Loading...
HomeMy WebLinkAboutCT 05-05; LA COSTA GREENS NEIGHBORHOOD 1.16; PRESSURE TEST REPORTS 2009; 2009-04-20crv9or PRESSURE-TEST REPORT .C.M.W.D. PROJECT NO.: La Costa Greens 1.16 DATE: 4/20/2009 CONTRACTOR: Murrieta Development FOREMAN: Jose SUPERINTENDENT: Gilbert V. of KB Homes LIMITS OF TEST: 8" PVC main line from Dove Lane poc to Tourmaline Place (sta 9+87 - 10+78.74) SIZE LENGTH LOSS TIME PSI MEAS. GAL. .11 S A LENGTH OF TEST: 4 (hours) ALLOWED LOSS: 0.06 (gallons total) TEST LOSS: 0 (gallons total) TEST PASSED -Ill TESTFAILEDD INSPECTED BY: PRESSURE TEST REPORT C.M.W.D. PROJECT NO.: La Costa Greens 1.16 DATE: 4/17/2009 CONTRACTOR: Murrieta Development FOREMAN: Jose SUPERINTENDENT: Gilbert V. of KB Homes LIMITS OF TEST: Entire 8" pvc main line including all laterals, fire service lines & 5 fire hydrants,.on Beryl Place poc, and Brass Place to Tourmaline Place (sta 10+78.74 to 27+42.92) SIZE LENGTH LOSS *11 ; I S TIME PSI MEAS. GAL. LENGTH OF TEST: (hours) ALLOWED LOSS: 1.14' (gallons total) TEST LOSS:' (gallons total) TEST PASSED TEST FAILEDO INSPECTED BY: NOTES: %7e vt - , PRESSURE TEST REPORT C.M.W.D. PROJECT NO.: La Costa Greens 1.16 DATE: 112,0L20,09 CONTRACTOR: Murrieta Development FOREMAN: Jose SUPERINTENDENT: Gilbert V. of KB Homes LIMITS OF TEST: entire 8" pvc main line including all laterals fire service lines &2 fire hydrants, for lots 22 to 26 on Mercury P1 and Feldspar P1. SIZE LENGTH LOSS ' TIME PSI MEAS. 'GAL. 611 .•,; * , 8" 661 044' In', 12" 14" 16" ' ______________ __ 18" ' "'- '41 ... . ..-. ALLOWED LOSS 0:44 it' )eV etop l 8' ij ,11or jot" r- c' LOSS - TIME LENGTH OF TEST: . (hours) ALLOWED LOSS:.--1• .. (gallons -total) s:, - I TEST LOSS: '-- -'" 0 ----(gallons total) EST.-FAILED INSPECTED NOTES -h---- 1 .. . - • -, -. (T) -, r. — -.,. . - _-77 —I =- -2,::-- •. "s' , — 0 ' 1. •