Revised June 16, 2009
W.O. 5353-B 1 -SC
Brookfield Homes
12865 Pointe Del Mar, Suite 200
Del Mar, California 92014
Attention: Ms. Teri McHugh
Subject: Geotechnical Update for Phase 2 Production Lots 280 Through 289 of
Planning Area 18, Robertson Ranch, East Village, Carlsbad Tract 04-26,
Drawing 453-813, City of Carlsbad, San Diego County, California
References: 1. "Report of Rough Grading, Planning Area 18 of Robertson Ranch, East Village (Lots 195
through 304, and 309) Carlsbad Tract 04-26, Drawing 453-8A, Carlsbad, San Diego County,
California," W.O. 5353-B1-SC, dated September 17, 2008.
2. "Precise Grading Plans for: The Foothills at Carlsbad, Robertson Ranch PA 18, Phase 2
Lots 280-289" P.U.D. 06-014A, C.T. 04726, job No. 01140, dated June 8, 2009, by O'Day
Consultants.
Dear Ms. McHugh:
In accordance with your request, GeoSoils, Inc. (GSI) has reviewed the referenced report
and plans with respect to as-graded site conditions and has prepared this update report.
Grading and processing of original ground within the subject building pads was observed
and selectively tested by a representative of GSI during the earthwork phase of
development for the subject property. Based on our observations and testing, the subject
lots are considered suitable for their intended residential use. Geotechnical observations
and testing completed by this office during site grading are summarized in the referenced
GSI report. As of this date, the site has not changed significantly since the completion of
grading and the issuance of the referenced GSI report; thus, the findings, conclusions, and
recommendations presented in that report are generally considered valid and applicable
with respect to the construction and development of the subject building pads. Based on
the duration of time following pad completion, pre-wetting is recommended, as indicated
in the referenced GSI report. Some surficial processing may also be necessary, owing to
the passage of time, erosion, weathering, etc..
David W. Skelly
Civil Engineer, RCE 4
LIMITATIONS
Inasmuch as our study is based upon our review, engineering analyses, and laboratory
data, these conclusions and recommendations are professional opinions. These opinions
have been derived in accordance with current standards of practice, and no warranty is
express or implied. Standards of practice are subject to change with time. GSI assumes
no responsibility or liability for work or testing performed by others, or their inaction, or
work performed when GSI is not requested to be onsite to evaluate ,if our
recommendations have been properly implemented. Use of this report constitutes an
agreement and consent by the User to all the limitations outlined above, notwithstanding
any other agreements that may be in place. In addition, this report may be subject to
review by the controlling authorities.
The opportunity to be of service is greatly appreciated. If you have any questions, please
do not hesitate to call our office.
Respectfully submitted
NAL
o.1934' Certified ) Engineering / GeologIst, ..
Robert G. Crisman
Engineering Geolog
RGC/DWS/JPF/jh
Distribution (4) Addressee
GeoSoils, Inc.
Brookfield Homes W.O. 5353-B1-SC
Production Lots Ph. 2, PA-18, Robertson Ranch Revised June 16, 2009
File: e:\wp9\5300\5353b1 .pal8.rgu3 Page 2
GeoSoils, Inc.
Geotechnical . Geologió. Coastal . Environmental
5741 Palmer Way • Carlsbad, California 92010 • (760) 438-3155 • FAX (760) 931-0915 • www.geosoilsinc.com
June 15, 2009
W.O. 5353-B1-SC
Brookfield Homes.
12865 Pointe Del Mar, Suite 200
Del Mar, California 92014
Attention: Ms. Teri McHugh
Subject: GeotechnicI. Update for Phase 1 Production Lots 275 Through 279, and
I290 Through 293 of Planning Area 18, Robertson Ranch, East Village,
Carlsbad:Tract 04-26, Drawing453-813, City of Carlsbad,San:Diego County,
California. :
References: .1. "Report of Rough Grading, Planning Area 18 of Robertson Ranch, East Village (Loth 195
through 304, and 309) Carlsbad Tract 04-26, Drawing 453-8A, Carlsbad, San Diego County,
California," W.O. 5353-131SC, dated September 17, 2008.
t2 "Precise Grading Plans for: The Foothills at Carlsbad, Robertson Ranch PA 18, Phase 1
Lots 275-279, 290-293" P.U.D 06-014A, C.T. 04-26, job No. 01140, dated June 8, 2009, by
0'Day Consultants
Dear'Ms. McHugh:
In accordance with your request, GeoSoils, Inc. (GSI) has reviewed the referenced report
and plans With respect to as-graded site conditions and has prepared this update report.
Grading and processing of original ground within the subject building pads was observed
and,. selectively tested by a epresentative of "GSI . during the earthwork phase of
development for the subject property. Based On our observations and testing, the subject
lots are considered suitable for thir intended residential ue. Geotechnical observatiOns
;and testing completed by this office during site grading are summarized in the rferenced
GSI report. As ofthis date, the site has not changed significantly since the completion of.
grading and the issuance of the referenced GSI report; thus, the findings; conclusions, and
recommendations presented in that report are generally considered valid and àjplicable
with respect to the construction and development of the subject büildingpads. Based on
the duration of time following pad completion, prewetting is recommended, as indicated
in the referenced GSI report. Some surficial processing may,also be necessary, owing to
the passage Of time, erosion, weathering, etc.
LIMITATIONS
Inasmuch as our study is based upon our review, engineering analyses, and laboratory
data, these conclusions and recommendations are professional opinions. These opinions
have been derived in accordance with current standards of practice, and no warranty is
express or implied. Standards of practice are subject to change with time. GSI assumes
no responsibility or liability for work or testing performed by others, or their inaction, or
work performed when GSI is not requested to be onsite to evaluate if our
recommendations have been properly implemented. Use of this report constitutes an
agreement and consent by the user to all the limitations outlined above, notwithstanding
any other agreements that may be in place... In addition, this report may be subject to
review by the controlling authorities.
The opportunity to be of service is greatly appreciated. If you have any questions, please
do not hesitate to call our office.
Respectfully su
G.
. No. 1934
G Is , Inc.
Certified
Engineering
ologist
Robert G Crismar 'OF C mftO/
Engineering GeologE1934
RGC/DWS/J PF/j h
David W. Skelly
Civil Engineer, RCE 47
'?ckOFESs,oN
RCE47857
CIVIL
0 c P A%-*(j
zI1
Distribution: (4) Addressee
Brookfield Homes W. 0. 5353-B1-SC
Production Lots Ph. 1, PA-18, Robertson Ranch June 15, 2009
FiIe:e:\wp9\5300\5353b1 .pal8.gu2 Page 2
GeoSoils, Inc.