HomeMy WebLinkAboutCT 04-09; LA COSTA GREENS NEIGHBORHOOD 1.17; COMPLETION OF GRADING; 2010-01-06'.GEOCON /
INCORPORATED
GEOTECHNICAL CONSULTANTS
(410)
Project No. 06403-52-26,
January 6,2010
Warm ngton Homes
5740 Fleet Street, Suite 101
Carlsbad, California 92008
Attention: Mr. Chuck Isbell
\
Subject:. VILLAGES OF LA COSTA —THE GREENS; NEIGHBORHOOD 1.17
CARLSBAD, CALIFORNIA
COMPLETION OF GRADING'
References 1 Update Geotechnical Investigation Villages of La Costa - The Greens Phase 2
Neighborhood 1.17, Carlsbad, California, prepared by Geocon Incorporated, dated
May 10, 2006 (Project-No. 06403-52-26).
2. Final Report of Testing and' Obsdrvation Services Performed During Site Grading,
Villages of La Costa - The Greens, Neighborhoods 1.17— Lots 1 through 107 and
Lot 111 (Park Site), Carlsbad, California,. prepared by Geocon Incorporated, dated
February 24, 2006 (Project No. 06403-52-19A).
Dear Mr. Isbell: '
In accordance with the request of City of Carlsbad, this letter has been prepared to confirm that'
grading of Lots '1' and 5 of the subject development is complete. As indicated in the referenced
reports, from a geotechnical engineermg standpoint, earthwork operations were performed in
substantial conformance with. the referenced, grading plan and project geotechnical repOrt.
-
Lots .1 and 5, are build-out lots and have recently been regarded. The results of our testing and
observation services performed during the regarding operations will be included in the final report of
improvements for the project. '
It is 'our opinion that all building pads have been properly graded and are ready to receive the planned
improvements. All conclusions and recommendations presented in the 'referenced update report
remain àpplic able.
Should you have any questions regáring this letter, or -if we may be of further service, please contact
the undersigned at your convenience.
Very truly yours,
GEOcpNçRPORATEE
SAD
Q -'
1'L4V
AU
R
ENGINEERING CEG 1778 1P GEOLOGIST
(2) Addressee
6960 Flanders Drive ' U San Diego, California 92121-2974 • 'Telephone (858) 558-6900 0 Fax (858) 558-6159
GE000N
INCORPORATED
GEOTECHNICAL CONSULTANTS
Project No. 06403-52-26
July 20, 2009
Revised July 30, 2009
Warmington Homes
5740 Fleet Street, Suite 101
Carlsbad, California 92008
Attention: Mr. Chuck Isbell
Subject: VILLAGES OF LA COSTA - THE GREENS
NEIGHBORHOOD 1.17'
CARLSBAD, CALIFORNIA
COMPLETION OF GRADING
References: 1. Update Geotechnical Investigation, Villages of La Costa The Greens, Phase 2,
Neighborhood 1.17, Carlsbad, California, prepared by Geocon Incorporated, dated
May 10, 2006 (Project No. 06403-52-26).
2. Final Report of Testing and Observation Services Performed During Site Grading,
Villages of La Costd - The Greens, Neighborhoods 1.17 - Lots 1 through 107 and
Lot 111 (Park Site), Carlsbad, California, prepared by Geocon Incorporated, dated
February 24, 2006 (Project No. 06403-52-19A).
Dear Mr. Isbell:
In accordance with the request of City of Carlsbad, this letter has been prepared to confirm that grading
of Lots 35 through 44 of the subject development is complete. As indicated in the referenced reports,
from a geotechnical engineering standpoint, earthwork operations were performed in substantial
conformance with the referenced grading plan and project geotechnical report.
/ Lots 39 through 42 have recently been regarded. The results of our testing and observation services
}_ performed during the regarding operations will be included in the final report of improvements for the
project. S
It is our opinion that all building pads have been properly graded and are ready to receive the planned
improvements. All conclusions and recommendations presented in the referenced update report remain
applicable.
6960 Flanders Drive 0 San Diego, California 92121;2974 U Telephone (858) 558-6900 0 Fax (858) 5586159
Should you have any questions regarding ,this letter, or if we may be of further service, please contact
the undersigned at your convenience.
Very truly yours,
GEOCO RPORATED
A adr CNO CEG 1778
AU
AS:dmc :lor SADR
No. 1778 C/)
* CERTIFIED ENGNEERING (2) Addressee
Project No. 06403-52-26
•
- 2 - Revised July 30, 2009
GEOCON
INCORPORATED
- GEOTECHNICAL CONSULTANTS 0
Project No. 06403-52-26
June 24, 2008
I
Warmington Homes
5740 Fleet Street, Suite 101
Carlsbad, California 92008
Attention: Mr. Chuck Isbell
Subject: VILLAGES OF LA COSTA - THE GREENS, PHASE 2
NEIGHBORHOOD 1 . 17
CARLSBAD, CALIFORNIA
COMPLETION OF GRADING
References: 1. Update Geotechnical Investigation, Villages of La Costa - The Greens, Phase 2,
Neighborhood 1.17, Carlsbad, California, prepared by Geocon Incorporated, dated
May 10, 2006 (Project No. 06403-52-26).
2. Final Report of Testing and Observation Services Performed During Site Grading,
Villages of La Costa The Greens, Neighborhoods 1.17 - Lots 1 through 107 and
Lot 111 (Park Site), Carlsbad, California, prepared by Geocon Incorporated, dated
February 24, 2006 (Project No. 06403-52-19A).
Dear Mr. Isbell:
In accordance with the request of City of Carlsbad, this letter has been prepared to confirm that grading
of Lots 50 through 63 of the subject development is complete. As indicated in the referenced reports,
from a geotechnical engineering standpoint, earthwork operations were performed in substantial
conformance with the referenced grading plan and project geotechnical report.
It is our opinion that all building pads have been properly graded and are ready to receive the planned
improvements. All conclusions and recommendationspresented in the referenced update report remain
applicable. S
Should you have any questions regarding this letter, or if we may be of further service, please contact
the undersigned at your convenience.
Very truly yours,
IJ[IJS)1I
adr
CEG 17 78 f AU ADR SNo.1778
01
AS:drnc ER11FIEs ENGINEERING
GEOUMW / ',T
(2) Addressee
Op CA"
6960 Flanders Drive 0 San Diego, California 92121-2974 U Telephone (858) 558.6900 0 Fax (858) 558-6159
GEOCQN
(
I N C 0 R P 0 R A T E D
GEOTECHNICAL CONSULTANTS
Project N 06403-52-26 .
April 4, 2008
Warmington Homes
5740 Fleet Street, Suite 101
Carlsbad, California 92008
Attention: Mr. Neal Keating
Subject: VILLAGES OF LA COSTA - THE GREENS, PHASE 2
NEIGHBORHOOD 1.17
- -E-A-R;SB-AD, CAHFORFiA--------------------- - -
COMPLETION OF GRADING -
References: 1. Update Gebtechnical Investigation, Villages of La Costa - The Greens, Phase 2,
Neighborhood 1.17, Carlsbad, California, prepared by Geocon Incorporated, dated
May 10, 2006 (Project No. 06403-52-26).
2. Final Report 0f Testing and Observation* Services Performed During Site Grading,
Villages of La Costa - The Greens, Neighborhoods 1.17 - Lots 1 through 107 and
Lot 111 (Park Site), Carlsbad, California, prepared. by Geocon InCorporated, dated
February 24, 2006: (Project No. 06403-52-19A).
Dear Mr. Keating:
In accordance with the request of City of Carlsbad, this letter has been prepared to confirm that grading
of Lots 45 through 49 and 64 through. 71 of the subject development is complete. As indicated in the
referenced reports, from a geotéchnical engineering standpoint, earthwork operations were performed
in substantial conformance with the referenced. grading plan and project geotechnical report.
It is our opinion that all building pads have been properly graded and are ready to receive the planned
improvements. All conclusions and recommendations presented in the referenced update report remain
a0p1icable.
Should you have any questions regarding this letter, or if we 'may be of further service, please contact
the undersigned at your convenience.
Very truly yours,' . . . . -.
GEOCON INCORPORA . .
AU
or G-,17. -4
ENGINMMG
V CE 78
6960 Flanders Drive 0 San Diego, California 92121-2974 U Telephone (858) 558-6900 11 Fax(858) 558-6159
GEOCON < I N CORPORAT ED
GEOTECHNICAL CONSULTANTS
Project No. 06403-52-26
November 29, 2007
Warmington Homes
5740 Fleet Street, Suite 101
Carlsbad, California 92008
Attention: Mr. Neal Keating
Subject: VILLAGES OF LA COSTA - THE GREENS, PHASE 2
NEIGHBORHOOD 1.17
CARLSBAD, CALIFORNIA
COMPLETION OF GRADING
References: 1. Update Geotechnical Investigation, Villages of La Costa -The Greens, Phase 2,
NeighbOrhood 1. 17, Carlsbad, California, prepared by Geocon Incorporated, dated
May 10, 2006 (Project No. 06403-52-26). -
2. Final Report of Testing and Observation Services Performed During Site Grading,
Villages of La Costa - The Greens, Neighborhoods 1.17 - Lots.] through 107 and
Lot 111 (Park Site), Carlsbad, California, prepared by Geocon Incorporated, dated
Februaiy 24, 2006 (Project No. 06403-52-19A).
Gentlemen:
In accordaçwithJherequesLoLCityofCarlsbád, this letter has been prepared to confirm that
grading ofLots 1JJhioiigl2,,j9through 86jf the subject development is complete. As indicated in
the referenced reports, from a geotechnical engineering standpoint, earthwork operations, were
performed in substantial conformance with the referenced grading plan and project geotechnical
report.
It is our opinionthat A building pads have been properly graded and are ready to receive the planned
improyemeñts. All conclusions and recommendations presented in the referenced update report
,remain applicable.
Should you have any questions .regarding this letter, or if we may be of further service, please contact
the undersigned at your convenience.
Very truly yours, .
otA1Q
GEOCON INCORPORATED. 49' . - .. AU
cc No. 1778 IL CEFMFqED
CEG 1778 . .
IGEOLOGlT. .
AS:dmc . . 0PCA%-
-
(2) Addressee
(2/del) . Warmington Homes Job Site
Attention: Mr. Kyle Isbell
6,960 Flanders Drive U San Diego, California 92121-2974 • Telephone (858) 558.6900 0 Fax. (858) 558-6159
GEOCON
INCORPORATED
GEOTECHNICAL CONSULTANTS
Project No. 06403-52-26
September25, 2007 -
-Warmington Homes /
5740 Fleet Street, Suite 101
Carlsbad, California 92008
Attention: Mr. Neal Keating /
Subject: VILLAGES OF LA COSTA - THE GREENS, PHASE 2
- NEIGHBORHOOD 1.17
CARLSBAD, CALIFORNIA
COMPLETION OF GRADING.
References: 1. Update Geotechnical Investigation, Villages of La Costa - The Greens, Phase 2,
Neighborhood 1. 17, Carlsbad, California, prepared by Geocon Incorporated, dated'
May 10, 2006 (Project No. 06403-52-26).
2. Final Report of Testing and Observation Services Performed During Site Grading,
Villages of La Costa - The Greens, Neighborhoods 1.17 - Lots I through,-] 07. and
Lot 111 (Park Site), Carlsbad, California, prepared by Geocon Incorporated, dated
February 24, 2006 (Project No. 06403-52719A).
Gentlemen:
-
In accordance with the request of City of Carlsbad, this letter has been, prepared to confirm that
grading of Lots 14 through 17, 75 through 78 and 87 through 91 of the subject development is
complete. As indicated in the referenced. ,reports, from a geotechnical engineering standpoint,
earthwork operations were performed in substantial' conformance with the referenced grading plan
and project geotechnicalreport. -
It is our opinion that all building pads have been properly graded and are ready to receive the planned.
improvements. All conclusions and recommendations presented in the referenced update report
remain applicable.
Should you have any questions regarding this letter, or if We may be of further service, please contact
the undersigned at your convenience. -
Very truly yours, '
GEOCON INCORPORATED • HAL Q
AU
GADR
No. 17718
/EG 1778 ENGINEERING
GEOLOGW
I OPCAt.°.
(2) Addressee
(2/del) Warmington Homes Job Site
Attention: Mr. Kyle Isbell
6960 Flanders Drive U San Diego, California 9221-2974. U Telephone (858) 558.6900 U -Fax (858) 558-659
- /
GEOCON
INCORPORATED
Project No. 06403-52-26
April 26, 2007
GEOTECHNICAL CONSULTANTS (low)
Warmington Homes
701 Palomar Airport Road, Suite 280
Carlsbad, California 92009
Attention: Mr. Neal Keating
Subject: VILLAGES OF LA COSTA - THE GREENS, PHASE 2
NEIGHBORHOOD 1.17
CARLSBAD, CALIFORNIA
COMPLETION OF GRADING
References: 1. Update Geotechnical Investigation, Villages of La Costa - The Greens, Phase 2,
Neighborhood 1. 17, Carlsbad, California, prepared by Geocon Incorporated, dated
May 10, 2006 (Project No. 06403-52-26).
2. Final Report of Testing and Observation Services Performed During Site Grading,
Villages of La Costa - The Greens, Neighborhoods 1.17— Lots 1 through 107 and
Lot 111 (Park Site), Carlsbad, California, prepared by Geocon Incorporated, dated
February 24, 2006 (Project No. 06403-52-19A).
Gentlemen:
In accordance with the request of City of Carlsbad; this letter has been prepared to confirm that
grading of Lots 10 through 13 and 90 through 101 of the subject development is complete. As
indicated in the referenced reports, from a geotechmcal engineering standpoint, earthwork operations
were performed in substantial confèrrnance with the referenced grading plan and project geotechnical'
report.
It is our opinion that all building pads have been properly graded and are ready to receive the planned
improvements.. All conclusions and recommendations presented in the referenced update report
remain applicable.
Should you have any questions regarding this letter, or if we may' be of further service, please contact
the undersigned at your convenience.
Very truly yours,
GEOCON INCORPORATED
04AL
ir No. 1778 dr CE
EG 1778 -LNG EERING
.sa
(2), Addressee
(2/del) Warmington Homes Job Site
Attention: Mr. Kyle Isbell
6960 Flanders Drive • San Diego, California 92121-2974 0 Telephone (858) 558-6900 0 Fax (858) 558-6159
GEOCON
I N C 0 B P 0 B A T B D
Project No. 06403-52-26
January 11, 2007
GEOTECHNICAL CONSULTANTS 0
Warmington Homes
701 Palomar Airport Road, Suite 280
Carlsbad, California 92009
Attention: Mr. Chuck Isbell
Subject: VILLAGES OF LA COSTA - THE GREENS
- NEIGHBORHOOD 1.17
CARLSBAD, CALIFORNIA
COMPLETION OF GRADING
References: 1. Final Report of Testing and Observation Services Performed During Site Grading,
Villages of La Costa - The Greens, Neighborhood 1.17 Lots I through 107 and
Lot 111 (Park Site), Carlsbad, California, prepared by Geocon Incorporated, dated
February 24, 2006 (Project No. 06403-52-19A).
Update Geotechniéal 'Investigation, Villages of La Costa - The Greens, Phase 2,
Neighborhood 1. 17, Carlsbad, California, prepared by Geocon Incorporated, dated
March 10, 2006 (Project No. 06403-52-26).
Grading and Erosion Control Plans for: La Costa Greens Neighborhood 1.16 &
1.17, prepared by Hunsaker and Associates, City of Carlsbad approval dated May
10,2005
Gentlemen:
In accordance, with the request of City of Carlsbad, this letter has been prepared to - confirm that
grading of Lots 6 through 9, 72 through 74, and 102 through 107 of the subject development is
complete. As indicated in the referenced reports, from a geotechnical engineering standpoint,
earthwork operations were performed in substantial conformance 'with the referenced grading plan
and project geotechnical report.
It is our opinion that all building pads have been properly graded and are ready to receive the planned
improvements. All conclusions 'and recommendations presented in the referenced update report
remain applicable.
Should you have any questions regarding this letter, or if we may be of further service, please contact
the undersigned at your convenience. -
2adr
ruly y urs,
COR
TED NAL 0,
AU
SADR 01
No. 1778 10
CEG 1778 * I CERTIFIED I "
't ENGINEERING
GEOLOGIST 'T
/ *
AS :anh
(2) ' Addressee OPCA
og6
(2/del) Warmington Homes; Job siteTrailer
Attention: Mr. Kyle Isbell
6960 Flanders Drive • San Diego, California 92121-2974 0 Telephone (858.) 558.6900 0 Fax (858) 558-6159