March 27, 2012
J.N. 155-10
Grading Permit
No.: GR1O-13
Mr. Tom Tupman
WARMINGTON RESIDENTIAL CALIFORNIA
3090 Pullman Street
Costa Mesa, CA 92626
Subject: Summary of Observation and Testing, Reconditioning of Lots 9, 10, 15 and 16 of Tract
04-01, The Poinisettia Ridge Project, Southeast Corner of Black Rail Road and Songbird
Avenue, City of Carlsbad, San Diego County, California
References: See Attached List.
Mr. Tupman:
Presented herein are the results of our field observation and testing performed during reconditioning of the pad
surfaces on Lots 9, 10, 15 and 16 of Tract 04-01. The purpose of this most recent grading was to restore the
subject pads back to their original condition as they existed at the completion of rough grading (Reference No.
1). A single-family residence is proposed on each lot.
OBSERVATIONS AND TESTING
A representative of this firm provided observation and testing during re-conditioning of the pad surfaces on the
subject parcels and lots. In general, the work was performed in the following manner:
1. All construction debris and weeds were removed from each parcel and lot.
The existing pad surfaces on each lot were scarified to depths of 4 to 6 inches, watered as necessary to
achieve near optimum moisture conditions, and then recompacted in place to a minimum relative
compaction of 90 percent by wheel-rolling with a skip loader and a water truck filled to capacity.
3. Field density tests were performed using Nuclear Test Method ASTM D 6938-08a. Test results are
presented in Table I and approximate locations of the field density tests are shown on Plate 1.
WARMINGTON RESIDENTIAL CALIFORNIA March 27, 2012
Lots 9, 10, 15 and 16 of Tract 04-01 J.N. 155-10
Page 2
Field density tests were taken at regular intervals to verify adequate compaction.
Maximum dry density and optimum moisture content of representative samples of the on-site soils were
determined in our laboratory in accordance with Test Method ASTM D 1557-07. The results of these
laboratory tests are summarized in Table II.
Visual classification of earth materials in the field was the basis for determining which of the
maximum density values was applicable for a given density test. One-point checks were performed to
supplement visual classifications.
CONCLUSIONS
Based on the results of our observations, on our field and laboratory tests, and on our experience and judgment,
it is our opinion that the completed earthwork discussed herein has been performed in general accordance with
our recommendations for processing of existing grades within the subject lots.
Recompaction of the pad surfaces under the purview of this report has been completed under the observation of
and with selective testing by Petra Geotechnical, Inc., and is found to be in compliance with the Grading Code
of the City of Carlsbad, California. The completed work has been reviewed and is considered adequate for the
construction now planned. Foundation design recommendations provided in Reference Nos. 3 and 4 remain
applicable and no further recommendations are needed at this time.
REPORT LIMITATIONS
A representative of Petra Geotechnical, Inc. (Petra) was present on-site on an on-call basis during post-grading
operations for the purpose of providing the owner's representative with professional opinions and
recommendations. These opinions and recommendations were developed based on field observation and
selective testing of the contractor's work. Our scope of services during this project did not include supervision
or direction of the contractor, his personnel or his subcontractors. As documented in this report, our
observations and testing did not reveal any obvious deviations from the recommendations provided in the
referenced geotechnical reports by our firm; however, Petra does not in any way guarantee the contractor's
work, nor do our services relieve the contractor (or any subcontractors) of their liability should any defects
subsequently be discovered in their work product.
Based on our findings, this report was prepared in conformance with generally accepted professional
engineering practices, and no further warranty is implied nor made.
WARMINGTON RESIDENTIAL CALIFORNIA March 27, 2012
Lots 9, 10, 15 and l6of Tract 04-01 J.N. 155-10
Page 3
This report is subject to review by the controlling authorities for the project. Should you have any questions,
please do not hesitate to call.
Respectfully submitted,
PETRA GEOTECHNICAL, INC.
Siamak JafroudjhD :;/Z7//L—
Senior Principal Engineer
GE 2024
SM/SJ/kg
W:\2010\100\155-10 Warminglon Residential California (Black Rail)\300\recert lots 9,10,15, 16.doc
WARMINGTON RESIDENTIAL CALIFORNIA March 27, 2012
Lots 9, 10, 15 and 16 of Tract 04-01 J.N. 155-10
Page 4
REFERENCES
Christian Wheeler Engineering, Report of Field Observation and Relative Compaction Testing,
Grading and Site Improvements, Black Rail 16-Lot Development, Black Rail Road and Songbird
Ave., Carlsbad, California: prepared for Watkins Landmark Construction, dated January 4, 2007
(CWE 2050489.05).
Geotechnical Commentary on Design and Construction of Post-Tensioned Slabs On-grade for Lots 1
through 16 Carlsbad Tract No. 04-01, The Poinsettia Ridge Project, Southeast Corner of Black Rail
Road and Songbird Avenue, City of Carlsbad, San Diego County, California, letter by Petra
Geotechnical, Inc., dated April 1, 2010.
Geotechnical Review of Precise Grading Plans and Updated Foundation Design Recommendations,
Lots 1 through 16 Carlsbad Tract No. 04-01, The Poinsettia Ridge Project, Southeast Corner of Black
Rail Road and Songbird Avenue, City of Carlsbad, San Diego County, California, letter by Petra
Geotechnical, Inc., dated April 13, 2010.
Response to City of Carlsbad Review Sheet and Review of Precise Grading and Foundation Plans,
Lots I through 16, Carsbad Tract No. 04-01, The Points ettia Ridge Project, Southeast Corner of Black
Rail Road and Songbird Avenue, City of Carlsbad, San Diego County, California, letter by Petra
Geotechnical, Inc., dated July 14, 2010.
WARMINGTON RESIDENTIAL CALIFORNIA March 27, 2012
Lots 9, 10, 15 and 16 of Tract 04-01 J.N. 155-10
Page 5
TABLE I
FWII) DVNSITV TPST SuMMARy
Date of
Test
Test
No.
.. Parcel Number Depth *,
(ft.)
Moist.
(%)
Unit Wt.
lbs./cu.ft.
% Rd.
Comp.
Soil
Type
3/26/2012 1 Lot #9 FG 12.6 116.0 92 A
3/26/2012 2 Lot#10 FG 13.3 115.1 91 A
3/26/2012 3 Lot# 15 FG 12.9 115.7 92 A
3/26/2012 4 Lot #16 FG 13.1 114.8 91 A
ru - rinisn uraae
* - Depth Below Finish Grade
TABLE II
Soil Type Optimum Moisture (%) Maximum Dry Density (pci)
A - Silty Sand (SM) 10.0 126.0
Ora
PETRA
:::eonmw1ta1 / Corporate
3190
rt Loop
Costa Mesa, California 92626
T: 714.549.8921 F: 714.549.1438 1
-
past + present + futur.
it's in our scienc.
Engineers, Geologist
Environmental Scientist
May 10, 2011
J.N. 155-10
Grading Permit
No.: GR1O-13
Mr. Tom Tupman
WARMINGTON RESIDENTIAL CALIFORNIA
3090 Pullman Street
Costa Mesa, CA 92626
Subject: Summary of Observation and Testing, Reconditioning of Lots 3 through 6 of Tract 04-01,
The Poinisettia Ridge Project, Southeast Corner of Black Rail Road and Songbird Avenue,
City of Carlsbad, San Diego County, California
References: See Attached List.
Mr. Tupman:
Presented herein are the results of our field observation and testing performed during reconditioning of the pad
surfaces on Lots 3 through 6 of Tract 04-01. The purpose of this most recent grading was to restore the subject
pads back to their original condition as they existed at the completion of rough grading (Reference No. 1). A
single-family residence is proposed on each lot.
OBSERVATIONS AND TESTING
A representative of this firm provided observation and testing during re-conditioning of the pad surfaces on the
subject parcels and lots. In general, the work was performed in the following manner:
1. All construction debris and weeds were removed from each parcel and lot.
The existing pad surfaces on each lot were scarified to depths of 4 to 6 inches, watered as necessary to
achieve near optimum moisture conditions, and then recompacted in place to a minimum relative
compaction of 90 percent by wheel-rolling with a skip loader and a water truck filled to capacity.
Field density tests were performed using Nuclear Test Method ASTM D 6938-08a. Test results are
presented in Table I and approximate locations of the field density tests are shown on Plate 1.
WARMINGTON RESIDENTIAL CALIFORNIA May 10, 2011
Lots 3 through 6 of Tract 04-01 J.N. 155-10
- Page
Field density tests were taken at regular intervals to verify adequate compaction.
Maximum dry density and optimum moisture content of representative samples of the on-site soils were
determined in our laboratory in accordance with Test Method ASTM D 1557-07. The results of these
laboratory tests are summarized in Table II.
Visual classification of earth materials in the field was the basis for determining which of the maximum
density values was applicable for a given density test. One-point checks were performed to supplement
visual classifications.
CONCLUSIONS
Based on the results of our observations, on our field and laboratory tests, and on our experience and judgment,
it is our opinion that the completed earthwork discussed herein has been performed in general accordance with
our recommendations for processing of existing grades within the subject lots.
Recompaction of the pad surfaces under the purview of this report has been completed under the observation of
and with selective testing by Petra Geotechnical, Inc., and is found to be in compliance with the Grading Code
of the City of Carlsbad, California. The completed work has been reviewed and is considered adequate for the
construction now planned. Foundation design recommendations provided in Reference Nos. 3 and '4 remain
applicable and no further recommendations are needed at this time.
REPORT LIMITATIONS
A representative of Petra Geotechnical, Inc. (Petra) was present on-site on an on-call basis during post-grading
operations for the purpose of providing the owner's representative with professional opinions and
recommendations. These opinions and recommendations were developed based on field observation and
selective testing of the contractor's work. Our scope of services during this project did not include supervision
or direction of the contractor, his personnel or his subcontractors. As documented in this report, our
observations and testing did not reveal any obvious deviations from the recommendations provided in the
referenced geotechnical reports by our firm; however, Petra does not in any way guarantee the contractor's
work, nor do our services relieve the contractor (or any subcontractors) of their liability should any defects
subsequently be discovered in their work product.
Based on our findings, this report was prepared in conformance with generally accepted professional
engineering practices, and no further warranty is implied nor made.
WARMINGTON RESIDENTIAL CALIFORNIA May 10, 2011
Lots 3 through 6 of Tract 04-01 J.N. 155-10
Page 3
This report is subject to review by the controlling authorities for the project. Should you have any questions,
please do not hesitate to call.
Respectfully submitted,
PETRA GEOTECHNICAL, INC.
No. G 024 Mm Siamak Jafroudi, PhD
Senior Princip al Engineer
GE 2024
SM/SJ/kg
W:\2010\100\155-10 Warmington Residential California (Black Rail)\300\Summary of Observation & Testing (Lots 3-6)doc
WARMINGTON RESIDENTIAL CALIFORNIA May 10, 2011
Lots 3 through 6 of Tract 04-01 J.N. 155-10
Page 4
REFERENCES
Christian Wheeler Engineering, Report of Field Observation and Relative Compaction Testing,
Grading and Site Improvements, Black Rail 16-Lot Development, Black Rail Road and Songbird
Ave., Carlsbad, California: prepared for Watkins Landmark Construction, dated January 4, 2007
(CWE 2050489.05).
Geotechnical Commentary on Design and Construction of Post-Tensioned Slabs On-grade for Lots 1
through 16 Carlsbad Tract No. 04-01, The Poinsettia Ridge Project, Southeast Corner of Black Rail
Road and Songbird Avenue, City of Carlsbad, San Diego County, California, letter by Petra
Geotechnical, Inc., dated April 1, 2010.
Geotechnical Review of Precise Grading Plans and Updated Foundation Design Recommendations,
Lots 1 through 16 Carlsbad Tract No. 04-01, The Poinsettia Ridge Project, Southeast Corner of Black
Rail Road and Songbird Avenue, City of Carlsbad, San Diego County, California, letter by Petra
Geotechnical, Inc., dated April 13, 2010.
Response to City of Carlsbad Review Sheet and Review of Precise Grading and Foundation Plans,
Lots 1 through 16, Carsbad Tract No. 04-01, The Pointsettia Ridge Project, Southeast Corner of Black
Rail Road and Songbird Avenue, City of Carlsbad, San Diego County, California, letter by Petra
Geotechnical, Inc., dated July 14, 2010.
I.
WARMINGTON RESIDENTIAL CALIFORNIA
Lots 3 through 6 of Tract 04-01
TABLE!
FIELD DENSITY TEST SUMMARY
May 10, 2011
J.N. 155-10
Page 5
Date of
Test
Test
No. Parcel Number Depth *
(ft.)
Moist.
(%)
Unit Wt.
lbs./cu.ft.
% Rel.
Comp.
Soil
Type
5/5/11 1 - Lot #3 FG 11.7 117.2 93 A
5/5/11 2 Lot #4 FG io:i 118.3 94 A
5/5/11 3 Lot #5 FG 12.2 117.1 93 A
5/5/11 4 Lot#6 FG 10.0 116.0 92 A
FG.- Finish Grade
* - Depth Below Finish Grade
TABLE II
Soil Type : Optimum Moisture (%) Maximum Dry Density (pci)
A - Silty Sand (SM) 10.0 126.0
ri
0 20 40 60
August 7 2009
2009007
EXPLANATION
111 Approximate Limits of This Report
X -4 Approximate Location of Density Test
Black Rail Road
Carlsbad, California
Warinington Residential of California
PETRA GEOTECHNICAL, INC.
J.N. 155-10 MAY 2011
PLATE 1
Poinsettia Ridge
Tract # CT04-01
Phase 2/
lLots3,4,..5, 6 (4units
Sequence Sheet
Issued: 2/17/11
Color Roof
Lot Plan Elevation Scheme Type Address
1 3 (4) 2 F 4 Flat 6657 Thrasher Place
4 (1) (4) 1 R S 9 "S" Tile 6659 Thrasher Place
5 (3) (4) 1 F 6 Flat 6658 Thrasher Place
6 (3) (4) 2R I 1 "S" Tile 6656 Thrasher Place
Carlsbad, California 92011
Backwater valve/Split System
Dropped Garages
Deepened Footings
Fire Sprinklers
Note:
The above items are to be confirmed by the superintendent referencing the Precise Grading Plan.
Mix - Phase 2-4 Lots
Plan Total
E I
1 1 N/A 1 2
2 1 1 0 2
3 0 0 0 0
Total 2 1 1 4
F = French Provence I = ltalianate S = Spanish
Arrnroved: Warminuton Residential California
BLS: JWS: -i -1
TOT: 7 -I' I MW:
DG:
L. r
H LJ
A
--------------
11P oinsetha
Carlsbad Tract O4O1
ka5ingran
CD
1'8O'
"'•--" I
: 1164L
EL (
CD
CD
CD
LO
I..C)
(J)UH
)LL._
0) tI I d'T i41L{i
A
c Ii
0)
- s ii-- 4-.- I Ii
OLI
--' J. I3 i
--I
A. oInsettIa f<icl&1
Carlsbad Tract No. 04-01
iasingan
CD
bcale 111 o0O
CJ A
Lot
N M i ty1r Tff'Iiase I\\/Lo 16
Lof
W, — --7 SII7-i' I <r_flfl
P
ILot 10
I\ I
OT 1iiIllhIfli
Lot 6 /J
S!'
.
biiiIi1
Lot 1-4
I F
Ifif Loj
L rt
Poinsettia Ridge
Tract # CT04-01
Phase 2
Lots 3, 4, 5, 6 (4 units)
Sequence Sheet
Issued: 2/17/11
Color Roof
Lot Plan Elevation Scheme Type Address
3 (4) 2 F 4 Flat 6657 Thrasher Place
4 (1) (4) 1 R S 9 "5" Tile 6659 Thrasher Place
5 (3) (4) 1 F 6 Flat 6658 Thrasher Place
6 (3) (4) 2R I 1 "S" Tile 6656 Thrasher Place
Carlsbad, California 92011
Backwater valve/Split System
Dropped Garages
Deepened Footings
Fire Sprinklers
Note:
The above items are to be confirmed by the superintendent referencing the Precise Grading Plan.
Mix - Phase 2 -4 Lots
Plan Total
1 1 N/A 1 2
2 1 1 0 2
0 0 0 0
Tctal 2 1 1 4
F = French Provence I = ltalianate S = Spanish
Approved: Warminqton Residential California
BLS: JWS:
TOT: MW:
DC:
Orange County I Environmental I Corporate 4 PETRA
3190 Airport Loop Drive, Suite J-1
Costa Mesa, California 92626
T: 714.549.8921 F: 714.549.1438
past + present + future
it's in our science
Engineers, Geologists
Environmental Scientists
December 9,2010
J.N. 155-10
Grading Permit
No.: GR10-13
Mr. Tom Tupman
WARMINGTON RESIDENTIAL CALIFORNIA
3090 Pullman Street
Costa Mesa, CA 92626
Subject: Summary of Observation and Testing, Reconditioning of Lots 11, 12, 13 and 14 of Tract
04-01, The Pointsettia Ridge Project, Southeast Corner of Black Rail Road and Songbird
Avenue, City of Carlsbad, San Diego County, California
References: See Attached List.
Mr. Tupman:
Presented herein are the results of our field observation and testing performed during reconditioning of the pad
surfaces on Lots 11, 12, 13 and 14 of Tract 04-01. The purpose of this most recent grading was to restore the
subject pads back to their original condition as they existed at the completion of rough grading (Reference No.
1). A single-family residence is proposed on each lot.
OBSERVATIONS AND TESTING
A representative of this firm provided observation and testing during re-conditioning of the pad surfaces on the
subject parcels and lots. In general, the work was performed in the following manner:
1. All construction debris and weeds were removed from each parcel and lot.
The existing pad surfaces on each lot were scarified to depths of 4 to 6 inches, watered as necessary to
achieve near optimum moisture conditions, and then recompacted in place to a minimum relative
compaction of 90 percent by wheel-rolling with a skip loader and a water truck filled to capacity.
Field density tests were performed using Nuclear Test Method ASTM D 6938-08a. Test results are
presented in Table I and approximate locations of the field density tests are shown on Plate 1.
Field density tests were taken at regular intervals to verify adequate compaction.
Maximum dry density and optimum moisture content of representative samples of the on-site soils were
WARMINGTON RESIDENTIAL CALIFORNIA
Lots 11, 12, 13 and 14 of Tract 04-01
December 9, 2010
J.N. 155-10
Page 2
determined in our laboratory in accordance with Test Method ASTM D 1557-07. The results of these
laboratory tests are summarized in Table II.
6. Visual classification of earth materials in the field was the basis for determining which of the maximum
density values was applicable for a given density test. One-point checks were performed to supplement
visual classifications.
CONCLUSIONS
Based on the results of our observations, on our field and laboratory tests, and on our experience and judgment,
it is our opinion that the completed earthwork discussed herein has been performed in general accordance with
our recommendations for processing of existing grades within the subject lots.
Recompaction of the pad surfaces under the purview of this report has been completed under the observation of
and with selective testing by Petra Geotechnical, Inc., and is found to be in compliance with the Grading Code
of the City of Carlsbad, California. The completed work has been reviewed and is considered adequate for the
construction now planned. Foundation design recommendations provided in Reference Nos. 3 and 4 remain
applicable and no further recommendations are needed at this time.
REPORT LIMITATIONS
A representative of Petra Geotechnical, Inc. (Petra) was present on-site on an on-call basis during post-grading
operations for the purpose of providing the owner's representative with professional opinions and
recommendations. These opinions and recommendations were developed based on field observation and
selective testing of the contractor's work. Our scope of services during this project did not include supervision
or direction of the contractor, his personnel or his subcontractors. As documented in this report, our
observations and testing did not reveal any obvious deviations from the recommendations provided in the
referenced geotechnical reports by our firm; however, Petra does not in any way guarantee the contractor's
work, nor do our services relieve the contractor (or any subcontractors) of their liability should any defects
subsequently be discovered in their work product.
Based on our findings, this report was prepared in conformance with generally accepted professional
engineering practices, and no further warranty is implied nor made.
S • ••
34
WARMINGTON RESIDENTIAL CALIFORNIA December 9, 2010
Lots 11, 12, 13 and 14 of Tract 04-01 J.N. 155-10
Page 3
This report is subject to review by the controlling authorities for the project. Should you have any questions,
please do not hesitate to call.
Respectfully submitted, 4o
PETRA GEOTECHNICAL, INC.
rn
Siamak Jafroudi,, GE 2024
Senior Principal gngineer /t/q/
SM/Si/kg
W:\2010\100\155-10 Warmington Residential California (Black Rail)\300\Recertflcation Letter (Lots 1,2,7,8 of Tr 04-0 ).doc
WARMINGTON RESIDENTIAL CALIFORNIA December 8, 2010
Lots 11, 12, 13, and 14 of Tract 04-01 J.N. 155-10
Page 4
REFERENCES
Christian Wheeler Engineering, Report of Field Observation and Relative Compaction Testing,
Grading and Site Improvements, Black Rail 16-Lot Development, Black Rail Road and Songbird
Ave., Carlsbad, California: prepared for Watkins Landmark Construction, dated January 4, 2007
(CWE 2050489.05).
Geotechnical Commentary on Design and Construction of Post-Tensioned Slabs On-grade for Lots 1
through 16 Carlsbad Tract No. 04-01, The Poinsettia Ridge Project, Southeast Corner of Black Rail
Road and Songbird Avenue, City of Carlsbad, San Diego County, California, letter by Petra
Geotechnical, Inc., dated April 1, 2010.
Geotechnical Review of Precise Grading Plans and Updated Foundation Design Recommendations,
Lots 1 through 16 Carlsbad Tract No. 04-01, The Poinsettia Ridge Project, Southeast Corner of Black
Rail Road and Songbird Avenue, City of Carlsbad, San Diego County, California, letter by Petra
Geotechnical, Inc., dated April 13, 2010.
Response to City of Carlsbad Review Sheet and Review of Precise Grading and Foundation Plans,
Lots I through 16, Carsbad Tract No. 04-01, The Pointsettia Ridge Project, Southeast Corner of Black
Rail Road and Songbird Avenue, City of Carlsbad, San Diego County, California, letter by Petra
Geotechnical, Inc., dated July 14, 2010.
5: S
WARMINGTON RESIDENTIAL CALIFORNIA
Lots 11, 12, 13, and 14 of Tract 04-01
-
TABLE I
FIELD DENSITY TEST SUMMARY
December 8, 2010
J.N. 155-10
Page 5
Date of
Test
Test
No. Parcel Number Depth *
(ft.)
Moist.
(%)
Unit Wt.
lbs./cu.ft.
% Rel.
Comp.
Soil
Type
12/8/2010 1 Lot# 11 FG 12.2 116.6 93 A
12/8/2010 2 Lot #12 FG 12.7 116.3 92 A
12/8/2010 3 Lot# 13 FG 13.1 116.7 93 A
12/8/2010 4 Lot #14 FG 12.8 117.0 93 A
FU - Finish Urade
* - Depth Below Finish Grade
TABLE II
Soil Type Optimum Moisture (%) Maximum Dry Density (pc
A - Silty Sand (SM) 10.0 126.0 '