS OF 2·YEAR 6 .. HOUR 4S I I 'l;!wr,.'I{",...J "~'.,,, 30' I 'l 15' I I) l-.lt \. ; ., 3'·' 4; t ; I' ,I uif. (AN}1I0a 1":Sl~ <1J.' ,r ~~ , P'.P~~db)' U,S. DEPART~IENT OF COMMERCE NATIONAL OCtANIC Al'lb ATMOSPHERIC AOMIN1'TRATlON 'II:C1A1. STUDIU BRAl'lCH. OFFiCe of IIVnROLOO\'. NATIONAL "'BATH~Jt IERVICI \~ ~ 30 1 II SO I.; J 30' I 45' 30' tit IS' ., 15 I , 1,6· ------------------- '. " ) . : .) " . COUNTY OF SAN DIEGO • DEPARTMENT OF SANITATION & FLOOD CONTROL • '\ .. ' .. ,,-, 45' 30' IS' 4$' I Pr.p.'"d by I U.S. DEPARTMENT OF COMMERCE NATIONAL O(:F.Aj-llt: AjIIO "TMO!WHEIUC ADMINISTItATlO" SPECIAL S'rI.lDI!! DRANCH, O"'ICt 0' HYDROLOGY, NAT10N"t. lV&ATHEIt S~"YlCC '1.01--' I T M 'r :r OON v.J 30' 1180 .... .. '.5' 30' lS' l1t 1 45' 30' 15' 1160 --- 10.0 9.0 8.0 7.0 6.0 ~ ~ "" , 5.0 )" 01' loo. 4. .... .... .... I"-.~ .... .... '" . , ,.,.. 3. 2 'C' i -5 1 .S ...... 0 ~ l!lO ~o o o o. o o 1 I 1 .,..... , t"--t..... o : ! i 0 3 s 7 I ~ ) , I ~ I 3 1 ~ tl---r I : --- ~ " i'o " "" ~ ..... "" " ,.,.. "" "1-",, ~ "'" '" I-"" ~ ... I' r.... ...."" ~ "-~"" ~ ~ r"-i'o ~ t..... l' " ,,... "- .... " I I' "I ~ l'r- "" i'o : I -f-I---'- 5 6 7 8 910 15 20 30 Mihute!\) I I I , ! I , , I I 1 I , I I I -- I ! I , I , , i i I , 1 ; , .. , , I I I , 40 50 Duration --- I 1 I EQUATION I ::i 7.44 P6 0-0.645 I = Intensity (in/hr) Ps = 6·Hour Precipitation ( in) o = Duration (min) i '-1'-0 ~ I'-o~ I' r"-I'" I~I"-. " I· I'~I' 1,,,1' 1"0-i' I' I' I Ii' 1- ~ J ~ f'" I I· "" '" I I ,... I-i'o ~t'- 1"0-" - ~ .... -. -~.-- " I 1 r Hours - ~ if Si '0 iii 6.0 ~, 5.5 ~ 5.0 !f 4.55- 4.d g. 3.S! 3.0 2.5 2.0 1.5 1.0 Intenslty..ouratlon Design Chart -Template ------ Directions for Application: (1) From precipitation maps determine S hr and 24 hr amounts for the selected frequency. These maps are induded In the County Hydrology Manual (10, 50. and 100 yrmaps included in the Design and Procedure Manual). (2) Adjust 6 hr precipitation (if necessary) so that it is within the range of 45% to 65% of the 24 hr precipitation (not applicaple to Desert). (3) Plot 6 hr precipitation on the right side of the chart. (4) Draw a line through the pOint parallel to the plotted lines. (5) This line Is the intenslty-dUration curve for the location being analyzed. Application Form: (a) Selected frequency ~ year P /.- (b)P6= ~ln"P24" "2.D 'P:4= ~%(2) (c) Adjusted P6(~)" ..l..::..:L in. (d) tx" __ min. (e) I ,. __ in.lhr. Note: This chart replaces the Intensity-Duration-Frequency curves used since 1965. P6 , 1.5'("2" .... 2'.5 3' 3.5! 4 4.5 5' 5.5 .. 6" Ouralloni I . Ii'" . i ':"''1''' .. j ...... j" ..... ( ..... ,":""j': I ... : .... ~.~ "g .. ?~ ;~ .. ~~t ~,.??.6.5~ ..7-99: 9.~: 10.54. 1~.86: 13.1?! 14:49. 1~,.~1 " ... 7 . ?c12".~:~~t ~.?4 .. 5,!3Q;.6:~. 7.42, ~.4S.; 9.54 : lq.60111.66: 12.72 10 1.66 2.53! 3.37 4.21! 5.05' 5.90. 6.74 7.&8 6.42, 9.27 10.1\ ..... L ..t:~:jA~~~~~E~;2E~;~~;~;~~"5.)~ : .. ~~.:. 6;4("J.,1(:t7?:. 20 1.08; 1.6212 •. 15 ;.?.6~; ~,2.:,J; ~:.?7 ...:...4:!3L.1,-f!~"'"S.!~~.i.?.~3., ti,4!l 25 0.93 1.4011.87 2.33 2.80:3.27: 3.73 4.20; 4,67' 5.13: 5.60 sO ii.8S i1.?.ii 1,66),67:2 . .(9~2.9~; 3 .. ~g: ~:.13.: ~,15; ~,!?6! 4.98 .... 1~ .M9 ; 1.0~{ 1.,38 .. 1.72.2.07,2.41: 2.76. 3.10 : 3.45: 3.79 i 4.13 liP 0:60. :q:~O!..1..1.9: 1..49 .. p9 ,?,~~ ?39 , 2,!?~ ... ?,j18 .;.=!.g~ ~ ~.!?ll .. _ .... ~ .0.53 ;0.8°11.06.1.33: 1.59.1.86; 2.12.2.39: 2.6512.92; 3.16 ........ ?I! .. 9..~1 .• O.61LQ·~. 1.,<>2".H?;.1.1!3. 1:6~ .. 1.81; '~'~.: .?·~§.i ?.~? l;lO 0.34 ;O,51l 1l.6B;0.85: 1.02: '1.19: 1.36.1.53 .1.70',1.87\ 2.04 ..... li: -~~X·~g::~!·g:;~·jg:~~··~:~1·~~'·U~· ~:~~; ~:~; ;'~:~~H:~;' .: ..... : 2~ ~Q,~ .. : 0.33r9A~j ~:~ .. :.9:~~~.O.~~; o'i,'i . O:9if~ 1.~: :'.1)~.L..1:~9 .. 300 0.19 0.28'0.38'0.47;0:56'0.00 0.75 0.85' 0.94 1.03! 1.13 360 '0,17 '0.251'0:33; 0:·i2';·o:sij"O:5S"·O.6i 0.75'; ·0.84· .... 0:92 i 1:00' FIGURE ~ - --- 10.0 9.0 8.0 7.0 ..... i' t' , ..... 6.0 5.0 Ii' 4. ) I N.... 3. ) : 2 J <.:11 .5 ~o ~ r .sO o , , ['0., ) . i I .0 9 . 8 7 I .6 ; "" .,.... ..... " ..... . ..... t--. '" • "'" '" ...... ° .5 : . , o : f lJ .4 ! I ! o "'3 I '.2 """ :-1-H-" I .. -- """ .... [00. "" ~ ~ i'o ~ ..... i'o I'--I-I'-- I'" ~ ..... " !." r-., "I' .... [00., I'~ '" ~ ""'. '" ~ f' "I ! ..... [oo.,r-., 1'-0. " I I I 1 I -+-- 5 6 7 8910 15 - ~ I~ t'-.. ~ , ~ r-. r-. '" , ..... .. 20 39 MlnUies -- I f ! 1 , ! I ! , I I I I 1 , ! I I I 1 I I , I I 1: I , , ! ! I ! I ' : I t _.. ' .. f I - I ! II 40 50 1 Dumtion --- 1 .1 I II I I 1 EQUATION I = 7.44 Pe 0-0.645 I :: Intensity (in/hr) Pa = 6.Hour Precipitation (I n) D = Duration (min) I I i 1""'1'-0. I I 1'-0. 1'-0. "" .... 1'--I .. I'-- I"'-1''' I \ .. ~"" ,.. l"'-I'--,.. i'o i'o ~ .... "- 1'"" i ... I I' I r--., I ~"'" I ... --...... ---.... ~-- - - 'fl ~ ., ~ 6.0~: 5.5 g 5.0 g' 4.55- 4.0 ~ 3.5 !!!- 3.0 2.5 2.0 1.5 1.0 2 3 4 5 6 Hours Intensity-Duration' Design Chart· Template ------ Directions for Application: (1) From precipitation maps determine 6 hr and 24 hr amounts for the selected frequency. These maps are induded in the County Hydrology Manual {10, 50, and 100 yr maps included in the Design and Procedure Manual). (2) Adjust 6 hr precipitation (if necessary) so that it is within the range of 45% to 65% of the 24 hr precipitation (not appllcaple to Desert). (3) Plot 6 hr precipitation on the right side of the chart. (4) Draw a line through the point parallel to the plotted lines. (5) This line is the intensity-duration curve for the location being analyzed. Application Form: (a) Selected frequency ltJ£L year (b)P6= 2.€:> in"P24= 4.5 .;a = ~ %(2) "7 (1 24 (c) Adjusted Pe(2) = ~in. (d) tx = __ min. (e) J ;:: __ in.lhr. Note: This chart replaces the Intensity-Duration-Frequency curves used since 1965. P6 .. 1" "1.s'1""··f . '~:5" 3 3.5 4 4,5 5 ~ 5.5 6 Duration 1 I'; j' . j"" j · ..... C·;· T" j" ... ,. r' "."': ", . "-""5 2.63 3.9515.27' 6.59 7.90'9.22: 10.54 11.!16·13.17j 14.49,15.81 .......... .t .·.g;12 ):l.·~r 4:24 ;·@).:6.36:7.42; 8.48: 9.54 : 1<?60111;6~] 1':1:'12 10 1 .. ~. ?A:ll~!~:L.1,.?L!?.!.~?. .. §·.9!L .~.,?1_ .... ?,§!L .. ~,1?~.n?. J.(H~. ... 1~ .. !:~~ .. JJ..?f&'~§!:~?1.:.~.~~; ~.~~; 5,19 .. ~~1 ... ~.4.9.i..7,1.~.; 7,?l'!. 20 1.08. 1.62! 2.1.5 i.~,!,!~ : 3!g;q:!.?.~~1.....i&f! .... !):.~. ~. ?:~: ~,4~ ~~ . o:~~ . ~ .491 1.~!; 2.~ . ?:80. 3,27: 3.73 . 4,20 ; 4.67 i 5.13: 5.60. 30 0.83; 1.?411.66:2.07.2.4~:~·~9; ~,~~. ~.73.: 4.15 L4.5!?: 4.98 ~ .O.t?9 . 1.0:1!1.~8: 1.72.2.01.2.41: 2.76. 3.10. 3.45 ~ 3.7914.13 ~ O.6~ .0.90.f 1.1J!: 1;~9 .. ).79 .. 2.Q~: ? .. 3~ .. ~,6~ .. , ?·~~.l 3:2.~.1. ~,~!I. 60 0.53 '0.80' 1.06: 1.33 1.59 1.86' 2.12' 2.39 2.65 i 2.92: 3.18 ::.":.:' .. ~ ·.9.:~t l~·~.llQ·~~: 1 .. !!(.1,2~;1:4~: ).:~:( 1.~.: ~,p4:! ~:J.~; ?'.~~. ~~ 0.34 iO.51\0.68:0.85;1.02:1.19i 1.39; 1.53. 1.70~ 1.67,2.04 .... J.~!L9.Z!., 0.44 •. Q:~~.l.~ . .1.~ .• .9. .. ~~ :.):.(l .. ~., 1:.18.: 1.32 , 1.47 • 1.£!? U.:!.6 ....... J~ . Q;2!3 .• O,39!51,§? i.9:~5.~ o.?!>; !J.9.1.!.1A4 ; .. 1:1.!-1. ... ).:~1 ..... 1:~; ~.57 .. ...... ~~ .Q,~ .. iQ:~~l.Q·.13"()I~,g .. l!l};.O}!3~ M7: 0.98. 1·~ .. , I:J.~.d .. 39.. . ~ .. ():~9 .. !0.28;.Q!?81.~:~U!'~; o.~~: .().7.!! .iJ)·~ ~ .9.'.~ .. ;)-,~. U .. J!3 360 0.17 0.25;0.33.0.42'0.50 0.560.67; 0.75' 0.840.92' 1.00 FIGURE ~ - ---- 10.0 9.0 8.0 7.0 6.0 ...... .... ~ " 5. ~ l" 4. 3. 2. I -g1 '='0 fo ~o o o o o. o. "1' ) I i l' ) . I I ) I e t ~ 7 I ! 5 5 i ; ~ 1 I i ~ . ~ I . - I, . ...... i'" ~ I" .... I .... " , ~ " i', , 'i"". I' '" I'l'o I' i"'o I" 'i"'.. " ..,. I'. i'1'. I I' I' I' I 1 ' I 5 6 1 8 910 -- " III , " "I-" I'" r"- l-I' "" ~ "I' ,...", I" " r-. 1"'1' .. ~ r-. ~ .. l- I .. " ~ '" ~ I' i'o, " 1 I I I I - '" ~ . - : I 15 20 30 M/riUfa'~ - - t 1 il , I I i I t I i I I , ! J 1 i 1 ! i I I I 1 I , t ! 1 I 1 I I ! , ! I i t j , 1 I I .. " 1 .! 40 50 Duration ---- ----~-------- III 1 . lUll ~ 1111 1 EQUATION I -= 7.44 P6 0-0.645 I = Intensity (In/hr) Pa = 6·Hour Precipitation D = Duration (min) 1'1' I' l' I"l'" i"'or-. I" ~ '1'1' '1'1' I' , I' r-. , " 1 I 1'1' '" , I .. i' " "I' i"'o~ t - I 2 3 Hours I J I (in) i 'U iil 6.0~: 5.5 ~ 5.0 g 4.55- 4.0 g. 3.5 ! 3.0 2.5 2.0 1.5 1.0 lntenlity-Duratlon Design Chart -Template ---- -- Directions for Application: (1) From precipitation maps determine 6 hr and 24 hr amounts for the selected frequency. These maps are included in the County Hydrology Manual (10, 50, and 100 yr maps included in the Design and Procedure Manual). (2) Adjust 6 hr precipitation (if necessary) so that it is within the range of 45% to 65% of the 24 hr precipitation (not applicaple to Desert). (3) Plot 6 hr precipitation on the right side of the chart. (4) Draw a line through the point parallel to the plotted lines . (5) This line is Ihe intenslty.duration curve for the location being analyzed. Application Form: (a) Selected frequency ~ year (b) Pa = .L..fL in., P24 = ~ ,pPs :: 58 %(2) 24 -- (C) Adjusted P6(2} = J.J.L in. (d) tx :: __ min. (e) I = __ in.lhr. Note: This chart replaces the Intensity-Duration-Frequency curves used since 1965. P6 '''1' 1.5·i" 2'" 2',5' 3 "'3.5: 4 . 4.5' 5 : '5.5'" 6' Duration' I . ,": '('" i'" 'r'" ",": T"'j .... ·1 .; .... 1' .. ; j' ......... ) .. ~:.~. '~'~~f.!?:.?1. .. ~~9 ].90. 9.;22pO.54. 11.86. 13:17; 1~.49J.-?~I. . ......... 1.? .. 1~. :3'.\.~14.l?'U.ilO".6:3~. 7.42~.8.48 . ~.54 .. IO.69111.6SiI2.72 10 .1:® : 2.5~1 ~:~? d:g,I.~.~,~? :.~:~o..l.~,?4 .. ...?·~ .... 8'.1? .U~:~.? ; 1.D., ~) . .. ,,1.~ )!~tL.~:~.~.;..?:~.~_;~,?1.:.~c8~:~.?1. 5.J~.: ~.~4 .. ~.1H?·1~.f..? .. !9.. 20 1.08 '.1.62; 2.15.; ?:?~ . ~.!?~: .. ?T!3:.~~ ..... _1:jI'?' .. ,.~:~.l.?:~~ : 6.~6 ~~ 9:9~.; 1.4~i 1'1I! I ;?:?~ . 2 .. 80 . 3.27 i S.73 : 4.20 . 4.67 : 5.13 : 5.S!>. 30 0.88! 1.24! 1'~12,07 .2.49 .2.~~;.~ .. ~~ .. , .~?~ .. 4 •. 15i 4.,f?~ i 4.98 .... '!9. .. O,~ : 1.03[ 1.~8: 1.72.2.07.2.41 i 2.76 . 3.10 . 3.45; 3.79 i 4.1? ~ 0.60. :q:~o.L1 .. 1j1~ ,:~~. F9 .2:Q~i ~:39 :.~~~ .. 2,~ t ~:2~ L 3.!?8 . .• " .... §4) .0 .. 5;3 ;0.80/1.06: 1.33.1.59. I.B6; 2.12 . 2.39 • 2.65 i 2.92: 3.18 ...... ~ .!!.~1. iO.61\.0~~:U .. .Q.?.,; giU.:43: 1:~3_j .1.!\4 •. ?:~ ~.~.?l!j.2.~~. 1~ 0.34 10.5110.68iO.85; '1.02.1.19,1.36; 1.53: 1.70: un; 2.04 150 0.29 :0.441 0.59iO.73· 0.88: 1.03' 1.18' 1.32' 1.47 1.62".76 ...... "-' " ..... ,. r'''''' , ... " .. " ....................... ' .. . '" "" ........ , .. ..... "..1~ 9,,2~.iO.3!\9.:?~i ~ .. ~5.:I?:~!I:.O':~~.:.1·~~.l .. U.~l.1.:~L .. ~:~ ~ '1.57 240 0.22 :O.3310.43.0.54·0.6510.76! 0.87,0.98: 1.OS 1.19' 1.30 .... ~ -Q.j9:: O.28r9.;~·!.QA~A,~;M6: Q.7~ ~.Q.~5 .:. 9:9(. (9.:(":i'.'1.3: 3fiO 0.17 0.2510.33;0.42·0.50'0.58 0.67; 0.7510.84 0.92! 1.00 FIGURE ~ - ------------------- 1.\" San Diego County Hydrology Manual Date: June 2003 Table 3-1 Section: Page: RUNOFF COEFFICIENTS FOR URBAN AREAS Land Use Runoff Coefficient "C" Soil TIEe NRCS Elements Coun Elements %IMPER. A B Undisturbed Natural Terrain (Natural) Pennanent Open Space 0* 0.20 0.25 Low Density Residential (LOR) Residential, 1.0 DU/A or less 10 0.27 0.32 Low Density Residential (LDR) Residential, 2.0 DU/A or less 20 0.34 0.38 Low Density Residential (LOR) Residential, 2.9 DU/A or less 25 0.38 0.41 Medium Density Residential (MDR) Residential, 4.3 DU/A or less 30 0.41 0.45 Medium Density Residential (MDR) Residentil:ll, 7.3 DU/A or less 40 0.48 0.51 Medium DQ1lSity Residential (MDR) Residentil:ll, 10.9 DU!A or less 45 0.52 0.54 Medium Density Residential (MDR) Residential, 14.5 DU/A or less 50 0.55 0.58 High Density Residential (HDR) Residential, 24.0 DUI A or less 65 0.66 0.67 High Density Residential (HDR) Residential, 43.0 DU/A or less 80 0.76 0.77 C01IllllerciaIlIndustrial (N. Com) Neighborhood Co1Illllercial . 80 0.76 0.77 ComItlerciallIndustrial (G. Com) General Commercial 85 0,80 0.80 CommerciaIlIndustrial (O.P. Com) Office Professional/Commercial 90 0.83 0,84 CommerciaIlIndustrial (Limited I.) Limited Industrial 90 0.83 0.84 General Industrial 95 0.87 0.87 C 0.30 0.36 0.42 0.45 0.48 0.54 0.57 0.60 0.69 0.78 0.78 0.81 0.84 0,84 0.87 3 6 of 26 D 0.35 0.41 0,46 0,49 0.52 0.57 0.60 0.63 0.71 0.79 0.79 0.82 0.85 0.85 0.87 *The values associated with 0% impervious may be used for direct calCtilation of the runoff coefficient as described in Section 3.1.2 (representing the pervious runoff coefficient, Cp, for the soil type), orfor areas that will remain undisturbed in perpetuity. Justification must be given that the area will remain natural forever (e.g., the area is located in Cleveland National Forest). DUI A = dwelling units pet acre NRCS = National Resources Conservation Service 3-6 I I I I I I I I I I I -I I I I I I I I San Diego County Hydrology Manual Date: June 2003 Section: Page: 3 12 of 26 Note that the Initial Time of Concentration should be reflective of the general land-use at the upstream end of a drainage basin. A single lot with an area of two or less acres does not have a significant effect where the drainage basin area is 20 to 600 acres. Table 3-2 provides limits of the length (Maximum Length (LM)) of sheet flow to be used in hydrology studies. Initial Ti values based on average C values for the Land Use Element are also included. These values can be used in planning and design applications as described below. Exceptions may be approved by the "Regulating Agency" when submitted with a detailed study. Table 3-2 MAXIMUM OVERLAND FLOW LENGTH (41) & INITIAL TIME OF CONCENTRATION (Til Element* nUl .5% 1% 2% 3% 5% 10% Acre LM Ti LM Ti LM Ti LM Ti LM Ti LM Ti Natural 50 13.2 70 12.5 85 10.9 100 10.3 100 8.7 100 6.9 LDR 1 50 12.2 70 11.5 85 10.0 100 9.5 100 8.0 100 6.4 LDR 2 50 11.3 70 10.5 85 9.2 100 8.8 100 7.4 100 5.8 LDR 2.9 50 10.7 70 10.0 85 8.8 95 8.1 100 7.0 100 5.6 MDR 4.3 50 10.2 70 9.6 80 8.1 95 7.8 100 6.7 100 5.3 MDR 7.3 50 9.2 65 8.4 80 7.4 95 7.0 100 6.0 100 4.8 MDR 10.9 50 8.7 65 7.9 80 6.9 90 6.4 100 5.7 100 4.5 MDR 14.5 50 8.2 65 7.4 80 6.5 90 6.0 100 5.4 100 4.3 HDR 24 50 6.7 65 6.1 75 5.1 90 4.9 95 4.3 100 3.5 HDR 43 50 5.3 65 4.7 . 75 4.0 85 3.8 95 3.4 100 2.7 N.Com 50 5.3 60 4.5 75 4.0 85 3.8 95 3.4 100 2.7 G.Com 50 4.7 60 4.1 75 3.6-85 3.4 90 2.9 100 2.4 O.PJCom 50 4.2 60 3.7 70 3.1 80 2.9 90 2.6 100 2.2 Limited I. 50 4.2 60 3.7 70 3.1 80 2.9 90 2 .. 6 100 2.2 General 1. 50 3.7 60 3.2 70 2.7 80 2.6 90 2.3 100 1.9 *See Table 3-1 for more detailed description 3-12 I I I I I I I I I I I I I I I I I I I EQUATION .6.E Feet Tc = c~~3r·385 5000 Tc L = 4000 = .6.e Time of concenlr"ation (hours) Watercourse Distance (miles) Change in elevation along effective slope line (See Figure 3-5)(feet) 3000 2000 .6.E SOURCE: California Division of Highways {1941} and Kirpich (1940) L Miles Feet 3000 , l , , Tc Hours Minutes , 3 " , , Tc 240 180 120 50 20 Nomograph for Determination of Time of Concentration (Tel or Travel Time (Ttl for Natural 'M:Ifersheds I I I I I ·1 I I I I 'I I I 1 I II / ........,n = .015-+-~ _ 2% _ __ _n=.0175 --------~------~ 2% 2 EXAMPLE: Concrete Gutter Given: Q = 10 S = 2.50/. 3 Paved 0.13 4 5 6 7 8 9 10 Discharge (C_F.S.) Chart gives: Depth = 0.4, Velocity = 4.4 f.p.s. SOURCE: San Diego County Depaltment of Special District Services Design Manual Gutter and Roadway Discharge -Velocity Chart ZQ_-- RESIOENllAL STREET ONESIDEONLY 20 30 40 50 FIGURE ~ ~~~ WlPOS'ED S. D. pE!/.:1t1Muff.Il 'O<;:)~ t.)tO" II II 'vI 0 1 ir •• 1 ... ---- - ---------:QIO = I. 0 ,.~"-.---- RECONST. DRIVEWAY TO JOIN-"£/ Ss PROPOSED STREET IMPROVEt1ENTS DWG 422-8 ------- 4:lt SLOPE 8 067}J PRIVA TE SHARED ACct'sSf 8 UTILITY EASEM'ENT ::.'i~I- 61.21' ~\PJ\j 2j-5~070~OB -"" . .--,' /vJ~S ~ POST -DEVELOPMENT HYDROLOGY -- PRE-DEVELOPMENT HYDROLOG Y S~HT DISTANCE CORRIIOOR, PER FINAL HAp 0.27 Ac -------. "'- o % / M P ______ '" :'24 AC\ 50%"IMP \ I: r-\ (i=J74!J I·---r--(i=J771>-&\ . ~\ 1 .) I ~~--~ ---- /----- ir 1 1 1 SCALE 1"=40' + SCALE 1'=40' CT 03-/3 Engineering Proftssional Civil Engineers and LAnd S uroryors 600 South Andreasen Drive. Suite E. Escondido, CA 92029 HYDROLOGY MAP -02/010/0100 phone 760741-3571 PAX 760 897-2165 E-Mail: MLBencsh@padlciLnet I: .