HomeMy WebLinkAboutCT 04-26; ROBERTSON RANCH EAST VILLAGE PA 16, 17, & 18; PAVEMENT DESIGN REPORT WIND TRAIL WAY; 2009-12-02 (2)Geotechnical • Geologic • Coastal • Environmental
5741 PalmeWay • Carlsbad, Califorñia'92010 (760) 438-155 • FAX (760) 931-0915
December 2, 2009
W.O. 5949E-SC
Cl 04-2 Co
Brookfield San Diego Builders, Inc.
12865 Pointe Del Mar, Suite 200
Del Mar, California 92014
Attention: Mr. Greg McDonnell
SUbject: Pavement Design Report, Wind Trail Way (Stations 1 6to '1'8Z), Alander
Court (Stations 12 to 19), and 'Cascade Street (Stations 12 to I
Portion of Planning Area 16 of Robertson Ranch, Carlsbad, San Diego
County,, California
Dear Mr. McDonnell:
In accordance-with your request, GeoSoils,lnc (GSl) has prepared preliminary design and
construction recommendations for asphalt concrete (AC) pavement at the subject site. The,
scope of services provided in preparation of this report include a review of the referenced
reports and documents (seethe Appendix), an evaluation of the pavement section for the
subject area, and préparàtion of this report.
PAVEMENT DESIGN
Pavement section evaluation was based on traffic' index (TI) values provided by (O'Day
Consultants, personal communications). Pavement sections were evaluated in 'general
accordance with the California Department of Transportation (Caltrans) Highway Design
Manual of Instructions and the City of Carlsbad Standard Drawings (see the Appendix).
Pavement sections presented are based on the aforementioned criteria and resistance
value (R-value) data (seetable), evaluated from soils exposed at, or near, final subgrade
elevations within, the subject areas. R-value testing was performed in general accordance
with the latest revisions to the Department of I Transportation. State of California, Material
& Research' Test Method No. 301.
ASPHALT CONCRETE PAVEMENT
Structural Section
Traffic Indices (TI) were provided bythe project civil engineer (O'Day Consultants, personal
communication) as 5.0 for the subject traffic areas. R-values (see attached Figures 1
through 4) ranging from 5 to 16 were obtained for representative subgrade soils onsite and
used in pavement design. The recommended pavement sections are provided in general
accordance with the City guidelines (City of Carlsbad, 1993) are presented in the following
table:
AC AGGREGATE
APPROXIMATE TRAFFIC SUBGRADE THICKNESS BASE TH ICKNESS3
TRAFFIC AREA INDEX1 R-VALUE (Inches)'2 (inches)
Wind Trail Way, Stations 16' to 5.0 <5 4.0 8.5(2)
18+76 (Sample obtained from
Station 1 8)
Alander Court, Stations 12 to 5.0 11 4.0 7.0
19 (Samples obtained from
Stations 14+LG and 17)
Cascade Street, Stations 12 to 5.0 16 4.0 6.0
15 (Sample obtained from
Station 13
" Per O'Day Consultants, (Improvement plans)
Exceeds City minimum, design per State of California (2006)
(3) Denotes Class 2 Aggregate Base R >78, SE 25)
All pavement installation,, including preparation and compaction .ofsubgrade, compaction
of base material, and placement and rolling of asphaltic concrete, shall be done in
accordance with the City guidelines, and under the observation and testing of the project
geotechnical engineer and/or the City. It should be noted that subgrade lime treatment
was previously waived by the City for the construction of pavement in the Calavera
Hills/Robertson Ranch area (GSI; 2007a, 2007b, 2007c, 2004a, 2004b, and 2004c). It is
therefore anticipated that lime stabilization will not be performed for the current road
construction. However, due to the low R-values (5 to 1.6), wet subgrade conditions could
significantly reduce the life of the placement. It is imperative that subgrade materials are
not allowed to become wet or saturated.
The recommended pavement sections are meant as minimums. If thinner or highly
variable pavement sections are constructed, increased maintenance and repair may be
needed. The recommended pavement sections provided above are intended as a
minimum guideline. If thinner or highly variable pavement sections are constructed,
Brookfield San Diego Builders, Inc. W.O. 5949-E-SC
Portion of Planning Area 16, Robertson Ranch December 2, 2009
FiIe:e:\wp9\5900\5949e.pdr Page 2
GeoSoils, Inc.
increased rnaintenanoe and repaircould be expected.. If the ADT (average dailytrathc) or
ADTT (average daily truck traffic) increases beyond that intended as reflected by the TI
used for design increased maintenance and repair could be required for the pavement
section Consideration should be given to the increased potential for distress from overuse
of paved street areas by heavy equipment and/or construction related heavy traffic
(e.g., concrete trucks, loaded supply trucks etc), particularly when the final section is not
in place (i.e., topcoat). Best management construction practices should be followed atall
times, especially during inclement weather.
PAVEMENT GRADING RECOMMENDATIONS
General
All section changes shall be properly tränsitibned. If adverse conditions are encountered
during the preparation of subgrade materials special construction methods may need to
be employed A GSI representative shall be present for the preparation of subgrade, base
rock, and asphalt concrete
Subgrade
Within streetand parking areas, all surficial deposits of loose soil material shall be removed
and recompacted as recommended After the loose soils are removed the bottom is to
be scarified to a depth of at least 12 inches, moisture conditioned as necessary, and
compacted to 9.5. percentof the iiairnum laboratory density, as determined by ASTM test
designation D 1557.
Deleteriousmaterial, excessively wet or dry':pockets, concentrated zarios of oversized rock
fragments and any other unsuitable materials encountered during grading shall be
removed. The, compacted fill material shall then be brought to the elevation of the
proposed subgrade for the pavement. The subgrade shall be proof-rolled in order to
ensure a uniform firm and unyielding surface. All grading and fill placement shall be
observed by the project soil engineer and/or his representative.
Base Rock
Compaction tests are required for the recommended base section. Minimum relative
compaction required will be 95 percent of the laboratory maximum density as determined
by ASTM test designation D 1557 Base aggregate shall be in accordance with
Section 26 of Caltrans Standard specifications (California Department of Transportation
2006), for Caltrans Class 2 aggregate base.
Brookfield: San DiegoBuilders, Inc. W.O. 5949-E-SC
Portion of Planning Area 16, Robertson Ranch December-2, 2009
FiIë:e:\wp9\5900\5949e.pdr Page 3
GeoSoits, Inc.
Paving
Prime coat may be omitted if all of the following conditions are met:
The' asphalt pavement layer 'i
.
splaood'-Withid two weeks, of completion of base,
and/or subbase course.
Traffic is not routed over completed base before pving.
3 Construction iscompleted:duringthe' dry season of -May through October.
4. The base is kept'free.of debris, prior to placement of asphaltic concrete.
If construction is performed during the wet season of November through April, prime 'coat
may be omitted if no rain occurs between 'completion of base course' and paving and the
time between completion of base and paving is reduced to three days provided the base
is free of loose soil or on Where prime coat has been omitted and rain occurs, traffic
is routed over base course or paving is delayed, measures shall betaken to restore base
course and subgrade to conditions m that will eet specifications as directed by the soil
engineer.
Drainage,
Positive drainage shall be, provided for all surface water to drain toward the curb and
gutter, or"to an approved drainage channel. Positive site draiAage shall 'be maintained at
all times Water shall not be allowed to pond or seep into the ground Over-watering of
landscape areas should be avoided.
OTHER DESIGN PROFESSIONALS/CONSULTANTS
The design civil engineer shall review the recommendations provided herein, i'ncorporate'
those recommendations into their plans, and by explicit reference make this report part
of their project plans.
LIMITATIONS.
The materials encountered on the project site and utilized for our analysis are believed
representative of the area; however, soiF and bedrock materials-vary in character between
excavations and natural outcrops or conditions exposed during mass grading Site
conditions may vary due to seasonal' changes or othe,rfactors.
Brookfield San Diego Builders, Inc. W.O. 549-E-SC Portion of, Planning Area 16, Robertson 'Ranch 'Dëöernber 2, '2009
File:e:\wp9\5900\5949e.pdr Page 4
GeoSoils, Me.
Inasmuch as our study1s based upon our reviewand engineering analyses and laboratory
data, the conclusions and recommendations are professional opinions These opinions
have been derived in accordance with current standards of practice and no warranty, is
express or implied Standards of practice are subject to change with time GSI assumes
no responsibility or liability for work or testing performed by others or their inaction or
work performed when GSI is not requested to be onsite to evaluate if our
recommendations,have been properly implemented Use of this report constitutes an
agreement and consent by the user to all the limitations outlined above, notwithstanding
any other agreements that may be in place In addition this report may be subject to
review by the controlling authorities.
The opportunity to be of service is greatly appreciated. If you have any questions, please
do not hesitate to call our office.
Respectfully su
GeoSoils' inc(
Robert G. Cr1
Engineering
a-n- No i-34
Ctfled
- \ Eng.!rig •/ &\ oit 7,:
~ndZK. GL
Geotechnical
RGC/ATG/JPF/jh
Attachments Figures 1 through 4 - R-yaluê Test Results
Appendix -References
Distribution (4) Addressee
Brookfield San Diego Builders, Inc. W.O. 5949-E-SC
Portion ofPtanning Area 16, Robertson Ranch December 2, 2009
File:e:\wp9\5900\5949e:pdr Page 5
GeoSoils, Inc.
TFST SPFfIMFN A B C D
Compac tor air pressure PSI 170 50
Water added % 3.8 8.1
Moisture at compaction % 18.1 23.0
Height of'sample IN , 2.52 2.65
Dry density ' PCF 109.2 99.5
R-Value by exudation ' 10 4
R-Value by exudation, corrected 10 4
Exudation pressure PSI 784 424
,Stability thickness FT 1.151 1.23
Expansion pressure thickness FT 1.401 0.10
flFSt(W CAI dILATION DATA SAMPLE INFORMATION
Traffic index, assumed ' 5.0
Gravel equivalent factor, assumed 1.25
Expansion, stability equilibrium 1.18
R-Value by expansion 8
R-Value by exudation ' <5
R-Value at equilibrium <5*
* Soil pressed out of bottom of mold, stopped test.
Expansion, Stability Equilibrium
2.00 I I I I I I I I I
'1.50
.0 Cu Cl)
.0
101.00 0) C
U
0.50
C-)
1 1 1111 1
0.00 0.50 1.00 1.50 2.00:
Cover Thickness by, Expansion Pressure (It)
Sample Location: Wind Trail 16+60-18+70
Sample Description: Gray Brown Clay
Notes: FROM 18+00
01/6 Retained on 3/4 inch sieve
Test Method: Cal-Trans Test 301
R-Value By Exudation
80-
60
50 - --------- -
U -
40
--
30 -'
li'••'
800 700 600' 500 400 300 200 100 0
Exudation Pressure (psi)
R' - VALUE TEST RESULTS GeoSoils, Inc.
5741 Palmer Way Project: BROOKFIELD
. Carlsbad, CA 92008
Telephone: (760) 438-3155 Number: 5949-E-SC
Fax: (760) 931-0915
Date: Dec-0,9 Figure: 1
TEST SPECIMEN A P
Compactor air pressure PSI 330 230 170
Water added % 2.7 3.6 4.7
Moisture at compaction % 12.3 13.2 14.5
Height of sample IN 2.4 2.43 2.54
Dry density PCF 122.6 119.7 116.4
R-Value by exudation 26 15 11
R-Value by exudation, corrected 24 . 15 11
Exudation pressure PSI 559 393 283
,Stability thickness FT 0:95 1.09 1.14
Expansion pressure thickness FT 1.871 1.20 037
DESIGN CALCULATION DATA
Traffic index, assumed 5.0:
Gravel equivalent factor, assumed. 1:25
Expansion, stability equilibrium' 1.1
R-Value by expansion 14
R-Value by exudation 11
R-Value at equilibrium 11
Expansion, Stability Equilibrium
2.00
1.50
.0 C's
C')
>, .0
cn U)1.00 0) C
U
I-
CD 0.50
SAMPLE INFORMATION
Sample Location: Alander 12+00-15+60
Sample Description: Gray Brown Sandy Clay
Notes: FROM 14+36
01/6 Retained on 3/4 inch sieve.
Test Method: Cal-Trans Test 301
R-Value By Exudation
80
70
60
50
CD
40
30
20
10
0:00I/hhIhI1I11I,I11l!1111
0.00 0.50 1:00 1.50 2.00
Cover Thickness by Expansion Pressure (ft)
a .! !
800 700 ' 600 :500 400 300 200 100 0
Exudation Pressure(psi)
GeoSoils, Inc. R - VALUE TEST RESULTS
5741'Palmer Way Project: BROOKFIELD
: carlsbad, CA 9200.8'
Telephone: (760) 438-3'155 Number: 5949-E-SC
Fax: .(760) 931-0915
Date: Dec-09 Figure: 2'
TEST SPECIMEN A P n
Compactor air pressure PSI .350 150 80
Water added % 0.0 3.4 4.7
Moisture at compaction % 13.3 17.0 18.5
Height of sample IN. 2.37 2.5 2.58
Dry density PCF 120.2 112.5 109.1
R-Value by exudation 22 11 7
R-Value by exudation, corrected 21 11 7
Exudation pressure PSI 669 303 204
Stability thickness FT 1.001 1.14 1.19
Expansion pressure thickness FT 3.671 0.53 0.30
DESIGN CALCULATION DATA
Traffic index, assumed 5.0
Gravel equivalent factor, assumed 1.25
Expansion, stability equilibrium. 1.1
R-Value.by expansion 14
R-Value by exudation 11
R-Value at equilibrium 11
SAMPLE INFORMATION
Sample Location: Alander 15+60-19+20
Sample Description: Gray Brown Sandy Clay
Notes: FROM 17+60
0% Retained on 3/4 inch sieve
Test Method: Cal-Trans Test 301
R-Value By Exudation
80,
___------------------
___
--::---- ::r
----- — ---MM —
'U o2.50
> .0
cn u,2.O0
U
ca 40
70
60
50
p1.50
I-
0.50
:::
0.00 1.00 2.00 3.00 4:00
Cover Thickness by Expansion Pressure (ft)
30
20
10
Dl .
800 700 600 500 400 300 200 100 0
Exudation Pressure (psi)
GeoSoils, Inc. R - VALUE TEST RESULTS
5741 Palmer Way Project: BROOKFIELD
Carlsbad, CA 92008
Telephone: (760) 4383155 Number: 5949-E-SC
Fax: (760) 931-0915
Date: Dec-09 Figure: 3
TEST SPECIMEN A B C D
Compactor air pressure PSI 350 280 230
Water added % 4.8 5.3 5.8
Môistureat compaction 13.0 13.6 142
Height of sample IN 2.5. 2:53 2.55
Dry density PCF 121.3 119.3 117.7
R-Value by exudation 22 18 15
R-Value by exudation, corrected 22 18 15
Exudation pressure PSI 448 365 281
Stability thickness FT 1.0011 . 1.05 1.09
Expansion pressure thickness FT 1.401 0.73 0.10
DESIGN CALCULATION DATA
Traffic index, assumed - 5.0
Gravel equivalent factor, assumed 125
Expansion, stability equilibrium 1.03
R-Value by expansion 20
R-Value by exudation 16
R-Value at equilibrium -16
Expansion, Stability Equilibrium
2.00
'1.5O
.0 0)
.0
U) 01.00 0)
C)
I-
SAMPLE INFORMATION
Sample Location: Cascade 12+25715+40
Sample Description: Gray Brown Sandy Clay
Notes: FROM 13+90
0% Retained on 3/4 inch sieve
Test Method: Cal-Trans Test 301
R-Vàlue By Exudation
80 -,
70
60
50
0)
40
30
20
10
0.00.V11 11if I I I 11!111 11,
0.00 0.50 tOO 1.50 2.00
Cover Thickness by Expansion Pressure (ft)
0 1
800 700 600 500 400 300 200 100 0
Exudation Pressure (psi)
GeoSoils, Inc.
5741 Palmer Way
Carlsbad, CA 92008
Telephone: (760) 438-3155
Fax: (760) 931-0915
R - VALUE TEST RESULTS
Number: 5949-E-SC
Date: Dec-09 I
.APPENDIX
REFERENCES
California Department of Transpottàtion, 2006, Caltrans, Standard specifications, May
printing.
Carlsbad, City of, 1993, Standards for design and construction of public works
improvements, in the City of Carlsbad.
GeoSoils, Inc.,2008 Memo Clarification of pavement design report Glen Avenue
Station 26 to the Cul Du Sac Robertson Ranch East Village, City of Carlsbad,
San Diego County, California, W.O. 5353-B-SC,. dated October 31.
2007a, Pavement design report, Improvement of "Iôop"roads,'Wind Trail Way, Glen
Avenue and Hilltop Street Robertson Ranch East Village, City of Carlsbad San
Diego, County, California, 'W.O. 53847E-SC, dated October 31.
2007b, Pavement design. report, Improvement (widening) of College Boulevard
(Stations 1 03 to 11 8-°) and Cannon Road (Stations 127 to 159+22), City of
Carlsbad, San Diego County, California, W.O. 5354-E-SC, dated .September 18.
2007c, Review of R-value data, Improvement (Widening) of College' Boulevard
(Stations 103 to 1t8), and Cannon Road (Stations 127to 159-°), City of
Carlsbad, San Diego County, California, 'W.O. 5354E-SC, dated 'September 4.
2004a, Revised pavement design report, College Boulevard Stations 78 to
101 Reach C, Calavera Hills II Carlsbad San Diego County California,
W.O. 4028-E-SC, dated April 19.
2004b, Revised pavement design report, College Boulevard Stations 101 to
1181Q, Reach B, Calavera Hills II, Carlsbad, San Diego County, California,
W.O. 4029-E-SC, dated April 23.
2004c, Third revision of pave'ment design report, Calavera Hills II, Cannon Road
Stations 125 to 164.7,,City of Carlsbad San Diego County California
W.O. 4030-E-SC, dated May 14.
NEWCON901 1991 computer program for the. determination of asphalt pavement sections,
version: April 30.
State of California, Department of Transportation, 2006, Highway' design 'manual of
instructions, sixth edition, September printing.
GeoSoils, Inc.