HomeMy WebLinkAboutCT 04-09; VLC LA COSTA GREENS 1.17; COMPLETION OF GRADING; 2006-09-27GEOCON
INCORPORATED
GEOTECHNICAL CONSULTANTS 0
Project No. 06403-52-26
September 27, 2006
Warmington Homes
701 Palomar Airport Road, Suite 280
Carlsbad, California 92009
Attention: Mr. Neal Keating
Subject: VILLAGES OF LA COSTA - THE GREENS, PHASE 2
NEIGHBORHOOD 1.17
CARLSBAD, CALIFORNIA
COMPLETION OF GRADING
References: 1. Update Geotechnical Investigation, Villages of La Costa - The Greens, Phase 2,
Neighborhood 1. 17, Carlsbad, California, prepared by Geocon Incorporated, dated
May 10, 2006 (Project No. 06403-52-26).
2. Final Report of Testing and Observation Services Performed During Site Grading,
Villages of La Costa - The Greens, Neighborhoods 1.17— Lots 1 through 107 and
Lot 111 (Park Site), Carlsbad, California, prepared by Geocon Incorporated, dated
February 24, 2006 (Project No. 06403-52-19A).
Gentlemen:
In accordance with the request of City of Carlsbad, this letter has been prepared to confirm that
grading of Lots 2 through 4 of the subject development is complete. As indicated in the referenced
reports, from a geotechnical engineering standpoint, earthwork operations were performed in
substantial conformance with the referenced grading plan and project geotechnical report.
It is our opinion that all building pads have been properly graded and are ready to receive the planned
improvements. All conclusions and recommendations presented in the referenced update report
remain applicable.
Should you have any questions regarding this letter, or if we may be of further service, please contact
the undersigned at your convenience.
Very truly yours,
:t:d
CEG 1778
AS:dmc
(2) Addressee
(I/del) Warmington Homes
Attention: Mr. Kyle Isbell
!f ftjj 2 S*DR
NO.1771 '
CER11F1ED
ENGINEERING *
GEOLOGIST j
\Zp' cM'
6960 Flanders Drive 0 San Diego, California 92121-2974 0 Telephone (858) 558-6900 • Fox (858) 558-6159