L_) Gèotechnical . GèoloOic..,Coastàl Environmental
57.41 Palmer Way • Carlsàd, California 92010. (760) 438-3155 • FAX (760)931-0915. www.geosoilsinc.com
Myi7, 2011 .
W.O. 5949-B-SC
Brookfield Homes '
12865 Pointe Del Mar, Suite 200
Del Mar, California 92014'.
Attention: Ms. Teri McHugh
Subject: Compaction Report of-Building Pad Re-Certification, Planning Area 16,
ProdüctionPhase5, Lots 160 through 165, and 184 through 189,'Robertson
Ranch Development, CarIsbd, San Diego County, California
Dear -Ms. McHugh:
As requested, GeoSoUs, Inc. (GSI) is providing this'summary of our observtiôn and testing
services of re-grading on Lots 160 through 165, and 184' through 189,. Vvithin Planning
Area 16, at the Robertson Ranch Subdivision in the City of Carlsbad, California Planning
'Area 16 was initially graded with observation and testing services provided by GSI (2009b).
The pupose of remedial grading was to re-condition the building pads, and consisted of
re-processing surlicial soils, moisture conditioning, and compacting the soil to a minimum
relative compaction of 90 percent per ASTM.D 1557 (GSI; 2009a, 2010). This operation
was generally complete by mid-April-2011. Based on our observations and testing, the
building pads appear to have been prepared, in general àccordanëë with the
recommendations provided by'this office (GSI; 2009a, 2010), and are considered suitable
for their intended use.
FIELD OBSERVATION AND TESTING
Fie ld densittests were performed using nucler (densometer) ASIM test methods D,2922
and 'D 3017. The test 'results taken during grading operations are presented in the
attach ed..copiesôf our "Field Testing Re'pots.'.- .
•,
The laboratory maximum dry density and optimum moisture content for the major soil'ty'pe
within this construction phase were determined according to test method ASTM D 1557.
The following table presents the results:
,
S
4SOILTYPE DENSITY (PCF) (PERCENT)k
A - Brown, Silty SAND , 127.0 10.0
E - Dark Brown toBrown; Silty SAND 1260 . 11.0
Field compaction testing indicates that the soils appear to meet the minimum compaction
reuirements previously established and adopted by the City of Carlsbad ([2010 California
Building Code {2010 CBC}] i.e., at least 90 percent relative compaction per ASTM
D 1557), and:testing also indicates adequate soil moiture. However, based on ' the
expansive character of site soils, and the anticipated additional time that will pass prior to
slab construction, additional moisture conditioning and verificationwill likely be necessary
priorto placement of the urderslab vapor retarder (see Table A, Note 11, and Page 12 of.
GSI, 2009b).
- SOIL EXPANSION, AND CORROSION POTENTIAL
A review of GSI (2009b) indicates that very kw expansive r soil underlie Lots 160 through
164 (expansion index [E.l.] <20), low expansive soils underlie Lots 184 through 189
(expansion' index [E.l.] >20, and <50),andmedium expansive soils underlie Lot 165 (E.l.
>50, and <90), as classified by 2001 California Building Code ([2001 CBC], lnterntional
Confernce of Building Officials [ICBO], 2001), Table 18-lB. Please note that GSI is
-utilizing -this previous CBC code only to classifI the soils, as the 2010 CBC (California
Building Standards Commissioh [CBSC], 20'l 0) does not provide this index. Subsequent
corrosion testing of soils within 3 feet of finish grade indicate that these soils present a
negligible (sulfate class SO) sulfate exposure to concrete,' per Table 4.2.1 and 4.3.1 of the
American Concrete Institute (ACI) document 318708 (2010 CBC [CBSC,2010]). Soils are
relatively neutral with respect to soil acidity/alkalinity (pH of 7.9),- and are considered
corrosive to exposed ferrous metals in asaturated'statO. The chloride ion contert in soil
was also noted to generally be in.the range of 84 to 194 ppm, and ,is co'nsidered below
action levels (300 ppm [see GSI, 2009b]). Itis our understanding that standard concrete
cover over reinforcing steel is usually appropriate' for these conditions; however, a
corrosion engineer should be consijlted to provide specific recommendations regarding
foundations and piping, etc.
FOUNDATION DESIGN/CONSTRUCTION
Post-tension slabs are proposed for all lots. Based. on a review of GSI (2009b) and
observations/testing performed during this phase of site grading, post-tension foundations
should be designed and constructed in accordance with at least the minimal
recommendations presented in GSI (2009b) for Category I (Lots 160 through 164, and
Lots 184 through 189), and Category II (Lot 165) posttension foundations. Please note
Brookfield Homes W.O. 5949-B-SC
Phase 5, PA 16, Robertson Ranch May 17, 2011
File:e:\wpl2\5900\5949b.cro.ph5 Page 2
GeoSoils, Inc.
that GSl (2009b) referenced the 2007 Code; however, while some sections numbers have•
changed from the 2007 Code to the 2010 CBC, the geotechnical design parameters are
the same.
Unless specifically superceded herein, the findings, conclusions, and recommendations
presented in GSI (2009b) are generally considered valid and applicable with respect to the
construction and development of the subject building pads. Based on the duration of time
following pad completion, pre-wetting/saturation is recommended, as indicated in the
referenced GSI reports.
SUBSURFACE WATER
As directed by the client during mass grading of the project, the slope descending from
the south side of Lots 160 through 164 was constructed as a fill over cut slope. As has
been observed at the face of slope, subsequent to rainstorm events, perched water
accumulates along the fill/formation contact, and results in seepage where the contact
daylights at the slope face. It should also be noted that perched groundwater was
observed toward the front (north) of these same lots, during trenching operations for water
utilities-.
The relatively permeable "shade sand" placed within the water !ine trench is anticipated
to drain off some of the perched water, primarily toward the front of the lots. However, in
order to mitigate perched conditions within the remaining portion of the building pads, and
the observed seepage at the slope face, a french drain is recommended to be constructed
near the top of slope, and convey the collected water eastward towards Cascade Street,
where a tie in to an existing storm drain inlet can be made. The drain may generally
consist of 3 to 4 inch perforated PVC pipe (SDR 35, or equivalent) embedded in % to
3/4 inch drain rock encapsulated in filter fabric. The drain should be deep enough (at least
4 feet) to penetrate the fill/formation contact and sloped a minimum 1 percent to drain. The
subdrain should be perforated (perforations down) through Lots 160 to 164, and maybe
tight-lined down-gradient from the lots. Specific subdrain construction guidelines (see
"Toedrain") are presented in GSI (2009b). A schematic drain location is presented as
Plate 1. The flowline drainage and storm drain tie-lin should be reviewed by the design
civil engineer for functionality and conflicts with other utilities.
Brookfield Homes W.O. 5949-B-SC
Phase 5, PA 16, Robertson Ranch May 17, 2011
FiIe:e:\wpl2\5900\5949b.croph5 Page 3
GeoSoils, Inc.
CLOSURE
The materials encountered on. the project site and utilized for our analysis are believed
representative of the area; however, soil and bedrock materials vary in character between
excavations and natural outcrops or conditions exposed during mass grading. Site
conditions may vary due to seasonal changes or other factors. Inasmuch as our study is
based upon our review and engineering analyses and laboratory data, the conclusions and
recommendations are professional opinions. These opinions have been derived in
accordance with current standards of practice, and no warranty, either express or implied,
is given. Standards of practice are subject to change with time. GSI assumes no
responsibility or liability for work or testing performed by others, or their inaction; or work
performed when GSI is not requested to be onsite, to evaluate if our recommendations
have been properly implemented. Use of this report constitutes an agreement and
consent by the user to all the limitations outlined above, notwithstanding any other
agreements that may be in place. In addition, this report maybe subject to review by the
controlling authorities. Thus, this report brings to completion our scope of services for this
portion of the project.
Brookfield Homes - W.O. 5949-8-SC
Phase 5, PA 16, Robertson Ranch May 17, 2011
FiIe:e:\wpl2\5900\5949b.cro.ph5 Page 4
GeoSoils,' Inc
The opportunity to be of service is sincerely appreciated. If you should have any
questions, please do not hesitate to contact our office.
Respectfully subn)ittéSNPAL QN
GeoSoils, Inc 4ci
( ) RCE 47857 .,1 )*
A \
CL eriiiied
FflgineeringJ / \Geologist /
Robert G Crism 0 David W. Skelly ''p1 CP-7
Engineering GeoIot-G6i934 Civil Engineer, RCE 857
RCG/DWS/JPF/jh
Attachments:
Distribution
Plate 1 - Schematic Drain Location Map, PA-16, Lots 160-164
Appendix - References
"Field Testing Reports"
(4) Addressee
Brookfield Homes W.O. 5949-B-SC
Phase 5, PA 16, Robertson Ranch May 17, 2011
File:e:\wpl2\5900\5949b.cro.ph5 GeoSoils, Inc. Page 5
109.7 945 Sr
6211 SF
\ !'EIM \ -J2 HO,
517
TC
k-1X-X-`7
55OO8
\
;
\ 5.0 \ 55
106.9
72 SF
5210 SF Q. 5000 SF 5000 SF X-705 jQ0.J
16 \X-547 Af
108? -707 ) - 48 -
-.- \ 50 0
-- 3 2
125 -
HOA.
- 1899 5f
- 0
-140
- 118 ,1J9 929
116 E LS..E 934 6805 SF
26 SF
6595 5F
927 5814 57
' \\ 6608 SF
-
BASE ADAPTED FROM GSI (2009b)
1" = 40' scale
SCHEMATIC SUBDRAIN LOCATION MAP
PA-16, LOTS 160-164
DATE 5/11 Iwo N0.5949-B-SC
Geotechnical. Geologic. Environmental
FORM 89/22 PLATE 1
APPENDIX
REFERENCES
California Building Standards Commission, 2010, California Building Code, California Code
of Regulations, Title 24, Part 2, Volume 2 of 2, Based on the 2009 International
Building Code, 2010 California Historical Building Code, Title 24, Part 8; 2010
California Existing Building Code, Title 24, Part 10.
GeoSoils, Inc., 2010, Supplemental discussion of slab subgrade pre-wetting, planning area
16 of Robertson Ranch, City of Carlsbad, California, W.O 5949-C-SC, dated
August 17.
2009a, Discussion of building slab subgrade pre-wetting, planning area 16 of
Robertson Ranch, City of Carlsbad, California, W.O. 5949-C-SC, dated October 8.
2009b, Report of rough grading, planning area 16 of Robertson Ranch, East Village
(Lots 44 through 63, 89 through 99, 117-through 140, and 160 through 189),
Carlsbad Tract 04-26, Drawing 453-8A, Carlsbad, San Diego County, California,
W.O. 5353-131-SC, dated February 16.
International conference of Building Officials, 2001, California Building Code.
O'Day Consultants, Inc., 2008, Grading plans for Robertson Ranch PA 16,17; 18,
Sheets 10 and 13, Job no. 01-1014, Carlsbad Tract C.T. 004-26, Drawing no.453-8A,
dated August.
Ii
GeoSoils, Inc.
w.o.--
DATE
NAME Cco
HOURS
CLIENT ______TRACT LOCATION •'? 4r.)
SUPT.- CONTRACTOR • ,•
EQUIPMENT 1— D4 H- bT' l -j)ii'J
Ave\ )H
TEST
NJ. LOCATION
--
ELEV.
OR
DEPTH
MOISTURE
CONTENT
% '
DRY
DENSIT'C
P.C.F.
%
RELATIVE
COMPACTION
TEST
TYPE
SOIL
TYPE
/17.1 L) E
.3 JoT-) FT.
-
COMMENTS':
.-••LQ. Y .. . ,_
GeoSoils, Inc.
BY:
PAGE OF
This field report presents a summary of observations and testing by Geosoils, Inc. personnel. Our work does not include
supervision or direction of the actual work of the contractor, his employees, or agents. The Contractor should be informed
that neither the presence of our field representative, nor the observation and testing by our firm, shall excuse him in any way
fou defects discovered in his work. It is understood that our firm will not be responsible for job or site safety on this project.
FIELD TESTING REPORT
W.O. s4'g-,q-cc
DATE '-/-1.2-1/
NAME C/41-i5 0.
HOURS -
CLIENT TRACT PA/,f4 f LOCATION__________________
SUPT. _G/. /4 CONTRACTOR 2 .
EQUIPMENT
TEST
NO. LOCATION
ELEV.
OR
DEPTH
MOISTURE
CONTENT
%
DRY .
DENSITY
P.C.F.
%
RELATIVE
COMPACTION
TEST
TYPE
SOIL
TYPE
Al A
/0 L ,'i jir/ 'vp, q A
11,0 /143 V. I iJ A
/1 Lr j/j ,J A
COMMENTS: O75/7 1 ..&% 7. r
I
/ _r.(_ is (-LLt1V(J
__,1I Sm,14IL ,L
:i. f4'> £-.'
a(14'. >'3o)
GeoSoils, Inc.
BY:
PAGE' OF /
This field report presents a summary of observations and testing by Geosoils, Inc. personnel only where the tests were performed. Our
work does not include supervision or direction of the actual work of the contractor, his employees, or agents. The Contractor should
be informed that neither the presence of our field representative, nor the observation and testing by our firm, shall excuse him in any
way for defects discovered in his work. It is understood that our firm will not be responsible for job or site safety on this project.