Project No. 06403-52-35
November18, 2010
Revised December 20, 2010
Taylor Morrison of California, LLC
15 Cushing
Irvine, California 92618
Attention: Ms. April Tornillo
Subject: VILLAGES OF LA COSTA - THE GREENS
- NEIGHBORHOOD .1.06 - LOTS 18 THROUGH 43 AND 70 THROUGH 75, 88
AND 92 .
CARLSBAD, CALIFORNIA
COMPLETION OF GRADING: PAD RELEASE
References: 1. Update Geotechnical Report, Villages of La Costa - The Greens, Phase 2,
Neighborhood 1. 06, Carlsbad, California, prepared by'Geocon Incorporated, dated
March 10, 2006 (Project No. 06403-52-25).
2. Final Report of Testing and Observation 'Services During Site Improvements
Villages of La Costa 7 The. Greens;' Neighborhood 1.06,. Carlsbad, California,
prepared by Geocon Incorporated, dated NOvember 3, 2006 (Project No. 06403-
52-23). . . .
Dear Ms. Tornillo:
In accordance with the request of your onsite superintendent, Mr. Gary Bosck, and the City of
lCarlsbad, we prepared this letter to confirm that grading of Lots18 through 43 and-70 through 75, 88
and 92 of the subject development is complete As indicated in the referenced reports, earthwork
operations were performed in substantial conformance with the project geotechnical report.
Lots 18 through 43 and 70 through 75, 88 and 92 have recently been procesSed by removing
v&getative growth and sprnmng the lots..We will perform compaction testing and observation services
during the future processing operations and include compaction test results, if necessary, in future pad
release letters for the project.
We opine that the building pads have been properly graded and are ready to receive the planned
improvements. The conclusions and recommendations presented in the .referenced update report
remains applicable. S S
6960 Flanders Drive E San Diego, California 92121-2974 0 Telephone 858.558.6900 Fax 858558.6159
Should you have any questions regarding this letter, or. if we may be of further service, please Contact
the undersigned at your convenience. .
Very truly yours,
GEOCO. INCORPORATED
NONAL (at
CEG 11778 4c SADR GE 2714 No. V78
CERTIFIED
ENGINEERING
GEOLOGIST
(2) Addressee u) 0 No. 2714
(3/del) Taylor Morrison ofCalifornia, LLC Exp.06/30/11 JJ Zo
Attention: Mr. Gary Bosck .
OF
Project No. 06403-52-35 - 2 - . November 18, 2010
GEOCON
INCORPORA T ED
GEOTECHNICAL CONSULTANTS
(40>)
Project No. 06403-52-25
July 26, 2007
Davidson Communities S
1302 Camino Del Mar-
Del Mar, California 92014
:5
Attention: Ms. Andrea Spinoza
Subject: VILLAGES OF LA COSTA - THE GREENS, PHASE-2
NEIGHBORHOOD 1.06 - LOTS 6 THROUGH 12 AND 61 THROUGH 65
CARLSBAIY CALIFORNIA
COMPLETION OF GRADING
References: 1. Update Geotechnical. Investigation, Villages of La Costa - The Greens, Phase 2,:
Neighborhood 1.06i Carlsbad California prepared by Geocon Incorporated, dated
March10, 2006 (Project No. 06403-52-25). 5
5
2. Final Report of Testing and Observation Services Peiformed During Site Grading,
Villages of La Costa -- The Greens, NeiEhborhoods. 1.06 & 1.07, Carlsbad,
California, prepared by GeoconIncorporated, dated December 29, :2005 (Project
- No. 06403-52-19B). •:
Dear Ms. Spinoza: S
In accordance with the: request of City of Carlsbad, this letter has been prepared to confirm that.
grading of Lots 6 through 12 and 61 through 65 of the subject, development is complete As indicated
in the referenced reports from a geotechmcal engineering standpoint, earthwork operations were
performed in substantial conformance with the referenced grading plan and project geotechnical
report.
It is our opinion that all building pads have been properly graded and are ready to receive the planned
improvements. All conclusions and reconmiendations presented in the referenced update report
remain applicable.
Should you have any questions regarding this letter, or if we may be of further service, please contact
the undersigned at ,yoür convenience.
Very truly yours,
: •:
S -'
GEOCON INCORPORATED /
Sádr :
: / k" AU
CEG 1778 ( 5:
:• S
A. CERTIFIED
S AS:dmc : QØ
tN 'GEOLOGIST J
(2) Addressee
6960 Flanders Drive: U San Diego, California 92121-2974 0 Telephone (858) '558-6900 0 Fax( 858) 558-6159
GEOCON
INCORPORATED
GEOTECHNICAL CONSULTANTS 'V
Project No. 06403-52-25
May 7, 2007
Davidson Communities
1302 Camino Del Mar
Del Mar, California 92014
Attention: Ms. Andrea Spinoza
Subject: VILLAGES OF LA COSTA - THE GREENS, PHASE 2
NEIGHBORHOOD 1.06— LOTS 1 THROUGH 5 AND 66 THROUGH 69
CARLSBAD CALIFORNIA
References: 1. Update Geotechnical Ihvèstigation, Villages of La Costa - The Greens, Phase 2,
Neighborhood 1.06, Carlsbad, California, prepared by Geocon Incorporated, dated
March 10,2006 (Project No. 0640352-25).
2. Final Report of Testing and Observation Services Performed During Site Grading,
Villages of La Costa - The Greens, Neighborhoods 1.06 & 1.07, Carlsbad,
Ca4fornia, prepared by Geocon Incorporated, dated December 29, 2005 (Project
No. 06403-52-19B).'
Dear Ms. Spinoza: S
In accordance with the request of City of Carlsbad, this letter has been prepared to confirm that
grading of Lots 1 through 5 and 66 through 69 of the subject development is complete As indicated
in the referenced reports from a ge engineeringcal engineering standpoint, earthwork operations were
performed in substantial conformance with the referenced grading plan and project geotechnical
report. -,
It is our opinion that all building pads have been properly graded and are ready to receive the planned
improvements. All conclusions and recommendations presented in the referenced update report
remain applicable.
Should you have any questions regarding this letter, or if we may be of further service, please contact
the undersigned at your convenience.
Very truly yours,
GEOCON INCORPORATED
CEG 1778
AS:sa
(2/pu) Addressee
SAOR
V N.1T78
CF.11T1F1ED lJ * \ NGNERING
\i \ c9LOGST J/
:P! CA-'
6960 Flanders Drive 0 Son Diego, California 92121-2974 • Telephone (858) 558-6900 0 Fax (858) 558-6159