HomeMy WebLinkAboutCT 04-10A; POINSETTIA PLACE; TRAFFIC IMPACT ANALYSIS; DWG 469-5; 2006-12-11TRAFFIC IMPACT ANALYSIS
POINSETTIA PLACE
Carlsbad, California
December 11, 2006
LINSCOTT
LAW &
GREENSPAN
engineers
Engineers & Planners
Traffic
Transportation
Parking
-•
• • -•
1111
• -•
!1111111
llill -• -• ..
II
1111
• -• -..
,.. --...
---
----
Prepared by:
Jose R Nunez Jr
Transportation Planner II
TRAFFIC IMPACT ANALYSIS
POINSETTIA PLACE
Carlsbad, California
December 11, 2006
LLG Ref. 3-04-1395
Under the Supervision of.'
John Boarman
Principal
LI NS COTT
LAW &
GREENSPAN
engineers
URSGott.titw & Gruunspiill, Engineel'$
4542 lluffiier Street
Suite tOll
San DieQo, CA.~2111
asuoa;uoo r
858.300:8810 F
WV1M1-llgengin11ers.corn
-•
-• -• -• -• -• -• -
TABLE OF CONTENTS
SECTION PAGE
1.0 Introduction............................................................................................................................. 1
2.0 Project Description I Study Area........................................................................................... 2
2.1 Project Description........................................................................................................... 2
2.2 Project Access.................................................................................................................. 2
3.0 Existing Conditions ................................................................................................................. 3
3.1 Existing Street System..................................................................................................... 3
3.2 Existing Traffic Volwnes ................................................................................................. 4
3.3 Study Area ........................................................................................................................ 4
4.0 Analysis Approach and Methodology-................................................................................... 6
4.1 Analysis Approach........................................................................................................... 6
4.2 Analysis Methodology..................................................................................................... 6
4.2.1 Signalized Intersections....................................................................................... 6
4.2.2 Street Segments .. ............ .... ... . . ...... ... .. . .. .... ... . . . . . ..... .. .. .. . ... . . ........ ................. ... . . . .. 7
• 5.0 Project Traffic.......................................................................................................................... 8
5 .1 Trip Generation................................................................................................................ 8
• 5.2 Trip Distribution............................................................................................................... 8
• 5.3 Trip Assignment............................................................................................................... 8
• 6.0 Significance Criteria................................................................................................................ 9
• 7.0 Cumulative Projects Traffic................................................................................................... 10 -7.1 Description of Projects ..................................................................................................... 10 ..
8.0 Near-Term Analysis ................................................................................................................ 12 -8.1 Existing Operations .......................................................................................................... 12 .. 8.1.1 Signalized Intersections ....................................................................................... 12
8.1.2 Unsignalized Intersections ................................................................................... 12 -8.2 Existing+ Project Operations .......................................................................................... 12 -8.2.1 Signalized Intersections ....................................................................................... 12
8.2.2 Unsignalized Intersections ................................................................................... 12 -8.3 Existing+ Project + Cwnulative Projects Operations .................................................... 12 -8.3.1 Signalized Intersections ....................................................................................... 12
8.3.2 Unsignalized Intersections ................................................................................... 12
-9.0 Year 2030 Analysis .................................................................................................................. 15
-
---
LINSCOTI, LAW & GREENSPAN, engineers LLG Ref. 3-04-1395
Poinsettia Place
N.\ 1395-Ub"\Text\ 1395-06.doc
1111'
Ill
...
-
• -• -1111
•
-• -•
• -
-------
-
---
10.0 Accident Analysis .................................................................................................................... 18
10.1 Project Access ........................................................... , ...................................................... 18
10.2 El Camino Real I Cassia Road Queue Analysis . . . . . . . . ........ ... . . . . . .. . ... . . . . .... .. . . .......... .. . . . . . . . . 19
10.3 Vehicular Accident Data................................................................................................. 19
11.0 Conclusions .................................................................................................................... ~ ........ 21
LINSCOn, LAW & GREENSPAN, engineers ii LLG Ref. 3-04-1395
Poinsettia Place
N: \ 139.5-0b\T .:xt\ 1395-06.doc
•
• -•
• •
• •
•
• •
•
•
II
• ..
• • -• -.. -.. --
---
---
APPENDICES
APPENDIX
A .
B.
C .
D .
E.
F .
Manual Peak Hour and ADT Traffic Volume sheets
Intersection Level of Service Analysis sheets
Cumulative Projects Traffic Data
Year 2030 Traffic Data
Project Driveway Analysis Sheets
El Camino Real I Cassia Road Intersection Queue Analysis & Traffic Accident Data
LIST OF FIGURES
SECTION-FIGURE# FOLLOWING PAGE
1-1 Vicinity Map .......................... '................................................................................................. 1
1-2 Project Area Map ................................................................................................................... 1
2-1 Site Plan ..... . .. ... . . . . . ...... .. . .. . . . . . . . ...... . . . . .... . ... ... .. .............. ...... . . .. .... . .. ........... ..... ... . . . ............... .... 2
3-1 Existing Conditions Diagrrun................................................................................................. 5
3-2 Existing Traffic Volumes....................................................................................................... 5
5-1 Regional Traffic Distribution................................................................................................. 8
5-1 Project Traffic Volumes......................................................................................................... 8
5-2
5-3.
Existing+ Project Traffic Volumes....................................................................................... 8
Existing+ Project Traffic Volumes....................................................................................... 8
7-1 Total Cumulative Traffic Volumes ........................................................................................ 11
7-2 Existing+ Project+ Cumulative Projects Traffic Volumes .................................................. 11
9-1 Year 2030 Traffic Volumes ................................................................................................... 17
LINSCOTI, LAW & GREENSPAN, engineers iii LLG Ref. 3,04-1395
Poinsettia Place
N:\ l J~)5-06\ l'cxt\139S-06.doc
..
•
• -• -• -•
• ..
• -•
Ill
-• -• -.. ---
...
-....
-
LIST OF TABLES
SECTION-TABLE #PAGE
3-1 Existing ADT Volumes.......................................................................................................... 5
5-1 Project Trip Generation.......................................................................................................... 8
8-1 Signalized Intersection Operations ..... .. .... .. .............. ......... ......... .......... .... .. .. .. .. .... .... .... .... ..... 13
8-2 Peak Hour Segment Operations ............................................................................................. 14
9-1 Year 2030 Signalized Intersection Operations ...................................................................... 16
9-1 Year 2030 Peak Hour Segment Operations ........................................................................... 17
10-1 Cassia Road Project Driveway Analysis ................................................................................ 18
10-2 Segment Accident Assessment (Years 2003-2006) ............................................................... 20
10-3 Intersection Accident Assessment (Years 2003-2006) .......................................................... 20
LiNSCOIT, LAW & GREENSPAN, engineers iv LLG Ref. 3-04-1395
Poinsettia Place
N:\ I J95-(16\Tcxt\l 395-06. doc
• • -• -...
---• -• -• -•
• -• -• -
--
----
---
-
1.0 INTRODUCTION
TRAFFIC IMPACT ANALYSIS
POINSETTIA PLACE
Carlsbad, California
December 11, 2006
Linscott, Law & Greenspan Engineers (LLG) has been retained to prepare a traffic study for the
Poinsettia Place project. The purpose of this study is to assess the impacts to the local circulation
system as a result of the project, which proposes the construction of 90 condominium units within
the City of Carlsbad.
The proposed site is located east of the Poinsettia Lane/Cassia Road intersection along the south side
of Cassia Road and is currently undeveloped. Figure 1-1 shows the project vicinity and Figure 1-2
illustrates, in more detail, the site location .
The traffic analysis presented in this report includes the following:
• Project description
• Existing conditions assessment
• Analysis approach and methodology
• Project traffic generation I distribution I assignment
• Significance criteria
• Near-term cumulative projects discussion
• Near-term intersection/street segment capacity analysis
• Year 2030 analysis
• Circulation and project access discussion
• Conclusions
LiNSCOn, LAW & GREENSPAN, engineers 1 LLG Ref. 3-04-1395
Poinsettia Place
N. \1395-06\T exr\ 1395-06.\foc
-• ..
Ill
Ill ..
• -•
• • -• -• -Ill
111111
•
1111111
1111,
-·
-.. -• -.. -.. -
CAMP
PENDLEl'ON
SOURCE: LLG En9inNl'II, 2006
LINSCOTT
LAW &
GREENSPAN
engineers
RIVERSIDE COUNTY
SAN DIEGO COUNTY
USA ---
MEXICO
NORTH
0
@
8
MILES
Figure 1-1
Vicinity Map
Polntsettla Place
• • -•1
,., -\ \% \i ., \,,..~-'•,
i
Ill, i
\<
q-'.-., !"1
\ ., \
• •
• .. -• ..
1111 -• -• .. .. -., ..
• -• -
111111 --.. .. ,
-... ,
.,-·-'\.
/ ' ,/ ' /
NORTH
0
NOTTO SCALE
Figure 1-2
Project Area Map
Polntsettla Place
•
••
•
-• ..
-•
-
1111
-.. .. ----..
....
2.0 PROJECT DESCRIPTION
2.1 Project Description
The residential development proposes to construct 90 condominium units on 20.4 acres. The
proposed site is located east of the Poinsettia Lane/Cassia Road intersection along the south side of
Cassia Road within the City of Carlsbad. The project site is currently undeveloped land .
2.2 Project Access
The project proposes to provide two full access driveways to Cassia Road with the eastern driveway
opposite Kalmia Circle ( east), which services the Poinsettia Heights residential development.
Figure 2-1 details the conceptual site plan and proposed access points .
LINSCOTI, LAW & GREENSPAN, engineers 2 LLG Ref. 3-04-1395
Poinsettia Place
N.\ 1395-06"\Tcxt\ I 395-06.doc
I f I I I I I I I I I I I I I I I I I I I I I I I I' I I I I I I I I I I I
Figure 2-1
Site Plan
Polntsettla Place
-• -• -• -• -• -• -• -•
• -• -1111 -• -------• ----
-
3.0 EXISTING CONDITIONS
According to the City of Carlsbad General Plan, Prime Arterials should be 106 feet wide in 126
feet of Right-of-Way (R/W), providing six travel lanes with no curbside parking and left-tum lanes
at major intersections. Major Arterials should be 82 feet wide in 102 feet of R/W, providing four
travel lanes, bike lanes, and left-tum lanes at major intersections. Secondary Arterials should be 64
feet wide in 84 feet of R/W providing two to four travel lanes, bike lanes, and left-tum lanes at major
intersections. Collectors should be 40 feet wide in 60 feet of R/W, providing two or four travel
lanes with curbside parking and left-tum lanes at major intersections. Local streets should be 34
feet wide in 60 feet of R/W, providing two travel lanes with curbside parking and no centerline
stripe. The following provides a description of the street system in the project area. Figure 3-1
illustrates the existing conditions, including the lane geometry, for the key intersections in the study
area.
3.1 Existing Street System
El Camino Real is classified as a Prime Arterial on the City of Carlsbad's Circulation Element. El
Camino Real is a north-south roadway within the study area. El Camino Real is currently
constructed as a five-lane divided roadway south of Palomar Airport Road. The majority of El
Camino Real provides bike lanes, bus stops, curb, gutters, and sidewalks along both sides of the
roadway. The speed limit is posted at 55 mph.
Palomar Airport Road is classified as a Prime Arterial on the City of Carlsbad's Circulation
Element. Palomar Airport Road is an east-west roadway within the study area. Palomar Airport
Road is currently constructed as a six-lane divided roadway. The majority of Palomar Airport Road
provides bike lanes, bus stops, curb, gutters, and sidewalks along both sides of the roadway. The
speed limit is posted at 55 mph.
Camino Vida Roble is classified as a Secondary Arterial on the City of Carlsbad's Circulation
Element. Camino Vida Roble is an east-west roadway within the study area. Camino Vida Roble is
currently constructed as a two-lane undivided roadway west of El Camino Real. The speed limit is
posted at 40 mph. Bus stops and bike lanes are provided with curbside parking generally prohibited.
Cassia Road is an unclassified east-west roadway within the study area. Cassia Road is currently
constructed as a two-lane undivided roadway west of El Camino Real. The speed limit is posted at
35 mph with no bus stops or bike lanes provided. Curbside parking is prohibited along the north
side of the street but allowed on the south side.
Dove Lane is an unclassified east-west roadway within the study area. Dove Lane is currently
constructed as a two-lane undivided roadway west of El Camino Real. Curbside parking is generally
prohibited. Bus stops and bike lanes are provided along Dove Lane.
LINSCOTI, LAW & GREENSPAN, engineers 3 LLG Ref. 3-04-1395
Poinsettia Place
N.\ 1395-06\T ext\ 1395-06.doc
-• --
•
• -•
•
• •
• .. ..
.. -• -• ---..
.. --------
Poinsettia Lane is classified as a Major Arterial on the City of Carlsbad's Circulation Element.
Poinsettia Lane is an east-west roadway within the study area. Poinsettia Lane is currently
constructed as a four-lane divided roadway from I-5 and Aviara Parkway before transitioning to a
two-lane roadway east of Aviara Parkway. The speed limit is posted at 45 mph with bike lanes
provided. Poinsettia Lane is proposed to be extended to connect between Cassia Road and El
Camino Real
Aviara Parkway is classified as a Secondary Arterial on the City of Carlsbad's Circulation Element.
A viara Parkway is an east-west roadway within the study area. A viara Parkway is currently
constructed as a four-lane divided roadway west of El Camino Real. The speed limit is posted at 40
mph. Bus stops and bike lanes are provided with curbside parking generally prohibited .
Alga Road is classified as a Major Arterial on the City of Carlsbad's Circulation Element. Alga
Road is an east-west roadway within the study area. Alga Road is currently constructed as a six-lane
divided roadway east of El Camino Real. The speed limit is posted at 45 mph. Bus stops and bike
lanes are provided with curbside parking generally prohibited .
3.2 Existing Traffic Volumes
Existing Average Daily Traffic Volumes (ADTs) and weekday morning (7-9) and afternoon (4-6)
peak hour traffic volumes were obtained from the City of Carlsbad "2006 Traffic Monitoring Plan" .
Figure 3-2 depicts these existing peak hour turning movement volumes at the key intersections and
the daily volumes on the street segments. Appendix A contains copies of the intersection and
segment count sheets. Table 3-1 summarizes the existing ADT volumes and their date and source.
3.3 Study Area
Based on the anticipated distribution of the project traffic, the specific study area includes the
following intersections and street segments:
Intersections:
• El Camino Real I Palomar Airport Road;
• El Camino Real I Camino Vida Roble;
• El Camino Real I Cassia Road;
• El Camino Real I Poinsettia Lane;
• El Camino Real I Dove Lane;
• El Camino Real I A viara Parkway-Alga Road;
• Poinsettia Lane I Aviara Parkway .
Street Segments:
• Palomar Airport Road: Camino Vida Roble to El Camino Real;
• Palomar Airport Road: El Camino Real to El Fuerte Street;
• El Camino Real: Faraday A venue to Palomar Airport Road;
• El Camino Real: Palomar Airport Road to Camino Vida Roble;
• El Camino Real: Camino Vida Roble to Aviara Parkway-Alga Road.
LINSCOTT, LAW & GREENSPAN, engineers 4 LLG Ref. 3-04-1395
Poinsettia Place
N. \J 395-00Y[ ext\J 395-06.~ioc
•
Ill .. .. -• ..
•
• •
•
•
-•
!Ill
• -.. -.. -.. -
.. -•
-----
TABLE3-l
EXISTING ADT VOLUMES
Street Segment Date
Palomar Airport Road
Camino Vida Roble to El Camino Real 2006
El Camino Real to El Fuerte Street 2006
El Camino Real
Faraday A venue to Palomar Airport Road 2006
Palomar Airport Road to Camino Vida Roble 2006
Camino Vida Roble to A viara Parkway-Alga Road 2006
Footnotes:
a. Counts obtained from "2006 Carlsbad Traffic Monitoring Program (TMP)"
LINSCOTI, LAW & GREENSPAN, engineers 5
Source
City of Carlsbad
City of Carlsbad
City of Carlsbad
City of Carlsbad
City of Carlsbad
ADT8
32,960
51,670
36,710
32,960
29,800
LLG Ref. 3-04-1395
Poinsettia Place
N. \1395-06\T ext\ 1395-n6.doc
..
• -• -..
• -• -..
•
11!1111
•
•
• •
-• -• ------------
LEGEND
fglo [.QJ -Traffic Signal
@ -All-Way Stop
@ -Two-Way Stop
BL -Bike Lane
NP -No Parking
YIELD -Free movement
RTOL -Right Turn Overlap
TWLTL -Two-Way Left-Turn Lane
2U -Two lane undivided roadway
4D -Four lane divided roadway
REV. 12/7/06
LLG1395-6 FIGJ-1.DWG
LINSCOTT
LAW &
GREENSPAN
engineers
CASSIA RD
-J -J CD CD
a. a. :z :z
Cl U)
2U BS 4JJ
40
40 MPH
AV/ARA PKWY
BS
NP BL
NP BL
POINSETT~
NORTH
0
NOTTO SCALE
Figure 3-1
Existing Conditions Diagram
Polntsettla Place
-
•
111111
• -•
• -..
-• -• -• -
.. -------
----
NOTES:
AM/PM Peak hour volumes are
shown at the intersections
REV, 12/7 /06
LLG1395-8 FIGJ-2.DWG
LINSCOTT
LAW &
GREENSPAN
engineers
CASSIA RD
~~ I <.· .. ·==·""'". . . . . . . . . . . . . . ' . . . . . . . . . . .
PROJECT
SITE
·····················
..J
'&~ a>-::;"-........ ..,
';j;; ~-; "-106/63 ID) \'--353/243 ,"612/372
NORTH
0
NOTTO SCALE
Figure 3-2
Existing Traffic Volumes
AM/PM Peak Hours
Polntsettla Place
-• -• 4.0 ANALYSIS APPROACH & METHODOLOGY
• 4.1 Analysis Approach
•
• -..
• •
• •
• -•
•
-.. -•
• -• -..
This traffic analysis assesses the key intersections and street segments in the project area. The study
area intersections and segments are analyzed in the following scenarios to determine the impacts to
the road network:
• Existing traffic
• Existing+ project traffic
• Existing+ project+ cumulative projects
• Year 2030
4.2 Analysis Methodology
Level of service (LOS) is the term used to denote the different operating conditions that occur on a
given roadway segment under various traffic volume loads. It is a qualitative measure used to
describe a quantitative analysis taking into account factors such as roadway geometries, signal
phasing, speed, travel delay, :freedom to maneuver, and safety. Level of service provides an index to
the operational qualities of a roadway segment or an intersection. Level of service designations
range from A to F, with LOS A representing the best operating conditions and LOS F representing
the worst operating conditions. Level of service designation is reported differently for signalized,
intersections and roadway segments, as described below .
4.2.1 Signalized Intersections
The signalized intersections were analyzed using the Intersection Capacity Utilization (ICU) method .
The ICU procedure is based on an article in the Institute of Transportation Engineers Journal, August
1978 and assumes the traffic flow characteristics of signalized intersections. It computes the Level
of Service (LOS) for the total intersection based upon a summation of volume to capacity (v/c) ratios
for the key conflicting movements. The ICU numerical value represents the percent of signal green
time, and thus, the capacity required to serve the traffic demand. The LOS for signalized
intersections varies from A (free flow, little delay) to F ("jammed" conditions). Appendix B
provides a more detailed explanation of the ICU methodology, a full description of LOS and the
signalized intersection calculation sheets.
LINSCOTT, LAW & GREENSPAN, engineers 6 LLG Ref. 3-04-1395
Poinsettia Place
N. \ 1395-06'\T ext\ 1395-06.doc
-----• -• -•
• •
..
•
•
• • -• -•
• -• ----------
4.2.2 Street Segments
The key street segments in the project area were analyzed on a peak hour basis for the near term and
Year 2030 scenarios. The greatest amount of peak hour turning volumes (generally the PM peak) at
an upstream or downstream intersection comprises the volumes utilized in the analysis. A volume to
capacity ratio 01 IC) is calculated for each direction of the street segment during the peak hour. The
City of Carlsbad assumes a one-direction capacity of 1,800 vehicles per lane per hour. A LOS is
determined by using V/C thresholds.
LINSCOTT, LAW & GREENSPAN, engineers 7 LLG Ref. 3-04-1395
Poinsettia Place
N.\1395-00\T C)(t\ 1395-06.doc
• -• -•
• • -• ..
• -
• •
• • -• -• -• -
Ill -.. -..
------
-
5.0 PROJECT TRAFFIC
5.1 Project Generation
The SAND AG 'Brief Guide of Vehicular Traffic Generation Rates', April 2002, was utilized to
determine the traffic generated by the project. Project trips were calculated using the trip rate for
multi-family condominium homes (8.0 trips/dwelling unit). Table 5-1 shows the trip generation
estimates for the project.
Based on the trip generation calculations, the total project is calculated to generate 720 ADT, with
12 inbound and 46 outbound trips during the AM peak hour, and 50 inbound and 22 outbound trips
during the PM peak hour .
TABLE 5-1
PROJECT TRIP GENERATION
Daily Trip Ends AM Peak Hour PMPeakHour
Land Use Size (ADT) %of Split Volume %of Split Volume
Rate Volume ADT In:Out In Out ADT In:Out In
Multi-Family Residential 90 8.0/DU 720 8% 20:80 12 46 10% 70:30 50
Notes:
a. SANDAG Brief Guide of Vehicular Traffic Generation Rates, April 2002
b. DU -Dwelling units
5.2 Project Distribution
The generated project traffic was distributed and assigned to the street system based on the
characteristics of the roadway system, proximity of the project to I-5 and El Camino Real, and the
location of employment, retail and educational opportunities. The regional distribution is illustrated
in Figure 5-1 .
5.3 Project Assignment
Based on the location of the project site, a higher percentage (48%) of trips were assigned west of
the project site, since the majority of traffic is expected to utilize I-5. A lesser portion (30%) of the
project trips were assigned south of the project along El Camino Real and the remaining portion of
project traffic was assigned to the north, which constitutes 22% of the project traffic. The project
traffic assignment is illustrated in Figure 5-2. Figure 5-3 illustrates the existing+ project traffic
volumes.
LINSCOTI, LAW & GREENSPAN, engineers 8 LLG Ref. 3-04-1395
Poinsettia Place
N.\ 1395-0olT ext\ 1395-<)6 . .loc
Out
22
-• -• -• -•
• •
• •
• •
•
Ill
•
1111
• •
• • -
-• -------• -
LEGEND
-t> -Outbound Trips
-.. -Inbound Trips
REV. 12/7/06
LLG1395-6 FIGS-1.DWG
LINSCOTT
LAW &
GREENSPAN
engineers
CASSIA RD
Q·"<._···· .. ····1 ·::. ·: :. ·::::. ·:::::::. ·:. ·. ·. ·::.
PROJECT
SITE
Ill! N N
.)
22%...) \
25% 'l ~
~
NORTH
@
NOTTO SCALE
Figure 5-1
Regional Traffic Distribution
Polntsettla Place
•
• • -• -• -• -•
• •
• •
• • -• -
• •
.. -.. --.. -
-
--
NOTES: -ADTs ore shown midblock
-AM/PM Peak hour volumes ore
shown at the intersections
REV. 12/7/06
LLG1395-6 FIGS-2.DWG
LINSCOTT
LAW &
GREENSPAN
engineers
CASSIA RD
36
......., ----"' .... 0
36
NORTH
@
NOTTO SCALE
Figure 5-2
Project Traffic Volumes
AM/PM Peak Hours & ADT
Polntsettla Place
•
II ..
• -•
•
II
• • -
• •
• •
•
-• -.. -
-----..
---
NOTE:
AM/PM Peak hour volumes are
shown at the intersections
CASSIA RD
-.J a, -.J~ ~~
1'>.j>. .J>.<0 .J>.t,J
.) + ------·
303/111...)
125/105,
~>·<:;····· .. ·I .......................... ..........................
PROJECT
SITE
REV. 12/7/06
LLG1395-6 FIGS-3.0WG
LINSCOTT
LAW &
GREENSPAN
engineers
AV/ARA
PKWY
NORlH
0
NOTTO SCALE
Figure 5-3
Existing + Project Traffic Volumes
AM/PM Peak Hours & ADT
Polntsettla Place
-• -..
--
• -• -• -•
• -• -• -•
• • -..
---..
II -----..
6.0 SIGNIFICANCE CRITERIA
A traffic impact is considered to be significant if the addition of project traffic causes the intersection
or street segment LOS to decrease to worse than LOS D during the peak hour, as outlined in the
City's Growth Management Plan. For intersections or street segments which are currently operating.
worse than LOS D, a project impact is considered significant if the project causes the ICU value at
an intersection to increase by greater than 0.02 or the volume-to-capacity ratio at a segment to
increase by greater than 0.02.
LINSCOTT, LAW & GREENSPAN, engineers 9 LLG Ref. 3-04-1395
Poinsettia Place
N. \ 1395-06\T ext\ 1395-06.doc
-• -• 7.0 CUMULATIVE PROJECTS
-Cumulative projects are other projects in the study area that will add traffic to the local circulation
• system in the near future. Based on information at the City of Carlsbad website, nine (10)
cumulative projects were identified for inclusion in the traffic study. ---•
•
• • -•
11111
11111 ..
..
• -
... -.. ---• -----...
7.1 Description of Projects
The following is a brief description of each individual cumulative project included in this report.
1. Kelly Ranch Single-Family is a 433-acre residential development located west of College Blvd,
north of Canyon Road, and south of El Camino Real. The project consists of 147 single-family
homes on 61.9 acres. The project is expected to generate 1470 daily trips with 35 inbound and 82
outbound trips during the AM peak hour and 103 inbound and 44 outbound trips during the PM peak
hour .
2. Cantarini Ranch is a residential development consisting of 105 single-family homes and 80
multi-family homes on 156.72 total acres. The site is located east of El Camino Real, just south of
the Holly Springs property. The project is expected to generate 1530 daily trips with 33 inbound and
90 outbound trips during the AM peak hour and 104 inbound and 45 outbound trips during the PM
peak hour.
3. Carlsbad Oaks North is a 219.5-acre industrial park designed to include 23 industrial use lots
and the 3 open space lots. The project is located north of Palomar Airport Rd, bordered by the City
of Vista on the north and east. The project is expected to generate 19,755 daily trips with 1956
inbound and 217 outbound trips during the AM peak hour and 474 inbound and 1896 outbound trips
during the PM peak hour .
4. Emerald Pointe Estates proposes to develop 14 single-family homes on 18 acres located on the
north side of Cobblestone Road, between Sapphire Drive and Aviara Parkway. The project is
expected to generate 140 daily trips with 3 inbound and 8 outbound trips during the AM peak hour
and 10 inbound and 4 outbound trips during the PM peak hour .
5. Mammoth Office Building is a multiple tenant three-story 67,958 sf office building in
conjunction with a two-story parking structure. The building will be situated north Palomar Airport
Road and east of Loker Avenue East within the City of Carlsbad. The project is expected to
generate 1,240 daily trips with 157 inbound and 17 outbound trips during the AM peak hour and 32
inbound and 130 outbound trips during the PM peak hour.
6. Alge Norte Community Park is a community park spanning 33 acres and located northwest of
the intersection of the future alignment of Poinsettia Lane and Alicante Road, and east of El Camino
Real. The project is expected to generate 660 daily trips with 43 inbound and 43 outbound trips
during the AM peak hour and 30 inbound and 30 outbound trips during the PM peak hour.
LINSCOTI, LAW & GREENSPAN, engineers 10 LLG Ref. 3-04-1395
Poinsettia Place
N.\ 1395-()0\T ext\ 139.5-06.doc
-• -
-.. -• --• -
• ..
•
• -• -• -.. -
ill ---• -..
-..
..
7. La Costa Village Center Town homes is a residential development consisting of 53 unit single-
family homes on 14.4-acres located northwest of the intersection of Dove Lane and El Camino Real.
The project is expected to generate 530 daily trips with 13 inbound and 30 outbound trips during the
AM peak hour and 37 inbound and 16 outbound trips during the PM peak hour .
8. Bressi Ranch is a 585.1 acre planned community located at the southeast corner of Palomar
Airport Road and El Camino Real. The mixed-use development is designed to include 523 single-
family homes and 100 condominiums, as well as 190 acres of open space park. The project is
expected to generate 6,030 daily trips with 139 inbound and 344 outbound trips during the AM peak
hour and 421 inbound and 181 outbound trips during the PM peak hour.
9. Cassia Professional Offices proposes to construct two separate buildings on site. One building
will contain 6,340 sf of medical offices and the other will contain 5,460 sf of lease space and a cat
hospital. The site is located on the northeast corner of El Camino Real and Cassia Road. Access
will be provided via the intersection of El Camino Real and Cassia Road.
10. Carlsbad Family Housing proposes to construct a 56-unit apartment complex. The site is
located on the southeast corner of El Camino Real and Cassia Road. Access will be provided via the
intersection of El Camino Real and Cassia Road .
Appendix C contains individual traffic assignments for each cumulative project.
Figure 7-1 shows the total cumulative project traffic volumes and Figure 7-2 shows the existing+
project+ cumulative project traffic volumes.
LINSCOTI, LAW & GREENSPAN, engineers 11 LLG Ref. 3-04-1395
Poinsettia Place
N. \ 1395-06\T ext\1395-06.doc
-------• -• -.. -•
-•
• -• -• -• -
.. -• -
-.. -
NOTES:
AM/PM Peak hour volumes are
shown at the intersections
REV. 12/7 /06
LLG1395-6 FIG7-1.DWG
LINSCOTT
LAW &
GREENSPAN
engineers
CASSIA RD
gz-··<:;·······1 ·.·.·.·:.·.·:::.·.·::.·.·:::.·.·:.·.·.·.·.
PROJECT
SITE
AV/ARA PKWY
NORlH
@
NOTTO SCALE
Figure 7-1
Cumulative Projects Traffic Volumes
AM/PM Peak Hours
Polntsettla Place
• • -• -----• -•
-• ..
• -• -• -• ---
---• -.. -
-
NOTES:
REV. 12/8/06
LLG1395-6 FIG7-2.DWG
LINSCOTT
LAW &
GREENSPAN
engineers
At.1/Pt.1 Peak hour volumes are
shown at the intersections
CASSIA RD
~-.. ·<._···"""! ·.·:.·.·::.·::.·:.·::.·.·:::.·:::.·.·.
PROJECT
SITE
AV/ARA PKWY
50/141__) --...\( 7/26-,.,.a>
20/103 '", it.i-;:;.
'"':; t,) »
?l, -.l '2,--::;
a>'-"<:P ~ ~~ (1)
0?li\5 ~ 114/12 '°)' \._ -353/243 ~ p 612/372
NORTH
@
NOTTO SCALE
Figure 7-2
Existing + Project + Cumulative Projects Traffic Volumes
AM/PM Peak Hours
Polntsettla Place
--• 8.0 NEAR· TERM ANALYSIS -8.1 Existing Operations • 8.1.1 Signalized Intersections
1111 As shown in Table 8-1, all existing intersections are calculated to currently operate at a level of
• service (LOS) D or better during both the AM and PM peak hours. -• -•
• -•
• • -..
• • -•
8.1.2 Peak Hour Street Segments
Table 8-2 shows that under existing conditions, all street segments are calculated to currently
operate at LOS A during the indicated peak hour .
8.2 Existing + Project Operations
8.2.1 Signalized Intersections
As shown in Table 8-1, with the addition of project traffic, all intersections are calculated to
continue to operate at a level of service (LOS) D with a slight increase in ICU's. These increases are
not significant.
8.2.2 Peak Hour Street Segments
Table 8-2 shows that with the addition of project traffic, all street segments are calculated to
continue to operate at LOS A during the indicated peak hour, with a slight increase in v/c ratios.
These increases are not significant.
• 8.3 Existing + Project+ Cumulative Projects Operations
• 8.3.1 Signalized Intersections -
---.. -----..
As shown in Table 8-1, with the addition of cumulative projects traffic, the intersections are
calculated to continue to operate at a level of service (LOS) D with the following exception.
• El Camino Real I Palomar Airport Road (LOS F-AM & PM peak hours)
8.3.2 Peak Hour Street Segments
Table 8-2 shows that with the addition of cumulative projects traffic, all street segments are
calculated to operate at LOS B or better during the indicated peak hour.
LINSCOIT, LAW & GREENSPAN, engineers 12 LLG Ref. 3-04-1395
Poinsettia Place
N.\1395-06\T cxt\l 39:'-06.,loc
• • -• -• -• -• -• -.. .. ..
• -
-
--Ill -.. -• ------
Table 8-1
SIGNALIZED INTERSECTION OPERATIONS
Peak Intersection Hour
AM
El Camino Real I Palomar Airport Road
PM
AM
El Camino Real I Camino Vida Roble
PM
AM
El Camino Real I Cassia Road
PM
AM
El Camino Real I Poinsettia Lane
PM
AM
El Camino Real I Dove Lane
PM
AM
El Camino Real I A viara Parkway I Alga Road
PM
AM
Poinsettia Lane I Aviara Parkway
PM
Footnotes:
a. ICU -Intersection Capacity Utilization.
b. Level of Service
c. ti denotes project induced ICU increase.
LINSCOIT, LAW & GREENSPAN, engineers
Existing+ Existing Project
ICU"
0.68
0.82
0.40
0.62
0.52
0.51
0.35
0.57
0.34
0.54
0.63
0.77
0.43
0.55
13
LOSb ICU LOS
B 0.68 B
D 0.82 D
A 0.40 A
B 0.63 B
A 0.53 A
A 0.52 A
A 0.35 A
A 0.58 A
A 0.34 A
A 0.54 A
B 0.63 B
C 0.77 C
A 0.43 A
A 0.56 A
ICU
DELAY/LOS THRESHOLDS
DELAY LOS
0.0 _::; 0.60 A
0.61 to 0.70 B
0.71 to 0.80 C
0.81 to 0.90 D
0.91 to 1.00 E
> 1.01 F
Ac
0.00
0.00
0.00
O.Ql
O.Ql
O.Ql
0.00
0.01
0.00
0.00
0.00
0.00
0.00
0.01
Existing+ Project
+ Cumulative
Projects
ICU LOS
1.15 F
1.15 F
0.53 A
0.74 C
0.65 B
0.60 A
0.45 A
0.70 B
0.43 A
0.64 B
0.70 B
0.86 D
0.45 A
0.59 A
LLG Ref. 3-04-1395
Poinsettia Place
N. \ 139.5-1)6\T ext\ 1395-c)6.doc
I I I 1 f I I I I I I I I I I I I I I I I I I I
TABLE8·2
PEAK HOUR SEGMENT OPERATIONS
# of Lanes I Direction/ Existing Street Segment Direction Peak Hour
Vol• V/Cb Los•
Palomar Airport Road
Camino Vida Roble to El Camino Real 3 WB/AM 1,516 0.28 A
El Camino Real to El Fuerte Street 3 EB/PM 2,518 0.47 A
El Camino Real
Faraday Avenue to Palomar Airport Road 3 SB/PM 1,851 0.34 A
Palomar Airport Road to Camino Vida Roble 3 SB/PM 1,374 0.25 A
Camino Vida Roble to Aviara Parkway-Alga Road 3 SB/PM 1,960 0.36 A
Camino Vida Roble
Las Palmas Drive to El Camino Real 1 EB/PM 676 0.38 A
Aviara Parkway
Mimosa Drive to El Camino Real 2 EB/PM 907 0.25 A
Alga Road
El Camino Real to Alicante Street 3 EB/PM 1,243 0.23 A
Footnotes:
a. Peak hour Road link volume.
b. Volume to Capacity ratio. Capacity based on 1800 vehicles per lane per hour.
c. Level of Service.
d. !!,. denotes project induced ICU increase.
LINSCOTI, LAW & GREENSPAN, engineers
14
I I I I I I
Existing + Project
Vol V/C LOS
1,521 0.28 A
2,519 0.47 A
1,854 0.34 A
1,384 0.26 A
1,966 0.36 A
677 0.38 A
908 0.25 A
1,244 0.23 A
I I I I I I
VIC
Ad
0.00
0.00
0.00
0.01
0.00
0.00
0.00
0.00
Existing+ Project+
Cumulative Projects
Vol V/C LOS
1,887 0.35 A
2,976 0.55 A
3,527 0.65 B
1,890 0.35 A
2,459 0.46 A
699 0.39 A
923 0.26 A
1,269 0.24 A
~
LLG Ref. 3-04-1395 '
Poinsettia Place
N:\!395-06\Textil395-06.doc
I I
..
•
• -• -•
• -• ----
9.0 YEAR 2030 ANALYSIS
9.1 Year 2030 Traffic Volumes
Year 2030 traffic volumes (ADTs) were obtained from the "City of Carlsbad Traffic Impact Fee
(TIF)" document for the majority of the study area intersections except for the El Camino
Real/Cassia Road intersection, where the City did not have Year 2030 projections .
For these intersections where Year 2030 peak hour data was not available from the City, the peak
hour turning movement volumes were estimated using a template in EXCEL developed by LLG to
calculate 2030 peak hour traffic at an intersection using 2030ADTs and the relationship between
existing peak hour turn movements and the existing ADTs. The future extension of Poinsettia Lane
was taken into account. Figure 9-1 depicts the Year 2030 traffic volumes. Appendix D contains the
Year 2030 traffic data.
As shown on Table 9-1, all intersections are calculated to operate at Dor better during both the AM
and PM peak hours.
Table 9-2, shows that all street segments are calculated to operate at LOS D or better during the
-identified hour. -
--..
• • -• -..
-
-..
----
...
LINSCOTI, LAW & GREENSPAN, engineers 15 LLG Ref. 3-04-1395
Poinsettia Place
N. \ 1395-00Yf ext\1395-1)6.doc
-----• ---• -• -• -• -• ..
•
• -• ---• -------.. -•
Table 9-1
Year 2030 Signalized Intersection Operations
Intersection
El Camino Real I Palomar Airport Road
El Camino Real I Camino Vida Roble
El Camino Real I Cassia Road
El Camino Real I Poinsettia Lane
El Camino Real I Dove Lane
El Camino Real I Aviara Parkway I Alga Road
Poinsettia Lane I A viara Parkway
SOURCE: City of Carlsbad TIF document.
Footnotes:
a. ICU -Intersection Capacity Utilization.
b. Level of Service.
LINSCOIT, LAW & GREENSPAN, engineers 16
Peak Year2030
Hour 1cua
AM 0.720
PM 0.868
AM 0.637
PM 0.758
AM 0.79
PM 0.75
AM 0.704
PM 0.754
AM 0.73
PM 0.86
AM 0.806
PM 0.876
AM 0.558
PM 0.721
ICU
DELAY/LOS THRESHOLDS
DELAY LOS
0.0 ~ 0.60 A
0.61 to 0.70 B
0.71 to 0.80 C
0.81 to 0.90 D
0.91 to 1.00 E
> 1.01 F
LOSb
C
D
B
C
C
C
C
C
C
D
D
D
A
C
LLG Ref. 3-04-1395
Poinsettia Place
N. \1395-06\T ext\ l 395-t)6.doc
-----• -
-.. --•
•
1111
-•
----• -.. -.. -..
----
-
TABLE9·2
YEAR 2030 PEAK HOUR SEGMENT OPERATIONS
# of Lanes/ Direction I Street Segment Direction Peak Hour
Palomar Airport Road
Camino Vida Roble to El Camino Real 3 EB/AM
El Camino Real to El Fuerte Street 3 EB/PM
El Camino Real
Faraday A venue to Palomar Airport Road 3 SB/PM
Palomar Airport Road to Camino Vida Roble 3 SB/PM
Camino Vida Roble to Aviara Parkway-Alga Road 2 NB/AM
Camino Vida Roble
Las Palmas Drive to El Camino Real 1 EB/PM
A viara Parkway
Mimosa Drive to El Camino Real 2 EB/PM
Alga Road
El Camino Real to Alicante Street 3 EB/PM
Footnotes:
a. Peak hour Road link volume.
b. Volume to Capacity ratio. Capacity based on 1800 vehicles per Jane per hour.
c. Level of Service.
LINSCOIT, LAW & GREENSPAN, engineers
17
Vol•
2,358
3,641
2,479
2,470
2,974
1,069
1,063
1,705
Year2030
V/Cb
0.44
0.67
0.46
0.46
0.83
0.59
0.30
0.32
Los•
A
B
A
A
D
A
A
A
LLG Ref. 3-04-1395
Poinsettia Place
N. \1395-00'\'[ exr\139.'.'-t)6.doc
-.. --iii -1111 -• -•
• -•
1111
•
-•
• • -• -• -----
--
NOTES:
AM/PM Peak hour volumes are
shown at the intersections
SOURCE: City of Carlsbad
REV. 12/8/06
LLG1395-8 FIG9-1.DWG
LINSCOTT
LAW &
GREENSPAN
engineers
CASSIA RD
AVIAAA PKWY
. .................. .
~60/90:
60/70;
("50/100:
14-70-/-21-0 ...)--1-, f ,-:
. ... ; 50/50-_.., u, :
... ••· ;220/19011 ::ig:~ : : ~a • N-0 • 0"' • 0 ............... ~ ....
NORTH
0
NOTTO SCALE
Figure 9-1
Year 2030 Traffic Volumes
AM/PM Peak Hours
Polntsettla Place
•
•
•
• -• -• -•
• -• -• -• -• -• ---..
----------
10.0 CIRCULATION AND PROJECT ACCESS
10.1 Project Access
A review of the site plan (Figure 2-1) shows that the project proposes to provide two full access
driveways to Cassia Road. The construction of the eastern driveway will be opposite Kalmia Circle
( east), which services the Poinsettia Heights residential development, located along the northern side
of Cassia Road. The second proposed driveway would be located approximately 340 feet west of the
eastern driveway.
As part of the site access review, a separate level of service analysis was conducted for the two
unsignalized project driveways. To account for existing traffic, LLG conducted AM and PM peak
hour counts in December 2006, to capture traffic from the Poinsettia Heights development in
addition to traffic utilizing Cassis Road. Table 10-1 shows the results of the project driveway
analysis. As Shown on Table 10-1, both driveways are calculated to operate at acceptable LOS C
operations with the addition of project traffic. Appendix E contains the project driveway analysis
sheets.
TABLE 10-1
CASSIA ROAD PROJECT DRIVEWAY ANALYSIS
Control Peak · Existing Existing+ Project Intersection Type A•
~
Hour DELAY"
AM 11.8
Cassia Road Western Driveway TWSCd
PM 13.3
TWSCd AM 15.1 Cassia Road Eastern Driveway
PM 13.6
Footnotes:
a. Average Delay expressed in seconds per vehicle.
b. Level of Service.
c. Increase in delay due to project.
d. Two-Way Stop Controlled intersection. Minor Street delay is
reported.
LINSCOTI, LAW & GREENSPAN, engineers 18
LOSb DELAY
B 16.5
B 15.9
C 17.7
B 15.3
UNSIGNALIZED
DELAY /LOS THRESHOLDS
Delay LOS
0.0 < 10.0 A
10.1 to 15.0 B
15.1 to 25.0 C
25.1 to 35.0 D
35.1 to 50.0 E
> 50.1 F
LOS
C
C
C
C
4.7
2.6
2.6
1.7
LLG Ref. 3-04-1395
Poinsettia Place
N. \1395-06\T ext\ 13Q5-06.doc
-• ---
•
•
• -• -• -• -•
• -• -.. ---• -----...
---...
10.2 El Camino Real I Cassia Road Queue Analysis
A queue analysis was conducted for the intersection of El Camino Real and Cassia Road during the
AM peak hour focusing on the eastbound left turn movement. LLG conducted a two-hour queue
count during a typical weekday at the intersection during the AM (7-9AM) peak hour. The resultant
queue inventory identified that for approximately one-half hour (7:30AM to 8:00AM), queue lengths
were over 20 vehicles for several signal cycles. However, it should be noted that the average queue
length was 9 vehicles between 7:00-8:00 AM and 9 vehicles between 7:30-8:30 AM and 6 between
7:00-9:00 AM. Appendix F, contains the queue analysis sheets .
To remedy the existing issue, the City could consider increasing the amount of green time that
Cassia Road traffic receives as opposed to El Camino Real traffic. However, this would have the
negative effect of increasing queues on El Camino Real, which is a major arterial where traffic
progression must be assured. It would also be possible to re-stripe the eastbound approach to
provide a left-tum lane and a shared left/thru/right turn lane thereby allowing two eastbound lanes to
turn left. This would necessitate changing the east-west phasing to split phasing, which can be
slightly less efficient than permissive or protected phases.
Once Poinsettia Lane is extended to connect between Cassia Road and El Camino Real, traffic will
have a second option to turn left onto El Camino Real.
The Highway Capacity Software (HCM) analysis indicated that the addition of project traffic will
increase the average queue by less than 1 vehicle during the AM peak hour .
10.3 Vehicular Accident Data
An accident assessment was conducted for both the Cassia Road segment between Poinsettia Lane
and El Camino Real and the El Camino Real/Cassia Road intersection. Accident data was obtained
for the Years between 2003-2006 from the City of Carlsbad Police Department.
Cassia Road segment:
A review of the accident data for Cassia Road revealed that during the three-year period, Cassia
Road had a total of six traffic-related accidents. Appendix F contains the traffic accident data
obtained from the Police Department. LLG utilized the Accident Rate formula fo~d in the "2004
Collision Data on California State Highways" publication to determine the accident rate for the
identified segment. Table 10-2 summarizes the findings over the three-year period.
~ Segment Accident Rate
LINSCOTI, LAW & GREENSPAN, engineers
=(# of AccidentsN ear)*(l ,000,000)
Vehicle Miles of Travel
19 LLG Ref. 3-04-1395
Poinsettia Place
N. \1395-06\Text\ 1395-06.doc
• -----•
• ..
• -•
• •
• -• -• -• ---• -.. -
------
TABLE 10-2
SEGMENT ACCIDENT ASSESSMENT {YEARS 2003-2006)
Segment #of Accident Expected Rate Accidents• Rateb
Cassia Road: Poinsettia Lane to El Camino Real 4 1.22 1.90
Notes:
a. Obtained from City of Carlsbad Police Department.
b. Calculated using the aforementioned formula .
c. Expected Rate is the statewide rate when compared to similar roadways (flat two-lane). Obtained from Caltrans
"2004 Collision Data on California State Highways".
Based on the Accident Rate formula, an accident rate of 1.22 per million vehicle miles of travel was
calculated for the Cassia Road segment. Based on the national average for a two-lane flat
conventional roadway (See Appendix E), Table 10-2 shows that the Cassia Road accident rate is
lower than the expected rate when compared to similar roadways.
In addition to the Cassia Road segment accident assessment, an additional assessment was
completed for the intersection of El Camino Real and Cassia Road.
>-Intersection Accident Rate = (# of AccidentsNear)*(l,000,000)
(365)(entering daily volume)
TABLE 10-3
INTERSECTION ACCIDENT AsSESSMENT (YEARS 2003-2006)
Intersection #of Accident Expected Rate Accidents• Rateb
El Camino Real I Cassia Road 4 0.14 0.43
Based on the Accident Rate formula for intersections, an accident rate of 0.14 per million vehicle
miles of travel was calculated for the El Camino Real/Cassia Road intersection. Based on the
national average for a signalized intersection (See Appendix E), Table 10-3 shows that the accident
rate for the intersection of El Camino Real and Cassia Road was lower than what would be expected
when compared to similar intersections.
LINSCOTT, LAW & GREENSPAN, engineers 20 LLG Ref. 3-04-1395
Poinsettia Place
-----
-•
1111111
1111111 -..
• -• -• -----
-
-----..
----
11.0 CONCLUSIONS
Based on the established significance criteria, no significant traffic capacity related impacts are
calculated. The delay and v/c ratio increases are nominal. Therefore, no mitigation measures are
necessary .
The accident assessment showed that the accident rate on Cassia Road is less than would be
expected on similar roads. The analysis off the two project driveways on Cassia Road showed
acceptable LOS C operations. The queue analysis at the El Camino Real/Cassia Road intersection
shows very long eastbound queues during the 7:30-8:30 AM time frame but more typical queue
during the remainder of the AM peak period.
L!NSCOIT, LAW & GREENSPAN, engineers 21 LLG Ref. 3-04-1395
Poinsettia Place
N. \1395-0~"\T ext\ 1395-06.doc
I
C
E
~
m
I
C
C
C
' ~
I
C
I
I
I
I
I
I
---..
---
• -•
II
• --.. -• -•
-
---
-----..
LINSCOn, LAW & GREENSPAN, engineers
APPENDIX A
MANUAL INTERSECTION AND STREET SEGMENT COUNT SHEETS
LLG Ref. 3-04-1395
Poinsettia Place
-•
: (~ GROWTH MANAGEMENT PLAN
.. .. -
• •
• ..
-• -----.. -..
-----0
--
2006 Traffic Monitoring Program
REVISED
Prepared for:
City of Carlsbad
1635 Faraday Avenue
Carlsbad, CA 92008
(760) 602-2720
TM
Prepared by:
RICK
ENGINEERING COMPANY-
Transportation Division
November 8, 2006
-
C
I
I
I
I
I
m
I
I
I
I
t
;
CITY OF CARLSBAD
TRAFFIC MONITO,RING PROGRAM
SUMMER2006
INTERSECTION ANALYSIS SUMMARY
Intersection Number: 9
Intersection Location: El Camino Real &
Palomar Airport Road
Contents: Turn Movement Count Summary
(A.M. and P.M.)
Page 1
A.M. Peak Hour ICU Analysis and Page 2
Turn Movement Diagram
P.M. Peak Hour ICU Analysis and Page 3
Turn Movement Diagram
'IM RICK
ENGINEERING COMPANY
Transportation Division
I 1 I I I I I I I I I 1 I I I I I I S I S I I I I I I I I I I I I I II I
( :
~/ u \ \_)
RICK ENGINEERING TURNING MOVEMENT ANALYSIS
City : Carlsbad
Intersection of: N/S Street : El Camino Real
Count Date:
07113/06
Endofl5
min. prd.
6:15 AM
6:30AM
6:45AM
7:00AM
7:15 AM
7:30AM * 7:45 AM *
8:00AM * 8:15 AM * 8:30AM
8:45AM
9:00AM
Max. 15 min.
Pk. Hr. Vol.
7:15 AM Peak
8:15 AM Hour
3:45 PM
4:00PM
4:15 PM
4:30PM
4:45PM
5:00PM *
5:15 PM * 5:30PM * 5:45 PM *
6:00PM
6:15 PM
6:30 PM
Max. 15 min.
Pk. Hr. Vol.
4:45 PM Peak
5:45 PM Hour
E/W Street : Palomar Airport Road
Day : Thursday
Weather : Sunny
South Approach (NB)
Left U-Tm Thru Right Peds
5
ll
11
18
10
13
25
45
17
15
22
20
45
100
35
30
50
28
22
24
24
28
18
38
38
24
50
94
0 30 31 l
0 47 · 24 0
0 50 58 0
0 87 59 0
0 66 72 0
0 137 83 0
0 116 91 0
1 146 115 1
1 160 101 0
0 107 84 l
0 155 105 0
0 126 82 0
l 160 115 1
2 559 390 l
Intersection Traffic in Pk. Hr.
Intersection Pdstms in Pk. Hr.
0 174 126 0
I 162 107 0
0 133 93. 0
0 164 126 1
2 177 100 0
0 180 95 0
l 200 126 0
0 174 134 0
0 162 96 1
0 121 83 0
0 139 75 0
0 149 66 l
2 200 134 l
l 716 451 l
-Intersection Traffic in Pk. Hr.
Intersection Pdstms in Pis_. Hr.
Page 1 of3
File : 2006 Int #09
Data Collected by: Albert, Jasen, Joe, Raul
Traffic Control : Signalized
North Aaaroach (SB) \VestAaaroach(EB)
Left U-Tm Thru Right Peds Left U-Tm Thru Right Peds
49
81
91
112
85
93
102
116
128
108
121
107
128
439
168
184
191
163
189
198
207
212
198
230
177
145
230
815
l
0
0
0
0
l
0
0
l
l
0
0
1
2
6000
9
0
0
0
0
0
0
1
.1
0
0
l
0
l
2
6740
6
83
95
136
181
135
152
167
163
195
145
168
168
195
677
140
147
143
146
178
197
254
243
199
176
116
113
254
893
21 l 23
42 0 23
31 0 12
.69 0 _ 13
70 l 20
63 0 20.
62 l 21
52 . 0 21
86 0 14
50 l 16 ·
48 0 26
56 0 17
86 1 26
263 l 76
Peak Hr. Factor
42 l 57
46 1 48
26 0 68
39 0 .90
25 0 64
37 0 68
31 0 72
38 0 47
35 0 45
21 0 61
31 0 36
26 1 35
46 1 90
141 0 232
Peak Hr. Factor .
0 80 9 0
0 89 15 l
0 113 13 2
l · 119 18 0
0 109 · 14 0
2 -124 8 1
0 149 12 0
1 ll9 . 26 1
0 125 17 3
0 128 26 0
l 133 14 0
0 118 27 0
2 149 27. 3
3 517 63 5
0.95
l 233 23 2
0 222 30 1
0 303 25 0
1 256 26 1
0 275 25 1
2 310 · 32 0
0 301 27 2
2 346 32 2
1 293 24 1
l 281 24 l
.0 286 26 l
l 241 27 2
2 346 32 2
5 1250 ll5 5
0.94
East A[![!roach (\VB} 15 min Total
Left U-Tm Thru Ri!!:ht Peds Vehicles Peds
72 0 240 123 0 767 2
83 0 222 137 0· 869 l
112 0 242 158 0 1027 2
141 0 279 · 218 l 1315 l
156 0 313 . 219 l 1269 2
153 0 238 276 0 1363 1
123 0 300 303 l 1471 2
153 0 313 312 0 1583 2
144 0 300 294 l 1583 4
131 0 273 228 0 1312 2
115 0 257 238 0 1403 0
114 0 261 195 6 1291 0
156 0 313 312 1 1583 4
573 0 1151 1185 2 6000 9
110 0 218 152 l 1479 4
83 0 169 . 135 0 1364 2
98 0 188 172 0 1490 0
84 0 209 150 0 1482 2
91 0 206 159 0 1513 l
76 0 196 211 0 · 1626 0
126 0 230 189 0 1789 2
153 0 167 188 0 1765 2
106 0 218 165 0 1560 2
82 0 235 146 0 1499 l
89 0 201 100 0 1315 l
79 0 176 114 0 1196 4
153 0 235 211 1 1789 4
461 0 811 753 0 6740 6
I I
..
• -• ) -• -• -• -• -• -• -•
El Camino Real at Palomar Airport Road
Lane Configuration for Intersection Capacity Utilization Page 2 of3
Pk. Hr. Time Period : South Aeer (NB2
7:15 AM to
8:15 AM Left Thru Right
Lane Inside 1 1
Config-. (left) 2 1
urations 3 1
4 1
5
6
Outside 7
Free-flow
Lane Settings 1 3
Capacity 1800 6000
Are the North/South phases split (YIN)?
Are the East/West phases split (YIN)?
Efficiency Lost Factor 0.10
Hourly Volume 102 .559
Adjusted Hourly Volume 102 559
Utilization Factor 0.06 0.09
Critical Factors
ICU Ratio.= 0.68
1
1
2
3600
N
N
39_0
.390
0.11
0.11
LOS=
North Aoor (SB)
Left Thru Right
1
1
1
1
1
1
2 3 1
3600 6000 1800
441 677 263
441 677 263
0.12 0.11 0.15
0.12
B
West Aeer (EB2 East Aeer (WB}
Left Thru Right Left Thru Right
1 1
1 1
l 1
1 1
1 1 1
1
1
2 3 0 2 3 2
3600 6000 0 3600 6000 3600
79 517 63 573 . 1151 1185
79 580 0 573 1151 1185
0.02 0.10 0.00 0.16 0.19 0.33
0.02 0.33
-• /) Turning Movements at Intersection of: El Camino Real and Palomar Airport Road -Time: 7:15 AM • to 8:15 AM North Approach
Date : 07 /13/06 -Day : Thursday
• Name: Albert, Jasen, Joe, Raul 1381 -• w
Sub-263 677
Totals totals J t
e -s
• -A
1517 ~ 2176 3 79
659 517 __... t 63 t North -p
p -~ t
102 559 -2
Subtotals 1315 1051 -Total 2366 --) South Approach ~----
3203
2
441
~
r
390
El Camino Real
1822
L 1185 +-1151
r 573
Total
Subtotals
Sub-
totals Totals ---
2909
0 4255
1346
Palomar Airport Road
Note : Left-tum volumes include
U-tums. U-tums in bold.
E
a
s
t
A
p
p
r
-• -----)
_ __,, -• -•
• •
•
Iii
• • -• -• -
El Camino Real at Palomar Airport Road
Lane Configuration for Intersection Capacity Utilization Page 3 of3
Pk. Hr. Time Period : South Aeer (NB}
4:45 PM to
5:45 PM Left Thru ..BJ.gh!_
Lane Inside 1 1
Config -(left) 2 1
urations 3 1
4 1
5
6
Outside 7
Free-flow
Lane Settings I 3
Capacity 1800 6000
Are the North/South phases split (YIN)?
Are the East/West phases split (YIN)?
Efficiency Lost Factor 0.10
Hourly Volume 95 716
Adjusted Hourly Volume 95 716
Utilization Factor 0.05 0.12
Critical Factors 0.12
ICU Ratio = 0.81
1
1
2
3600
N
N-
451
0
0.00
LOS=
North Annr (SB)
Left Thru Right
1
1
1
1
1
1
2 3 I
3600 6000 1800
817 893 141
817 893 141
0.23 0.15 0.08
0.23
D
West Aeer {EB} East Aeer {WB}
Left" Thru Right Left Thru Right
1 1
1 1
1 1
1 1
1 1 1
1
1
2 3 0 2 3 2
3600 6000 0 3600 6000 -3600
237 1250 115 461 811 753
237 1365 0 461 811 753
0.07 0.23 0.00 0.13 0.14 0.21
0.23 0.13
-) Turning Movements at Intersection of: . -_ _,,. -
El Camino Real and Palomar Airport Road
-Time : 4:45 PM .. to 5:45 PM North Approach
Date : 07 /13/06 -Day : Thursday -·Name: Albert, Jasen, Joe, Raul 1851
--w
Sub-141 893
Totals totals J t ·---
e -s
t --A
1051 _t 2653 5 237
1602 1250~ t 115 • North
p -p
r ' t -95 716 .. 1
Subtotals 1470 1262 -Total 2732 .. -J South Approach ---
3554
2
817
~
·r
451
El Camino Real
1703
L 753 +-811
r 461
Total
Subtotals
Sub-
totals Totals
2025
0 4541
2516
Palomar Airport Road
Note : Left-tum volumes include
U-tums. U-tums in bold.
E
a
s
A
p
p
-•
I
" I
I '
• •
-
CITY OF CARLSBAD
TRAFFIC MONITO,RING PROGRAM
SUMMER2006
INTERSECTION ANALYSIS SUMMARY
Intersection Number: 11
Intersection Location: EI Camino Real &
Camino Vida Roble
Contents: Turn Movement Count Summary
(A.M. and P.M.)
Page 1
A.M. Peak Hour ICU Analysis and Page 2
Turn Movement Diagram
P.M. Peak Hour ICU Analysis and Page 3
Turn Movement Diagram
lM RICK
ENGINEERING COMPANY
Transportation Division
I I I 1 I I I I I I I I I I I I I I I I I I • I ·1 I It I a I
( ) . i ; "--../ RICK ENGINEERING TURNINt:MOVEMENT ANALYSIS
City : Carlsbad ·
Intersection of: N/S Street : El Camino Real .
Count Date:
07/13/06
End of 15
E/W Street : Camino Vida Roble
Day : Thursday
Weather: Sunny
South Aooroach (NB)
File : 2006 Int# 11
Data Collected by : Sarah, Scott
Traffic Control : Signalized
North Anoroach (SB) \VestAooroach(EB) East Aeeroach (WB)
I I I I I I I I
"-)
Pagel of3
· 15 min Total
min. prd. Left U-Trn Thru Right Peds Left U-Trn Thru Right Peds Left U-Trn Thru Right Peds Left U~Trn Thru Rii:iht Peds Vehicles Peds
6:15 AM
6:30AM
6:45AM
7:00AM
7:15AM
7_:30AM
7:45AM
8:00AM * 8:15 AM * 8:30AM * 8:45AM * 9:00AM
Max. 15 min.
Pk. Hr. Vol.
7:45 AM Peak
8:45 AM Hour
3:45 PM
4:00PM
4:15 PM
4:30PM
4:45 PM
5:00 PM * 5:15 PM *
5:30 PM * 5:45 PM * 6:00PM
6:15 PM
6:30 PM
Max .. 15 min.
Pk. Hr, Vol.
4:45 PM Peak
5:45 PM Hour
17
11
28
36
34
57
57
104
87
63
73
68
104
327
29
28
24
22
25
31
26
28
29
17
18
19
31
114
0 65 0 0
0 78 1 0
0 130 8 0
0 166 0 0
0 154 .o 0
0 267 0 0
0 209 0 0
0 311 2 0
0 250 2 0
l 233 0 0
0 250 0 0
0 216 0 0
1 311, 8 o.
I 1044 4 0
Intersection Traffic in Pk. Hr.
Intersection Pdstrns in Pk. Hr.
0 238 r 0
0 238 1 0
i 214 0 0
0 217 0 0
0 215 1 0
0 237 0 0
I 233 0 0
I 218 l 0
0 229 0 0
1 193 0 0
0 216 0 0
0 201 0 0
1 238 1 0
2 917 1 0,
Intersection Traffic in Pk. Hr.
Intersection Pdstrns in Pk. Hr.
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
2414
1
0
0
0
0
0
0
0
0
0
0
0
0
0 o.
3084
Note: Southbound approach open to construction traffic only
94 18 0
113 32 0
182 23 0
190 44 0
204 31 2
178 38 l
i73 33 0
213 44 1
181 45 0
200 33 0
180 20 0
173 · 31 0
213 45 2
774 142 1
Peak Hr. Factor
203 8 0
242 17 1
262 6 2
242 21 3
255 8 0
293 13 0
288 21 1
398 6 0
349 6 0
325 5 1 .
208 7 1
224 14 0
398 21 .3
1328 46 I
Peak Hr: Factor
4 0 0 4 1 0 0 Q 0 0 202 l
2· 0 0 9 0 0 0 0 0 0 246 0
4 0 0 9 0 0 0 0 0 0 384 0
8 0 0 15 0 0 0 0 0 0 459 0
3 0 0 14 0 0 0 0 0 0 440 2
6 l 0 16 0 0 0 0 0 0 563 1
10 0 0 7 0 0 0 0 0 0 489 0
11 0 0 15 0 0 0 0 0 0 700 1
19 0 0 14 0 0 0 0 0 0 598 0
8 0 0 20 0 0 0 0 0 0 558 0
17 0 0 18 0 0 0 0 0 0 558 0
20 0 0 11 0 0 0 0 0 0 519 0
20 1 0 20 1 0 0 0 0 0 700 2
55 0 0 67 0 0 0 0 0 0 2414 1
0.86
35 0 0 54 0 0 0 0 0 0 568 0
49 0 0 67 0 0 0 0 0 0 642 1
35 0 0 64 0 0 0 0 0 0 606 2
42 0 0 86 0 0 0 0 0 0 630 3
36 0 0 73 1 0 0 0 0 0 613 1
45 0 0 114 0 0 0 0 0 0 733 0
56 0 0 138 0 0 0 0 0 0 763 1
67 0 0 119 0 0 0 0 0 0 838 0
32 0 0 105 0 0 0 0 0 0 750. 0
28 0 0 91 0 0 0 0 0 0 660 l
22 0 0 87 0 0 0 0 0 0 558 1
14 0 0 54 0 0 0 0 0 0 526 0
67 0 0 138 I 0 0 0 0 0 838 3
200 .· 0 0 476 0 .o 0 0 0 o. 3084 I
. 0.92
-••
• • ) -•
• •
• • -.. -• -Ill -•
El Camino Real at ·Camino Vida Roble
Lane Configuration for Intersection Capacity Utilization
Pk. Hr. Time Period : South Aeer (NB}
7:45 AM to
8:45 AM Left Thru Right
Lane Inside 1 1
. Config -(left) 2 1
urations 3 I
4 1
5
6
Outside 7
Free-flow
Lane S~ttings 2 2
Capacity 3600 4000
Are the North/South phases split (YIN)?
Are the East/Westphases split (YIN)?
Efficiency Lost Factor 0.10
Hourly Volume 328 1044
Adjusted Hourly Volume. 328 1048
Utilization Factor 0.09 0.26
Critical Factors 0.26
ICU Ratio = 0.40
0
0
N
N
4
4
0.00
LOS=
North Aoor (SB) West Aeer (EB}
Left Thru Right Left Thru Right
1
1
1 1
I
I 1
0 3 0 2 0 1
0 6000 0 3600 0 1800
0 774 142 55 0 67
0 916 0 55 0 67
0.00 0.15 0.00 0.02 0.00 0.04
0.00 0.04
A
Page 2 of3
East Aeer (WB}
Left Thru Right
0 0 0
0 0 0
0 0 o.
0 0 0
0.00 0.00 0.00
0.00
-• ·_) Turning Movements at Intersec~ion of: El Camino Real and Camino Vida Roble
-Time: 7:45 AM • to 8:45 AM North Approach El Camino Real
Date: 07/13/06 -Day : Thursday 2015 Total.
• Name: Sarah, Scott 916 1099 Subtotals
0 --w
Sub-142 774 0 Sub -
Totals. totals J t ~ totals Totals
e -s --A
469 _j L 591 0 55 t 0
122 0 ~ +-0 0
67 -. r 0 0 4
North
• p
p
r
4
' t r -328 1044 4 Camino Vida Roble • 1
Subtotals 842 1376 -Total 2218
• -~) South Approach Note: Left-turn volumes include
U-tums. U-tums in bold. -Note: Southbound approach open to construction traffic only --
E
a
s
A
p
p
.. ..
• • . --~) -• -• ...
ill ---• -• -•
El Camino Real at Camino Vida Roble
Lane Configuration for Intersection Capacity Utilization
Pk. Hr. Time Period : South Aeer (NB)
4;45 PM to
5:45 PM ~ Thru Right
Lane Inside 1 1
Config-· (left) 2 1
urations 3 1
4 1
5
6
Outside 7
Free-flow
Lane Settings 2 2
Capacity 3600 4000
Are the North/South phases split(Y/N)?
Are the East/West phases split (YIN)?
Efficiency Lost Factor O .I 0
HourlyVolume 116 917
Adjusted Hourly Volume 116 918
Utilization Factor 0.03 0.23
Critical Factors 0.03
ICU Ratio = 0.62
0
0
N
N
1
0
0.00
LOS=
North Annr (SB) West Aeer (EB)
Left Thru Right Left Thru Right
1
1 -
1 1
1
1 1
0 3 0 2 0 1
0 6000 0 3600 0 1800
0 1328 . 46 · 200· 0 476
0 1374 0 200 0 476
0.00 Q.23 0.00 0.06 0.00 0.26
0.23 0.26
B
Page 3 of3
East Aeer (WB)
Left Thru Right
0 0 0
0 0 0
0 0 0
0 0 0
0.00 0.00 0.00
0.00
-• .J Turning Movements at Inters~ction of: El Camino Real and Camino Vida Roble
-.. -..
--w
e -s --A
p .. p ---.. --) ----
Time : 4:45 PM
to 5:45 PM
Date : 07 /13/06
Day : Thursday
Name: Sarah, Scott
Sub -
Totals totals
160
836
676
0
Subtotals
Total
200
0
476
North Approach
2491
1374
0
46 1328 0
I ~ ~ +J
_J
~ t -. North
~ t r
116 917
2
1806 1034
2840
South Approach
Note: Southbound approach open to construction traffic only
El Camino Real
Total
1117 Subtotals
Sub-
totals Totals
L 0
~ 0 0
+ 0 0
Camino Vida Roble
Note: Left-turn volumes include
U-turns. U-turns in bold.
E
a
s
A
p
p
1111111
Ill
" •••
I
CITY OF CARLSBAD
TRAFFIC MONITORING P·ROGRAM·
SUMMER2006
INTERSECTION ANALYSIS SUMMARY
Intersection Number: 12
Intersection Location: El Camino Real &
Cassia Road
Contents: Turn Movement Count Summary
(A.M. and P.M.)
Page 1
A.M. Peak Hour ICU Analysis and P::,ige 2
Turn Movement Diagram ·
P.M. Peak Hour ICU Analysis and Page 3
Turn Movement Diagram
RICK
ENGINEERING COMPANY
Transportation Division
f 1 I I I I I J I I I I f J. I I I I. I I I_I I' ·1 I I I I I I I I I I I I I I
( )
'....__/ u <_)
RICK ENGINEERING TURNING MOVEMENT ANALYSIS
City : Carlsbad
.Intersection of: N/S Street : El Camino Real
E/W Street : Cassia Road
Count Date:
07/13/06
End of 15
Day : Thursday
Weather: Sunny
South Aooroach (NB)
File: 2006Int#l2
Data Collected by : Art, Carlos
Traffic Control : Signalized
North Aooroach (SB) West Approach (EB)
min. prd. Left U-Trn Thru Right Peds Left U-Trn Thru Right Peds Left U-Trn Thru Right. Peds
6:15 AM
6:30AM
6:45AM
7:00AM
7:15 AM
7:30AM
7:45AM
8:00AM *
8:15 AM * 8:30AM * 8:45AM * 9:00AM
Max. 15 min.
Pk. Hr. Vol.
7:45AM Peak
8:45 AM Hour
3:45 PM
4:00 PM
4:15 PM
4:30PM
4:45 PM
5:00PM
5:15 PM * 5:30PM * 5:45 PM * 6:00 PM * 6:15.PM
6:30 PM
Max. 15 min.
Pk. Hr. Vol.
5:00 PM ·Peak
6:00 PM Hour
5
5
6
8
18
13
17
14
l3
25
11
11
25
63
9.
27
39
19
30
34
21
23
29
37
18
41
41
110
I 60 0 0
I 63 0 0
0 90 0 0
0 142 0 0
0 140 0 0
0 191 0 0
0 222 O· 0
0 268 0 0
0 292 0 0
0 250 0 0
0 236 0 0
0 256 0 0
I 292 0 0
0 1046 0 0
Intersection Traffic in Pk. Hr.
.Intersection Pdstms in Pk. Hr.
0 132 0 0
3 236 0 0
0 210 0 0
0 191 0. 0
0 199 0 0
0 205 0 0
I 214 0 0
2 218 0 0
0 203 0 0
0 228 0 0
0 183 0 0
0 193 0 0
3 236 , 0 0
3 863 0 0
Intersection Traffic in Pk. Hr.
Intersection Pdstms in Pk. Hr.
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0 .
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
2
I
0
0
0
I
2
2
0
2.
5
2378
0
I
0
I
0
0
0
I
0
0
0
·2
0
2
I
2908
2
8 4 0 25 0 0 2 0
79 6 0 24 0 0 9 0
ll8 12 0 23 0 0 16 0
146 15 0 27 0 0 22 0
184 18 0 54 0 0 18 0
207 20 0 64 0 0 23 0
202 19 0 67 0 0 38 0
187 17 0 65 0 0 28 0
191 18 0 85 0 0 28 0
201 14 0 67 0 0 29 0
202 28 0 76 0 0 28 0
191 16 0 63 0 0 34 0
207 28 0 85 0 0 38 0
781 77 0 293 0 0 113 0
Peak Hr. Factor 0.95
145 5 0. 44 0 0 22 0
281 41 0 28 0 0 15 0
254 36 0 30 0 0 21 0
296 40 0 38 0 0 31 b
306 37 I 25 0 0 19 0
277 ·59 0 21 0 0 14 0
351 38 l 26 0 0 14 0
395 73 0 19 0 0 24 0
381 59 0 37 0 0 45 0
366 63 l 24 0 0 16 0
251 53 0 33 0 0 37 0
224 49 0 31 0. 0 28 0
395 73 l 44 0 0 45 0
1493 233 2 106 o· 0 99 0
Peak Hr. Factor -0.96
Page·l of3
East Al!l!roach (WB}. 15 min Total
Left U-Trn Thru Right Peds Vehicles Peds
0 0 0 0 0 105 0
0 0 0 0 0 187 0
0 0 0 0 0 265 0
0 0 0 0 0 362 0
0 0 0 0 0 433 0
0 0 0 0 0 518 0
0 0 0 0 0 565 0
0 0 0 0 0 579 0
0 0 0 0 0 628 0
0 0 0 ·O 0 588 0
0 0 0 0 0 583 0
0 0 0 0 0 571 0
0 0 0 0 0 628 0
0 0 0 0 0 2378 0
0 0 0 0 0 358 0
0 0 0 0 0 631 0
0. 0 0 0 0 591 0
0 0 0 0 0 615 0
0 0 0 0 0 616 I
0 0 0 0 0 610 0
0 0 0 0 0 666 I
0 0 0 0 0 754 0
0 0 0 0 0 754 0
0 0 0 0 0 734 l
0 0 0 0 0 577 0
0 0 0 0 0 566 0
0 0 0 O· 0 754 I
0 0 0 0 0 2908 2
• • -• ..
• -• -•
• • ..
• ..
111111 -II --•
• • .. ...
...... .. .. .. ..
• -
Ill .. -,..
111111
')
El Camino Real at Cassia Road
Lane Configuration for Intersection Capacity Utilization
Pk. Hr. Time Period : South Aeer (NB}
7:45 AM to
8:45 AM Left Thru ~
Lane Iriside 1 1
Config -(left) 2 1
urations 3 1 .. 4
5
6
Outside 7
Free-flow
Lane Settings 1 2
Capacity 1800 4000
Are the North/South phases split (YIN)?
Are the East/West phases split (YIN)?
Efficiency Lost Factor 0.10
HourlyVolume 63 1046
Adjusted Hourly Volume 63 1046
Utilization Factor 0.04 0.26
Critical Factors 0.26
ICU Ratio = 0.52
0
0
N
N
0
0
0.00
LOS=
North Aoor (SB) West Aeer (EB)
Left Thru Right Left Thru ~
1 1
1 1
1
1 1
1 3 0 1 0 1
1800 6000 0 1800 0 1800
5 781 77 293 0 113
5 858 0 293 0 113
0.00 0.14 0.00 0.16 0.00 0.06
0.00 0.16
A
Page 2 of3
East Aeer (WB)
Left Thru Right
0 0 0
0 0 0
0 0 0
0 0 0
0.00 0.00 · 0.00
0.00 0.00
~) Turning Movements at Intersection of: El Camino Real and Cassia Road
Time: 7:45 AM
to 8:45 AM North Approach
Date: 07/13/06
Day : Thursday
Name: Art, Carlos
Sub -77
To~ totals J w
e 140 _j
s 546 0 293
t 406 0 ~
113 -. A
p
p ' r
63
0
Subtotals 894
Total 2003
-~) South Approach
2207
863
5
781 5
t ~
t
North
t r
1046 0
1109
El Camino Real
1344
L 0 ~ 0·
r 0
Total
Subtotals
· Sub-
totals Totals
0
0 0
0
Cassia Road
Note : Left-tum volumes include
U-tums. U-tums in bold.
E
a
s
A
p
p
r
-• -• )
• • -• -• --••
• ..
• -..
El Camino Real at Cassia Road
Lane Configuration for Intersection Capacity Utilization
Pk. Hr. Time Period : South AEEr (NB}
5:00PM. to
6:00PM ~ Thru Right
Lane Inside 1 1
Config -(left) 2 1
urations 3 1
4
5
.6
Outside 7
Free-flow
Lane Settings 1 2
Capacity 1800 . 4000
Are the.North/South phases split (YIN)?·
Are the East/West phases split (YIN)?
Efficiency Lost Factor 0.10
Hourly Volume 113 863
Adjusted Hourly Volume 113 863
Utilization Factor 0.06 0.22
Critical Factors 0.06
ICU Ratio = 0.51
0
0
N
N·
0
0
0.00
LOS=
North Appr (SB) WestAEQr(EB}
Left Thru Right Left Thru Right
1 1
1 1
1
1 1
J 3 0 1 0 1
1800 6000 0 1800 0 1800
1493 233 106 0 99
1 1726 0 106 0 99
0.00 0.29 0.00 0.06 0.00 0.06
0.29 0.06
A
Page 3 of3
East AQEr (WB)
Left Thru Right
0 0 0
0 0 0
0 0 0
0 0 0
0.00 0.00 0.00
0.00 0.00
: /) Turning Movements at Intersection of: El Camino Real and Cassia Road -• -• --w
e
""' s -t
-A
p -p
r -..
---_) ---
Time: 5:00 PM
to 6:00 PM
Date: 07/13/06
Day: Thursday
Name: Art, Carlos
Sub-
To~ totals
343
· 548
205
0
Subtotals
Total
106
o.
99
North Approach
1727
233 1493
J +·
_j
-->-t -. North
i t
113 863
3
1595 976
2571
South Approach
2697
1
1
L..
r
0
El Camino Real
970
L 0 ..__ 0
r 0 0
Total
Subtotals
Sub-
totals
0
0
Cassia Road
Totals
0
Note : Left-turn volumes include
U-tums. U-turns in bold:
E
a
s
A
p
p
r
-•
fl!.
•
-
• •
•
CITY OF CARLS.BAD
TRAFFIC MONITORING PROGRAM
SU:MMER 2006 .
INTERSECTION ANALYSIS SUMMARY ·
Intersection Number: 13
Intersection Location: El Camino Real &
Poinsettia Lane
Contents: Turn Move~ent Count Summary
(A.M. and P.M.)
Page 1
A.M. Peak Hour ICU Analysis and Page 2
Turn Movement Diagram
P.M. Peak Hour ICU Analysis and Page 3
Turn Movement Diagram
TM RICK
ENGINEERING COMPAN.Y
Transportation Division
· I I I I I I I I I I I I I I I 'i I I I I I I I I 1. I I I I I I l I I I I I I
( ) "'-"' u \
' ) \..__,-
RICK ENGINEERING TURNING MOVEMENT ANALYSIS
City : Carlsbad
Intersection of: N/S Street : El Camino Real
E/W Street : Poinsettia Lane
Count Date:
07/20/06
End of 15
Day : Thursday
Weather: Sunny
South Annroach (NB)
File : 2006 Int# l 3
Data Collected by : Joe, Raul
Traffic Control : Signalized
North Aooroach (SB) West Aooroach (EB)
min. prd. Left U-Ttn Thru Right Peds Left U-Trn Thru Right Peds Left U-Trn Thru Right Peds
6:15AM
6:30AM
6:45AM
7:00AM
7:15 AM
7:30AM
7:45AM * 8:00AM * 8:15 AM * 8:30AM * 8:45 AM
9:00AM
Max. 15 min.
Pk. Hr. Vol.
7:30AM Peak
8:30AM Hour
3:45 PM
4:00PM
4:15 PM
4:30PM
4:45 PM
5:00PM *
5:15 PM * 5:30 PM *
5:45 PM * 6:00PM
6:15 PM
6:30 PM
Max. 15 min.
Pk. Hr. Vol.
· 4:45 PM Peak
5:45 PM Hour
0
0
1
0
0.
1
0
0
.I
2
1
15
15
3
0
2
4
2
1
0
6
3
3
3
0
1
6
12
5 57 12 1
0 84 21 1
3 118 30 3
3 151 27 0
3 132 34 1
3 192 24 0
l 239 39 0
2 309 58 · 1
5 247 70 0
3 241 34 0
7 200 27 0
7 260 25 0
7 309 70 3
11 1036 201 1
Intersection Traffic in: Pk'. Hr.
Intersection Pdstrns in Pk. Hr.
5 211 38 0
3 210 30 1
6 235 32 0
3 233 43 2
1 197 24 -0
1 240 36 0
4 256 47 0
1 231 41 1
0 218 38 0
3 192 41 1
4 222 55 0
3 185 34 I
6 256 55 2
6 945 162 1
Intersection Traffic in Pk. Hr.
Intersection Pdstrns in Pk. Hr.
5
IO
15
25
13
26
30
23
26
12
23
10
30
91
31
30
36
51
32
29
62
90
61
37
36
32
90.
242
0
3
4
7
2
3
3
1 . 3
4
2
0
7
11
2479
4
0
1
0
0
2
0
0
1
0
0
0
0
,2
1 ---. 3334
5
80 0 1 2 0 0 0 3
126 0 0 0 0 0 0 1
147 0 0 1 0 0 0 1
221 1 2 .2 0 0 1 0
219 0 0 3 0 1 1 1
229 0 3 4 0 2 1 0
185 1 0 2 0 2 0 0
187 1 0 1 0 1 2 I
213 2 0 0 0 1 3 0
185 3 0 5 0 2 3 0
234 1 6 3 0 2 2 4
256 0 0 1 0 0 0 0
256 3 6 5 0 2 3 4
770 7 0 8 0 6 8 1
Peak Hr. Factor 0.90
302 5 0 4 0 0 3 0
289 6 0 2 0 0 0 1
380 6 1 8 0 0 3 1
376 7 0 3 0 1 4 0
346 5 0 7 0 1 3 1
377 9 0 ·3 0 0 3 0
426 6 0 1 0 0 1 0
457 ·2 1 2 0 0 3 3
435 . 5 0 2 0 0 3 0
339 10 1 0 0 0 4 0
319 7 1 3 0 0 5 0
233 6 0 5 1 2 1 0
:
457 IO 1 8 1 2 5 3
1695 22 1 8 0 0 IO 3
Peak Hr. Factor 0.93
Page 1 of3
East Approach (WB) 15 min-Total
Left U-Trn Thru Right Peds Vehicles Peds
22 0 0 7 2 190 7
27 0 l 8 1 280 3
19 0 0 16 0 354 4
27 0 0 20 3 485 5
42 0 0 28 0 478 2
31 0 2 27 0 545 3
52 0 1 25 0 580 0
51 0 .o 53 0 689 2
33 0 2 30 2 636 2
38 0 2 40 0 574 0
.32 0 0 29 0 563 IO
48 0 0 27 0 649 0
52 0 2 53-3 689 10
174 0 5 148 2 2479 4
47 0 2 25 0 673 0
22 0 1 29 0 625 2
26 0 3 17 0 756 2
21 0 0 24 0 768 2
25 0 0 18 0 662 1
30 0 1 18 0 747 0
38 .. 0 1 16 0 864 0
39 0 2 21 0 893 5
44 0 2 19 0 830 0
29 0 0 16 1 674 3
26 0 1 6 0 684 1
24 0 0 IO 0 537 1
47° 0 3 29 1 893 . 5
151 0 6 74 0 3334 5
-~-"-··-~--
•
•
-· -~) -• -• ..
• ..
• .. .. -• --
El Camino Real at Poinsettia Lane
Lane Configuration for Intersection Capacity Utilization
Pk. Hr. Time Period : South Aeer (NB}
7:30AM to
8:30AM Left Thru ----
Lane Inside 1 1
Config 0 (left) 2 1
urations 3 1
4 1
5 1
6
Outside 7
Free-flow
Lane Settings 2 3
Capacity 3609 6000
Are the North/South phases split (YIN)?
Are.the East/West phases splft (YIN)?
Efficiency Lost Factor 0.10
Hourly Volume 14 1036.
Adjusted Hourly Volume 14 1036
Utilization Factor 0.00 0.17
Critical Factors 0.1.7
ICU Ratio = 0.35
Right
1
1
1800
N
N
201
201
0.11
LOS=
North Appr (SB) West Aeer (EB}
Left Thru Right Left Thru Right
1 1
1 1
1 1
1 1 1
1
2 2 1 2 2 0
3600 4000 1800 3600 4000 0
102 770 7 8 6 8
102 770 7 8 14 0
0.03 0.19 0.00 0.00 0.00 0.00
0.03 0.00
A
Page2 of3
East Aeer {WB}
Left Thru Right
1
1
1
1 1
2 2 0
3600 4000 · 0
174 5 148
174 153 0
0.05 0.04 0.00
0.05
: '_) Turning Movements at Intersection of: EI Camino Real and Poinsettia Lane
-Time : 7:30 AM • to 8:30AM North Approach EI Camino Real
Date: 07/20/06 -Day : Thursday 2082 Total
• Name : Joe, Raul. 879 1203 Subtotals
11 -Sub-7 770 102 Sub--w To~ totals j + L. totals· Totals
e -s --A
15 _t L 37 0 8 148
22 6 --+ t .. 5 327
8 t r 174 0 625
North -p
p
r -
298
i t r
14 1036 201 Poinsettia Lane -11
Subtotals 963 1251 -Total 2214 -.... -)
__.. South Approach Note: Left-tumvolumes include
U-tums. U-tums in bold . •• -..
E
a
s
t
A
p
p
r
-•
,. .. -)
~
ill -.. ..
• -• -• -• -•
El Camino Real at Poinsettia Lane
Lane Configuration for Intersection Capacity Utilization
Pk. Hr. Time Period : South Aeer (NB}
4:45 PM to
5:45 PM Left Thru Right
Lane Inside 1 1
Config-(left) 2 1
urations 3 1
4 1
5 1
6
Outside 7
Free-flow
Lane Settings 2 3
Capacity 3600 6000
Are the North/South phases split (YIN)?
Are the East/West phases split (YIN)?
Efficiency Lost Factor 0.10
Hourly Volume 18 945
Adjusted Hourly Volume 18 945
Utilization Factor 0.01 0.16
Critical Factors 0.01
ICU Ratio = 0.57
1
1
1800
N
N
162
162
0.09
LOS=
North Appr (SB) West Aeer (EB2 ·
Left Thru Right Left Thru Right
1 1
1 1
1 l
1 1 1
1
2 2 1 2 2 O·
3600 4000 1800 3600 4000 0
243 .1695 22 8 0 10
243 1695 22 8 10 0
0.07 0.42 O.Ql 0.00 0.00 0.00
0.42 0.00
A
Page 3 of3
East Aeer {WB}
Left Thru Right
1
1
1
1 1
2 2 0
3600 4000 0
151 6 74·
151 80 0
0.04 0.02 0.00
0.04
: (--) Turning Movements at Interse~tion of: El Camino Real and Poinsettia Lane -Time : 4:45 PM • to 5:45 PM
Date: 07/20/06 -Day : Thursday
• Name : Joe, Raul -Sub-
Totals totals • w
e 40 -s 58 0 8 -18 0
10 -A -p
p
r -• Subtotals -Total .. --~) .. -..
North Approach
2988
1960
1
22 1695 243
J t L~
_t
~ t • North
i t r
18 945 162
6
1862 1125
2987
South Approach .
El Camino Real
1028
t 74 ... 6
r 151
Total
Subtotals
Sub -
totals Totals
231
0 635
404
Poinsettia Lane
Note : Left-tum volumes include
U-tums. U-turns in bold .
E
a
s
A
p
p
r
•
I
I ii
I
• I
•
CITY OF CARLSBAD
TRAFFIC MONITORING PRO.GRAM
SUMMER 2006 ·
. INTERSECTION ANALYSIS SUMMARY
· Intersection Number: 14
Intersection Location: El Camino Real &
Dove Lane
Contents: Turn Movement Count Summary
(A.M. and P.M.)
Page 1
A.M. Peak Hour ICU Analysis and Page 2
Turn Movement Diagram
P.M. Peak Hour ICU Analysis and Page 3
Turn Movement Diagram
RICK
ENGINEERING COMPANY
Transporr.ation Division
I I I I I I 11 I I I I I I I I 11 11 11 II 11 • I 11 I I 11 11 11
u u \_)
RICK ENGINEERING TURNING MOVEMENT ANALYSIS
City : Carlsbad
Intersection of: N/S Street : El Camino Real
E/W Street : Dove Lane
Count Date:
07/20/06
End of 15
min. prd.
6:15 AM
6:30AM
6:45.AM
7:00AM
7:15 AM
7:30AM
7:45AM
8:00AM * 8;15 AM * 8:30AM * 8:45AM * 9:00AM
Max. 15 min.
Pk. Hr. Vol.
7:45 AM Peak
8:45 AM Hour
3:45PM
4:00PM
4:15 PM
4:30 PM
4:45PM
5:00 PM * 5:15 PM *
5:30PM * 5:45 PM *
6:00PM
6:15 PM
6:30PM
Max. 15 min.
Pk. Hr. Vol.
4:45 PM Peak
5:45 PM Hour
Day : Thursday
\Veather: Sunny
South Approach (NB)
. Left U-Tm Thru . Right Peds
I
0
1
3
5
2
3
4
2
3
9
4
9
18
19
20
30
18
18
17
14
24
16
21.
16
15
30
71
1 44 1 0
0 58 1 0
2 133 6 0
0 20.6 2 0
1 181 0 1
0 215 0 0
0 279 5 2
1 280 I 1
0 257 2 0
0 258 l 0
1 309 2 0
0 209 5 0
2 309 6 2
2 1104 6 I
Intersection Traffic in Pk. Hr.
Intersection Pdstrns in Pk. Hr.
4 159 3 I
9 191 8 0
4 209 4 0
0 212 8 I
0 164 7 .o
I 214 9 0
5 213 11 0
5 177 8 I
2 212 6 0
5 197 14 0
4 220 I 0
3 178 9 0
9 . 220 14 1
13 816 34 1
Intersection Traffic in Pk. Hr.
Intersection Pdstrns in Pk. Hr.
File : 2006 Int# 14
Data Collected by : Sam, Tyler
Traffic Control : Signalized
North Aaaroach (SB) West APoroach (EB)
Left U-Tm Thru Right Peds Left U-Trn Thru Right Peds
3
5
7
6
8
6
17
4
7
3
12
15
17
26
14
18
16
19
21
11
20
19
16
19
23
IO
23
66
0
0
0
0
0
0
2
0
2
1
0
0
2
3
2155
2
8
6
6
4
2
1
3
2
4
6
4
0
8
IO ---3068
11
100
135
141
220
246
203
218
205
209
209
215
209
246
838
249
277
340
318
274
332
351
371
403
312
296
199
403
1457
4 0
8 0
11 0
5 0
14 o-·
12 0
5 0
1 0
14 0
13 0
19 0
22 0
22 0
47 0
Peak Hr. Factor
23 0
48 0
32 0
47 0
35 0
46 0
40 1
47 0
46 I
33 0
31 0
35 0
48 l
179 2
Peak Hr. Factor
3 o· 1 1 0
2 o. 1 2 1
6 0 2 2 0
3 0 0 1 I
11 0 I 2 2
3 0 0 0 O·
19 0 i 1 0
12 0 0 1 0
3 0 3 2 0
11 0 0 0 0
12 0 4 2 0
15 0 I 5 I
19 0 4 5 2
38 0 7 5 0
0.89
44 0 1 12 I
26 0 6 26 0
45 0 9 18 0
27 0 6 15 4 •
34 0 6 18 0
35 0 7 25 2
29 0 6 32 5
44 0 7 15 1
28 . 0 6 24 0
35 0 7 25 l
25 0 3 27 · I
33 0 5 23 0
45 0 9 32 5
136 0 26 96 8
Q.95
Page 1 of3
East A(!(!roach (WB} 15 min Total
Left U-Trn Thru Right Peds Vehicles Peds
5 0 1 3 1 168 1
6 0 1 13 0 232 l
7 0 0 10 0 328 0
2 0 1 4 0 453 1
5 0 1 14 1 489 4
4 0 2 6 0 453 0
7 0 1 8 ·o 566 2
3 0 1 4 . 0 517 1
7 0 i 11 0 520 0
13 0 2 2 1 516 l
12 0 I 4 0 602 0
11 0 2 11 0 509 1
13 0 2 14 l 602 4
35 p 5 21 1 2155 2
16 0 5 9 0 566 . 2
15 0 4 11 0 665 0
14 0 5 9 0 741 0
20 0 5 7 I 706 6
11 0 8 8 0 606 0
14 0 13 11 0 736 2
20 0 6 16 0 766 6
18 ·2 4 16 0 759 2
25 0 9 10 0 807 l
15 0 8 9 0 706 l
21 0 12 12 l 695 2
19 -0 6 13 0 548 0
25 i ' 13 16 l 807 6
77 2 32 53 0 3068 11
-------) -/ ------• -• -.. ---
El Camino Real at Dove Lane
Lane Configuration for Intersection Capacity Utilization
Pk. Hr. Time Period : South AEer (NB2
7:45 AM to
8:45 AM Left Thru ----
Lane Inside 1 1
Config-(left) 2· 1
urations 3 1
4 1
5
6
Outside 7
Free-flow
Lane Settings 1 3
Capacity 1800 6000
Are the North/Soutl:t phases split (YIN)?
Are the East/West phases split (YIN)?
Efficiency Lost Factor 0.10
Hourly Volume 20 1104
Adjusted Hourly Volume 20 1110
Utilization Factor 0.01 0.19.
Critical Factors 0.19
ICU Ratio = 0.34
Right
1
0
0
N
N
6
0
0.00
LOS=
North Aoor (SB) West AeEr (EB2
Left Thru Right Left Thru Right
1 1
1 1 1
1
1 1
1 3 0 1 1 0
1800 6000 0 1800 2000 0
29 838 47 38 7 5
29 885 0 38 12 0
0.02 0.15 0.00 0.02 O.DI 0.00
0.02 0.02
A
Page 2 of3
East Aeer (WB}
Left . Thru Right
1
1 1 -
1 1 0
1800 2000 0
35 5 21
35 26 0
0.02 0.01 0.00
0.01
• .· /]Turning Movements at Intersection .of: El Camino Real and Dove Lane
------w
e -s .. t -A .. p
p
r ------~) ---
Time: 7:45 AM
to 8:45 AM
Date : 07 /20/06
Day : Thursday
Name : Sam, Tyler
Totals
120
Sub -
totals
70
50
0
Subtotals
Total
38
7
5
North Approach
914 ·
47 838
J + _j
-->-t -. North
~ t
20 1104
2
880 1130
2010
South Approach
2080
J
29
~
r
6
El Camino Real
1166
L 21
~ 5
r 35 0
Total
Subtotals
Sub-
totals
61
39
Dove Lane
Totals
100
Note : Left-tum volumes include
U-tums. U-tums in bold.
E
a
s
t
A
p
p
---• ) -• -• -• -• -• ..
• ---
El Camino Real at Dove Lane
Lane Configuration for Intersection Capacity Utilization
Pk. Hr. Time Period : South Aeer CN:B}
4:45 PM to
5:45 PM ~ Thru. Right
Lane Inside 1 1
Config -(left) 2 1
urations 3 1
4 1
5
6
Outside 7
Free-flow
Lane Settings 1 3
Capacity 1800 6000
Are the North/South phases split (YIN)?
Are the East/West phases split (YIN)?
Efficiency Lost Factor 0.10
Hourly Volume 84 816
Adjusted Hourly Volume · 84 850
Utilization Factor 0.05 0.14
Critical Factors 0.05
ICU Ratio = 0.54
1
0
0
N
N
34
0
0.00
LOS=
North Aoor (SB) West Aeer (EB}
Left Thru Right Left . Thru Right
1 1
1 1 1
1
1 1
1 3 0 1 1 0
1800 6000 0 1800 2000 0
'76 1457 179 D6. 26 96
76 1636 0 139 122 0
0.04 0.27 0.00 0.08 0.06 0.00
0.27 0.08
A
Page3 of3
. East Aeer {WB}
Left Thru Right
I
1 1
1 1 0
1800 2000 0
79 32 53
79 85 0
0.04 0.04 0.00
0.04
•
1
/) Turning Movements at Intersection of: El Camino Real and Dove Lane -• Time : 4:45 PM
to 5:45 PM
Date: 07/20/06 -Day : Thursday • Name : Sam, Tyler -Sub -
• Totals totals
w -e 282
s 540 0 136 .. 258 26
96 -.A -p
p -r -Subtotals -Total ..
-_) ..
--
North Approach
2727
1712
10
179 1457 76
J ·+ ~
_j _. t .. North
' t r
84 816 34
13
1643 934
2577
South Approach
El Camino Real
1015
t 53
4111 32 .. 79
Total
Subtotals
Sub-
totals . Totals
164
2 292
128
Dove Lane
Note : Left-tum volumes include
U-turrts. U-turns in bold .
E
a
s
A
p
p
r
-•
"' I CITY OF CARLSBAD
TRAFFIC MONITORING PROGRAM
SUMMER2006
INTERSECTION ANALYSIS SUMMARY
Intersection Number: 15
Intersection Location: El Camino Real &
Alga Road I A viara Parkway
Contents: Turn Movement Count Summary Page 1
(A.M. and P.M.)
A.M. Peak Hour ICU Analysis and Page 2
Turn Movement Diagram
P.M. Peak Hour ICU Analysis and Page 3
Turn Movement Diagram
TM RICK
ENGINEERING COMPANY
Transportation Division
I I I I I ·1 I I I I I I I I I I I I ·I I I' I I I I I I I I I I I I I I I I I
( i \._..,I u
RICK ENGINEERING·TURNING MOVEMENT ANALYSIS
City : Carlsbad
Intersection of: N/S Street : · El Camino Real
Count Date:
07/20/06
End of 15
E/W Street : Alga Road/ Aviara Parkway
Day : Thursday
Weather: Sunny
South Approach (NB)
File: 2006 Int #15
Data Collected by : Matt (AM), Sarah, Scott
Traffic Control : Signalized
North Aooroach (SB) West Aooroach (EB) East Aeeroach (WB}
Pagel of3
) \J
15 min Total
min. prd. Left U-Trn Thru Right Peds Left U-Trn Thru Right Peds Left U-Tm Thru Right Peds Left U-Tm Thru Right Peds rv ehides Peds
6:15AM
6:30AM
6:45AM
7:00AM
7:15 AM
7:30AM
7:45AM
8:00AM * 8:15 AM ·*
8:30AM * 8:45AM *
9:00AM
Max. 15 min.
Pk. Hr. Vol.
7:45 AM Peak
8:45 AM Hour
3:45 PM
4:00PM
4:15 PM
4:30PM
4:45PM
5:00PM
5:15 PM *
5:30PM * 5:45 PM * 6:00PM * 6:15 PM
6:30PM
Max. 15 min.
Pk. Hr. Vol..
5:00 PM Peak
6:00PM Hour
6
17
18
17
20
25
27
51
46
55
55
68
68
207
92
83
80
91
94
79
87
122
84
79
68
95
122
372
0 49 16 0 8
0 84 35 2 8
0 136 51 1 .9
0 133 44. 0
0 116 44 l
0 150 55 2
0 218 37 1
0 272 51 0
0 244 78 1
0 194 61 0
0 206 54 2
0 194 42 0
0 272 78 2
0 916 244 3
Intersection Traffic in Pk. Hr.
Intersection Pdstms in Pk. Hr.
0 178 116 2
0 151 132 0
0 205 134 0
0 229 100 0
0 198 123 0
1 187 140 0
0 233 153 0
0 225 142 0
0 174 118 0
0 204 168 0
0 208 165 0
0 165 139 I
l 233 168 2
0 836 581 0
Intersection Traffic in Pk. Hr.
Intersection Pdstms in Pk. Hi;.
11
18
20
15
17
11
24
12 ·
20
24
64
36
38
37
45
36
40
55
68
54
29
42
44
68
206
0
0
0
0
0
l
0
0
0
0
0
0
1
0
3885
14
2
3
0
0
0
1
3
2
0
3
3
I
.3
8 ----5075
13
91
127
147
181
221
199
191
203
203
163
196
193
221
765
2ll
266
285
276
295
292
361
320
375
332
229
215
375
1388
7 0 8
7 0 3
5 0 IO
15 2 5
15 0 14
18 1 12
17 0 16
II 0 23
21 0 25
16 0 15
15 0 22
17 0 15
21 2 25
63 0 85
Peak Hr. Factor
18 0 8
32 2 19
16 0 23
17 0 21
22 0 14
27 0 25
27 0 15
12 0 13
33 l 17
27 0 18
31 0 28
18 0 22
33 2 28
99 I 63
Peak Hr. Factor
0 IO 1.6 0 80 0 32 8. 2 331 2
0 7 23 0 104 0 41 8 l 464 3
0 16 30 0 116 l 69 11 4 619 5
1 27 42 0 139 0 41 15 3 671 5
0 17 · 49 0 140 l 68 17 2 ·740 3
1 34 60 0 139 l 73 21 0 809 3
0 39 49 0 163 0. 96 29 1 897 2
1 40 60 0 175 1 93 36 2 1034 2
1 33 65 0 136 3 81 28 l 975 2
0 62 85 0 163 2 88 20 4 948 4
0 41 82 1 131. .1 91 22 3 928 6
0 41 61 0 163 0 86 24 2 924 2
1 62 85 1 175 3 96 36 4 1034 6
2 176 292 1 605 7 353 106 10 3885 14
0.94
2 53 70 0 93 5 56 14 I 954 3
0 87 69 0 101 5 69 14 5 1069 7
0 83 95 0 82 3 64 24 2 1131 2
0 71 104 0 73 2 60 24 l 1113 l
0 60 70 0 75 l 60 14 5 1062 5
0 81 109 0 '!)7 1 68 19 1 ll67 1
0 71 77 0 96 4 58 10 5 1250 5
0 134 123 0 82 2 69 14 3 1328 3
0 127 107 0 98 3 .57 18 0 1265 1
1 116 88 0 86 I 59 21 4 1232 4
1 88 80 0 73 5 48 21 0 1090 0
0 72 57 2 93 2 55 16 2 994 5
2 134 123 2 101 5 69 24 5 1328 7
I 448 395 0 362 10 243 63 12 5075 13
0.96
1111
•
• •
• --~) .. -..
• .. .. •
• • ..
1111
• •
..
• .. • -.. -• -.. -• -•· -__ ) ---
El Camino Real at Alga Road/Aviara Parkway
Lane Configuration for Intersection Capacity Utilization
Pk. Hr. Time Period : South Aeer (NB2
7:45 AM to
8:45 AM Left Thru ----
Lane Inside 1 1
Config-(left) 2 1
urations 3 1
4 1
5 I
6
Outside 7
Free-flow
Lane Settings 2 3
Capacity 3600 6000
Are the North/South phases split (YIN)?
Are the East/West phases split (YIN)?
Efficiency Lost Factor 0.10
Hourly Volume 207 916
Adjusted Hourly Volume 207 916
Utilization Factor 0.06 · 0.15
Critical Factors 0.06
ICU Ratio = 0.63
Right
I
I
1800
N
N
244
0
0.00
LOS=
North Annr (SB)
Left Thru Right
1
1
1
l
1 1
2 3· 0
3600 6000 0
'64 765 63
64 828 0
0.02 0.14 0.00
0.14
B
Page 2 of3
West Aeer (EB 2 East Aeer (WB 2
Left Thru Right Left Thru Right
1 1
. 1 1
1 1
1 1 I
I
2 2 I 2 2 0
3600 4000 1800 3600 4000 0
87 176 292 612 353 106
87 176 292 612 459 0
0.02 0.04 0.16 0.17 0.11 0.00
0.16 0.17
Turning Movements at Intersection of: El Camino Real and Alga Road/Aviara Parkway
Time : 7:45 AM
to 8:45 AM North Approach
Date : 07 /20/06
Day : Thursday
Name : Matt (AM), Sarah, Scott 892
Sub-63 765
w
To~ totals J i
e
s
A
625 _t 1180 2 87
555 176 __... t 292 -. North
p
p
r ' t
207 916
0
Subtotals 1662 1367
Total 3029
South Approach
1999
0
64
~
r
244
El Camino Real
1107
L 106
~ 353
r 612
Total
Subtotals
Sub-
totals Totals
1071
7 1562
491
Alga Road/Aviara Parkway
Note : Left-turn volumes include
U-tums. U-turns in bold.
E
a
s
A
p
p
r
-• -• ~)
,. ___ /' -• ..
• -•
• •
• • -• -•
-• -• ----------') ---·' -·--
El Camino Real at Alga Road/Aviara Parkway
Lane Configuration for Intersection Capacity Utilization Page 3 of 3
Pk. Hr. Time Period : South Aeer (NB}
5:00 PM to
6:00PM . Left Thtu Right
Lane Inside 1 1
Config ~ (left) 2 1
urations 3 1
4 1
5 1
6
Outside 7
Free-flow
Lane Settings 2 3
Capacity 3600 6000
Are the North/South phases split (YIN)?
Are the East/West phases split (YIN)?
Efficiency Lost Factor 0.10
Hourly Volume 372 836
Adjusted Hourly Volume 372 836
Utilizatiori Factor 0.10 0.14
Critical Factors 0.10
ICU Ratio = 0.77
1
1
1800
N.
N
581
209
0.12
LOS=
North Aoor (SB)
Left Thru Right
1
1
1
1
1 1
2 3 0
3600 6000 0
214 1388 99
214 1487 0
0.06 0.25 0.00
0.25
C
West Aeer (EB} East Aeer {WB}
Left Thru Right Left Thru Right
I I
' I I
l I
1 1 1
1
2 2 1 2 2 0
3600 4000 1800 3600 4000 0
64 448 395 372 243 63
64 448 395 372 306 0
0.02 0.11 0.22 0.10 0.08 0.00
0.22 0.10
Turning Movements at Intersection of: El Camino Real and Alga Road/Aviara Parkway
Time : 5 :00 PM
to 6:00 PM North Approach
Date: 07/20/06
Day : Thursday
Name : Matt (AM), Sarah, Scott
Sub-99
To~ totals j w
e 715 _t s 1622 1 64
907 448 -+
395 t A
p
p ~
372
0
Subtotals 2145
Total 3934 .
South Approach
2671
1701
8
1388 214
i l
t
North
t r
836 581
1789
El Camino Real
970
t 63 .... 243 r 372
Total
Subtotals
Sub-
totals Totals
678
10 1923
1245
Alga Road/Aviara Parkway
Note : Left-tum volumes include
U-turns. U-turns in bold.
E
a
s
t
A
p
p.
r
-•
M •
I
CITY OF CARLSBAD
TRAFFIC MONITORING PROGRAM
su,MMER 2006
INTERSECTION ANALYSIS SUMMARY
Intersection Number: 40
Intersection Location: Poinsettia Lane &
Aviara Parkway
Contents: Turn Movement Count Summary
(A.M. and P.M.)
Page 1
A.M. Peak Hour ICU Analysis· and Page 2
Turn Movement Diagram
P.M. Peak Hour ICU Analysis and Page 3
Turn Movement Diagram
, ..
RICK
ENGINEERING COMPANY
Transportation Division
I I I t 11 II 11 II II II II II II II II II II II II II II
( j "-._../. u \'<..__)
RICK ENGINEERING TURNING MOVEMENT ANALYSIS
City : Carlsbad
Intersection of: N/S Street: AviaraParkway
E/W Street : Poinsettia Lane
Count Date:
08/08/06
End ofl5
Day : Tuesday
Weather : Sunny
South Annroach (NB)
file : 2006 Int #40
Data Collected by : Matt, Mark
Traffic Control : Signalized
North Annroach (SB) West Annroach (EB)
min. prd. Left U-Tm Thru Rilzht Peds Left U-Tm Thru Right Peds Left U-Tm Thru Right Peds
6:15 AM
6:30AM
6:45 AM
7:00AM
7~15 AM
7:30AM
7:45AM
8:00AM * 8:15 AM * .
8:30AM *
8:45 AM * 9:00AM
Max. 15min.
Pk. Hr. Vol.
7:45 AM Peak
8:45 AM Hour
3:45 PM
4:00PM
4:15 PM
4:30PM
4:45PM
5:00PM
5:15 PM * 5:30PM *
5:45PM * 6:00PM *
6:15 PM
6:30PM
Max. 15 min.
Pk. Hr. Vol.
5:00PM Peak
6:00PM Hour
28
36
58
63
58
59
58
60
64
70
58
53
70
252
74
76
68
67
66
71
89
71
78
77
55
85
89
315
0 8 0 2
I 15 0 0
0 22 I 0
o. 24 0 0
0 21 2 0
0 37 0 3
0 32 I 0
0 75 1 1
0 58 0 0
0 47 1 0
0 48 0 .0
0 43 0 . 0
I 75 2 3
0 228 2 I
Intersection Traffic in Pk. Hr.
Intersection Pdstrns in Pk. Hi;.
0 54 I 0
0 46 0 0
o· 45 3 0
0 37 0 0
0 52 I 0
0 53 J 0
0 41 4 0
6 44 5 0
0 48 I 0
0 54 0 0
0 39 I 0
0 33 I 0
6 54 5 0
6 187 10 0
Intersection Traffic in Pk. Hr.
Intersection Pdstms in Pk. Hr.
I I
3 . 2
I
7
1
6
8
3
4
5
5
5
8
17
18
10
11
12
12
12
17
20.
24
26
16
11' •.
26
87
I
0
0
0
0
0
0
0
0
I
2
0
1998
3
0
0
0
I
0
I
0
0
2
0
0
0
2
2
2465
4
8 15 2 18 I 11 20 0
5 5 0 11 0 J6 17 I
10 14 2 22 2 15 27 I
18 12 0 35 7 27 18 0
13 22 0 40 0 45 40 0
22 29 0 66 0 55 60 0
21 23 3 106 0 52 70 I
38 21 0 119 1 59 52 0
30 21 0 140 I 64 68 0
26 12 0 113 0 85 58 I
35 17 0 122 I 63 71 I
37 20 0 126 0 64 52 0
38 29 3 140 7 85 71 I
129 71 0 494 3 271 . 249 2
Peak Hr. Factor 0.96
54 45 I 19 I 61 67 0
73 27 2 46 2 47 65 0
76 . 46 0 32 0 33 63 0
68 55 0 . 28 0 42 66 0
90 66 0 36 0 72 67 2
73 84 0 40 I 52 64 0
105 llO 2 39 I 68 72 0
124 105 I 26 0 77 112 0
89 83 0 39 I 63 82 0
95 69 0 27 0 100 86 o·
97 73 0 27 4 84 71 0
58 45 0 15 0 65 73 0
124 110 2 . 46 4 100 112 2
413 367 3 131 2 308 352 0
Peak Hr. Factor 0.94
Page I of3
East Aeer2ach {WB} 15 min Total
Left U-Tm Thru Riirht Peds Vehicles Peds
0 0 35 0 2 146 6
0 0 29 4 0 144 I
0 0 36 5 0 214 3
1 0 · 45 8 2 265 2
1 0 62 11 2 316 2
0 0 48 5 I 387 4
I 0 53 16 0 441 4
3 0 70 17 0 519 1
2 0 46 12 0 510 0
2 0 59 8 0 486 1
2 I 46 14 0 483 I
0 0 52 7 0 460 0
3 1 70 17 2 519 6
9 I 221 5i 0 1998 3
1 0 51 5 0 451 1
0 0 23 12 2 427 4
7 0 28 7 0 . 419 0
2 0 47 13 0 438 0
2 0 33 8 0 505 2
2 0 57 12 2 523 2
3 0 70 15 0 634 2
4 1 47 ll 0 653 1
0 0 56 12 I 578 I
I 0 50 15 0 600 0
4 0 46 6 1 523 I
0 0 41 17 1 444 1
7 I 70 17 2 653 4
8 1 223 53 1 2465 4
-•
• ... ---.__
11111 .. )
• -ill
• • -• -• -• -• r --) .. -.. -• -..
-• ------" -) __ _, ---
A viara Parkway at Poinsettia Lane
Lane Configuration for Intersection Capacity Utilization Page 2 of3
Pk. Hr. Time Period :
7:45 AM to
8:45AM
South Appr (NB)
Lane
Config -
urations.
Inside
(left) 2
3
4
5
6
Outside 7
Free-flow
Lane Settings
Capacity
2
3600
1
1
2
40o"o
Are the North/South phases split (YIN)?
Are the East/West phases split (YIN)?
Efficiency Lost Factor 0.10
Hourly Volume 252 228
Adjusted Hourly Volume 252 230
Utilization Factor 0.07 0.06
Critical Factors 0.07
ICU Ratio = 0.43
Turning Movements at Intersection of :
Time: 7:45 AM
to 8:45 AM
Date: 08/08/06
Day : Tuesday
Name: Matt, Mark
Sub-
To~ totals
w
e 547
s 1564 3
t 1017
A
p
p
r
1
0
0
N
N
2
0
0.00
LOS=
497
271
249
Subtotals
Total
North Appr (SB) West Appr (EB) East Appr (WB)
2
1800 4000
17 129
17 200
O.Ql 0.05
0.05
A
1
0
0
71
0
0.00
1
1
2
3600
49_7
497
0.14
0.14
Aviara Parkway
North Approach
990
217
0
71 129 17
J ~ ~
_j-_... t • North
~ t r·
252 228 2
0
387 482
869
South Approach
1
1
1
1 2 1
2000 3600 1800
271 249 10
271 249 10
0.14 0-.07 O.Ql
and Poinsettia Lane
1
1
2
4000
221
272
0.07
0.07
0
0
51
0
0.00
A viara Parkway
773
L 51 .. 221
't 10
Total
Subtotals
Sub-
totals Totals
282
1 573
291
Poinsettia Lane
Note: Left-tum volumes include
U-turns. U-turns in bold.
E
a
s
t
A
p
p
r
---1111 /) -• -• -• -• -• -• -1111
A viara Parkway at Poinsettia Lane
Lane Configuration for Intersection Capacity Utilization
Pk. Hr. Time Period : South AEEr (NB)
5:00PM to
6:00PM Left Thru Right
Lane Inside 1 1
Config-(left) 2 1
urations 3 1
4 1
5
6
Outside 7
Free-flow
Lane Settings 2 2
Capacity 3600 4000
Are the North/South phases split (YIN),?
Are the East/West phases split (YiN)?
Efficiency Lost Factor 0.10
Hourly Volume 321 187
Adjusted Hourly Volume 321 197
Utilization Factor 0.09 0.05
Critical Factors 0.09
ICU Ratio = 0.55
1
0
0
N
N
10
0
0.00
LOS=
North Aoor (SB)
Left Thru Right
1
1
1 -1
1 2 0
1800 4000 0
89 413 367
89 _ 780 0
0.05 0.20 0.00
0.20
A
West AEEr {EB)
Left Thru Right
1
1
1
1
1
2 1 2
3600 2000 3600
133 308 352
133 308 352
0.04 0.15 0.10
0.15
Page 3 of3
East A£!Er {WB)
_ Left Thru Right
1
1
1 1
1 2 0
1800 4000 0
-9 223 53
9 276 0
0.01 0.07 0.00
0.01
Aviara Parkway and Poinsettia Lane -• ' _) · Turning Movements at Intersection of:
-Time : 5 :00 PM • to 6:00 PM
Date: 08/08/06
• Day : Tuesday
• Name : Matt, Mark
Sub--To~ totals • w
e 907 -s 1700 2 133
793 308 • 352
A -p .. p
r --Subtotals -Total ---) -__ __., --•
North Approach
869
367 413
J t
_f
-+ t + North
~ t
321 187
6
779 518
1297
South Approach
1242
2
89
~
r
10
Aviara Parkway
373
L 53 ...._ 223 • 9
Total
Subtotals
Sub-
totals Totals
285
1 691
406
Poinsettia Lane
Note: Left-tum volumes include
U-tums. U-tums in bold.
E
a
s
t
A
p
p
r
-• .. .. -• ..
Ii -• -•
• • -•
• • -• -•
• • -• -• ---• ---.. --
--)
:)
~)
2006 TRAFFIC MONITORING PROGRAM
AVERAGE DAILY TRAFFIC VOLUMES
Legend:
• Mid-Block Count Location xx,xxx Mid-Block Average Daily Traffic (ADT)
N
~'-v.1--w-·E
' s
NOTTO SCALE
Camino De
Los Caches
Figure B-1
RICK
ENGINEERING COMPANY
IM
11/8/06
--..
--.. -• -• -•
• -• -• -• -• --------------
LiNSCOn, LAW & GREENSPAN, engineers
APPENDIX 8
INTERSECTION LEVEL OF SERVICE ANALYSIS SHEETS
LLG Ref. 3-04-1395
Poinsettia Place
.. ---• -• -• -• -•
,.
• -• -• -.. ------.. ---• ----
El Camino Real at Palomar Airport Road
Lane Configuration for Intersection Capacity Utilization Page 2 of3
Pk. Hr. Time Period : South AQQr (NB} North Annr (SB) West AQQr (EB} East AQQr {WB}
7:30AM to
8:30AM ~ Thru ...filg!g_ Left Thru ~ Left Thru ~ Left Thru ~
Lane Inside I I I I I
Config-(left) 2 I I I I
urations 3 I I I I
4 I I I I
5 I I I 1 1
6 1 1 1
Outside 7 1
Free-flow
Lane Settings 1 3 2 2 3 1 2 3 0 2 3 2
Capacity 1800 6000 3600 3600 6000 1800 3600 6000 0 3600 6000 3600
Are the North/South phases split (YIN)? N
Are the East/West phases split (YIN)? N
Efficiency Lost Factor 0.10
Hourly Volume 102 559 390 441 677 263 79 517 63 573 1151 1185
Adjusted Hourly Volume 102 559 390 441 677 263 79 580 0 573 1151 1185
Utilization Factor 0.06 0.09 0.11 0.12 0.11 0.15 0.02 0.10 0.00 0.16 0.19 0.33
Critical Factors 0.11 0.12 0.02 0.33
ICU Ratio = 0.68 LOS= B
Turning Movements at Intersection of: El Camino Real and Palomar Airport Road
Existing
Time: 7:15 AM
to 8:15 AM North Approach El Camino Real
Date: 07/13/06
Day : Thursday 3206 Total
Name: Albert, Jasen, Joe, Raul 1381 1825 Subtotals
2
Sub-263 677 441 Sub-
T~ totals J i w ~ totals
e 1516 ___j s 2175 3 79
t 659 517 ---+ t 63 ---. A North
L 1185
~ 1151 2909
r 573 0
p
p i t r
1348 r
102 559 390 Palomar Airport Road
2
Subtotals 1313 1051
Total 2364
Totals
4257
South Approach Note : Left-tum volumes include
U-tums. U-tums in bold.
E
a
s
A
p
p
r
-----• --
• -• ---• -• -.. -• -.. --------------
El Camino Real at Palomar Airport Road
Lane Configuration for Intersection Capacity Utilization Page 3 of3
Pk. Hr. Time Period : South Appr (NB)
4:30 PM to
5:30 PM
Lane
Config-
urations
Inside
(left)
Outside
Free-flow
2
3
4
5
6
7
Lane Settings 3
Capacity 1800 6000
Are the North/South phases split (YIN)?
Are the East/West phases split (YIN)?
Efficiency Lost Factor 0.10
Hourly Volume 95 716
Adjusted Hourly Volume 95 716
Utilization Factor 0.05 0.12
Critical Factors
ICU Ratio = 0.82
2
3600
N
N
451
451
0.13
0.13
LOS=
North Aoor (SB)
2 3
3600 6000 1800
817 893 141
817 893 141
0.23 0.15 0.08
0.23
D
West Appr (EB) East Appr (WB)
2 3 0 2 3 2
3600 6000 0 3600 6000 3600
237 1250 115 461 811 753
237 1365 0 461 811 753
0.07 0.23 0.00 0.13 0.14 0.21
0.23 0.13
Turning Movements at Intersection of: El Camino Real and Palomar Airport Road
Existing
w
e
s
A
p
p
r
Time : 4:45 PM
to 5:45 PM
Date : 07 fl 3/06
Day : Thursday
North Approach
Name: Albert, Jasen, Joe, Raul
Sub-141
Totals totals J
1047 _j
2649 5 237
1602 1250 __.,
115 -.
i
95
1
Subtotals 1469
Total 2731
3558
1851
2
893 817
+ L.
t
North
t r
716 451
1262
El Camino Real
1707
l__
753 ..__ 811 • 461 0
Total
Subtotals
Sub-
totals
2025
2517
Palomar Airport Road
Totals
4542
South Approach Note : Left-tum volumes include
U-tums. U-tums in bold.
E
a
s
A
p
p
r
• -
----
• -• -• --
•• -• ---..
---
---...
--
El Camino Real at Camino Vida Roble
Lane Configuration for Intersection Capacity Utilization
Pk. Hr. Time Period : South AQQr (NB}
7:30AM to
8:30AM ~Thru~
Lane Inside 1 1
Config-(left) 2 1
urations 3 1
4 1
5
6
Outside 7
Free-flow
Lane Settings 2 2
Capacity 3600 4000
Are the North/South phases split (YIN)?
Are the East/West phases split (YIN)?
Efficiency Lost Factor 0.10
Hourly Volume 328
Adjusted Hourly Volume 328
Utilization Factor 0.09
Critical Factors
ICU Ratio = 0.40
1044
1044
0.26
0.26
0
0
N
N
4
4
0.00
LOS=
North Aoor (SB) West AQQr {EB}
Left Thru Right Left Thru ~
1
1
1 1
1
1 1
0 3 0 2 0 1
0 6000 0 3600 0 1800
0 774 142 55 0 67
0 916 0 55 0 67
0.00 0.15 0.00 0.02 0.00 0.04
0.00 0.04
A
Page 2 of3
East AQQr {WB 2
Left Thru ~
0 0 0
0 0 0
0 0 0
0 0 0
0.00 0.00 0.00
0.00
Turning Movements at Intersection of: El Camino Real and Camino Vida Roble
Existing
w
e
s
A
p
p
r
Time : 7:45 AM
to 8:45 AM
Date: 07/13/06
Day : Thursday
Name: Sarah, Scott
Sub-
Totals . totals
470
592
122
0
Subtotals
Total
North Approach
142
J
55 _f
0 -->-
67 •
~
328
1
841
2218
South Approach
2015
916
0
774 0
+ L.
t
North
t r
1044 4
1377
El Camino Real
1099
L_
0 ..._ 0 r 0 0
Total
Subtotals
Sub-
totals
0
4
Camino Vida Roble
Totals
4
Note : Left-tum volumes include
U-tums. U-tums in bold.
E
a
s
A
p
p
r
-..
• --
• -•
• -•
..
Iii
• -• -• -• -----------..
El Camino Real at Camino Vida Roble
Lane Configuration for Intersection Capacity Utilization
Pk. Hr. Time Period : South A22r (NB2
4:30PM to
5:30PM Left Thru ~
Lane Inside 1 1
Config-(left) 2 1
urations 3 1
4 1
5
6
Outside 7
Free-flow
Lane Settings 2 2
Capacity 3600 4000
Are the North/South phases split (YIN)?
Are the East/West phases split (YIN)?
Efficiency Lost Factor 0.10
Hourly Volume 116 917
Adjusted Hourly Volume 116 918
Utilization Factor 0.03 0.23
Critical Factors 0.03
ICU Ratio = 0.62
0
0
N
N
0
0.00
LOS=
North Appr (SB) West AQQr {EB2
Left Thru Right Left Thru ~
1
1
1 1
1
1 1
0 3 0 2 0 1
0 6000 0 3600 0 1800
0 1328 46 200 0 476
0 1374 0 200 0 476
0.00 0.23 0.00 0.06 0.00 0.26
0.23 0.26
B
Page 3 of3
East AQQr {WB2
Left Thru Right
0 0 0
0 0 0
0 0 0
0 0 0
0:00 0.00 0.00
0.00
Turning Movements at Intersection of: El Camino Real and Camino Vida Roble
Existing
w
e
s
A
p
p
r
Time : 4:45 PM
to 5:45 PM
Date : 07 /13/06
Day : Thursday
Name : Sarah, Scott
Sub-
To~ totals
162
838
676
0
Subtotals
Total
North Approach
46
J
200 _t
0 --+
476 -.
~
116
2
1804
2840
2492
1374
0
1328 0
+ L.
t
North
t r
917
1036
El Camino Real
1118
L_
0
~ 0
+ 0 0
Total
Subtotals
Sub-
totals
0
0
Camino Vida Roble
Totals
0
South Approach Note : Left-tum volumes include
U-turns. U-tums in bold.
E
a
s
t
A
p
p
r
-• -• -• -•
•
• ..
• -
-
•
•
• • -• -• -• ---.. -• --
El Camino Real at Cassia Road
Lane Configuration for Intersection Capacity Utilization
Pk. Hr. Time Period : South A22r (NB2
7:30AM to
8:30AM Left Thru ~
Lane Inside 1 1
Config-(left) 2 1
urations 3 1
4
5
6
Outside 7
Free-flow
Lane Settings 1 2
Capacity 1800 4000
Are the North/South phases split (YIN)?
Are the East/West phases split (YIN)?
Efficiency Lost Factor 0.10
Hourly Volume 63
Adjusted Hourly Volume 63
Utilization Factor 0.04
Critical Factors
ICU Ratio = 0.52
1046
1046
0.26
0.26
0
0
N
N
0
0
0.00
LOS=
North Aoor (SB) West A22r {EB2
Left Thru ~ Left Thru _filgfil_
1 1
1 1
1
1 1
1 3 0 1 0 1
1800 6000 0 1800 0 1800
5 781 77 293 0 113
5 858 0 293 0 113
0.00 0.14 0.00 0.16 0.00 0.06
0.16
A
Page 2 of3
East A22r {WB}
Left Thru Right
0 0 0
0 0 0
0 0 0
0 0 0
0.00 0.00 0.00
Turning Movements at Intersection of : El Camino Real and Cassia Road
Existing
w
e
s
A
p
p
r
Time : 7:45 AM
to 8:45AM
Date: 07/13/06
Day : Thursday
Name : Art, Carlos
Sub-
Totals totals
140
546
406
0
Subtotals
Total
North Approach
77
J
293 _j
0 ____..
113 •
i
63
0
894
2003
South Approach
2207
863
5
781 5
+ L.
t
North
t r
1046 0
1109
El Camino Real
1344
l_ 0
~ 0
r 0 0
Total
Subtotals
Sub-
totals ---
0
5
Cassia Road
Totals
5
Note : Left-tum volumes include
U-turns. U-turns in bold.
E
a
s
A
p
p
r
-----• -
lill -•
-.. -• -• -• -• -
---...
----------
El Camino Real at Cassia Road
Lane Configuration for Intersection Capacity Utilization Page 3 of3
Pk. Hr. Time Period : South Appr (NB)
4:30PM to
5:30PM
Lane
Config-
urations
Inside
(left)
Outside
Free-flow
I
2
3
4
5
6
7
Lane Settings 2
Capacity 1800 4000
Are the North/South phases split (YIN)?
Are the East/West phases split (YIN)?
Efficiency Lost Factor 0.10
Hourly Volume 113 863
Adjusted Hourly Volume 113 863
Utilization Factor 0.06 0.22
Critical Factors 0.06
0
0
N
N
0
0
0.00
ICU Ratio = 0.51 LOS=
Turning Movements at Intersection of:
Existing
w
e
s
A
p
p
r
Time: 5:00 PM
to 6:00PM
Date: 07/13/06
Day : Thursday
Name : Art, Carlos
Sub-
Totals totals
346
551
205
0
Subtotals
Total
106
0
99
North Annr (SB) West Appr (EB) East Appr (WB)
3 0
1800 6000 0 1800
1493 233 106
1726 0 106
0.00 0.29 0.00 0.06
0.29 0.06
A
El Camino Real
North Approach
2697
1727
1
233 1493 1
J + ~
_j __.. t • North
+i t r
113 863 0
3
1592 976
2568
South Approach
0 0 0 0
0 1800 0 0 0
0 99 0 0 0
0 99 0 0 0
0.00 0.06 0.00 0.00 0.00
0.00
and Cassia Road
El Camino Real
970
t_ 0 ...._ 0 • 0 0
Total
Subtotals
Sub-
totals
0
0
Cassia Road
Totals
0
Note : Left-tum volumes include
U-tums. U-tums in bold.
E
a
s
t
A
p
p
r
-------• -• -1111 -•
•
• •
El Camino Real at Poinsettia Lane
Lane Configuration for Intersection Capacity Utilization
Pk. Hr. Time Period : South A22r (NB}
7:30AM to
8:30AM ~Thru~
Lane Inside 1 1
Config-(left) 2 1
urations 3 1
4 1
5 1
6
Outside 7
Free-flow
Lane Settings 2 3
Capacity 3600 6000
Are the North/South phases split (YIN)?
Are the East/West phases split (YIN)?
Efficiency Lost Factor 0.10
Hourly Volume 14 1036
Adjusted Hourly Volume 14 1036
Utilization Factor 0.00 0.17
Critical Factors 0.17
ICU Ratio = 0.35
1
0
1
1800
N
N
201
201
0.11
LOS=
North Appr (SB) West A22r (EB}
Left Thru ~ Left Thru ~
1 1
1 1
1 1
1 1 1
1
2 2 1 2 2 0
3600 4000 1800 3600 4000 0
102 770 7 8 6 8
102 770 7 8 14 0
O.Q3 0.19 0.00 0.00 0.00 0.00
O.Q3 0.00
A
Page 2of3
East AQQr {WB}
Left Thru Right
1
1
1
1 1
2 2 0
3600 4000 0
174 5 148
174 153 0
0.05 0.04 0.00
0.05
• Turning Movements at Intersection of : El Camino Real and Poinsettia Lane
1111 Existing
••
••
·-w •• e
s ·-•• A ·-p
p •• r
·-...
~-
••
·-
Time : 7:30 AM
to 8:30AM
Date : 07 /20/06
Day : Thursday
Name : Joe, Raul
Sub-
Totals totals
26
48
22
0
Subtotals
Total
North Approach
7
J
8 _j
6 __.
8 •
i
14
11
963
2214
South Approach
2082
879
11
770 102
+ ~
i
North
t r
1036 201
1251
El Camino Real
1203
l__ 148
~ 5 • 174 0
Total
Subtotals
Sub-
totals
327
309
Poinsettia Lane
Totals
636
Note : Left-tum volumes include
U-tums. U-tums in bold .
E
a
s
A
p
p
r
,.
·-••
·-••
••
,. ..
•• .. ,.
••
·-••
•• ..
•• •
·-••
·-••
·-
·-
jlllf
·-••
·-••
·--·-...
El Camino Real at Poinsettia Lane
Lane Configuration for Intersection Capacity Utilization
Pk. Hr. Time Period : South AQQr (NB}
4:30PM to
5:30PM ~ Thru Right
Lane Inside I 1
Config-(left) 2 I
urations 3 I
4 1
5 I
6
Outside 7
Free-flow
Lane Settings 2 3
Capacity 3600 6000
Are the North/South phases split (YIN)?
Are the East/West phases split (YIN)?
Efficiency Lost Factor 0.10
Hourly Volume 18 945
Adjusted Hourly Volume 18 945
Utilization Factor 0.01 0.16
Critical Factors 0.01
ICU Ratio = 0.57
I
I
1800
N
N
162
162
0.09
LOS=
North Aoor (SB) West AQQr (EB}
Left Thru Right Left Thru ~
I 1
I I
I I
1 I I
I
2 2 I 2 2 0
3600 4000 1800 3600 4000 0
243 1695 22 8 0 10
243 1695 22 8 10 0
0.07 0.42 O.Ql 0.00 0.00 0.00
0.42 0.00
A
Page 3 of3
East Aoor (WB)
Left Thru Right
I
1
I
I I
2 2 0
3600 4000 0
151 6 74
151 80 0
0.04 0.02 0.00
0.04
Turning Movements at Intersection of: El Camino Real and Poinsettia Lane
Existing
w
e
s
A
p
p
r
Time : 4:45 PM
to 5:45 PM
Date : 07 /20/06
Day : Thursday
Name : Joe, Raul
Sub-
Totals totals
46
64
18
0
Subtotals
Total
North Approach
22
J
8 _t
0 ____..
10 •
+i
18
6
1856
2981
South Approach
2989
1960
1
1695 243
~ ~
t
North
t r
945 162
1125
El Camino Real
1029
t_
74 ...._ 6 • 151
Total
Subtotals
Sub-
totals Totals
231
0 635
404
Poinsettia Lane
Note : Left-tum volumes include
U-turns. U-turns in bold.
E
a
s
t
A
p
p
r
••
, .
••
••
11111 -
,.
•• ..
..
• -•
••
-•
'""
••
,.
••
...
, ..
••
·-••
••
••
·--
••
••
....
••
El Camino Real at Dove Lane
Lane Configuration for Intersection Capacity Utilization Page 2 of3
Pk. Hr. Time Period :
7:30AM to
8:30AM
South Appr (NB)
Lane
Config-
urations
Inside
(left)
Outside
Free-flow
2
3
4
5
6
7
Lane Settings 3
Capacity 1800 6000
Are the North/South phases split (YIN)?
Are the East/West phases split (YIN)?
Efficiency Lost Factor 0.10
Hourly Volume 20 1104
Adjusted Hourly Volume 20 1110
Utilization Factor 0.01 0.19
Critical Factors 0.19
0
0
N
N
6
0
0.00
ICU Ratio = 0.34 LOS=
Turning Movements at Intersection of:
Existing
w
e
s
A
p
p
r
Time : 7:30 AM
to 8:30AM
Date : 07 /20/06
Day : Thursday
Name : Sam, Tyler
Sub-
Totals totals
72
122
50
0
Subtotals
Total
38
7
5
North Aoor (SB) West Appr (EB) East Appr (WB)
3 0
1800 6000 0 1800
29 838 47 38
29 885 0 38
0.02 0.15 0.00 0.02
0.02 0.02
A
El Camino Real
North Approach
2077
914
3
47 838 29
J + ~
_t _.. t • North
' t r
20 1104 6
2
880 1130
2010
South Approach
0 0
2000 0 1800 2000 0
7 5 35 5 21
12 0 35 26 0
0.01 0.00 0.02 0.01 0.00
o.oi
and Dove Lane
El Camino Real
1163
L 21 ...--5 .-35 0
Total
Subtotals
Sub-
totals
61
42
Dove Lane
Totals
103
Note : Left-tum volumes include
U-tums. U-tums in bold .
E
a
s
A
p
p
r
·-••
·-••
1• -• ,.
•
•• •
• •
••
1111
,.
111 ,.
••
••
lilll
·-
••
·-••
, ..
IN
·--·-
·-...
EI Camino Real at Dove Lane
Lane Configuration for Intersection Capacity Utilization Page 3 of3
Pk. Hr. Time Period :
4:30PM to
South Appr (NB)
5:30 PM
Lane
Config-
urations
Inside
(left)
Outside
Free-flow
2
3
4
5
6
7
1
1
Lane Settings 3
Capacity 1800 6000
Are the North/South phases split (YIN)?
Are the East/West phases split (YIN)?
Efficiency Lost Factor 0.10
Hourly Volume 84 816
Adjusted Hourly Volume 84 850
Utilization Factor 0.05 0.14
Critical Factors 0.05
0
0
N
N
34
0
0.00
ICU Ratio = 0.54 LOS=
Turning Movements at Intersection of:
Existing
w
e
s
A
p
p
r
Time : 4:45 PM
to 5:45 PM
Date : 07 /20/06
Day : Thursday
Name : Sam, Tyler
Sub-
Totals totals
295
553
258
0
Subtotals
Total
136
26
96
North Aoor (SB) West Appr (EB) East Annr (WB)
1 3 0
1800 6000 0 1800
76 1457 179 136
76 1636 0 136
0.04 0.27 0.00 0.08
0.27 0.08
A
El Camino Real
North Approach
2728
1712
10
179 1457 76
J + L.
_j ____.. t -. North
+i t r
84 816 34
13
1645 934
2579
South Approach
0 0 1
2000 0 1800 0 1800
26 96 79 32 53
122 0 79 85 0
0.06 0.00 0.04 0.00 0.00
0.04
and Dove Lane
El Camino Real
1016
t_
53 ...-32 • 79 2
Total
Subtotals
Sub-
totals
164
137
Dove Lane
Totals
301
Note : Left-tum volumes include
U-turns. U-tums in bold.
E
a
s
A
p
p
r
...
II
•
•• • -•
II
• •
• •
, ..
•• .. ..
• ...
••
....
11111
....
....
·-
••
....
••
, ...
••
•• ..
-••
••
••
El Camino Real at Alga Road/ Aviara Parkway
Lane Configuration for Intersection Capacity Utilization
Pk. Hr. Time Period : South AQQr (NB}
7:30AM to
8:30AM Left Thru ~
Lane Inside 1 1
Config-(left) 2 1
urations 3 1
4 1
5 1
6
Outside 7
Free-flow
Lane Settings 2 3
Capacity 3600 6000
Are the North/South phases split (YIN)?
Are the East/West phases split (YIN)?
Efficiency Lost Factor 0.10
Hourly Volume 207 916
Adjusted Hourly Volume 207 916
Utilization Factor 0.06 0.15
Critical Factors 0.06
ICU Ratio = 0.63
1
1
1800
N
N
244
244
0.14
LOS=
North Aoor (SB)
Left Thru Right
1
1
1
1
1 1
2 3 0
3600 6000 0
64 765 63
64 828 0
0.02 0.14 0.00
0.14
B
Page 2 of3
West AQQr (EB} East AQQr (WB}
Left Thru Right Left Thru ~
1 1
1 1
1 1
1 1 1
1
2 2 1 2 2 0
3600 4000 1800 3600 4000 0
87 176 292 612 353 106
87 176 292 612 459 0
0.02 0.04 0.16 0.17 0.11 0.00
0.16 0.17
Turning Movements at Intersection of: El Camino Real and Alga Road/Aviara Parkway
Existing
w
e
s
A
p
p
r
Time : 7:45 AM
to 8:45 AM
Date : 07 /20/06
Day : Thursday
North Approach
Name: Matt (AM), Sarah, Scott
Sub-63
To~ totals j
625 __t 1180 2 87
555 176 ____..
292 •
' 207
0
Subtotals 1669
Total 3036
South Approach
2001
892
0
765 64
+ L.
t
North
t r
916 244
1367
El Camino Real
1109
L 106 ...-353
r 612 7
Total
Subtotals
Sub-
totals
1071
491
Totals
1562
Alga Road/Aviara Parkway
Note : Left-tum volumes include
U-tums. U-turns in bold.
E
a
s
A
p
p
r
·-...
·-••
·-•• ...
•• ...
•• -iill ,.
••
••
••
••
1•
·-••
••
·-
i ..
·-
·-••
·-
-·-
El Camino Real at Alga Road/ Aviara Parkway
Lane Configuration for Intersection Capacity Utilization
Pk. Hr. Time Period : South Appr (NB)
4:30PM to
5:30 PM
Lane
Config-
urations
Inside
(left)
Outside
Free-flow
2
3
4
5
6
7
Lane Settings 2 3
Capacity 3600 6000
Are the North/South phases split (YIN)?
Are the East/West phases split (YIN)?
Efficiency Lost Factor 0.10
Hourly Volume 372 836
Adjusted Hourly Volume 372 886
Utilization Factor 0.10 0.15
Critical Factors 0.10
ICU Ratio = 0. 77
1
1800
N
N
581
0
0.00
LOS=
North Appr (SB)
2 3 0
3600 6000 0
214 1388 99
214 1487 0
0.06 0.25 0.00
0.25
C
Page 3 of3
West Appr (EB) East Appr (WB)
2 2 1 2 2 0
3600 4000 1800 3600 4000 0
64 448 395 372 243 63
64 448 395 372 306 0
0.02 0.11 0.22 0.10 0.08 0.00
0.22 0.10
Turning Movements at Intersection of: El Camino Real and Alga Road/ Aviara Parkway
Existing
w
e
s
A
p
p
r
Time : 5:00 PM
to 6:00PM
Date : 07 /20/06
Day : Thursday
North Approach
Name : Matt (AM), Sarah, Scott
Sub-99
Totals totals J
715 _t 1622 1 64
907 448 --+
395 •
i
372
0
Subtotals 2155
Total 3944
South Approach
2673
1701
8
1388 214
+ ~
t
North
t r
836 581
1789
El Camino Real
972
L_ 63 ..-243
+ 372 10
Total
Subtotals
Sub-
totals
678
1252
Totals
1930
Alga Road/Aviara Parkway
Note : Left-tum volumes include
U-tums. U-tums in bold.
E
a
s
t
A
p
p
r
·-••
·-...
·-••
••
••
••
••
••
•• ,.
••
111111
••
••
·-
·-
·-••
·--, ..
••
, ..
·-
Poinsettia Lane at Aviara Parkway
Lane Configuration for Intersection Capacity Utilization Page 2 of3
Pk. Hr. Time Period :
7:30 AM to
8:30AM
South Appr (NB)
Lane
Config-
urations
Inside
(left)
Outside
Free-flow
2
3
4
5
6
7
Lane Settings 2 2
Capacity 3600 4000
Are the North/South phases split (YIN)?
Are the East/West phases split (YIN)?
Efficiency Lost Factor 0.10
Hourly Volume 252 228
Adjusted Hourly Volume 252 230
Utilization Factor 0.07 0.06
Critical Factors 0.07
0
0
N
N
2
0
0.00
ICU Ratio = 0.43 LOS=
Turning Movements at Intersection of:
Existing
w
e
s
t
A
p
p
r
Time : 7:45 AM
to 8:45 AM
Date : 08/08/06
Day : Tuesday
Name : Matt, Mark
Sub-
T~ totals
544
1561
1017
3
Subtotals
Total
497
271
249
North Aoor (SB) West Appr (EB) East Appr (WB)
2 0 2
1800 4000 0 3600
17 129 71 497
17 200 0 497
O.ol 0.05 0.00 0.14
0.05 0.14
A
Poinsettia Lane
North Approach
993
217
0
71 129 17
J + L.
~ ____.. t • North
~ t r
252 228 2
0
388 482
870
South Approach
2 2 0
2000 3600 1800 4000 0
271 249 10 221 51
271 249 10 272 0
0.14 0.07 0:01 O.Q7 0.00
O.Q7
and Aviara Parkway
Poinsettia Lane
776
L 51 ..--221 r 10 1
Total
Subtotals
Sub-
totals
282
290
Aviara Parkway
Totals
572
Note : Left-tum volumes include
U-turns. U-turns in bold.
E
a
s
t
A
p
p
r
••
••
·-....
.....
illll
.... ...
...
••
••
•
••
••
·-••
••
••
•• -
·-·-·-••
·-·-·-1•
-·-,.
·-,.
Poinsettia Lane at Aviara Parkway
Lane Configuration for Intersection Capacity Utilization
Pk. Hr. Time Period : South Aeer (NB2
4:30PM to
5:30PM Left Thru ~
Lane Inside 1 1
Config -(left) 2 1
urations 3 1
4 1
5
6
Outside 7
Free-flow
Lane Settings 2 2
Capacity 3600 4000
Are the North/South phases split (YIN)?
Are the East/West phases split (YIN)?
Efficiency Lost Factor 0.10
Hourly Volume 321 187
Adjusted Hourly Volume 321 197
Utilization Factor 0.09 0.05
Critical Factors 0.09
ICU Ratio = 0.55
1
0
0
N
N
10
0
0.00
LOS=
North Aoor (SB) West AQQr (EB2
Left Thru ~ Left Thru ~
1 1
1
1 1
1 1 1
1
1 2 0 2 1 2
1800 4000 0 3600 2000 3600
89 413 367 133 308 352
89 780 0 133 308 352
0.05 0.20 0.00 0.04 0.15 0.10
0.20 0.15
A
Page 3 of3
East AQQr (WB2
Left Thru __filgh!._
1
1
1 1
1 2 0
1800 4000 0
9 223 53
9 276 0
0.01 0.07 0.00
0.01
Turning Movements at Intersection of: Poinsettia Lane and A viara Parkway
Existing
w
e
s
A
p
p
r
Time: 5:00 PM
to 6:00PM
Date : 08/08/06
Day : Tuesday
Name : Matt, Mark
Sub-
Totals totals
911
1704
793
2
Subtotals
Total
133
308
352
North Approach
869
367 413
J + _j ____.. t • North
~ t
321 187
6
774 518
1292
South Approach
1243
2
89
L.
r
10
Poinsettia Lane
374
t_
53
._ 223
.---9 1
Total
Subtotals
Sub-
totals
285
406
Aviara Parkway
Totals
691
Note : Left-tum volumes include
U-turns. U-tums in bold.
E
a
s
A
p
p
r
·-••
·-••
·-·-...
••
••
• -•
1111
!Ill
•• -••
El Camino Real at Palomar Airport Road
Lane Configuration for Intersection Capacity Utilization Page 2 of3
Pk. Hr. Time Period : South A_QQr (NB}
7:30AM to
8:30AM Left Thru ~
Lane Inside 1 1
Config-(left) 2 1
urations 3 1
4 1
5
6
Outside 7
Free-flow
Lane Settings 1 3
Capacity 1800 6000
Are the North/South phases split (YIN)?
Are the East/West phases split (YIN)?
Efficiency Lost Factor 0.10
Hourly Volume 107 561
Adjusted Hourly Volume 107 561
Utilization Factor 0.06 0.09
Critical Factors
ICU Ratio = 0.68
1
1
2
3600
N
N
392
392
0.11
0.11
LOS=
North Appr (SB)
Left Thru ~
1
1
1
1
1
1
2 3 1
3600 6000 1800
441 678 263
441 678 263
0.12 0.11 0.15
0.12
B
West AQ.Qr {EB} East AQQr {WB}
Left Thru ~ Left Thru __filgh!_
1 1
1 1
1 1
1 1
1 1 1
1
1
2 3 0 2 3 2
3600 6000 0 3600 6000 3600
79 517 64 573 1151 1185
79 581 0 573 1151 1185
0.02 0.10 0.00 0.16 0.19 0.33
0.02 0.33
•• Turning Movements at Intersection of: El Camino Real and Palomar Airport Road
111 Existing + Project
Time : 7:15 AM
to 8:15 AM North Approach • Date : 07/13/06
Day : Thursday
IJII Name: Albert, Jasen, Joe, Raul
1111 Sub-263
·-Totals totals J w
e 1521 ~ s 2181 3 79 -t 660 517 ->-
1111 64 • A
'""' p
•• p i r
107
'""' 2
•• Subtotals 1315
Total 2375 -South Approach
••
3209
1382
2
678 441
+ L.
t
North
t r
561 392
1060
El Camino Real
1827
L 1185 ..--1151
r 573
Total
Subtotals
Sub-
totals Totals
2909
0 4259
1350
Palomar Airport Road
Note : Left-tum volumes include
U-tums. U-tums in bold .
E
a
s
A
p
p
r
••
•• ...
••
••
•
••
•
•
•
•• ,.
..
·-,.
·-
!Ill
·-·-·-•• -
------
El Camino Real at Palomar Airport Road
Lane Configuration for Intersection Capacity Utilization Page 3 of3
Pk. Hr. Time Period : South Appr (NB)
4:30 PM to
5:30 PM
Lane
Config-
urations
Inside
(left)
Outside
Free-flow
1
2
3
4
5
6
7
Lane Settings 3
Capacity 1800 6000
Are the North/South phases split (YIN)?
Are the East/West phases split (YIN)?
Efficiency Lost Factor 0.10
Hourly Volume 98 717
Adjusted Hourly Volume 98 717
Utilization Factor 0.05 0.12
Critical Factors
ICU Ratio = 0.82
2
3600
N
N
452
452
0.13
0.13
LOS=
North Annr (SB)
2 3
3600 6000 1800
817 896 141
817 896 141
0.23 0.15 0.08
0.23
D
West Appr (EB) East Appr (WB)
2 3 0 2 3 2
3600 6000 0 3600 6000 3600
237 1250 120 463 811 753
237 1370 0 463 811 753
O.Q7 0.23 0.00 0.13 0.14 0.21
0.23 0.13
Turning Movements at Intersection of: El Camino Real and Palomar Airport Road
Existing + Project
Time : 4:45 PM
to 5:45 PM
Date: 07/13/06
Day : Thursday
North Approach
Name : Albert, Jasen, Joe, Raul
Sub-141
To~ totals J w
e 1050 __j s 2657 5 237
t 1607 1250 ------->-
120 -. A
p
p i r
98
1
Subtotals 1479
Total 2746
3562
1854
2
896 817 • ~
t
North
t r
717 452
1267
El Camino Real
1708
L 753
~ 811 • 463 0
Total
Subtotals
Sub-
totals
2027
2518
Palomar Airport Road
Totals
4545
South Approach Note : Left-tum volumes include
U-tums. U-tums in bold.
E
a
s
A
p
p
r
... ...
••
••
••
••
••
••
••
• • ,.
• ,.
•• ,. ..
••
••
•
--------
El Camino Real at Camino Vida Roble
Lane Configuration for Intersection Capacity Utilization Page 2 of3
Pk. Hr. Time Period :
7:30AM to
8:30AM
South Appr (NB)
Lane
Config-
urations
Inside
(left)
Outside
Free-flow
2
3
4
5
6
7
Lane Settings 2 2
Capacity 3600 4000
Are the North/South phases split (YIN)?
Are the East/West phases split (YIN)?
Efficiency Lost Factor 0.10
Hourly Volume 329 1053
Adjusted Hourly Volume 329 1053
Utilization Factor 0.09 0.26
Critical Factors 0.26
0
0
N
N
0
0
0.00
ICU Ratio = 0.40 LOS=
Turning Movements at Intersection of:
Existing + Project
w
e
s
A
p
p
r
Time : 7:45 AM
to 8:45 AM
Date : 07/13/06
Day : Thursday
Name : Sarah, Scott
Sub-
T~ totals
471
593
122
0
Subtotals
Total
55
0
67
North Aoor (SB) West Appr (EB) · East Appr (WB)
0 3 0 2
0 6000 0 3600
0 776 142 55
0 918 0 55
0.00 0.15 0.00 0.02
0.00
A
El Camino Real
North Approach
2026
918
0
142 776 0
J + ~
_J
~ t • North
i t r
329 1053 0
1
843 1383
2226
South Approach
0 0 0 0
0 1800 0 0 0
0 67 0 0 0
0 67 0 0 0
0.00 0.04 0.00 0.00 0.00
0.04 0.00
and Camino Vida Roble
El Camino Real
1108
L 0 +--0
r 0 0
Total
Subtotals
Sub-
totals
0
0
Camino Vida Roble
Totals
0
Note : Left-tum volumes include
U-turns. U-turns in bold.
E
a
s
A
p
p
r
illlri
...
•• ...
••
••
••
••
• ,.
••
••
••
••
••
••
••
'-
-------
El Camino Real at Camino Vida Roble
Lane Configuration for Intersection Capacity Utilization Page 3 of3
Pk. Hr. Time Period : South Appr (NB)
4:30PM to
5:30PM
Lane
Config-
urations
Inside
(left)
Outside
Free-flow
2
3
4
5
6
7
Lane Settings 2 2
Capacity 3600 4000
Are the North/South phases split (YIN)?
Are the East/West phases split (YIN)?
Efficiency Lost Factor 0.10
Hourly Volume 116 922
Adjusted Hourly Volume 116 922
Utilization Factor 0.03 0.23
Critical Factors 0.03
0
0
N
N
0
0
0.00
ICU Ratio = 0.63 LOS=
Turning Movements at Intersection of:
Existing + Project
w
e
s
A
p
p
r
Time : 4:45 PM
to 5:45 PM
Date : 07 /13/06
Day : Thursday
Name: Sarah, Scott
Sub-
Totals totals
162
839
677
0
Subtotals
Total
200
0
477
North Annr (SB) West Appr (EB) East Appr (WB)
0 3 0 2
0 6000 0 3600
0 1338 46 200
0 1384 0 200
0.00 0.23 0.00 0.06
0.23
B
El Camino Real
North Approach
2507
1384
0
46 1338 0
J + ~
~ ____.. t • North
~ t r
116 922 0
2
1815 1040
2855
South Approach
0 0 0 0
0 1800 0 0 0
0 477 0 0 0
0 477 0 0 0
0.00 0.27 0.00 0.00 0.00
0.27 0.00
and Camino Vida Roble
El Camino Real
1123
L 0
~ 0 .. 0 0
Total
Subtotals
Sub-
totals
0
0
Camino Vida Roble
Totals
0
Note : Left-tum volumes include
U-tums. U-tums in bold.
E
a
s
A
p
p
r
....
-· .... ...
••
••
••
•• -• -• -• -II -
• -• -----
--------
El Camino Real at Cassia Road
Lane Configuration for Intersection Capacity Utilization
Pk. Hr. Time Period : South AQQr (NB}
7:30AM to
8:30AM Left Thru ~
Lane Inside 1 1
Config-(left) 2 1
urations 3 1
4
5
6
Outside 7
Free-flow
Lane Settings 1 2
Capacity 1800 4000
Are the North/South phases split (YIN)?
Are the East/West phases split (YIN)?
Efficiency Lost Factor 0.10
Hourly Volume 66
Adjusted Hourly Volume 66
Utilization Factor 0.04
Critical Factors
ICU Ratio = 0.53
1046
1046
0.26
0.26
0
0
N
N
0
0
0.00
LOS=
North Appr (SB) West AQQr {EB}
Left Thru _filgh!_ Left Thru _filgh!_
1 1
1 1
1
1 1
1 3 0 1 0 1
1800 6000 0 1800 0 1800
0 781 79 303 0 125
0 860 0 303 0 125
0.00 0.14 0.00 0.17 0.00 0.07
0.17
A
Page 2 of3
East AQQr {WB}
Left Thru Right
0 0 0
0 0 0
0 0 0
0 0 0
0.00 0.00 0.00
Turning Movements at Intersection of: El Camino Real and Cassia Road
Existing+ Project
w
e
s
A
p
p
r
Time : 7:45 AM
to 8:45 AM
Date : 07 /13/06
Day : Thursday
Name : Art, Carlos
Sub-
To~ totals
145
573
428
0
Subtotals
Total
North Approach
79
J
303 _j
0 __..
125 -.
~
66
0
906
2018
South Approach
2214
860
5
781 0
+ ~
t
North
t r
1046 0
1112
El Camino Real
1354
L 0 +-0
r 0 0
Total
Subtotals
Sub-
totals
0
0
Cassia Road
Totals
0
Note : Left-tum volumes include
U-tums. U-tums in bold.
E
a
s
A
p
p
r
---• -
-• -• -•
• -• -• -• --.. .. ---
----------
El Camino Real at Cassia Road
Lane Configuration for Intersection Capacity Utilization Page 3 of3
Pk. Hr. Time Period : South AQQr (NB}
4:30PM to
5:30PM Left Thru Right
Lane Inside 1 1
Config-(left) 2 1
urations 3 1
4
5
6
Outside 7
Free-flow
Lane Settings 1 2
Capacity 1800 4000
Are the North/South phases split (YIN)?
Are the East/West phases split (YIN)?
Efficiency Lost Factor 0.10
Hourly Volume 125 863
Adjusted Hourly Volume 125 863
Utilization Factor 0.07 0.22
Critical Factors 0.07
0
0
N
N
0
0
0.00
ICU Ratio = 0.52 LOS=
Turning Movements at Intersection of:
Existing+ Project
w
e
s
A
p
p
r
Time: 5:00 PM
to 6:00PM
Date : 07 /13/06
Day : Thursday
Name : Art, Carlos
Sub-
Totals totals
369
585
216
0
Subtotals
Total
111
0
105
North Aoor (SB) West AQQr {EB} East AQQr {WB}
Left Thru Right Left Thru Right Left Thru ~
1 1
1 1·
1
1 1
1 3 0 1 0 1 0 0 0
1800 6000 0 1800 0 1800 0 0 0
0 1493 244 111 0 105 0 0 0
0 1737 0 111 0 105 0 0 0
0.00 0.29 0.00 0.06 0.00 0.06 0.00 0.00 0.00
0.29 0.06 0.00
A
El Camino Real and Cassia Road
North Approach
1737
244 1493
J + _t
~ t • North
+i t
125 863
3
1598 988
2586
South Approach
2712
1
0
L.
r
0
El Camino Real
975
L_
0
-4lf-0 • 0 0
Total
Subtotals
Sub-
totals
0
-1
Cassia Road
Totals
-1
Note : Left-tum volumes include
U-turns. U-turns in bold.
E
a
s
A
p
p
r
-----•
-• -• ..
-------
-...
-..
----------
El Camino Real at Poinsettia Lane
Lane Configuration for Intersection Capacity Utilization Page 2 of3
Pk. Hr. Time Period :
7:30 AM to
8:30AM
South Appr (NB)
Lane
Config-
urations
Inside
(left)
Outside
Free-flow
2
3
4
5
6
7
Lane Settings 2 3
Capacity 3600 6000
Are the North/South phases split (YIN)?
Are the East/West phases split (YIN)?
Efficiency Lost Factor 0.10
Hourly Volume 14 1039
Adjusted Hourly Volume 14 1039
Utilization Factor 0.00 0.17
Critical Factors 0.17
0
1800
N
N
201
201
0.11
ICU Ratio = 0.35 LOS=
Turning Movements at Intersection of:
Existing + Project
w
e
s
t
A
p
p
r
Time : 7:30 AM
to 8:30AM
Date : 07 /20/06
Day : Thursday
Name: Joe, Raul
Sub-
T~ totals
26
48
22
0
Subtotals
Total
8
6
8
North Annr (SB) West Appr (EB) East Appr (WB)
2 2 2
3600 4000 1800 3600
102 782 7 8
102 782 7 8
0.03 0.20 0.00 0.00
0.03
A
El Camino Real
North Approach
2097
891
11
7 782 102
J + ~
__j
--+ t --. North
' t r
14 1039 201
11
975 1254
2229
South Approach
2 0 2 2 0
4000 0 3600 4000 0
6 8 174 5 148
14 0 174 153 0
0.00 0.00 0.05 0.04 0.00
0.00 0.05
and Poinsettia Lane
El Camino Real
1206
L_ 148 +---5
r 174
Total
Subtotals
Sub-
totals Totals
327
0 636
309
Poinsettia Lane
Note : Left-tum volumes include
U-tums. U-tums in bold.
E
a
s
A
p
p
r
---.. -.. -... -• -• -
1111 -II -1111 -• -• -• -• ---
--------
El Camino Real at Poinsettia Lane
Lane Configuration for Intersection Capacity Utilization Page 3 of3
Pk. Hr. Time Period :
4:30PM to
South Appr (NB)
5:30 PM
Lane
Config-
urations
Inside
(left)
Outside
Free-flow
1
2
3
4
5
6
7
Lane Settings 2 3
Capacity 3600 6000
Are the North/South phases split (YIN)?
Are the East/West phases split (YIN)?
Efficiency Lost Factor 0.10
Hourly Volume 18 957
Adjusted Hourly Volume 18 957
Utilization Factor 0.01 0.16
Critical Factors 0.01
1800
N
N
162
162
0.09
ICU Ratio = 0.58 LOS=
Turning Movements at Intersection of:
Existing + Project
w
e
s
A
p
p
r
Time : 4:45 PM
to 5:45 PM
Date : 07 /20/06
Day : Thursday
Name: Joe, Raul
Sub-
T~ totals
46
64
18
0
Subtotals
Total
8
0
10
North Avvr (SB) West Appr (EB) East Appr (WB)
2 2 2
3600 4000 1800 3600
243 1701 22 8
243 1701 22 8
0.07 0.43 0.01 0.00
0.43
A
El Camino Real
North Approach
3007
1966
1
22 1701 243
J i L.
_t _.... t t North
i t r
18 957 162
6
1862 1137
2999
South Approach
2 0 2 2 0
4000 0 3600 4000 0
0 10 151 6 74
10 0 151 80 0
0.00 0.00 0.04 0.02 0.00
0.00 0.04
and Poinsettia Lane
El Camino Real
1041
L 74 +-6 • 151
Total
Subtotals
Sub-
totals Totals
231
0 635
404
Poinsettia Lane
Note : Left-tum volumes include
U-turns. U-turns in bold.
E
a
s
t
A
p
p
r
-------•
-• -• -• -• -..
--------------
El Camino Real at Dove Lane
Lane Configuration for Intersection Capacity Utilization
Pk. Hr. Time Period : South AQQr (NB}
7:30AM to
8:30AM ~Thru~
Lane Inside 1 1
Config-(left) 2 1
urations 3 1
4 1
5
6
Outside 7
Free-flow
Lane Settings 1 3
Capacity 1800 6000
Are the North/South phases split (YIN)?
Are the East/West phases split (YIN)?
Efficiency Lost Factor 0.10
Hourly Volume 20 1107
Adjusted Hourly Volume 20 1113
Utilization Factor O.Ql 0.19
Critical Factors 0.19
ICU Ratio = 0.34
1
0
0
N
N
6
0
0.00
LOS=
North Appr (SB) West A22r (EB}
Left Thru Right Left Thru Right
1 1
1 1 1
1
1 1
1 3 0 1 1 0
1800 6000 0 1800 2000 0
29 850 47 38 7 5
29 897 0 38 12 0
0.02 0.15 0.00 0.02 0.01 0.00
0.02 0.02
A
Page 2 of3
East Annr (WB)
Left Thru ~
1
1 1
1 1 0
1800 2000 0
35 5 .21
35 26 0
0.02 O.Ql 0.00
O.Ql
Turning Movements at Intersection of: El Camino Real and Dove Lane
Existing + Project
w
e
s
t
A
p
p
r
Time : 7:30 AM
to 8:30AM
Date : 07 /20/06
Day : Thursday
Name : Sam, Tyler
Sub-
Totals totals
72
122
50
0
Subtotals
Total
38
7
5
North Approach
926
47 850
J t
_j
~ t • North
i t
20 1107
2
892 1133
2025
South Approach
2092
3
29
L.
r
6
El Camino Real
11~6
L 21 ._ 5
r 35 0
Total
Subtotals
Sub-
totals
61
42
Dove Lane
Totals
103
Note : Left-tum volumes include
U-turns. U-tums in bold.
E
a
s
A
p
p
r
---
-• ---• -• -.. -• -• --.. ---------------..
El Camino Real at Dove Lane
Lane Configuration for Intersection Capacity Utilization
Pk. Hr. Time Period : South A22r (NB}
4:30PM to
5:30PM --1:4!..__ Thru ~
Lane Inside 1 1
Config-(left) 2 1
urations 3 1
4 1
5
6
Outside 7
Free-flow
Lane Settings 1 3
Capacity 1800 6000
Are the North/South phases split (YIN)?
Are the East/West phases split (YIN)?
Efficiency Lost Factor 0.10
Hourly Volume 84 828
Adjusted Hourly Volume 84 862
Utilization Factor 0.05 0.14
Critical Factors 0.05
ICU Ratio = 0.54
1
0
0
N
N
34
0
0.00
LOS=
North Aoor (SB) West A22r {EB} ·
Left Thru ~ Left Thru ~
1 1
1 1 1
1
1 1
1 3 0 1 1 0
1800 6000 0 1800 2000 0
76 1463 179 136 26 96
76 1642 0 136 122 0
0.04 0.27 0.00 0.08 0.06 0.00
0.27 0.08
A
Page 3 of3
EastAE!E!r {WB}
Left Thru ~
1
1 1
1 0 1
1800 0 1800
79 32 53
79 85 0
0.04 0.00 0.00
0.04
Turning Movements at Intersection of : El Camino Real and Dove Lane
Existing+ Project
w
e
s
t
A
p
p
r
Time : 4:45 PM
to 5:45 PM
Date : 07 /20/06
Day : Thursday
Name : Sam, Tyler
Sub-
To~ totals
295
553
258
0
Subtotals
Total
136
26
96
North Approach
179
J
~ __.. •
~
84
13
1651
2597
South Approach
2746
1718
10
1463 76
+ ~
t
North
t r
828 34
946
El Camino Real
1028
L_
53 -+--32
+ 79 2
Total
Subtotals
Sub-
totals
164
137
Dove Lane
Totals
301
Note : Left-turn volumes include
U-tums. U-tums in bold.
E
a
s
A
p
p
r
-----.. -• -• -•
ii -• -• -• -• -•
..
-
-----..
-• --
Poinsettia Lane at A viara Parkway
Lane Configuration for Intersection Capacity Utilization Page 2 of3
Pk. Hr. Time Period :
7:30AM to
8:30AM
South Appr (NB)
Lane
Config-
urations
Inside
(left)
Outside
Free-flow
2
3
4
5
6
7
Lane Settings 2 2
Capacity 3600 4000
Are the North/South phases split (YIN)?
Are the East/West phases split (YIN)?
Efficiency Lost Factor 0.10
Hourly Volume 252 228
Adjusted Hourly Volume 252 230
Utilization Factor 0.07 0.06
Critical Factors 0.07
0
0
N
N
2
0
0.00
ICU Ratio = 0.43 LOS=
Turning Movements at Intersection of:
Existing+ Project
w
e
s
A
p
p
r
Time : 7:45 AM
to 8:45 AM
Date : 08/08/06
Day : Tuesday
Name: Matt, Mark
Sub-
T~ totals
561
1583
1022
3
Subtotals
Total
497
276
249
North Aoor (SB) West Appr (EB) East Appr (WB)
1 2 0 2
1800 4000 0 3600
18 129 71 497
18 200 0 497
0.01 0.05 0.00 0.14
0.05 0.14
A
Poinsettia Lane
North Approach
999
218
0
71 129 18
J + L.
___j _.. t • North
~ t r
252 228 2
0
388 482
870
South Approach
1 2 2 0
2000 3600 1800 4000 0
276 249 IO 238 56
276 249 IO 294 0
0.14 0.07 0.01 0.07 0.00
0.07
and Aviara Parkway
Poinsettia Lane
781
L 56
~ 238 .-IO 1
Total
Subtotals
Sub-
totals
304
296
Aviara Parkway
Totals
600
Note : Left-tum volumes include
U-turns. U-turns in bold.
E
a
s
A
p
p
r
-• -• -• -• -• -
-• -•
• -• ------------------
Poinsettia Lane at Aviara Parkway
Lane Configuration for Intersection Capacity Utilization Page 3 of3
Pk. Hr. Time Period : South AQQr (NB)
4:30PM to
5:30PM Left Thru Right
Lane Inside 1 1
Config -(left) 2 1
urations 3 1
4 1
5
6
Outside 7
Free-flow
Lane Settings 2 2
Capacity 3600 4000
Are the North/South phases split (YIN)?
Are the East/West phases split (YIN)?
Efficiency Lost Factor 0.10
Hourly Volume 321 187
Adjusted Hourly Volume 321 197
Utilization Factor 0.09 0.05
Critical Factors 0.09
1
0
0
N
N
10
0
0.00
ICU Ratio = 0.56 LOS=
Turning Movements at Intersection of:
Existing + Project
w
e
s
t
A
p
p
r
Time: 5:00 PM
to 6:00PM
Date : 08/08/06
Day : Tuesday
Name : Matt, Mark
Sub-
T~ totals
919
1731
812
2
Subtotals
Total
133
327
352
North Annr (SB) West AQQr {EB) East AQQr {WB)
Left Thru ~ Left Thru Right Left Thru Right
1 1 1
1
1 1 1
1 1 1 1 1
1
1 2 0 2 1 2 1 2 0
1800 4000 0 3600 2000 3600 1800 4000 0
94 413 367 133 327 352 9 231 55
94 780 0 133 327 352 9 286 0
0.05 0.20 0.00 0.04 0.16 0.10 0.01 0.07 0.00
0.20 0.16 0.01
A
Poinsettia Lane and Aviara Parkway
North Approach
874
367 413
J + _t __. t • North
+i t
321 187
6
774 518
1292
South Approach
1250
2
94
L.
r
10
Poinsettia Lane
376
L 55 ..__ 231 • 9 1
Total
Subtotals
Sub-
totals
295
430
Aviara Parkway
Totals
725
Note : Left-tum volumes include
U-tums. U-turns in bold.
E
a
s
t
A
p
p
r
-• ..
• -• -• -• -•
•
• -• -• -• -• -.. ---... -..
------
El Camino Real at Palomar Airport Road
Lane Configuration for Intersection Capacity Utilization Page 2 of3
Pk. Hr. Time Period :
7:30AM to
8:30AM
South Appr (NB)
Lane
Config-
urations
Inside
(left)
Outside
Free-flow
Lane Settings
Capacity
2
3
4
5
6
7
1
1800
3
6000
Are the North/South phases split (YIN)?
Are the East/West phases split (YIN)?
Efficiency Lost Factor 0.10
Hourly Volume 296 1026
Adjusted Hourly Volume 296 1026
Utilization Factor 0.16 0.17
Critical Factors 0.16
ICU Ratio= 1.15
2
3600
N
N
467
467
0.13
LOS=
North Aoor (SB)
2 3
3600 6000 1800
539 792 396
539 792 396
0.15 0.13 0.22
0.22
F
West Appr (EB)
2
3600
833
833
0.23
0.23
1
1
3
6000
563
705
0.12
0
0
142
0
0.00
East Appr (WB)
2 3 2
3600 6000 3600
602 1195 1592
602 1195 1592
0.17 0.20 0.44
0.44
Turning Movements at Intersection of: El Camino Real and Palomar Airport Road
Existing+Project+Cumulative Project
Time: 7:15 AM
to 8:15 AM North Approach El Camino Real
Date : 07 /13/06
Day : Thursday 5180 Total
Name : Albert, Jasen, Joe, Raul 1727 3453 Subtotals
2
Sub-396 792 539 Sub-
Totals totals J + w L. totals
e 1887 _t s 3425 3 833
1538 563 ~ t 142 ------. A North
L 1592
~ 1195 3389
r 602 0
p t p i r
1569 r
296 1026 467 Palomar Airport Road
2
Subtotals 1536 1789
Total 3325
Totals
4958
South Approach Note : Left-tum volumes include
U-turns. U-turns in bold.
E
a
s
A
p
p
r
-• -• -..
• .. -• -•
• -• -• -II
•
-
------------
El Camino Real at Palomar Airport Road
Lane Configuration for Intersection Capacity Utilization Page 3 of3
Pk. Hr. Time Period : South AQQr (NB} North Annr (SB) West AQQr {EB} East AQQr {WB}
4:30PM to
5:30 PM ~Thru~ Left Thru ~ Left Thru ~ Left Thru ~
Lane Inside 1 1 1 1 1
Config-(left) 2 1 1 1 1
urations 3 1 1 1 1
4 1 1 1 1
5 1 1 1 1 1
6 1 1 1
Outside 7 1
Free-flow
Lane Settings 1 3 2 2 3 1 2 3 0 2 3 2
Capacity 1800 6000 3600 3600 6000 1800 3600 6000 0 3600 6000 3600
Are the North/South phases split (YIN)? N
Are the East/West phases split (YIN)? N
Efficiency Lost Factor 0.10
Hourly Volume 201 883 490 1218 1378 931 445 1268 351 555 882 902
Adjusted Hourly Volume 201 883 490 1218 1378 931 445 1619 0 555 882 902
Utilization Factor 0.11 0.15 0.14 0.34 0.23 0.52 0.12 0.27 0.00 0.15 0.15 0.25
Critical Factors 0.11 0.52 0.27 0.15
ICU Ratio= 1.15 LOS= F
Turning Movements at Intersection of: El Camino Real and Palomar Airport Road
Existing+ Project+Cumulative Project
Time : 4:45 PM
to 5:45 PM North Approach El Camino Real
Date : 07 /13/06
Day : Thursday 5758 Total
Name: Albert, Jasen, Joe, Raul 3527 2231 Subtotals
2
Sub-931 1378 1218 Sub-
To~ totals J + w L. totals
e 2014 ~ s 4078 5 445
t 2064 1268~ t 351 • A North
L 902 +--882 2339 • 555 0
p t p i r
2975 r
201 883 490 Palomar Airport Road
1
Subtotals 2284 1574
Total 3858
Totals
5314
South Approach Note : Left-tum volumes include
U-tums. U-turns in bold.
E
a
s
t
A
p
p
r
---• -• -• -• -• -•
• -• -• -•
•
--.. ---------
El Camino Real at Camino Vida Roble
Lane Configuration for Intersection Capacity Utilization
Pk. Hr. Time Period : South A1212r (NB}
7:30AM to
8:30AM Left Thru ~
Lane Inside 1 1
Config-(left) 2 1
urations 3 1
4 1
5
6
Outside 7
Free-flow
Lane Settings 2 2
Capacity 3600 4000
Are the North/South phases split (YIN)?
Are the East/West phases split (YIN)?
Efficiency Lost Factor 0.10
Hourly Volume 348 1531
Adjusted Hourly Volume 348 1531
Utilization Factor 0.10 0.38
Critical Factors 0.38
ICU Ratio = 0.53
0
0
N
N
0
0
0.00
LOS=
North Appr (SB) West AJ2J2r {EB}
Left Thru Right Left Thru Right
1
1
1 1
1
1 1
0 3 0 2 0 1
0 6000 0 3600 0 1800
0 899 142 55 0 84
0 1041 0 55 0 84
0.00 0.17 0.00 0.02 0.00 0.05
0.00 0.05
A
Page 2 of3
East AJ2J2r {WB}
Left Thru __filg!rt_
0 0 0
0 0 0
0 0 0
0 0 0
0.00 0.00 0.00
0.00
Turning Movements at Intersection of: El Camino Real and Camino Vida Roble
Existing+Project+Cumulative Projects
w
e
s
A
p
p
r
Time : 7:45 AM
to 8:45 AM
Date: 07/13/06
Day : Thursday
Name : Sarah, Scott
Sub-
Totals totals
490
629
139
0
Subtotals
Total
55
0
84
North Approach
1041
142 899
j + __t __.. t • North
' t
348 1531
1
983 1880
2863
South Approach
2627
0
0
L.
r
0
El Camino Real
1586
L 0 ...._ 0
r 0
Total
Subtotals
Sub-
totals Totals
0
0 0
0
Camino Vida Roble
Note: Left-tum volumes include
U-turns. U-turns in bold.
E
a
s
A
p
p
r
-.. ----• -• ..
•
••
••
••
-• -• -
-• -
----------
El Camino Real at Camino Vida Roble
Lane Configuration for Intersection Capacity Utilization Page 3 of3
Pk. Hr. Time Period : South A1212r (NB}
4:30PM to
5:30PM Left Thru Right
Lane Inside 1 1
Config-(left) 2 1
urations 3 1
4 1
5
6
Outside 7
Free-flow
Lane Settings 2 2
Capacity 3600 4000
Are the North/South phases split (YIN)?
Are the East/West phases split (YIN)?
Efficiency Lost Factor 0.10
Hourly Volume 139 1139
Adjusted Hourly Volume 139 1139
Utilization Factor 0.04 0.28
Critical Factors 0.04
0
0
N
N
0
0
0.00
ICU Ratio = 0.74 LOS=
Turning Movements at Intersection of :
Existing+Project+Cumulative Projects
w
e
s
t
A
p
p
r
Time : 4:45 PM
to 5:45 PM
Date: 07/13/06
Day : Thursday
Name : Sarah, Scott
Sub-
Totals totals
185
884
699
0
Subtotals
Total
200
0
499
North Appr (SB) West A1212r (EB} East AJ212r {WB 2
Left Thru ~ Left Thru ~ Left Thru ~
1
1
1 1
1
1 1
0 3 0 2 0 1 0 0 0
0 6000 0 3600 0 1800 0 0 0
0 1844 46 200 0 499 0 0 0
0 1890 0 200 0 499 0 0 0
0.00 0.32 0.00 0.06 0.00 0.28 0.00 0.00 0.00
0.32 0.28 0.00
C
El Camino Real and Camino Vida Roble
North Approach
1890
46 1844
J + _j -.. t • North
+i t
139 1139
2
2343 1280
3623
South Approach
3230
0
0
~
r
0
El Camino Real
1340
L_
0
~ 0 • 0 0
Total
Subtotals
Sub-
totals
0
0
Camino Vida Roble
Totals
0
Note: Left-tum volumes include
U-turns. U-turns in bold.
E
a
s
A
p
p
r
• -• -----• -•
• -----• -•
•
• ------------
El Camino Real at Cassia Road
Lane Configuration for Intersection Capacity Utilization Page 2 of3
Pk. Hr. Time Period : South AQQr (NB}
7:30AM to
8:30AM Left Thro Right
Lane Inside 1 1
Config-(left) 2 1
urations 3 1
4
5
6
Outside 7
Free-flow
Lane Settings 1 2
Capacity 1800 4000
Are the North/South phases split (YIN)?
Are the East/West phases split (YIN)?
Efficiency Lost Factor 0.10
Hourly Volume 66 1533
Adjusted Hourly Volume 66 1533
Utilization Factor 0.04 0.38
Critical Factors 0.38
0
0
N
N
14
14
0.00
ICU Ratio = 0.65 LOS=
Turning Movements at Intersection of :
Existing+Project+Cumulative Projects
w
e
s
t
A
p
p
r
Time : 7:45 AM
to 8:45 AM
Date : 07 /13/06
Day : Thursday
Name : Art, Carlos
Sub-
T~ totals
156
594
438
0
Subtotals
Total
303
10
125
North Aoor (SB) West AQQr (EB} East AQQr {WB}
~ Thru ...ill&!!!.. Left Thro~ Left Thro~
1 1 1
1 1 1 1 1
1
1 1
1 3 0 1 1 0 1 1 0
1800 6000 0 1800 2000 0 1800 2000 0
10 894 79 303 10 125 7 11 10
10 973 0 303 135 0 7 21 0
0.01 0.16 0.00 0.17 0.07 0.00 0.00 0.01 0.00
0.17
B
El Camino Real and Cassia Road
North Approach
983
79 894
j + _j ___.. t • North
~ t
66 1533
0
1026 1613
2639
South Approach
2834
5
10
L.
r
14
El Camino Real
1851
l_ 10 ...._ 11
r 7 0
Total
Subtotals
Sub-
totals
28
34
Cassia Road
Totals
62
Note : Left-tum volumes include
U-tums. U-turns in bold.
E
a
s
A
p
p
r
-• -• -•
• -
-• .. --• -• -----..
------------
El Camino Real at Cassia Road
Lane Configuration for Intersection Capacity Utilization Page 3 of3
Pk. Hr. Time Period :
4:30 PM to
5:30PM
South Appr (NB)
Lane
Config-
urations
Inside
(left)
Outside
Free-flow
2
3
4
5
6
7
Lane Settings 2
Capacity 1800 4000
Are the North/South phases split (YIN)?
Are the East/West phases split (YIN)?
Efficiency Lost Factor 0.10
Hourly Volume 125 1086
Adjusted Hourly Volume 125 1086
Utilization Factor 0.07 0.27
Critical Factors 0.07
0
0
N
N
10
IO
0.00
· ICU Ratio = 0.60 LOS=
Turning Movements at Intersection of:
Existing+Project+Cumulative Projects
w
e
s
A
p
p
r
Time : 5:00 PM
to 6:00PM
Date : 07 /13/06
Day : Thursday
Name : Art, Carlos
Sub-
Totals totals
382
611
229
0
Subtotals
Total
111
13
105
North Aonr (SB) West Appr (EB) East Appr (WB)
3 0 I
1800 6000 0 1800
13 1988 244 111
13 2232 0 111
0.01 0.37 0.00 0.06
0.37 0.06
A
El Camino Real
North Approach
3458
2245
1
244 1988 13
j + ~
_t
~ t t North
' t r
125 1086 IO
3
2109 1221
3330
South Approach
0 0
2000 0 1800 2000 0
13 105 16 13 15
118 0 16 28 0
0.06 0.00 0.01 0.01 0.00
and Cassia Road
El Camino Real
1213
L 15 ....-13 • 16 0
Total
Subtotals
Sub-
totals
44
35
Cassia Road
Totals
79
Note : Left-tum volumes include
U-tums. U-tums in bold.
E
a
s
A
p
p
r
---
• -
ill -•
•
-• --
• -•
• •
• -..
-----------..
El Camino Real at Poinsettia Lane
Lane Configuration for Intersection Capacity Utilization Page 2 of3
Pk. Hr. Time Period :
7:30AM to
8:30AM
South Appr (NB)
Lane
Config-
urations
Inside
(left)
Outside
Free-flow
1
2
3
4
5
6
7
Lane Settings 2 3
Capacity 3600 6000
Are the North/South phases split (YIN)?
Are the East/West phases split (YIN)?
Efficiency Lost Factor 0.10
Hourly Volume 14 1566
Adjusted Hourly Volume 14 1566
Utilization Factor 0.00 0.26
Critical Factors 0.26
0
1800
N
N
201
201
0.11
ICU Ratio = 0.45 LOS=
Turning Movements at Intersection of:
Existing+Project+Cumulative Projects
w
e
s
A
p
p
r
Time : 7:30 AM
to 8:30AM
Date : 07 /20/06
Day : Thursday
Name : Joe, Raul
Sub-
Totals totals
36
68
32
0
Subtotals
Total
8
16
8
North Aoor (SB) West Appr (EB) East Annr (WB)
2 2 1 2
3600 4000 1800 3600
122 876 7 8
122 876 7 8
0.03 0.22 0.00 0.00
0.03
A
El Camino Real
North Approach
2748
1005
11
7 876 122
j + L.
_j __.. t ---. North
~ t r
14 1566 201
11
1079 1781
2860
South Approach
2 0 2 2 0
4000 0 3600 4000 0
16 8 184 15 158
24 0 174 173 0
0.01 0.00 0.05 0.04 0.00
0.01 0.05
and Poinsettia Lane
El Camino Real
1743
L 158 ...._ 15 r 184 0
Total
Subtotals
Sub-
totals
357
339
Poinsettia Lane
Totals
696
Note : Left-tum volumes include
U-turns. U-turns in bold.
E
a
s
t
A
p
p
r
--• ---• -• -• ---• ---• -• -• -----
---
----
El Camino Real at Poinsettia Lane
Lane Configuration for Intersection Capacity Utilization Page 3 of3
Pk. Hr. Time Period : South Appr (NB)
4:30 PM to
5:30 PM
Lane
Config-
urations
Inside
(left)
Outside
Free-flow
2
3
4
5
6
7
Lane Settings 2 3
Capacity 3600 6000
Are the North/South phases split (YIN)?
Are the East/West phases split (YIN)?
Efficiency Lost Factor 0.10
Hourly Volume 18 1180
Adjusted Hourly Volume 18 1180
Utilization Factor 0.01 0.20
Critical Factors 0.01
1800
N
N
162
162
0.09
ICU Ratio = 0. 70 LOS=
Turning Movements at Intersection of:
Existing+ Proj ect+Cumulative Projects
w
e
s
A
p
p
r
Time : 4:45 PM
to 5:45 PM
Date : 07 /20/06
Day : Thursday
Name : Joe, Raul
Sub -
T~ totals
56
84
28
0
Subtotals
Total
8
10
IO
North Aoor (SB) West Appr (EB) East Appr (WB)
2 2 2
3600 4000 1800 3600
263 2174 22 8
263 2174 22 8
0.07 0.54 0.01 0.00
0.54
B
El Camino Real
North Approach
3733
2459
1
22 2174 263
j + ~
_t __.. t • North
~ t r
18 1180 162
6
2345 1360
3705
South Approach
2 0 2 2 0
4000 0 3600 4000 0
10 IO 161 16 84
20 0 161 100 0
0.01 0.00 0.04 0.03 0.00
0.01 0.04
and Poinsettia Lane
El Camino Real
1274
L_ 84 .._ 16
+ 161
Total
Subtotals
Sub-
totals Totals
261
0 695
434
Poinsettia Lane
Note : Left-tum volumes include
U-turns. U-tums in bold.
E
a
s
A
p
p
r
-.. .. --• -
-•
tl!III
• -• -• -.. -• -• ..
• -..
-.. ---------..
El Camino Real at Dove Lane
Lane Configuration for Intersection Capacity Utilization Page 2 of3
Pk. Hr. Time Period :
7:30AM to
8:30AM
South Appr (NB)
Lane
Config-
urations
Inside
(left)
Outside
Free-flow
Lane Settings
Capacity
2
3
4
5
6
7
1800
3
6000
Are the North/South phases split (YIN)?
Are the East/West phases split (YIN)?
Efficiency Lost Factor 0.10
Hourly Volume 24 1642
Adjusted Hourly Volume 24 1648
Utilization Factor O.DI 0.27
Critical Factors 0.27
ICU Ratio = 0.43
Turning Movements at Intersection of:
Existing+Project+Cumulative Projects
Time : 7:30 AM
to 8:30AM
Date : 07 /20/06
Day : Thursday
Name : Sam, Tyler
Sub-
Totals totals
w
e 79
s 156 0
t 77
A
p
p
r
0
0
N
N
6
0
0.00
LOS=
50
7
20
Subtotals
Total
North Annr (SB) West Appr (EB) East Appr (WB)
I 3 0 0 I I 0
1800 6000 0 1800 2000 0 1800 2000 0
29 962 50 50 7 20 35 5 21
29 1012 0 50 27 0 35 26 0
0.02 0.17 0.00 0.03 0.01 0.00 0.02 0.01 0.00
0.02 0.03 0.01
A
El Camino Real and Dove Lane
North Approach El Camino Real
2754 Total
1041 1713 Subtotals
3
50 962 29 Sub-
j + L. totals Totals
_j L 21 ___.. t ..__ 5 61 • r 35 0 103
North
42
~ t r
24 1642 6 Dove Lane
2
1019 1672
2691
South Approach Note: Left-tum volumes include
U-turns. U-turns in bold.
E
a
s
A
p
p
r
-----• -• -• -• -•
• -• -
-... ---
---.. --------
El Camino Real at Dove Lane
Lane Configuration for Intersection Capacity Utilization
Pk. Hr. Time Period : South AQQr (NB}
4:30PM to
5:30 PM Left Thru ~
Lane Inside 1 1
Config-(left) 2 1
urations 3 1
4 1
5
6
Outside 7
Free-flow
Lane Settings 1 3
Capacity 1800 6000
Are the North/South phases split (YIN)?
Are the East/West phases split (YIN)?
Efficiency Lost Factor 0.10
Hourly Volume 100 1086
Adjusted Hourly Volume 100 1120
Utilization Factor 0.06 0.19
Critical Factors 0.06
ICU Ratio = 0.64
1
0
0
N
N
34
0
0.00
LOS=
North Aoor (SB) West AQQr {EB}
Left Thru Right Left Thru ~
1 1
1 1 1
1
1 1
1 3 0 1 1 0
1800 6000 0 1800 2000 0
76 1947 193 141 26 103
76 2140 0 141 122 0
0.04 0.36 0.00 0.08 0.06 0.00
0.36 0.08
B
Page 3 of3
East AQQr {WB}
Left Thru _filg!g_
I -
1 1
1 0 1
1800 0 1800
79 32 53
79 85 0
0.04 0.00 0.00
0.04
Turning Movements at Intersection of: El Camino Real and Dove Lane
Existing+ Project+Cumulative Projects
w
e
s
A
p
p
r
Time : 4:45 PM
to 5:45 PM
Date : 07 /20/06
Day : Thursday
Name : Sam, Tyler
Sub-
Totals totals
325
595
270
0
Subtotals
Total
141
26
103
North Approach
2216
193 1947
J + _j _.. t -. North
+i t
100 1086
13
2142 1220
3362
South Approach
3507
10
76
~
r
34
El Camino Real
1291
L 53 +-32 • 79 2
Total
Subtotals
Sub-
totals
164
137
Dove Lane
Totals
301
Note : Left-tum volumes include
U-tums. U-turns in bold.
E
a
s
t
A
p
p
r
---------• -.. -------• ------------------
El Camino Real at Alga Road/ Aviara Parkway
Lane Configuration for Intersection Capacity Utilization
Pk. Hr. Time Period : South AJ:!J:!r (NB}
7:30AM to
8:30AM ~ Thru~
Lane Inside 1 1
Config-(left) 2 1
urations 3 1
4 1
5 1
6
Outside 7
Free-flow
Lane Settings 2 3
Capacity 3600 6000
Are the North/South phases split (YIN)?
Are the East/West phases split (YIN)?
Efficiency Lost Factor 0.10
HourlyVolume 208 1476
Adjusted Hourly Volume 208 1476
Utilization Factor 0.06 0.25
Critical Factors 0.25
ICU Ratio = 0.70
1
1
1800
N
N
244
244
0.14
LOS=
North Aoor (SB)
Left Thru~
1
1
1
1
1 1
2 3 0
3600 6000 0
83 912 68
83 980 0
0.02 0.16 0.00
0.02
B
Page 2 of3
West AJ:!J:!r {EB2 East AQJ:!r {WB2
Left Thru ~ Left Thru Right
1 1
1 1
1 1
1 1 1
1
2 2 1 2 2 0
3600 4000 1800 3600 4000 0
97 186 294 612 353 114
97 186 294 612 467 0
0.03 0.05 0.16 0.17 0.12 0.00
0.16 0.17
Turning Movements at Intersection of: El Camino Real and Alga Road/Aviara Parkway
Existing+ Proj ect+Cumulative Projects
Time : 7:45 AM
to 8:45 AM
Date : 07 /20/06
Day : Thursday
North Approach
Name : Matt (AM), Sarah, Scott
Sub-68
T~ totals j w
e 631 _j s 1208 2 97
t 577 186 --+
294 • A
p
p i r
208
0
Subtotals 1818
Total 3746
South Approach
2750
1063
0
912 83
+ L.
t
North
t r
1476 244
1928
El Camino Real
1687
L 114 -+-353 • 612
Total
Subtotals
Sub-
totals Totals
1079
7 1599
520
Alga Road/ Aviara Parkway
Note : Left-tum volumes include
U-turns. U-turns in bold.
E
a
s
A
p
p
r
---.. -.. -• ..
-• -• -• -• -• -.. -
--------------
Poinsettia Lane at A viara Parkway
Lane Configuration for Intersection Capacity Utilization Page 2 of3
Pk. Hr. Time Period : South A1212r (NB2
7:30AM to
8:30AM Left Thru Right
Lane Inside 1 1
Config-(left) 2 I
urations 3 1
4 I
5 -6
Outside 7
Free-flow
Lane Settings 2 2
Capacity 3600 4000
Are the North/South phases split (YIN)?
Are the East/West phases split (YIN)?
Efficiency Lost Factor 0.10
Hourly Volume 258 229
Adjusted Hourly Volume 258 232
Utilization Factor 0.07 0.06
Critical Factors 0.07
I
0
0
N
N
3
0
0.00
ICU Ratio = 0.45 LOS=
Turning Movements at Intersection of:
Existing+ Proj ect+Cumulative Projects
w
e
s
A
p
p
r
Time : 7:45 AM
to 8:45AM
Date : 08/08/06
Day : Tuesday
Name: Matt, Mark
Sub-
Totals totals
618
1675
1057
3
Subtotals
Total
497
307
253
North Aoor (SB) West A1212r {EB2 East A1212r {WB2
Left Thru ...Bi8!!!. Left Thru _.lli8h!. Left Thru Right
1 1 1
I
1 1 I
I I I I I
I
1 2 0 2 1 2 I 2 0
1800 4000 0 3600 2000 3600 1800 4000 0
31 131 76 497 307 253 12 284 75
31 207 0 497 307 253 12 359 0
0.02 0.05 0.00 0.14 0.15 0.07 0.01 0.09 0.00
0.05 0.14 0.09
A
Poinsettia Lane and Aviara Parkway
North Approach
238
76 131
j + _t _.. t t North
~ t
258 229
0
396 490
886
South Approach
1039
0
31
L.
r
3
Poinsettia Lane
801
L 75 +-284
r 12 1
Total
Subtotals
Sub-
totals
371
341
Aviara Parkway
Totals
712
Note : Left-tum volumes include
U-turns. U-tums in bold.
E
a
s
A
p
p
r
----• -..
-----------• -• -• --------------
Poinsettia Lane at A viara Parkway
Lane Configuration for Intersection Capacity Utilization Page 3 of3
Pk. Hr. Time Period :
4:30PM to
5:30PM
South Appr (NB)
Lane
Config-
urations
Inside
(left)
Outside
Free-flow
2
3
4
5
6
7
Lane Settings 2 2
Capacity 3600 4000
Are the North/South phases split (YIN)?
Are the East/West phases split (YIN)?
Efficiency Lost Factor 0.10
Hourly Volume 323 188
Adjusted Hourly Volume 323 202
Utilization Factor 0.09 0.05
Critical Factors 0.09
0
0
N
N
14
0
0.00
ICU Ratio = 0.59 LOS=
Turning Movements at Intersection of:
Existing+ Proj ect+Cumulative Projects
w
e
s
A
p
p
r
Time : 5:00 PM
to 6:00PM
Date : 08/08/06
Day : Tuesday
Name : Matt, Mark
Sub-
Totals totals
973
1858
885
2
Subtotals
Total
133
388
364
North Aoor (SB) West Appr (EB) East Aoor (WB)
2 0 2
1800 4000 0 3600
119 417 382 133
119 799 0 133
0.07 0.20 0.00 0.04
0.20
A
Poinsettia Lane
North Approach
1300
918
2
382 417 119
j + L.
_j
-->-t + North
~ t r
323 188 14
6
791 525
1316
South Approach
2 1 2 0
2000 3600 1800 4000 0
388 364 IO 268 60
388 364 10 328 0
0.19 0.10 0.01 0.08 0.00
0.19 0.01
and Aviara Parkway
Poinsettia Lane
382
L 60 +-268 • 10 1
Total
Subtotals
Sub-
totals ---
338
520
Aviara Parkway
Totals
858
Note : Left-tum volumes include
U-tums. U-tums in bold.
E
a
s
t
A
p
p
r
---• -... -----• ----...
-.. ---.. -
-----
------
L!NSCOTI, LAW & GREENSPAN, engineers
APPENDIXC
CUMULATIVE PROJECTS TRAFFIC DATA
LLG Ref. 3-04-1395
Poinsettia Place
-----• -• -• -• -• -
--
11111 -.. -----------.. -.. --
NOTE:
AM/PM Peak hour volumes are
--s._ wn at the intersections
REV. B/25/05
LLG1395.DWG
LINSCOTT
LAW &
GREENSPAN
engineers
CASSIA RD
., ... -.,... ~ _:::~}TI
PROJECT
SITE
4°~
AV/ARA PKWY
... ~
'-" '--)\~7
::: -...\( , ~
..i-.
'---r ,t,
"" .A
NO SCALE
Figure
Q.unulative Projects# /
AM/PM PEAK HOURS
-----------• ---• ---• -• ----------------
NOTE:
-AM/PM Peak hour volumes are
shown at the intersections
REV. 8/25/05
LLG1395.DWG
LINSCOTT
LAW &
GREENSPAN
engineers
CASSIA RD
-·-··o ........ ·:::::::: -·····
PROJECT
SITE
AV/ARA PKWY
c:A -..A
"1 (1-l
····················
.... ~
····················
-~
NO SCALE
Figure Z.
Cumulative Projects # 2-.,
AM/PM PEAK HOURS
-----.. ---.. -
-.. -
-..
-
..
-------------• --
NOTE:
-AM/PM Peak hour volumes are
shown at the intersections
REV. B/25/05
LLG1395.DWG
LINSCOTT
LAW &
GREENSPAN
engineers
CASSIA RD
AVIARA PKWY
····················
NO SCALE
Figure
CurTl.llatfve Projects# 3
AM/PM PEAK HOURS
Dl"\I .. IC!CTTIA DI Al"C
-------• ..
• -• -------
------------------
NOTE:
-AM/PM Peak hour volumes are
shown at the intersections
REV. 8/25/05
LLG1395.DWG
LINSCOTT
LAW &
GREENSPAN
engineers
CASSIA RD
·····o ········· -·····
PROJECT
SITE
AVIARA
PKWY
····················
~ .)~'.. r
:!. '\tr! , :
NO SCALE
Figure
Cumulative Projects f t./
AM/PM PEAK HOURS
-------.. ---• ---• -..
-..
---• -------------..
NOTE:
-AM/PM Peak hour volumes are
shown at the intersections
CASSIA RD
·····g ........ ······.··· -·····
PROJECT
SITE
~~
REV. 8/25/05
LLG1395.DWG
LINSCOTT
LAW &
GREENSPAN
engineers
AV/ARA PKWY
···················· --
. ... ~
····················
:::-~ ~
)\'-7
:!. '\\( , ~ -v .... -~
)\'.
':i/~
..!:_ -·
NO SCALE
Figure
Ctmllative Projects t 5
AM/PM PEAK HOURS
---.. -.. ---• ..
Ill -• -.. ---
-----------..
---..
-..
NOTE:
-AM/PM Peak hour volumes are
shown at the intersections
REV. B/25/05
LLG 1395.DWG
LINSCOTT
LAW &
GREENSPAN
engineers
CASSIA RD
·····o ::::::::. -·····
PROJECT
SITE
AV/ARA PKWY
0 -. d . ~ . .,.
I II,.
.)I'._ -t (.
····~ ---+--· . -!. ,ti ,
'•
,:
····················
pQ\NS~
NO SCALE
U Figure.
Cl.mulatlve Projects f · G
AM/PM PEAK HOURS
Dl"\ltJ~CTTIA DI Al'C
-• --
• -• -• -• -.. -.. -.. ...
ill
• • -.. ---------
----
NOTE: k hour volumes are
-AM/PM Ptefhe intersections shown a
REV. 8/25/05
LLG1395.0WG
LINSCOTT
LAW &
GREENSPAN
engineers
CASSIA RD
·-·.':.·.:~
;:c;JECT
SITE
AV/ARA
PKWY
.. ~
PALOMAR
AIRPORT
RD
· ..... . . ..... . ······
V -0
?
NO SCALE
Figure
Q.mulative ProEAKJectsH~i AM/PM P ..... ~ .. ... ,,.., .... ~ ..........
-----• -
-• -•
..
• -.. ---------..
---
------
NOTE:
-AM/PM Peak hour volumes are
shown at the intersections
REV. B/25/05
LLG1395.DWG
LINSCOTT
LAW &
GREENSPAN
engineers
CASSIA RD
AV/ARA PKWY
NO SCALE
. Figure
Q.mulatlve Projects,· ·'$
AM/PM PEAK HOURS
---------• -• -----.. -----
---------..
----
NOTES: -ADTs are. shown midblock
('l.rJT
3'10
REV. 8/25/05
LLG1395.DWG
-AM/PM Peak hour volumes are
shown at the intersections
CASSIA RD
... ----
A.tA-ffA.
_j 0 !
5" 23 -z'Z..,
0
<\
·····g .·::::::.·. ········· -·····
PROJECT
SITE
......................
POINSETTIA LN
~
NO SCALE
~~ 7, Figure 9
· VOLUMES
AM M PEAK HOURS & ADTs
POINSETIIA PLACE
--..
-,,.
-•
-
---• -• ---------..
--------
NOTES: -ADTs are shown midblock
-AM/PM Peak hour volumes are
shown at the intersections
CASS/A RD
·.':.':.":':':'1 ......:-:~-:;-:::::;J
PROJECT
SITE
'OD zer s 1if s5
REV. B/25/05
LLG1395.DWG
,;o
......................
pQ\NSETflA LN
NO SCALE
Figure /0 Oil~
//---VOLUMES
AM/PM PEAK HOURS & ADTs
POINSETTIA PLACE
-----------
-.. -----• ---..
-
---.. --------
LINSCOTI, LAW & GREENSPAN, engineers
APPENDIXD
YEAR 2030 TRAFFIC DATA
LLG Ref. 3-04-1395
Poinsettia Place
I I I
0
I 11 11 II
(-' Existing Geometry
@)
Q) :, C: Q) ~ -1..
-4 t t "" ->, IV "C f! r
IV LJ... --ni Q)
-----1181 Faraday Ave. ~1-----
a::
0 C:
1
{
J "'\ "'\ tt y
.E
~ w
-01@
IV 0 a:: 0.
g .E
a
iii
~
5 i :=
! ...; t H "" i.: ~ 8 ,
~ Palomar Airport Rd. oi------
i ~ l "'\ tt t rr
Q) ../ a:: 0. a:: 0 > ·g =: -~ 0 ·-a ~ ' -() w w
Q)I@
Li 0 a::
-21 5
0 C: 4 + + .E -~ camino Vida Roble 8
i .J.~ 1u ~~ t t Q) ~ a:: a::
0 --.,: 0
.5: ' -~ ~ a () -w w
JN: 55-100214.001 December 2005
I I I I I I I I I I \as! Ana,ys1steo~etr~
Year 2030 Volume ~ (CII~ TIF or Developer Fees) I@ ~~ r~~,@
C') ~ "q" I,. ~ o £!? '-242/603
:g ~ ; -509/268
;~: ,62165
,--..,--:-----181-----Faraday Ave. o
2~112 J 1 """ t r a:: ~~CX) 317/426-g ~ ~ £!?
201/495 ---... .E N !:: ~ ~
' 8 NL!)~ -AM/PM iii CX) ~ ~
\.. .... -...If++"" r -. . gi---
1 i "'\"'\ t t v
=t ·I 0 iii
~ I I TIF Funded
~ o~
'el~~~
v'
~ ~ ~ '--1090/784
~ ~ ~ -1360/700 ,) + " , 4111993
Palomar Airport Rd. 8 t . "'\ r , 149/467 J l a, -q-("I)
, ,1020/1807-~ t:: ~ ~ a 02184 , -~ • ~ ~ ~ ~
AMiPM ~ Lt) CO i w ~ <
I
@ ~ 7
~ ~ ~ '--27/28
~~a, -14/9
N ~ N .. 11/24 ,) +.'*' o'
Camino Vida Roble g1--"'\--t-r-
• 63/266 J l ,... 0 "q" a:: N co~ 10/9-0 ~~~
104/655 ---... -~ § ~ ("I) ~
' 0 CX)~ 2 -co < w N AM/PM
*Operational
@
Existing geometries
used for year 2030 analysis.
@
4++\.. '
camino Vida Roble gi----
J t
~ ~~ ttt,,,
0 -~ a
iii
Future roadway extensions require
changes to the intersection configuration.
I I Rec~~n0~~~±ri:fmeit~ I
@ l
Base geometry
sufficient
@4K
'-. free ---~ .,. ""~8 ~
0
Palomar Airport Rd. m "'\ t t t (""(""
_!, &! .9-J O fi
@
-C -.E
'" ... 0
' jjj
Base geometry
sufficient
I I
Intersection Geomet_ry and Traffic Volumes
EXHIBIT 3 (page 9 of 20)
I I I
0
I -, I I .. I I I I f · \ 1:x1stmg l:ieomelry
<IJ C ta ....I
.!!! :t:: 5l
@
.,) • t \...\...
~ -f
IQ!
I I
C ·a a.. --iii <IJ 0::
g ·e
~
Poinsettia Lj riJ ~~ ft f t""
-0 C:
' .E 8
jjJ w
t® a..
~ ~
.!!! -~ --
" -I!! u..
0 .£: ovl -
E p'
c'3
jjJ
L-
@
\__ --r
j
0 .£: -E -c'3 ' w
~ JN: 55-100214.001 December 2005
'@ ~ ~ l __ ~Anl J . • • 28 co j 6·::.·.i i, (CIP,TIF o i-· G~._..-/ M ~ l,.;:,t;,;:· '28' r Developer Fees)
"' --CX) \,, ~
I I • I I I 'Year 10"30\/olume
'.!:: ~ !:!2 '-95/21
~;:: ~ -64/143 .,) t \... ,219/830
Poinsettia Ln. 8r----
. 132/32 _j .; ~ f t"" .
288/133-~ 0 ,.._ CX) ..-co ,.._ ..-..-v --..--.. LO -.. "I 196/42 -~
AM/PM 1\ 8 w
@) ~·"¢·
"I "I M
O>LOM 0) "¢
LO "'
"'o ~ -478/312 ..-M CX)
0) 0 "' 7 48/403 Lt)..-..-r ·~ ' t \.._ 8 Alga Rd.
Aviara Pkwy. 0 ~ f t""
I I
108/105 ...I ~ ;£ ~ ~
224/506-g ~ ~ ;-;::; ~
·-..-CX) .. , a.. 308/452 -...,_ E CX) LO CO -. i
AM/PM ' 8 MLOLO ~
w "' • i
~ ~ \:;::::I ,.._ 0 ..-"' "' ..-t::: co ~ \... 404/236 ~ ~ M -472/406
; ~ ~ , 1a91161
~~..-----101---~~~
La Costa Ave. ~ t t""
1126/629 _j .; a> a> ,-...
372/617-~ ~ ~ ~
77 C: --..---324/2 , ~ re ~ ~ ;
AM/PM w ~ <(
~ -"1 t. \...\... 0 r
Poinsettia Ln.
ai ~~ tt t,,.... j Cl) a:: -g I ' .E
8
iij
@
11 Existing geometries
/ used for year 2030 analysis.
@
Existing geometries
used for year 2030 analysis.
I I ReL .. lnenclu ,«,proft:11.lnts/l I
Modifications (-:--~
I I
@ ''
@)
@
Base geometry
sufficient
Existing geometry
sufficient
\... ovlp
J 111 1,..1,.. ~ 7
La Costa Ave.1 ~~ t t y j 1 .L. g
-·e ' ~ w
I I
Intersection Geometry and Traffic Volumes
EXHIBIT 3 (page 10 of 20)
ai Cl
0 3l ~ -Ql C ~
.!!! 3: C ·o a..
>-I ro a..
11:! ro ~ -Ql C ro .....I
.!!! ~ 3l C ·o a..
I I I I
Existing Geometry
~ -4" r
0
J
Poinsettia Ln.
j j "y
=: ~ ' ~ ~
@
~ -p.::: ~, ..... _' __
"" t y t ;
Q.
!!! ('ll ~
-ovlp :\
'
-g(s-r & \:::..Y \_ ~
~ ~
-5 C ro 0::: -"C ro
&
.c
01
~
"iii .r. C Ql
.:?: 5
--4-. r
Olivenhain Rd.
..J -'
if "1 r
lll ]
ffi Cl)
-5
&
JN: 55-100214.001 December 2005
I I .a! I ~ale An.1ys! Gelmely
Year 2030Volume fJLd (CIP,TIF or Developer Fees)
I I I I Re~omfnenla ,Pnpro!em!nt-,I
Modifications (
I I I I I I
'@ ..-,,_,,::.;;o, -@ 0) C"')
-.;f" ..-
0) -.;f" ~
C"') ~ LO
(") -.;f" sr:t
.,,/ t "
Poinsettia Ln.
\_ 51/36
647/504..J ~ ~ t t
z --799/1069 -a; ~ co M 0 C\IC"') C"') 20/83....... 0 ...... ~
' :Ji -. AM/PM ~ ~
@) ..-m ,.._ <O m <O ...._ ~in~ \_ 107/59
~ ~ ~ -300/637 .,,; t \... ,8124
Poinsettia Ln. 8'1----
535/218 ..J " t r
J
435/313-1.{
228/463, ~
a,.._ se LO,.._..-
C"') ~ C"J c-:lm ~
...... 0 e: .!l! ~ AM/PM C"J LO ~
<C
® 0 j \_13/23 ..-<C ~ t::: ~ g -1137/978 O),q-..-·-
..-N N ~ f 458/504 .,,/ t \...
Rancho Santa Fe Rd.
Olivenhain Rd. . " t r
10/15..J ~ C") <0 co
IL O ..-CO 984/1212-s ~ ;::: SQ
71/468, ~ ~ ~ ~
0 sr:t (0 -.
AM/PM ij ~ C: /}.
Existing geometries
used for year 2030 analysis.
@
Existing geometries
used for year 2030 analysis.
®
Existing geometries
used for year 2030 analysis.
@
®
Existing geometry
sufficient
Existing geometry
sufficient
~ \_
.2: -
<C -
4-.
0
j f
Rancho Santa Fe Rd.
Olivenhain Rd.
..J -...
'
~ ,"1 r
if 3l lll .i:
C:
c?l
-5 C:
IP.
Intersection Geomet_iy and Traffic Volumes
EXHIBIT 3 {page 17 of 20)
•
-------~
t-----• -• ---• ----------------------
MITIG8 -2030 ,am_.:.,.:· , Thu Jan 5, 2006 15:55:56 .i?age 1-l: -------------------~--~------------~--------------------------------------·-----
City of Carlsbad TIF
-,Year -2030 AM Peak Hour Conditions
With Improvements/ Modifications
--.-----.--. ·------------------------------------------·--------·--·-
Level Of serviqe Computation Report
ICU !(Loss as ·Gycle Length·%) Method (Future Volume Alternative)
*************~********~*******************************************~*****~*******
Intersection #1026 El ·camino Real and Palomar Ai:rport Rd
****W***~************~***~******~**********~************************************·
Cycle (sec): .
Loss Time (sec) t
Optimal Cycle:
140-.
·10.-{Y+R =
57
Critical Vol./Cap. (X):
4 sec} Average Delay (sec/veh):
-Level ·Of Service:
* * * ***** * ** ** ***** ** ** * * * * *** * .. ~ ** * **.*.** * * * *** * **** * * * * *** * ** *** * *i: **** * * * * **** * Street Name: El Camino Real Palomar Ai:rport Rd ·
Approach: ·
Movement:
North Bound South Bound East Bound West Bound
L --. T R L T R L T R L T R ------------1-·--------------11-. -------------11---------------11---------· -----1
C9ntrol: Protected Protected Protected Protected
Rights: Ovl Include Include · Ignore
Min. Green: o o o o o o o o o o o 0
Lanes: 1 o 3 o 2 3 o 2 .1 o 2 o 3 o 1 3 O 3 O 1 ------------1----. ----------11----__ · -------11---------------11---------------1
Volume Module:
Base Vol: 38 1548 612 66·4 846 524 149 1020 102 477 1360 992
Growth Adj: 1.00 1.00· 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Initial Bse: 38 1548 612 664; 846 524 149. 1020 102 477 1360 992
Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0
PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0
Initial Fut: 38 1548 612 664 846 524 149 1020 102 477 1360 992
User Adj: 1.00 1.00 l.QO 1. 00 1.00 1.00 1.00 1.00 1. 00 1. 00 1.00 · 0.00
PHF Adj: l.OQ 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 o.oo
PHF Volume: 38 1548 612 664 846 524 149 1020 102 477 1360 0
Reduct Vol: 0 0 0 ·o 0 0 0 0 0 0 0 0
Reduced Vol: 38 15.48 61·2 664 846 524 149 1020 102 477 1360 0
PCE Adj: J;.QO 1.00 1.00 :l,.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 o.oo
MLF Adj: l;QQ 1.00 1.00 1.00 1.00 1.00 1. 00 1. 00 1.00 1.00 1.00 0.00
Final Vol.: 38 1548 612 664 846 524 149 1020 102 477 1360 0
------------1---------------11---------------11---------------11---------------!
Saturation Flow Module:
sat/Lane:. 18QO 1800 , 1800 1.800 1800 1800 1800 1800 1800 1800 1800 1800
Adjustment: 1.00 1.11 1. 00 LOO l.lJ; 1 .. 0.0 1.00 1.11 1.00 1.00 1.11 1.00·
Lanes: 1.00 3 .00 · 2.00 3.00 2.00 1.00 2.00 3.00 1. 00 3.00 3.00 1.00
Final Sat.: 1800 6000 -3600 5400 '4000 1800 3600 6000 1800 5400 6000 1800
------------1---------------11---------------11---------------! 1---------------1
Capacity Analysis Module:
Vol/Sat: 0.02 0.26 0.17 0.12 0 .21 · 0.29 0.04 0.17 0.06 0.09 0.23 0.00
Crit Moves: *·*** **** **** ****
********•**************************************************************~********
Traffix 7.6.0715 (c) 2003 Dowling Assoc. Licensed to RBF CONSULTING, IRVINE
-------• -• -• -• --
... ---..
----
------
---
-~
\_.})
'•,, ..... •·
MITIG8 -: 2030· pm . Thu Jan 5, 2006 15:56:05
City of Carlsbad TIF
Year-·2030 PM Peak Hour Conditions
With Improvements I Modifications
Page 1-1
---... ------. -------------------------------------------------------------"--
Level Of Se:rvice_Computation Report
ICU l(Loss as Cycle Length%) Method (Future Volume Alternative)
* * * * ** * * * * * * ** * * * ** *·* * ** * ** * * ** * ** * *·**** *** * * * ** ***** * *** * * * * * * ** * * *** ** * **** * ** Intersection #1026 El Camino Real and Palomar Airport Rd
********************************************************************************
Cycle (sec}:
Loss Time (sec):
Optimal Cycle:
140 Critical-Vol./Cap. (X):
10 .(Y+R =a ·4 sec) Average Delay (sec/veh),
· 98 ,Level Of Service:
0.868 = D
********************************************************************************
Street Name;
Approach:
El Camino Real Palomar Airport Rd
North Bound South Bound East Bound West Bound
Movement: L T R L T R I, T R L T R
------------J---------------11---------------11----------------11---------------1
Control: Protected Protected Protected Protected
Rights: Ovl Include Include Ignore
Min. Green: ·O O o o O o o O o O o 0
Lanes: 1 o 3 o 2 3 o 2 1 O 2 o 3 o 1 3 o 3 o 1
------------1---------------11---------------1 l---------------11---------------1
Volume Module:
Base Vol: 79 924 753 953 1230 168 467 1807 84 892 700 574
Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 l.00 1.00
Initial Bse: 79 924 753 953 1230 168 467 1807 84 892 700 574
Added Vol: o o · o o O o o o o O o o
PasserByVol: o o o o o o o O o o O o
Initial Fut: 79 924 753 953 1230 168 467 1807 84 892 700 574
User Adj: 1;00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 o.oo
PHF Adj: 1.00 1.00 1..00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00
PHF Volume: 79 924 753 953 1230 16& 467 1807 84 892 700 O
Reduct Vol: o o o o O o O o o O o O
Reduced Vol: 79 924 753 953 1230 168 467 1807 84 892 700 o
PCE Adj: 1..00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00
MLF Adj: 1..00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 0. 00
Final Vol.: 79 924 753 953 1230 168 467 1807 84 892 700 o ------------1---------------11---------------11---------------l l---------------1
Saturation Flow Module:
Sat/Lane: 1800 -1800 1800. 1800 1800 1800 1800 1800 1800 1800 1800 1800
Adjustment: 1.00 1.1"1 1.00 1.00 1.08 1.00 1.00 1.11 1.00 1.00 1.11 1.00
Lanes: 1.00 3.00 2.00 3.00 2.64 o.36 2.00 3.00 1.00 3.00 3.00 1.00
Final Sat.: 1800 6000 3600 5400 5151 649 3600 6000 1800 5400 6000 1800 ------------1----. -----------I I -----------------11---------------11 ---------------I
Capacity Analysis Module:
Vol/Sat: 0.04 0.15 0.21 0.18 0.24 0.26 o.13 0.30 0.05 0.11 0.12 o.oo
Crit Moves: **** **** **** ****
*****~**************************************************************************
Traffix 7.6.0715 (c) 2003 Dowling Assoc. Licensed to RBF CONSULTING, IRVINE
-----/ .. ,·-····?) -i : ..
---• -• ---.. -----·,
---..
-..
-...
-----'• -1( -, ----
MITIGB -2030 am Thu Jan 5, 2006 15:21:54 l'.!age 1-1
City of Carlsbad TIF
Year 2030 AM Peak Hour Conditions -------------------------------------------------------------------------w------
Level Of Service Computation Report
ICU l(Loss as Cycle Length%) Method (Future Volume Alternative)
* * * *** * * *** * * * * * * ** * * **** **** **** * *** * ** * * *** * ** **** * * * ** *** ** ** * * * * **** * * *'** * **.
Intersection #1027 El Camino Real and Camino Vida Roble
********************************************************************************
Cycle (sec): 140 critical Vol./Cap. {X): 0.637
Loss 'l'.ime (sec): 10 (Y+R = 4 ·sec) Average Delay (sec/veh}: xxxxxx:
Optimal Cycle: 46 Level Of Service: ~
****************************************************************************~***
Approach: North Bound South Bound East Bound West Bound
Movement: L T R L T R L T R L T . -R
------·-----l---------------l 1---------------11---------------11--------------. I
Control: Protected Protected Protected Protected
Rights: Include Include Include Include
Min. Green: o o · o o o o o o o o o 0
Lanes: 2 o 2 1 o l o 2 1 o 1 o o 1 1 1 .. o o 1 o
------------1---------------11 .-_ ------------11---------------11-------. -------1
Volume Module: -·
Base Vol: 807 2619 34 29 1086 248 63 10 104 11 14 27
Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 l.00 1.00 1.00 1.-00 1,00 1.00
Initial Bse: 807 2619 34 29 1086 248 63 10 104 11· 14 27
Added Vol: o o o o o o o o O O O O
PasserByVol: O O O O O o O O O o O -O
Initial Fut: 807 2619 34 29 1086 248 63 10 104 11-14 27
User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00.1.00 1.00
PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1,00 1.00 1.00 1.00
PHF Volume: 807 2619 34 29 1086 248 63 10 104 11 14 -27
Reduct Vol: o O o o o o o O O O O O
Reduced Vol: 807 2619 34 29 1086 2·49 63 10 104 11 14 27
PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Final Vol.: 807 2619 34 29 1086 248 63 10 104 11 14 27
------------1---------------11---------------11---------------11---------------1
Saturation Flow Module:
Sat/Lane: 1800 1800 1800 1800 1800 1800 1800 1800 1800 lS-00 1800 1800
Adjustment: 1.00 1.08 1.00 1.00 1..09 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lanes: 2.00 2.96 0.04 1.00 2.44 0.56 1.00 0.18 '.!,.82 1.00 0.34 0.66
Final sat.: 3600 5731 69 1800 4796 1004 1800 316 3284 1800 · 615 1185
-----------1---------------11---------------ri---------------11---------------1
Capacity Analysis Module:
Vol/Sat: 0.22 0.46 0.49 0.02 o.23 0.25 0.04 0.03 0.03 0.01 0.02 0.02
Crit Moves: ****. **** ****. ****
* * *** *** ***** **** * *** ** ** ***** * * *** * *·******** *** ****** **************"**** * * *****'le-
Traffix 7.6.0715 (c) 2003 Dowling Assoc. Licensed to RBF CONSULTING, IRVINE.
--------
• -• -• ---• -•
--...
--------
MITIG8 -2030 pm· Thu Jan 5, 2006 15:36:52 Page 1-1 -------------~---~----------------------------------------------------· --------4
City of Carlsbad TIF
, . Year 2030 PM Peak Hour conditions
---. ------------------------.---------------------------------------~--------·---. Level Of Service Computation Report
··ICU 1 (Loss .as Cycle Length,.%) Method (Future Volume Alternative)
********************************************************************************
Intersection #1027 El Camino Real and Camino Vida Roble
********************************************************************************
Cycle (sec):
Loss Time (sec):
Optimal Cycle:.
140'
10 (Y+R.,
64:
Critical Vol ./Cap. (X):
4 sec) Average Delay (sec/veh):
Level Of Service:
0.758
XX?CXJCX
C
*****************************************************************************~**
App=ach: North Bound . south Bound East Bound West Bound
Movement: L . T · R L T ·-R L T R L--T R ------------1---------------11---,-----------I 1---------------11--------------I Control: · Protected· · Protected Protected ·· Protected
Rights:· Include Include Include Include
Min. Green; o o ·o o o o o o o 6 O 0
Lanes:· 2 o 2 ·1 o .· 1 o 2 1 ·.o 1 o o 1 1 l .o o 1 o
------------!---.-----------11---------------11---.-----------11--------------1 Volume Module:
Base Vol: 127 1160 14 20 2398 52 266 9 655 24 9 28
Growth Adj: 1.00 l.00 1.00 .l.00 1.00 1.00 1.00 1.00 1.00 l.00 l,00 1.00
Initial Bse: 127 1160 14 20 2398 52 266 9 655 24 9 28
Added Vol: o o o o o o o o o o o o
PasserByVol: O O O O o o O O O O O 0
Initial Fut: 127 1160 14 20 2398 52 266 9 655 24 9 28
user Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Loo l.Q.O' 1.00
PHF Adj: 1.00 1.00 1.00 1;00 1.00 1.00 ·1.00 1.00 1.00 1.00 1.00 1.00
PHF Volume: 127 1160 14 20 2398· 52 266 9 655 24 9 28
Reduct Vol: o o O o o o o O· o O O O
Reduced Vol: 127 1160 14 20 2398 52 266 9 655 24 9 28
PCE Adj: 1.00 1.00 -1.00 1.00 1.00 1.00 1.00 1.00 l.00 1.00 1.00 1.00
MLF Adj: .1.00 1.00 1.00 1.00 1.00 .l.00 1.00 1.00 1.00 1.00 1.00 1.00
Final Vol. : 127 1160 .14 20 2398 52 266 9 655 24 9 28 ------------1---------------IJ---------------! f---------------f 1-------------·-I Saturation Flow Module: ·
Sat/Lane: 1800 1800 1800 ,1800 1800 1800 1800 1800 1800 1800 1800 1800
Adjustment: 1.00 1.07 1.00 1.00 1.08 1.00 l.00 1.00 1.00 J...00 1.00 1.00
Lanes: 2;00 2.96 ·o.04 ·1:00 2.94 ·.0.06 ·1.00 0.03 1.97 1.00 0.24 0.76
Final Sat.: 3600 5736 .64 1800 5685 115 1800 49 3551 1800 438 1362 ------------1---------------l l----------------11---------------11---------------1
Capacity Analysis Module:
Vol/sat: 0:04 0.20 ·0.22 0.01 0.42 0;45 0.15 0.18 o.18 0.01 0.02 0.02
Crit Moves: **** · **** **** ****~**********************•***********~****************************************
,.. Traffix 7.6.0715. (c) 2003 Dowling Assoc. Licensed to RBF CONSULTING, IRVINE
' ' .. K~-, __ ----
-----------•
• ---.. -..
--• --------------
El Camino Real at Cassia Road
Lane Configuration for Intersection Capacity Utilization Page 2 of3
Pk. Hr. Time Period :
7:30 AM to
8:30AM
South Appr (NB)
Lane
Config-
urations
Inside
(left)
Outside
Free-flow
Lane Settings
Capacity
1
2
3
4
5
6
7
1
1800
3
6000
Are the North/South phases split (YIN)?
Are the East/West phases split (YIN)?
Efficiency Lost Factor 0.10
Hourly Volume 120 2600
Adjusted Hourly Volume 120 2600
Utilization Factor 0.07 0.43
Critical Factors 0.43
ICU Ratio= 0.79
Turning Movements at Intersection of:
Year 2030
Time : 7:45 AM
to 8:45 AM
Date : 07/13/06
Day : Thursday
Name : Art, Carlos
Sub-
T~ totals
w
e 330
s 1070 0
740
A
p
p
r
0
0
N
N
50
50
0.00
LOS=
470
50
220
Subtotals
Total
North Annr (SB) West Appr (EB) East Appr (WB)
1 3 0 1 1 0 1 0
1800 6000 0 1800 2000 0 1800 2000 0
60 960 150 470 50 220 50 60 60
60 1110 0 470 270 0 50 120 0
0.03 0.19 0.00 0.26 0.14 0.00 O.Q3 0.06 0.00
0.26
C
El Camino Real and Cassia Road
North Approach El Camino Real
4305 Total
1170 3135 Subtotals
5
150 960 60 Sub-
j + L. totals Totals
_t L 60 _..... t -+-60 170 -. • 50 0 330
North
160
i t r
120 2600 50 Cassia Road
0
1230 2770
4000
South Approach Note: Left-tum volumes include
U-turns. U-tums in bold.
2
a
s
t
A
p
p
r
-------------------• -• -• -• ------------
El Camino Real at Cassia Road
Lane Configuration for Intersection Capacity Utilization
Pk. Hr. Time Period : South A:e:er (NB} North Aoor (SB) West Appr {EB}
4:30PM to
5:30 PM Left Thru ~ Left Thru ~ Left Thru ~
Lane Inside 1 1 1 1
Config-(left) 2 1 1 1 1
urations 3 1 1
4 1 1 1 1
5
6
Outside 7
Free-flow
Lane Settings 1 3 0 1 3 0 1 1 0
Capacity 1800 6000 0 1800 6000 0 1800 2000 0
Are the North/South phases split (YIN)? N
Are the East/West phases split (YIN)? N
Efficiency Lost Factor 0.10
Hourly Volume 120 1200 100 60 2400 350 210 50 190
Adjusted Hourly Volume 120 1300 0 60 2750 0 210 240 0
Utilization Factor 0.07 0.22 0.00 0.03 0.46 0.00 0.12 0.12 0.00
Critical Factors 0.07 0.46 0.12
ICU Ratio = 0.75 LOS= C
Page 3 of3
East A:e:er {WB}
Left Thru ~
1
1 1
1 1 0
1800 2000 0
100 70 90
100 160 0
0.06 0.08 0.00
Turning Movements at Intersection of: El Camino Real and Cassia Road
Year 2030
Time : 5:00 PM
to 6:00 PM North Approach El Camino Real
Date: 07/13/06
Day : Thursday 4311 Total
Name : Art, Carlos 2810 1501 Subtotals
1
Sub-350 2400 60 Sub-
To~ totals J + L. totals Totals
w
e 540 _j L s 990 0 210 90
450 50 __.. t ....__ 70 260
190 t • 100 0 469
A North
p 209
p +i t r r
120 1200 100 Cassia Road
3
Subtotals 2690 1420
Total 4110
South Approach Note: Left-tum volumes include
U-turns. U-turns in bold.
E
'I
s
A
p
p
r
------,-~
"· ----.. -• -• -..
-.. ----) •' .·'· ... --... ..
-----...
-------~ ... :.-l -----
MITIG8 ~ 2030 am Thu Jan 5, 2006 15:22:03 · -Page i-i
-----------------------,--... ----.. ------------------------------------------· -·--·-
City of Carlsbad TIF
Year 2030 AM Peak Hour Conditions -----------------------------------------------------------------·-. -·-----------
Level Of Service Computation Report
ICU l(Loss as Cycle Length%) Method (Future Volume Alternative)
********************************************************************~***********
Int~rsection #1028 El Camino Re.~l an,q. Poinsettia Lane
********************************************************************Y*****'******
Cycle (sec):
Loss T:ime.(sec):
Optimal Cycle:
i40
10 (Y+R =
54
Critical Vol./Cap. (X):
4 sec) Average Delay {sec/veh):
· · Level 0:1: Service:
0.704
xxxxxx
C
********************************************************************~**~*****~**
Approaqh; North Bound · Soutii Bound "East Bound West Bound
Movement: L T R L T R L T R L T R
------------1---------------11-.-----... -------.11---------------11--------------·-1
control: Protected Protected Protected Protected
Rights: Include Incluqe Include . Include
Mi~. Green: O O O O o O O O O Q. ·O 0
Lanes, 2 o 3 o 1 2· o 2 1 o 2 o 1 1 o 2 o 1 1 o
------------1---------------11--. ---------.--11---------------11----------~----I
Volume Module:
Base Vol: 95 2595 432 18 ·1146 36 132 2!38 196 219 .~ 64 95
Growth J\dj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 ·1.00
Initial Bse: 95 2595 432 i& 114~ 36 132 288 196 219 64 95
Added V9l: 0 0 0 0 0 0 0 0 0 0 0 0
PasserByVol: o o o o o o. o o 0 0 0 0
Initial Fut: 95 36 196 2i9 64 95 2595 432 18 1146 132 288
User Adj: 1. co 1. oo 1. oo 1. oo 1. 00 1. 00· 1.00 1.00 1.00 1.00 1.00 1.00
PHF Adj: 1.00 1.00 1.00 1.00· 1.00 1.00 1.00 1.00 1.00 1. 00 1.00 1.00
PHF Volume: 95 36 196 2·19. 64 95 2595 432 18 1146 132 288
Reduct Vol: o o o o o· o 0 0 0 0 0 0
Reduced Vol: 95 2595 432 18 1146 36 132 288 196 219 64 95
PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Final Vol.: 95 2595 432 18 1146 36 132 288 196 219 54· 95
----------· -1---------------11---------------11---------------11---------------1
Saturation Flow Module:
Sat/Lane: 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800
Adjustment: 1.00 1.11. _1.00 1.00 1.08 1.00 1.00 1.09 1.00 1.00 1.11 1.00
Lanes: 2.00 3.00 1.00 2.00 2.91 0.09 ·2.00 1.19 0.81 2.00 1.'00 1.00
Final Sat.: 3600 6000 1800 360G 5~36 164 3600 2342 1458 3600 iooo 1800 ------------I ---------------I I -----.. · -' ------I 1 ---------------11---·-------~ -·--I
Capacity Analysis Module: -·
Vol/sat·: 0.03· 0.43 0.24 0.01 0.20 0.22 o.o4 0.12 0.13 0.06 o·.03 0.05
Crit Moves: ·**** **"'* **** ****
***************************************************************************~****
Traffix 7.6.0715 (c) 2003 Dowling Assoc. Licensed to RBF CONSULTING, IRVINE
-------
---
---..
---• -• ..
• -• ------------
MITIG8 -203Q pm Thu Jan 5, 2006 15:37:00 Page 1-1
City of Carlsbad TIF
-Year· 2030 PM Peak Hour Gonditions
- - -... -----__ ..__ --- - - --·--·--------------- ------------------- - -------------·-----• - --'"4
. . · Level Of. Service Computation Report
ICU 1 (Loss as ·Cycle Length .. %J Method (Future Volume Alte;rnative)
***~*****~*******~****~************************************************~********
Intersection #1028 Bl Camino Real and Poinsettia Lane
*********************•**********************************************************
Cycle (sec):
Loss Time (sec):
Optimal Cycle:
140 Criti"cal V'ol./Cap. (X):
10 (Y+R: · 4 sec) Average Delay (sec/veh):
63 Level Of Service:
0.754
xxxxxx
C
*********~******************~*~********************************************~****
Approach:·
Movement:
North Bound South Bound Bast Bound ·west Bound
L T R L T R L T R L T - R ------------1-----. ---------11---------------11---------------11--------------1
Control:· · Protected Protected Protected Protected
Rights: Include Include Include Include
Min . Green : O · O O O o O O O O O . O 0
Lanes: 2 o 3: o 1 2 o 2 1 o 2 o l l o 2 o 1 1 O ------------I ------: -----· ---11-------· -------I-I ---------------11---------------I
Volume Module: .
Base voii· · · 110 1167 : 478 · 58 1906 123 32 133 42
Growth Adj, 1. oo 1. oo 1. oo-1. oo 1. ao 1. oo 1. oo 1. oo 1. oo
Initial Bse: 110 1167 478 58 1906 123 32 133 42
Added Vol: o o o o o o o o o
PasserByVol: o o _o o o o o O o
Initial Fut: 110" 1167 478 58 1906 · 123 32 133 42
User Adj: 1.00 1.00 LOO LOO .1.00 1.00 1.00 1.00 i.oo
PHF Adj: 1. 00-1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00
PHF Volume: 110 1167 478 58 1906 123 32 133 42
Reduct Vol: o o o O o o o o o
830 143
1.00 1.00
830 143
0 0
0 0
830 143
1.00 1.00
1.00 1. 00
830 143
0 0
21
1.00
21
0
0
21
1. 00
1.00
21
0
Reduced Vol: 110 ,1167-478 58 1906 123 32 133 42 830 143 21
PCE Adj: 1.00 -1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
MLF Adj: 1.00 1.00 1.00 1.-00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Final Vol.: 110 1167 478· 58 1906 123 32 133 42 830 143 21
-----------1----------------11---------------I l-·--------------11---------------!
Saturation Flow Module: ·
Sat/Lane: 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800
Adjustment: 1.00 1.11 1..00 1.00 1.08-1.00 1.00 1.07 1.00 1.00 1.06 1.00
Lanes, 2.00 3.00 1:00 2.00 2.82 0.18 2.00 1.52 0.48 2.00 1,74 0.26
Final Sat~: 3600 ~000 l800 3600 5473 327 3600 2936 864 3600 3339 461 ------------·I·----:---------11-----.---·-------11---------------11---------------1
Capacity Analysis Module:
Vol/Sat: 0.03 0.19 0.27 0.02 0.35 0.38 0.01 0.05 0.05 0.23 0.04 0.05
Crit Moves: **** **** **** **~*
** ** * ****** **.***"* *"* *** ~****** *** ********·** * * * ****** ****** * ****** * **·* * * ** **** ** * *
Traffix 7.6.0715 (c) 2003 Dowling Assoc. Licensed to RBF CONSULTING, IRVINE
-----.. -------.. ---• -~~ ./~····,., .. • I \
.. ) -• -• -• .. .. ----
----
MITIG8 -2030 am Thu Jan 5, 2006 15:22:11 ··.·~ .:page 1-':J..:.
--------·----------------------------------·----t--·-------· -------... -,., -·--· --· -· .
city of Carlsbad TIF
Year 2030 AM Peak Hour Conditions
Level Of Service Computation Report
ICU l(Loss as Cycle Length,) Method {Future Volume Alternative}
* * *' * * ** * * **** * ** * * * ** *** ** ***** * * *** *** * * *** * * * *** * **** *** ** ** ****'**.** ** * *'* *** ** Intersection #1029 El Camino Real and Aviara Pkwy/Alga Road
** * **** * * * *** * ** * * ** ** * * *** **** * * * * * * * * * * *** ** * * * ** *** *** *** ** ** **''* ***"'** * *** * * * Cycle (sec):
Loss Time (sec):
Optimal Cycle:
140
10 (Y+R =
75
Critical Vol./Cap. (X}:
4 sec) Average Delay (sec/veh):
· ·Level Of Service:
0.806
::o6codc
.. ' J)
**************************************************************~*****************' Ap:proach: North Bound South Bound East Bound · .. West Bound
Movement: L T R L T R L T R L · -. T· -R
---·--------1---------------11-----· ---------1 r---------------11-------· ---· ---1
control: Protected Protected Protected· Protected
Rights: Ignore Include Ovl Include
Min. Green : o o o o o o o o o · o o 0
Lanes. 2 o 3 o l 2 o 2 l o 2 o 2 o l 2 ·o 1 1 o
------------1---------------11---------------11---------------11------·-----· ---1 Volume Module: · · ·
Base Vol: 381 2558 565 128 1030 59 108 224 308 748-478 308
Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1;00 1:00 1.00
Initial Bse: 381 2558 565 128 1030 59 io8 224 308 748 478 308
Added Vol: o o o o o o o o O O O o
PasserByVol: 0 0 0 0 0 0 o· 0 0 o. 0. 0
Initial Fut: 381 2558 565 128 1030 59 108 224 308 148 478 308
User Adj: 1.00 1.00 0.00 1.00 1.00 1.00 l.QO 1.00 1.00 1.00· 1.00 1.00
PHF Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00· 1.00
PHF Volume: 381 2558 o 128 1030 · 59 108 224 308 748 478 308
Reduct Vol : o o o o o O o o O . O .. O O
Reduced Vol: 381 2558 O 128 1030 59 108 224 308 749: 478 308
PCE Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
MLF Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Final Vol.: 381 2558 o 128 1030 59 108 224 308 74S-478 308
------------,-· ------------11---------------11--------------· 11------· · -------1
Saturation Flow Module: ·
sat/Lane: 1000 1aoo 1000 1800 1800 1000 1000.1aoo 1aoo 1000 1000 1000
Adjustment: 1.00 1.11 1.00 1.00.~.oa 1.00 1.00 1.11 1.00 1.00 1.09 1.00.
Lanes: 2.00 3.oo 1.00 2.00 2.84 0.16 ·2.00 2.bo 1.00 2.00.1.22 0.78
Final Sat.: 3600 6000 1800 3600 5507 293 3600 4000 1800 3600 2389 1411
-----------· 1---------------11----. ----------11---------------1 f ----------·-----I
Capacity Analysis Module: · ·
Vol/Sat: 0.11 0.43 0.00 0.04 0.19 0.20 0.03 0.06 0.17 0.21 0.20 0.22
Cr.it Moves: **** *.*** · **** ****
********************************************************************************
Traffix 7.6.0715 (c) 2003 Dowling Assoc. Licensed to RBF CONSULTING, IRVINE
---------.. -• -• -
Ill ---
·. ·: ,~. -.. -• ..
-----------...
. MITIG8 -20.3 0 pm Thu Jan 5, 2·00& 15:37:07 Page 1-1 -------------. --. ---------...... -. ---.. -.-.--. --.-_ -.. ---------------------· --------
City of Carlsbad TIF
Year 2030 PM Peak Hour Conditions ----. -----. ----.. ------. ----. ------. -------------. ·--------------------· ----------
. · Level Of Service Computation Report ICU: l(Loss as Cycle Lengt~·%)_Method (Future Volume Alternative)
***************'!it.***********·***~!:*::':**·*~******·********************* **'x ****** ** ** **
Intersection #1029 El Camino-Real and Aviara Pkwy/Alga Road
* * * ** ** * * ** **·* **·* * * ** * *·***·***·* 1'* ** *** *** *** ** * * **** * ** ***** *** * * * ** * * *** ****** * * Cycle (sec):
Loss TimE! . (sec} :
Optimal Cycle: ·
140 .
10 {Y+R =;
.102
Critical Vol. /Cap. {X) :
4 sec) Average Delay (sec/veh):
Level-Of service:
0.876
xxxxxx
D
* * * * * ** * **** * * ** *'* ** **·*·*** * *· ***·*'*-* ****-****·** * * ** * ** ** ** * **** * * * * * * * * ** ** ** * * * * * * Approach: North Bqund South, Bound. East Bound West Bound
Movement: LT R LT R LT R LT R
---------.---1-------.-. --.. --1 (-.-.... ----------1.1---------------11---------------1
Control : Protecte!i Protected ._· Protected Protected
Rights; Ignore· Include -OVl Include
Min. Green: o o O o o o o o o O O 0
Lanes: 2 o 3 o 1 2 o 2 1 o 2 o 2 O 1 2 Q. 1 1 o
------------1-----------. ---11----:---· .---.--·-11---------------11----------·----1
Volume Module:
Base Vol: 481 9~4 865 334 2·214 122 105 506 452 403 312 132
Growth Adj: 1.00 LOO LOO 1_.00 1.00 1,00 1.00 1.00 1.00 1.00 1.00 l.OCi
Initial Bse: 481 944 J65 334 ·2214 ·122 105 506 452 403 312 132
Added Vol: o o o o o o o o o o o o
PasserByVol: O O O O O o o O O O O O
Initial Fut: 481 944 865 ·334 2214 122 105 506 452 403 312 132
User Adj: 1 .• 00 l.OQ 0.00 LOO· LOO· 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Adj: 1.00 1.00 o .. oo 1.00 1.00 1.00, 1.00 1.00 i.oo 1.00 1.00 1.00
PHF Volume: 481 944 o ~34 2214 122 105 506 452 403 312 132
Reduct Vol: 0 O O O O O O O O O O 0
Reduced Vol: 481 944 o 334 2214 122 105 506 452 403 312 132
PCE Adj: 1.00 1.00 0.00 LOO 1.QO 1.00. 1.00 1.00 1.00 1.00 1.00 1,00
MLF Adj: 1.00 1.00 0.00 .LOO 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Final Vol.: 481 944 o , 334 2214 122 105 506 452 403 312 132
------------1-----·-.--------11--· · -·.--.-----I l---------------11---------------1
Saturation Flow Module: · ·
Sat/Lane: 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800
Adjustment: L 00 1.11 ;t. OQ 1 .. oo l. OB l. 00 1. oo 1.11 1. 00 1. oo -1. 08 1. oo
Lanes: 2.00 3.0Q. 1.00 2·.00 2,.84 0.16 2.00 2.00 1.00 2.00 1.41 0.59
Final Sat.: 3600 6000 1·800. 3ti00 5518 282 . 3600 4000 1800 3600 2730 1070 -------. ____ .. , · _________ .----11--·-· · .. ----------1 i---------------11 · ---·-----------!
Capacity Analysis Module:
Vol/Sat: .0.13 0.16 0.00. Oc09 0.40 0.43 0.03 0.13 0.25 0.-11 0.11 0.12
Crit Moves: **** **** **** **** ·******************************~~**~*********~~**********************************
Traffix 7.6.0715 {c) 2003 Dowling Assoc. Licensed to RBF CONSULTING,· IRVINE
--
--.. ~3) --• -..
• • -.. -.. -• -&2:\ • r1 .:.,· -.. -.. ---------.,---:-._ -t-::-·:.:• ...
(' n 1~!~,~-.. ----
MITIG8 -2030 am Thu Jan 5, 2006 15:28:30 Page 1-1
--------------------------------------------------------------------------------
City of Carlsbad TIF
Year 2030 AM Peak Hour Conditions
Level Of Service Computation Report
ICU l(Loss as Cycle Length%) Method (Future Volume Alternative)
**~*****************************************************************************
Intersection #1050 Poinsettia Lane and Aviara Pkwy
********************************************************************************
Cycle (sec): 100 Critical Vol./Cap. (X): 0.558
Loss Time (sec): 10 (Y+R = 4 sec) Average Delay (sec/veh): .xxxxxx
Optimal Cycle: 37 Level Of Service: A
********************************************************************************
Approach: North Bound South Bound East Bound West Bound
Movement: LT R LT R LT R LT R ------------1---------------11---------------11---------------11---------------1
Control: Protected Protected Protected Protected
Rights: Include Include Ovl Include
Min. Green: O O o o o O O O o O O 0
Lanes: 2 O 1 l o 1 O 1 1 O 2 O 1 O 2 1 0 1 l 0 ------------J---------------11---------------11----. ----------1 [--------------1
Volume Module:
Base Vol: 372 509 31
Growth Adj: 1.00 1.00 1.00
Initial Bse: 372 509 31
Added Vol: o 0 0
PasserByVol: 0 0 0
Initial Fut: 372 509 31
User Adj: 1.00 1.00 1.00
PHF Adj: 1.00 1. 00 1.00
PHF Volume: 372 509 31
98 115
1.00 1.00
98 115
79
1.00
79
535 435
1. 00 l. 00
535 435
228
1.00
228
8 300
1.00 1.00
8 300
0 0
107
1.00
107
0
0·
98
1.00
1.00
98
0
0
0
0
0
0
0
0
0
0
0
0 0 0
115 79 535 ·435 228 8 300 107
1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
115 79 535 435 228 8 300 107
Reduct Vol: O O O O O O O o O O O 0
Reduced Vol: 372 509 31 98 115 79 535 435 228 8 300 107
PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Final Vol.: 372 509 31 98 115 79 535 435 228 8 300 107
------------1---------------11---------------ll---------------1 ,---------------/ Saturation Flow Module:
Sat/Lane: 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800
Adjustment: 1.00 1.06 1.00 1.00 1.09 1.00 1.00 1.11 1.00 1.00 1.08 1.00
Lanes, 2.00 1.89 0.11 1.00 1.19 0.81 2.00 1.00 2.00 1.00 1.47 0.53
Final Sat.: 3600 3593 207 1800 2334 1466 3600 2000 3600 1800 2854 945
------------l---------------11----------.----1 !---------------! 1---------------1 Capacity Analysis Module:
Vol/Sat: 0.10 0,14 0.15 0.05 0.05 0.05 0.15 0.22 0.06 0.00 0.11 0.11
Crit Moves: **** **** **** ****
****************~***************************************************************
Traffix 7.6.0715 (c) 2003 Dowling Assoc. Licensed to RBF CONSUX.TING, IRVINE
-------• ---
---A,
~I ... ---
• --
-
---G~
{l .,· .... -'• ----
MITIG8 -2030 pm Thu Jan 5, 2006 15:41:54 Page 1-1
City of Carlsbad TIF
Year 2030 PM Peak Kour Conditions
Level Of Service Computation Report
ICU l(Loss as Cycle Length%) Method (Future Volume Alternative}
*******************************~************************************************
Intersection #1050 Poinsettia Lane and Aviara Pkwy
********************************************************************************
Cycle (sec): 100 Critical Vol./Cap. (X): 0.721
Loss Time (sec): 10 (Y+R = 4 sec) ~verage Delay (sec/veh): .xxxxxx
Optimal Cycle: 53 Level Of Service: C
********************************************************************************
Approach: North Bound South Bound East Bound West Bound
Movement: LT R LT R LT R LT R ------------1---------------11---------------11---------------11--------· ------1
Control: Protected Protected Protected Protected
Rights: Include Include Ovl Include
Min. Green: o o O O O O o o O O O 0
Lanes: 2 o 1 1 o 1 o 1 1 o 2 o 1 O 2 1 o 1 1 O ------------1---------------11---------------11---------------1 !---------------)
Volume Module:
Base Vol: 350 277 6 176 671 299 218 313 463 24 637 59
Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Initial Bse: 350 277 6 218 24 637 59 313 463
Added Vol : o o O o o o O 0 0
PasserByVol: o o o o o o o 0 0
Initial Fut: 350 2?7 6 218 24 637 59 313 463
User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1. 00 1. 00
PHF Adj: 1.00 1,00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Volume: 350 277 6 218 24 637 59 313 463
Reduct Vol: o o o o o o o o o
Reduced Vol: 350 277 6 176 671 299 218 313 463 24 637 59
PCE Adj: 1.00 1.00 1.00 1.00.1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1..00 1.00 1.00 1.00
Final Vol.: 350 277 6 176 671 299 218 313 463 24 637 59 ------------1---------------11---------------11---------------11---------------1
Saturation Flow Module:
Sat/Lane: 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800
Adjustment: 1.00 1.06 1.00 1.00 1.08 1.00 1.00 1.11 1.00 1.00 1.06 1.00
Lanes: 2.00 1.96 0.04 1.00 1.38 0.62 2.00 1.00 2.00 1.00 1.83 0.17
Final Sat.: 3600 3724 76 1800 2690 1110 3600 2000 3600 1800 3495 305
------------1---------------11----. ----------I l---------------11---------------1
Capacity Analysis Module:
Vol/Sat: 0.10 0.07 0.08 0.10 0.25 0.27 0.06 0.16 0.13 0.01 0.18 0.19
Crit Moves: **** **** ****' **** ********************************************************************************
Traffix 7.6.0715 (c) 2003 Dowling Assoc. Licensed to RBF CONSULTING, IRVINE
-------------------------
-----------
LINSCOn, LAW & GREENSPAN, engineers
APPENDIXE
PROJECT DRIVEWAYS ANALYSIS SHEETS
LLG Ref. 3-04-1395
Poinsettia Place
--------
-----
-------.. -------------
~•••----~----Ccc, C --------------------
MITIG8 -ex am Fri Dec 8, 2006 09:06:07 Page 1-1
Level Of Service Computation Report
2000 HCM Unsignalized Method (Future Volume Alternative)
********************************************************************************
Intersection #3 Cassia Rd -Western Driveway
********************************************************************************
Average Delay (sec/veh): 0.7 Worst Case Level Of Service: B[ 11.8]
********************************************************************************
Approach: North Bound South Bound East Bound West Bound
Movement : L T R L T R L T R L T R
------------1---------------11---------------11---------------11---. -----------1
Control: Stop Sign Stop Sign Uncontrolled Uncontrolled
Rights: Include Include Include Include
Lanes: O O 1! O O o O 1! o O O 1 O O O O O O 1 O
------------1---------------11---------------11---------------11---------------1
Volume Module:
Base Vol:
Growth Adj:
Initial Bse:
Added Vol:
PasserByVol:
Initial Fut:
User Adj:
PHF Adj:
PHF Volume:
Reduct Vol:
Final Vol.:
0 0
1.00 1.00
0 0
0 0
0 0
0 0
1.00 1.00
0.92 0.92
0 0
0 0
0 0
Critical Gap Module:
0
1. 00
0
0
0
0
1. 00
0.92
0
0
0
11 0
1.00 1.00
11 0
0 0
0 0
11 0
1. 00 1. 00
0.92 0.92
12 0
0 0
12 0
23
1. 00
23
0
0
23
1. 00
0.92
25
0
25
13 437
1. 00 1. 00
13 437
0 0
0 0
13 437
1.00 1.00
0.92 0.92
14 475
0 0
14 475
0
1. 00
0
0
0
0
1.00
0.92
0
0
0
0 254
1. 00 1. 00
0 254
0 0
0 0
0 254
1.00 1.00
0.92 0.92
0 276
0 0
0 276
5
1. 00
5
0
0
5
1. 00
0.92
5
0
5
Critical Gp:xxxxx xxxx xxxxx 6.4 xxxx 6.2 4.1 xxxx xxxxx xxxxx xxxx xxxxx
FollowUpTim:xxxxx xxxx xxxxx 3.5 xxxx 3.3 2.2 xxxx xxxxx xxxxx xxxx xxxxx
------------1---------------11---------------11---------------11---------------1
Capacity Module:
Cnflict Vol: xxxx xxxx xxxxx 2 82 xxxx xxxxx xxxx xxxx xxxxx
Potent Cap.: xxxx xxxx xxxxx 366 xxxx 765 1293 xxxx xxxxx xxxx xxxx xxxxx
Move Cap.: xxxx xxxx xxxxx 363 xxxx 765 1293 xxxx xxxxx xxxx xxxx xxxxx
Volume/Cap: xxxx xxxx xxxx 0.03 xxxx 0.03 0.01 xxxx xxxx xxxx xxxx xxxx
782 xxxx 279
------------1---------------11---------------11---------------11---------------1
Level Of Service Module:
2Way95thQ: xxxx xxxx xxxxx xxxx xxxx xxxxx
Control Del:xxxxx xxxx xxxxx xxxxx xxxx xxxxx
LOS by Move: * * * * * *
Movement: LT -LTR -RT LT -LTR -RT
Shared Cap. : xxxx 0 xxxxx xxxx 563 xxxxx
SharedQueue:xxxxx xxxx xxxxx xxxxx 0.2 xxxxx
Shrd ConDel:xxxxx xxxx xxxxx xxxxx 11. 8 xxxxx
Shared LOS: * * * * B *
ApproachDel: xxxxxx 11.8
0.0 xxxx xxxxx xxxx xxxx xxxxx
7. 8 xxxx xxxxx xxxxx xxxx xxxxx
A * LT -LTR
xxxx xxxx
0.0 xxxx
7.8 xxxx
A *
xxxxxx
* -RT
xxxxx
xxxxx
xxxxx
*
* * * LT -LTR -RT
xxxx xxxx xxxxx
xxxxx xxxx xxxxx
xxxxx xxxx xxxxx
* * *
xxxxxx
ApproachLOS: * B * * ********************************************************************************
Note: Queue reported is the number of cars per lane.
Traffix 7.8.0515 (c) 2006 Dowling Assoc. Licensed to LLG, PASADENA, CA
------..
-------------• ---
------------
MITIG8 -ex pm Fri Dec 8, 2006 09:06:30 Page 1-1
Level Of Service Computation Report
2000 HCM Unsignalized Method (Future Volume Alternative)
********************************************************************************
Intersection #3 Cassia Rd -Western Driveway
********************************************************************************
Average Delay (sec/veh): 0.3 Worst Case Level Of Service: B[ 13.3]
********************************************************************************
Approach: North Bound South Bound East Bound West Bound
Movement: L T R L T R L T R L T R
------------1---------------11---------------11---------------11---------------1
Control: Stop Sign Stop Sign Uncontrolled Uncontrolled
Rights: Include Include Include Include
Lanes: O O l! O O O O l! O O O 1 O O O O O O 1 O
------------1---------------11---------------11---------------11---------------1
Volume Module:
Base Vol:
Growth Adj:
Initial Bse:
Added Vol:
PasserByVol:
Initial Fut:
User Adj:
PHF Adj:
PHF Volume:
Reduct Vol:
Final Vol.:
0 0
1.00 1.00
0 0
0 0
0 0
0 0
1.00 1.00
1. 00 1. 00
0 0
0 0
0 0
Critical Gap Module:
0
1. 00
0
0
0
0
1.00
1. 00
0
0
0
8 0
1.00 1.00
8 0
0 0
0 0
8 0
1.00 1.00
1.00 1.00
8 0
0 0
8 0
3
1. 00
3
0
0
3
1. 00
1. 00
3
0
3
7 300
1.00 1.00
7 300
0 0
0 0
7 300
1.00 1.00
1.00 1.00
7 300
0 0
7 300
0
1. 00
0
0
0
0
1. 00
1. 00
0
0
0
0 400
1. 00 1. 00
0 400
0 0
0 0
0 400
1.00 1.00
1.00 1.00
0 400
0 0
0 400
2
1. 00
2
0
0
2
1. 00
1. 00
2
0
2
Critical Gp:xxxxx xxxx xxxxx 6.4 xxxx 6.2 4.1 xxxx xxxxx xxxxx xxxx xxxxx
FollowUpTim:xxxxx xxxx xxxxx 3.5 xxxx 3.3 2.2 xxxx xxxxx xxxxx xxxx xxxxx
------------1---------------11---------------11---------------11---------------1
Capacity Module:
Cnflict Vol: xxxx xxxx xxxxx 715 xxxx 401 402 xxxx xxxxx xxxx xxxx xxxxx
Potent Cap.: xxxx xxxx xxxxx 400 xxxx 653 1168 xxxx xxxxx xxxx xxxx xxxxx
Move Cap.: xxxx xxxx xxxxx 399 xxxx 653 1168 xxxx xxxxx xxxx xxxx xxxxx
Volume/Cap: xxxx xxxx xxxx 0.02 xxxx 0.00 0.01 xxxx xxxx xxxx xxxx xxxx
------------1---------------11---------------11---------------11---------------1
Level Of Service Module:
2Way95thQ: xxxx xxxx xxxxx xxxx xxxx xxxxx
Control Del:xxxxx xxxx xxxxx xxxxx xxxx xxxxx
LOS by Move: * * * * * *
Movement: LT -LTR -RT LT -LTR -RT
Shared Cap. : xxxx 0 xxxxx xxxx 446 xxxxx
SharedQueue:xxxxx xxxx xxxxx xxxxx 0.1 xxxxx
Shrd ConDel:xxxxx xxxx xxxxx xxxxx 13.3 xxxxx
Shared LOS: * * * * B *
ApproachDel: xxxxxx 13.3
ApproachLOS: * B
0. 0 xxxx xxxxx xxxx xxxx xxxxx
8.1 xxxx xxxxx xxxxx xxxx xxxxx
A * * * * * LT -LTR -RT LT -LTR -RT
xxxx xxxx xxxxx xxxx xxxx xxxxx
0.0 xxxx xxxxx xxxxx xxxx xxxxx
8.1 xxxx xxxxx xxxxx xxxx xxxxx
A * * * * *
xxxxxx xxxxxx
* *
********************************************************************************
Note: Queue reported is the number of cars per lane.
Traffix 7.8.0515 (c) 2006 Dowling Assoc. Licensed to LLG, PASADENA, CA
-------..
-----------.. ------------------
MITIG8 -ex am Fri Dec 8, 2006 09:06:17 Page 1-1
Level Of Service Computation Report
2000 HCM Unsignalized Method (Future Volume Alternative)
********************************************************************************
Intersection #2 Cassia Rd -Eastern D/W
********************************************************************************
Average Delay (sec/veh): 0.8 Worst Case Level Of Service: C[ 15.1]
********************************************************************************
Approach: North Bound South Bound East Bound West Bound
Movement: L T R L T R L T R L T R
------------1---------------11---------------11---------------11---------------1
Control: Stop Sign Stop Sign Uncontrolled Uncontrolled
Rights: Include Include Include Include
Lanes: 0 0 l! 0 0 0 0 1! 0 0 0 1 0 0 0 0 0 0 1 0
------------1---------------11---------------11---------------11---------------1
Volume Module:
Base Vol:
Growth Adj:
Initial Bse:
Added Vol:
PasserByVol:
Initial Fut:
User Adj:
PHF Adj:
PHF Volume:
Reduct Vol:
Final Vol.:
0 0
1.00 1.00
0 0
0 0
0 0
0 0
1.00 1.00
0.92 0.92
0 0
0 0
0 0
Critical Gap Module:
0
1. 00
0
0
0
0
1. 00
0.92
0
0
0
30 0
1. 00 1. 00
30 0
0 0
0 0
30 0
1.00 1.00
0.92 0.92
33 0
0 0
33 0
5
1. 00
5
0
0
5
1. 00
0.92
5
0
5
6 442
1. 00 1. 00
6 442
0 0
0 0
6 442
1. 00 1. 00
0.92 0.92
7 480
0 0
7 480
0
1.00
0
0
0
0
1.00
0.92
0
0
0
0 256
1.00 1.00
0 256
0 0
0 0
0 256
1.00 1.00
0. 92 0. 92
0 278
0 0
0 278
10
1. 00
10
0
0
10
1. 00
0.92
11
0
11
Critical Gp:xxxxx xxxx xxxxx 6.4 xxxx 6.2 4.1 xxxx xxxxx xxxxx xxxx xxxxx
FollowUpTim:xxxxx xxxx xxxxx 3.5 xxxx 3.3 2.2 xxxx xxxxx xxxxx xxxx xxxxx
------------1---------------11---------------11---------------11---------------1
Capacity Module:
Cnflict Vol: xxxx xxxx xxxxx 777 xxxx 284 289 xxxx xxxxx xxxx xxxx xxxxx
Potent Cap.: xxxx xxxx xxxxx 368 xxxx 760 1284 xxxx xxxxx xxxx xxxx xxxxx
Move Cap.: xxxx xxxx xxxxx 367 xxxx 760 1284 xxxx xxxxx xxxx xxxx xxxxx
Volume/Cap: xxxx xxxx xxxx 0.09 xxxx 0.01 0.01 xxxx xxxx xxxx xxxx xxxx
------------1---------------11---------------11---------------11---------------1
Level Of Service Module:
2Way95thQ: xxxx xxxx xxxxx xxxx xxxx xxxxx
Control Del:xxxxx xxxx xxxxx xxxxx xxxx xxxxx
LOS by Move: * * * * * *
Movement: LT -LTR -RT LT -LTR -RT
Shared Cap. : xxxx 0 xxxxx xxxx 396 xxxxx
SharedQueue:xxxxx xxxx xxxxx xxxxx 0.3 xxxxx
Shrd ConDel:xxxxx xxxx xxxxx xxxxx 15.1 xxxxx
Shared LOS: * * * * C *
ApproachDel: xxxxxx 15.1
ApproachLOS: * C
0 . 0 xxxx xxxxx xxxx xxxx xxxxx
7 . 8 xxxx xxxxx xxxxx xxxx xxxxx
A * * * * * LT -LTR -RT LT -LTR -RT
xxxx xxxx xxxxx xxxx xxxx xxxxx
0.0 xxxx xxxxx xxxxx xxxx xxxxx
7.8 xxxx xxxxx xxxxx xxxx xxxxx
A * * * * *
xxxxxx xxxxxx
* *
********************************************************************************
Note: Queue reported is the number of cars per lane.
Traffix 7.8.0515 (c) 2006 Dowling Assoc. Licensed to LLG, PASADENA, CA
------
---------• -• -
• -• -
-----...
----
MITIG8 -ex pm Fri Dec 8, 2006 09:06:38 Page 1-1
Level Of Service Computation Report
2000 HCM Unsignalized Method (Future Volume Alternative)
********************************************************************************
Intersection #2 Cassia Rd -Eastern D/W
********************************************************************************
Average Delay (sec/veh): 0.2 Worst Case Level Of Service: B[ 13.6]
********************************************************************************
Approach: North Bound South Bound East Bound West Bound
Movement: L T R L T R L T R L T R
------------1---------------11---------------11---------------11---------------1
Control: Stop Sign Stop Sign Uncontrolled Uncontrolled
Rights: Include Include Include Include
Lanes: o o 1! o o o o 1! o o o 1 o o o O O O 1 o
------------1---------------11---------------11---------------11---------------1
Volume Module:
Base Vol:
Growth Adj:
Initial Bse:
Added Vol:
PasserByVol:
Initial Fut:
User Adj:
PHF Adj:
PHF Volume:
Reduct Vol:
Final Vol.:
0 0
1. 00 1. 00
0 0
0 0
0 0
0 0
1.00 1.00
0.92 0.92
0 0
0 0
0 0
Critical Gap Module:
0
1.00
0
0
0
0
1. 00
0.92
0
0
0
6 0
1. 00 1. 00
6 0
0 0
0 0
6 0
1. 00 1. 00
0. 92 0. 92
7 0
0 0
7 0
3
1.00
3
0
0
3
1.00
0.92
3
0
3
4 300
1.00 1.00
4 300
0 0
0 0
4 300
1.00 1.00
0.92 0.92
4 326
0 0
4 326
0
1.00
0
0
0
0
1. 00
0.92
0
0
0
0 400
1.00 1.00
0 400
0 0
0 0
0 400
1. 00 1. 00
0.92 0.92
0 435
0 0
0 435
7
1. 00
7
0
0
7
1.00
0.92
8
0
8
Critical Gp:xxxxx xxxx xxxxx 6.4 xxxx 6.2 4.1 xxxx xxxxx xxxxx xxxx xxxxx
FollowUpTim:xxxxx xxxx xxxxx 3.5 xxxx 3.3 2.2 xxxx xxxxx xxxxx xxxx xxxxx
------------1---------------11---------------11------·--------11---------------1
Capacity Module:
Cnflict Vol: xxxx xxxx xxxxx 773 xxxx 439 442 xxxx xxxxx xxxx xxxx xxxxx
Potent Cap.: xxxx xxxx xxxxx 370 -xxxx 622 1128 xxxx xxxxx xxxx xxxx xxxxx
Move Cap.: xxxx xxxx xxxxx 369 xxxx 622 1128 xxxx xxxxx xxxx xxxx xxxxx
Volume/Cap: xxxx xxxx xxxx 0.02 xxxx 0.01 0.00 xxxx xxxx xxxx xxxx xxxx
------------1---------------11---------------11---------------11---------------1
Level Of Service Module:
2Way95thQ: xxxx xxxx xxxxx xxxx xxxx xxxxx
Control Del:xxxxx xxxx xxxxx xxxxx xxxx xxxxx
LOS by Move: * * * * * *
Movement: LT -LTR -RT LT -LTR -RT
Shared Cap. : xxxx 0 xxxxx xxxx 427 xxxxx
SharedQueue:xxxxx xxxx xxxxx xxxxx 0.1 xxxxx
Shrd ConDel:xxxxx xxxx xxxxx xxxxx 13.6 xxxxx
Shared LOS: * * * * B *
ApproachDel: xxxxxx 13.6
ApproachLOS: * B
0. 0 xxxx xxxxx xxxx xxxx xxxxx
8. 2 xx.xx xxxxx xxxxx xx.xx xxxxx
A * * * * * LT -LTR -RT LT -LTR -RT
xxxx xx.xx xxxxx xxxx xxxx xxxxx
0 . 0 xx.xx xxxxx xxxxx xx.xx xxxxx
8. 2 xx.xx xxxxx xxxxx xxxx xxx.xx
A * * xxxxxx
*
* * xxxxxx
*
*
********************************************************************************
Note: Queue reported is the number of cars per lane.
Traffix 7.8.0515 (c) 2006 Dowling Assoc. Licensed to LLG, PASADENA, CA
-------.. -------• -----------
-..
-----
--
MITIG8 -ex+p am Fri Dec 8, 2006 09:06:51 Page 1-1
Level Of Service Computation Report
2000 HCM Unsignalized Method (Future Volume Alternative)
********************************************************************************
Intersection #3 Cassia Rd -Western Driveway
********************************************************************************
Average Delay (sec/veh): 1.2 Worst Case Level Of Service: C[ 16.5]
********************************************************************************
Approach: North Bound South Bound East Bound West Bound
Movement: L T R L T R L T R L T R
------------1---------------11---------------11---------------11---------------1
Control: Stop Sign Stop Sign Uncontrolled Uncontrolled
Rights: Include Include Include Include
Lanes: o o l! o o o o l! O o O O l! O O O O l! O O
------------1---------------11---------------11---------------11---------------1
Volume Module:
Base Vol:
Growth Adj:
Initial Bse:
Added Vol:
PasserByVol:
Initial Fut:
User Adj:
PHF Adj:
PHF Volume:
Reduct Vol:
Final Vol.:
17 0
1. 00 1. 00
17 0
0 0
0 0
17 0
1.00 1.00
0.92 0.92
18 0
0 0
18 0
Critical Gap Module:
7
1. 00
7
0
0
7
1. 00
0.92
8
0
8
11 0
1.00 1.00
11 0
0 0
0 0
11 0
1.00 1.00
0.92 0.92
12 0
0 0
12 0
23
1. 00
23
0
0
23
1. 00
0.92
25
0
25
13 439
1.00 1.00
13 439
0 0
0 0
13 439
1.00 1.00
0.92 0.92
14 477
0 0
14 477
5
1. 00
5
0
0
5
1.00
0.92
5
0
5
1 261
1.00 1.00
1 261
0 0
0 0
1 261
1. 00 1. 00
0.92 0.92
1 284
0 0
1 284
5
1. 00
5
0
0
5
1. 00
0.92
5
0
5
Critical Gp: 7.1 xx.xx 6.2 7.1 xx.xx 6.2 4.1 xx.xx xxxxx 4.1 xx.xx xxxxx
FollowUpTim: 3.5 xx.xx 3.3 3.5 xx.xx 3.3 2.2 xxxx xxxxx 2.2 xx.xx xxxxx
------------1---------------11---------------11---------------11---------------1
Capacity Module:
Cnflict Vol: 809 xx.xx 480 801 xx.xx 286 289 xxxx xxxxx 483 xx.xx xxxxx
Potent Cap.: 301 xx.xx 590 305 xx.xx 757 1284 xx.xx xxxxx 1091 xxxx xxxxx
Move Cap.: 289 xx.xx 590 299 xxxx 757 1284 xx.xx xxxxx 1091 xxxx xxxxx
Volume/Cap: 0.06 xx.xx 0.01 0.04 xx.xx 0.03 0.01 xx.xx xx.xx 0.00 xxxx xxxx
------------1---------------11---------------11---------------11---------------1
Level Of Service Module:
2Way95thQ: xx.xx xx.xx xxxxx xx.xx xx.xx xxxxx 0.0 xxxx XXXXX 0.0 xx.xx XXXXX
Control Del:xxxxx xx.xx xxxxx xxxxx xx.xx xxxxx 7.8 xxxx xxxxx 8.3 xxxx xxxxx
LOS by Move: * * * * * * A * * A * *
Movement: LT -LTR -RT LT -LTR -RT LT -LTR -RT LT -LTR -RT
Shared Cap. : xx.xx 339 xxxxx xx.xx 506 xxxxx xx.xx xx.xx xxxxx xxxx xxxx xxxxx
SharedQueue:xxxxx 0.2 xxxxx xxxxx 0.2 xxxxx xxxxx xxxx xxxxx xxxxx xxxx xxxxx
Shrd ConDel:xxxxx 16.5 xxxxx xxxxx 12. 7 xxxxx xxxxx xx.xx xxxxx xxxxx xxxx xxxxx
Shared LOS: * C * * B * * * * * * *
ApproachDel: 16.5 12. 7 xxxxxx xxxxxx
ApproachLOS: C B * *
********************************************************************************
Note: Queue reported is the number of cars per lane .
Traffix 7.8.0515 (c) 2006 Dowling Assoc. Licensed to LLG, PASADENA, CA
...
-----------------.. ---
--------------
MITIG8 -ex+p pm Fri Dec 8, 2006 09:07:09 Page 1-1
Level Of Service Computation Report
2000 HCM Unsignalized Method (Future Volume Alternative)
********************************************************************************
Intersection #3 Cassia Rd -Western Driveway
********************************************************************************
Average Delay (sec/veh): 0.6 Worst Case Level Of Service: C[ 15.9]
********************************************************************************
Approach: North Bound South Bound East Bound West Bound
Movement: L T R L T R L T R L T R
------------I ---------------I I ---------------I I ---------------I I ----------·-----I
Control: Stop Sign Stop Sign Uncontrolled Uncontrolled
Rights: Include Include Include Include
Lanes: 0 0 1! 0 0 0 0 1! 0 0 0 0 1! 0 0 0 0 1! 0 0
------------1---------------11---------------11---------------11---------------1-
Volume Module:
Base Vol: 8 0 3 8 0 3 7 308 19 7 403 2
Growth Adj: 1.00 1.00 1. 00 1.00 1. 00 1.00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00
Initial Bse: 8 0 3 8 0 3 7 308 19 7 403. 2
Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0
PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0
Initial Fut: 8 0 3 8 0 3 7 308 19 7 403 2
User Adj: 1.00 1. 00 1. 00 1. 00 1.00 1.00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00
PHF Adj: 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
PHF Volume: 9 0 3 9 0 3 8 335 21 8 438 2
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Final Vol.: 9 0 3 9 0 3 8 335 21 8 438 2
Critical Gap Module:
Critical Gp: 7.1 xxxx 6.2 7.1 xxxx 6.2 4.1 xxxx xxxxx 4.1 xxxx xxxxx
FollowUpTim: 3.5 xxxx 3.3 3.5 xxxx 3.3 2.2 xxxx xxxxx 2.2 xxxx xxxxx
------------1---------------11---------------11---------------11---------------1
Capacity Module:
Cnflict Vol: 816 xxxx 345 816 xxxx 439 440 xxxx xxxxx 355 xxxx xxxxx
Potent Cap.: 298 xxxx 702 298 xxxx 622 1130 xxxx xxxxx 1214 xxxx xxxxx
Move Cap.: 293 xxxx 702 294 xxxx 622 1130 xxxx xxxxx 1214 xxxx xxxxx
Volume/Cap: 0.03 xxxx 0.00 0.03 xxxx 0.01 0.01 xxxx xxxx 0.01 xxxx xxxx
------------1---------------11---------------11---------------11---------------1
Level Of Service Module:
2Way95thQ: xxxx xxxx xxxxx xxxx xxxx xxxxx
Control Del:xxxxx xxxx xxxxx xxxxx xxxx xxxxx
LOS by Move: * * * * * *
Movement: LT -LTR -RT LT -LTR -RT
Shared Cap. : xxxx 349 xxxxx xxxx 343 xxxxx
SharedQueue:xxxxx 0.1 xxxxx xxxxx 0.1 xxxxx
Shrd ConDel:xxxxx 15.7 xxxxx xxxxx 15.9 xxxxx
Shared LOS: * C * * C *
ApproachDel: 15.7 15.9
ApproachLOS: C C
0.0 xxxx xxxxx
8.2 xxxx xxxxx
A * * LT -LTR -RT
xxxx xxxx xxxxx
xxxxx xxxx xxxxx
xxxxx xxxx xxxxx
* * *
xxxxxx
*
0.0 xxxx xxxxx
8.0 xxxx xxxxx
A * *
LT -LTR -RT
xxxx xxxx xxxxx
xxxxx xxxx xxxxx
xxxxx xxxx xxxxx
* * *
xxxxxx
*
********************************************************************************
Note: Queue reported is the number of cars per lane.
Traffix 7.8.0515 (c) 2006 Dowling Assoc. Licensed to LLG, PASADENA, CA
-------------------• ---..
-..
-----------
MITIG8 -ex+p am Fri Dec 8, 2006 09:06:59 Page 1-1
Level Of Service Computation Report
2000 HCM Unsignalized Method (Future Volume Alternative)
********************************************************************************
Intersection #2 Cassia Rd -Eastern D/W
********************************************************************************
Average Delay (sec/veh): 1.3 Worst Case Level Of Service: C[ 17.7]
********************************************************************************
Approach: North Bound South Bound East Bound West Bound
Movement: L T R L T R L T R L T R
------------1---------------11---------------11---------------11---------------1
Control: Stop Sign Stop Sign Uncontrolled Uncontrolled
Rights: Include Include Include Include
Lanes: 0 0 1! 0 0 0 0 1! 0 0 0 0 1! 0 0 0 0 1! 0 0
------------1---------------11---------------11---------------11---------------1
Volume Module:
Base Vol:
Growth Adj:
Initial Bse:
Added Vol:
PasserByVol:
Initial Fut:
User Adj:
PHF Adj:
PHF Volume:
Reduct Vol:
Final Vol.:
7 0
1. 00 1. 00
7 0
0 0
0 0
7 0
1.00 1.00
0.92 0.92
8 0
0 0
8 0
Critical Gap Module:
15
1. 00
15
0
0
15
1. 00
0.92
16
0
16
30 0
1.00 1.00
30 0
0 0
0 0
30 0
1.00 1.00
0. 92 0. 92
33 0
0 0
33 0
5
1. 00
5
0
0
5
1. 00
0.92
5
0
5
6 449
1.00 1.00
6 449
0 0
0 0
6 449
1.00 1.00
0.92 0.92
7 488
0 0
7 488
2
1. 00
2
0
0
2
1.00
0.92
2
0
2
4 257
1.00 1.00
4 257
0 0
0 0
4 257
1. 00 1. 00
0. 92 0. 92
4 279
0 0
4 279
10
1. 00
10
0
0
10
1. 00
0.92
11
0
11
Critical Gp: 7.1 xxxx 6.2 7.1 xxxx 6.2 4.1 xxxx xxxxx 4.1 xxxx xxxxx
FollowUpTim: 3.5 xxxx 3.3 3.5 xxxx 3.3 2.2 xxxx xxxxx 2.2 xxxx xxxxx
------------1---------------11---------------11---------------11---------------1
Capacity Module:
Cnflict Vol: 798 xxxx 489 804 xxxx 285 290 xxxx xxxxx 490 xxxx xxxxx
Potent Cap.: 306 xxxx 583 304 xxxx 759 1283 xxxx xxxxx 1084 xxxx xxxxx
Move Cap.: 302 xxxx 583 293 xxxx 759 1283 xxxx xxxxx 1084 xxxx xxxxx
Volume/Cap: 0.03 xxxx 0.03 0.11 xxxx 0.01 0.01 xxxx xxxx 0.00 xxxx xxxx
------------1---------------11---------------11---------------11---------------1
Level Of Service Module:
2Way95thQ: xxxx xxxx xxxxx xxxx xxxx xxxxx
Control Del:xxxxx xxxx xxxxx xxxxx xxxx xxxxx
LOS by Move: * * * * * *
Movement: LT -LTR -RT LT -LTR -RT
Shared Cap. : xxxx 450 xxxxx xxxx 321 xxxxx
SharedQueue:xxxxx 0.2 xxxxx xxxxx 0.4 xxxxx
Shrd ConDel:xxxxx 13.5 xxxxx xxxxx 17.7 xxxxx
Shared LOS: * B * * C *
ApproachDel: 13.5 17.7
ApproachLOS: B C
0.0 xxxx xxxxx
7.8 xxxx xxxxx
A * * LT -LTR -RT
xxxx xxxx xxxxx
xxxxx xxxx xxxxx
xxxxx xxxx xxxxx
* * *
xxxxxx
*
0.0 xxxx xxxxx
8.3 xxxx xxxxx
A * * LT -LTR -RT
xxxx xxxx xxxxx
xxxxx xxxx xxxxx
xxxxx xxxx xxxxx
* * *
xxxxxx
*
********************************************************************************
Note: Queue reported is the number of cars per lane.
Traffix 7.8.0515 (c) 2006 Dowling Assoc. Licensed to LLG, PASADENA, CA
-----------------..
----------------
---
MITIG8 -ex+p pm Fri Dec 8, 2006 09:07:16 Page 1-1
Level Of Service Computation Report
2000 HCM Unsignalized Method (Future Volume Alternative)
********************************************************************************
Intersection #2 Cassia Rd -Eastern D/W
********************************************************************************
Average Delay (sec/veh): 0.4 Worst Case Level Of Service: C[ 15.3]
********************************************************************************
Approach: North Bound South Bound East Bound West Bound
Movement: L T R L T R L T R L T R
------------1---------------11---------------11---------------11---------·-----1
Control: Stop Sign Stop Sign Uncontrolled Uncontrolled
Rights: Include Include Include Include
Lanes: o o 1! o o o o 1! o o O o 1! o O o o O 1 O
------------1---------------11---------------11---------------11----------.-----1
Volume Module:
Base Vol:
Growth Adj:
Initial Bse:
Added Vol:
PasserByVol:
Initial Fut:
User Adj:
PHF Adj:
PHF Volume:
Reduct Vol:
Final Vol.:
3 0
1.00 1.00
3 0
0 0
0 0
3 0
1.00 1.00
0. 92 0. 92
3 0
0 0
3 0
Critical Gap Module:
8
1.00
8
0
0
8
1. 00
0.92
9
0
9
6 0
1. 00 1. 00
6 0
0 0
0 0
6 0
1.00 1.00
0.92 0.92
7 0
0 0
7 0
3
1. 00
3
0
0
3
1. 00
0.92
3
0
3
4 303
1. 00 1. 00
4 303
0 0
0 0
4 303
1.00 1.00
0.92 0.92
4 329
0 0
4 329
8
1. 00
8
0
0
8
1. 00
0.92
9
0
9
0 416
1.00 1.00
0 416
0 0
0 0
0 416
1.00 1.00
0. 92 0. 92
0 452
0 0
0 452
7
1.00.
7
0
0
7
1. 00
0.92
8
0
8
Critical Gp: 7.1 xxxx 6.2 7.1 xxxx 6.2 4.1 xxxx xxxxx xxxxx xxxx xxxxx
FollowUpTim: 3.5 xxxx 3.3 3.5 xxxx 3.3 2.2 xxxx xxxxx xxxxx xxxx xxxxx
------------1---------------11---------------11---------------11---------------1
Capacity Module:
Cnflict Vol: 800 xxxx 334 803 xxxx 456 460 xxxx xxxxx
Potent Cap.: 306 xxxx 713 304 xxxx 609 1112 xxxx xxxxx
Move Cap.: 303 xxxx 713 300 xxxx 609 1112 xxxx xxxxx
Volume/Cap: 0.01 xxxx 0.01 0.02 xxxx 0.01 0.00 xxxx xxxx
xxxx xxxx xxxxx
xxxx xxxx xxxxx
xxxx xxxx xxxxx
xxxx xxxx xxxx
------------1---------------11---------------11---------------11---------------1
Level Of Service Module:
2Way95thQ: xxxx xxxx xxxxx xxxx xxxx xxxxx
Control Del:xxxxx xxxx xxxxx xxxxx xxxx xxxxx
LOS by Move: * * * * * *
Movement: LT -LTR -RT LT -LTR -RT
Shared Cap. : xxxx 521 xxxxx xxxx 361 xxxxx
SharedQueue:xxxxx 0.1 xxxxx xxxxx 0.1 xxxxx
Shrd ConDel:xxxxx 12 .1 xxxxx xxxxx 15.3 xxxxx
Shared LOS: * B * * C *
ApproachDel: 12 .1 15.3
ApproachLOS: B C
0. 0 xxxx xxxxx xxxx xxxx xxxxx
8. 3 xxxx xxxxx xxxxx xxxx xxxxx
A * * * * * LT -LTR -RT LT -LTR -RT
xxxx xxxx xxxxx xxxx xxxx xxxxx
xxxxx xxxx xxxxx xxxxx xxxx xxxxx
xxxxx xxxx xxxxx xxxxx xxxx xxxxx
* * * * * *
xxxxxx xxxxxx
* *
********************************************************************************
Note: Queue reported is the number of cars per lane.
Traffix 7.8.0515 (c) 2006 Dowling Assoc. Licensed to LLG, PASADENA, CA
-
-----.. -------.. -... -------
-------
----
LINSCOTI, LAW & GREENSPAN, engineers
APPENDIXF
EL CAMINO REAL/CASSIA ROAD INTERSECTION
QUEUE ANALYSIS & TRAFFIC ACCIDENT DATA
LLG Ref. 3-04-1395
Poinsettia Place
---------• .. .. ---.. ----------------.. ----
MITIG8 -ex am Fri Dec 8, 2006 09:18:08 Page 1-1
Level Of Service Computation Report
2000 HCM Operations Method (Future Volume Alternative)
********************************************************************************
Intersection #1 E.C.R./Cassia Road
********************************************************************************
Cycle (sec):
Loss Time (sec):
Optimal Cycle:
100
12 (Y+R=4.0 sec)
47
Critical Vol. /Cap. (X):
Average Delay (sec/veh):
Level Of Service:
0.590
20.9
C
********************************************************************************
Approach: North Bound South Bound East Bound West Bound
Movement: L T R L T R L T R L T R
------------1---------------11---------------11---------------11---------------1
Control: Protected Protected Split Phase Split Phase
Rights: Include Include Include Include
Min. Green: o O o o O O O O O O O O
Lanes : 1 O 1 1 o 1 o 2 1 o 1 o O 1 O O O 1 ! O O
------------1---------------11---------------11---------------11---------------1
Volume Module:
Base Vol: 63 1046 10 10 781 77 293 10 113 10 10 10
Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Initial Bse: 63 1046
Added Vol: 0 0
PasserByVol: 0 0
Initial Fut: 63 1046
User Adj: 1.00 1.00
PHF Adj: 0.92 0.92
PHF Volume: 68 1137
10
0
0
10
1. 00
10
0
0
781
0
0
10 781
1.00 1.00
0. 92 0. 92 0. 92
11 11 849
77
0
0
77
1. 00
0.92
84
293
0
0
293
1. 00
0.92
318
10
0
0
10
1. 00
0.92
11
113
0
0
113
1. 00
0.92
123
10
0
0
10
1.00
0.92
11
10
0
0
10
1. 00
10
0
0
10
1. 00
0. 92 0. 92
11 11
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Reduced Vol: 68 1137 11 11 849 84 318 11 123 11 11 11
PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Final Vol.: 68 1137 11 11 849 84 318 11 123 11 11 11
------------1---------------11---------------11---------------11---------------1
Saturation Flow Module:
Sat/Lane: 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Adjustment: 0.95 0.95 0.95 0.95 0.90 0.90 0.95 0.86 0.86 0.94 0.94 0.94
Lanes: 1.00 1.98 0.02 1.00 2.73 0.27 1.00 0.08 0.92 0.34 0.33 0.33
Final Sat.: 1805 3572 34 1805 4660 459 1805 133 1505 595 595 595
------------1---------------11---------------11---------------11---------------1
Capacity Analysis Module:
Vol/Sat: 0.04 0.32 0.32 0.01 0.18 0.18 0.18 0.08 0.08 0.02 0.02 0.02
Crit Moves: **** **** **** **** Green/Cycle: 0.09 0.54 0.54 0.01 0.46 0.46 0.30 0.30 0.30 0.03 0.03 0.03
Volume/Cap: 0.40 0.59 0.59 0.59 0.40 0 .40 0.59 0.27 0.27 0.59 0.59 0.59
Uniform Del: 42.6 15.5 15.5 49.3 18.2 18.2 29.8 26.7 26.7 47.8 47.8 47.8
IncrernntDel: 1.5 0.5 0.5 41. 7 0.1 0.1 1. 7 0.3 0.3 15.7 15.7 15.7
InitQueuDel: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Delay Adj: 1. 00 1. 00 1. 00 1.00 1. 00 1. 00 1. 00 1.00 1.00 1. 00 1.00 1. 00
Delay/Veh: 44.1 16.0 16.0 90.9 18.3 18.3 31.5 27.0 27.0 63.5 63.5 63.5
User DelAdj: 1. 00 1. 00 1. 00 1. 00 1.00 1. 00 1. 00 1.00 1. 00 1. 00 1. 00 1. 00
AdjDel/Veh, 44.1 16.0 16.0 90.9 18.3 18.3 ~7.0 27.0 63.5 63.5 63.5
LOS by Move: D B B F B B C C C E E E
HCM2kAvgQ: 2 13 13 1 7 7 9 3 3 2 2 2
*********************************************** ***************************
Note: Queue reported is the number of cars per lane.
Traffix 7.8.0515 (c) 2006 Dowling Assoc. Licensed to LLG, PASADENA, CA
-
-----------• -..
---.. -----------------
MITIG8 -ex+p am Fri Dec 8, 2006 09:18:22 Page 1-1
Level Of Service Computation Report
2000 HCM Operations Method (Future Volume Alternative)
********************************************************************************
Intersection #1 E.C.R./Cassia Road
********************************************************************************
Cycle (sec): 100 Critical Vol./Cap. (X):
Loss Time (sec): 12 (Y+R=4. 0 sec)
48
Average Delay (sec/veh):
0.597
21.3
C Optimal Cycle: Level Of Service:
********************************************************************************
Approach: North Bound South Bound East Bound West Bound
Movement: LT R LT R LT R LT R
------------1---------------11---------------11---------------11---------------1
Control: Protected Protected Split Phase Split Phase
Rights: Include Include Include Include
Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0
Lanes: 1 0 1 1 0 1 0 2 1 0 1 0 0 1 0 0 0 1! 0 0
------------1---------------11---------------11---------------11---------------1
Volume Module:
Base Vol:
Growth Adj:
Initial Bse:
Added Vol:
PasserByVol:
Initial Fut:
User Adj:
PHF Adj:
PHF Volume:
Reduct Vol:
66 1046
1.00 1. 00
66 1046
0 0
0 0
66 1046
1.00 1.00
0. 92 0. 92
72 1137
0 0
10
1. 00
10
0
0
10
1. 00
0.92
11
0
10 781
1.00 1.00
10 781
0 0
0 0
10 781
1.00 1.00
0.92 0.92
11 849
0 0
79
1. 00
79
0
0
79
1. 00
0.92
86
0
303 10
1. 00 1. 00
303 10
0 0
0 0
303 10
1.00 1.00
0.92 0.92
329 11
0 0
125
1.00
125
0
0
125
1.00
0.92
136
0
10 10
1.00 1.00
10 10
0 0
0 0
10 10
1. 00 1.00
0.92 0.92
11 11
0 0
10
1. 00
10
0
0
10
1. 00
0.92
11
0
Reduced Vol: 72 1137 11 11 849 86 329 11 136 11 11 11
PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Final Vol.: 72 1137 11 11 849 86 329 11 136 11 11 11
------------1---------------11---------------11---------------11---------------1
Saturation Flow Module:
Sat/Lane: 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Adjustment: 0.95 0.95 0.95 0.95 0.90 0.90 0.95 0.86 0.86 0.94 0.94 0.94
Lanes: 1.00 1.98 0.02 1.00 2.72 0.28 1.00 0.07 0.93 0.34 0.33 0.33
Final Sat.: 1805 3572 34 1805 4645 470 1805 121 1515 595 595 595
------------1---------------11---------------11---------------11---------------1
Capacity Analysis Module:
Vol/Sat: 0.04 0.32 0.32 0.01 0.18 0.18 0.18 0.09 0.09 0.02 0.02 0.02
Crit Moves: **** **** **** ****
Green/Cycle: 0.10 0.53 0.53 0.01 0.45 0.45 0.31 0.31 0.31 0.03 0.03 0.03
Volume/Cap: 0.41 0.60 0.60 0.60 0.41 0.41 0.60 0.29 0.29 0.60 0.60 0.60
Uniform Del: 42.4 16.0 16.0 49.3 18.7 18.7 29.5 26.5 26.5 47.9 47.9 47.9
IncremntDel: 1.6 0.5 0.5 44.0 0.1 0.1 1.8 0.3 0.3 16.7 16.7 16.7
InitQueuDel: 0.0 0.0 0.0 0.0 0.0 o.o o.o o.o o.o o.o o.o 0.0
Delay Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Delay/Veh: 44.0 16.5 16.5 93.3 18.9 18.9 31.3 26.8 26.8 64.6 64.6 64.6
User DelAdj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
AdjDel/Veh: 44.0 16.5 16.5 93.3 18.9 18.9 m6.8 26.8 64.6 64.6 64.6
LOS by Move : D B B F B B C C C E E E
HCM2kAvgQ: 3 13 13 1 7 7 9 4 4 2 2 2
*********************************************** **** ***************************
Note: Queue reported is the number of cars per lane.
Traffix 7.8.0515 (c) 2006 Dowling Assoc. Licensed to LLG, PASADENA, CA
----Time: Number of Queue Length
Cycles (# of Cars) --7:00am 1 3 --2 L/ -3 f --4 3
·1·. o q()Jp\ 5 5 -6 6
7 <{ ..
8 ' --9 b
-1'. lSOJw\ 10 5 --11 I -12 ~ --13 L(
-14 5 -7 ".'::G .. 0,./w\ 15 -'1----16 J -17 5 --18 6
19 b --/'.'300JyY\ 20 6
-21 5 -22 1, --23 3
-----
Number Queue Length Time: of {# of Cars)
-
Cycles -1·,:,~ 24 11 --25 \5 -26 I l • -27 J~ .. 28 :JO --29 ;}3
-1·.«s~ 30 ~i
31 J5 -.. 32 ;)5
-33 J\ --34 I~ .. ' : S"'/ t:J/JYJ 35 I ir\ --36 6 -37 q
38 11 --<3' :a)0,,?11 .. 39 1 -'6: OtX tYYY/ 40 6 ..
-41 g' -42 i --43 3
-44 L/ -g /() t t:J.-"1 45 a --46 7
--· ---
Number Queue Length Time: of
Cycles {# of Cars)
-47 5 --48 b -? .'IS o,,n"1 49 1 --50 If -51 3 --52 5
-53 °'' -54 J.. --55 6 -56 3 --57 5 -58 L/ --q,·30~ 59 5 -60 3 -61 B --62 3 -63 5 --64 ,Q -65 L( --66 ~
-67 3 -68 1 --g~·1s 69 a - ---
---TRAFFIC COLLISION LC~ --STREET NAME: C/JS.S/.t'} l?tJ,1/) -PRIMARY USION FACTOR,
DATE OTHER FACTORS, RESULT APPROXIMATE LOCATION -COMMENTS ---.. .. ---.. -----..
----
----..
------
--I -I ---s~ -//' -V I i --~-",. -....... -, (4/3<-){v.) ::( \ .3~I[\,.woiooo) --: 1'3LlODx? -r: 5µ_;_) C~s)_ (~r::xx>J -/09S()OQ -/.· -1-111/"f? /,~;)_ -I ----,,..
,, u --~M= ;,qo --
--ii -I I ---!
11111 I I
I --I -
I --. I -I -.--W-1--111 --------------,
1!1 --
------+1-l----------.. ---µ+------------------------------------+I-I-------------..
.... l~ j ,1] 1: ;~ ~i ;ir:; •. ·,. ::~::i .. 10·;::,J .. ,,t:·;~ i .. -~ f-t ,· ~~-.~. ·;·•;·,. ·~ f;ns,1 . J•'"i -.. t):fi,:", : . ~,)r;·:;H1fr?t~i(,,2a:,~ti': .
08-15-00 BASIC AVERAGE ACCIDENT RATE TABLE F .(Se5~J Page 1
RATE BASE + ADT PCT PCT PCT AIN DESIGN ACC COSTS ($1000)
GROUP RATE FACTOR FAT INJ F+ I HIGHWAY TYPE ORADT SPEED AREA F+ I ALL
H 01 1.15 0.3500 I 3.4 45.1 48.5 CONVENTIONAL 2 LANES OR LESS FLAT =:55 RURAL 345.4 169.6
H 02 0.90 0.3500 I 3.8 44.6 48.5 CONVENTIONAL 2 LANES OR LESS FLAT >55 RURAL 376.7 184.8
H 03 1.30 0~3500 I 2.2 46.0 48.2 CONVENTIONAL 2 LANES OR LESS ROLL =:55. RURAL 251.9 123.5
H 04 0.80 0.3500 I 3.7 46.2 49.9 CONVENTIONAL 2 LANES OR LESS ROLL >55 RURAL 360.8 182.1
H 05 1.65 0.4000 I 2.1 48.2 50.3 CONVENTIONAL 2 LANES OR LESS MTN ~55 RURAL 237.0 121.2
. H 06 1.25 0.4000 I 2.7 44.8 47.5 CONVENTIONAL 2 LANES OR LESS MTN >55 RURAL 294.7 142.1
H 07 2.95 0.0000 0.4 38.3 38.7 CONVENTIONAL 2 LANES OR LESS <45 SUBURBAN 99.0 40.8
H 08 ~.0000 1.0 41.4 42.4 CONVENTIONAL 2 LANES OR LESS c 45-55 SUBURBAN ::, 145.8 64.1
H 09 0.0000 1.7 40.8 42.5 CONVENTIONAL 2 LANES OR LESS >55 SUBURBAN 203.9 89.0
H 10 3.05 0.0000· 0.4 40.5 41.0 CONVENTIONAL 2 LANES OR LESS <45 URBAN 95.6 41.6
H 11 1.75 0.0000 1.3 45.2 46.6 CONVENTIONAL 2 LANES OR LESS ;::45 URBAN 158.0 75.8
H 12 1.00 0.0000 3.1 45.0 48.1 CONVENTIONAL 3 LANES RURAL 323.8 157.8
H 13 1.30 0.0000 2.2 42.2 44.4 CONVENTIONAL 3 LANES SUBURBAN 237.7 107.8
00 H 14 2.05 0.0000 0.9 38.0 38.9 CONVENTIONAL 3 LANES URBAN 132.0 53.8
(.;J
H 15 0.60 0.0000 6.0 46.6 52.7 EXPRESSWAY 3 LANES OR LESS FLAT RURAL 512.5 272.0
H 16 0.60 0.0000 3.8 42.9 46.7 EXPRESSWAY 3 LANES OR LESS ROLL RURAL 388.4 183.5
H 17 1.20 0.0000 -t5 42.5 44.0 EXPRESSWAY 3 LANES OR LESS MTN RURAL 207.7 93.6
H 18 0.90 0.0000 5.6 52.8 58.3 EXPRESSWAY 3 LANES OR LESS ~55 SU13URBAN. 402.3 236.2
H 19 0.90 0.0000 5.6 42.1 47.7 EXPRESSWAY 3 LANES OR LESS >55 SUBURBAN 477.7 230.0
H 20 1.00 0.0000 1.5 44.9 46.4 EXPRESSWAY 3 LANES OR l:ESS URBAN 163.9 78.2
H 21 1.20 0.0000 2.8 49.8 52.6 UNDIVIDED 4 LANES FLAT RURAL 280.9 149.6
H 22 1.65 0.0000 2.2 38.4 '40.6 UNDIVIDED 4 LANES RO LUM TN RURAL 284.5 117.9
H 23 2.55 0.0000 1.1 37.1 38.3 UNDIVIDED 4 LANES ~55 SUBURBAN 163.8 65.2
H 24 2.55 0.0000 2.0 41.1 43.1 UNDIVIDED 4 LANES >55 SUBURBAN 226.6 99.9
H 25 4.95 0.0000 0.4 39.4 39.8 UNDIVIDED 4 LANES <45 URBAN 86.9 37.0
H 26 3.35 0.0000 0.6 42.5 43.2 UNDIVIDED 4 LANES :::.45 URBAN 100.0 45.5
H 27 1.50 0.0000 2.0 37.0 39.0 UNDIVIDED 5-6 LANES FLAT RURAL 273.4 109.1
H 28 2.85 0.0000 1.7 50.0 51.7 UNDIVIDED 5-6 LANES ROLUMTN RURAL 203.1 106.9
H 29 0.95 0.0000 3.1 46.9 50.0 UNDIVIDED 5-6 LANES ~55 SUBURBAN 281.7 142.9
H 30 0.95 0.0000 1.0 32.8 33.8 UNDIVIDED 5-6 LANES >55 SUBURBAN 167.1 59.1
1 H 31 4.45 0.0000 1.0 26.1 27.1 UNDIVIDED 5-6 LANES <45 URBAN 179.4 51.5
------------------------
-
-----------
o,55
r3/.V-/00 vVlbt\ · 7 10 7 (l~? l~ .")( ~7~) l~J'.::f
3/i,t,( 00 ())eJ. t:l~ \(olb ei;:, PoO
1 n~te4-~ r,Bl \.,16dc> (it;h -Iµ A-rr t~·T
)/0/03 ~-r, 147~ 1108 Y2-7? PDO
t1j'l,jo"? /}1tf(I 4¢bv'l 08~5' t<h-~-1 tJ4:TI' L ~r
\.._ J ~ ti\'I ':::>)
~
,tat [EN7=> ,iJ l-151 3 lf ib~ e
(A-;,GIIJ-1 £0? /NlE'fL6t:-cllOAi
f3-${ (a2hQ,
,,
------------------------------------------
---
-
-----1+1------------------:-------:----
A~ !Zdi == ,, /~ -~ -
...
----~5i~54~0~------'C-~/-. e:h.. ~ • '7'3"""'---.. } '-4(-L
-------+1-'1-----t------------------. ...c -.......
-----l+l-----1--~
___ ____µ4--__ _.__d~-------------
1 -
-------l+J--------
--------l-1--1-----------
... ]1
-------------------"+'--------------------------~------------------------·--
-,II
1 t 11 11 11 11 11 11 II II II II 11 II II 11 11 11 Ii I!
08-15-00 BASIC AVERAGE:~CCIDENT RATE TABLE FO!it1NTERSECTIONS, Page 1
RATE BASE + ADT PCT PCT PCT INTERSECTION ACC COSTS ($1000)
GROUP 'RATE FACTOR FAT INJ F+I TYPE* CONTROL TYPE AREA F+I ALL
I 01 0.11 0.0000 3.5 42.0 45.5 F, MANDS NO CDNTROL RURAL 371.4 171.2
I 02 0.33 0.0000 2.4 45.3 47.7 F, MAND S STOP & YIELD SIGNS (EXC 4 WAY) RURAL 269.7 130.8
I 03 0.76 0.0000 0.8 41.4 42.2 F, MAND S 4WAYSTOP RURAL 149.9 65.6
I 04 0.70 0.0000 1.0 45.5 46.5 F, MANOS SIGNALS RURAL 159.6 76.4
I 05 0.70 0.0000 1.3 43.3 44.5 F, MANOS 4 WAY FLASHERS RURAL 189.2 86.4
I 06 0.35 0.0000 0.8 32.3 33.1 F, MAND S NO CONTROL SUBURBAN 147.9 51.6
I 07 0.34 · 0.0000 1.2 40.4 41.5 F, MANOS STOP & YIELD SIGNS (EXC 4 WAY) SUBURBAN 164.8 70.7
I 08 0.51 0.0000 0.4 36.4 36.8 F, MAND S 4WAYSTOP SUBURBAN 100.9 39.6
I 09 0.58 0.0000 0.5 39.3 39.7 F,MANDS SIGNALS SUBURBAN 107.1 44.9
I 10 0.55 0.0000 1.3 30.7 32.0 F, MAND S 4 WAY FLASHERS SUBURBAN 206.1 68.7
I 11 0.06 0.0000 2.6 42.8 45.4 F,MANDS NO CONTROL URBAN 249.7 115.5
I 12 0.22 0.0000 0.7 42.2 42.9 F, MAND S STOP & YIELD SIGNS (EXC 4 WAY) URBAN 108.5 48.8
00 I 13 0.41 0.0000 0.5 45.0 45.5 F, MANOS 4WAYSTOP URBAN 90.1 43.2
0\ -URBAN 39.1 I 14 0.43 0.0000 0.4 43.9 44.3 F,MANDS SIGNALS 83.3
I 15 0.62 0.0000 0.7 39.6 40.3 F, MAND S 4 WAY FLASHERS URBAN 112.1 47.6
I 16 0.14 0.0000 I 1.8 43.5 45.3 T, YANDZ NO CONTROL RURAL 229.3 106.1
I 17 0.22 0.0000 1.8 42.6 44.3 T, YANDZ STOP & YIELD SIGNS (EXC 4 WAY) RURAL 232.9 105.4
I 18 0.60 0.0000 0.5 47.8 48.4 T, YANDZ 4WAYSTOP RURAL 116.7 58.6
I 19 0.50 0.0000 0.2 37.9 38.1 T, YANDZ SIGNALS RURAL 97.5. 39.6
I 20 0.58 0.0000 2.2 39.4 41.7 T, YANDZ 4 WAY FLASHERS RURAL 278.9 118.6
I 21 0.13 0.0000 0.4 40.0 40.5 T, Y ANDZ NO CONTROL SUBURBAN 97.2 41.7
I 22 0.19 0:0000 0.9 40.5 41.4 T, YANDZ STOP & YIELD SIGNS (EXC 4 WAY) SUBURBAN 139.3 60.0
I 23 0.54 0.0000 0.5 33.3 33.8 T, YANDZ 4WAYSTOP SUBURBAN 114.7 41.4
I 24 ~0.0000 0.2 38.9 39.1 T, YANDZ SIGNALS SUBURBAN 80.5 33.9
I 25 . 0.0000 2.9' 48.3 51.2 T, YANDZ 4 WAY FLASHERS SUBURBAN 262.8 136.5
I 26 0.10 0.0000 0.8 41.2 42.0 T, YANDZ NO CONTROL URBAN 117.9 51.8
I 27 0.14 0.0000 0.8 42.4 43.2 T, YANDZ STOP & YIELD SIGNS (EXC 4 WAY) ·uRBAN 116.0 52.4
I 28 0.18 0.0000 1.1 34.1 35.2 T, YANDZ 4WAYSTOP URBAN 159.9 58.9
I 29 0.2.8 0.0000 0.4 43.3 43.7 T, YANDZ SIGNALS URBAN 83.8 38.9
,J
--------------.. -..
---.. ----------------
17608-01 EventCount-566 Page 1
Traffic Data Service Southwest
Event Counts
17608-01 EventCount-566 --English (ENU)
Datasets:
Site:
Input A:
Input B:
Survey Duration:
[17608] El Camino Real Btwn Camino Vida Roble & Cassia Rd.
1 -North bound. -Added to totals. (1)
3 -South bound. -Excluded from totals. (O)
8:22 Monday, July 10, 2006 => 14:51 Friday, July 14, 2006
File:
Identifier:
F:\Traffic Data\MCData\RICK\2006\176\1760814JUL2006.ECO (Plus)
M144ME75 MC56-6 [MC55] (c)Microcom 02/03/01
Algorithm: Event Count
Data type: Axle sensors -Separate (Count)
Profile:
Filter time:
Name:
10:00 Monday, July 10, 2006 => 12:00 Thursday, July 13, 2006
Factory default profile
Scheme:
Units:
In profile:
Count events divided by two.
Non metric (ft, mi, ft/s, mph, lb, ton)
Events= 92131 I 131813 (69.90%}
* Monday, July 10, 2006=9119 (Incomplete), 15 minute drops
0000 0100 0200 0300 0400 0500 0600 0700 0800 0900 1000 1100 1200 -795 774 886 -209 159 220
-200 199 225 -180 197 215
-206 219 226
PM Peak 1530 • 1630 (1011), PM PHF:0.92
* Tuesday, July 11, 2006=14342, 15 minute drops
1300
886
222
189
243
232
0000 0100 0200 0300 0400 0500 0600 0700 0800 0900 1000 1100 1200 1300
58 45 24 36 71 206 533 1201 1230 1008 822 900 1146 1099
15 10 8 12 33 72 206 313 301 215 225 258 280
21 13 9 11 41 108 280 328 237 201 226 258 283
16 11 12 11 16 54 151 295 287 233 215 216 315 274
6 11 2 8 32 78 202 420 302 237 191 233 315 262
AM Peak 0730-0830 (1356), AM PHF:0.81 PM Peak 1230 • 1330 (1193), PM PHF:0.95
* Wednesday, July 12, 2006:14335, 15 minute drops
0000 0100 0200 0300 0400 0500 0600 0700 0800 0900 1000 1100 1200 1300
45 46 19 33 71 200 502 1180 1232 1044 799 821 1023 1144
13 8 6 3 8 23 76 197 335 302 232 197 214 289
13 9 4 10 15 42 112 288 312 278 176 193 264 290
12 11 8 11 17 54 135 313 286 222 205 179 251 273
7 18 1 9 31 81 179 382 299 242 186 252 294 292
AM Peak 0730 -0830 (1342), AM PHF:0.88 PM Peak 1245-1345 (1146), PM PHF:0.97
* Thursday, July 13, 2006:6226 (Incomplete), 15 minute drops
1400 1500 1600 1700 1800
915 961 972 898 654
252 245 275 184 180
247 225 245 238 170
224 251 192 254 145
192 240 260 222 159
1400 1500 1600 1700 1800
943 919 928 961 654
228 222 257 223 174
239 232 209 261 179
244 227 230 247 160
232 238 232 230 141
1400 1500 1600 1700 1800
956 990 941 1003 726
208 235 248 260 166
260 268 228 256 191
252 245 239 255 181
236 242 226 232 188
1900
433
117
116
111
89
1900
513
138
144
132
99
1900
521
166
141
116
98
2000 2100 2200 2300
381 284 165 115
100 74 55 38
88 78 52 36
101 60 26 23
92 72 32 18
2000 2100 2200 2300
380 352 196 117
100 102 75 41
85 87 53 31
93 83 37 34
102 80 31 11
2000 2100 2200 2300
384 330 204 121
117 101 62 37
88 86 57 34
77 78 45 32
102 65 40 18
0000 0100 0200 0300 0400 0500 0600 0700 0800 0900 1000 1100 1200 1300 1400 1500 1600 1700 1800 1900 2000 2100 2200 2300
62 41 21 27 65 222 548 1215 1258 1030 866 871
16 18 7 6 8 30 79 195 360 310 222 209
21 7 6 6 12 36 91 317 287 255 226 209
16 10 5 9 13 53 170 290 333 250 208 221
9 6 3 6 32 103 208 413 278 215 210 232
1J8 A'&.
15
21
i6
6
13
13
12
7
16
21
16
9
-
---Traffic Data Service Southwest
Event Counts
17608-01 EventCount-567 Page 1
• 17608-01 EventCount-567 --English CENU) ---------• -
-------------------
Datasets:
Site:
Input A:
Input B:
Survey Duration:
File:
Identifier:
Algorithm:
Data type:
Profile:
Filter time:
Name:
Scheme:
Units:
In profile:
[17608] El Camino Real Btwn Camino Vida Roble & Cassia Rd.
1 -North bound. -Excluded from totals. (0)
3 -South bound. -Added to totals. (1)
8:22 Monday, July 10, 2006 => 14:51 Friday, July 14, 2006
F:\Traffic Data\MCData\RICK\2006\176\ 1760814JUL2006.ECO (Plus)
M144ME75 MC56-6 [MC55] (c)Microcom 02/03/01
Event Count
Axle sensors -Separate (Count)
10:00 Monday, July 10, 2006 => 12:00 Thursday, July 13, 2006
Factory default profile
Count events divided by two.
Non metric (ft, mi, ft/s, mph, lb, ton)
Events= 92131 I 131813 (69.90%)
* Monday, July 10, 2006:11457 (Incomplete), 15 minute drops
0000 0100 0200 0300 0400 0500 0600 0700 0800 0900 1000 1100 1200 1300 1400 1500 1600 1700 1800 1900 -754 954 1151 958 872 973 1310 1720 1113 620
-177 207 354 245 212 273 306 481 347 179
-183 235 297 235 207 221 300 448 260 164
-150 261 270 240 226 263 368 459 271 149
-244 251 230 238 227 216 336 332 235 128
PM Peak 1645 -1745 (1724), PM PHF:0.90
* Tuesday, July 11, 2006:15380, 15 minute drops
0000 0100 0200 0300 0400 0500 0600 0700 0800 0900 1000 1100 1200 1300 1400 1500 1600 1700 1800 1900
57 43 48 41 79 207 610 837 864 779 788 1019 1137 1039 938 1031 1334 1730 1081 662
16 13 12 14 16 22 102 217 215 209 204 229 336 300 251 249 325 422 328 209
10 8 18 11 16 36 125 207 218 202 192 225 312 254 227 266 295 461 263 168
19 11 5 22 53 182 238 244 187 190 305 256 256 227 251 343 446 244 147
12 11 13 9 25 96 201 175 187 181 202 260 233 229 233 265 371 401 246 138
AM Peak 1130-1230 (1213), AM PHF:0.90 PM Peak 1700-1800 (1730), PM PHF:0.94
* Wednesday, July 12, 2006:15544, 15 minute drops
2000 2100 2200 2300
440 285 198 109
97 83 73 40
110 84 41 26
136 67 39 23
97 51 45 20
2000 2100 2200 2300
433 327 194 102
114 86 55 40
117 98 62 22
101 76 36 12
101 67 41 28
0000 0100 0200 0300 0400 0500 0600 0700 0800 0900 1000 1100 1200 1300 1400 1500 1600 1700 1800 1900 2000 2100 2200 2300
78 33 41 39 79 187 611 861 950 823 745 991 1229 1019 922 1009 1399 1712 1028 666 419 380 209 114
18 11 9 9 12 17 101 216 206 217 181 222 324 251 235 239 324 453 305 221 124 126 75 42
24 4 14 10 20 33 133 176 239 188 184 226 333 280 215 243 327 457 242 161 113 105 56 30
20 8 9 8 22 33 192 242 275 179 195 251 296 240 242 270 338 421 247 127 103 87 49 19
16 10 9 12 25 104 185 227 230 239 185 292 276 248 230 257 410 381 234 157 79 62 29 23
AM Peak 1145-1245 (1245), AM PHF:0.93 PM Peak 1645-1745 (1741), PM PHF:0.95
* Thursday, July 13, 2006:5728 (Incomplete), 15 minute drops
0000 0100 0200 0300 0400 0500 0600 0700 0800 0900 1000 1100 1200 1300 1400 1500 1600 1700 1800 1900 2000 2100 2200 2300
77 32 44 51 81 210 641 873 905 852 918 1044
22 10 10 9 8 31 102 225 216 216 221 226
20 7 15 10 28 45 119 210 247 205 225 197
17 7 7 13 18 50 204 191 222 208 249 310
18 8 12 19 27 84 216 247 220 223 223 311
SB
16
10
19
12
18
24
20
16
22
20
17
18