HomeMy WebLinkAboutCT 05-05; LA COSTA GREENS NEIGHBORHOOD 1.16; PRESSURE TEST REPORTS 2009; 2009-04-20crv9or
PRESSURE-TEST REPORT
.C.M.W.D.
PROJECT NO.: La Costa Greens 1.16 DATE: 4/20/2009
CONTRACTOR: Murrieta Development FOREMAN: Jose
SUPERINTENDENT: Gilbert V. of KB Homes
LIMITS OF TEST:
8" PVC main line from Dove Lane poc to Tourmaline Place (sta 9+87 - 10+78.74)
SIZE LENGTH LOSS TIME PSI MEAS. GAL.
.11
S
A
LENGTH OF TEST: 4 (hours)
ALLOWED LOSS: 0.06 (gallons total)
TEST LOSS: 0 (gallons total)
TEST PASSED -Ill TESTFAILEDD
INSPECTED BY:
PRESSURE TEST REPORT
C.M.W.D.
PROJECT NO.: La Costa Greens 1.16 DATE: 4/17/2009
CONTRACTOR: Murrieta Development FOREMAN: Jose
SUPERINTENDENT: Gilbert V. of KB Homes
LIMITS OF TEST: Entire 8" pvc main line including all laterals,
fire service lines & 5 fire hydrants,.on Beryl Place poc, and Brass Place to
Tourmaline Place (sta 10+78.74 to 27+42.92)
SIZE LENGTH LOSS
*11
;
I
S
TIME PSI MEAS. GAL.
LENGTH OF TEST: (hours)
ALLOWED LOSS: 1.14' (gallons total)
TEST LOSS:' (gallons total)
TEST PASSED TEST FAILEDO
INSPECTED BY:
NOTES:
%7e vt
- ,
PRESSURE TEST REPORT
C.M.W.D.
PROJECT NO.: La Costa Greens 1.16 DATE: 112,0L20,09
CONTRACTOR: Murrieta Development FOREMAN: Jose
SUPERINTENDENT: Gilbert V. of KB Homes
LIMITS OF TEST: entire 8" pvc main line including all laterals
fire service lines &2 fire hydrants, for lots 22 to 26 on Mercury P1 and Feldspar P1.
SIZE LENGTH LOSS ' TIME PSI MEAS. 'GAL.
611 .•,; * ,
8" 661 044'
In',
12"
14"
16" ' ______________ __
18" ' "'-
'41 ... . ..-.
ALLOWED LOSS 0:44
it'
)eV etop l
8' ij
,11or jot"
r-
c'
LOSS - TIME LENGTH OF TEST: . (hours)
ALLOWED LOSS:.--1• .. (gallons -total)
s:, - I
TEST LOSS: '--
-'" 0 ----(gallons total)
EST.-FAILED
INSPECTED
NOTES -h----
1 .. . - • -, -. (T) -, r.
— -.,. .
- _-77 —I
=- -2,::-- •. "s' , —
0 ' 1.
•