tIC SOIL & TISTING, INC. . San Diego Office Indio Office i " o ... ::. tIC IJ
Z lIC ... :z: S o '"
PHONE
(619) 280-4321
rOll. r-REE
(877) 215-4321
f A x
(619) 280-4717
P;O. Box 600627
San Diego, CA 92160-062.7
6280 Riverdale Street
San Diego, CA 92120
WWW.5cst.com
PHONE
(760) 775-5983
TOl.l FREE
(877) 215-4321
FA X
(760) '775-8362
83-740 CItrus Avenue
SUite G
Indio, CA 92201-3438
WWW.scst.com
seSAT No. 0611115
Report NO.2
september 8,2006
Ms. Lynn Yut
All Cats Hospital
7040 Loker Avenue West, Suite 100
Carlsbad, California 92008 Cf 05-0(0
Subject: PRELIMINARY RETAINING WALL DESIGN RECOMMENDATIONS
ALL CATS HOSPITAL TESTING SERVICES
EL CAMINO REAL & CASSIA ROAD
CARLSBAD, CALIFORNIA
Reference: "Geotechnical Investigation, Cassia Road Projecr, prepared by Geocon
Incorporated; dated December 16,2004; (Project No. 07431-22-01).
Dear Ms. Yut:
In accordance with a request from Mr. Tom Guinn, Southern California Soil and Testing,. Inc.
has prepared this report to provide preliminary retaining wall design recpmmendations for the
masonry retaining walls for the subject project.
FOUNDATIONS
Conventional shallow foundations may be utilized for the support of the proposed retaining
walls. The footings should have a minimum depth of 18 inches below lowest adjacent finish pad
grade and a· minimum width of 12 inches. A bearing capacity of 3000 pounds per square foot
(pst) may be assumed for said footings. The bearing capacity may be increased by 300 psf and
500 psf for each additional foot of foundation width and depth, respectively, up to a maximum of
5000 psf. The bearing capacity may be increased by one-third when consjder~ng wind and/or·
seismic forces. Footings located adjacent or within, slopes should be I9xtended to a depth such
that a minimum horizontal distance of 10.feet exists between the outer footing edge and the
face of the slope.
EARTH RETAINING WALLS
Passive Pressure
The passive pressure for the prevailing soil conditions may be considered to be 300 pst per foot
of depth. This pressure may.be increased by 1/3 tor seismic loading. The coefficient of friction
between concrete and the underlying material may be assumed to be 0.30 When combining
frictional and passive resistance, friction should be reduced by~. The upper 12 inches of soil
should not be considered when calculating passive pressures for exterior walls.
•
I
I
I
I
I'
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Ms. Lynn Yut
All Cat's Hosp/tal
£/ Camino Real and Cassia St., Carlsbad, CA
ActIve Pressure
September 8, 2006,
SCS& T No. 0611115-2
, Page2
The active soil, pressure for the design of unrestrained earth. retaining structures with level
backfills may be assumed to be equivalent to the pressure of a fluid weighing 40 pounds per
cubic foot (pcf). This pressure does not consider any surcharge loads. If any are anticipated,
this office should be contacted for the necessary increase in soil pressure. T,hese values
assume a granular and drained backfill condition. Waterproofing specifications and details
should be provided by the project architect. A typical wall subdrain detail is provided' on Plate
'No.1.
Waterproofing and Subdrain Observation
The geotechnical engineer should be requested to verify that waterproofing has been applied
and that the subdrain has been properly installed. However, unless specifically asked to do so,
we will not verify proper application of the waterproofing. '
Backfill
All backfill soils should be compacted to at least 90 percent relative compaction. Expansive or
clayey soils should not be used for backfill material. ,The wall should not be backfilled until the
grout has reached an adequate strength.
Should you have any questions regarding this document or if we may be of further service,
please contact our office at your convenience.
DBA:kv
(2) Addressee
(2) Q/Day Consultants, Inc.
(1) Geogrid Retaining Wall Systems, Inc.
Attn: Forrest Armentrout (fax also)
ATrACHMENT
Plate No.1 :td"'-''!i~f
:j
•
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
-t------IBM min.
Compacted . ·.FiII
.. _-....... -
1
Typical Retaining Wall
Subdrain Detail
Not to Scale
Compa.cted
Flil· .
Miradrain 6000
or equivalent,
2/3 wall height
1
<D Floor Slab
® Filter Fabric between rock and soU
® Backcut
@
®
Waterproof back of wall following architect's specifications
4-minimum perforated pipe, SDR35 or equivalent, holes down, 1 % fall to outlet,
top of pipe below top of slab, encased in 3/4-crushed rock. Provide 3 cubic feet
per linear foot crushed rock minimum. Crushed rock to be surrounded by filter
fabric (Mlran 140N or equivalent), with 6N minimum overlap.
Provide solid outlet pipe at suitable location.
SOUTHERN CALIFORNIA
SOIL & TESTING, INC. BY:
JOB NUMBER:
All CAT'S HOSPITAL
DBA DATE: 9/8/2006
0611115-2 PLA TENO.:
•
I
APPENDIX II
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
.. -------
•
I
I
I
I
I
I
I
I:
I
I
I
I
I
I
I
I
I
I
I
~ SOIL' TISTING, INC.
Z
San Diego Office Indio Office
• o PHONE 83-740 Citrus Avenue P.O. Box 600627 PHONE ... ~ sc I SIT·
(619) 2.80-432.1
TOLL FREE
(877) 215-4321
San Diego, CA 92160-0627
6280 Riverdale Street
(760) 775-5983
TOLL FREE
(877) 215-4321
Suite G
:t o ~
February 26, 2007
MI'. Pat O'Day
O'Day Consultants
F A x
(619) 280-4717
2710 Loker Avenue West
Carlsbad, California 92008
San Diego, CA 92120
www.scst.com
Subject: SHORING RECOMMENDATIONS
O'DAY MEDICAL OFFICE BUILDING
2020 CASSIA ROAD
CARLSBAD, CALIFORNIA
Indio, CA 92201-3438
F A x
(760) 775-8362 www.scst.com
SCS&T No. 0611114
Report No.5
Reference: "Keystone Retaining Wall Plans For: Cassia Professional Offices, All Cats
Hospital Keystone Retaining Wall Plans, Sheets 1 to 5~ prepared by Southern
California Soil and Testing, Inc., dated December 21, 2006.
Dear Mr. O'Day: \
In accordance with a request from Mr. Erik Nelson, of Pacific Building Group this letter has been
prepared to provide .shoring recommendatio~s' for the subject project. We understand
improvements will consist of a road widening supported by a Keystone wall and a curb inlet
structure. Tne site is underlain by undocumented fill and formation'al material commonly
identified as the Santiago Formation. To determine the extent of the fill along the planned wall . .
alignment SCS& T drilled ~ borings at the locations indicated on Figure 1. The fill was
determined to range from approximately 10 to 25 feet in depth thickening to the south and east.
. Th~ fill ,consists of soft clays and loose clayey sands. The boring logs are presented in
Appendix I. Laboratory testing performed on the sample is presented in Appendix II. Shoring
along Ef Camino Real will be required to support excavations for ·the construction of the planned
wall and curb inlet structure.
It is anticipated that soldier beams with tiebacks and lagging will be utilized ranging from about
15 to 27 feet in height starting at wall Station 2+80 and ending at Station 4+00. Areas nOrth and
south of t~e shored area can be cut temporarily at an inclination of 1(H): 1(V) with a 5-foot
vertical at the toe of the slope .. Cross section A-A', Figure 2, shows ~he antiCipated top and
bottom elevation of the shoring along EI Camino Real. Typical sections through the most. critical . ,
areas are shown on Figures 3 and 4.
The design parameters to calculate the earth pressures on shoring are presented in Table 1.
•
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
O'Day Consultants
O'Day Medical Office Building
2020 Cassia Rd., Carlsbad, CA
Material
Fill
Formation
Total Unit Weight
Pounds Per Cubic
Foot
125
135
Table 1
Internal Friction
Angle-Phi
27
35
February 26, 2007
SCS& T No. 0611114-5
Page 2
Cohesion Value
Pounds per Square
Foot
100
,500
An active condition can be applied to shoring that is capable of rotating 0.002 radians. An at-
rest condition should be applied to a shoring system that is unyielding and not able to rotate.
Construction surcharge loads should be evaluated on a case-by-case basis. Soils should no be
stockpiled at the top of slopes or at the top of the shoring. Vertical and lateral movements of
the temporary shoring are expected to be sma" assuming an adequate lateral support system.
If any other surcharge loads are anticipated. SCS& T should be contacted for the necessary
increase in soil pressure.
The passive pressure for the design of the proposed shoring system may be considered to be
350 psf per foot of depth up to ~ maximum of 5,000 psf. The passive pressure may be
assumed to act on an area equal to ~ice the soldier beam diameter. This value may be
increased by % for seismic loading. The upper 1 foot of embedment should be neglected when
calculating passive pressures. '
Survey monuments should be installed at no more than 40-foot intervals along the perimeter of
the excavation. One row of monuments should be located' just beyond the edge of the top of
excavation. A second row should be established' 10 feet beyond the excavation. and a third row
should be set 20 feet from the top of the excavation. A reference point should be established
we" away from, the block where the excavation will take place. The horizontal and vertical
location of each monument should be established with a survey instrument before excavation
starts. Readings should be made daily during'the initial stages of excavation. say for up to one
week. Results of the initial readings will be reviewed by SCS& T and modifications to the
monitoring schedule may be made. depending on these results.
Significant sloughing and erosion of the slopes should be anticipated. In addition. construction
activities above or near the slopes could affect overall stability. The slopes should be observed
by a representative of SCS& T periodically to ascertain that no unforeseen adverse conditions
are observed. The temporary, slopes should be inspected daily by the contractor's Competent
Person before personnel are 'allowed to enter the excavation. Zones of potential instability.
sloughing or raveling should be brought to the attention of the Engineer and corrective action
•
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
O'Day Consultants
O'Day Medical Office Building
2020 Cassia Rd., Carlsbad, CA
February 26, 2007
SCS&TNo.0611114-5
Page 3
implemented before personnel begin working in the trench. No surcharge loads should be
placed within a distance from the top of temporary cut slopes equal to half the slope height.
DBA:kv
(4) Addressee
(1) PaCific Building Group, Attn: Erik Nelson. via-email Erik@pacificbuildinggroup.com
(1) Anderson Drilling, Attn: Mike Empizo via email-mempizo@andersondrilling.com
Attachments
Figures 1,2,3,4
Appendix I
Appendix II
B
305
300
295
290
285
280
275
o 5
'.
TYPICAL SECTION
I
(STA~ 2+75 TO STA. 3+10)
CASE 19,21,22,24 GRID LENGTH 15.5'
SCALE: 1" = 5'
H=V
APPROXIMATE
GRID LOCATION
23'
SCS&T LEGEND
Qaf Artificial Fill
Ts Santiago Formation
---? GeQIogic Contact
8'
305
300
SHORING BEAM I
295
Qaf' 290
285
BonOM OF WALL (BW)
280
---? ?? ? ? ---?'---,
"--FINISH GRADE
ATBW
10 15 20 25 30
I
35
I
40
Ts 275
~ . SOUTHERN CAUFORNIA
~,~ SOIL & TESTING, INC.
O'DAY MEDICAL BUILDING
By: GF/DCD Date: 2112107
Job No.: 0611114-5 . Figure: 3
-I~
I
I
I
.1
I
I
I
I
I
I
I
I
I
I
I
c
305
300
295
290
285
280
275
o 5
FACE OF
WALL
10
I Yt'I{;AL 5ECTION
(STA. 3+10 TO STA. 3+35)
CASE 25,26 GRID LENGTH 20.0'
SCALE: 1" = 5"
15
H=V
APPROXIMATE
GRID LOCATION
20 25 30 35
AC BERM c·
EL CAMINO REAL
SHORING BEAM
Qaf
................. i?.... .....
Ts
.-DV TTOM OF WALL (BW)
45 50 55
40
Qaf
Ts
Artificial Fill
Santiago Formation
I' Ii? Geologic Contact
,
I
305\
300
2951 ,
290,
\
288 ,
280
275
SOUTHERN CALIFORNIA
SOIL & TESTING, INC.
C"DA Y MEDICAL BUILDING II I By: GF/DCD Date: 2112/07 I Job No.: 0611114-5 Figure: 4
I
I
I .
I
I
I
I
I
I
I
I
,I
I
I
,I
I
I
I
I'
I
APPENDIX I
I
I
I
I
I
I
I
I
I
I
,I
I
I
I
I
I
I
I
I
SUBSURFACE EXPLORATION LEGEND
UNIFIED SOIL CLASSIFICATION CIIART
SOIL DESCRIPTION
-~ ---GROllI'
SYMBOL TYI)ICAL NAMES
I. COARSE GRAINED, more than hair or material lit IIlrRer than No. ZOO ~Ieve size.
<.iRA VEL£. CLEAN GRA VELS OW Well gnlded gravels. gravel-sand mixtures, little Of no lines.
More than halfofcoarse
fraction is largl!T than No.4 {jP Poorly graded gravels. gl1lvel slim! mixtures, little or no lines.
sieve size hut smaller than 3".
GRAVELS WITII FINES OM Silty gravels. poorly graded gravel-sund-sill lIIixtures.
(Appreciable amount of lines)
GC Clayey gravels, poorly gmded gravel-sand. clay mixtures.
SAlSDS.. CLEAN SANDS SW Well gmdud sand. gravelly sunds, liltle Of no lines.
MOfe thun Imlfofcoarse
Iruction is slIIllller than No.4 SI' P(lorly graded sands. gravelly sands. liule or no lines.
sieve size.
SANlJS WITU FINES 8M Silly sands, poorly gmded sand and silty mixtures.
(Appreciable amount of tines)
se Clayey sunds, poorly graded sund and clay mixtures.
II. "'IN"~ (;RAINEI), more thlln hulr or mllterhtlls smllller thlln No. 21MI sieve ~Ize.
SILTS AND CLAYS
Li'luid Limit less thun 50
SILTS AND CLA YS
Li'luid Limit greater than 50
ML
CL
OL
MH
CH
OH
III. HIGHLY ORGANIC SOILS PT
2 us
SC
CON
EI
MS
MAX
ST
SPT
pH
SF/CL
-
-
-
-
-
--
-
.
-
-
WutL'1' level at time of excavation or as indicat<:d
Undisturbed, driven ring sample Of tube sample
Sand Cone
Consolidation
Expansion Index
Maximwn Size of Particle
Maximwn Density
Shelby Tube
Standard Pcnetmtion Sample
pH & Resistivity
Suttate & Chloride
Inorganic silts and very line sands. rock !louf, sandy silt
IIr clayey-silt-sand mixtures with slight plasticity.
Inorganic clays oflow to medium plasticity.
gravelly clays, sandy clays. silty clays. lean clays.
Organic silts lind organic silty clays or low plasticity.
Inorganic silts. mieaceolls or diatomaceous line
sandy or silty soils, elastic silts.
Inorganic clays of high plasticity. fht clays.
Organic cluys of medium to high plasticity.
Peat and other highly organic soils.
CK • Undisturbed chunk sample
181-Bulk Sample
DS • Direct Shear
SA • Sieve Analysis
PI -Plasticity Index
RC· Relative Compaction
UC -Unconfined Compression
TX -Triaxial Compression
RS· RingShcar
AL -AUerberg Limits
RV -R Value
r-' SOUTHERN CALIFORNIA (~ SOIL & TESTING, INC.
ODAY MEDICAL OFFICE BUILDING -ROAD WIDENING
BY: DBA DATE: 2126/2007
JOB NUMBER: 0611114 APPENDIX I: 1-1
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
LOG OF EXPLORATORY BORING NUMBER B·1
Date Excavated: 2/16/2007 Logged by: MM
Equipment: CME 55 Project Manager: GBF
Surface Elevation (ft): 303 Depth to Water (ft): NIA
SAMPLES
0 Z W 0 CD a: ~~ :::> I-~/jj SUMMARY OF SUBSURFACE CONDITIONS
ASPHALT -6 Inches
SM FILL(Qaf) -Brown, moist, dense, SILTY SAND
- 2
en
i3 z :::>
z W Do
Q) > '1: "t:J .... 0
.ti
1 e
~
'fi' en -W
~ a. I-0 --~ >-W a: a: 0 :::> l-I-I-Z ~ en
0 :::> 0 ?! III ~ :5 c
~ ~ 4r-_+~~~~~~----------------------------------~r_+_~---_+--~--_+~ ASPHALT - 3 inches
I-
CL FILL(Qaf) -Brown to gray, moist, soft, SILTY CLAY .... 6
I-8
:-10 --i---------------------------------------
SC FILL(Qaf) -Light brown, moist, loose to medium dense,
CLAYEY SAND ~ 12
I-14
US
J
~\ ---
US
-------------------------------------------
CL FILL(Qaf) -Dark brown, moist, soft, SANDY CLAY
~ 16
I-18
us
13
---------~--
19
------1---
15
I ~
I
I
I
-20~~---------------------------------------------~~~~--~--~ ___ -L~
.'l~ SOUTHERN CALIFORNIA
f S' SOIL & TESTING, INC.
~~" . JOB NUMBER: 0611114 1-2
ODAY MEDICAL OFFICE BUILDING -ROAD WIDENING
BY: AP/GBF DATE: 2126/2007
APPENDIX I:
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
LOG OF EXPLORATORY BORING NUMBER B-1 (continued)
Date Excavated: 2117/2007 Logged by: MM
Equipment: CME55 Project Manager: GBF
Surface Elevation (ft): 303 Depth to Water (ft): NIA
SAMPLES
& c Q) --z .~ is w > -en al 0 ·c ~ :c ~ " w 0 a: ~ '0 I-en SUMMARY OF SUBSURFACE CONDITIONS :::> a: a. :::> I-:::> ffi -= :::> I-W en al Us til z c c z ~ 0 :::> z w 0
:::> Il. :0 :E >--a: 0
-------------------------------------------------. ----
SM FILL(Qaf) -Ligth brown to tan, moist, dense, SIL TV SAND US 53
-22
-24
SM SANTIAGO FORMATION(Ts) -Light brown, moist, very dense r-26 "-SILTVSAND
~ PRACTICAL REFUSAL @ 26 FEET
.... 28
r-30
I-
r-32
-34
~ 36
.... 38
'-40
&.. SOUTHERN CAUFORNIA O'DAY MEDICAL OFFICE BUILDING -ROAD WIDENING
, .. -SOIL & TESTING, INC. BY: APIGF DATE: 2127/2007
JOB NUMBER: 0611114 APPENDIX I: 1-3
~ en w I->-a: 0 ~ 0 al ::5
--
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
LOG OF EXPLORATORY BORING NUMBER B·2
Date Excavated: 2/16/2007 Logged by: MM
Equipment: CME55 Project Manager: GBF
Surface Elevation (ft): 303 Depth to Water (ft): N/A
SAMPLES ~
'fi' en c Q) -w g z ~ Co I-W 0 > 0 -en III ·c -~ >-~i -c W 0::: J: () 0::: -I-en SUMMARY OF SUBSURFACE CONDITIONS ::l 0 0::: 0 a.. ::l I-~tu .i:! ::l I-~ W en -.. I-Z C C Z II) en
z w ~ 6 ::l 0
::::> a.. e :?! >-III 0::: ~ c
ASPHALT -6 Inches
i-
SM FILL(Qaf) -Brown, moist, dense, SIL TV SAND
I--2
--- -------------------------------------------------I---
CL FILL(Qaf) -Brown to gray, moist, soft, CLAY
I-4
-
I-6
US 12
I-8
I--10 !------------- --------------- --- --- -------~----------------
ML FILL(Qaf) -Light brown to tan, moist, stiff, SANDY SILT US 25
I-12
SM SANTIAGO FORMATION(Ts) -Light brown, moist, very dense,
t-14
SILTVSAND
US 71
t-16
REFUSAL @ 17 FEET
I-18
"-20 --
~i SOUTHERN CAliFORNIA ODAY MEDICAL OFFICE BUILDING -ROAD WIDENING
(~. __ . .. SOIL & TESTING, INC. BY: AP/GBF DATE: 2126/2007
JOB NUMBER: 0611114 APPENDIX I: 1-4
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
LOG OF EXPLORATORY BORING NUMBER B-3
Date Excavated: 2/16/2007 Logged by: MM
Equipment: CME 55 Project Manager: GBF
Surface Elevation (ft): 303 Depth to Water (ft): NIA
-~ rn :t: u l-V') SUMMARY OF SUBSURFACE CONDITIONS a. :::J W 0
ASPHALT - 6 Inches
SW FILL(Qaf) -Brown, moist, dense, WELL GRADED SAND
I-2
SAMPLE~
0 z W 0 III ~~ a:: :::l I-~tu V') a z
Z w
:::l Q.
OJ > '1: -c -0
.:!
l 0 e
V')
l-e V') -0 w
::§! a. I-0 --~ >-W a:: a:: 0 :::l I-~ I-Z V') a :::l 0
:E >-co a:: :1 0
r-4 ----------------------------------------------- --- ---1---
CL FILL(Qaf) -Brown to gray, moist, soft, SILTY CLAY
- 6
l-
i-8
-
-10~~----------------------------------------~~~--_+--~--~~
SM SANTIAGO FORMATION(Ts) -Light brown, mOist, very dense, SIL us 73
SILTY SAND
I-12
r-14
REFUSAL @ 15 FEET
I-16
l-
I-18
~20~-L-----------------------------------------------------------L-~~----L---~---~~
I.S£, SOUTHERN CALIFORNIA
\!:~" SOIL & TESTING, INC.
ODAY MEDICAL OFFICE BUILDING -ROAD WIDENING
BY: APIGBF DATE: 2126/2007
JOB NUMBER: 0611114 APPENDIX I: 1-5
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
APPENDIX II
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Direct Shear Test Results
5_0 .------.-----r-------,-----:--i ---""J/--'I------:'------:--,----,
,I I I :: ---:-~:h~~ s=~ ~~~-'=~-~::~-j~--T=-~t~ F
inches of Deformation _ ._ I _,
3.5 C-.---.__ -------
.;::-3.0 ----_.
, ,
. ---.. ---_.--------.. -1--._-_. __ .. --r-----.. ·--·-----.--.-+-------+------------~---.
!
! .tI 2.5 -----+-----+--+-----t-----+----t----+----I----I-----.4
II)
:a .!
II) 2.0r---+----+----+--~--_+--~-+-,.---r-----r--~I-~
1.5 ~----+----.j__-_+--t__-__t__::~;;--'~--1r---~-+-----j----J
1.0 l--__+_--t---t----.---I-----/------jr----+----+---i---------l ..
0.5 '----+--::r-....!~=_+_-__lf---_I_-__l---_+_-----l----+--_t _ __I " ~ I
-~ i 0.0 +-----1---+---4---1----4----11----1----1----+----1
0_0 0.5 1_0 1_5 2.0 2_5 3.0 3.5 4.0 4.5 5.0
ConfinIng Pressure (ksf)
SAMPLE DESCRIPTION
INTERNAL
FRICTION
ANGLE(DEG.)
COHESION
INTERCEPT
(PSF)
B2@6-6.5 Tan, Clayey Sand
Shear Strength at 27 98
0.2 Inches of Deformation
O'DAY MEDICAL OFFICE SOUTHERN CALIFORNIA
SOIL & TESTING BY: JJS/GBF /DATE: 2/27/2007
JOB NUMBER: 0611114 /APPENDIX 11-1
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Direct Shear Test Results
5.0 ..-----,.---r----.,---', -----r----~--_:__I------,
..... __ ......... ___ .. _.' ... _ .... _ ",' ... ' __ ... _L ... ___ . __ !,i ______ ._ ....... _r; _. ____ . "'_jl___ _ __ _ 4.5 ....... -. _. -. ~
I . 4.0 ....... -.... -. .." ... " .. ,-...... -." ... -.... """ ..... -..... _ ...... ---.. -.... -·-·r-.. ·· .. · .... · .. ·· .-.----• Shear Strength at 0.2
inCh:of :ef:rmation -1-. __ r---___ -__ .. -.l_--'f---
3.51---·--
,3.0 ....... -... -...... -...... _ ... -............. _-... -.-...... -.-......... -.... _ .. _-... r-""""'-" ...... -_.-........ -.... -... -._ .. r-.-
i 2.5 1---'-' .,-
~ ! -J 2.0 -------~-I-----f------r--.. --..J.-...---l
~ ,
1.5 I----.--.. I----+--+-....,.~.....!::.+----+--+----+--+---t----j
j
I. ~ 1.0 1----.--.-.-1---JI!!......--j----J---4--·-f---f---+--+----l
0.5 rr#---I---+---I--+---+---+---I/I--+/---I---t
I Iii 0.0 I----I---I----I-----I'----!-----i---I-------i------+--~
0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 5.0
Confining Pressure (kst)
SAMPLE DESCRIPTION
B1@11-11.5 Brown, Clay
Shear Strength at
0.2 Inches of Deformation
"c-, ·5 cs, SOUTHERN CALIFORNIA ~~ SOIL & TESTING
INTERNAL
FRICTION
ANGLE(DEG.)
33
COHESION
INTERCEPT
(PSFl
333
O'DAY MEDICAL OFFICE
BY: JJS/GBF I DATE: 212712007
JOB NUMBER: 06111141APPENDIX U-2
•
I
I
I,' I
'I
I
"1"
,I
I'
I
"
Sari Diego Office
PHON.E
(619) 280-4321
I P.O: Box 600627
San Diego, CA 92160-0627
6280 Riverdale Street
, Indio Office
PHONE ' 83-740 Citrus Avenue
(760) 775-5983
Suite G, -TOLL FREE
(877) 215-4321
San Diego, CA 92120
www.scst.com
_ TOLL FRJ:E
(877) 215-4321 IndiO, CA 922'0~:3438,
F A X
(61'9) 280-4717
Mr. Pat O'Day
O'Day Consultants
2710 Loker Avenue West Suite 100
Carlsbad, California 92010
SUQject: RESPONSE TO CITY OF CARLSBAD COMMENTS
O'DAY MEDICAL OFFICE BUILDING
2020 CASSIA ROAD
CARLSB~D, CALIFORNIA
Dear, Mr., O'Day:
FAX '-
(760) 775-8362 . www.scst.com
, SCS&T No. 0611114
Report No.6"
This letter has been prepared to respond to the comments prepared by the EsGii Corporation, Pia"
. Checker, for the City of Carl~bad. The city comments and responses, are presented below.
Comment 6:
Provide a copy of the project soil. report prepared by a California licensed architect or civil engineer.
The'report shall include foundation design r(3commendations based on 'the engineer\s findings and
shall comply with UBC Section '1804. (include the recommendation for .the retaini~g wall).
Response 6: ., , I ,
,Copies of the p~oject soil reports applicable to the sU9ject project (Referen'ces 3 a~d 4(are provided
in Appendix I and II: . . .
,CommentS:
, ' I
Provide a letter from the'soils engineer confirming that the foundation plan, grading plein and
specifications have been reviewed and that it has been' determined that the recommendations in th~
soil report are, properly incorporated into the plans(wheri required by the soil ,report).
Response S':
The plans, References 2 and 3, have be~n reviewed and vyere found to be in accotdqnce with the
recommendations provided in the referenced reports. Additionally, slope. stability analyses were
perfo.nnsd.-Tile site 'will have a factor-of-safety 'grB.lt0r than 1.5 in 'respect to global staqHity· at tt.1e
. completion of the project. '
~ GBF:kv
Attachments:
/ App~hdix I
Appendix II
c.--r "5--~~
~e~o~\~.
'"
., 'I
I'
I
I
I
'I
I
I
I
I
'I
'I' -
I'
I,
I-
I
'I'
I
I
O'Oay Consultants
O'Oay Medical Office Building
2020 Cassia Rd,,' Carlsbad, CA
, May 17, 2007
SCS& T No. 0611114-6,
Page 2 I
, I
REFERENCES
,
1.} '''Keystone Retaining Wall Plans For: Cas$ia Professional Officf]s; All Cats Hospital
Keystone Retaining ,Wall Plans, Sbeets 1 to 5'~ 'prepared by Red One Engineering,
dated ,December 21, 2006.
2:) ''Temporary'Shoring Wall (Adjunct to KeystoneRW) For: Cassia Professional Office's Plans,
Sheets 23 to 25," prepared by PB&A, dated April 30, 2007.
3.) "Shoring Recommendations, Cassia Prof~ssional Offices, 2020 Cassia Road., Carlsbad,
California", prepared by Southern California S9i1 'ang Testing, dated' February 26,
2007, (SCS&T Job Number 06~ 1 ~ 1'4-5)., ' '
4.) "Preliminary Retaining Wall Design Recommendations, ~II CatsHospjtal Testing Services,
EI Camino Real and Cassia Road, 'Carlsbad, CaJifornia'~ prepared, by $outhern
California Soil and Testing, Inc.,'dated September 8, 2006 (SCS&T No. 061 j 1 1'5-2). ' "
5'.)' "City Comments prepared by Es~iI Corporation, Plan Check NiJmber 071296", dated'May
14,2007. '
r" I
\ '
7
I, ,
1-
J
•
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
APPENDIX I
A
310
305
300
295
290
285
280
275
270
2+65
•
. •
CROSS SECTION A-A'
SCALE: 1" = 5'
H=V
I" CASE 19
. I
I
I
SOUTHEEJRN END. qlF SHORING
STA. 2+79
i I
TOP
/-OF SLOPE
I
I
. I
AREA TO
BE SLOPED
ATA
l{H):l(V)
WlTHA
5 FOOT
VERTICAL
AT BOTTOM
- - ---
.
L---.
2+70 2+75 2+80
••
CASE 21
•
. ~ "e-.,4'-"
•
.
"
--?--
•
.
-
L
2+85 2+90
r'
-
h-.
1
2+95
CASE 22 +
•
. -'''~ ~ . ..
BonOM
OF/,~",,'
~,-.'"
?-
-
3+300
•
CASE 24 +
•
,.
;.
-?--
SHORING
BEAMS
3+05
•
..-.
1
3+10
~
1 . CASE.26.
',II ...
CASE 28 CASE 30 CASE 31 CASE 25
TOP TOP
~OFSHORING / OF SHORING
..
.' . .' -
.-
! . . .
I. . I .
. ".
.
..... :'. . , ' .'. . ; .
'. .
Qaf
BonoM
OFSH01ING
-/ ?-
?
•
Ts
"' . .' :::;.:;;;;;
g¥ 1,1 uiVI "\:
276""
J..-... ;..... J..-... h ~
"'\L--'-o-,~-':'_" BOTTOM OF BEAMSTO BE DETERMINED BY SHORING ENGINEER '",,' ...,----,-----,-.-1("
, I' ' " 1 1 ' .'. ,I ' ',".' 1 . '." ::-j'.::"
3+30 . 3+35 3+40 3+453+59"-;--3+55
. 1
3+25 3+15 3+20
+ CASE 33.
1
I ..
~ r
.
J..-...
"
I .,;: -~.--, ';3+,0
CASE 34
"
'-
h
J
3+75
'BOnOM
OF
CURB
INLET '"
,
1:1'::1
1
3+80
. . ...
~
IUIV
CASE3B
I
,
,
--
h
3+.85 3+90'
.'
Qaf
T8
..
SCS&T LEGEND.
Artificial Fill
Santiago Formation
---?----Geologic Contact
•
J
NORTHERN
I END OF SHORING
STA. 4+00
~A
310
305
.
300
..' .
I· ....... . .-. ' . L " .••.
290 ,
~
L/ 285
280
275
I
h 270
.1 >.1,
3+95,,"'/-4+00'
. '.< .
. .
. By: .
,
.. ~ .'-
: ii<!
. if, . -.~ .. ...
• ....
~." '.1· .. '
'/~
"J, '. , ...... .,
...I . . !" .. "', .~ . ....
" .
SOUTHERN CALIFORNIA
SOIL & TESTING, INC.
, O'DAY MEDICAL BUILDING
GFIDCD Date: 2112/07
Job No.: 0611114·5 Figure: 2