HomeMy WebLinkAboutCT 04-06; PALOMAR POINTE; HYDROLOGY REPORT; 2006-06-13(619' 296-5565 • Fax (619) 296-5564 E ' K&S ENGINEERING ci-0 4--00 Planning Engineering Surveying HYDROLOGY REPORT (As-Built 422-9A) FOR: CT 04-06 PALOMAR POINTE APN 212-120-33 PUD 03-002, CDP 03-006, HDP 03-002, PIP 03-002 IN CITY OF CARLSBAD iN 02-084-REC June 13, 2006 I. TABLE OF CONTENTS 1. INTRODUCTION 2. HYDROLOGICAL DESIGN DESIGN METHODS DESIGN CRITERIA REFERENCES 3. HYDROLOGIC CALCULATIONS PROPOSED HYDROLOGY 100-YR STORM FOR DITCHES 4. FIGURES & CHARTS VICINITY MAP RUNOFF COEFFICIENTS TIME OF CONCENTRATION NOMOGRAPH ISOPLUVIAL MAPS INTENSITY-DURATION CHART MANNING'S NOMOGRAPH DEVELOPED (POST DEVELOPMENT) WATERSHED MAP a 1. INTRODUCTION THIS REPORT FOR THE PALOMAR POINTE PROJECT INCLUDES THE HYDROLOGY AND CAPACITY CALCULATIONS FOR THE EXISTING AND PROPOSED CONCRETE DITCHES ALONG THE NORTHERLY PROPERTY LINE OF THE SITE. AND IT DEMONSTRATES THAT SAID DITCHES HAVE THE CAPACITY TO CONVEY THE PROPOSED 100 YEAR FLOWS. 2. HYDROLOGICAL DESIGN DESIGN ME THODS THE RATIONAL METHOD IS USED IN THIS HYDROLOGY STUDY; THE RATIONAL FORMULA IS AS FOLLOWS: Q = CIA, WHERE : Q= PEAK DISCHARGE IN CUBIC FEET/SECOND * C = RUNOFF COEFFICIENT (DIMENSIONLESS) I = RAINFALL INTENSITY IN INCHES/HOUR A = TRIBUTARY DRAINAGE AREA IN ACRES THE NATURAL WATERSHED METHOD IS ALSO USED IN THIS HYDROLOGY STUDY; THE NATURAL WATERSHED FORMULA IS AS FOLLOWS: TC=[11.9L31H]385 L = LENGTH OF WATERSHED H = DIFFERENCE IN ELEVATION ALONG EFFECTIVE SLOPE LINE TC= TIME IN MINUTES DESIGN CRITERIA -FREQUENCY, 10 YEAR STORM. - LAND USE PER PRELIMINARY PLAN. - PAINPAT I ThJTPMSTTV PP1? CflT1NTV (W IQ AN flTPr,C I-TVflPAT ()('.V 1. 3. PROPOSED 100-YR HYDROLOGY FOR EXISTING AND PROPOSED D-75 DITCHES 422-9A San Diego County Rational Hydrology Program CIVILCADD/CIVILDESIGN Engineering Software, (c)1991-2003 Version 6.3 Rational method hydrology program based on San Diego County Flood Control Division 1985 hydrology manual Rational Hydrology Study Date: 05/26/06 ------------------------------------------------------------------------ ********* Hydrology Study Control Information K & S Engineering, San Diego, CA - SIN 868 ------------------------------------------------------------------ Rational hydrology study storm event year is 100.0 English (in-lb) input data Units used English (in) rainfall data used Map data precipitation entered: 6 hour, precipitation(inches) = 2.500 24 hour precipitation(inches) = 4.500 Adjusted 6 hour precipitation (inches) = 2.500 P6/P24 = 55.6% San Diego hydrology manual 'C' values used Runoff coefficients by rational method Process from Point/Station 1.000 to Point/Station'20.000 INITIAL AREA EVALUATION **** User specified 'C' value of 0.350 given for subarea Time of concentration computed by the natural watersheds nomograph (App X-A) V TC = (11.9*length(Mi)3)/(elevation change(Ft.))].385 *60(min/hr) + 10 mm. Initial subarea flow distance = 157.000(Ft.) Highest elevation = 334.200(Ft.) Lowest elevation = 328.000(Ft.) Elevation difference = 6.200(Ft.) TC=((11.9*0.02973)/( 6.20)].385= 1.33 + 10 mm. = 11.33 mm. Rainfall intensity (I) = 3.886(In/Hr) for a 100.0 year storm Effective runoff coefficient used for area (Q=KCIA) is C = 0.350 Subarea runoff = 0.680(CFS) Total initial stream area = 0.500 (Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 20.000 to Point/Station 2.000 IMPROVED CHANNEL TRAVEL TIME **** Upstream point elevation = 323.900(Ft.) Downstream point elevation = 323.500(Ft.) Channel length thru subarea = 65.000(Ft.) Channel base width = 3.000(Ft.) Slope or 'Z of left channel bank = 67.000 Slope or 'Z' of right channel bank = 67.000 Estimated mean flow rate at midpoint of channel = Manning's 'N' = 0.015 Maximum depth of channel = 0.100(Ft.) 0.952 (CFS) Flow(q) thru subarea = 0.952(CFS) Depth of flow = 0.092(Ft.), Average velocity = 1.125(Ft/s) Channel flow top width = 15.355(Ft.) Flow Velocity = 1.13 (Ft/s) Travel time = 0.96 mm. Time of concentration = 12.29 mm. Critical depth = 0.085(Ft.) Adding area flow to channel Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 0.000 Decimal fraction soil group D = 1.000 (COMMERCIAL area type Rainfall intensity = 3.687(In/Hr) for a 100.0 year storm Runoff coefficient used for sub-area, Rational method,Q=KCIA, C = 0.850 Subarea runoff = 1.254(CFS) for 0.400(Ac.) Total runoff = 1.934(CFS) Total area = 0.90(Ac.) + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + +.+ + + + + + + + + + ++ + + + + + + + + + + + + + + + + + + + + + + + + + + Process from Point/Station 2.000 to Point/Station 3.000 PIPEFLOW TRAVEL TIME (Uéer specified size) Upstream point/station elevation = 320.700(Ft.) Downstream point/station elevation 319.940 (Ft.) Pipe length = 95.12(Ft.) Manning's N = 0.013 No. of pipes = 1 Required pipe flow = 1.934(CFS) Given pipe size = 10.00(In.) Calculated individual pipe flow = 1.934(CFS) Normal flow depth in pipe = 8.09(In.) Flow top width inside pipe = 7.87(In.) Critical Depth = 7.48(In.) Pipe flow velocity = 4.09 (Ft/s) Travel time through pipe = 0.39 min. Time. of concentration (TC) = 12.68 mm. + + + + + + + + + + + + + + + + + + + + + + + + + + + . + + + + + + + + + + + + + + + + + + + + + + + + + + + + ++ + + + + + + + + + + + + Process from Point/Station 2.000 to Point/Station 3.000 **** SUBAREA FLOW ADDITION **** Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 0.000 Decimal fraction soil group D = 1.000 [COMMERCIAL area type -] Time of concentration = 12.68 mm. Rainfall intensity = 3.614(In/Hr) for a 100.0 year storm Runoff coefficient used for sub-area, Rational method,Q=KCIA, C = 0.850 Subarea runoff = 0.922(CFS) for 0.300(Ac.) Total runoff = 2.855(CFS) Total area = 1.20(Ac.) Process from Point/Station 2.000 to Point/Station 3.000 **** SUBAREA FLOW ADDITION **** User specified 'C' value of 0.350 given for subarea - Time of concentration = 12.68 min. Rainfall intensity = 3.614(In/Hr) for a 100.0 year storm Runoff coefficient used for sub-area, Rational method,Q=KCIA, C = 0.350 Subarea runoff = 1.012(CFS) for 0.800(Ac.) Total runoff = 3.867(CFS) Total area = 2.00(Ac.) Process from Point/Station 3.000 to Point/Station 4.000 PIPEFLOW TRAVEL TIME (User specified size) **** Upstream point/station elevation = 319.940(Ft.) Downstream point/station elevation = 318.230(Ft.) Pipe length = 142.10(Ft.) Manning's N = 0.013 No. of pipes = 1 Required pipe flow = 3.867(CFS) Given pipe size = 12.00(In.) Calculated individual pipe flow = 3.867(CFS) Normal flow depth in pipe = 9.73(In.) Flow top width inside pipe = 9.40(In.) Critical Depth = 10.02(In.) Pipe flow velocity = 5.67(Ft/s) Travel time through pipe = 0.42 mm. Time of concentration (TC) = 13.10 mm. Process from Point/Station 3.000 to Point/Station 4.000 **** SUBAREA FLOW ADDITION **** Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 0.000 Decimal fraction soil group D = 1.000 (COMMERCIAL area type Time of concentration = 13.10 mm. Rainfall intensity = 3.539(In/Hr) for a 100.0 year storm Runoff coefficient used for sub-area, Rational method,Q=KCIA, C = 0.850 Subarea runoff = 0.903(CFS) for 0.300(Ac.) Total runoff = 4.770(CFS) Total area = 2.30(Ac.) +++ ++ + + + ++++++ ++ +++++ +++ +++++ ++++ ++++++++++++++++++ ++++++++ Process from Point/Station 3.000 to Point/Station 4.000 **** SUBAREA FLOW ADDITION User specified 'C' value of 0.356 given for subarea Time of concentration = 13.10 mm. Rainfall intensity = 3.539(In/Hr) for a 100.0 year storm Runoff cofficient used for sub-area, Rational method,Q=KCIt, C = 0.350 Subarea runoff = 2.230(CFS) for 1.800(Ac.) Total runoff = 7.000(CFS) Total area = 4.10(Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 4.000 to Point/Station 5.000 PIPEFLOW TRAVEL TIME (User specified size) Upstream point/station elevation = 318.230(Ft.) Downstream point/station elevation = 316.750(Ft.) Pipe length = 123.60(Ft.) Manning's N = 0.013 No. of pipes = 1 Required pipe flow = 7.000(CFS) Given pipe size = 15.00(In.) Calculated individual pipe flow = 7.000(CFS) Normal flow depth in pipe = •12.16(In.) Flow top width inside pipe = 11.75(In.) Critical Depth = 12.71(In.) Pipe flow velocity = 6.57(Ft/s) Travel time through pipe = 0.31 mm. • Time of concentration (TC) = 13.41 mm. Process from Point/Station 4.000 to Point/Station 5.000 SUBAREA FLOW ADDITION **** Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 0.000 Decimal fraction soil group D = 1.000 (COMMERCIAL area type Time of concentration = 13.41 mm. Rainfall intensity = 3.486(In/Hr) for a 100.0 year storm r Runoff coefficient used for sub-area, Rational method,Q=KCIA, C = 0.850 Subarea runoff = 0.889(CFS) for 0.300 (Ac.) Total runoff = 7.889(CFS) Total area = 4.40(Ac.) Process from Point/Station 4.000 to Point/Station 5.000 **** SUBAREA FLOW ADDITION **** User specified 'C' value of 0.350 given for subarea Time of concentration = 13.41 mm. Rainfall intensity = 3.486(In/Hr) for a 100.0 year storm Runoff coefficient used for sub-area, Rational method,Q=KCIA, C= 0.350 Subarea runoff = 0.488(CFS) for 0.400(Ac.) Total runoff = 8.377(CFS) Total area = 4.80(Ac.) ++++.++++++++++++++++++++++++++++++++++++.f++++++++++++++++++++++++++++ Process from Point/Station 5.000 to Point/Station 6.000 PIPEFLOW TRAVEL TIME (User specified size) *' Upstream point/station elevation = 316.750(Ft.) Downstream point/station elevation = 316.000(Ft.) Pipe length = 44.40(Ft.) Manning's N = 0.013 No. of pipes = 1 Required pipe flow = 8.377(CFS) Given pipe size = 15.00(In.) Calculated individual pipe flow = 8.377(CFS) Normal flow depth in pipe = 12.26(In.) Flow top width inside pipe = 11.60(In.) Critical Depth = 13.58(In.) Pipe flow velocity = 7.80(Ft/s) Travel time through pipe = 0.09 min. Time of concentration (TC) = 13.51 mm. Process from Point/Station 5.000 to Point/Station 6.000 SUBAREA FLOW ADDITION **** Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 0.000 Decimal fraction soil group D = 1.000 [COMMERCIAL area type Time of concentration = 13.51 mm. Rainfall intensity = 3.470(In/Hr) for a 100.0 year storm Runoff coefficient used for sub-area, Rational method,Q=KCIA, C = 0.850 Subarea runoff = 0.590(CFS) for 0.200(Ac.) Total runoff = 8.966(CFS) Total area = 5.00(Ac.) +++++++++++++++++++±++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 5.000 to Point/Station 6.000 **** CONFLUENCE OF MINOR STREAMS **** Along Main Stream number: 1 in normal stream number 1 Stream flow area = 5.000(Ac.) Runoff from this stream = 8.966(CFS) Time of concentration = 13.51 mm. Rainfall intensity = 3.470(In/Hr) Process from Point/Station 7.000 to Point/Station 8.000 INITIAL AREA EVALUATION **** Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 0.000 Decimal fraction soil group D = 1.000 (COMMERCIAL area type Initial subarea flow distance = 277.000(Ft.) Highest elevation = 326.300(Ft.) Lowest elevation = 323.300(Ft.) Elevation difference = 3.000(Ft.) Time of concentration calculated by the urban areas overland flow method (App X-C) = 7.29 mm. TC = (1.8*(1.1_C)*distance(Ft.)".5)/(% slope(1/3)] TC= (1.8*(1.1_0.8500)*( 277.000.5)/( 1.083(1/3)1= 7.29 Rainfall intensity (I) = 5.163(In/Hr) for a 100.0 year storm Effective runoff coefficient used for area (Q=KCIA) is C = 0.850 Subarea runoff = 3.072(CFS) Total initial stream area = 0.700(Ac.) Process from Point/Station 8.000 to Point/Station 6.000 PIPEFLOW TRAVEL TIME (User specified size) Upstream point/station elevation = 320.300(Ft..) Downstream point/station elevation = 316.000 (Ft.) Pipe length = 94.00(Ft.) Mannings N = 0.013 No. of pipes = 1 Required pipe flow = 3.072(CFS) Given pipe size = 8.00(In.) NOTE: Normal flow is pressure flow in user selected pipe size. The approximate hydraulic grade line above the pipe invert is 3.578(Ft.) at the headworks or inlet of the pipe(s) Pipe friction loss = 6.074(Ft.) Minor friction loss = 1.804(Ft.) K-factor = 1.50 Pipe flow velocity = 8.80(Ft/s) Travel time through pipe = 0.18 mm. Time of concentration (TC) = 7.47 mm. Process from Point/Station 8.000 to Point/Station 6.000 **** CONFLUENCE OF MINOR STREAMS **** Along Main Stream number: 1 in normal stream number 2 Stream flow area = 0.700 (Ac.) Runoff from this stream = 3.072(CFS) Time of concentration = 7.47 mm. - Rainfall intensity = 5.084(In/Hr) Summary of stream data: Stream Flow rate TC Rainfall Intensity No. (CFS) (mm) (In/Hr) 1 8.966 13.51 3.470 2 3.072 7.47 5.084 Qmax(l) = 1.000 * 1.000 * 8.966) + 0.683 * 1.000 * 3.072) + = 11.063 Qmax(2) = 1.000 * 0.553 * 8.966) + 1.000 * 1.000 * 3.072) + = 8.032 Total of 2 streams to confluence: Flow rates before confluence point: 8.966 3.072 Maximum flow rates at confluence using above data: 11.063 8.032 Area of streams before confluence: 5.000 0.700 Results of confluence: Total flow rate = 11.063(CFS) Time of concentration = 13.506 mm. Effective stream area after confluence = 5.700(Ac.) Process from Point/Station 6.000 to Point/Station 9.000 PIPEFLOW TRAVEL TIME (User specified size) Upstream point/station elevation = 316.000(Ft.) Downstream point/station elevation = 315.000(Ft.) Pipe length = 92.30(Ft.) Manning's N = 0.013 No. of pipes = 1 Required pipe flow = 11.063(CFS) Given pipe size = 18.00(In.) Calculated individual pipe flow = 11.063(CFS) Normal flow depth in pipe = 14.95(In.) Flow top width inside pipe = 13.50(In.) Critical Depth = 15.29(In.) Pipe flow velocity = 7.05(Ft/s) Travel time through pipe = 0.22 mm. Time of concentration (TC) = 13.72 mm. Process from Point/Station 6.000 to Point/Station 9.000 SUBAREA FLOW ADDITION **** Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 0.000 Decimal fraction soil group D = 1.000 [COMMERCIAL area type J Time of concentration = 13.72 mm. Rainfall intensity = 3.434(In/Hr) for a 100.0 year storm Runoff coefficient used for sub-area, Rational method,Q=KCIA, C = 0.850 Subarea runoff = 0.584(CFS) for 0.200(Ac.) Total runoff = 11.647(CFS) Total area = 5.90(Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++.++.++++ Process from Point/Station 9.000 to Point/Station 10.000 PIPEFLOW TRAVEL TIME (User specified size) Upstream point/station elevation = 315.000(Ft.) Downstream point/station elevation = 313.370(Ft.) Pipe length = 47.70(Ft.) Manning's N = 0.013 No. of pipes = 1 Required pipe flow = 11.647(CFS) Givenpipe size = 18.00(In.) Calculated individual pipe flow = 11.647(CFS) Normal flow depth in pipe = 10.04(In.) Flow top width inside pipe = 17.88(In.) Critical Depth = 15.60(In.) Pipe flow velocity = 11.48 (Ft/s) Travel time through pipe = 0.07 mm. Time of concentration (TC) = 13.79 mm. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 10.000 to Point/Station 13.000 PIPEFLOW TRAVEL TIME (User specified size) Upstream point/station elevation = 313.370(Ft.) Downstream point/station elevation = 312.230 (Ft.) Pipe length = 135.10(Ft.) Manning's N = 0.013 No. of pipes = 1 Required pipe flow = 11.647(CFS) Given pipe size = 18.00(In.) NOTE: Normal flow is pressure flow in user selected pipe size. The approximate hydraulic grade line above the pipe invert is 1.532(Ft.) at the headworks or inlet of the pipe(s) Pipe friction loss = 1.660(Ft.) Minor friction loss = 1.012(Ft.) K-factor = 1.50 Pipe flow velocity = 6.59(Ft/s) Travel time through pipe = 0.34 mm. Time of concentration (TC) = 14.13 mm. .............. .' ....................................................... Process from Point/Station 10.000 to Point/Station 13.000 **** SUBAREA FLOW ADDITION Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 0.000 Decimal fraction soil group D = 1.000 (COMMERCIAL area type Time of concentration = 14.13 mm. Rainfall intensity = 3.370(In/Hr) for a 100.0 year storm Runoff coefficient used for sub-area, Rational method,Q=KCIA, C = 0.850 Subarea runoff = 0.859(CFS) for 0.300(Ac.) Total runoff = 12.507(CFS) Total area = 6.20(Ac.) Process from Point/Station 13.000 to Point/Station 14.000 PIPEFLOW TRAVEL TIME (User specified size) Upstream point/station elevation = 312.230(Ft.) Downstream point/station elevation = 299.000(Ft.) Pipe length = 51.50(Ft.) Manning's N = 0.013 No. of pipes = 2 Required pipe flow = 12.507(CFS) Given pipe size = 12.00(In.) Calculated individual pipe fldw = 6.253(CFS) Normal flow depth in pipe = 4.87(In.) Flow top width insidepipe = 11.79(In.) Critical depth could not be calculated. Pipe flow velocity = 20.90(Ft/s) Travel time through pipe = 0.04 mm. Time of concentration (TC) = 14.18 mm. Process from Point/Station 13.000 to Point/Station 14.000 **** SUBAREA FLOW ADDITION Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 0.000 Decimal fraction soil group D = 1.000 (COMMERCIAL area type Time of concentration = 14.18 mm. Rainfall intensity = 3.363(In/Hr) for a 100.0 year storm Runoff coefficient used for sub-area, Rational method,Q=KCIA, C = 0.850 Subarea runoff = 0.286(CFS) for 0.100(Ac.) Total runoff = 12.792(CFS) Total area = 6.30(Ac.) Process from Point/Station 13.000 to Point/Station 14.000 **** CONFLUENCE OF MINOR STREAMS **** Along Main Stream number: 1 in normal stream number 1 Stream flow area = 6.300 (Ac.) Runoff from this stream = 12.792(CFS) Time of concentration = 14.18 mm. Rainfall intensity = 3.363(In/Hr) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 11.000 to Point/Station 80.000 INITIAL AREA EVALUATION Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 0.000 Decimal fraction soil group D = 1.000 (COMMERCIAL area type Initial subarea flow distance = 50.000 (Ft.) Highest elevation = 325.400(Ft.) Lowest elevation = 325.150(Ft.) Elevation difference = 0.250(Ft.) Time of concentration calculated by the urban areas overland flow method (App X-C) = 4.01 mm. TC= (1.8*(1.1_C)*distance(Ft.).5)/(% slope(1/3)) TC= (1.8*(1.1_0.8500)*( 50.000.5)/( 0.500(1/3)1= 4.01 Setting time of concentration to 5 minutes Rainfall intensity (I) = 6.587(In/Hr) for a 100.0 year storm Effective runoff coefficient used for area (Q=KCIA) is C = 0.850 Subarea runoff = 0.392(CFS) Total initial stream area = 0.070 (Ac.) + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + Process from Point/Station 80.000 to Point/Station 12.000 IMPROVED CHANNEL TRAVEL TIME **** Upstream point elevation = 325.150(F - t.) Downstream point elevation = 323.850(Ft.) Channel length thru subarea 257.000(Ft.) Channel base width = 0.000(Ft.) Slope or 'Z' of left channel bank = 67.000 Slope or 'Z' of right channel bank = 67.000 Estimated mean flow rate at midpoint of channel = 2.995(CFS) Manning's 'N' = 0.020 Maximum depth of channel = 0.500 (Ft.) Flow(q) thru subarea = 2.995(CFS) Depth of flow = 0.199(Ft.), Average velocity = 1.133(Ft/s) Channel flow top width = 26.616(Ft.) Flow Velocity = 1.13 (Ft/s) Travel time = 3.78 mm. Time of concentration = 8.78 mm. Critical depth = 0.166(Ft.) Adding area flow to channel Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 0.000 Decimal fraction soil group D = 1.000 (COMMERCIAL area type Rainfall intensity = 4.581(In/Hr) for a 100.0 year storm Runoff coefficient used for sub-area, Rational method,Q=KCIA, C 0850 Subarea runoff = 3.621(CFS) for 0.930(Ac.) Total runoff = 4.013(CFS) Total area = 1.00(Ac.) ++.++++++++++++++++±+++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 12.000 to Point/Station 70.000 PIPEFLOW TRAVEL TIME (User specified size) Upstream point/station elevation = 320.550 (Ft.) Downstream point/station elevation = 318.300 (Ft.) Pipe length = 48.20(Ft.) Manning's N = 0.013 No. of pipes = 1 Required pipe flow = 4.013(CFS) Given pipe size = 10.00(In.) Calculated individual pipe flow = 4.013(CFS) Normal flow depth in pipe = 7.07(In.) Flow top width inside pipe = 9.11(In.) Critical depth could not be calculated. Pipe flow velocity = 9.74 (Ft/s) Travel time through pipe = 0.08 mm. Time of concentration (TC) = 8.86 mm. ++++++++++++++.+++++++++++++++++++++++++++++++++++++++,+++++++++++++1-++ Process from Point/Station 12.000 to Point/Station 70.000 SUBAREA FLOW ADDITION **** Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 0.000 Decimal fraction soil group D = 1.000 [COMMERCIAL area type Time of concentration = 8.86 mm. Rainfall intensity = 4.553(In/Hr) for a 100.0 year storm Runoff coefficient used for sub-area, Rational method,Q=KCIA, C= 0.850 Subarea runoff = 0.581(CFS) for 0.150(Ac.) Total runoff = 4.594(CFS) Total area = 1.15(Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 70.000 to Point/Station 14.000 PIPEFLOW TRAVEL TIME (User specified size) Upstream point/station elevation = 320.100(Ft.) Downstream point/station elevation = 302.070 (Ft.) Pipe length = 300.00(Ft.) Manning's N = 0.015 No. of pipes = 1 Required pipe flow = 4.594(CFS) Given pipe size = 24.00(m.) Calculated individual pipe flow = 4.594(CFS) Normal flow depth in pipe = 5.01(In.) Flow top width inside pipe = 19.51(In.) Critical Depth = 9.04(In.) Pipe flow velocity = 9.65(Ft/s) Travel time through pipe = 0.52 mm. Time of concentration (TC) = 9.38 mm. +.+++ + + + ++ ++++++++++++++ +++++++++ ++++++++++++ ++++ +++++++ +++++++ ++ Process from Point/Station 70.000 to Point/Station 14.000 **** CONFLUENCE OF MINOR STREAMS **** Along Main Stream number: 1 in normal stream number 2 Stream flow area = 1.150(Ac.) Runoff from this stream = 4.594(CFS) Time of concentration = 9.38 mm. Rainfall intensity = 4.390(In/Hr) Summary of stream data: Stream Flow rate TC Rainfall Intensity No. (CFS) (mm) (Id/Hr) 1 12.792 14.18 3.363 2 4.594 9.38 4.390 Qmax(1) = 1.000 * 1.000 * 12.792) + 0.766 * 1.000 * 4.594) + = 16.312 Qmax(2) = 1.000 * 0.662 * 12.792) + 1.000 * 1.000 * 4594) + = 13.059 Total of 2 streams to confluence: Flow rates before confluence point: 12.792 4.594 Maximum flow rates at confluence using above data: 16.312 13.059 Area of streams before confluence: 6.300 1.150 Results of confluence: Total flow rate = 16.312(CFS) Time of concentration = 14.176 mm. Effective stream area after confluence = 7.450 (Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 70.000 to Point/Station 14.000 SUBAREA FLOW ADDITION **** User specified 'C value of 0.350 given for subarea Time of concentration = 14.18 mm. Rainfall intensity = 3.363(In/Hr) for a 100.0 year storm ---..--.-.-- .-,.•_,_.. . Runoff coefficient used for sub-area, Rational method,Q=KCIA, C = 0.350 Subarea runoff = 1.648(CFS) for 1.400(Ac.) Total runoff = 17.960(CFS) Total area = 8. 85 (Ac.) Process from Point/Station 70.000 to Point/Station 14.000 *** SUBAREA FLOW ADDITION **** Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 0.000 Decimal fraction soil group D = 1.000 (COMMERCIAL area type Time of concentration = 14.18 mm. Rainfall intensity = 3.363(In/Hr) for a 100.0 year storm Runoff coefficient used for sub-area, Rational method,Q=KCIA, C = 0.850 Subarea runoff = 2.287(CFS) for 0.800(Ac.) Total runoff = 20.247(CFS) Total area = 9.65(Ac.) Process from Point/Station 14.000 to Point/Station 100.000 PIPEFLOW TRAVEL TIME (User specified size) Upstream point/station elevation = 299.340(Ft.) Downstream point/station elevation = 0.000(Ft.) Pipe length = 56.30(Ft.) Manning's N = 0.015 No. of pipes = 1 Required pipe flow = 20.247(CFS) Given pipe size = 36.00(In.) Calculated individual pipe flow = 20.247(CFS) Normal flow depth in pipe = 3.10(In.) Flow top width inside pipe = •20.19(In.) Critical Depth = 17.34(In.) Pipe flow velocity = 68.74(Ft/s) Travel time through pipe = 0.01 mm. Time of concentration (TC) = 14.19 mm. Process from, Point/Station 100.000 to Point/Station 101.000 PIPEFLOW TRAVEL TIME (User specified size) Upstream point/station elevation = 298.590(Ft.) Downstream point/station elevation = 295.170(Ft.) Pipe length = 137.70(Ft.) Manning's N = 0.015 No. of pipes =1 Required pipe flow = 20.247(CFS) Given pipe size = 36.00(In.) Calculated individual pipe flow = 20.247(CFS) Normal flow depth in pipe = 11.53(In.) Flow top width inside pipe = 33.59(In.) Critical Depth = 17.34(In.) Pipe flow velocity = 10.37(Ft/s) Travel time through pipe = 0.22 min. Time of concentration (TC) = 14.41 mm. Process from Point/Station 101.0.00 to Point/Station 102.000 PIPEFLOW TRAVEL TIME (User specified size) Upstream point/station elevation = 295.170(Ft.) Downstream point/station elevation = 291.060(Ft.) Pipe length = 131.70 (Ft.) Manning's N = 0.015 No. of pipes = 1 Required pipe flow = 20.247(CFS) Given pipe size = 36.00(In.) Calculated individual pipe flow = 20.247(CFS) Normal flow depth in pipe = 10.88(In.) Flow top width inside pipe = 33.06(In.) Critical Depth = 17.34(In.) Pipe flow velocity = 11.26 (Ft/s) Travel time through pipe = 0.20 mm. Time of concentration (TC) = 14.61 mm. Process from Point/Station 102.000 to Point/Station 103.000 PIPEFLOW TRAVEL TIME (User specified size) Upstream point/station elevation 291.060 (Ft.) Downstream point/station elevation = 285.340 (Ft.) Pipe length = 105.00(Ft.) Manning's N = 0.015 No. of pipes = 1 Required pipe flow = 20.247(CFS) Given pipe size = 36.00(In.) Calculated individual pipe flow = 20.247(CFS) Normal flow depth in pipe = 9.42(In.) Flow top width inside pipe = 31.65(In.) Critical Depth = 17.34(In.) Pipe flow velocity = 13.73 (Ft/s) Travel time through pipe = 0.13 mm. Time of concentration (TC) = 14.73 mm. End of computations, total study area = 9.650 (Ac.) 24