Poinsettia Place
Carlsbad Tract No. CT 04-lO(A)
Potable Water System Analysis
Date Prepared:
March 25, 2011
• 0 z
~
0 w
X
0 z <(
-' ~
-
-
-
-
,,,..
-
-
-
Table of Contents
1.0
2.0
2.1
2.2
3.0
3.1
3.2
4.0
4.1
4.2
Introduction.............................................................................................................. 1
Alternative 1 -375 Zone Water System .................................................................. 1
Alternative 1 Meter Sizing for 375 Zone ............................................................. 1
Alternative 1 -375 Zone Water System Hydraulic Analysis ............................... 3
Alternative 2 -550 Zone Water System .................................................................. 4
Alternative 2-550 Zone Flows and Meter Sizing ................................................ 4
Alternative 2 -550 Zone Hydraulic Analysis ...................................................... 5
Alternative 3 -Split Zone 375/550 Zone Water System Analysis ........................... 6
Alternative 3 -Split 375/550 Zone Flows and Meter Sizing ............................... 6
Alternative 3 -Split 375/550 Hydraulic Analysis ................................................ 8
Appendix
1 Fixture Counts
2 AWWA Standards and Guidelines
3 Water System Hydraulic Analyses
a. Alternative 1 -375 Pressure Zone
i. Fixture Value Flow Estimates
ii. Peak Hour Demands Results
iii. Fire Flow Analysis Report
b. Alternative 2-550 Pressure Zone
i. Fixture Value Flow Estimates
ii. Peak Hour Demands Results
iii. Fire Flow Analysis Report
c. Alternative 3 -Split 375/550 Pressure Zones
i. Fixture Value Flow Estimates
ii. Peak Hour Demands Results
iii. Fire Flow Analysis Report
C
C .
C
1.0 Introduction
This study herein provides analyses of the flows anticipated to each of the buildings for
proper sizing of the master meter for each building. Additionally, since there are two
pressure zones adjacent to the project, alternatives for water system supply to the project
are analyzed including meter sizing based on the different pressure zone service
opportunities.
2.0 Alternative 1 -375 Zone Water System
2.1 Alternative 1 Meter Sizing for 375 Zone
In accordance with A WW A standards for meter sizing, the method utilized to establish
the flow requirements to size the master meters to the buildings is the total fixture value
method. Pursuant to the A WW A M22 manual for sizing service lines and meters, it is
stated that fixture values are applied to demand curves and that the demand curves are not
linear as fixture counts increase. (See the figure below as copied from the A WW A
Manual.) Therefore, it is appropriate to size the master meters for each building based on
the total fixture count for that building.
1$0 , ..
1::»
''° 110
Daauci-Dm '1111
to
:r
tel,
:(
JO
IO ..
0
0 •00
-.. Ult -s--c .. ----,.... .. _ ,...,.. ... _, ..... , .. .
--~ ..... -,,....._ ... ...,.... ._,__,,_ -T-•-J
0.-.tltoCIJIC __ .. -c--,,-, ....
100 JOO ,CO $OIi to0 100 tc0 toll 1-I 11111 11"" , ....,
CombmnfmunYalut
fit, ,U W ater-ll01'1" Dem.1111d per fixmt Yalu .. Low Ruic•
For the Poinsettia project, the type and number of fixtures have been established for each
dwelling unit plan, and are provided in the Appendix. Flow values and flows are
estimated utilizing the A WW A M22 standard criteria. A summary of the analysis is
llPage
,.. :
I I..
..
I ..
provided below. The adjusted flow rates are adjusted by the appropriate pressure factor
assuming service to the project is provided from the 375 Pressure Zone.
Building
Table 1 Alternative 1
Peak Design Flows • 375 Pressure Zone
Total
Fixtures
Fixture
Value
Peale Design Adjusted Peale
Flow at 35 psi Design Flow
( m) m)
1 74 382 41 64 ----------,,_.,.,_,.. ____ ,n,..• ---------,,..,--•-----•-2 62 322 38 60 ------------------·----·---____ ,, __ _ 3 124 638 53 80
---4 __ -+--=--124 :=__ __ 638 __ ---=~~~sr-==--~~~===so--::::=
5 124 638 53 80 --6--N 124 -~ • 638 53 -77 ----------· -----------·------7 136 698 56 81 -----+----8 74 382 41 60 ·------------···---·--···· .. --···----·-·-.. -·-·--··---·· ·-·---·-···-·-·---·-.. -9 128 698 56 81
In accordance with A WW A specifications as shown in Table 2 below from the A WW A
C700 standard, the recommended design criteria for sizing meters is that the peak design
flow should not exceed 80% of the meter maximum capacity. Based on meter capacity,
the flow of about 80 gpm as shown in Table 1 is about 80% of the capacity of a 1 ¥2-inch
meter. (A 1 Y2-inch meter has a maximum capacity range of up to 100 gpm.)
Size
In
~/;
5/8 '. ·,1,1
1
1 ~~
2
Table 2
Displacement-1)•p,• .Merers Meetin~ A WWA Standards
Flov.'-Pl'e.m11·e l.oss Al'<trage.i of 1990-,\,fodel Merers
Mmwn1.1111 <.".ip.icily Recomm,:,nded D,:,sign C'onlinuou~ flow
AV.'WA Flow Criteria C'riteria--80% ('ap. Criteria-50% Cap.
gpm psi gpm ps; gpm p.~i
15 7.9 12 5.0 7.5 2.0
20 9.7 16 6.2 10 2.4
30 I 0.4 24 6.7 15 2.6
50 9.8 40 6.3 25 2.5
JOO 10.6 80 6.8 50 2.7
160 11.~ BO 7.1 80 2.8
Brands
included in
averagn
1
5
5
5
4
4
2-inch meters have a capacity of 160 gpm. A design flow of 80% of maximum capacity
would be 128 gpm, which would be about 60% larger than what is needed and could be
less efficient. Therefore, a 1 ¥2-inch master meter is recommended for all buildings. Table
3 below provides the recommended meter size and design flow for each building.
21Page
,.. ..
ii.
fl"
' ..
11111 •
Table3 Alternative 1
Recommended Meters for Each Building
375 Pressure Zone
Building Peak Design Meter Size Number of
Flow (1mm) (inches) Meters
1 64 1-1/2 1 --.... --.. -· .. ___ ............. ___ -·------2 60 1-1/2 1 -------t--·------·---... _... .... " .. ·--·--"·-· ---3 80 1-1/2 1 ------80 ---.
__ .., _____ t----------4 1-1/2 1 --------·----· ---5 80 1-1/2 1 ,___ .. ____ ,,,.. ______ -----------.. ----· .. -·--·-·-""·-·--.......
_______ ..... __
6 77 1-1/2 1 "-·---_, .. __ _.., ___ ,_ .. __ -·------7 81 1-1/2 1 ______ ,,_ ---------.. --·-----.. --... --8 60 1-1/2 1 ---_____ ,, ____ ___ ,,.._ .. -·-·-·----~-.. ---9 81 1-1/2 1
2.2 Alternative 1-375 Zone Water System Hydraulic Analysis
To serve the project from the existing 375 Pressure Zone would require a new connection
to the 12-inch pipeline in Poinsettia Lane. In order to provide a secondary supply, a
connection would need to be made to the existing 30-inch 550 Zone pipeline in Cassia
Drive with a new pressure reducing station at Cassia Drive and Drive "C". For the system
to operate properly without the new PRV filling the 375 Zone tank, the PRV is assumed
to have a setting no higher than the 387-ft HGL, which is the low water level in the tank
serving the 375 Zone.
A hydraulic analysis was perlormed using computer modeling software for peak hour and
maximum day plus fire flow demands. The analysis assumed the HGL of the tank to be
half full at 400·ft. The peak hour demands were conservatively assumed to be the total
fixture value for the entire project with a resulting peak demand of 128 gpm. The
resulting pressure, or HGL, at the water main in the street was then used to size the
service laterals and meters to each building based on the peak design flows shown in
Table 3.
The fire flow analysis was perlormed based on a fire flow of 2,750 gpm. The results
show that the minimum residual pressure is 35 psi at the hydrant near buildings 2 and 3.
Modeling results are provided in the Appendix.
The hydraulic analysis for the laterals and meters to each building included the peak
design flows and pressure losses through the lateral, master meter, and the sub-meter
pressure loss. The sub-meter was assumed to be a 5/8" meter. Table 4 provides a
summary of the resulting pressures to the front of each building first and top floors.
31Page
II""''
j ...
,.
L
r ii
..
Table 4 Alternative 1
Hydraulic Analysis Results -375 Pressure Zone
Pressure at 1st Pressure at Top
Building Pad HGL Floor of Floor of
Elevation (ft) Building Front Building Front
(psi) (psi)
I 248.4 400.0 53.4 46.9 ,.__, -·--... -·---N-i--_,......._ _____ ,_,,.N _ ___ ,, .. __________
2 248.8 399.9 52.5 46.0 ------------------3 250.7 399.9 47.6 41.1
w ... --... ·-·-·-----~-----·-·-.. , 4 254.2 399.9 46.1 39.6 ------~----------·-·-·-------· 5 257.6 399.9 44.8 38.3 -·-,----,.·-------.....
6 263.7 399.8 42.0 35.5 ---· .... --·-----f---..... ____ .,._, _ ______ ,. ___ .,,_.. ·------.. ----·-· 7 266.3 399.8 40.4 33.9 .. -·-·-.. --·--~.-.. -·-·-·-·-·-·---·--------------·--8 269.4 399.8 45.0 38.5 1-----...... ____ f-----.. ------9 269.4 399.8 39.6 31.6
Pressures mclude pressure loss through 1 W' lateral, 1 W' master meter and 5/8" sub-meter.
As shown in Table 4, the resulting pressures for buildings 4 through 9 do not meet the 40
psi criteria.
3.0 Alternative 2 • 550 Zone Water System
Since there is a 30~inch 550 Zone pipeline along Cassia Drive, an alternative system that
would meet the minimum pressure criteria would be to serve the project entirely from the
550 Zone. Connections for a looped pipeline would be made to the existing pipeline at
Cassia Drive and Drive "C", and with a pipeline connection from the intersection of
Cassia Drive and Poinsettia Lane. The hydrant along Drive "B" would be served directly
from the existing 30~inch pipeline in Cassia Drive .
3.1 Alternative 2-550 Zone Flows and Meter Sizing
The same fixture value method is used for determining the flows and sizing of the meters
for the 550 Zone. However, since the pressures from the 550 Zone are higher, the
pressure factor applied to the fixture value flow is greater. This yields a higher peak
design flow to each building. Table 5 provides a summary of the 550 Zone peak design
flows and meter sizes. Additional detail is provided in the Appendix.
41Page
,.
i ..
Building
1
Table 5 Alt.emative 2
Recommended Met.ers for Each Building
SSO Pressure Zone
Peak.Design
Flow ( m)
83
Meter Size
(inches
2
Number of
Meters
1
2 77 1 --··--,---1-3 -U>7 ---2 ----1 --------------, __ _ 4 106 2 1 --------------·-.. --------5 105 2 1 1------·-6 105 2 ---i----------7 110 -------------2 ---·----·-· -----·-----·--8 80 2 ---·-----·---·--9 109 ·-·-2 -·--·-
3.2 Alternative 2 -550 Zone Hydraulic Analysis
1 -----1
1
1
A hydraulic analysis was performed using a computer modeling software for peak hour
and maximum day plus fire flow demands. The analysis assumed the HGL to be a farily
constant 550 -ft. The peak hour demands were conservatively assumed to be the total
fixture value for the entire project with a resulting peak demand of 165 gpm. The
resulting pressure, or HGL, at the water main in the street was then used to size the
service laterals and meters to each building based on the peak design flows shown in
Table 4.
The pressures at the buildings range from 121 psi to 131 psi. The system pipelines,
valves, and fittings should be designed for a higher pressure class rating to accommodate
these pressures. Additionally, individual pressure regulators should be installed at each
master meter with a second or backup pressure regulator installed at each sub-meter to
each unit.
The fire flow analysis was performed based on a fire flow of 2,750 gpm. The results
show that there is more than adequate pressure with a minimum residual pressure is 113
psi.
The hydraulic analysis for the laterals and meters to each building included the peak
design flows and pressure losses through the lateral, master meter, pressure regulators,
and the sub-meter. The sub-meter was assumed to be a 5/8" meter. Table 6 provides a
summary of the resulting pressures to the front of each building first and top floors.
51Page
....
I ...
,. .. ..
I •
.. •
Table6 Alternative 2
Hydraulic Analysis Results -550 Pressure Zone
Pressure at 1st Pressure at Top
Building Pad HGL Floor of Floor of
Elevation (ft) Building Front Building Front
(psi) (psi)
1 248.4 550.0 71.0 64.5 i,.,.---------__ N,.,_,.,......,..,, ____ , t-----···-... ·------·----------2 248.8 549.9 71.0 64.5 ... --·-·----·---.. -·-------------,-.---··-·----3 250.7 549.9 71.0 64.S ·--------,__, __ ... ___ ..,, ____ ·-·--------4 254.2 549.9 71.0 64.S --·-·--· ... ·-f,,-,o-__ ,..,_H _____ --------5 257.6 549.9 71.1 64.6 ,...._. ------_________ ... ,_ -· ·--6 263.7 549.9 71.0 64.S -·-----·-...__ _______ ·------·--·" ~.-N ..... ,....__, ___ ONN,H ___
.. _, ________ .... __
7 266.3 549.9 70.9 64.4 ----..... --·--·-----------·-----·----------8 269.4 549.9 70.9 64.4 -·------f----------·-·------·---'-· ... --·-·----·-------· ----·------·----···------9 269.4 550.0 71.0 63.0
Pressures include pressure loss through 2" lateral, 2" master meter, 2 pressure regulators and 5/8" sub-meter.
4.0 Alternative 3 • Split Zone 375/550 Zone Water System
Analysis
As shown in Table 2 for Alternative 1 buildings 1, 2, and 3 meet the minimum pressure
criteria, but yield pressures exceeding 130 psi for the 550 Zone. Therefore, as a third
alternative these buildings are proposed to be served from the 375 Pressure Zone from the
12-inch pipeline in Poinsettia Lane. A single pipeline which would serve a total of 21
units (or three 1 W' meters) and one fire hydrant is proposed for this 375 Pressure Zone.
The remaining units, buildings 4 through 9, would be served directly from the 550
Pressure Zone. Two connections would be made to the existing 30-inch pipeline in Cassia
Drive, one at Drive "B" and at Drive "C". A single line serving one fire hydrant and 20
units would supply buildings 4 and 5. Static pressures range from 121 psi to 128 psi. The
maximum static pressure will be at building 4, with a maximum static pressure of 128
psi. Pipelines, valves, and fittings would need to be designed for the higher pressure class
ratings accordingly.
4.1 Alternative 3 -Split 375/550 Zone Flows and Meter Sizing
Flow and meter sizing to each building varies for this water system depending on the
pressure zone, the 550 Zone meters are slightly different due to the higher pressures in
the 550 Zone that result in a higher adjusted design flow for sizing meters per the
A WW A criteria. Table 7 provides the revised flow conditions for this system layout.
61Page
,.
'
,..
•
; ..
Table? Altemative 3
Peak Design Flows -37S/SS0 Split ~ure Zone Service
Fixture Peak Design Adjusted Peak
Building Fixtures Value Flow at 35 psi Design Flow
(rom) (mm)
1 74 382 41 64 ·-----------·---------2 62 322 38 60 -------· --r--------·--·---·--------·-3 124 638 53 80 -------·-------·-4 124 638 53 106 -· ·---·------·--·-·-... ___ ,..,,.., _____ . :..-..----... --·---5 124 638 53 105 -----·-~----·------·------N--6 124 638 53 105 ------·----·--·--------·--· 7 136 698 56 110 ·--~---------··----·--------·-------------·-··-------------·-------· 8 74 382 41 80 ,....._ ---r------··-_ ___ ...,_,, ---9 128 698 56 109
Adjusted Peak Design Flow for buildings 4-9 are based on pressures from the 550 Pressure Zone.
As shown in Table 8, the meter size for the meters within the 550 2'.one reflect a higher
flow rate due to the higher pressure adjustment factor, and will need to be 2-inch meters
since they exceed the 80% capacity design flow criteria for a 1 ~-inch meter.
Table 8 Alternative 3
Recommended Meters for Each Building
375/550 Split Pressure Zone System
Peak Design
Building Flow ( m
1 64 -----2 60
Meter Size
(inches)
1-1/2 ---------·-1-1/2 -----· ------+-·-----·-·-·
Number of
Meters
1
1
3 80 1-1/2 1 --------N------------------·--·-·--·-------.......... ------------4 106 2 1 ------5 105 -----·--·----·-------2 1 ----· _____ ..,______ ------
6 105 2 1 ,----1--------------------7 110 2 1 __ .,._____ _ __ ,, __ ,.
8 80 2 1 ----------__ .., ________________ .. ____ --------
9 109 2 1
71Page
c· ,. .
I. .
' II
4.2 Alternative 3 -Split 375/550 Hydraulic Analysis
The hydraulic analysis was performed for the 375/550 Split Pressure Z.one system with a
summary provided in Table 9. The meters within the 550 Zone are assumed to be
equipped with 2-inch pressure reducing valves to reduce pressure to a maximum of 80 psi
per the plumbing code.
Additionally, for added reliability a second pressure reducing valve would be added at the
sub-meter to each unit.
Building
1 ----·-2
3 ---·----·--
Table 9 Alternative 3
Hydraulic Analysis Results
375/550 Split Pres.,ure Zone System
Pressure at 1st
Pad HGL Floor of
Elevation (ft) Building Front
( si
248.4 400.0 53.4 --·--·-----.. --.. _,,.,. _________
248.8 399.9 52.5 ----· ------·· ... ---250.7 399.9 47.6 ------·---·--·------
Pressure at Top
Floor of
Building Front
( si)
46.9
46.0 ---·---"---41.1 ·--·--·-----4 254.2 549.9 71.4 64.9 --·----------·----~---·-·-.... --.... ·"·--·------5 257.6 549.9 71.4 64.9 _ .. _______ -·-----·------· --·-·----·--____ ,,.. ___ _
6 263.7 549.9 71.3 64.8 -·-·--··-----·--------------·-·-----------·-··-·--·----·-·---·-----·" ________ ., ____ , _____ .,,, __ ,
7 266.3 549.9 71.3 64.8 ----------------------------~------------8 269.4 549.9 71.1 64.6
9 269.4 550.0 71.3 63.3
Pressures for the 550 Zone include pressure loss through the lateral, master meter, pressure regulators, and
5/8" sub-meter. Pressures in the 375 Zone do not include a pressure regulator since maximum pressures are
less than 80 psi. The 550 Zone includes PRY at the master meter set to 80 psi.
The fire flow analysis for the 375 Zone was performed based on a fire flow of 2,750 gpm.
The results show that the minimum residual pressure is 51 psi at the hydrant near
buildings 2 and 3.
The fire flow analysis was performed based on a fire flow of 2,750 gpm. The results
show that there is more than adequate pressure with a minimum residual pressure of 115
psi.
81Page
-• .. -
..
.. ..
• •
-...
-
-
-• .. -
-
Appendix
1 Fixture Counts
2 A WW A Standards and Guidelines
3 Water System Hydraulic Analyses
a. Alternative 1 -375 Pressure Zone
i. Fixture Value Flow Estimates
ii. Peak Hour Demands Results
iii. Fire Flow Analysis Report
b. Alternative 2 -550 Pressure Zone
i. Fixture Value Flow Estimates
ii. Peak Hour Demands Results
iii. Fire Flow Analysis Report
c. Alternative 3 -Split 375/550 Pressure Zones
i. Fixture Value Flow Estimates
ii. Peak Hour Demands Results
iii. Fire Flow Analysis Report
-..
-..
•
•
• .. -•
• -
.. ..
,..
-...
..
.. -
-
Appendix 1
Fixture Counts
-
Poinsettia Place CT10·04(A) -IT-House Toilets UV8tOnl Kitchen Sink Olshw.sher 1Na$tter Tub/~ HoRllbb .. Pl8n1 3 4 1 1 1 2
Plan 2 I 4 1 1 1 2
Planl z 4 1 1 1 3
Plan4 I 4 1 1 1 3
Hose llbbs • AsMne 2 per llulldlng 2
111-•1
11111 T-House Tollels 1.-.. ICilc:hen Sink Dish W8$lt« Wltsher Tub/._ .._ ...
4-Pllnl 12 16 4 4 4 a • Z·Planl 4 I 2 z z 6
Tot.I 16 24 6 6 6 14 2
IIUlldlncZ
T-House Tallets ·-IQtdlea Sink Di911 w.sher Washer Tub / Shower HGNlllbb
,_,.. 1 9 12 s I s 6
Z•Planl .. a 2 2 2 6
• Total 13 20 5 5 5 12 z
• _,
T-House Toilets --Sink Dlshw.sher Wisher Tub/st.Mr Hoselllbb
Z•Planl 6 I 2 z z 4 -4 • Pllll 2 12 16 4 4 4 8 .. 2· Pllll 3 4 8 z 2 2 6
2•Pllll4 6 a 2 z 2 6
Total 28 40 10 10 10 24 2 •
II Town House Ton.ts
8ulldlaa4
la-ICltdlen Sink DlshWUher Washer Tub I Showe,-HNelllb
Z•Plan 1 6 a z z 2 4
4-PlanZ u 16 4 4 4 8 -2 • P1111 !I 4 8 z 2 2 6
Z • Pllll 4 6 8 2 2 2 6
Tora 21 "° 10 10 10 24 2
-.5
IT-House Toi.-. ~ -Sltllc Dish Washer Wisher Tub I SIIOJNer HMlllb
Z.Pllnl 6 8 2 2 2 4
4 • Plan Z u 16 4 4 4 I
2-Plan3 4 8 z 2 2 6
Z • Pl1114 6 I 2 2 2 6
Total 28 40 10 10 10 24 2
81111-6 -IT-House Toilets lavatOry Kitchen Sink Dishwasher w.sher Tub/9-HoRllbb
2·Plan1 6 8 2 z 2 4
4·Plan2 u 16 4 4 4 8
2-P1ans 4 8 2 2 z 6
2•Plan4 6 8 2 2 2 6 -Tos.l 28 40 10 10 10 24 z
8ulldln&7
-House Toilets ~ Kitchen Sink Dish Washer Wisher Tub/~ Hosellbb -!-Plan 1 9 u 3 3 3 6
4·PlanZ u 16 4 4 4 a
2 • Pllll 3 4 8 z 2 2 6
~-Plan4 6 a 2 2 2 6
Total 31 44 11 11 11 26 z --· • rr-House Toilets ............ Kitchen Sink Dish Washer -Ttlb/~ Hoselllbb
4 • Pl111 Z u 16 4 4 4 8 -2·Plln3 4 I 2 2 2 6
Tobi 16 24 6 6 6 14 2 ..
Bulldlng9
Tcillets .__ ICltc:hen Sink Dish Washer VIMher Tub/~ HNellbb -14Unlb 28 28 14 14 14 28
Total za 28 14 14 14 28 2
-
---..
•
-
..
-
• ..
--
-
-...
Appendix 2
AWWA Standards and Guidelines
-
---..
-.. -
-
• -..
ill -
-.. -.. -
-
-
34
SIZING WATER SERVICE LINES AND METERS1
CITY OF ______ _
Water Customer Data Sheet
Customer ___________________ Address. _________________ _
Building Address ________________________ Zip Code _________ _
Subdivision ___________________ Lot No. ______ Blk. No.--------
Type of Occupancy _______________________________ _
•••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••
FlxTURE V ALOE
FlxTURE 35PSI
Bathtub 8
Bedpan Washers 10
Combination Sink and Tray 3
Dental Unit l
Dental Lavatory 2
Drinking Fountain -Cooler l
-Public 2
Kitchen Sink -Yz" Connection 3
-%" Connection 7
Lavatory -3/8" Connection 2
-W' Connection 4
Laundry Tray -Yz" Connection 3
-%" Connection 7
Shower Head (Shower Only) 4
Service Sink -Yz" Connection 3
-%" Connection 7
Urinal -Pedestal Flush Valve 12
-Wall Flush Valve 12
-Trough (2 Ft. Unit) 12
Wash Sink (Each Set ofFaucets) 4
Water Closet -Flush Valve 3
-Tank Type 3
Dishwasher -Yz"Connection 5
-%" Connection 10
Washing Machine -Yz" Connection 5
-%" Connection 12
-l" Connection 25
Hose Connection (Wash Down) -Yz" 6
-%" 10
Hose (50 Ft. Wash Down) -Yz" 6
-sis" 9
-%" 12
Combined Fixture Total Value
Customer Peak Demand from Fig. 4.4 or 4.5 x Press. Factor
Add Irrigation Demand -GPM of Largest Zone
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
-----Hose Bibs x 6.5 x Press. Factor
Add Fixed Load
TOTAL FIXED DEMAND
No.OF
FIXTURES
Fig. 4.6. Sample Form for Calculating Customer Demand
=
FlxTURE
VALUE
____ ...,.gpm
____ ...,.gpm
____ _.gpm
____ _,gpm
=====gpm
1 Reprinted from Sizing Water Service Lines and Meters -M22, by permission. Copyright O 1975, American Water Works
Association.
M
..
..
..
-
.. ... -
-
---..
-----..
-• -.. -
---
1111
Demand-gpm
SIZING WATER SERVICE LINES AND METERS
ISO
140
130
120
110
100
90
10
20
Oo,Nstic Ute
H01111
~C.,,un
"--MIi
Pwtic $cllools
~""lclift9s
HOotall
a..ci °" 3S oti .. Meu,
0-,,,.. lot "itl* ,_,..Aocllv '"'°' ,._, ..... l
10
o~"""""'.~..,_~----'-:_,___.__..__,__.._..,_....__._-'--'---t.--i~.__,__.._"'"--'--'---'-~
0 IQ) lOO 300 .C,0 $00 600 700 800 900 I 000 I 100 I ,M 1 ,M
Combined Fixture Value
Fig. 4.4 Water-Flow Demand per Fixture Value-Low Range
ESTIMATING THE CUSTOMER'S PEAK DEMAND
Table 4.2
MULTIPLICATION FACTORS TO ADJUST DEMAND LEAD AS OBTAINED FROM TEI
CURVES IN FIGS. 4.4 OR 4.5 TO VARIOUS UTILITY DELIVERY PRESSURES AT THE METER
OUTLET
DESIGN PRESSURE FACTOR
PSI
20 0.74
30 0.92
35 Base 1.00
40 1.07
50 1.22
60 1.34
Z!!. 1.46
80 1.57
90 1.68
100 1.78
N
•
II
--• -
-...
-
---..
-...
-• -
-
-
-
-
----
Alternative 1
375 Zone Analysis
Building Peak Flow Based on AWWA Fixture Value Method
Based on 375 Pressure Zone Alternative
,. . Number Total
of Fixtures
Load Fixtures per Total Fixture
Value per Unit Bull ding Value per 8uikllng
8uildlna 1,8
Toilets 3 3 16 48
Lavatory 4 4 24 96
Kitchen Sink 3 1 6 18
Dish Washer 4 1 6 24
Washer 12 1 6 72
Tub/Shower 8 3 14 112
hose Bibb 6. 2 12
Total Fixture Value 13 74 382
Flow at 35 psi 41 apm
C Max Static 77 psi
Adjusted Peak Flow, Bldg 1 64 IP"'
Max Static 68 psi
r Ii
Adjusted Peak Flow, Bldg 8 60 gpm
Bulldlngl
Toilets 3 3 13 39
Lavatory 4 4 20 80
Kitchen Sink 3 1 5 15
Dish Washer 4 1 5 20
Washer 12 1 5 60
Tub/Shower 8 3 12 96
hose Bibb 6 0 2 12
Total Fixture Value 13 62 322
Flow at 35 psi 38 apm
Max Static 77 psi
Adjusted Peak Flow 60 gpm
Bulldiltg3
Toilets 3 3 28 84
C Lavatory 4 4 40 160
Kitchen Sink 3 l 10 30
Dish Washer 4 1 10 40
Washer 12 1 10 120
Tub/Shower 8 3 24 192
hose Bibb 6 0 2 12
Total Fixture Value 13 124 638
Flow at 35 psi 53 apm
MaxSatic 76 psi
Adjusted Peak Flow 80 om
BuHcllnl4
Toilets 3 3 28 84
Lavatory 4 4 40 160
Kitchen Sink 3 l 10 30
C Dish Washer 4 1 10 40
Washer 12 1 10 120
Tub/Shower 8 3 24 192
hose Bibb 6 0 2 12
Total Fixture Value 13 124 638
Flow at 35 psi 53 gpm
MaxSatic 74 psi
AdJusted Peak Flow 80 1mm
C
C
C
,. ..
C
" •
C
----------------
Building Peak Flow Based on AWWA Fixture Value Method
Based on 375 Pressure Zone Alternative
Number Total
of Fixtures
Load Fixtures per total Fixture
Value per Unit Building Value per Building
lkllldlng 5
Toilets 3 3 28 84
Lavatory 4 4 40 160
Kitchen Sink 3 1 10 30
Dish Washer 4 1 10 40
Washer 12 1 10 120
Tub/Shower 8 3 24 192
hose Bibb 6 0 2 12
Total Fixture Value 13 124 638
Flow at 35 psi 53 IPffl
MaxSatic 73 psi
Adjusted Peak Flow 80 IPffl
Bulldtng&
Toilets 3 3 28 84
Lavatory 4 4 40 160
Kitchen Sink 3 1 10 30
Dish Washer 4 1 10 40
Washer 12 1 10 120
Tub/Shower 8 3 24 192
hose Bibb 6 0 2 12
Total Fixture Value 13 124 638
Flow at 35 psi 53 IPffl
MaxSatic 70 psi
Adjusted Peak Flow n gpm
Bulkltng7
Toilets 3 3 31 93
Lavatory 4 4 44 176
Kitchen Sink 3 1 11 33
Dish Washer 4 1 11 44
Washer 12 1 11 132
Tub/Shower 8 3 26 208
hose Bibb 6 0 2 12
Total Fixture Value 13 136 698
Flow at 35 psi 56 IPffl
Max Static 69 psi
Adjusted Peak Flow 81 gpm
Buldlng9
Toilets 3 3 28 84
Lavatory 4 4 28 112
Kitchen Sink 3 1 14 42
Dish Washer 4 1 14 56
Washer 12 1 14 168
Tub/Shower 8 3 28 224
hose Bibb 6 0 2 12
Total Fixture value 13 128 698
Flow at 35 psi 56 IPffl
Max Static 68 psi
Adjusted Peak Flow 81 mm
__ _c __ _
P17
375 Pressure Zone System Analysis
Model Node Diagram
J86
~1'J18
P21
J98J60 ~
N
ii:
P33
~ P119
:utJ108
139
..,
C')
C:
RES9006
I I r 1 f I I 1 I I I I I I I 1 I I IF I .,,-, I' , 1 ,-1 I I R I I I I I ,-I I I
Peak Demand Conditions -375 Zone (1-1/2" Meters)
Pressure
Loss Across Pressure Total
Dynamic 11/2-inch 11/2" Loss Across Pressure Pressure
Bldg Pad Pressure at Lateral Design Meter at Sub-Meter Friction Loss loss from at Pressure at
Elevation Head the Main Length to Flow to Design Flow at Design of Lateral to Main to 1st Floor Top Floor
(ft) (ft) (psi)1 Bldg Bldg (gpm) (psi) Flow (psi) Bldg (psi) Bldg (psi) (psi) Fixture (psi) ------·---·-~---------·--·-------~-
Bldgl 248.4 400.0 66.3 19.7 64 4.0 6.0 2.21 12.2 53.4 46.9
Bldg2 248.8 399.9 65.8 29.5 60 4.0 6.0 2.87 12.9 52.5 46.0
B1dg3 250.7 399.9 65.4 18.0 80 7.0 7.0 2.98 17.0 47.6 41.1
B1dg4 254.2 399.9 64.1 18.0 80 7.0 7.0 2.98 17.0 46.1 39.6
B1dg5 257.6 399.9 62.3 16.8 80 7.0 7.0 2.78 16.8 44.8 38.3
B1dg6 263.7 399.8 59.9 18.4 77 7.0 7.0 2.90 16.9 42.0 35.5
B1dg7 266.3 399.8 58.6 20.0 81 7.0 7.0 3.40 17.4 40.4 33.9
Bldg8 269.4 399.8 58.0 15.3 60 4.0 6.0 1.50 11.5 45.0 38.5
B1dg9 269.4 399.8 57.6 16.9 81 7.0 7.0 2.87 16.9 39.6 31.6
1) Dynamic pressure is based on the hydraulic model analysis for peak demands based on the fixture value of the whole project, or 128 gpm. The pressure shown is
the pressure at the water main in the street, and based on a reservoir half full.
...
L
C
C
...
'
,.
I ..
375 Zone Peak Hour Demands -Junction Report
10
1 r J10
2 r'-J100
0
2
4
3 r J104
4 r J1oe
s rJ1os
6 r J11
1 r J11
8 r J11
9 r J12
10 r J14
11 r J1s
12 r J1s
13 r J20
14 r m
1s r J24
10 r J2.6
11r J30
1a Im
19 r J34
20 r J38
21 r J38
22 --.-J40
23F J42
241 J44
2sr J48
261 J48
271 J50
28 r J52
29 r Jsa
so r JaO
31 r J62
32 r .1$4
33 r .-
34 r J88
ss r J10
36 r m
37tJ74
38 r J7a
39 r J78
40 r JaO
41 r J82
42 r J84
43 r J86
44 r J88
45 r J90
46 r a
41 r J94
481 J98
Demand
(gpm)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
12.16
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
15.75
o.oo
11.36
0.00
0.00
15.35
0.00
15.11
15.55
0.00
o.oo
15.75
15.95
0.00
0.00
11.56
0.00
Elevation Head
(ft) (ft)
247.67 399.91
271.00 550.00
270.00 550.00
270.00 550.00
270.00 399.81
270.00 399.81
248.00 399.92
248.40 363.88
249.00 399.89
249.00 399.89
252.00 399.87
252.00 399.87
256.00 399.84
256.00 399.84
257.00 399.84
258.00 399.84
261.50 399,82
261.50 399.82
264.00 399.82
264.50 399.81
264.50 399.81
266.00 399.81
266.00 399.81
267.00 399.81
267.00 399.81
247.00 399.97
247.00 399.97
247.67 399.91
257.34 399.84
260.32 399.84
264.03 399.82
269.40 355.53
269.40 399.81
269.40 365.26
269.40 399.81
266.30 399.81
266.30 355.81
263.70 399.82
283.70 356.24
257.60 356.67
257.60 399.84
254.40 399.87
254.40 356.36
250.70 356.12
250.70 399.89
248.80 399.97
248.80 364.18
262.00 399.84
Pressure
(psi)
65.97
120.89
121.32
121.32
56.25
56.25
65.83
50.04
65.38
65.38
64.07
64.07
62.33
62.33
61.89
61.46
59.93
59.93
58.85
58.63
58.63
57.98
57.98
57.55 --57.55
66.28
66.28
65.97 --61.75
60.45
58.84
37.32
56.51
41.54
56.51
57.85
38.79
58.98
40.10
42.93
61.63
63.03
44.18
45.68
64.65
65.50
49.99
59.73
..
!
375 Zone Peak Hour Demands -Junction Report ..
r ......
,.. ..
--
ID
1 r J10
2 r J100
3 r J104
4 r J1oe
5 r J1oe
6 r JUO
1 F J112
8 r J114
9 r J12 or J14
1 r Jt6
2 r J18
3F J20
4 rm
5 r J24
s r J26 1r J80
a r JS2
1 9 r J34
... 20
"' 2
r.136
•
' ..
1 r J38
22 r J40
3 r J42 2
2
25
26
2
2
29
30
3
32
33
34
35
3
3
38
39
40
4
4
43
44
45
46
4
48
4 r J44 r J48 rJ48
1 r JS()
8F J52 rJ58 rJeO
11 J62 r* r-r-r J70
s rm
1 r J74 r J76 rm rJ&O
1 r •
2 r J84
r-r-r-r J82
71 J94 F J98
Demand Elevation Head
(gpm) (ft) (ft)
0.00 247.67 399.91
0.00 271.00 550.00
0.00 270.00 550.00
0.00 270.00 550.00
0.00 270.00 399.81
0.00 270.00 399.81
0.00 248.00 399.92
12.16 248.40 363.88
0.00 249.00 399.89
0.00 249.00 399.89
0.00 252.00 399.87
0.00 252.00 399.87
0.00 256.00 399.84
0.00 256.00 399.84
0.00 257.00 399.84
0.00 258.00 399.84
0.00 261.50 399.82
0.00 281.50 399.82
0.00 284.00 399.82
0.00 264.50 399.81
0.00 264.50 399.81
0.00 266.00 399.81
0.00 266.00 399.81
0.00 267.00 399.81
0.00 267.00 399.81
0.00 247.00 399.97
o.oo 247.00 399.97
0.00 247.67 399.91
0.00 257.34 399.84
0.00 260.32 399.84
0.00 264.03 399.82
15.75 269.40 355.53
0.00 269.40 399.81
11.36 269.40 365.26
0.00 269.40 399.81
0.00 266.30 399.81
15.35 266.30 355.81
0.00 263.70 399.82
15.11 263.70 356.24
15.55 257.60 356.67
0.00 257.60 399.84
0.00 254.40 399.87
15.75 254.40 356.36
15.95 250.70 356.12
o.oo 250.70 399.89
0.00 248.80 399.97
11.56 248.80 364.18
0.00 262.00 399.84
--
Pressure
(psi)
65.97
120.89
121.32
121.32
56.25
56.25
65.83
50.04
65.38
65.38
64.07
64.07
62.33
62.33
61.89
61.46
59.93
59.93
58.85
58.63
58.63
57.98
57.98
57.55
57.55
66.28
66.28
65.97
61.75
60.45
58.84
37.32
56.51
41.54
56.51
57.85
38.79
58.98
40.10
42.93 -61.63
63.03
44.18
45.68
64.65
65.50
49.99
59.73
~-
375 Zone Peak Hour Demands • Pipe Report
ID From Node To Node Length Diameter Roughness Flow Velocity Headloss
(ft) (In) (gpm) (ft/s) (ft)
1 r P101 J22 J24 29.46 8.00 130.00 57.57 0.37 0.00
2 r P109 J98 J60 23.36 6.00 130.00 0.00 0.00 0.00
3 rP111 J20 J82 17.35 4.00 130.00 0.00 o.oo 0.00
4 r P113 J22 J80 16.81 2.00 130.00 15.55 1.59 43.17
5 rP115 J24 J26 30.78 8.00 130.00 57.57 0.37 0.00
6 r P119 AES9006 J100 76.79 30.00 130.00 0.00 0.00 0.00
7 r P121 J26 J98 139.49 8.00 130.00 0.00 0.00 0.00
8 r P127 J100 J104 22.45 8.00 130.00 0.00 o.oo 0.00
9 rP129 AES9008 J48 76.85 8.00 130.00 128.53 0.82 0.03
10 r P13 J10 J12 71.98 8.00 130.00 104.81 0.67 0.02
11 FP131 J104 J106 27.43 8.00 130.00 0.00 0.00 0.00
12 rP133 J110 J44 187.56 8.00 130.00 0.00 0.00 0.00
13 FP135 J106 V8000 7.46 8.00 120.00 0.00 0.00 0.00
14 rP137 V8ooo J108 9.15 8.00 120.00 0.00 0.00 0.00
15 r P139 J108 J110 27.87 8.00 130.00 0.00 o.oo 0.00
16 rP141 ,_ J112 J10 7.23 8.00 130.00 104.81 0.67 0.00
11 r P143 J112 J114 29.48 2.00 130.00 12.16 1.24 36.04
18 r P15 J12 J14 6.04 8.00 130.00 104.81 0.67 0.00
19 --.-P17 J14 J16 131.88 8.00 130.00 88.87 0.57 0.03
20 r P19 J16 J18 4.58 8.00 130.00 73.12 0.47 0.00
21 r P21 J18 J20 142.74 8.00 130.00 73.12 0.47 0.02 --22r P33 J26 J30 187.26 8.00 130.00 57.57 0.37 0.02
23 r Pa5 J30 J32 5.25 8.00 130.00 42.46 0.27 0.00
C 24 r P37 J32 J34 92.99 8.00 130.00 42.46 0.27 0.00
25 r P39 J34 J36 57.02 8.00 130.00 42.46 0.27 0.00
26 r P41 J36 J38 5.83 8.00 130.00 27.11 0.17 0.00
27 r P43 J38 J40 73.48 8.00 130.00 27.11 0.17 0.00
28 r P45 J40 J42 5.81 8.00 130.00 27.11 0.17 0.00
29 r P47 J42 J44 94.20 8.00 130.00 15.75 0.10 0.00 --30 r P48 J44 J46 5.52 8.00 130.00 15.75 0.10 o.oo
31 r P53 J48 J50 5.48 8.00 130.00 116.97 0.75 0.00
32 r PSS J50 J112 144.77 8.00 130.00 116.97 0.75 0.05
33 r P57 J10 J52 11.72 6.00 130.00 0.00 0.00 0.00
34 r PS1 J24 J58 9.93 6.00 130.00 0.00 0.00 0.00
35 r P65 J34 J62 10.93 6.00 130.00 0.00 0.00 0.00
I 36 r P67 J46 J64 16.86 2.00 130.00 15.75 1.61 44.29 .. 31 r P69 J44 J66 17.34 4.00 130.00 0.00 0.00 0.00
38 F P71 J42 J68 15.28 2.00 130.00 11.36 1.16 34.55
39r m J40 J70 16.54 4.00 130.00 0.00 0.00 o.oo
40 r P7s J38 J72 18.15 4.00 130.00 0.00 0.00 0.00
41 Fm J36 J74 20.06 2.00 130.00 15.35 1.57 44.00
42 r P79 J32 J76 17.37 4.00 130.00 0.00 0.00 0.00
43 r P81 J30 J78 18.38 2.00 130.00 15.11 1.54 43.59
44 r P87 J18 J84 17.46 4.00 130.00 0.00 0.00 0.00
45F P89 J16 J86 18.00 2.00 130.00 15.75 1.61 43.51
C 46 r P91 J14 J88 18.03 2.00 130.00 15.95 1.63 43.77
41 r P93 J12 J90 17.26 4.00 130.00 0.00 0.00 0.00
48 r P95 J50 J92 18.37 4.00 130.00 0.00 0.00 0.00
49 r P97 J48 J94 19.66 2.00 130.00 11.56 1.18 35.79
C so r P99 J20 J22 5.24 12.00 100.00 73.12 0.21 0.00
375 Pressure Zone Analysis -Are Flow Report
-..
IO Static Demand Static Pressure Statict-lead Fire-Flow Demand Residual Pressure Available Flow at
(gpm) (psi) (ft) (gpm) (psi) ~!'l
1 r JS2 o.oo 65.99 399.97 2,750.00 54.83 6,517.07
2 r J68 0.00 61.79 399.95 2,750.00 46.39 5,135.49
3 r J60 0.00 60.50 399.95 2,750.00 34.96 3,632.26
4rJ62 0.00 58.89 399.94 2,750.00 43.32 5,000.88
..
' ..
..
..
-•
..
•
• -
-
-• ..
•
' Ill
.. -..
-
-
Alternative 2
550 Zone Analysis
C
; ..
j ..
r ..
C
Building Peak Flow Based on AWWA Fixture Value Method
Based on 550 Pressure Zone Alternative
I
Total
Number Fixtures Total Load
Load of per per
Units Fixtures Building Bull ding
Bulldlns 1,8
Toilets 3 3 16 48
Lavatory 4 4 24 96
Kitchen Sink 3 1 6 18
Dish Washer 4 1 6 24
Washer 12 1 6 72 -
Tub/Shower 8 3 14 112
hose Bibb 6 -2 12
Total Load 13 74 382
Flow at 35 psi 41 IPffl
Max Static 131 psi
Adjusted Peak Flow, Ilda 1 83 1Pm
Max Static 121 psi
Adjusted Peak Flow, Bldg 8 80 gpm
BulldtngZ
Toilets 3 3 13 39
Lavatory 4 4 20 80
Kitchen Sink 3 1 5 15
Dish Washer 4 l s 20
Washer 12 1 5 60
Tub/Shower 8 3 12 96
hose Bibb 6 0 2 12
Total Load 13 62 322
Flow at 35 psi 38 gpm
Max Static 130 psi
Adjusted Peak Flow 77 gpm
Bulld1ng3
Toilets 3 3 28 84
Lavatory 4 4 40 160
Kitchen Sink 3 l 10 30
Dish Washer 4 1 10 40
Washer 12 1 10 120
Tub/Shower 8 3 24 192
hose Bibb 6 0 2 12
Total Load 13 124 638
Flow at JS psi S3 gpm
MaxSatic 130 psi
Adjusted Peak Flow 107 IPffl
Buildlng4
Toilets 3 3 28 84
Lavatory 4 4 40 160
Kitchen Sink 3 1 10 30
Dish Washer 4 1 10 40
Washer 12 1 10 120
Tub/Shower 8 3 24 192
hose Bibb 6 0 2 12
Total Load 13 124 638
Flow at 35 psi 53 gpm
MaxSatic 128 psi
Adjusted Peak Flow 106 !IPffl
Building Peale Flow Based on AWWA Fixture Value Method
Based on 550 Pressure Zone Alternative
C Total
Number Fixtures Total Load
Load of per per
Units Fixtures Bulldln1 Bulldln1
BuUdlng5
Toilets 3 3 28 84
Lavatory 4 4 40 160
Kitchen Sink 3 l 10 30
Dish Washer 4 1 10 40
Washer 12 l 10 120
Tub/Shower 8 3 24 192
hose Bibb 6 0 2 12
Total Load 13 124 638
Flow at 35 psi 53 !1pm
MaxSatlc 126 psi
Adjusted Peak Flow 105 IPffl
Buitcllng 6
Toilets 3 3 28 84
i Lavatory 4 4 40 160
ill Kitchen Sink 3 1 10 30
Dish Washer 4 1 10 40
washer 12 1 10 120
Tub/Shower 8 3 24 192
hose Bibb 6 0 2 12
Total Load 13 124 638
Flow at 35 DSi 53 IPffl
MaxSatlc 124 psi
Adjusted Peak Flow 105 1Pm
Butlcffng7
Toilets 3 3 31 93
Lavatory 4 4 44 176
Kitchen Sink 3 l 11 33
Dishwasher 4 1 11 44
Washer 12 1 11 132
Tub/Shower 8 3 26 208 r--hose Bibb 6 0 2 12
Total Load 13 136 698
Flow at 35 psi gpm 56 gpm
Max Static 123 psi
Adjust.«! Peak Flow 110 gpm
Bulldlnc9
Toilets 3 3 28 84
Lavatory 4 4 28 112
Kitchen Sink 3 1 14 42
Dish Washer 4 1 14 56
Washer 12 1 14 168 .. Tub/Shower 8 3 28 224 • hose Bibb 6 0 2 12
Total Load 13 128 698
Flow at 35 psi 56 gpm
Max Static 121 psi
Adjusted Peak Flow 109 mm
-
550 Pressure Zone System Analysis
Model Node Diagram
PH
J88
~·'J18
P121
P21
J98
P33
P127
J100
t;;:
~
p119
RES9006
f I f 1 I I I 1 I" I I 1 I 1 I I ' 1 r I I I I 1 ••• I' I s-I • 1 I I I I .-,
Peak Demand Conditions Hydraulic Analysis -550 Zone (2" Meters)
Pressure Pressure Pressure Total Max
Dynamic 2-inch Loss Across Loss Across Loss Across Pressure Pressure Max
Pressure at lateral Design 2" Meter at Sub-Meter PRVat Friction Loss Loss from at Pressure at
Elevation Head the Main Length to Flow to Design Flow at Design Master of lateral to Main to 1st Floor Top Floor
(ft) (ft) (psi)1 Bldg Bldg (gpm) (psi) Flow (psi) Meter (psi) Bldg Bldg (psi) (psi)2 Fixture (psi}
Bldgl 248.4 550.0 131.1 19.7 83 3.0 6.0 40.6 0.97 50.6 71.0 64.5
Bldg2 248.8 549.9 130.7 29.5 77 3.0 6.0 40.1 1.26 50.4 71.0 64.5 --~ ------··---------
Bldg3 250.7 549.9 130.2 18.0 107 4.0 7.0 37.1 1.42 49.S 71.0 64.5
Bldg4 254.2 549.9 129.1 18.0 106 4.0 7.0 35.6 1.40 48.0 71.0 64.5
Bldg5 257.6 549.9 127.4 16.8 105 4.0 7.0 34.2 1.29 46.5 71.1 64.6
Bldg6 263.7 549.9 125.0 18.4 105 4.0 7.0 31.5 1.40 43.9 71.0 64.5
Bldg7 266.3 549.9 123.7 20.0 110 4.0 7.0 30.2 1.67 42.9 70.9 64.4
Bldg8 269.4 549.9 123.0 15.3 80 3.0 6.0 31.8 0.70 41.5 70.9 64.4
Bldg9 269.4 550.0 122.6 16.9 109 4.0 7.0 29.1 1.39 41.5 71.0 63.0
1) Dynamic pressure is based on the hydraulic model analysis for peak demands based on the fixture value of the whole project, or 167 gpm. The pressure shown Is
the pressure at the water main in the street.
2) Includes pressure loss across a prv at the sub-meter to each unit.
,. ... ..
550 Zone Peak Hour Demands • Junction Report ..
ID Demand Elevation Head Preasure
(gpm) (ft) (ft) (psi)
1 r J10 0.00 247.67 549.94 130.97
2 -r J100 0.00 271.00 550.00 120.89
3 r J112 0.00 248.00 549.94 130.83
4 ,-J114 16.46 248.40 483.93 102.06
5 1 J11e 0.00 0.00 550.00 238.31
6 r J12 0.00 249.00 549.93 130.39
1 r J14 0.00 249.00 549.93 130.39
8 r J1e 0.00 252.00 549.93 129.09 .. 9 r J1e 0.00 252.00 549.93 129.09
10 r J20 0.00 256.00 549.93 127.36
111 J22 0.00 256.00 549.93 127.36
12r J24 0.00 257.00 549.93 126.92
13 r J28 0.00 258.00 549.93 126.49
14 r J30 0.00 261.50 549.93 124.98
15 r J32 0.00 261.50 549.93 124.98 .. 16 r • 0.00 264.00 549.93 123.89
11 r J38 0.00 264.50 549.93 123.68
18 r J38 0.00 264.50 549.93 123.68
1e r J40 0.00 266.00 549.94 123.03 .. 20 r J42 0.00 266.00 549.94 123.03
21 r J44 0.00 267.00 549.95 122.60 -22 r J48 0.00 267.00 549.95 122.60
23 r J48 0.00 247.00 549.95 131.27
24 r a 0.00 247.00 549.95 131.27
25 r J52 0.00 247.67 549.94 130.97
26 r .-0.00 257.34 549.93 126.78
21 r .teo 0.00 260.32 550.00 125.52
28 r J82 0.00 264.03 549.93 123.88 29r .-.. 21.32 269.40 468.76 86.38
30 r • 0.00 269.40 549.95 121.56
31 r J88 15.37 269.40 486.68 94.15
32 r J10 0.00 269.40 549.94 121.56
33r m 0.00 266.30 549.93 122.90 .. 341 J74 20.78 266.30 469.27 87.95
35r J78 0.00 263.70 549.93 124.02
36 r .11a 20.46 263.70 470.05 89.41
371 J80 21.04 257.60 470.83 92.39 38 r J82 0.00 257.60 549.93 126.66
39rJ84 0.00 254.40 549.93 128.05
40 r J88 21.32 254.40 470.19 93.50
41 r J88 21.59 250.70 469.72 94.90
42 r J80 0.00 250.70 549.93 129.66
43 r .192 0.00 248.80 549.95 130.49
441 J84 15.65 248.80 484.36 102.07 45 r J98 0.00 262.00 550.00 124.79 -
-
----···-----·-··----------------
C ..
-
JI""
'
-
I
I
C
550 Pressure Zone -Peak Hour Demands • Pipe Report
ID From Node To Node
1 J22 J24
J98 J60
1 J20 J82
8 J22 J80
5 J24 J26
9 RES9006
1 r P10
2 r Ptoe
3 r P11
4 r Pf1
s r P11
6 r PU
7 r P121
8 r P127
9 rP1
10 r P14
11 r P14S
12 r Pt46
13 r P14
14 r Pt
15 r P1
16r Pt
11 r P2
18 r PSS
1s r P35
20r m
21 r P39
22rP4
23 r p.a
24 r PG
25 r P4
26 r ,~
21 r P63 28r PsS
29 r P57
ao r P8
31 r P65
321P8
33r P88
341"'"P1
as r m
36 r P75
37 r P77
38 r m
39 r PB
40 r P8
41 r PBe
42 r Pe
43 r P93
44r P95
45 r P87
46 r P99
J100
J98 J116
J100 J98
3 J10 J12
1 J112 J10
J112 J114
J116 J48
7 J100 J46
5 J12 J14
7 J14 J16
9 J16 J18
1 J18 J20
J26 J30
J30 J32
J32 J34
J34 J36
1 J36 J38
J38 J40
J40 J42
7 J42 J44
J44 J46
J48 JSO
J50 J112
J10 J52
1 J24 J58
JM J62
7 J46 J64
J44 J66
1 J42 J68
J40 J70
J38 J72
J36 J74
J32 J76
1 J30 J78
7 J18 J84
J16 JS6
1 J14 J88
J12 J90
JSO J92
J48 J94
J20 J22
Length Diameter
(ft) (in)
29.46 8.00
47.00 6.00
17.35 4.00
16.81 2.00
30.78 8.00
76.79 30.00
848.33 30.00
530.63 30.00
71.98 8.00
7.23 8.00
29.48 2.00
245.18 8.00
223.91 8.00
6.04 8.00
131.88 8.00
4.58 8.00
142.74 8.00
187.26 8.00
5.25 8.00
92.99 8.00
57.02 8.00
5.83 8.00
73.48 8.00
5.81 8.00
94.20 8.00
5.52 8.00
5.48 8.00
144.77 8.00
11.72 6.00
9.93 6.00
10.93 6.00
16.86 2.00
17.34 4.00
15.28 2.00
16.54 4.00
18.15 4.00
20.06 2.00
17.37 4.00
18.38 2.00
17.46 4.00
18.00 2.00
18.03 2.00
17.26 4.00
18.37 4.00
19.66 2.00
5.24 12.00
--
Roughneas Flow Velocity Headloss
(gpm) (ftls) (ft)
130.00 -12.69 0.08 0.00
130.00 0.00 0.00 0.00
130.00 0.00 0.00 0.00
130.00 21.04 2.15 79.09
130.00 -12.69 0.08 0.00
130.00 174.00 0.08 0.00
130.00 83.37 0.04 o.oo
130.00 83.37 0.04 0.00
130.00 51.27 0.33 0.01
130.00 51.27 0.33 0.00
130.00 16.46 1.68 66.00
130.00 83.37 0.53 0.04
130.00 90.63 0.58 0.05
130.00 51.27 0.33 0.00
130.00 29.68 0.19 0.00
130.00 · 8.36 0.05 0.00
130.00 8.36 0.05 0.00
130.00 -12.69 0.08 0.00
130.00 -33.15 0.21 0.00
130.00 -33.15 0.21 0.00
130.00 -33.15 0.21 0.00
130.00 -53.93 0.34 0.00
130.00 -53.93 0.34 0.01
130.00 -53.93 0.34 0.00
130.00 -69.31 0.44 0.01
130.00 -69.31 0.44 0.00
130.00 67.72 0.43 0.00
130.00 67.72 0.43 0.02
130.00 0.00 0.00 0.00
130.00 0.00 0.00 0.00
130.00 0.00 0.00 0.00
130.00 21.32 2.18 81.19
130.00 0.00 0.00 0.00
130.00 15.37 1.57 63.26
130.00 0.00 0.00 0.00
130.00 0.00 0.00 0.00
130.00 20.78 2.12 80.66
130.00 0.00 0.00 0.00
130.00 20.46 2.09 79.88
130.00 0.00 0.00 0.00
130.00 21.32 2.18 79.73
130.00 21.59 2.20 80.21
130.00 0.00 0.00 0.00
130.00 0.00 0.00 0.00
130.00 15.65 1.60 65.59
100.00 8.36 0.02 0.00
C
550 Zone -Fire Flow Analysis Report
,...
,... ..
C
---
ID Static Demand Static Pressure Static Head Fire-Flow Demand Residual Pressure
(gpm) (psi) (ft) (gpm) (psi)
1 r J52 0.00 130.99 549.99 2,750.00 119.16
2 r J58 0.00 126.80 549.99 2,750.00 113.18
a r JeO 0.00 125.52 550.00 2,750.00 115.63
4F.m 0.00 123.91 549.99 2,750.00 111.59
C
II
II
... ..
-
-
---.. -
-..
-
Alternative 3
Split 375/550 Zone Analysis
C
,. ..
l ..
,..
• •
I
r
l ..
Buildina Peak Flow Based on AWWA Fixture Value Method
Based on 375/550 Split Pressure Zone Alternative
Total
Number fixtures Total Load
Load of per par
Units Fixtures BuilcUng Buildina
Building 1
Toilets 3 3 16 48
Lavatory 4 4 24 96
Kitchen Sink 3 l 6 18
Dish Washer 4 l 6 24
Washer 12 l 6 72
Tub/Shower 8 3 14 112
hose Bibb 6-2 12
Total Fixture Value 13 74 382
Flow at 35 psi 41 1Pm
Max Static 77 psi
Adjusted Peak Flow, Bldg 1 64 gpm
Buildln&2
Toilets 3 3 13 39
Lavatory 4 4 20 80
Kitchen Sink 3 1 5 15
Dishwasher 4 1 s 20
Washer 12 1 5 60
Tub/Shower 8 3 12 96
hose Bibb 6 0 2 12
Total Fixture Value 13 62 322
Flow at 35 psi 38 1PM
Max Static 77 psi
Adjusted Peak Flow 60 IPffl
Bulldlng3
Toilets 3 3 28 84
Lavatory 4 4 40 160
Kitchen Sink 3 l 10 30
Dish Washer 4 1 10 40
Washer 12 1 10 120
Tub/Shower 8 3 24 192
hose Bibb 6 0 2 12
Total Fixture Value 13 124 638
Flow at 35 psi 53 1pm
MaxSatic 76 psi
Adjusted Peak Flow 80 IPffl
Buildlng4
Toilets 3 3 28 84
Lavatory 4 4 40 160
Kitchen Sink 3 1 10 30
Dish Washer 4 1 10 40
Washer 12 1 10 120
Tub/Shower 8 3 24 192
hose Bibb 6 0 2 12
Total load 13 124 638
Flow at 35 psi 53 um
MaxSatlc 128 psi
Adjusted Peak Flow 106 IPffl
Building Peak Flow Based on AWWA Fixtur• Value Method
Based on 375/550 Split Pressure Zone Alternative
Total
Number Fixtures Total Load
Load of per per
Units Fixtures BUIiding Building
Bulldlftl 5
Toilets 3 3 28 84
Lavatory 4 4 40 160
Kitchen Sink 3 1 10 30
Dish Washer 4 1 10 40
Washer 12 1 10 120
Tub/Shower 8 3 24 192
hose Bibb 6 0 2 12
Total Load 13 124 638
Flow at 35 psi 53 gpm
MaxSatic 126 psi
Adjusted Peak Flow 105 gpm
Bullcllllfl 6
Toilets 3 3 28 84
Lavatory 4 4 40 160
Kitchen Sink 3 1 10 30
Dish Washer 4 1 10 40
Washer 12 1 10 120
Tub/Shower 8 3 24 192
hose Bibb 6 0 2 12
Total Load 13 124 638
Flow at 35 psi 53 gpm
MaxSi!ltic 124 psi
Adjusted Peak Flow 105 gpm
C Bu11d1nc7
Toilets 3 3 31 93
Lavatory 4 4 44 176
Kitchen Sink 3 1 11 33
DishWuher 4 1 11 44
Washer 12 1 11 132
Tub/Shower 8 3 26 208
hose Bibb 6 0 2 12
Total Load 13 136 698
Flow at 35 psi om 56 1PM
Max Static 123 psi
Adjusted Peak Flow 110 tpffl
Buildintl
Toilets 3 3 16 48
Lavatory 4 4 24 96
Kitchen Sink 7 1 6 42
Dish Washer 4 1 6 24
Washer 12 1 6 72
Tub/Shower 4 3 14 56
hose Bibb 6. 2 12
Total Load 13 74 350
Flow at 35 psi 39 gpm
Max Static 121 psi
Adjusted Peak Flow 79 1pm
. ; ..
Bulldina Peak Flow Based on AWWA Fixture Value Method
Based on 375/550 Split Pressure Zone Altematlve
Total
Number Fixtures Total Load
Load of per per
Units Fixtures Bulldln1 Buildtna
Bullcllna9
Toilets 3 3 28 84
Lavatory 4 4 28 112 .. Kitchen Sink 3 1 14 42
Dish Washer 4 1 14 56
Washer 12 1 14 168
Tub/Shower 8 3 28 224
hose Bibb 6 0 2 12
Total Load 13 128 698
Flow at 35 psi 56 IP"'
Max Static 121 psi
Adjusted Peak Flow 109 gpm
,...
' I ..
..
.. •
-
375/550 Split Pressure Zone System
Model Node Diagram
P21
J98
O> "'f a: J60
--0 1
in
0::
P33
P127
J100
..... .., a:
P119
RES9006
I I I 1 I 1 I I I 1 ll II It 11 I 1 r 1 1·1 1-1 171 S'"I •• I 1 11 I' I
Peak Demand Conditions Hydraulic Analysis -Split 375/550 Zone
-
Pressure Pressure Pressure Total
Dynamic Loss Across Loss Across Loss Across Pressure Pressure
Pressure at Lateral Design Meter at Sub-Meter PRVat Friction Loss Loss from at Pressure at
Elevation Head the Main Length to Flow to Design Flow at Design Master of Lateral to Main to 1st Floor Top Floor
(ft) {ft) (psi)1 Bldg Bldg (gpm) (psi) Flow (psi) Meter (psi) Bldg Bldg (psi) (psi)2 Fixture (psi)
Bldgl 248.4 400.0 66.3 19.7 64 4.0 6.0 -2.21 12.2 53.4 46.9
Bldg2 248.8 399.9 65.8 29.5 60 4.0 6.0 -2.87 12.9 52.5 46.0 ---------~---------'-·
Bldg3 250.7 399.9 65.4 18.0 80 7.0 7.0 -2.98 17.0 47.6 41.1
Bldg4 254.2 549.9 129.1 18 106 4.0 7.0 35.2 1.47 47.7 71.4 64.9
Bldg5 257.6 549.9 127.4 16.8 105 4.0 7.0 33.8 1.36 46.2 71.4 64.9
Bldg6 263.7 549.9 125.0 18.4 105 4.0 7.0 31.1 1.47 43.6 71.3 64.8
Bldg7 266.3 549.9 123.7 20 110 4.0 7.0 29.7 1.75 42.5 71.3 64.8
Bldg8 269.4 549.9 123.0 15.3 79 3.0 6.0 31.6 0.72 41.3 71.1 64.6
Bldg9 269.4 550.0 122.6 16.9 109 4.0 7.0 28.7 1.45 41.2 71.3 63.3
1) Dynamic pressure is based on the hydraulic model analysis for peak demands based on the fixture value of the whole project. The pressure shown is
the pressure at the water main In the street.
2) The meters in the 550 Zone include a pressure loss across a prv at the sub-meter to each unit.
..
,,.. ...
.... ..
,,.. ... ..
I
I ,. •
375/550 Split Zone Peak Hour Demands Analysis -Junction Report
-·-·------·-----------
IO Demand Elevation Head Pressure
(gpm) (ft) (ft) (pal}
1 r J10 0.00 247.67 399.96 65.99
2 r J100 0.00 271.00 550.00 120.89
3 rJn2 0.00 248.00 399.96 65.85
4 rJ114 32.70 248.40 364.52 50.31
5 r JU8 0.00 260.00 549.99 125.65
6 r J12 0.00 249.00 399.96 65.41
1 FJ14 0.00 249.00 399.96 65.41
a r J1e 0.00 252.00 549.96 129.11
9 r J1s 0.00 252.00 549.96 129.11
10 r J20 o.oo 256.00 549.96 127.37
11 r .122 0.00 256.00 549.96 127.37
12 r J24 0.00 257.00 549.97 126.94
13 r J26 0.00 258.00 549.97 126.51
14 r a 0.00 261.50 549.96 124.99
151 J32 0.00 261.50 549.96 124.99
1s r .J34 0.00 264.00 549.96 123.91
171J88 0.00 264.50 549.96 123.69
1s r-. 0.00 264.50 549.96 123.69
191 J40 0.00 266.00 549.96 123.04
20 r J42 o.oo 266.00 549.96 123.04
21 r J44 0.00 . 267.00 549.97 122.61
221 J46 0.00 267.00 549.97 122.61
231 .ka 0.00 247.00 399.98 66.29
24 r J50 o.oo 247.00 399.98 66.29
25 r-• 0.00 247.67 399.96 65.99
26 r JSB 0.00 257.34 549.97 126.79
21 r JeO o.oo 260.32 549.99 125.51
28 FJ62 0.00 264.03 549.96 123.89
29 r J84 25.30 269.40 435.67 72.04
ao r • 0.00 269.40 549.97 121.57
31 r a 25.30 269.40 378.68 47.35
a2 r J70 0.00 269.40 549.96 121.57
331.112 0.00 266.30 549.96 122.91 34 r J74 25.30 268.30 430.42 71.11 35 r J78 0.00 263.70 549.96 124.04 36 r a 25.30 263.70 427.86 71.13
37 r Jae 25.30 257.60 435.66 77.15
381J82 0.00 257.60 549.96 126.68 39 r J84 0.00 254.40 549.96 128.07
40 r a 25.30 254.40 437.71 79.43
41 r J88 32.70 250.70 358.77 46.83
42 r J80 0.00 250.70 399.96 64.68 43 r J92 0.00 248.80 399.98 65.51
44 r J84 32.70 248.80 364.81 50.27 ·-
45 r J98 0.00 262.00 550.00 124.79
....
.) ..
f .. ..
I ..
,..
• Ill
C .. ..
C
C
3751550 Split Zone Peak Hour Demands Analysis -Pipe Report
ID From Node To Node Length Diameter Roughness (ft) (in)
1 r P101 J22 J24 29.46 8.00 130.00
2 r P109 J118 J60 25.87 6.00 130.00
3 r P111 J20 J82 17.35 4.00 130.00
4 r P113 J22 J80 16.81 2.00 130.00 5 r P11-S J24 J26 30.78 8.00 130.00
6 r P11$ RES9006 J100 76.79 30.00 130.00
7 r P127 J100 J98 555.44 30.00 130.00
8 r P13 J10 J12 71.98 8.00 130.00
9 r P141 J112 J10 7.23 8.00 130.00
10 r P143 J112 J114 29.48 2.00 130.00
11 rP1•1 J100 J46 223.91 8.00 130.00
12 r P149 J98 J118 46.89 8.00 130.00
13r P15 J12 J14 6.04 8.00 130.00
14 rP151 J118 J26 139.38 8.00 130.00
15 r P163 RES9010 J48 73.19 8.00 130.00
16 r P19 J16 J18 4.58 8.00 130.00
11r P21 J18 J20 142.74 8.00 130.00
1s r P33 J26 J30 187.26 8.00 130.00
19r P35 J30 J32 5.25 8.00 130.00
20 r P37 J32 J34 92.99 8.00 130.00
21 r P39 J34 J36 57.02 8.00 130.00
22 r P41 J36 J38 5.83 8.00 130.00
23r P43 J38 J40 73.48 8.00 130.00
24 F P45 J40 J42 5.81 8.00 130.00
25 r P47 J42 J44 94.20 8.00 130.00
26 r P49 J44 J46 5.52 8.00 130.00
21 r P53 J48 J50 5.48 8.00 130.00
2aF A56 J50 J112 144.n 8.00 130.00
29 -.--P57 J10 J52 11.72 6.00 130.00
30l""' P61 J24 J58 9.93 6.00 130.00
31 r P65 J34 J62 10.93 6.00 130.00 32r P67 J46 J64 16.86 2.00 130.00 33 r P69 J44 J66 17.34 4.00 130.00
34r P11 J42 J68 15.28 2.00 130.00 35r m J40 J70 16.54 4.00 130.00 36 r P75 J38 J72 18.15 4.00 130.00
37 r P77 J36 J74 20.06 2.00 130.00 38r P79 J32 J76 17.37 4.00 130.00
39 r Pe1 J30 J78 18.38 2.00 130.00
40 F P67 J18 J84 17.46 4.00 130.00
41 r P89 J16 J86 18.00 2.00 130.00
42 r P91 J14 J88 18.03 2.00 130.00
43r P93 J12 JOO 17.26 4.00 130.00
44 r P95 J50 J92 18.37 4.00 130.00 45 r P97 J48 J94 19.66 2.00 130.00
46r P99 J20 J22 5.24 12.00 100.00
Flow Velocity Headloas
(gpm) (ft/s) (ft)
-50.60 0.32 0.00
0.00 0.00 0.00
o.oo 0.00 0.00
25.30 2.58 114.30
-50.60 0.32 0.00
151.80 0.07 0.00
80.75 0.04 0.00
32.70 0.21 0.00
32.70 0.21 0.00
32.70 3.34 35.45
71.05 0.45 0.03
80.75 0.52 O.o1
32.70 0.21 0.00
80.75 0.52 0.02
98.10 0.63 0.02
-25.30 0.16 0.00
-25.30 0.16 0.00
30.15 0.19 0.01
4.85 0.03 0.00
4.85 0.03 0.00
4.85 0.03 0.00
-20.45 0.13 0.00
-20.45 0.13 0.00
-20.45 0.13 0.00
-45.75 0.29 0,01
-45.75 0.29 0.00
65.40 0.42 0.00
65.40 0.42 0.02
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
25.30 2.58 114.30
0.00 0.00 0.00
25.30 2.58 171.28
0.00 0.00 0.00
0.00 0.00 0.00
25.30 2.58 119.54
0.00 0.00 0.00
25.30 2.58 122.10
0.00 0.00 0.00
25.30 2.58 112.25
32.70 3.34 41.19
0.00 0.00 0.00
0.00 0.00 0.00
32.70 3.34 35.18
-25.30 0.07 0.00
..
...
l ..
r ..
C
.. ..
C
375_550 Pressure Zone System -Fire Flow Report
ID Static Demand Static Pressure
(gpm) (psi)
1 r J52 0.00 66.00
2 r J58 0.00 126.81
3 r J60 0.00 125.52
4 r ..162 0.00 123.91
Static Head Fire-Flow Demand Residual Pressure
(ft) (gpm) (plli)
399.99 2,750.00 51.37
549.99 2,750.00 118.24
550.00 2,750.00 118.31
549.99 2,750.00 114.71