Loading...
HomeMy WebLinkAboutCT 05-18; Seascape; SWQMP- DWG 475-7A; 2016-08-08Storm Water Quality Management Plan (SWQMP) Seascape CITY OF CARLSBAD PRIORITY DEVELOPMENT PROJECT (PDP) STORM WATER QUALITY MANAGEMENT PLAN (SWQMP) FOR SEASCAPE CT 05-18 ENGINEER OF WOR R. PREPARED FOR: SEASCAPEDEVELOPMENTS,LLC 6540 Lusk Blvd. Suite C135 San Diego, CA 92121 858-658-9400 PREPARED BY: Civcom & Associates 6540 Lusk Blvd. Suite C135 San Diego, CA 92121 858-658-9400 DATE: Rev.August8, 2016 1 . ~ H . ~ • Storm Water Quality Management Plan (SWQMP) Seascape CITY OF CARLSBAD PRIORITY DEVELOPMENT PROJECT (PDP) STORM WATER QUALITY MANAGEMENT PLAN (SWQMP) FOR SEASCAPE CT 05-18 DRAWING No.: DWG 475-7 SWQMP No. 12-09 ENGINEER OF WORK: PREPARED FOR: SEASCAPE DEVELOPMENTS, LLC 6540 Lusk Blvd. Suite C135 San Diego, CA 92121 858-658-9400 PREPARED BY: Civcom & Associates 6540 Lusk Blvd. Suite C135 San Diego, CA 92121 858-658-9400 DATE: Rev.August8, 2016 1 TABLE OF CONTENTS Storm Water Quality Management Plan (SWQMP) Seascape Certification Page .................................................................................. 3 Project Vicinity Map ............................................................................... 4 FORM E-34 Storm Water Standard Questionnaire ........................................ 5 Site Information ..................................................................................... 6 Description of Existing Site Condition and Drainage Patterns .......................... 7 Description of Proposed Site Development and Drainage Patterns .................. 9 Identification Receiving Water Pollutants of Concern ................................... 11 Identification of Project Site Pollutants ...................................................... 11 Hydromodification Management Requirements ........................................... 12 Critical Coarse Sediment Yield Areas ....................................................... 12 Flow Control for Post-Project Runoff . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13 Other Site Requirements and Constraints . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14 FORM E-36 Standard Project Requirement Checklist ................................... 15 Summary of PDP Structural BMPs ............................................................ 16 Structural BMPs Summary Information BMP1-BMP7 .................................... 30 Attachment 1: Backup for PDP Pollutant Control BMPs ................................ 35 Attachment 1 a: DMA Exhibit .............................................................. 37 BMP Sizing Spreadsheet v1 .04 Attachment 1 b: Tabular Summary of DMAs and Design Capture Volume Calculations ................................................... 38 B.4-1 Simple Method B.2-1 DCV Form 1-9 Report-Infiltration Rate Testing Attachment 1 c: Harvest and Use Feasibility Screening ............................ 39 Attachment 1 d: Categorization of Infiltration Feasibility Condition ............... 40 Attachment 1 e: Pollutant Control BMP Design Worksheets I Calculations .... 41 Attachment 2: Backup for PDP Hydromodification Control Measures . . . . . . . . . . . . . 42 Attachment 2a: Hydromodification Management Exhibit Attachment 2b: Management of Critical Coarse Sediment Yield Areas Attachment 2c: Geomorphic Assessment of Receiving Channels (Not performed) Attachment 2d: Flow Control Facility Design and Drawdown Calculations Attachment 3: Structural BMP Maintenance Thresholds and Actions ............... 43 Attachment 4: Single Sheet BMP (SSBMP) Exhibit ...................................... 44 2 Project Name: SEASCAPE Project ID: CT 05-18 Storm Water Quality Management Plan (SWQMP) Seascape CERTIFICATION PAGE I hereby declare that I am the Engineer in Responsible Charge of design of storm water BMPs for this project, and that I have exercised responsible charge over the design of the project as defined in Section 6703 of the Business and Professions Code, and that the design is consistent with the requirements of the BMP Design Manual, which is based on the requirements of SDRWQCB Order No. R9-2013-0001 (MS4 Permit) or the current Order. I have read and understand that the City Engineer has adopted minimum requirements for managing urban runoff, including storm water, from land development activities, as described in the BMP Design Manual. I certify that this SWQMP has been completed to the best of my ability and accurately reflects the project being proposed and the applicable source control and site design BMPs proposed to minimize the potentially negative impacts of this project's land development activities on water quality. I understand and acknowledge that the plan check review of this SWQMP by the City Engineer is confined to a review and does not relieve me, as the Engineer in Responsible Charge of design of storm water BMPs for this project, of my responsibilities for project design. R. Bhatia Print Name Civcom & Associates Company 08/16/2016 Date 3 Storm Water Quality Management Plan (SWQMP) Seascape PROJECT VICINITY MAP N I VIC INJTY MAP 4 Storm Water Quality Management Plan (SWQMP) Seascape [Insert City's Storm Water Standard Questionnaire (Form E-34) here] 5 C cityof Carlsbad STORM WATER STANDARDS QUESTIONNAIRE Development Services Land Development Engineering 1635 Faraday Avenue (760) 602-2750 www.carlsbadca.gov E-34 I INSTRUCTIONS: To address post-development pollutants that may be generated from development projects, the city requires that new development and significant redevelopment priority projects incorporate Permanent Storm Water Best Management Practices (BMPs) into the project design per Carlsbad BMP Design Manual (BMP Manual). To view the BMP Manual, refer to the Engineering Standards (Volume 5). This questionnaire must be completed by the applicant in advance of submitting for a development application (subdivision, discretionary permits and/or construction permits). The results of the questionnaire determine the level of storm water standards that must be applied to a proposed development or redevelopment project. Depending on the outcome, your project will either be subject to 'STANDARD PROJECT' requirements or be subject to 'PRIORITY DEVELOPMENT PROJECT' (PDP) requirements. Your responses to the questionnaire represent an initial assessment of the proposed project conditions and impacts. City staff has responsibility for making the final assessment after submission of the development application. If staff determines that the questionnaire was incorrectly filled out and is subject to more stringent storm water standards than initially assessed by you, this will result in the return of the development application as incomplete. In this case, please make the changes to the questionnaire and resubmit to the city. If you are unsure about the meaning of a question or need help in determining how to respond to one or more of the questions, please seek assistance from Land Development Engineering staff. A completed and signed questionnaire must be submitted with each development project application. Only one completed and signed questionnaire is required when multiple development applications for the same project are submitted concurrently. PROJECT INFORMATION PROJECT NAME: SEASCAPE PROJECT ID: CT 05-18 ADDRESS: BLACK RAIL ROAD & AVENA COURT EAST, CARLSBAD APN: 215-04-09-00, 215-04-11-00 The project is (check one): Ill New Development 0 Redevelopment The total proposed disturbed area is: 219540 ft2 ( 5.04 ) acres The total proposed newly created and/or replaced impervious area is: 101 ,500 ft2 ( 2.33 ) acres If your project is covered by an approved SWQMP as part of a larger development project, provide the project ID and the SWQMP # of the larger development project: Project ID N/A SWQMP#: N/A Then, go to Step 1 and follow the instructions. When completed, sign the form at the end and submit this with your application to the city. E-34 Page 1 of 4 REV 02/16 STEP1 ~ TO BE COMPLETED FOR ALL PROJECTS To determine if your project is a "development project", please answer the following question: YES NO Is your project LIMITED TO routine maintenance activity and/or repair/improvements to an existing building 0 Ill or structure that do not alter the size (See Section 1.3 of the BMP Design Manual for guidance)? If you answered "yes" to the above question, provide justification below then go to Step 5, mark the third box stating "my project is not a 'development project' and not subject to the requirements of the BMP manual" and complete applicant information. Justification/discussion: (e.g. the project includes only interior remodels within an existing building): If you answered "no" to the above question, the project is a 'development project', go to Step 2. STEP2 TO BE COMPLETED FOR ALL DEVELOPMENT PROJECTS To determine if your project is exempt from PDP requirements pursuant to MS4 Permit Provision E.3.b.(3), please answer the following questions: Is your project LIMITED to one or more of the following: o·1. YES NO Constructing new or retrofitting paved sidewalks, bicycle lanes or trails that meet the following criteria: a) Designed and constructed to direct storm water runoff to adjacent vegetated areas, or other non- erodible permeable areas; 0 Ill b) Designed and constructed to be hydraulically disconnected from paved streets or roads; c) Designed and constructed with permeable pavements or surfaces in accordance with USEPA Green Streets guidance? 2. Retrofitting or redeveloping existing paved alleys, streets, or roads that are designed and constructed in 0 [lJ accordance with the USEPA Green Streets guidance? 3. Ground Mounted Solar Array that meets the criteria provided in section 1.4.2 of the BMP manual? 0 Ill If you answered "yes" to one or more of the above questions, provide discussion/justification below, then go to Step 5, mark the second box stating "my project is EXEMPT from PDP ... " and complete applicant information. Discussion to justify exemption ( e.g. the project redeveloping existing road designed and constructed in accordance with the USEPA Green Street guidance): If you answered "no" to the above questions, your Qrolect is not exempt from PDP, go to Step 3. E-34 Page 2 of4 REV 02116 ..... , ~ TO BE COIR.EYI!OFORALLiEW'OR REOEVEI.iPtilliNTPROJECTS To determine if your project is a PDP, please answer the following questions (MS4 Permit Provision E.3.b.(1 )): YES NO 1. Is your project a new development that creates 10,000 square feet or more of impervious surfaces collectively over the entire project site? This includes commercial, industrial, residential, mixed-use, Ill D and public development projects on public or private land. 2. Is your project a redevelopment project creating and/or replacing 5,000 square feet or more of impervious surface collectively over the entire project site on an existing site of 10,000 square feet or D GZl more of impervious surface? This includes commercial, industrial, residential, mixed-use, and public development projects on public or private land. 3. Is your project a new or redevelopment project that creates and/or replaces 5,000 square feet or more of impervious surface collectively over the entire project site and supports a restaurant? A restaurant is a facility that sells prepared foods and drinks for consumption, including stationary lunch counters and D Ill refreshment stands selling prepared foods and drinks for immediate consumption (Standard Industrial Classification (SIC) code 5812). 4. Is your project a new or redevelopment project that creates 5,000 square feet or more of impervious surface collectively over the entire project site and supports a hillside development project? A hillside D Ill development project includes development on any natural slo~e that is twenty-five percent orgreater. 5. Is your project a new or redevelopment project that creates and/or replaces 5,000 square feet or more of impervious surface collectively over the entire project site and supports a parking lot? A parking lot is D 121 a land area or facility for the temporary parking or storage of motor vehicles used personally for business or for commerce. 6. Is your project a new or redevelopment project that creates and/or replaces 5,000 square feet or more of impervious surface collectively over the entire project site and supports a street, road, highway Ill D freeway or driveway? A street, road, highway, freeway or driveway is any paved impervious surface used for the transportation of automobiles, trucks, motorcycles, and other vehicles. 7. Is your project a new or redevelopment project that creates and/or replaces 2,500 square feet or more 0 of impervious surface collectively over the entire site, and discharges directly to an Environmentally D Ill Sensitive Area (ESA)? "Discharging Directly to" includes now that is conveyed overland a distance of 200 feet or less from the project to the ESA, or conveyed in a pipe or open channel any distance as an isolated now from the project to the ESA (i.e. not commingled with flows from adjacent lands).* 8. Is your project a new development or redevelopment project that creates and/or replaces 5,000 square feet or more of impervious surface that supports an automotive repair shop? An automotive repair D Ill shop is a facility that is categorized in any one of the following Standard Industrial Classification (SIC) codes: 5013, 5014, 5541, 7532-7534, or 7536-7539. 9. Is your project a new development or redevelopment project that creates and/or replaces 5,000 square feet or more of impervious area that supports a retail gasoline outlet (RGO)? This category includes 0 Ill RGO's that meet the following criteria: (a) 5,000 square feet or more or (b) a project Average Daily Traffic (ADT) of 100 or more vehicles per day. 1 0. Is your project a new or redevelopment project that results in the disturbance of one or more acres of land Ill D and are expected to generate pollutants post construction? 11. Is your project located within 200 feet of the Pacific Ocean and (1) creates 2,500 square feet or more of impervious surface or (2) increases impervious surface on the property by more than 10%? (CMC D Ill 21.203.040) If you answered "yes" to one or more of the above questions, your project is a PDP. If your project is a redevelopment project, go to step 4. If your project is a new project, go to step 5, check the first box stating "My project is a PDP ... .. and complete applicant information. If you answered "no" to all of the above questions, your project is a 'STANDARD PROJECT.' Go to step 5, check the second box stating "My project is a 'STANDARD PROJECT' ... " and complete applicant information. E-34 Page 3 of4 REV 02116 I STEP4 TO BE COMPLETED FOR REDEVELOPMENT PROJECTS THAT ARE PRIORITY DEVELOPMENT PROJECTS (PDP) ONLY Complete the questions below regarding your redevelopment project (MS4 Permit Provision E.3.b.(2)): YES NO Does the redevelopment project result in the creation or replacement of impervious surface in an amount of less than 50% of the surface area of the previously existing development? Complete the percent impervious calculation below: Existing impervious area (A) = 113·256 sq. ft. D lll Total proposed newly created or replaced impervious area (B)= 101 ,500 sq. ft. Percent impervious area created or replaced (B/A)*1 00 = 89·62 % If you answered "yes", the structural BMPs required for PDP apply only to the creation or replacement of impervious surface and not the entire development. Go to step 5, check the first box stating "My project is a PDP ... " and complete applicant information. If you answered "no," the structural BMP's required for PDP apply to the entire development. Go to step 5, check the . check the first box stating "My project is a PDP ... " and complete applicant information. STEPS CHECK THE APPROPRIATE BOX AND COMPLETE APPLICANT INFORMATION [lJ My project is a PDP and must comply with PDP stormwater requirements of the BMP Manual. I understand I must prepare a Storm Water Quality Management Plan (SWQMP) for submittal at time of application. 0 My project is a 'STANDARD PROJECT' OR EXEMPT from PDP and must only comply with 'STANDARD PROJECT' stormwater requirements of the BMP Manual. As part of these requirements, I will submit a "Standard Project Requirement Checklist Form E-36" and incorporate low impact development strategies throughout my project. Note: For projects that are close to meeting the PDP threshold, staff may require detailed impervious area calculations and exhibits to verify if 'STANDARD PROJECT' stormwater requirements apply. D My Project is NOT a 'development project' and is not subject to the requirements of the BMP Manual. Applicant Information and Signature Box Applicant Name: SEASCAPE DEVELOPMENTS LLC Applicant Title: MANAGING MEMBER Applicant Signatureo ~-· Date: 1/16/2016 .. Environmentally Sens1t1ve Areas Include but are not hm1ted to all Clean Water Act Sect1on 303(d) 1mpa1red water bodies, areas designated as Areas of Spec1al Biological Significance by the State Water Resources Control Board (Water Quality Control Plan for the San Diego Basin (1994) and amendments); water bodies designated with the RARE beneficial use by the State Water Resources Control Board (Water Quality Control Plan for the San Diego Basin (1994) and amendments); areas designated as preserves or their equivalent under the Multi Species Conservation Program within the Cities and County of San Diego; Habitat Management Plan; and any other equivalent environmentally sensitive areas which have been identified by the City. " c 0 This Box or ity Use nly YES NO City Concurrence: D D By: Date: Project ID: E-34 Page 4 of4 REV 02/16 Storm Water Quality Management Plan (SWQMP) Seascape SITE INFORMATION Project Summary Information Project Name SEASCAPE Project ID CT 05-18 Project Address Corner of Avena Court East & Black Rail Road , Carlsbad Assessor's Parcel Number(s) (APN(s)) 215-040-09-00 & 215-040-1 1-00 Project Watershed (Hydrologic Unit) Carlsbad 904 Parcel Area 5.02 Acres (218,671 Square Feet) Existing Impervious Area (subset of Parcel Area) 2.60 Acres ( 113,256 Square Feet) Area to be disturbed by the project (Project Area) 5.04 Acres (219,540 Square Feet) Project Proposed Impervious Area (subset of Project Area) 2.33 Acres ( 101,500 Square Feet) Project Proposed Pervious Area (subset of Project Area) 2.71 Acres ( 118,040 Square Feet) Note: Proposed Impervious Area + Proposed Pervious Area = Area to be Disturbed by the Project. This may be less than the Parcel Area. 6 Storm Water Quality Management Plan (SWQMP) Seascape Description of Existing Site Condition and Drainage Patterns Current Status of the Site (select all that apply): D Existing development IZI Previously graded but not built out IZI Agricultural or other non-impervious use D Vacant, undeveloped/natural Description I Additional Information: This was an existing nursery, with numerous greenhouses, concrete slabs, and storage warehouses. Existing Land Cover Includes (select all that apply): IZI Vegetative Cover IZI Non-Vegetated Pervious Areas IZI Impervious Areas Description I Additional Information: This was an existing nursery, with numerous greenhouses, concrete slabs, and storage warehouses. Underlying Soil belongs to Hydrologic Soil Group (select all that apply): IZI NRCS Type A IZI NRCS Type B D NRCS Type C D NRCS TypeD Approximate Depth to Groundwater (GW): D GW Depth < 5 feet D 5 feet < GW Depth < 1 0 feet IZI 1 0 feet < GW Depth < 20 feet D GW Depth > 20 feet Existing Natural Hydrologic Features (select all that apply): D Watercourses D Seeps D Springs D Wetlands IZI None Description I Additional Information: 7 Storm Water Quality Management Plan (SWQMP) Seascape Description of Existing Site Topography and Drainage [How is storm water runoff conveyed from the site? At a minimum, this description should answer (1) whether existing drainage conveyance is natural or urban; (2) describe existing constructed storm water conveyance systems, if applicable; and (3) is runoff from offsite conveyed through the site? if so, describe]: The existing topography is shown on the Grading Plans indicating slopes along west and southern property line and a ridge line in the middle. Under pre-project conditions, the site is almost 52% impervious and balance pervious. The site historically supported agricultural greenhouse use. The western portion of approx. 2.8 acres currently contributes storm runoff to an existing brow ditch outlet to existing curb & gutter on the east side of the Black Rail Road; and the runoff ultimately flows to existing 8' B-1 inlet in the Black Rail Road at station 10 + 81 .95. The eastern part of the basin flows towards the open space along eastern property line. This basin consists of approximately 1.6 acres which currently contributes storm runoff at the southeast corner of the property to the adjacent wooded canyon area. There is no offsite flow currently conveyed through the site. 8 Storm Water Quality Management Plan (SWQMP) Seascape Description of Proposed Site Development and Drainage Patterns Project Description I Proposed Land Use and/or Activities: The project site is located east of Black Rail Road just north of Avena Court East, in Carlsbad. The property consists of approximately 5.04 acres of land previously used as a nursery. The proposed development consists of construction of grading, improvements and twelve single family homes. List/describe proposed impervious features of the project (e.g., buildings, roadways, parking lots, courtyards, athletic courts, other impervious features): The project consists of completion of Grading & Improvements including two paved streets per approved plans and construction of 12 single family homes including pervious driveways .. List/describe proposed pervious features of the project (e.g., landscape areas): The project has a large landscaped area in the middle and all the driveways will be pervious pavers. Does the project include grading and changes to site topography? ~Yes D No Description I Additional Information: The site will be graded per the approved Tentative Map and will create 12 residential, buildable lots. Does the project include changes to site drainage (e.g., installation of new storm water conveyance systems)? ~Yes D No Description I Additional Information: The drainage pattern shall remain similar to the existing pre-development pattern. Four Filterra inlets will be installed, an infiltration trench, one 4x4 inlet with pipe connection to existing storm drain in Black Rail Road. 9 Storm Water Quality Management Plan (SWQMP) Seascape Identify whether any of the following features, activities, and/or pollutant source areas will be present (select all that apply): IZI On-site storm drain inlets D Interior floor drains and elevator shaft sump pumps D Interior parking garages D Need for future indoor & structural pest control IZI Landscape/Outdoor Pesticide Use D Pools, spas, ponds, decorative fountains, and other water features D Food service D Refuse areas D Industrial processes D Outdoor storage of equipment or materials D Vehicle and Equipment Cleaning D Vehicle/Equipment Repair and Maintenance D Fuel Dispensing Areas D Loading Docks D Fire Sprinkler Test Water D Miscellaneous Drain or Wash Water D Plazas, sidewalks, and parking lots 10 Storm Water Quality Management Plan (SWQMP) Seascape Identification of Receiving Water Pollutants of Concern Describe path of storm water from the project site to the Pacific Ocean (or bay, lagoon, lake or reservoir, as applicable): The drainage from the site enters an existing inlet/storm drain on Black Rail Road, continuing on to west on Aviara Parkway, then south on just west of fairway 5, 4, 3 & 2 via 72" pipe and an open channel and then crossing under Batiquitoes Drive and outletting in Batiquitos Lagoon just west of Green 1 . List any 303(d) impaired water bodies within the path of storm water from the project site to the Pacific Ocean (or bay, lagoon, lake or reservoir, as applicable}, identify the pollutant(s)/stressor(s) causing impairment, and identify any TMDLs for the impaired water bodies: 303(d) Impaired Water Body Pollutant(s)/Stressor(s) TMDLs Batiquitos Lagoon Total coliform Identification of Project Site Pollutants Identify pollutants anticipated from the project site based on all proposed use(s) of the site (see BMP Design Manual Appendix B.6): Also a Receiving Not Applicable to the Anticipated from the Water Pollutant of Pollutant Project Site Project Site Concern Sediment X Nutrients X Heavy Metals X Organic Compounds X Trash & Debris X Oxygen Demanding Substances X Oil & Grease X Bacteria & Viruses X Pesticides X 11 Storm Water Quality Management Plan (SWQMP) Seascape Hydromodification Management Requirements Do hydromodification management requirements apply (see Section 1.6 of the BMP Design Manual)? IZl Yes, hydromodification management flow control structural BMPs required . 0 No, the project will discharge runoff directly to existing underground storm drains discharging directly to water storage reservoirs, lakes, enclosed embayments, or the Pacific Ocean. 0 No, the project will discharge runoff directly to conveyance channels whose bed and bank are concrete-lined all the way from the point of discharge to water storage reservoirs, lakes, enclosed embayments, or the Pacific Ocean. 0 No, the project will discharge runoff directly to an area identified as appropriate for an exemption by the WMAA for the watershed in which the project resides. Description I Additional Information (to be provided if a 'No' answer has been selected above): The project area drains directly into a existing storm drain system that drains into the Batiquitos Lagoon. Critical Coarse Sediment Yield Areas* *This Section only required if hydromodification management requirements apply Based on the maps provided within the WMAA, do potential critical coarse sediment yield areas exist within the project drainage boundaries? 0 Yes IZl No, No critical coarse sediment yield areas to be protected based on WMAA maps If yes, have any of the optional analyses presented in Section 6.2 of the BMP Design Manual been performed? 0 6.2.1 Verification of Geomorphic Landscape Units (GLUs) Onsite 0 6.2.2 Downstream Systems Sensitivity to Coarse Sediment 0 6.2.3 Optional Additional Analysis of Potential Critical Coarse Sediment Yield Areas On site D No optional analyses performed, the project will avoid critical coarse sediment yield areas identified based on WMAA maps If optional analyses were performed, what is the final result? 0 No critical coarse sediment yield areas to be protected based on verification of GLUs onsite 0 Critical coarse sediment yield areas exist but additional analysis has determined that protection is not required . Documentation attached in Attachment 8 of the SWQMP. 0 Critical coarse sediment yield areas exist and require protection. The project will implement management measures described in Sections 6.2.4 and 6.2.5 as applicable, and the areas are identified on the SWQMP Exhibit. Discussion I Additional Information: 12 Storm Water Quality Management Plan (SWQMP) Seascape Flow Control for Post-Project Runoff* *This Section only required if hydromodification management requirements apply List and describe point(s) of compliance (POCs) for flow control for hydromodification management (see Section 6.3.1 ). For each POC, provide a POC identification name or number correlating to the project's HMP Exhibit and a receiving channel identification name or number correlating to the project's HMP Exhibit. POC1 -Proposed inlet at Station 10+60 Avena Court East as shown on the Post Project Runoff Exhibit included in the following page. O pre = 9.06 cfs O post = 8.91 cfs Has a geomorphic assessment been performed for the receiving channel(s)? IZl No, the low flow threshold is 0.102 (default low flow threshold) D Yes , the result is the low flow threshold is 0.102 D Yes , the result is the low flow threshold is 0.302 D Yes , the result is the low flow threshold is 0.502 If a geomorphic assessment has been performed, provide title , date, and preparer: Discussion I Additional Information: (optional) 13 POST PROJECT RUNOFF Storm Water Quality Management Plan (SWQMP) Seascape Other Site Requirements and Constraints When applicable, list other site requirements or constraints that will influence storm water management design, such as zoning requirements including setbacks and open space, or City codes governing minimum street width, sidewalk construction, allowable pavement types, and drainage requirements. None Optional Additional Information or Continuation of Previous Sections As Needed This space provided for additional information or continuation of information from previous sections as needed. 14 Storm Water Quality Management Plan (SWQMP) Seascape [Insert City's Standard Project Requirement Checklist Form E-36 (here)] 15 ('ci ty of Carlsbad Project Name: SEASCAPE Project ID: CT 05-18 STANDARD PROJECT REQUIREMENT CHECKLIST E-36 Project Information DWG No. or Building Permit No.: 475-7 Source Control BMPs Development Services land Development Engineering 1635 Faraday Avenue (760) 602-2750 www.carlsbadca.gov All development projects must implement source control BMPs SC-1 through SC-6 where applicable and feasible. See Chapter 4 and Appendix E.1 of the BMP Design Manual for information to implement source control BMPs shown in this checklist. Answer each category below pursuant to the following . • "Yes" means the project will implement the source control BMP as described in Chapter 4 and/or Appendix E.1 of the Model BMP Design Manual. Discussion/justification is not required. • "No" means the BMP is applicable to the project but it is not feasible to implement. Discussion/justification must be provided. Please add attachments if more space is needed. • "N/A" means the BMP is not applicable at the project site because the project does not include the feature that is addressed by the BMP (e .g., the project has no outdoor materials storage areas). Discussion/justification may be provided. Source Control Requirement Applied? SC-1 Prevention of Illicit Discharges into the MS4 i2l Yes 0 No 0 N/A Discussion/justification if SC-1 not implemented: SC-2 Storm Drain Stenciling or Signage i2l Yes 0 No 0 N/A Discussion/justification if SC-2 not implemented: SC-3 Protect Outdoor Materials Storage Areas from Rainfall, Run-On, Runoff, and Wind i2l Yes 0 No 0 N/A Dispersal Discussion/justification if SC-3 not implemented: E-36 Page 1 of 4 Revised 03/16 Source Control Requirement (continued) Applied? SC-4 Protect Materials Stored in Outdoor Work Areas from Rainfall, Run-On, Runoff, and i2l Yes 0 No 0 N/A Wind Dispersal Discussion/justification if SC-4 not implemented: SC-5 Protect Trash Storage Areas from Rainfall, Run-On, Runoff, and Wind Dispersal i2l Yes 0 No 0 N/A Discussion/justification if SC-5 not implemented: SC-6 Additional BMPs based on Potential Sources of Runoff Pollutants must answer for each source listed below and identify additional BMPs. (See Table in Appendix E.1 of BMP Manual for guidance). ~ On-site storm drain inlets i2l Yes D No D N/A D Interior floor drains and elevator shaft sump pumps DYes D No i2l N/A 0 Interior parking garages DYes D No i2l N/A D Need for future indoor & structural pest control DYes D No i2l N/A i2l Landscape/Outdoor Pesticide Use i2l Yes D No D N/A D Pools, spas, ponds, decorative fountains, and other water features DYes D No i2l N/A D Food service DYes D No i2l N/A 0 Refuse areas 0 Yes 0 No i2l N/A D Industrial processes DYes D No i2l N/A 0 Outdoor storage of equipment or materials DYes D No i2l N/A 0 Vehicle and Equipment Cleaning DYes D No i2l N/A D Vehicle/Equipment Repair and Maintenance DYes D No i2l N/A D Fuel Dispensing Areas DYes D No i2l N/A D Loading Docks DYes D No i2l N/A 0 Fire Sprinkler Test Water 0 Yes 0 No i2l N/A 0 Miscellaneous Drain or Wash Water DYes 0 No i2l N/A D Plazas, sidewalks, and parking lots DYes D No 0 N/A For "Yes" answers, identify the additional BMP per Appendix E.1. Provide justification for "No" answers. There are 4 Filterra inlets proposed as follows: F1 @ Station 2+19 Surf Crest Street on the East side F2 @ Station 2+15 Surf Crest Street on the West side F3 @ Station 0+ 75 Peregrine Place on the East side F44 @ Station 0+45 Peregrine Place on the West side E-36 Page 2 of 4 Revised 03/16 Site Design BMPs All development projects must implement site design BMPs SD-1 through SD-8 where applicable and feasible. See Chapter 4 and Appendix E.2 thru E.6 of the BMP Design Manual for information to implement site design BMPs shown in this checklist. Answer each category below pursuant to the following . • "Yes" means the project will implement the site design BMPs as described in Chapter 4 and/or Appendix E.2 thru E.6 of the Model BMP Design Manual. Discussion I justification is not required. • "No" means the BMPs is applicable to the project but it is not feasible to implement. Discussion/justification must be provided. Please add attachments if more space is needed. • "N/A" means the BMPs is not applicable at the project site because the project does not include the feature that is addressed by the BMPs (e.g., the project site has no existing natural areas to conserve). Discussion/justification may be provided. Source Control Requirement I Applied? SD-1 Maintain Natural Drainage Pathways and Hydrologic Features I iZI Yes I 0 No I 0 N/A Discussion/justification if SD-1 not implemented: Natural drainage paths are maintained. SD-2 Conserve Natural Areas, Soils, and Vegetation I iZI Yes I 0 No I 0 N/A Discussion/justification if SD-2 not implemented: Natural areas, soils and vegetation is conserved SD-3 Minimize Impervious Area I iZI Yes I 0 No I 0 N/A Discussion/justification if SD-3 not implemented: SD-4 Minimize Soil Compaction I iZI Yes I 0 No I 0 N/A Discussion/justification if SD-4 not implemented: SD-5 Impervious Area Dispersion I ill Yes I 0 No I 0 N/A Discussion/justification if SD-5 not implemented: E-36 Page 3 of4 Revised 03/16 Source Control Requirement (continued} 1 Applied? SD-6 Runoff Collection I f2l Yes I D No I D N/A Discussion/justification if SD-6 not implemented: SD-7 Landscaping with Native or Drought Tolerant Species I f2l Yes I D No I D N/A Discussion/justification if SD-7 not implemented: SD-8 Harvesting and Using Precipitation I f2l Yes I D No I D N/A Discussion/justification if SD-8 not implemented: It is proposed that all houses will utilize rain barrels to provide additional source control. E-36 Page 4 of4 Revised 03/16 Storm Water Quality Management Plan (SWQMP) Seascape SUMMARY OF PDP STRUCTURAL BMPS PDP Structural BMPs All POPs must implement structural BMPs for storm water pollutant control (see Chapter 5 of the BMP Design Manual). Selection of PDP structural BMPs for storm water pollutant control must be based on the selection process described in Chapter 5. POPs subject to hydromodification management requirements must also implement structural BMPs for flow control for hydromodification management (see Chapter 6 of the BMP Design Manual). Both storm water pollutant control and flow control for hydromodification management can be achieved within the same structural BMP(s). PDP structural BMPs must be verified by the City at the completion of construction. This may include requiring the project owner or project owner's representative to certify construction of the structural BMPs (see Section 1.12 of the BMP Design Manual). PDP structural BMPs must be maintained into perpetuity, and the City must confirm the maintenance (see Section 7 of the BMP Design Manual). Use this form to provide narrative description of the general strategy for structural BMP implementation at the project site in the box below. Then complete the PDP structural BMP summary information sheet for each structural BMP within the project (copy the BMP summary information page as many times as needed to provide summary information for each individual structural BMP). Describe the general strategy for structural BMP implementation at the site. This information must describe how the steps for selecting and designing storm water pollutant control BMPs presented in Section 5.1 of the BMP Design Manual were followed, and the results (type of BMPs selected). For projects requiring hydromodification flow control BMPs, indicate whether pollutant control and flow control BMPs are integrated together or separate. Structural BMPs have been utilized to the maximum extent practicable to provide a long-term solution for addressing runoff water quality. BMPs are selected that meet the current regulations and also fit within the entitled project. Final engineering design, the Low Impact Development {LID) BMP's have been sized to meet the current requirements. The integrated LID outlines four strategies: 1. Each lot will have a self-treating filtration basins with overflow. 2. Use of pervious surfaces such as -all driveways will be constructed with pervious pavers (see landscape plans). 3. Disperse runoff from impervious surfaces on to adjacent pervious surfaces such as direct roof downspout to disperse runoff onto a lawn. 4. Provide an infiltration trench sized for the Design Capture Volume (DCV). 5. Drain impervious surfaces to engineered structural Filterra. This feature is being provided for treatment above and beyond the minimum current requirements. The site layout has been designed to preserve over 62 percent of the property in pervious state by providing open space including large Open Space areas in the middle. The total existing impervious area has been reduced from 2.60 acres to 2.33 acres after development due the proposed site design. That is a reduction of 0.27 acres. Runoff from the roofs shall flow to pervious landscape lawn areas for each of the lots. Each lot 16 Storm Water Quality Management Plan (SWQMP) Seascape will retain its runoff to mitigate the accumulative effect of the peak thereby eliminating the need for a separate basin. Each of the residential lot is a separate DMA and will consist of an Infiltration Basin sized for the DMA to accommodate the required DCV. Flows from offsite areas A 1, A2 , and A3 of Surfcrest Street north of the tract have been included in the treatment train to offset portion of Peregrine Place which only has two Filterra units provided to treat the runoff volume. Two Filterra Inlets are proposed and sized to receive and treat the flow from the Surf Crest Road. Low flow from node 207 to node 206 on west side of Surf Crest Street is intercepted by a proposed Filterra Sic-Retention inlet F2 and processed. Low flow node 208 to node 209 on east side of Surf Crest Street is intercepted by a proposed Filterra Sic-Retention inlet F2 and processed. Outlet of 6" PVC carries the flow from F1 and combine with outlet pipe from F2 and carries it in 6" PVC northwesterly direction to outlet in the proposed Infiltration Trench located in the SDG&E easement. This flow outlets in a brow ditch D-75 that carries it to a D-25 outlet (R3) at node 111 . Low flow from node 111 flows southerly in Peregrine Place and it is intercepted by two additional Filterra Sic-Retention inlets F3 and F4. The outlet flow is combined to B-1 inlet K at node 121 Avena Court East which conveys the flow to 24" storm drain in Black Rail Road. The proposed Infiltration Trench is sized to treat the entire DCV required and the four Filterra units are provided as additional treatment above and beyond the minimum required. All proposed BMP's on this report as well as the project plans, DWG #475-7 and #475-7A, shall be constructed as part of this project. 17 Storm Water Quality Management Plan (SWQMP) Seascape Structural BMP Summary Information Structural BMP ID No. BMP-L 1 DWG 475-?SW Sheet No. 1 Type of structural BMP: D Retention by harvest and use (HU-1) ~ Retention by infiltration basin (INF-1) D Retention by bioretention (INF-2) D Retention by permeable pavement (INF-3) D Partial retention by biofiltration with partial retention (PR-1) Biofiltration (BF-1) D Flow-thru treatment control included as pre-treatmenUforebay for an onsite retention or biofiltration BMP (provide BMP type/description and indicate which onsite retention or biofiltration BMP it serves in discussion section below) D Detention pond or vault for hydromodification management D Other (describe in discussion section below)-Vegetated Swale Purpose: D Pollutant control only D Hydromodification control only ~ Combined pollutant control and hydromodification control D Pre-treatmenUforebay for another structural BMP D Other (describe in discussion section below) Discussion (as needed): Proposed Infiltration Basin will be used as pollutant control BMP, designed to infiltrate runoff from the tributary areas. The proposed infiltration basins are designed with a storage volume equal to full DCV and are able to meet the drawdown requirements. 18 Storm Water Quality Management Plan (SWQMP) Seascape Structural BMP Summary Information Structural BMP ID No. BMP-L2 DWG 475-?SW Sheet No. 1 Type of structural BMP: D Retention by harvest and use (HU-1) ~ Retention by infiltration basin (INF-1) D Retention by bioretention (INF-2) D Retention by permeable pavement (INF-3) D Partial retention by biofiltration with partial retention (PR-1) Biofiltration (BF-1) D Flow-thru treatment control included as pre-treatment/forebay for an onsite retention or biofiltration BMP (provide BMP type/description and indicate which onsite retention or biofiltration BMP it serves in discussion section below) D Detention pond or vault for hydromodification management D Other (describe in discussion section below)-Vegetated Swale Purpose: D Pollutant control only D Hydromodification control only ~ Combined pollutant control and hydromodification control D Pre-treatment/forebay for another structural BMP D Other (describe in discussion section below) Discussion (as needed): Proposed Infiltration Basin will be used as pollutant control BMP, designed to infiltrate runoff from the tributary areas. The proposed infiltration basins are designed with a storage volume equal to full DCV and are able to meet the drawdown requirements. 19 Storm Water Quality Management Plan (SWQMP) Seascape Structural BMP Summary Information Structural BMP ID No. BMP-L3 DWG 475-?SW Sheet No. 1 Type of structural BMP: D Retention by harvest and use (HU-1) IZI Retention by infiltration basin (INF-1) D Retention by bioretention (INF-2) D Retention by permeable pavement (INF-3) D Partial retention by biofiltration with partial retention (PR-1) Biofiltration (BF-1) D Flow-thru treatment control included as pre-treatment/forebay for an onsite retention or biofiltration BMP (provide BMP type/description and indicate which onsite retention or biofiltration BMP it serves in discussion section below) D Detention pond or vault for hydromodification management D Other (describe in discussion section below)-Vegetated Swale Purpose: D Pollutant control only D Hydromodification control only IZI Combined pollutant control and hydromodification control D Pre-treatment/forebay for another structural BMP D Other (describe in discussion section below) Discussion (as needed): Proposed Infiltration Basin will be used as pollutant control BMP, designed to infiltrate runoff from the tributary areas. The proposed infiltration basins are designed with a storage volume equal to full DCV and are able to meet the drawdown requirements. 20 Storm Water Quality Management Plan (SWQMP) Seascape Structural BMP Summary Information Structural BMP ID No. BMP-L4 DWG 475-?SW Sheet No. 1 Type of structural BMP: 0 Retention by harvest and use (HU-1) IZI Retention by infiltration basin (INF-1) 0 Retention by bioretention (INF-2) 0 Retention by permeable pavement (INF-3) 0 Partial retention by biofiltration with partial retention (PR-1) Biofiltration (BF-1) 0 Flow-thru treatment control included as pre-treatmentlforebay for an onsite retention or biofiltration BMP (provide BMP type/description and indicate which onsite retention or biofiltration BMP it serves in discussion section below) 0 Detention pond or vault for hydromodification management 0 Other (describe in discussion section below)-Vegetated Swale Purpose: 0 Pollutant control only 0 Hydromodification control only IZI Combined pollutant control and hydromodification control 0 Pre-treatmentlforebay for another structural BMP 0 Other (describe in discussion section below) Discussion (as needed): Proposed Infiltration Basin will be used as pollutant control BMP, designed to infiltrate runoff from the tributary areas. The proposed infiltration basins are designed with a storage volume equal to full DCV and are able to meet the drawdown requirements. 21 Storm Water Quality Management Plan (SWQMP) Seascape Structural BMP Summary Information Structural BMP ID No. BMP-LS DWG 475-?SW Sheet No. 1 Type of structural BMP: D Retention by harvest and use (HU-1) IZI Retention by infiltration basin (INF-1) D Retention by bioretention (INF-2) D Retention by permeable pavement (INF-3) D Partial retention by biofiltration with partial retention (PR-1) Biofiltration (BF-1) D Flow-thru treatment control included as pre-treatmenUforebay for an onsite retention or biofiltration BMP (provide BMP type/description and indicate which onsite retention or biofiltration BMP it serves in discussion section below) D Detention pond or vault for hydromodification management D Other (describe in discussion section below)-Vegetated Swale Purpose: D Pollutant control only D Hydromodification control only ~ Combined pollutant control and hydromodification control D Pre-treatmenUforebay for another structural BMP D Other (describe in discussion section below) Discussion (as needed): Proposed Infiltration Basin will be used as pollutant control BMP, designed to infiltrate runoff from the tributary areas. The proposed infiltration basins are designed with a storage volume equal to full DCV and are able to meet the drawdown requirements. 22 Storm Water Quality Management Plan (SWQMP) Seascape Structural BMP Summary lnfonnation Structural BMP ID No. BMP-L6 DWG 475-?SW Sheet No. 1 Type of structural BMP: 0 Retention by harvest and use (H U-1) IZI Retention by infiltration basin (INF-1) 0 Retention by bioretention (INF-2) 0 Retention by permeable pavement (INF-3) 0 Partial retention by biofiltration with partial retention (PR-1) Biofiltration (BF-1) 0 Flow-thru treatment control included as pre-treatmenUforebay for an onsite retention or biofiltration BMP (provide BMP type/description and indicate which onsite retention or biofiltration BMP it serves in discussion section below) 0 Detention pond or vault for hydromodification management 0 Other (describe in discussion section below)-Vegetated Swale Purpose: 0 Pollutant control only 0 Hydromodification control only IZI Combined pollutant control and hydromodification control 0 Pre-treatmenUforebay for another structural BMP 0 Other (describe in discussion section below) Discussion (as needed): Proposed Infiltration Basin will be used as pollutant control BMP, designed to infiltrate runoff from the tributary areas. The proposed infiltration basins are designed with a storage volume equal to full DCV and are able to meet the drawdown requirements. 23 Storm Water Quality Management Plan (SWQMP) Seascape Structural BMP Summary Information Structural BMP ID No. BMP-L7 DWG 475-?SW Sheet No . 1 Type of structural BMP: 0 Retention by harvest and use (H U-1) ~ Retention by infiltration basin (INF-1) 0 Retention by bioretention (INF-2) 0 Retention by permeable pavement (INF-3) 0 Partial retention by biofiltration with partial retention (PR-1) Biofiltration (BF-1) 0 Flow-thru treatment control included as pre-treatmenUforebay for an onsite retention or biofiltration BMP (provide BMP type/description and indicate which onsite retention or biofiltration BMP it serves in discussion section below) 0 Detention pond or vault for hydromodification management 0 Other (describe in discussion section below)-Vegetated Swale Purpose: 0 Pollutant control only 0 Hydromodification control only ~ Combined pollutant control and hydromodification control 0 Pre-treatmenUforebay for another structural BMP 0 Other (describe in discussion section below) Discussion (as needed): Proposed Infiltration Basin will be used as pollutant control BMP, designed to infiltrate runoff from the tributary areas. The proposed infiltration basins are designed with a storage volume equal to full DCV and are able to meet the drawdown requirements. 24 Storm Water Quality Management Plan (SWQMP) Seascape Structural BMP Summary Information Structural BMP ID No. BMP-L8 DWG 475-?SW Sheet No. 1 Type of structural BMP: D Retention by harvest and use (HU-1) ~ Retention by infiltration basin (INF-1) D Retention by bioretention (INF-2) D Retention by permeable pavement (INF-3) D Partial retention by biofiltration with partial retention (PR-1) Biofiltration (BF-1) D Flow-thru treatment control included as pre-treatmenUforebay for an onsite retention or biofiltration BMP (provide BMP type/description and indicate which onsite retention or biofiltration BMP it serves in discussion section below) D Detention pond or vault for hydromodification management D Other (describe in discussion section below)-Vegetated Swale Purpose: D Pollutant control only D Hydromodification control only ~ Combined pollutant control and hydromodification control D Pre-treatmenUforebay for another structural BMP D Other (describe in discussion section below) Discussion (as needed): Proposed Infiltration Basin will be used as pollutant control BMP, designed to infiltrate runoff from the tributary areas. The proposed infiltration basins are designed with a storage volume equal to full DCV and are able to meet the drawdown requirements. 25 Storm Water Quality Management Plan (SWQMP) Seascape Structural BMP Summary Information Structural BMP ID No. BMP-L9 DWG 475-?SW Sheet No. 1 Type of structural BMP: D Retention by harvest and use (HU-1) IZI Retention by infiltration basin (INF-1) D Retention by bioretention (INF-2) D Retention by permeable pavement (INF-3) D Partial retention by biofiltration with partial retention (PR-1) Biofiltration (BF-1) D Flow-thru treatment control included as pre-treatment/forebay for an onsite retention or biofiltration BMP (provide BMP type/description and indicate which onsite retention or biofiltration BMP it serves in discussion section below) D Detention pond or vault for hydromodification management D Other (describe in discussion section below)-Vegetated Swale Purpose: D Pollutant control only D Hydromodification control only lZI Combined pollutant control and hydromodification control D Pre-treatment/forebay for another structural BMP D Other (describe in discussion section below) Discussion (as needed): Proposed Infiltration Basin will be used as pollutant control BMP, designed to infiltrate runoff from the tributary areas. The proposed infiltration basins are designed with a storage volume equal to full DCV and are able to meet the drawdown requirements. 26 Storm Water Quality Management Plan (SWQMP) Seascape Structural BMP Summary Information Structural BMP ID No. BMP-L 10 DWG 475-7SW Sheet No. 1 Type of structural BMP: D Retention by harvest and use (HU-1) ~ Retention by infiltration basin (INF-1) D Retention by bioretention (INF-2) D Retention by permeable pavement (INF-3) D Partial retention by biofiltration with partial retention (PR-1) Biofiltration (BF-1) D Flow-thru treatment control included as pre-treatmenUforebay for an onsite retention or biofiltration BMP (provide BMP type/description and indicate which onsite retention or biofiltration BMP it serves in discussion section below) D Detention pond or vault for hydromodification management D Other (describe in discussion section below)-Vegetated Swale Purpose: D Pollutant control only D Hydromodification control only ~ Combined pollutant control and hydromodification control D Pre-treatmenUforebay for another structural BMP D Other (describe in discussion section below) Discussion (as needed): Proposed Infiltration Basin will be used as pollutant control BMP, designed to infiltrate runoff from the tributary areas. The proposed infiltration basins are designed with a storage volume equal to full DCV and are able to meet the drawdown requirements. 27 Storm Water Quality Management Plan (SWQMP) Seascape Structural BMP Summary Information Structural BMP ID No. BMP-L 11 DWG 475-7SW Sheet No. 1 Type of structural BMP: D Retention by harvest and use (H U-1) IZI Retention by infiltration basin (INF-1) D Retention by bioretention (INF-2) D Retention by permeable pavement (INF-3) D Partial retention by biofiltration with partial retention (PR-1) Biofiltration (BF-1) D Flow-thru treatment control included as pre-treatment/forebay for an onsite retention or biofiltration BMP (provide BMP type/description and indicate which onsite retention or biofiltration BMP it serves in discussion section below) D Detention pond or vault for hydromodification management D Other (describe in discussion section below)-Vegetated Swale Purpose: D Pollutant control only D Hydromodification control only IZI Combined pollutant control and hydromodification control D Pre-treatment/forebay for another structural BMP D Other (describe in discussion section below) Discussion (as needed): Proposed Infiltration Basin will be used as pollutant control BMP, designed to infiltrate runoff from the tributary areas. The proposed infiltration basins are designed with a storage volume equal to full DCV and are able to meet the drawdown requirements. 28 Storm Water Quality Management Plan (SWQMP) Seascape Structural BMP Summary Information Structural BMP ID No. BMP-L 12 DWG 475-?SW Sheet No. 1 Type of structural BMP: 0 Retention by harvest and use (HU-1) ~ Retention by infiltration basin (INF-1) 0 Retention by bioretention (INF-2) 0 Retention by permeable pavement (INF-3) 0 Partial retention by biofiltration with partial retention (PR-1) Biofiltration (BF-1) 0 Flow-thru treatment control included as pre-treatment/forebay for an onsite retention or biofiltration BMP (provide BMP type/description and indicate which onsite retention or biofiltration BMP it serves in discussion section below) 0 Detention pond or vault for hydromodification management 0 Other (describe in discussion section below)- Purpose: 0 Pollutant control only 0 Hydromodification control only ~ Combined pollutant control and hydromodification control 0 Pre-treatment/forebay for another structural BMP 0 Other (describe in discussion section below) Discussion (as needed): Proposed Infiltration Basin will be used as pollutant control BMP, designed to infiltrate runoff from the tributary areas. The proposed infiltration basins are designed with a storage volume equal to full DCV and are able to meet the drawdown requirements. 29 Storm Water Quality Management Plan (SWQMP) Seascape Structural BMP Summary Information Structural BMP ID No. BMP-C:!) DWG 475-7SW Sheet No. 1 Type of structural BMP: D Retention by harvest and use (HU-1) D Retention by infiltration basin (INF-1) D Retention by bioretention (INF-2) D Retention by permeable pavement (INF-3) D Partial retention by biofiltration with partial retention (PR-1) Biofiltration (BF-1) IZI Flow-thru treatment control included as pre-treatment/forebay for an onsite retention or biofiltration BMP (provide BMP type/description and indicate which onsite retention or biofiltration BMP it serves in discussion section below) D Detention pond or vault for hydromodification management IZI Other (describe in discussion section below)-Infiltration Trench Purpose: D Pollutant control only D Hydromodification control only IZI Combined pollutant control and hydromodification control D Pre-treatment/forebay for another structural BMP D Other (describe in discussion section below) Discussion (as needed): Proposed BMP will filter drainage through Filterra inlet BMP 1 and deliver to Infiltration Trench BMP7 and will infiltrate into native soil. 30 Storm Water Quality Management Plan (SWQMP) Seascape Structural BMP Summary Information Structural BMP ID No. BMP-0 DWG 475-?SW Sheet No. 1 Type of structural BMP: D Retention by harvest and use (HU-1) D Retention by infiltration basin (INF-1) D Retention by bioretention (INF-2) D Retention by permeable pavement (INF-3) D Partial retention by biofiltration with partial retention (PR-1) Biofiltration (BF-1) ~ Flow-thru treatment control included as pre-treatmenUforebay for an onsite retention or biofiltration BMP (provide BMP type/description and indicate which onsite retention or biofiltration BMP it serves in discussion section below) D Detention pond or vault for hydromodification management ~ Other (describe in discussion section below)-Infiltration Trench Purpose: D Pollutant control only D Hydromodification control only ~ Combined pollutant control and hydromodification control D Pre-treatmenUforebay for another structural BMP D Other (describe in discussion section below) Discussion (as needed): Proposed BMP will filter drainage through Filterra inlet BMP 2 and deliver to Infiltration Trench BMP? and will infiltrate into native soil. 31 Storm Water Quality Management Plan (SWQMP) Seascape Structural BMP Summary lnfonnation Structural BMP ID No. BMP-@ DWG 475-?SW Sheet No. 1 Type of structural BMP: D Retention by harvest and use (H U-1) D Retention by infiltration basin (I NF-1) D Retention by bioretention (INF-2) D Retention by permeable pavement (INF-3) D Partial retention by biofiltration with partial retention (PR-1) Biofiltration (BF-1) IZI Flow-thru treatment control included as pre-treatment/forebay for an onsite retention or biofiltration BMP (provide BMP type/description and indicate which onsite retention or biofiltration BMP it serves in discussion section below) D Detention pond or vault for hydromodification management D Other (describe in discussion section below)- Purpose: D Pollutant control only D Hydromodification control only IZI Combined pollutant control and hydromodification control D Pre-treatment/forebay for another structural BMP D Other (describe in discussion section below) Discussion (as needed): Proposed BMP will filter drainage through Filterra inlet BMP 3. 32 Storm Water Quality Management Plan (SWQMP) Seascape Structural BMP Summary Information Structural BMP ID No. BMP~ DWG 475-?SW Sheet No. 1 Type of structural BMP: D Retention by harvest and use (HU-1) D Retention by infiltration basin (INF-1) D Retention by bioretention (INF-2) D Retention by permeable pavement (INF-3) D Partial retention by biofiltration with partial retention (PR-1) Biofiltration (BF-1) ~ Flow-thru treatment control included as pre-treatment/forebay for an onsite retention or biofiltration BMP (provide BMP type/description and indicate which onsite retention or biofiltration BMP it serves in discussion section below) D Detention pond or vault for hydromodification management ~ Other (describe in discussion section below)-Vegetated Swale Purpose: D Pollutant control only D Hydromodification control only ~ Combined pollutant control and hydromodification control D Pre-treatment/forebay for another structural BMP D Other (describe in discussion section below) Discussion (as needed): Proposed BMP will filter drainage through Filterra inlet BMP 4. 33 Storm Water Quality Management Plan (SWQMP) Seascape Structural BMP Summary lnfonnation Structural BMP ID No. BMP-Q) DWG 475-7SW Sheet No. 1 Type of structural BMP : 0 Retention by harvest and use (HU-1) ~ Retention by infiltration basin (INF-1) 0 Retention by bioretention (INF-2) 0 Retention by permeable pavement (INF-3) 0 Partial retention by biofiltration with partial retention (PR-1) Biofiltration (BF-1) 0 Flow-thru treatment control included as pre-treatmenUforebay for an onsite retention or biofiltration BMP (provide BMP type/description and indicate which onsite retention or biofiltration BMP it serves in discussion section below) 0 Detention pond or vault for hydromodification management ~ Other (describe in discussion section below)-Infiltration Trench Pu rpose: 0 Pollutant control only 0 Hydromodification control only ~ Combined pollutant control and hydromodification control 0 Pre-treatmenUforebay for another structural BMP 0 Other (describe in discussion section below) Discussion (as needed): Proposed Infiltration Trench will receive drainage from Filterra inlet BMP 1 and 2 and offsite drainage from North and infiltrate into native soil. Required DCV is 3071 cu. ft. 34 Storm Water Quality Management Plan (SWQMP) Seascape ATTACHMENT 1 BACKUP FOR PDP POLLUTANT CONTROL BMPS Items are Included behind this cover sheet: Attachment Sequence Attachment 1 a Contents DMA Exhibit (Required) BMP Sizing Method Checklist ~ Included ~Included Attachment 1 b Tabular Summary of DMAs Showing ~ Included on DMA Exhibit in DMA ID matching DMA Exhibit, DMA Attachment 1 a Area, and DMA Type (Required)* ~ Included as Attachment 1 b, Attachment 1 c Attachment 1 d Form 1-7, Harvest and Use Feasibility Screening Checklist (Required unless the entire project will use infiltration BMPs) Form 1-8, Categorization of Infiltration Feasibility Condition (Required unless the project will use harvest and use BMPs) Refer to Appendices C and D of the BMP Design Manual to complete Form 1-8. Attachment 1 e Pollutant Control BMP Design Worksheets I Calculations (Required) Refer to Appendices B and E of the BMP Design Manual for structural pollutant control BMP design guidelines 35 separate from DMA Exhibit ~Included D Not included because the entire project will use infiltration BMPs ~Included D Not included because the entire project will use harvest and use BMPs IZI Included Storm Water Quality Management Plan (SWQMP) Seascape Use this checklist to ensure the required information has been included on the DMA Exhibit: The DMA Exhibit must identify: cgJ Underlying hydrologic soil group cgJ Approximate depth to groundwater cgJ Existing natural hydrologic features (watercourses, seeps, springs, wetlands) D Critical coarse sediment yield areas to be protected (if present) cgJ Existing topography and impervious areas cgJ Existing and proposed site drainage network and connections to drainage offsite cgJ Proposed grading cgJ Proposed impervious features cgJ Proposed design features and surface treatments used to minimize imperviousness cgJ Drainage management area (DMA) boundaries, DMA ID numbers, and DMA areas (square footage or acreage), and DMA type (i.e., drains to BMP, self-retaining , or self- mitigating) cgJ Structural BMPs (identify location and type of BMP) 36 Storm Water Quality Management Plan (SWQMP) Seascape 37 ATTACHMENT 1a DMA EXHIBIT BMP SIZING METHOD I I I I I I I I I I I I I I I I I I I I I I I I I n I II I I ~ I I I L:: I I I I I oi;: I I I I I I I I I I I r I / I / / I I I --' ' \ \ I 0 <( 0 IY _j <( IY VICINITlrf MAP I I I I ' : I : I t I I I I I : I : I : I t I : I I : I I I : I I I : I I I : I I I : I 3: I ;:::::::1:: II II II II H II I II II II II II II II II II II II II II II 'cl 'fj II II I :I :I I I I I I I I I I \ I \ CAMINO REAL I' ALOMAR J>-IRPORT RO. COST .q A 'I dma6 dma5 BMP-L5 -------- dma4 BMP-L4 dma3 BMP-L3 dma2 BMP-L2 .-- 0 E 'U BMP CITY I DMA EXHIBIT OF CARLSBAD SEASCAPE ' I ' I ' I ' I w ' ~ I ' I _j ' (l_ , ' , w ' z ' IY I C) ' 2l w 0::: I w Q_ l.{) I .- I ' I ' I ' 1+ I 0 E 'U ' ' / dma7 --- - - -- -- -- dma8 BMP-LB 'N EX.HOUSE ! ~~ l 1--~--1 r--_J ~ ____ .._ ~"' dma17 I I .· : EX.HOUSE I I I I I ~ I L ___ --L-------~---- dma10 I +1 • I ' I 1-w IY 0::: 1- (/) 1- (/) w 0::: () I.J... IY :::::> (/) I_ I I I I ,- I I I EX. HOUSE I I ,-- dma11 dma12 BMP-L12 BMP "" ()) 0 l (;J ()'1 0 0 l() t') BMP TABLE (;J -!>- 0 (;J -1>- 0 I BMP ID• BMP TYPE I SYMBOL CASQA NO QUANTITY HYDROMODIFICATIC,N 8r TREATMENT CONTROL 0-G-BID-RETENTION IQJ BF-3 4 FILTERRA L1-L12 INFILTRATION I<ZZ?A INF-1 12 CELL BMP0 INFILTRATION H ~~ INF-1 1 LOW IMPACT DESIGN (L.I.D.l L1-L12 INFILTRATION CELL V...aJ INF-1 12 BMF\D INFILTRATION ~ INF-1 1 TRENCH SOURCE CONTROL ®-~ INLET · • SD-13 5 STENCLING LANDSCAPING/ ALL GRADE[ SD-.10 1 PESTICIDE AREAS DMA I BMP TABLE * D: LOT ~~AI~ DMA TYPE dmo1 1 6188 144 INFILTRATION CELL 2 6003 174 INFILTRATION CELL -~ 3 6040 148 INFILTRATION CELL """' 4 6024 148 INFILTRATION CELL 5 6009 148 INFILTRATION CELL -· 6 7465 166 INFILTRATION CELL 1umu 7 7054 156 INFILTRATION CELL 8 8171 209 INFILTRATION 1"1:'1 I 9 13106 373 INFILTRATION ~""'11 i"mOIU 10 6581 166 INFILTRATION ~~• ' 1umu 11 9710 227 INFILTRATION ""'I I 04 12 14444 327 INFILTRATION 1"1:'11 l"mu1.> SLiRf 6100 IN~L~' SURF 6200 IN~~i~ pmo pmo11 ~ 32130 INFIL'II ~ 327 IN~~ 9068 AREA IN~~T~ A2 3720 ~~A MIXED 34388 IN~~T ""'~ I PERE 7680 FILTERRA fmOIO t= 8980 FILTERRA DRAWING NO. 475-7 475-7 475-7 475-7 475-7 475-7 475-7L PVT PVT PVT PVT PVT PVT PVT PVT PVT PVT PVT PVT HOA HOA HOA HOA · · HOA HOA HOA HOA • FOR MORE INFORMATION REFER TO SEASCAPE DEVELOPMENTS LLC STORM WATER QUALITY MANAGEMENT PLAN 12-09 REMOVEABLE CI>P RUNOFF FILTERS THRU SHEET NO<Sl INSPECTION MAINTENANCE CONSTRUCTION FREQUENCY FREQUENCY SIGN OFF ANNUALLY ANNUALLY ANNUALLY ANNUALLY ANNUALLY ANNUALLY ANNUALLY ANNUALLY ANNUALLY ANNUALLY ANNUALLY ANNUALLY ALL SHEETS ANNUALLY ANNUALLY SWMP NO. 12-09 PARTY RESPONSIBLE FOR MAINTENANCE ROGER BHATIA 6540 LUSK BL '10. SUITE C135 SAN DIEGO, CA 92121 PHONE: 858-658-9400: PLAN PREPARED BY: CIVCOM 8c ASSOCIATES 6540 LUSK BLVD. SUITE C135 SAN DIEGO, CA 92121 PHONE:858-658-9400 CERTIFICATION : RCE 51348 RUNOFF FILTERS THRU GRASS BUFFER FOREBAY II ~ II ~ II II BMf® I GRASS BUFFER FOREBAY dma9 _j CD II II dma1 II II BMP-L1 II I II I II I 1~ : I I I I I I I • I I I I I II i I I II I I I II i :j:: I ~ II i I II i II ' II ' II i II i IIi II i I II t 14 : II j ! \mz.35> i --_;:-:;- I ---------I ~--------~ :: 1!~---------: ;, / :Ill I :u : I I : I I : I I : I I CIVCOM & ASSOCIATES 6540 Lusk Blvd. Sui-te Cl35 San Diego, California 92121 <858> 658-9400 Fox: (858> 658-9420 ' I ------- I I ·/ I \ ' I; '\\ I ' I I l'h \ \ I! I I I I I I I ~ I I I I I I ' I I I I I I I 30 BMP-L9 -- --13 ~'*-'-""'­ AVE ----- \ \ \ \. "" "' \ \ \ I I I \ 0 30 60 90 --- GRAPHIC SCALE 1"· 301 40 20 0 40 / n u 80 I ( I I I I I I I I I I I I BMP NOTES 1. THESE BMPS ARE MANDATORY TO BE INSTALLED PER MANUFACTURERS RECOMMENDATIONS OR THESE PLANS. ', 2. NO CHANGES TO THE PROPOSED BMPS ON THIS SHEET WITHOUT PRIOR />PPROVAL FROM THE CITY ENGINEER. ~/£'~/~ ~ IN F I L T ~R A T I 0 N~ PVC TYP. SEC. -INFILTRATION CELL/TRENCH VERIFY BY: • NO SUBSTITUTIONS TO THE MATERIAL OR TYPES OR PLANTING TYPES WITHOUT PRIOR DATE />PPROVAL OF THE CITY ENGINEER. ~--~--~------------------~-~-~~--+;:::7,::::::=:;-;::::;:::::::::::::=:~:;::::=::=:::;::;:::::::::::::==~~~:::::;1 INSPECTOR 4. NO OCCUPANCY WILL BE GRANTED UNTIL THE CITY INSPECTOR STAFF HAS INSPECTED THE 1----11---f-----------------f--1---+-___.j SHEET CITY OF CARLSBAD I SHEE1 TS I PROJECT FOR />PPROPRIATE BMP CONSTRUCTION AND INSTALLATION. 1 • MAINTENANCE WILL BE TRANSFERRED FROM SEASC/>PE DEVELOPMENTS LLC TO THE ENGINEERING DEPARTMENT HOMEOWNERS ASSOCIATION ONCE HOA IS FORMED. ENGINEER OF WORK R. BH~ 051348 DATE ~GISTRATION EXPIRATION DATE: 6-30-18 DATE INITIAL ENGINEER OF WORK REVISION DESCRIPTION SHT. DATE INITIAL NO. CITY APPROVAL SINGLE SHEET BMP I DMA SITE PLAN SEASCAPE CARLSBAD TRACT NO CT 05-18 APPROVED: CITY ENGINEER OWN BY:.-""AN,___ CHKD BY: RVWD BY: JASON S.GELDERT PE 63912 EXP. 9-30-16 DATE PROJECT NO. DRAWING NO. CT 05-18 475-7SW E 2 -j BMP Sizing Spreadsheet V1.04 Project Name: SEASCAPE Project Applicant: SEASCAPE DEVELOPMENTS LLC Jurisdiction: County Of San Diego Parcel (APN): 215-040-09 & 215-040-11 Hydrologic Unit: 904.5.1 Rain Gauge: Oceanside Total Project Area (sf): 6188 Channel Susceptibility: Low BMP Sizing Spreadsheet V1.04 Project Name: SEASCAPE Hydrologic Unit: 904.5.1 Project Applicant: SEASCAPE DEVELOPMENTS LLC Rain Gauge: Oceanside Jurisdiction: County Of San Diego Total Project Area: 6188 Parcel (APN): 215-040-09 & 215-040-11 Low Flow Threshold: 0.5Q2 BMP Name: BMPLl BMPType: Infiltration BMP Native Soil Type: A BMP Infiltration Rate (in/hr): 9.3 Areas Draining to BMP DMA Post Project Runoff Factor Name Area (sf) Soil Type Slope Surface Type (Table4-2) Surface Area DMA1 1803 A Flat ROOF 0.9 0.045 420 A Flat PAVERS 0.4 0.045 3965 A Flat LANDSCAPING 0.1 0.045 Total 8MP Area 6188 Descnbe the BMP's m suff1c1ent deta1lm your SWMP to demonstrate the area, volume, and other cntena can be met w1th1n the constramts of the s1te. BMP's must be adapted and applied to the conditions specific to the development project such as unstable slopes or the lack of available head. Designated Staff have final review and approval authority over the project design. HMP Sizing Factors Infiltration Volume N/A Surface Area (sf) 0.117 N/A 73 0.117 N/A 8 0.117 N/A 18 Minimum BMP Size 98.424 Proposed BMP Size• 144 Minimum Infiltration Depth Maximum Infiltration Depth Selected Infiltration Depth This Sizing Calculator has been developed in compliance with the Countywide Model SUSMP. For questions or concerns please contact the jurisdiction in which your project is located. Minimum BMP Size Infiltration Volume (cf) N/A 190 N/A 20 N/A 46 N/A 256 151 N/A 18.00 in 21.33 in 892.80 in 24.00 in BMP Sizing Spreadsheet Vl.04 '--"' Project Name: SEASCAPE Hydrologic Unit: 904.5.1 Project Applicant: SCAPE DEVELOPMENTS Rain Gauge: Oceanside Jurisdiction: County Of San Diego Total Project Area: 6188 Parcel (APN): 15-040-09 & 215-040-1 Low Flow Threshold: 0.5Q2 BMP Name BMP L1 BMP Type: Infiltration DMA Rain Gauge Existing Condition Q2 Sizing Factor DMA Area (ac) Orifice Flow - %Q2 Orifice Area (in2) Name Soil Type Cover Slope (cfs/ac) (cfs) DMA1 Oceanside A Scrub Flat 0.035 0.041 N/A N/A Oceanside A Scrub Flat 0.035 0.010 N/A N/A Oceanside A Scrub Flat 0.035 0.091 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A Tot. Allowable Tot. Allowable Max Orifice Orifice Flow Orifice Area Diameter (cfs) (in2) (in) Actual Orifice Flow Actual Orifice Area Selected Orifice Diameter (cfs) (in2) (in) Drawdown (Hrs) 2.6 BMP Sizing Spreadsheet V1.04 Project Name: SEASCAPE Project Applicant: SEASCAPE DEVELOPMENTS LLC Jurisdiction: County Of San Diego Parcel (APN): 215-040-09 & 215-040-11 Hydrologic Unit: 904.5.1 Rain Gauge: Oceanside Total Project Area (sf): 6003 Channel Susceptibility: low BMP Sizing Spreadsheet V1.04 Project Name: SEASCAPE Hydrologic Unit: 904.5.1 Project Applicant: SEASCAPE DEVELOPMENTS LLC Rain Gauge: Oceanside Jurisdiction: County Of San Diego Total Project Area: 6003 Parcel (APN): 215-040-09 & 215-040-11 Low Flow Threshold: 0.5Q2 BMP Name: BMPL2 BMPType: Infiltration BMP Native Soil Type: A BMP Infiltration Rate (in/hr): 9.3 Areas Draining to BMP DMA Post Project Runoff Factor Name Area (sf) Soil Type Slope Surface Type (Table 4-2) Surface Area DMA2 2130 A Flat ROOF 0.9 0.045 305 A Flat PAVERS 0.4 0.045 3568 A Flat LANDSCAPING 0.1 0.045 Total BMP Area 6003 Descnbe the BMP s 1n suff1c1ent deta1l1n your SWMP to demonstrate the area, volume, and other cntena can be met w1thm the constramts of the s1te. BMP's must be adapted and applied to the conditions specific to the development project such as unstable slopes or the lack of available head. Designated Staff have final review and approval authority over the project design. HMP Sizing Factors Infiltration Volume N/A Surface Area (sf) 0.117 N/A 86 0.117 N/A 5 0.117 N/A 16 Minimum BMP Size 107.811 Proposed BMP Size• 174 Minimum Infiltration Depth Maximum Infiltration Depth Selected Infiltration Depth This Sizing Calculator has been developed in compliance with the Countywide Model SUSMP. For questions or concerns please contact the jurisdiction in which your project is located. Minimum BMP Size Infiltration Volume (cf) N/A 224 N/A 14 N/A 42 N/A 280 183 N/A 18.00 in 19.33 in 892.80 in 24.00 in BMP Sizing Spreadsheet V1.04 '-" Project Name: SEASCAPE Hydrologic Unit: 904.5.1 Project Applicant: SCAPE DEVELOPMENTS Rain Gauge : Oceanside Jurisdiction: County Of San Diego Total Project Area: 6003 Parcel (APN): 15-040-09 & 215-040-1 Low Flow Threshold: O.SQ2 BMP Name BMP L2 BMPType: Infiltration DMA Rain Gauge Existing Condition Q2 Sizing Factor DMA Area (a c) Orifice Flow -%Q2 Orifice Area (in2} Name Soil Type Cover Slope (cfs/ac) (cfs) DMA2 Oceanside A Scrub Flat 0.035 0.049 N/A N/A Oceanside A Scrub Flat 0.035 0.007 N/A N/A Oceanside A Scrub Flat 0.035 0.082 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A Tot. Allowable Tot. Allowable Max Orifice Orifice Flow Orifice Area Diameter (cfs) (in2) (in) Actual Orifice Flow Actual Orifice Area Selected Orifice Diameter (cfs) (in2) (in) Drawdown (Hrs) 2.6 BMP Sizing Spreadsheet V1.04 Project Name: SEASCAPE Project Applicant: SEASCAPE DEVELOPMENTS LLC Jurisdiction: County Of San Diego Parcel (APN): 215-040-09 & 215-040-11 Hydrologic Unit: 904.5.1 Rain Gauge: Oceanside Total Project Area (sf): 6040 Channel Susceptibility: Low BMP Sizing Spreadsheet Vl.04 Project Name: SEASCAPE Hydrologic Unit: 904.5.1 Project Applicant: SEASCAPE DEVELOPMENTS LLC Rain Gauge: Oceanside Jurisdiction: County Of San Diego Total Project Area: 6040 Parcel (APN): 215-040-09 & 215-040-11 Low Flow Threshold: 0.5Q2 BMP Name: BMPL3 BMPType: Infiltration BMP Native Soil Type: A BMP Infiltration Rate (in/hr): 9.3 Areas Draining to BMP DMA Post Project Runoff Factor Name Area (sf) Soil Type Slope Surface Type (Table 4-2) Surface Area DMA3 1803 A Flat ROOF 0.9 0.045 450 A Flat PAVERS 0.4 0.045 3787 A Flat LANDSCAPING 0.1 0.045 Total BMP Area 6040 Descnbe the BMP s m sufficient deta1lm your SWMP to demonstrate the area, volume, and other cntena can be met w1thm the constramts of the s1te. BMP's must be adapted and applied to the conditions specific to the development project such as unstable slopes or the lack of available head. Designated Staff have final review and approval authority over the project design. HMP Sizing Factors Infiltration Volume N/A Surface Area (sf) 0.117 N/A 73 0.117 N/A 8 0.117 N/A 17 Minimum BMP Size 98.163 Proposed BMP Size• 148 Minimum Infiltration Depth Maximum Infiltration Depth Selected Infiltration Depth This Sizing Calculator has been developed in compliance with the Countywide Model SUSMP. For questions or concerns please contact the jurisdiction in which your project is located. Minimum BMP Size Infiltration Volume (cf) N/A 190 N/A 21 N/A 44 N/A 255 155 N/A 18.00 in 20.69 in 892.80 in 24.00 in BMP Sizing Spreadsheet V1.04 '--"' Project Name: SEASCAPE Hydrologic Unit: 904.5.1 Project Applicant: SCAPE DEVELOPMENTS Rain Gauge: Oceanside Jurisdiction: County Of San Diego Total Project Area: 6040 Parcel (APN): 15-040-09 & 215-040-1 Low Flow Threshold: 0.5Q2 BMP Name BMP L3 BMPType: Infiltration DMA Rain Gauge Existing Condition Q2 Sizing Factor DMA Area (ac) Orifice Flow -%Q2 Orifice Area (in2) Name Soil Type Cover Slope (cfs/ac) (cfs) DMA3 Oceanside A Scrub Flat 0.035 0.041 N/A N/A Oceanside A Scrub Flat 0.035 0.010 N/A N/A Oceanside A Scrub Flat 0.035 0.087 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A Tot. Allowable Tot. Allowable Max Orifice Orifice Flow Orifice Area Diameter (cfs) (in2) (in) Actual Orifice Flow Actual Orifice Area Selected Orifice Diameter (cfs) (in2) (in) Drawdown (Hrs) 2.6 BMP Sizing Spreadsheet V1.04 Project Name: SEASCAPE Project Applicant: SEASCAPE DEVELOPMENTS LLC Jurisdiction: County Of San Diego Parcel (APN): 215-040-09 & 215-040-11 Hydrologic Unit: 904.5.1 Rain Gauge: Oceanside Total Project Area (sf): 6024 Channel Susceptibility: Low BMP Sizing Spreadsheet Vl.04 Project Name: SEASCAPE Hydrologic Unit: 904.5.1 Project Applicant: SEASCAPE DEVELOPMENTS LLC Rain Gauge: Oceanside Jurisdiction: County Of San Diego Total Project Area: 6024 Parcel (APN): 215-040-09 & 215-040-11 low Flow Threshold: 0.5Q2 BMP Name: BMPL4 BMPType: Infiltration BMP Native Soil Type: A BMP Infiltration Rate (in/hr): 9.3 Areas Draining to BMP DMA Post Project Runoff Factor Name Area (sf) Soil Type Slope Surface Type (Table 4-2) Surface Area DMA4 2128 A Flat ROOF 0.9 0.045 320 A Flat PAVERS 0.4 0.045 3576 A Flat LANDSCAPING 0.1 0.045 Total BMP Area 6024 Descnbe the BMP s 1n sufficient deta1l1n your SWMP to demonstrate the area, volume, and other cntena can be met w1thm the constratnts of the s1te. BMP's must be adapted and applied to the conditions specific to the development project such as unstable slopes or the lack of available head. Designated Staff have final review and approval authority over the project design. HMP Sizing Factors Infiltration Volume N/A Surface Area (sf) 0.117 N/A 86 0.117 N/A 6 0.117 N/A 16 Minimum BMP Size 108.036 Proposed BMP Size• 148 Minimum Infiltration Depth Maximum Infiltration Depth Selected Infiltration Depth This Sizing Calculator has been developed in compliance with the Countywide Model SUSMP. For questions or concerns please contact the jurisdiction in which your project is located. Minimum BMP Size Infiltration Volume (cf) N/A 224 N/A 15 N/A 42 N/A 281 155 N/A 18.00 in 22.78 in 892.80 in 24.00 in BMP Sizing Spreadsheet V1.04 '-" Project Name: SEASCAPE Hydrologic Unit: 904.5.1 Project Applicant: SCAPE DEVELOPMENTS Rain Gauge: Oceanside Jurisdiction: County Of San Diego Total Project Area: 6024 Parcel (APN): 15-040-09 & 215-040-1 Low Flow Threshold: 0.5Q2 BMP Name BMP L4 BMPType: Infiltration DMA Rain Gauge Existing Condition Q2 Sizing Factor DMA Area (ac) Orifice Flow -%Q2 Orifice Area (in2) Name Soil Type Cover Slope (cfs/ac) (cfs) DMA4 Oceanside A Scrub Flat 0.035 0.049 N/A N/A Oceanside A Scrub Flat 0.035 0.007 N/A N/A Oceanside A Scrub Flat 0.035 0.082 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A Tot. Allowable Tot. Allowable Max Orifice Orifice Flow Orifice Area Diameter (cfs) (in2) (in) Actual Orifice Flow Actual Orifice Area Selected Orifice Diameter (cfs) (in2) (in) Drawdown (Hrs) 2.6 BMP Sizing Spreadsheet V1.04 Project Name: SEASCAPE Project Applicant: SEASCAPE DEVELOPMENTS LLC Jurisdiction: County Of San Diego Parcel (APN): 215-040-09 & 215-040-11 Hydrologic Unit: 904.5.1 Rain Gauge: Oceanside Total Project Area (sf): 6009 Channel Susceptibility: low BMP Sizing Spreadsheet Vl.04 Project Name: SEASCAPE Hydrologic Unit: 904.5.1 Project Applicant: SEASCAPE DEVELOPMENTS LLC Rain Gauge: Oceanside Jurisdiction: County Of San Diego Total Project Area: 6009 Parcel (APN): 215-040-09 & 215-040-11 Low Flow Threshold: 0.5Q2 BMP Name: BMPLS BMPType: Infiltration BMP Native Soil Type: A BMP Infiltration Rate (in/hr): 9.3 Areas Draining to BMP DMA Post Project Runoff Factor Name Area (sf) Soil Type Slope Surface Type (Table 4-2) Surface Area DMA5 1768 A Flat ROOF 0.9 0.045 393 A Flat PAVERS 0.4 0.045 3848 A Flat LANDSCAPING 0.1 0.045 Total BMP Area 6009 Descnbe the BMP's m sufficient deta1lm your SWMP to demonstrate the area, volume, and other cntena can be met w1thm the constramts of the s1te. BMP's must be adapted and applied to the conditions specific to the development project such as unstable slopes or the lack of available head. Designated Staff have final review and approval authority over the project design. HMP Sizing Factors Infiltration Volume N/A Surface Area (sf) 0.117 N/A 72 0.117 N/A 7 0.117 N/A 17 Minimum BMP Size 95.994 Proposed BMP Size• 148 Minimum Infiltration Depth Maximum Infiltration Depth Selected Infiltration Depth This Sizing Calculator has been developed in compliance with the Countywide Model SUSMP. For questions or concerns please contact the jurisdiction in which your project is located. Minimum BMP Size Infiltration Volume (cf) N/A 186 N/A 18 N/A 45 N/A 250 155 N/A 18.00 in 20.24 in 892.80 in 24.00 in BMP Sizing Spreadsheet V1.04 '-" Project Name: SEASCAPE Hydrologic Unit: 904.5.1 Project Applicant: SCAPE DEVELOPMENTS Rain Gauge: Oceanside Jurisdiction: County Of San Diego Total Project Area: 6009 Parcel (APN): 15-040-09 & 215-040-1 Low Flow Threshold: 0.502 BMP Name BMP L5 BMPType: Infiltration DMA Rain Gauge Existing Condition 02 Sizing Factor DMA Area (ac) Orifice Flow -%02 Orifice Area (in2) Name Soil Type Cover Slope (cfs/ac) (cfs) DMA5 Oceanside A Scrub Flat 0.035 0.041 N/A N/A Oceanside A Scrub Flat 0.035 0.009 N/A N/A Oceanside A Scrub Flat 0.035 0.088 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A Tot. Allowable Tot. Allowable Max Orifice Orifice Flow Orifice Area Diameter (cfs) (in2) (in) Actual Orifice Flow Actual Orifice Area Selected Orifice Diameter (cfs) (in2) (in) Drawdown (Hrs) 2.6 BMP Sizing Spreadsheet Vl.04 Project Name: SEASCAPE Project Applicant: SEASCAPE DEVELOPMENTS LLC Jurisdiction: County Of San Diego Parcel (APN): 215-040-09 & 215-040-11 Hydrologic Unit: 904.5.1 Rain Gauge: Oceanside Total Project Area (sf): 7465 Channel Susceptibility: low BMP Sizing Spreadsheet Vl.04 Project Name: SEASCAPE Hydrologic Unit: 904.5.1 Project Applicant: SEASCAPE DEVELOPMENTS LLC Rain Gauge: Oceanside Jurisdiction: County Of San Diego Total Project Area: 7465 Parcel (APN): 215-040-09 & 215-040-11 Low Flow Threshold: 0.5Q2 BMP Name: BMP L6 BMPType: Infiltration BMP Native Soil Type: A BMP Infiltration Rate (in/hr): 9.3 Areas Draining to BMP DMA Post Project Runoff Factor Name Area (sf) Soil Type Slope Surface Type (Table 4-2) Surface Area DMA6 2130 A Flat ROOF 0.9 0.045 472 A Flat PAVERS 0.4 0.045 4863 A Flat LANDSCAPING 0.1 0.045 Total BMP Area 7465 Descnbe the BMP's m sufficient deta1l1n your SWMP to demonstrate the area, volume, and other cntena can be met w1thm the constramts of the s1te. BMP's must be adapted and applied to the conditions specific to the development project such as unstable slopes or the lack of available head. Designated Staff have final review and approval authority over the project design. HMP Sizing Factors Infiltration Volume N/A Surface Area (sf) 0.117 N/A 86 0.117 N/A 8 0.117 N/A 22 Minimum BMP Size 116.6445 Proposed BMP Size• 166 Minimum Infiltration Depth Maximum Infiltration Depth Selected Infiltration Depth This Sizing Calculator has been developed in compliance with the Countywide Model SUSMP. For questions or concerns please contact the jurisdiction in which your project is located. Minimum BMP Size Infiltration Volume (cf) N/A 224 N/A 22 N/A 57 N/A 303 174 N/A 18.00 in 21.92 in 892.80 in 24.00 in BMP Sizing Spreadsheet Vl.04 '-' Project Name: SEASCAPE Hydrologic Unit: 904.5.1 Project Applicant: SCAPE DEVELOPMENTS Rain Gauge: Oceanside Jurisdiction: County Of San Diego Total Project Area: 7465 Parcel (APN): 15-040-09 & 215-040-1 Low Flow Threshold: O.SQ2 BMP Name BMPL6 BMPType: Infiltration DMA Rain Gauge Existing Condition Q2 Sizing Factor DMA Area (ac) Orifice Flow-%Q2 Orifice Area (in2) Name Soil Type Cover Slope (cfs/ac) (cfs) DMA6 Oceanside A Scrub Flat 0.035 0.049 N/A N/A Oceanside A Scrub Flat 0.035 0.011 N/A N/A Oceanside A Scrub Flat 0.035 0.112 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A Tot. Allowable Tot. Allowable Max Orifice Orifice Flow Orifice Area Diameter (cfs) (in2) (in) Actual Orifice Flow Actual Orifice Area Selected Orifice Diameter (cfs) (in2) (in) Drawdown (Hrs) 2.6 BMP Sizing Spreadsheet V1.04 Project Name: SEASCAPE Project Applicant: SEASCAPE DEVELOPMENTS LLC Jurisdiction: County Of San Diego Parcel (APN): 215-040-09 & 215-040-11 Hydrologic Unit: 904.5.1 Rain Gauge: Oceanside Total Project Area (sf): 7054 Channel Susceptibility: Low BMP Sizing Spreadsheet Vl.04 Project Name: SEASCAPE Hydrologic Unit: 904.5.1 Project Applicant: SEASCAPE DEVELOPMENTS LLC Rain Gauge: Oceanside Jurisdiction: County Of San Diego Total Project Area: 7054 Parcel (APN): 215-040-09 & 215-040-11 Low Flow Threshold: O.SQ2 BMP Name: BMP L7 BMPType: Infiltration BMP Native Soil Type: A BMP Infiltration Rate {in/hr): 9.3 Areas Draining to BMP DMA Post Project Runoff Factor Name Area (sf) Soil Type Slope Surface Type (Table 4-2) Surface Area DMA7 2028 A Flat ROOF 0.9 0.045 450 A Flat PAVERS 0.4 0.045 4576 A Flat LANDSCAPING 0.1 0.045 Total 8MP Area 7054 Descnbe the BMP's m sufficient deta1l1n your SWMP to demonstrate the area, volume, and other cntena can be met w1thm the constramts of the s1te. BMP's must be adapted and applied to the conditions specific to the development project such as unstable slopes or the lack of available head. Designated Staff have final review and approval authority over the project design. HMP Sizing Factors Infiltration Volume N/A Surface Area (sf) 0.117 N/A 82 0.117 N/A 8 0.117 N/A 21 Minimum BMP Size 110.826 Proposed BMP Size• 156 Minimum Infiltration Depth Maximum Infiltration Depth Selected Infiltration Depth This Sizing Calculator has been developed in compliance with the Countywide Model SUSMP. For questions or concerns please contact the jurisdiction in which your project is located. Minimum BMP Size Infiltration Volume (cf) N/A 214 N/A 21 N/A 54 N/A 288 164 N/A 18.00 in 22.17 in 892.80 in 24.00 in BMP Sizing Spreadsheet V1.04 ,, Project Name: SEASCAPE Hydrologic Unit: 904.5.1 Project Applicant: SCAPE DEVELOPMENTS Rain Gauge: Oceanside Jurisdiction: County Of San Diego Total Project Area: 7054 Parcel (APN): 15-040-09 & 215-040-1 Low Flow Threshold: 0.502 BMP Name BMP L7 BMPType: Infiltration DMA Rain Gauge Existing Condition Q2 Sizing Factor DMA Area (ac) Orifice Flow -%Q2 Orifice Area (in2) Name Soil Type Cover Slope (cfs/ac) (cfs) DMA 7 Oceanside A Scrub Flat 0.035 0.047 N/A N/A Oceanside A Scrub Flat O.Q35 0.010 N/A N/A Oceanside A Scrub Flat 0.035 0.105 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A Tot. Allowable Tot. Allowable Max Orifice Orifice Flow Orifice Area Diameter (cfs) (in2) (in) Actual Orifice Flow Actual Orifice Area Selected Orifice Diameter (cfs) (in2) (in) Drawdown (Hrs) 2.6 BMP Sizing Spreadsheet V1.04 Project Name: SEASCAPE Project Applicant: SEASCAPE DEVELOPMENTS LLC Jurisdiction: County Of San Diego Parcel (APN): 215-040-09 & 215-040-11 Hydrologic Unit: 904.5.1 Rain Gauge: Oceanside Total Project Area (sf): 8171 Channel Susceptibility: Low BMP Sizing Spreadsheet Vl.04 Project Name: SEASCAPE Hydrologic Unit: 904.5.1 Project Applicant: SEASCAPE DEVELOPMENTS LLC Rain Gauge: Oceanside Jurisdiction: County Of San Diego Total Project Area: 8171 Parcel (APN): 215-040-09 & 215-040-11 Low Flow Threshold: 0.5Q2 BMP Name: BMPL8 BMPType: Infiltration BMP Native Soil Type: A BMP Infiltration Rate (in/hr): 9.3 Areas Draining to BMP DMA Post Project Runoff Factor Name Area (sf) Soil Type Slope Surface Type (Table 4-2) Surface Area DMA8 2407 A Flat ROOF 0.9 0.045 470 A Flat PAVERS 0.4 0.045 5294 A Flat lANDSCAPING 0.1 0.045 Total BMP Area 8171 Descnbe the BMP s m suffic1ent deta1lm your SWMP to demonstrate the area, volume, and other cntena can be met w1th1n the constraints of the s1te. BMP's must be adapted and applied to the conditions specific to the development project such as unstable slopes or the lack of available head. Designated Staff have final review and approval authority over the project design. HMP Sizing Factors Infiltration Volume N/A Surface Area (sf) 0.117 N/A 97 0.117 N/A 8 0.117 N/A 24 Minimum BMP Size 129.7665 Proposed BMP Size• 209 Minimum Infiltration Depth Maximum Infiltration Depth Selected Infiltration Depth This Sizing Calculator has been developed in compliance with the Countywide Model SUSMP. For questions or concerns please contact the jurisdiction in which your project is located. Minimum BMP Size Infiltration Volume (cf) N/A 253 N/A 22 N/A 62 N/A 337 219 N/A 18.00 in 19.37 in 892.80 in 24.00 in BMP Sizing Spreadsheet V1.04 \.._/ Project Name: SEASCAPE Hydrologic Unit: 904.5.1 Project Applicant: SCAPE DEVELOPMENTS Rain Gauge: Oceanside Jurisdiction: County Of San Diego Total Project Area: 8171 Parcel (APN): 15-040-09 & 215-040-1 Low Flow Threshold: 0.5Q2 BMP Name BMP L8 BMPType: Infiltration DMA Rain Gauge Existing Condition Q2 Sizing Factor DMA Area (ac) Orifice Flow -%Q2 Orifice Area (in2) Name Soil Type Cover Slope (cfs/ac) (cfs) DMA8 Oceanside A Scrub Flat 0.035 0.055 N/A N/A Oceanside A Scrub Flat 0.035 0.011 N/A N/A Oceanside A Scrub Flat 0.035 0.122 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A Tot. Allowable Tot. Allowable Max Orifice Orifice Flow Orifice Area Diameter (ds) (in2) (in) Actual Orifice Flow Actual Orifice Area Selected Orifice Diameter (cfs) (in2) (in) Drawdown (Hrs) 2.6 BMP Sizing Spreadsheet V1.04 Project Name: SEASCAPE Project Applicant: SEASCAPE DEVELOPMENTS LLC Jurisdiction: County Of San Diego Parcel (APN}: 215-040-09 & 215-040-11 Hydrologic Unit: 904.5.1 Rain Gauge: Oceanside Total Project Area (sf}: 13106 Channel Susceptibility: Low BMP Sizing Spreadsheet Vl.04 Project Name: SEASCAPE Hydrologic Unit: 904.5.1 Project Applicant: SEASCAPE DEVELOPMENTS LLC Rain Gauge: Oceanside Jurisdiction: County Of San Diego Total Project Area: 13106 Parcel (APN): 215-040-09 & 215-040-11 low Flow Threshold: 0.5Q2 BMPName: BMPL9 BMPType: Infiltration BMP Native Soil Type: A BMP Infiltration Rate (in/hr): 9.3 Areas Draining to BMP DMA Post Project Runoff Factor Name Area (sf) Soil Type Slope Surface Type (Table 4-2) Surface Area DMA9 2767 A Flat ROOF 0.9 0.045 646 A Flat PAVERS 0.4 0.045 9693 A Flat LANDSCAPING 0.1 0.045 Total BMP Area 13106 Descnbe the BMP s m sufficient detail m your SWMP to demonstrate the area, volume, and other en ten a can be met w1thm the constramts of the s1te. BMP's must be adapted and applied to the conditions specific to the development project such as unstable slopes or the lack of available head. Designated Staff have final review and approval authority over the project design. HMP Sizing Factors Infiltration Volume N/A Surface Area (sf) 0.117 N/A 112 0.117 N/A 12 0.117 N/A 44 Minimum BMP Size 167.31 Proposed BMP Size• 373 Minimum Infiltration Depth Maximum Infiltration Depth Selected Infiltration Depth This Sizing Calculator has been developed in compliance with the Countywide Model SUSMP. For questions or concerns please contact the jurisdiction in which your project is located. Minimum BMP Size Infiltration Volume (cf) N/A 291 N/A 30 N/A 113 N/A 435 392 N/A 18.00 in 13.99 in 892.80 in 24.00 in BMP Sizing Spreadsheet V1.04 '-.../ Project Name: SEASCAPE Hydrologic Unit: 904.5.1 Project Applicant: SCAPE DEVELOPMENTS Rain Gauge: Oceanside Jurisdiction: County Of San Diego Total Project Area: 13106 Parcel (APN): 15-040-09 & 215-040-1 Low Flow Threshold: 0.5Q2 BMP Name BMP L9 BMP Type: Infiltration DMA Rain Gauge Existing Condition Q2 Sizing Factor DMA Area (ac) Orifice Flow - %Q2 Orifice Area (in2) Name Soil Type Cover Slope (cfs/ac) (cfs) DMA9 Oceanside A Scrub Flat 0.035 0.064 N/A N/A Oceanside A Scrub Flat 0.035 0.015 N/A N/A Oceanside A Scrub Flat 0.035 0.223 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A Tot. Allowable Tot. Allowable Max Orifice Orifice Flow Orifice Area Diameter (ds) (in2) (in) Actual Orifice Flow Actual Orifice Area Selected Orifice Diameter (cfs) (in2) (in) Drawdown (Hrs) 2.6 BMP Sizing Spreadsheet Vl.04 Project Name: SEASCAPE Project Applicant: SEASCAPE DEVELOPMENTS LLC Jurisdiction: County Of San Diego Parcel (APN): 215-040-09 & 215-040-11 Hydrologic Unit: 904.5.1 Rain Gauge: Oceanside Total Project Area (sf): 6581 Channel Susceptibility: Low BMP Sizing Spreadsheet Vl.04 Project Name: SEASCAPE Hydrologic Unit: 904.5.1 Project Applicant: SEASCAPE DEVELOPMENTS LLC Rain Gauge: Oceanside Jurisdiction: County Of San Diego Total Project Area: 6581 Parcel (APN): 215-040-09 & 215-040-11 low Flow Threshold: 0.5Q2 BMP Name: BMP llO BMPType: Infiltration BMP Native Soil Type: A BMP Infiltration Rate (in/hr): 9.3 Areas Draining to BMP DMA Post Project Runoff Factor Name Area (sf) Soil Type Slope Surface Type (Table 4-2) Surface Area OMA10 2028 A Flat ROOF 0.9 0.04S 652 A Flat PAVERS 0.4 0.045 3901 A Flat LANDSCAPING 0.1 0.045 Total BMP Area 6581 Descnbe the BMP s m suffictent detatlm your SWMP to demonstrate the area, volume, and other cntena can be met wtthm the constratnts of the stte. BMP's must be adapted and applied to the conditions specific to the development project such as unstable slopes or the lack of available head. Designated Staff have final review and approval authority over the project design. HMP Sizing Factors Infiltration Volume N/A Surface Area (sf) 0.117 N/A 82 0.117 N/A 12 0.117 N/A 18 Minimum BMP Size 111.4245 Proposed BMP Size• 166 Minimum Infiltration Depth Maximum Infiltration Depth Selected Infiltration Depth This Sizing calculator has been developed in compliance with the Countywide Model SUSMP. For questions or concerns please contact the jurisdiction in which your project is located. Minimum BMP Size Infiltration Volume (cf) N/A 214 N/A 31 N/A 46 N/A 290 174 N/A 18.00 in 20.94 in 892.80 in 24.00 in BMP Sizing Spreadsheet V1.04 '-' Project Name: SEASCAPE Hydrologic Unit: 904.5.1 Project Applicant: SCAPE DEVELOPMENTS Rain Gauge: Oceanside Jurisdiction: County Of San Diego Total Project Area: 6581 Parcel (APN): 15-040-09 & 215-040-1 Low Flow Threshold: 0.5Q2 BMP Name BMP L10 BMPType: Infiltration DMA Rain Gauge Existing Condition Q2 Sizing Factor DMA Area (ac) Orifice Flow -%Q2 Orifice Area (in2) Name Soil Type Cover Slope (cfs/ac) (cfs) DMA10 Oceanside A Scrub Flat 0.035 0.047 N/A N/A Oceanside A Scrub Flat 0.035 0.015 N/A N/A Oceanside A Scrub Flat 0.035 0.090 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A Tot. Allowable Tot. Allowable Max Orifice Orifice Flow Orifice Area Diameter (ds) (in2) (in) Actual Orifice Flow Actual Orifice Area Selected Orifice Diameter (cfs) (in2) (in) Drawdown (Hrs) 2.6 BMP Sizing Spreadsheet V1.04 Project Name: SEASCAPE Project Applicant: SEASCAPE DEVELOPMENTS LLC Jurisdiction: County Of San Diego Parcel (APN): 215-040-09 & 215-040-11 Hydrologic Unit: 904.5.1 Rain Gauge: Oceanside Total Project Area (sf): 9710 Channel Susceptibility: Low BMP Sizing Spreadsheet V1.04 Project Name: SEASCAPE Hydrologic Unit: 904.5.1 Project Applicant: SEASCAPE DEVELOPMENTS LLC Rain Gauge: Oceanside Jurisdiction: County Of San Diego Total Project Area: 9710 Parcel (APN): 215-040-09 & 215-040-11 Low Flow Threshold: 0.5Q2 BMP Name: BMP L11 BMPType: Infiltration BMP Native Soil Type: A BMP Infiltration Rate (in/hr): 9.3 Areas Draining to BMP DMA Post Project Runoff Factor Name Area (sf) Soil Type Slope Surface Type (Table4-2) Surface Area DMAll 3161 A Flat ROOF 0.9 0.045 575 A Flat PAVERS 0.4 0.045 5974 A Flat LANDSCAPING 0.1 0.045 Total BMP Area 9710 Descnbe the BMP's 1n sufficient deta1lm your SWMP to demonstrate the area, volume, and other cntena can be met w1thm the constraints of the s1te. BMP's must be adapted and applied to the conditions specific to the development project such as unstable slopes or the lack of available head. Designated Staff have final review and approval authority over the project design. HMP Sizing Factors Infiltration Volume N/A Surface Area (sf) 0.117 N/A 128 0.117 N/A 10 0.117 N/A 27 Minimum BMP Size 165.2535 Proposed BMP Size• 227 Minimum Infiltration Depth Maximum Infiltration Depth Selected Infiltration Depth This Sizing Calculator has been developed in compliance with the Countywide Model SUSMP. For questions or concerns please contact the jurisdiction in which your project is located. Minimum BMP Size Infiltration Volume (cf) N/A 333 N/A 27 N/A 70 N/A 430 238 N/A 18.00 in 22.71 in 892.80 in 24.00 in BMP Sizing Spreadsheet V1.04 '-.../ Project Name: SEASCAPE Hydrologic Unit: 904.5.1 Project Applicant: SCAPE DEVELOPMENTS Rain Gauge: Oceanside Jurisdiction: County Of San Diego Total Project Area: 9710 Parcel (APN): 15-040-09 & 215-040-1 Low Flow Threshold: 0.5Q2 BMP Name BMP Lll BMPType: Infiltration DMA Rain Gauge Existing Condition Q2 Sizing Factor DMA Area (ac) Orifice Flow -%Q2 Orifice Area (in2) Name Soil Type Cover Slope (cfs/ac) (cfs) DMAll Oceanside A Scrub Flat 0.035 0.073 N/A N/A Oceanside A Scrub Flat 0.035 0.013 N/A N/A Oceanside A Scrub Flat 0.035 0.137 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A . N/A N/A N/A Tot. Allowable Tot. Allowable Max Orifice Orifice Flow Orifice Area Diameter (ds) (in2) (in) Actual Orifice Flow Actual Orifice Area Selected Orifice Diameter (cfs) (in2) (in) Drawdown (Hrs) 2.6 BMP Sizing Spreadsheet V1.04 Project Name: SEASCAPE Project Applicant: SEASCAPE DEVELOPMENTS LLC Jurisdiction: County Of San Diego Parcel (APN): 215-040-09 & 215-040-11 Hydrologic Unit: 904.5.1 Rain Gauge: Oceanside Total Project Area (sf): 14444 Channel Susceptibility: Low BMP Sizing Spreadsheet Vl.04 Project Name: SEASCAPE Hydrologic Unit: 904.5.1 Project Applicant: SEASCAPE DEVELOPMENTS LLC Rain Gauge: Oceanside Jurisdiction: County Of San Diego Total Project Area: 14444 Parcel (APN): 215-040-09 & 215-040-11 Low Flow Threshold: O.SQ2 BMP Name: BMP L12 BMPType: Infiltration BMP Native Soil Type: A BMP Infiltration Rate (in/hr): 9.3 Areas Draining to BMP DMA Post Project Runoff Factor Name Area (sf) Soil Type Slope Surface Type (Table4-2) Surface Area DMA12 3800 A Flat ROOF 0.9 0.045 652 A Flat PAVERS 0.4 0.045 9992 A Flat LANDSCAPING 0.1 0.045 Total BMP Area 14444 Oescnbe the BMP s m sufficient deta1l1n your SWMP to demonstrate the area, volume, and other cntena can be met w1thm the constraints of the s1te. BMP's must be adapted and applied to the conditions specific to the development project such as unstable slopes or the lack of available head. Designated Staff have final review and approval authority over the project design. HMP Sizing Factors Infiltration Volume N/A Surface Area (sf) 0.117 N/A 154 0.117 N/A 12 0.117 N/A 45 Minimum BMP Size 210.6 Proposed BMP Size• 325 Minimum Infiltration Depth Maximum Infiltration Depth Selected Infiltration Depth This Sizing Calculator has been developed in compliance with the Countywide Model SUSMP. For questions or concerns please contact the jurisdiction in which your project is located. Minimum BMP Size Infiltration Volume (cf) N/A 400 N/A 31 N/A 117 N/A 548 341 N/A 18.00 in 20.22 in 892.80 in 24.00 in BMP Sizing Spreadsheet Vl.04 '-" Project Name: SEASCAPE Hydrologic Unit: 904.5.1 Project Applicant: SCAPE DEVELOPMENTS Rain Gauge: Oceanside Jurisdiction: County Of San Diego Total Project Area: 14444 Parcel {APN): 15-040-09 & 215-040-1 Low Flow Threshold: 0.5Q2 BMP Name BMP L12 BMPType: Infiltration DMA Rain Gauge Existing Condition Q2 Sizing Factor DMA Area (ac) Orifice Flow - %Q2 Orifice Area (in2) Name Soil Type Cover Slope (cfs/ac) (cfs) DMA12 Oceanside A Scrub Flat 0.035 0.087 N/A N/A Oceanside A Scrub Flat 0.035 0.015 N/A N/A Oceanside A Scrub Flat 0.035 0.229 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A Tot. Allowable Tot. Allowable Max Orifice Orifice Flow Orifice Area Diameter (ds) (in2) (in) Actual Orifice Flow Actual Orifice Area Selected Orifice Diameter (cfs) (in2) (in) Drawdown (Hrs) 2.6 BMP Sizing Spreadsheet V1.04 Project Name: SEASCAPE Project Applicant: SEASCAPE DEVELOPMENTS LLC Jurisdiction: County Of San Diego Parcel (APN): 215-040-09 & 215-040-11 Hydrologic Unit: 904.5.1 Rain Gauge: Oceanside Total Project Area (sf): 14444 Channel Susceptibility: Low BMP Sizing Spreadsheet Vl.04 Project Name: SEASCAPE Hydrologic Unit: 904.5.1 Project Applicant: SEASCAPE DEVELOPMENTS LLC Rain Gauge: Oceanside Jurisdiction: County Of San Diego Total Project Area: 14444 Parcel (APN): 215-040-09 & 215-040-11 Low Flow Threshold: 0.5Q2 BMP Name: BMP7 BMPType: Infiltration BMP Native Soil Type: A BMP Infiltration Rate (in/hr): 9.3 Areas Draining to BMP DMA Post Project Runoff Factor Name Area (sf) Soil Type Slope Surface Type (Table 4-2) Surface Area DMA13 6100 A Flat Road 0.9 0.045 DMA14 6200 A Flat Road 0.9 0.045 DMA17 32130 A Flat Landscaping 0.1 0.045 AreaA1 9068 A Flat Road 0.9 0.045 AreaA2 3720 A Flat Road 0.9 0.045 AreaA3 4557 A Flat Landscaping 0.1 0.045 AreaA4 34388 A Flat Mixed 0.5 0.045 Total BMP Area 96163 Descnbe the BMP's 1n sufficient deta1l1n your SWMP to demonstrate the area, volume, and other cntena can be met Within the constraints of the s1te. BMP's must be adapted and applied to the conditions specific to the development project such as unstable slopes or the lack of available head. Designated Staff have final review and approval authority over the project design. HMP Sizing Factors Infiltration Volume N/A Surface Area (sf) 0.117 N/A 247 0.117 N/A 251 0.117 N/A 145 0.117 N/A 367 0.117 N/A 151 0.117 N/A 21 0.117 N/A 696 Minimum BMP Size 1877.5125 Proposed BMP Size• 1880 Minimum Infiltration Depth Maximum Infiltration Depth Selected Infiltration Depth This Sizing Calculator has been developed in compliance with the Countywide Model SUSMP. For questions or concerns please contact the jurisdiction in which your project is located. Minimum BMP Size Infiltration Volume (cf) N/A 642 N/A 653 N/A 376 N/A 955 N/A 392 N/A 53 N/A 1811 N/A 4882 2726 N/A 18.00 in 31.16 in 892.80 in 36.00 in BMP Sizing Spreadsheet V1.04 ' I Project Name: SEASCAPE Hydrologic Unit: 904.5.1 Project Applicant: SCAPE DEVELOPMENTS Rain Gauge: Oceanside Jurisdiction: County Of San Diego Total Project Area: 14444 Parcel (APN): 15-040-09 & 215-040-1 Low Flow Threshold: 0.502 BMP Name BMP7 BMP Type: Infiltration DMA Rain Gauge Existing Condition 02 Sizing Factor DMA Area (a c) Orifice Flow -%0 2 Orifice Area (in2) Name Soil Type Cover Slope (cfs/ac) (cfs) DMA13 Oceanside A Scrub Flat 0.035 0.140 N/A N/A DMA 14 Oceanside A Scrub Flat 0.035 0.142 N/A N/A DMA 17 Oceanside A Scrub Flat 0.035 0.738 N/A N/A Area A1 Oceanside 0.208 N/A N/A Area A2 Oceanside 0.085 N/A N/A Area A3 Oceanside 0.105 N/A N/A Area A4 Oceanside 0.789 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A Tot. Allowable Tot. Allowable Max Orifice Orifice Flow Orifice Area Diameter (cfs) (in2) (in) Actual Orifice Flow Actual Orifice Area Selected Orifice Diameter (cfs) (in2) (in) Drawdown (Hrs) 3.9 DMA TABULAR SUMMARY Storm Water Quality Management Plan (SWQMP) Seascape ATTACHMENT 1b TYPICAL DETAIL OF INFILTRATION TRENCH DRAWDOWN CALCULATION WORKSHEETS 38 RUNOFF FILTERS THRU GRASS BUFFER FOREBAY ~=====~~ <" ~ J&~~!:j ~/~~~~~~~ <"" ~ PVC FOOTPLATE RUNOFF FILTERS THRU GRASS BUFFER FOREBAY NATURAL SOIL TYP. SEC. -INFILTRATION CELL/TRENCH DMAid BMP NO. dma1 L1 dma2 L2 dma3 L3 dma4 L4 dma 5 L5 dma6 L6 dma 7 L7 dma8 L8 dma9 L9 dma10 L10 dma11 L11 dma12 L12 dma 13, dma 14, dma17, Area A1 , 7 Area A2, Area A3, AreaA4 SEASCAPE CT 05-18 DRAWDOWN CALCULATIONS PER APPENDIX 8.4-1 DCV* BMP AVERAGE SURFACE CU.FT. AREA DEPTH 174 144 1.21 180 174 1.03 173 148 1.17 180 148 1.22 169 148 1.14 207 166 1.25 197 156 1.26 228 209 1.09 323 373 0.87 196 166 1.18 283 227 1.25 382 325 1.18 2,912 1,880 1.55 *Design Capture Volume-cu. ft. SWMP NO. 12-09 INFILTRAT DRAW DOWN ION RATE TIME IN/HR HR 3.38 4.29 3.38 3.67 3.38 4.15 3.38 4.32 3.38 4.05 3.38 4.43 3.38 4.48 3.38 3.87 3.38 3.07 3.38 4.19 3.38 4.43 3.38 4.17 3.38 5.50 Appendix B: Storm Water Pollutant Control Hydrologic Calculations and Sizing Methods 8.4.1 Simple Method Stepwise Instructions: 1. Compute DCV using Worksheet B.4-1. 2. Estimate design infiltration rate using Form I-9 in Appendix I. 3. Design BMP(s) to ensure that the DCV is fully retained (i.e., no surface discharge during the design event) and the stored effective depth draws down in no longer than 36 hours. Worksheet B.4-1: Simple Sizing Method for Infiltration BMPs-#' I DCV= cubic-feet Estimated design infiltration rate (Form I-9 in Appendix K<Jcsign= 3·38 in/hr AnMP= I L.f y Average effective depth in the BMP footprint Davg= /·2... f feet cv 5 Drawdown T= q. 2.. 't hours 6 Provide alternative calculation of drawdown time, if needed. Notes: • Drawdown time must be less than 36 hours. This criterion was set to achieve average annual capture of 80% to account for back to back storms (See rationale in Section B.4.3). In order to use a different drawdown time, BMPs should be sized using the percent capture method (Section B.4.2). • The average effective depth calculation should account for any aggregate/media in the BMP. For example, 4 feet of stone at a porosity of 0.4 would equate to 1.6 feet of effective depth. • This method may overestimate drawdown time for BMPs that drain through both the bottom and walls of the system. BMP specific calculations of drawdown time may be provided that account for BMP-specific geometry. B-18 February 2016 Appendix B: Storm Water Pollutant Control Hydrologic Calculations and Sizing Methods 8.4.1 Simple Method Stepwise Instructions: 1. Compute DCV using Worksheet B.4-1. 2. Estimate design infiltration rate using Form I-9 in Appendix I. 3. Design BMP(s) to ensure that the DCV is fully retained (i.e., no surface discharge during the design event) and the stored effective depth draws down in no longer than 36 hours. Worksheet B.4-1: Simple Sizing Method for Infiltration BMPs,4t2 DCV= l&r> cubic-feet Estimated design infiltration rate (Form I-9 in Appendix ~esign= 3·38 in/hr ABMI'= t74 Average effective depth in the BMP footprint D~vg= I•D$ feet 5 Drawdown T= 3·ID7 hours 6 Provide alternative calculation of drawdown time, if needed. Notes: • Drawdown time must be less than 36 hours. This criterion was set to achieve average annual capture of 80% to account for back to back storms (See rationale in Section B.4.3). In order to use a different drawdown time, BMPs should be sized using the percent capture method (Section B.4.2). • The average effective depth calculation should account for any aggregate/media in the BMP. For example, 4 feet of stone at a porosity of 0.4 would equate to 1.6 feet of effective depth. • This method may overestimate drawdown time for BMPs that drain through both the bottom and walls of the system. BMP specific calculations of drawdown time may be provided that account for BMP-specific geometry. February 2016 Appendix B: Storm Water Pollutant Control Hydrologic Calculations and Sizing Methods 8.4.1 Simple Method Stepwise Instructions: 1. Compute DCV using Worksheet B.4-1. 2. E stimate design infiltration rate using Form I-9 in Appendix I. 3. Design BMP(s) to ensure that the DCV is fully retained (i.e., no surface discharge during the design event) and the stored effective depth draws down in no longer than 36 hours. Worksheet B.4-1: Simple Sizing Method for Infiltration BMPs -:#::3 DCV= 1'73 cubic-feet Estimated design infiltration rate (Form I-9 in Appendix l«<esign= 3·~ in/hr AnMP= Davg= 1·{7 feet 5 Drawdown T= tf·IS'" hours 6 Provide alternative calculation of drawdown time, if needed. Notes: • Drawdown time must be less than 36 hours. This criterion was set to achieve average annual capture of 80% to account for back to back storms (See rationale in Section B.4.3). In order to use a different drawdown time, BMPs should be sized using the percent capture method (Section B.4.2). • The average effective depth calculation should account for any aggregate/media in the BMP. For example, 4 feet of stone at a porosity of 0.4 would equate to 1.6 feet of effective depth. • This method may overestimate drawdown time for BMPs that drain through both the bottom and walls of the system. BMP specific calculations of drawdown time may be provided that account for BMP-specific geometry. B-18 February 2016 Appendix B: Storm Water Pollutant Control Hydrologic Calculations and Sizing Methods 8.4.1 Simple Method Stepwise Instructions: 1. Compute DCV using Worksheet B.4-1. 2. Estimate design infiltration rate using Form I-9 in Appendix I. 3. Design BMP(s) to ensure that the DCV is fully retained (i.e., no surface discharge during the design event) and the stored effective depth draws down in no longer than 36 hours. Worksheet B.4-1: Simple Sizing Method for Infiltration BMPs#"J.( DCV= fE;O cubic-feet Estimated design infiltration rate (Form I-9 in Appendix K<!esign= 3{38 in/hr A aMP= 148 Average effective depth in the BMP footprint Davg= , . 2.2. feet T= hours 6 Provide alternative calculation of drawdown time, if needed. Notes: • Drawdown time must be less than 36 hours. This criterion was set to achieve average annual capture of 80% to account for back to back storms (See rationale in Section B.4.3). In order to use a different drawdown time, BMPs should be sized using the percent capture method (Section B.4.2). • The average effective depth calculation should account for any aggregate/media in the BMP. For example, 4 feet of stone at a porosity of 0.4 would equate to 1.6 feet of effective depth. • This method may overestimate drawdown time for BMPs that drain through both the bottom and walls of the system. BMP specific calculations of drawdown time may be provided that account for BMP-specific geometry. B-18 February 2016 Appendix B: Storm Water Pollutant Control Hydrologic Calculations and Sizing Methods 8.4.1 Simple Method Stepwise Instructions: 1. Compute DCV using Worksheet B.4-1. 2. E stimate design infiltration rate using Form I-9 in Appendix I. 3. Design BMP(s) to ensure that the DCV is fully retained (i.e., no surface discharge during the design event) and the stored effective depth draws down in no longer than 36 hours. Worksheet B.4-1: Simple Sizing Method for Infiltration BMPs #' 5 DCV= cubic-feet Estimated design infiltration rate (Form I-9 in Appendix l«Jcsign= 3·Eli in/hr Available BMP surface area AnMP= t48 -ft Average effective depth in the BMP footprint Davg= 1·14 feet T= ~·OS hours Provide alternative calculation of drawdown time, if needed. Notes: • Drawdown time must be less than 36 hours. This criterion was set to achieve average annual capture of 80% to account for back to back storms (See rationale in Section B.4.3). In order to use a different drawdown time, BMPs should be sized using the percent capture method (Section B.4.2). • The average effective depth calculation should account for any aggregate/media in the BMP. For example, 4 feet of stone at a porosity of 0.4 would equate to 1.6 feet of effective depth. • This method may overestimate drawdown time for BMPs that drain through both the bottom and walls of the system. BMP specific calculations of drawdown time may be provided that account for BMP-specific geometry. B-18 February 2016 Appendix B: Storm Water Pollutant Control Hydrologic Calculations and Sizing Methods 8.4.1 Simple Method Stepwise Instructions: 1. Compute DCV using Worksheet B.4-1. 2. Estimate design infiltration rate using Form I-9 in Appendix I. 3. Design BMP(s) to ensure that the DCV is fully retained (i.e., no surface discharge during the design event) and the stored effective depth draws down in no longer than 36 hours. Worksheet B.4-1: Simple Sizing Method for Infiltration BMPs .,r6 DCV= cubic-feet Estimated design infiltration rate (Form I-9 in Appendix l<dcsign= 3·~ in/hr 166 Average effective depth in the BMP footprint Davg= \•2..-r feet cv 5 Drawdown T= 4·43 hours 6 Provide alternative calculation of drawdown time, if needed. Notes: • Drawdown time must be less than 36 hours. This criterion was set to achieve average annual capture of 80% to account for back to back storms (See rationale in Section B.4.3). In order to use a different drawdown time, BMPs should be sized using the percent capture method (Section B.4.2). • The average effective depth calculation should account for any aggregate/media in the BMP. For example, 4 feet of stone at a porosity of 0.4 would equate to 1.6 feet of effective depth. • This method may overestimate drawdown time for BMPs that drain through both the bottom and walls of the system. BMP specific calculations of drawdown time may be provided that account for BMP-specific geometry. B-18 February 2016 Appendix B: Storm Water Pollutant Control Hydrologic Calculations and Sizing Methods 8.4.1 Simple Method Stepwise Instructions: 1. Compute DCV using Worksheet B.4-1. 2. Estimate design infiltration rate using Form I-9 in Appendix I. 3. Design BMP(s) to ensure that the DCV is fully retained (i.e., no surface discharge during the design event) and the stored effective depth draws down in no longer than 36 hours. Worksheet B.4-1: Simple Sizing Method for Infiltration BMPs1/=T DCV= cubic-feet Estimated design infiltration rate (Form I-9 in Appendix K.tcsign= ~33. in/hr Available BMP surface area A aMP= IS6 -ft Average effective depth in the BMP footprint Davg= (·2.6 feet cv T= t/·48 hours Provide alternative calculation of drawdown time, if needed. Notes: • Drawdown time must be less than 36 hours. This criterion was set to achieve average annual capture of 80% to account for back to back storms (See rationale in Section B.4.3). In order to use a different drawdown time, BMPs should be sized using the percent capture method (Section B.4.2). • The average effective depth calculation should account for any aggregate/ media in the BMP. For example, 4 feet of stone at a porosity of 0.4 would equate to 1.6 feet of effective depth. • This method may overestimate drawdown time for BMPs that drain through both the bottom and walls of the system. BMP specific calculations of drawdown time may be provided that account for BMP-specific geometry. B-18 February 2016 Appendix B: Storm Water Pollutant Control Hydrologic Calculations and Sizing Methods 8.4.1 Simple Method Stepwise Instructions: 1. Compute DCV using Worksheet B.4-1. 2. Estimate design infiltration rate using Form I-9 in Appendix I. 3. Design BMP(s) to ensure that the DCV is fully retained (i.e., no surface discharge during the design event) and the stored effective depth draws down in no longer than 36 hours. Worksheet B.4-1: Simple Sizing Method for Infiltration BMPs -ft 8 DCV= cubic-feet Estimated design infiltration rate (Form I-9 in Appendix l<.Jcsign= S·Sj in/hr ABMl'= eo<t Average effective depth in the BMP footprint Davg= I· t>Cf feet 5 Drawdown T= z·g7 hours 6 Provide alternative calculation of drawdown time, if needed. Notes: • Drawdown time must be less than 36 hours. This criterion was set to achieve average annual capture of 80% to account for back to back storms (See rationale in Section B.4.3). In order to use a different drawdown time, BMPs should be sized using the percent capture method (Section B.4.2). • The average effective depth calculation should account for any aggregate/media in the BMP. For example, 4 feet of stone at a porosity of 0.4 would equate to 1.6 feet of effective depth. • This method may overestimate drawdown time for BMPs that drain through both the bottom and walls of the system. BMP specific calculations of drawdown time may be provided that account for BMP-specific geometry. B-18 February 2016 Appendix B: Storm Water Pollutant Control Hydrologic Calculations and Sizing Methods 8.4.1 Simple Method Stepwise Instructions: 1. Compute DCV using Worksheet B.4-1. 2. Estimate design infiltration rate using Form I-9 in Appendix I. 3. Design BMP(s) to ensure that the DCV is fully retained (i.e., no surface discharge during the design event) and the stored effective depth draws down in no longer than 36 hours. Worksheet B.4-1: Simple Sizing Method for Infiltration BMPssf#' or DCV= 32.3 cubic-feet Estimated design infiltration rate (Form I-9 in Appendix K.!csign= 3~r in/hr AnMP= 373 Average effective depth in the BMP footprint Davg= ~·J7 feet 5 Drawdown T= 3·tJ7 hours 6 Provide alternative calculation of drawdown time, if needed. Notes: • Drawdown time must be less than 36 hours. This criterion was set to achieve average annual capture of 80% to account for back to back storms (See rationale in Section B.4.3). In order to use a different drawdown time, BMPs should be sized using the percent capture method (Section B.4.2). • The average effective depth calculation should account for any aggregate/media in the BMP. For example, 4 feet of stone at a porosity of 0.4 would equate to 1.6 feet of effective depth. • This method may overestimate drawdown time for BMPs that drain through both the bottom and walls of the system. BMP specific calculations of drawdown time may be provided that account for BMP-specific geometry. B-18 February 2016 Appendix B: Storm Water Pollutant Control Hydrologic Calculations and Sizing Methods 8.4.1 Simple Method Stepwise Instructions: 1. Compute DCV using Worksheet B.4-1. 2. Estimate design infiltration rate using Form I-9 in Appendix I. 3. Design BMP(s) to ensure that the DCV is fully retained (i.e., no surface discharge during the design event) and the stored effective depth draws down in no longer than 36 hours. Worksheet B.4-1: Simple Sizing Method for Infiltration BMPs#f 0 DCV= cubic-feet Estimated design infiltration rate (Form I-9 in Appendix I<.Jcsign= 3~. in/hr AnMP= /66 -ft Average effective depth in the BMP footprint Davg= I· rJ feet 5 Drawdown T= 4·1 hours 6 Provide alternative calculation of drawdown time, if needed. Notes: • Drawdown time must be less than 36 hours. This criterion was set to achieve average annual capture of 80% to account for back to back storms (See rationale in Section B.4.3). In order to use a different drawdown time, BMPs should be sized using the percent capture method (Section B.4.2). • The average effective depth calculation should account for any aggregate/media in the BMP. For example, 4 feet of stone at a porosity of 0.4 would equate to 1.6 feet of effective depth. • This method may overestimate drawdown time for BMPs that drain through both the bottom and walls of the system. BMP specific calculations of drawdown time may be provided that account for BMP-specific geometry. B-18 February 2016 Appendix B: Storm Water Pollutant Control Hydrologic Calculations and Sizing Methods 8.4.1 Simple Method Stepwise Instructions: 1. Compute DCV using Worksheet B.4-1. 2. Estimate design infiltration rate using Form I-9 in Appendix I. 3. Design BMP(s) to ensure that the DCV is fully retained (i.e., no surface discharge during the design event) and the stored effective depth draws down in no longer than 36 hours. Worksheet B.4-1: Simple Sizing Method for Infiltration BMPs J/11/ DCV= cubic-feet Estimated design infiltration rate (Form I-9 in Appendix Kdesign= 3:.3J,, in/hr ABMP= 2..2-t Average effective depth in the BMP footprint Davg= ,.zs feet 5 Drawdown · T= 4· 3 hours 6 Provide alternative calculation of drawdown time, if needed. Notes: • Drawdown time must be less than 36 hours. This criterion was set to achieve average annual capture of 80% to account for back to back storms (See rationale in Section B.4.3). In order to use a different drawdown time, BMPs should be sized using the percent capture method (Section B.4.2). • The average effective depth calculation should account for any aggregate/ media in the BMP. For example, 4 feet of stone at a porosity of 0.4 would equate to 1.6 feet of effective depth. • This method may overestimate drawdown time for BMPs that drain through both the bottom and walls of the system. BMP specific calculations of drawdown time may be provided that account for BMP-specific geometry. B-18 February 2016 Appendix B: Storm Water Pollutant Control Hydrologic Calculations and Sizing Methods 8.4.1 Simple Method Stepwise Instructions: 1. Compute DCV using Worksheet B.4-1. 2. Estimate design infiltration rate using Form I-9 in Appendix I. 3. Design BMP(s) to ensure that the DCV is fully retained (i.e., no surface discharge during the design event) and the stored effective depth draws down in no longer than 36 hours. Worksheet B.4-1: Simple Sizing Method for Infiltration BMPs4/ I/ DCV= cubic-feet Estimated design infiltration rate (Form I-9 in Appendix K<:tesign= 3~ in/hr AnMP= 2_2-"7 Average effective depth in the BMP footprint Davg= J·2.S feet 5 Drawdown · T= ~·Y3 hours 6 Provide alternative calculation of drawdown time, if needed. Notes: • Drawdown time must be less than 36 hours. This criterion was set to achieve average annual capture of 80% to account for back to back storms (See rationale in Section B.4.3). In order to use a different drawdown time, BMPs should be sized using the percent capture method (Section B.4.2). • The average effective depth calculation should account for any aggregate/media in the BMP. For example, 4 feet of stone at a porosity of 0.4 would equate to 1.6 feet of effective depth. • This method may overestimate drawdown time for BMPs that drain through both the bottom and walls of the system. BMP specific calculations of drawdown time may be provided that account for BMP-specific geometry. B-18 February 2016 Appendix B: Storm Water Pollutant Control Hydrologic Calculations and Sizing Methods 8.4.1 Simple Method Stepwise Instructions: 1. Compute DCV using Worksheet B.4-1. 2. Estimate design infiltration rate using Form I-9 in Appendix I. 3. Design BMP(s) to ensure that the DCV is fully retained (i.e., no surface discharge during the design event) and the stored effective depth draws down in no longer than 36 hours. Worksheet B.4-1: Simple Sizing Method for Infiltration BMPs,#-/2- DCV= cubic-feet Estimated design infiltration rate (Form I-9 in Appendix ~csign= 3·.?J in/hr AsMP= 32.&" Average effective depth in the BMP footprint Davg= ,.,8 feet cv T= \.{·17 hours 6 Provide alternative calculation of drawdown time, if needed. Notes: • Drawdown time must be less than 36 hours. This criterion was set to achieve average annual capture of 80% to account for back to back storms (See rationale in Section B.4.3). In order to use a different drawdown time, BMPs should be sized using the percent capture method (Section B.4.2). • The average effective depth calculation should account for any aggregate/media in the BMP. For example, 4 feet of stone at a porosity of 0.4 would equate to 1.6 feet of effective depth. • This method may overestimate drawdown time for BMPs that drain through both the bottom and walls of the system. BMP specific calculations of drawdown time may be provided that account for BMP-specific geometry. B-18 February 2016 Appendix B: Storm Water Pollutant Control Hydrologic Calculations and Sizing Methods 8.4.1 Simple Method Stepwise Instructions: 1. Compute DCV using Worksheet B.4-1. 2. Estimate design infiltration rate using Form I-9 in Appendix I. 3. Design BMP(s) to ensure that the DCV is fully retained (i.e., no surface discharge during the design event) and the stored effective depth draws down in no longer than 36 hours. Worksheet B.4-1: Simple Sizing Method for Infiltration BMPs I $,tY, 1'1, /4t, At,A3 DCV= cubic-feet Estimated design infiltration rate (Form I-9 in Appendix ~esign= 3·.3~ in/hr ABMP= ,~~ Average effective depth in the BMP footprint Davg= I·SS feet T= _s;_re. hours 6 Provide alternative calculation of drawdown time, if needed. Notes: • Drawdown time must be less than 36 hours. This criterion was set to achieve average annual capture of 80% to account for back to back storms (See rationale in Section B.4.3). In order to use a different drawdown time, BMPs should be sized using the percent capture method (Section B.4.2). • The average effective depth calculation should account for any aggregate/media in the BMP. For example, 4 feet of stone at a porosity of 0.4 would equate to 1.6 feet of effective depth. • This method may overestimate drawdown time for BMPs that drain through both the bottom and walls of the system. BMP specific calculations of drawdown time may be provided that account for BMP-specific geometry. B-18 February 2016 LOT DMAid LOT NO. A dma 1 1 6,188 dma 2 2 6,003 dma 3 3 6,040 dma4 4 6,024 dma 5 5 6,009 dma 6 6 7,465 dma 7 7 7,054 dma 8 8 8,171 dma 9 9 13,106 dma10 10 6,581 dma11 11 9,710 dma12 12 14,444 dma13 Surf Crest 6,100 dma14 Surf Crest 6,200 dma 17 SDG&E 32,130 Area A1 Surf Crest 32,130 Area A2 Landsc 8,980 Area A3 Mixed 32 ,130 117 ,670 SEASCAPE CT 05-18 APPENDIX 82-1 AREAS IN SQ.FT. LAND A in ROOF DWY SCAPE ACRES 1803 420 3,965 0.14 2130 305 3,568 0.14 1803 450 3,787 0.14 2128 320 3,576 0.14 1768 393 3,848 0.14 2130 472 4,863 0.17 2028 450 4,576 0.16 2407 470 5,294 0.19 2767 646 9,693 0.30 2028 652 3,901 0.15 3161 575 5,974 0.22 3800 652 9,992 0.33 0.14 0.14 0.74 0.74 0.21 0.74 2.70 SWMP NO. 12-09 WEIGHTED 85TH DCV*** 810 DEPTH c AC INCHES CU. FT. RETEN REQD. AREA 0.54 0.08 0.62 174 150 1.16 0.58 0.08 0.62 180 180 1.00 0.55 0.08 0.62 173 150 1.15 0.58 0.08 0.62 180 150 1.20 0.55 0.08 0.62 169 150 1.13 0.54 0.09 0.62 207 160 1.30 0.54 0.09 0.62 197 160 1.23 0.54 0.10 0.62 228 210 1.09 0.48 0.14 0.62 323 380 0.85 0.58 0.09 0.62 196 170 1.15 0.56 0.13 0.62 283 230 1.23 0.51 0.17 0.62 382 330 1.16 0.85 5,185 0.62 268 0.85 5,270 0.62 272 0.10 3,213 0.62 166 0.85 27,311 0.62 1 ,411 0.10 898 0.62 46 0.45 14,459 0.62 747 0.48 56,363 0.62 2,912 1,880 1.55 Appendix B: Storm Water Pollutant Control Hydrologic Calculations and Sizing Methods WorksheetB.2-1. DCV ))M A ..1 1 85th percentile 24-hr storm depth from Figure B.1-1 d= !), b;( inches 2 Area A= 0. I acres Area weighted runoff factor (estimate using Appendix 3 B.1.1 and B.2 C= unidess 4 Tree wells volume reduction TCV= cubic-feet 5 Rain barrels volume reduction RCV= cubic-feet Calculate DCV = 6 -TCV -RCV DCV= J 1lf cubic-feet B-10 February 2016 Appendix B: Storm Water Pollutant Control Hydrologic Calculations and Sizing Methods 1 85'h percentile 24-hr storm depth from Figure B.1-1 d= 2 Area A= o.) acres Area weighted runoff factor (estimate using Appendix o.sg 3 B.1.1 and B.2.1 C= unidess 4 Tree wells volume reduction TCV= cubic-feet 5 Rain barrels volume reduction RCV= cubic-feet Calculate DCV = 6 -TCV -RCV DCV= /<60 cubic-feet B-10 February 2016 Appendix B: Storm Water Pollutant Control Hydrologic Calculations and Sizing Methods WorksheetB.2-1. DCV bM A 3 1 85'h percentile 24-hr storm depth from Figure B.1-1 d= inches 2 Area A= 0. I acres Area weighted runoff factor (estimate using Appendix 0.5"5' 3 B.1.1 and C= unidess 4 Tree wells volume reduction TCV= cubic-feet 5 Rain barrels volume reduction RCV= cubic-feet Calculate DCV = 6 -TCV -RCV DCV= 113 cubic-feet B-10 February 2016 Appendix B: Storm Water Pollutant Control Hydrologic Calculations and Sizing Methods Worksheet B.2-1. DCV 1) f1 " Lf 1 85th percentile 24-hr storm depth from Figure B.1-1 d= 2 Area A= 0. I acres Area weighted runoff factor (estimate using Appendix 0. 5'g 3 B.1.1 and B.2.1 C= unidess 4 Tree wells volume reduction TCV= cubic-feet 5 Rain barrels volume reduction RCV= cubic-feet Calculate DCV = 6 -TCV -RCV DCV= /<60 cubic-feet B-10 February 2016 Appendix B: Storm Water Pollutant Control Hydrologic Calculations and Sizing Methods Worksheet B.2-1. DCV D M A 5"' 1 85th percentile 24-hr storm depth from Figure B.1-1 d= 2 Area A= 0. /'f acres Area weighted runoff factor (estimate using Appendix o.~s-3 B.1.1 and B.2.1 C= unidess 4 Tree wells volume reduction TCV= cubic-feet 5 Rain barrels volume reduction RCV= cubic-feet Calculate DCV = 6 -TCV -RCV DCV= lb9 cubic-feet B-10 February 2016 Appendix B: Storm Water Pollutant Control Hydrologic Calculations and Sizing Methods Worksheet B.2-1. DCV 1 85'h percentile 24-hr storm depth from Figure B.1-1 d= 2 Area A= 0· 11 acres Area weighted runoff factor (estimate using Appendix 0-5"4-3 B.1.1 and B.2. C= unidess 4 Tree wells volume reduction TCV= cubic-feet 5 Rain barrels volume reduction RCV= cubic-feet Calculate DCV = 6 630 XC X d X -TCV -RCV DCV= ;2.01 cubic-feet B-10 February 2016 Appendix B: Storm Water Pollutant Control Hydrologic Calculations and Sizing Methods Worksheet B.2-1. DCV 1 85'h percentile 24-hr storm depth from Figure B.1-1 d= 0. b.;l inches 2 Area A= 0./b acres Area weighted runoff factor (estimate using Appendix 0 ' 5"4 3 B.1.1 and B.2. C= unitless 4 Tree wells volume reduction TCV= p cubic-feet 5 Rain barrels volume reduction RCV= cubic-feet Calculate DCV = 6 630 xCx dx -TCV -RCV DCV= /'17 cubic-feet B-10 February 2016 Appendix B: Storm Water Pollutant Control Hydrologic Calculations and Sizing Methods Worksheet B.2-1. DCV ,1) M A f? 24-hr storm depth from Figure B.l-1 d= 0. 62 inches 2 Area A= O. I acres Area weighted runoff factor (estimate using Appendix o.5tf 3 B.l .l and B.l2. C= unidess 4 Tree wells volume reduction TCV= cubic-feet 5 Rain barrels volume reduction RCV= cubic-feet Calculate D~ = 6 -TCV-RCV DCV= )o<.g cubic-feet B-10 February 2016 Appendix B: Storm Water Pollutant Control Hydrologic Calculations and Sizing Methods Worksheet B.2-1. DCV }) f'1 A 9 1 85'h percentile 24-hr storm depth from Figure B.1-1 d= 0· {p;( inches 2 Area A= O.J,o acres Area weighted runoff factor (estimate using Appendix o. B.1.1 and B.2.1 C= unitless Tree wells volume reduction TCV= cubic-feet RCV= cubic-feet Calculate DCV = -TCV -RCV DCV= 3;l3 cubic-feet B-10 February 2016 Appendix B: Storm Water Pollutant Control Hydrologic Calculations and Sizing Methods Worksheet B.2-1. DCV DMA IV 1 85th percentile 24-hr storm depth from Figure B.1-1 d= 2 Area A= o .;~ acres Area weighted runoff factor (estimate ·using Appendix 0,5"8 3 B.1.1 and B.2.1 C= unidess 4 Tree wells volume reduction TCV= cubic-feet 5 Rain barrels volume reduction RCV= cubic-feet Calculate DCV = 6 -TCV-RCV DCV= 11b cubic-feet ----1 B-10 February 2016 Appendix B: Storm Water Pollutant Control Hydrologic Calculations and Sizing Methods WorksheetB.2-1. DCV bfv/A 11 1 85th percentile 24-hr storm depth from Figure B.1-1 d= o. {:,;z inches 2 Area A= 0. ;<..;.. acres Area weighted runoff factor (estimate using Appendix o.56 3 B.1.1 and B.2. C= unidess 4 Tree wells volume reduction TCV= cubic-feet 5 Rain barrels volume reduction RCV= cubic-feet Calculate DCV = 6 -TCV -RCV DCV= .;2.83 cubic-feet B-10 February 2016 Appendix B: Storm Water Pollutant Control Hydrologic Calculations and Sizing Methods WorksheetB.2-1. DCV 1 85th ercentile 24-hr storm from Figure B.l-1 d= 2 Area A= 0. 33 acres Area weighted runoff factor (estimate using Appendix 0,5'1 3 B.1.1 and C= unitless 4 Tree wells volume reduction TCV= cubic-feet 5 Rain barrels volume reduction RCV= cubic-feet Calculate DCV = 6 -TCV-RCV DCV= 38c2 cubic-feet B-10 February 2016 Appendix B: Storm Water Pollutant Control Hydrologic Calculations and Sizing Methods WorksheetB.2-1. ncvj)M 1?>}4,17, f}f,/12..2..{/S, 1 85th percentile 24-hr storm depth from Figure B.1-1 d= 0·62. inches 2 Area A= 2·10 acres Area weighted runoff factor (estimate using Appendix o·48 3 B.1.1 and B.2 C= unidess 4 Tree wells volume reduction TCV= cP cubic-feet 5 Rain barrels volume reduction RCV= cubic-feet Calculate DCV = 6 630 XC X d X -TCV -RCV DCV= zqrz. cubic-feet B-10 February 2016 Appaadbr 1: Forma aad Checkhta I :. I I I'' I) I l, .l i I ' I • I. (. J ) ( ! ' I,;.! 'I t li. I \ ~ '> I I l ~ I I' I . i ... ....,. I'K&I:Ir Pmdact(p) Pactcc Ca&epy Pacrorllelaiftioa \Veip(w) Vtlae{'f} p•wsv Scii1111111meat m.thoclt 0.25 '2_ 6)·~ Pted=iaaot soilt:atute 0.25 z. -(S)•!) SW:ability SireiQil~ 0.25 '2... f!>·S A Aaaameot Depth to~/~ 0.25 t (!)•2$"' layer - Suitability .AiteMmeot s.Iet.y &eux; s.\ .. ~ t·~.l" Level o£ prrtrestment/ aptc:ted •r.dimeat load& o.s !.. ' B DeliF ~'11~ 0.25 \ (!)•U eomp.ct:ioo cmaoc cor»tmesico o.25 ~ ~~ro Daip Sa!cty Factor, Ss = Ip l' 1> Cn-biocd Safety Ptaor, s~ SAX Sa ~·D6 Oblemcl Infilmdoo Rate, ls:lcll/br, x.-. fd'•3Lt (eottecad !«tea~ bial) Deai&n Infiltmtioo Rate. iA/bt. :K...... = I<ot.nc.l I S... 3 ·8!. ~DII&a . Btiefty descdbe isl&harjon tNt lad~#~ to*' Ioa:r-: Field testing was performed by Soils EnJineer to determine the actual infiltration rate for the site, as attached on the following paaes. Tbree teats were done and the lowest infiltration rate of 10.34 inlbr wu used as above to determine the drawdown. .. Febnwy2016 I \ .. , AppeAdix I: Pomas ud Cheeldiata I '' J it I. f ) I L . ~ 4 ' • I ( : I ) I l· . ,·I:( Jl ! C.: 1 \\ I I' I I I' I ! , • I It Pmdua(p) 6Jiipd. ~ PICtC¥ Catepy Ftca:O.alfdoa 'l'fliabt(w) Vtlae(v) p•wsv SailUMIIIJllmt methcd1 0.25 "2... t!)·~ P.secbnir"Gt IOi1. tature 0.25 '2.. -~·~ Suirab!Uty Site aai1 vu:ia1ility 0.25 z_ (f):r A MsalmeS:It t>cpmro~/~ 0.25 t d>·P.S' lay&r Suitability Atseumen .. Safety F8ctot; SA • ~ t .-.,-:! Le9el of P' euearmeat/ apeetecl . o.s '2. ' •edimalt bda B Deaiso ledw:usa~u~r/~ 0.25 \ (!>;2.6 - Ccmpac:liclo ==a~ 0.25 ~ ~·ro --.-:Daiao Safety Factor. Sa = 1f l' 1.:> Combiaed Safety Fsctoa:, ~ SuSs ~·IJ6 Obsemd In6lt,.rion Rate, il:lch/br, Koi.md tc9·3'-1 (roued'ed for~ biaa) Desip Infilmtioa Rate, ia/hr. I<..,= Koa..vas I 8.o.l 3 ·8!. 9uppodioa Data Bl:iefly describe iafiltretion 181t ACCI pnmde ~ to t..r Iorm.: I~ield testing wu performed by Soils Enpeer to determine the actual infiltration rate for the site, u attached on the following paaes. Three testa were done and the lowest infiltration rate of 10.34 inlhr was used as above to determine the drawdown. .. 1-7 Pebnwy2016 G E 0 H 0 LIsT I c s MULTIDISCIPLINARY GEOSCIENCE & ENGINEERING ENGINEERING GEOLOGY • GEOTECHNICAL ENGINEERING • ENVIRONMENTAL GEOSCIENCE • MATERIALS TESTING /INSPECTION 14602 WILSON STREET • MIDWAY CITY, CALIFORNIA 92655 • PHONE/FAX: 714-891-6635 • E-MAIL: geohollst!cs@yahoo.com RVM Construction, Inc. 1200 Jefferson Street, Suite J Anaheim, CA 92708 ATTENTION: Mr. Ron Vandermooren Project No.: 16-008-02 May 24,2016 SUBJECT: Carlsbad Report of Preliminary Infiltration Rate Testing for Biofiltration Units, Seascape, Tract 05-18, City of Carlsbad, California 92708 REFERENCES: See Appendix A Dear Mr. Vandermooren, Based on your request, our office performed preliminary infiltration rate testing as part of the Water Quality Management Plan (WQMP) for the subject project; Seascape, Carlsbad Tract 05-18, City of Carlsbad, San Diego County, California. Our field procedures, findings, conclusions and recommendations are presented herein. 1. FIELD PROCEDURES: Prior to our infiltration rate testing, we reviewed the City of Carlsbad BMP Design Manual, dated February 16, 2016. After review of this document, we contacted Mr. Jerome Riddle of the City Planning Department for clarification and with questions in relation to our planned field procedures and our general approach. Our field reconnaissance, test pit excavations and presaturation was completed on May 21, 2016. The test pits were excavated to 12 inches square, length and width, and to 12 inches in depth. Our preliminary infiltration tests were completed on May 22, 2016. The locations of our test pits were determined on the basis of limited access. The site is surrounded by chain-link fence with a small opening. Other access requires offsite traverse to gain access and our water supply had to be carried in. The selected, approximate test locations are shown on the attached site plan. Water level is checked and recorded regularly, every inch for a total of 12 inches. In these instances the infiltration rates of presaturated holes was such that the entire volume has infiltrated. The test is repeated two more times in succession and the rate at which the water level falls in the third test is used to calaculate the infiltration rate. Preliminary Infiltration Testing Seascape, Carlsbad Tract 05-18 City of Carlsbad, California 2. FINDINGS: Project No. 15·014-01 May 24, 2016 Page2 Based on our site current reconnaissance, previous site reconnaissance during our Grading Plan Review in May 2014 and on our review of previous geotechnical reports by others, the site soils exposed at the ground surface generally fall into three classifications. They are silty sand and gravel, fine to medium sand, and silty fine sand. Based on our review of available references, (Appendix A) and on our site reconnaissance, the typical site soils fall into the Hydrologic Soil Group A. Preliminary Infiltration Testing: Test Pit No. P-1 Trial No. Start Time (full) End Time (Empty) 1 1:00 1:30 2 1:33 2:47 3 2:47 4:09 Test Pit No. P-2 Trial No. Start Time (Full) End Time (Empty) 1 1:18 1:53 2 1:53 2:29 3 2:30 3:19 Test Pit No. P-3 Trial No. Start Time (Full) End Time (Empty) 1 12:54 1:21 2 1:22 2:02 3 2:05 3:25 Infiltration Rate Summary Test Pit No. Trial No. Infiltration rate (inches/ hour) P-1 3 12/1.16 P-2 3 12/0.82 P-3 3 12/0.50 Preliminary Infiltration Testing Seascape, Carlsbad Tract 05-18 City of Carlsbad, California 3. CONCLUSIONS AND RECOMMENDATIONS 3.1 General Project No. 15-014-01 May 24,2016 Page2 These sets of infiltration rate data which would be used to reduce storm water runoff should be considered preliminary and are only intended to satisfy WQMP requirements in order to obtain a grading permit. The infiltration rate assessment method testing was appropriate for a staged approach of preliminary testing which should be followed by additional location specific infiltration rate testing. Additional infiltration rate testing should be competed near the completion of precise grading when actual conditions representative of the site soils at the known locations of future planned bioswales I biofiltration units are exposed. 3.2 Observations and Testing (a) All grading and construction activities during precise grading and post grading earthwork should be continuously monitored and observed by the Engineering Geologist, Geotechnical Engineer or his representative. A representative of this office should observe all biofiltration swale I biofiltration unit bottoms prior to placement of select manufactured bioswale mix or engineered fill. (b) All future site specific infiltration rate assessment testing for bioswales and biofiltration units on-site should be observed and tested as required, by a representative of the Engineering Geologist or Geotechnical Engineer to verify conformance with the intent of the geotechnical recommendations provided herein, those shown on the approved plans and to evaluate the acceptability of these recommendations for the actual site conditions, and sizing of the bioswales I bioretention units .. 4.0 LIMITATIONS (a) Our investigation was performed in accordance with the usual and current standards of the profession, as they relate to this and similar localities. No other warranty, expressed or implied, is provided as to the conclusions and professional advice presented in this report. (b) As in most projects, conditions revealed during construction excavation may be at variance with preliminary findings. If this occurs, the changed conditions must be evaluated by the Project Geotechnical Consultant and the Geologist, and revised recommendations be provided as required. Preliminary Infiltration Testing Seascape, Carlsbad Tract 05-18 City of Carlsbad, California Project No. 15-014-01 • May 24, 2016 Page2 (c) This report is issued with the understanding that it is the responsibility of the Owner, or of his representative, to ensure that the information and recommendations contained herein are brought to the attention of the Architect and Engineer for the project and incorporated into the plans, and that the properly Licensed Contractor and Subcontractors implement such recommendations in the field. (d) This firm does not practice or consult in the field of safety engineering. We do not direct the Contractor's operations, and we are not responsible for other than our own personnel on the site; therefore, the safety of others is the responsibility of the Contractor. The Contractor should notify the Owner if any of the recommended actions presented herein are considered to be unsafe. (e) The findings of this report are considered valid as of the present date. However, changes in the conditions of a site can occur with the passage of time, whether they are due to natural events or to human activities on this or adjacent sites. In addition, changes in applicable or appropriate codes and standards may occur, whether they result from legislation or the broadening of knowledge. (f) Accordingly, this report may become invalidated wholly or partially by changes outside our control. Therefore, this report is subject to review and revision as changed conditions are identified. It is a pleasure being associated with you on this project If you have any questions, or if we may be of further assistance, please do not hesitate to contact our office. Very truly, GEOHOLISTICS Jeff Schymanietz, PG, CEG Principal Engineering Geologist C.E.G. 2304 Expires 7/31/17 _ Attachments: Preliminary Infiltration Test Location Plan Distribution: Addressee-(1 copy -electronic) Preliminary Infiltration Testing Seascape, Carlsbad Tract 05-18 City of Carlsbad, California APPENDIX A REFERENCES Project No. 15-014-01 May 24, 2016 ·Page 2 Civcom & Associates, Grading Plans for Seascape Tract 05-18, Sheets 1 of 3 through 3 of 3 and of the Improvement plans for Carlsbad Tract CT 05-18, scale: 1 inch = 40 feet, stamp dated July 18, 2016 prepared by Civcom & Associates and Improvement Plans, Sheets S-1 through S-5. City of Carlsbad, BMP Design Manual, dated February 16, 2016. Geoholistics, Geotechnical Report Update and Grading Plan Review Grading and Improvement Plans for Seascape Carlsbad Tract 05-18, City of Carlsbad, California, dated April 28, 2015. Leighton and Associates, Preliminary Geotechnical Investigation, Proposed Residential Subdivision, Northeast of Avena Court and Black Rail Road, APN's 21504009 and 215040011, Carlsbad, California, dated September 29, 2004. Orange County Technical Guidance Document, for the preparation of conceptual preliminary and /or project water quality management plans, (WQMP's). USDA, Natural Resources Conservation Group, National Engineering Handbook, Part 630 Hydrology. I I I 0 -1'P-3 Storm Water Quality Management Plan (SWQMP) Seascape ATTACHMENT 1c HARVEST AND USE FEASIBILITY SCREENING CHECKLIST 39 Appendix 1: Forms and Checklists apply) at the project site that is reliably present during the wet season? 0 Toilet and urinal flushing Ill Landscape irrigation 0 Other: ____ _ 2. there is a demand; estimate the ant1e1pated average wet season over a of 36 hours. for planning level demand calculations for toilet/urinal flushing and landscape irrigation is provided in Section B.3.2. !.Provide a summary of calculations here] DMA1 Moderate planned water use • 1,470 gallons, Landscape area= 0.09 acre, Demand= 134 gallons= 17.39 cu ft 3. Calculate the DCV using worksheet B.2-1. DCV = 256 (cubic feet) 3a. Is greater than or equal to the DCV? 0 Yes I EINo c:} ~ Harvest and use appears to feasible. Conduct more detlliled evaluation and sizing calculations to confirm that DCV can be used at an adequate rate to meet drawdown criteria. 3b. Is the 36 0 Yes .lJ. and use may be feasible. Conduct tnore detailed evaluation and sizing calculations to determine feasibility. Harvest and use may only be able to be used for a portion of the site, or (optionally) the storage may need to be upsized to meet long term capture targets while · · than 36 hours. Is harvest and use feasible based on further evaluation? D Yes, refer to Appendix E to select and size harvest and use BMPs. EJ No, select alternate BMPs. 1-2 Is the 36 hour demand less than 0.25DCV? El Yes .0. use 1S considered to be infeasible. February 2016 Appendix I: Forms and Checklists 1. Is there a demand for harvested water (check all that apply) at the project site that is reliably present during the wet season? 0 Toilet and urinal flushing Ill Landscape irrigation 0 Other:. ____ _ 2. If there is a demand; estimate the anticipated average wet season demand over a period of 36 hours. \,;J~lualLlo..t: for planning level demand calculations for toilet/urinal flushing and landscape irrigation is provided in Section B.3.2. [Provide a summary of calculations here] DMA2 Moderate planned water use= 1,470 gallons, Landscape area= 0.08 acre, Demand •120 gallons= 16.13 cu ft 3. '-'i:&JLI.UJLalC DCV = _2e_o ___ (cubic feet) 3a. Is the 36 hour demand greater than or equal to the DCV? 0 Yes I ElNo c:> ~ Harvest use appears to fe:~.sible. Conduct more detailed evaluation and sizing calculations to confirm that DCV can be used at an adequate rate to meet drawdown criteria. .2-1. 3b. Is the 36 greater than 0.25DCV but less than the full DCV? 0 Yes I El No c::> ~ use may be fewble. Conduct more detailed evaluation and sizing calculations to determine feasibility. Harvest and use may only be able to be used for a portion of the site, or (optionally) the storage may need to be up sized to meet long term capture targets while than 36 hours. Is harvest and use feasible based on further evaluation? 0 Yes, refer to Appendix E to select and size harvest and u5e BMPs. El No, select alternate BMPs. 3c. Is the 36 hour demand less than 0.25DCV? El Yes ~ Harvest and use is considered to be infeasible. February 2016 Appendix 1: Forms and Checklists the wet season? 0 Toilet and urinal flushing Ill Landscape irrigation 0 Other: ____ _ 2. there is a demand; estimate the anticipated average wet season demand over a of 36 hours. Guidance for planning level demand calculations for toilet/urinal flushing and landscape irrigation is provided in Section B.3.2. [Provide a S\lOlmai}' of calculations here] DMA3 Moderate planned water use= 1,470 gallons, Landscape area= 0.09 acre, Demand= 128 gallons= 17.12 cu ft DCV = _25_5 ___ (cubic feet) 3a.Is greater 3b. than or equal to the DCV? 0 Yes I EINo ~ .JJ 0 Yes JJ Is the 36 hour demand less than 0.25DCV? 8 Yes .0. Harvest use appears to use may use lS feasible. Conduct more detailed evaluation and sizing calculations to confirm that DCV can be used at an adequate rate to meet drawdown criteria. Conduct more detailed evaluation and considered to be infeasible. sizing calculations to determine feasibility. HatVest and use may only be able to be used for a portion of the site, or (optionally) the storage may need to be upsized to meet long term capture targets while than 36 hours. Is harvest and use feasible based on further evaluation? 0 Yes, refer to Appendix E to select and size harvest and use BMPs. El No, select alternate BMPs. 1-2 February 2016 I I Appendix 1: Forms and Checklists 1. Is there a demand for harvested water (check all that apply) at the project site that is reliably present the wet season? 0 Toilet and urinal flushing Ill Landscape irrigation 0 Other:. ____ _ 2. If there is a estunate average wet season demand over a period of 36 hours. Guidance for planning level demand calculations for toilet/urinal flushing and landscape irrigation is provided in Section B.3.2. [Provide a summary of calculations here] DMA4 Moderate planned water use • 1,470 gallons, Landscape area= 0.08 acre, Demand= 121 gallons= 16.17 cu ft 3. Calculate DCV = _28_1 ___ (cubic feet) 3a. Is the 36 greater than or equal to the DCV? 0 Yes I E)No c:::> JJ Harvest and use appears to be feasible. Conduct more detailed evaluation and sizing calculations to confirm that DCV can be used at an adequate rate to meet drawdown criteria. 1. 3b. Is the greater than 0.25DCV but less than the full DCV? 0 Yes I E1 No r::::> ~ Harvest Conduct =ore deta.iled evaluation and sizing calculations to determine feasibility. Harvest and use may only be able to be used for a portion of the site, or (optionally) the storage may need to be up sized to meet long term capture targets while than 36 hours. Is harvest and use feasible based on further evaluation? 0 Yes, refer to Appendix E to select and size harvest and use BMPs. EJ No, select alternate BMPs. 1-2 Is the 36 hour demand less than 0.25DCV? El Yes a Harvest use 1s considered to be infea&ble. February 2016 Appendix 1: Forms and Checklists 1. Is there a demand for huvested water (check all that apply) at the project site that is reliably present during the wet season? 0 Toilet and urinal flushing Ill Landscape irrigation 0 Other: ____ _ 2. If there is a demand; estimate the average wet season demand over a period of 36 hours. Guidance for planning level demand calculations for toiletlw:inal flushing and landscape irrigation is provided in Section B.3.2. [Provide a summary of calculations here] DMA5 Moderate planned water use = 1,470 gallons, Landscape area = 0.09 acre, Demand = 130 gallons = 17.40 cu ft 3. the DCV using worksheet B.2-1. DCV = 250 (cubic feet) 3a. Is the 36 hour demand greater than or equal to the DCV? 0 Yes I 0No c:::> ~ Harvest and use appears to feasible. Conduct more detailed evaluation and sizing calculations to confirm that DCV can be used at an adequate rate to meet drawdown criteria. 3b. Is the 36 hour demand greater than 0.25DCV but less than the full DCV? 0 Yes I El No c:::> ~ Harvest Conduct more debl.i.led evAluation and sizing calculations to determine feasibility. Harvest and use may only be able to be used for a portion of the site, or (optionally) the storage may need to be upsized to meet long term capture targets while · than 36 hours. Is harvest and use feasible based on further evaluation? 0 Yes, refer to Appendix E to select and size huvest and use BMPs. El No, select alternate BMPs. 3c. Is the 36 hour demand less than 0.25DCV? 8 Yes .0. use 1S considered to be infeaeible. February 2016 Appendix 1: Forms and Checklists 1. Is there a demand for harvested water (check all that apply) at the project site that is reliably present during the wet season? 0 Toilet and urinal flushing Ill Landscape irrigation 0 Other:. ____ _ 2. If there is a average wet season over a penod of 36 hours. Guidance for planning level demand calculations for toilet/urinal flushing and landscape irrigation is provided in Section B.3.2. [Provide a summary of calculations here] DMA6 Moderate planned water use = 1 ,470 gallons, Landscape area = 0.11 acre, Demand z 164 gallons = 21.99 cu ft 3. Calculate the DCV = _3o_3 ___ (cubic feet) 3a. Is the 36 hour demand greater than or equal to the DCV? 0 Yes I 8No .::::> ~ Harvest and use appears to be feasible. Conduct more detailed evaluation and sizing calculations to confirm that DCV can be used at an adequate rate to meet drawdown criteria. 3b. Is the 36 hour demand greater 0.25DCV but less than the full DCV? 0 Yes I E1 No .:::> ~ Harvest use may Conduct more detailed evaluation and sizing calculations to determine feasibility. Harvest and use may only be able to be used for a portion of the site, or ( optio.nally) the storage may need to be upsized to meet long term capture targets while than 36 hours. Is harvest and use feasible based on further evaluation? 0 Yes, refer to Appendix E to select and size harvest and use BMPs. El No, select alternate BMPs. 1-2 3c. Is the hour demand less than 0.25DCV? Ia Yes a use 15 considered to be infeasible. February 2016 I I I the wet season? 0 Toilet and urinal flushing Ill Landscape irrigation 0 Other: ____ _ Appendix 1: Forms and Checklists 2. If there is a demand; estimate the anticipated average wet season demand over a period of 36 hours. Guidance for planning level demand calculations for toilet/urinal flushing and landscape irrigation is provided in Section B.3.2. [Provide a summary of calculations here] DMA7 Moderate planned water use= 1,470 gallons, Landscape area= 0.11 acre, Demand= 154 gallons= 20.69 cu ft 3. Calculate DCV = _2s_s ___ (cubic feet) 3a. Is the 36 hour demand greater than or equal to the DCV? 0 Yes I 8No t::> ~ Harvest and use appears to be feasible. Conduct more detailed evaluation and sizing calculations to confirm that DCV can be used at an adequate rate to meet drawdown criteria. 3b. Is the 36 hour demand greater than 0.25DCV but less than the full DCV? 0 Yes I E1 No .::::> ~ Harvest and use may be feasible. Conduct more detlilled evaluation and sizing calculations to dete.r:mine feasibility. Harvest and use may only be able to be used for a portion of the site, or (optionally) the storage may need to be upsized to meet long term capture taLgets while than 36 hours. Is harvest and use feasible based on further evaluation? 0 Yes, refer to Appendix E to select and size harvest and use BM.Ps. El No, select alternate BMPs. 1-2 3c. Is the 36 hour demand less than 0.25DCV? Ia Yes .(), H~1rvl"!~t and use is considered to be infeasible. February 2016 I I \ Appendix I: Forms and Checklists the wet season? 0 Toilet and urinal flushing Ill Landscape irrigation 0 Other: ____ _ 2. If there is a demand; estimate anticipated average wet season over a period of 36 hours. Guidance for planning level demand calculations for toilet/urinal flushing and landscape irrigation is provided in Section B.3.2. [Provide a summary of calculations here] DMA8 Moderate planned water use • 1,470 gallons, Landscape area= 0.12 acre, Demand = 179 gallons • 23.94 cu ft 3. '-'"'''-UJ"'~c usmg DCV = _33_7 ___ (cubic feet) 3a. Is greater than or equal to the DCV? 0 Yes I E]No c:::> ~ Harvest and use appears to be feasible. Conduct more detailed evaluation and sizing calculations to confirm that DCV can be used at an adequate rate to meet drawdown criteria. c1etnanLc1 greater than 0.25DCV but less than the full DCV? 0 Yes I E1 No t:::> ~ H~'rv""~t and use may Conduct more dctailc;d evaluation and sizing calculations to determine feasibility. Harvest and use may only be able to be used for a portion of the site, or (optionally) the storage may need to be upsized to meet long term capture targets while · than 36 hours. Is harvest and use feasible based on further evaluation? 0 Yes, refer to Appendix E to select and size harvest and use BMPs. El No, select alternate BMPs. 1-2 3c. Is the 36 hour demand less than 0.25DCV? El Yes ~ and use is considered to be infeasible. February 2016 Appendix 1: Forms and Checklists harvested water (check all that apply) at the project site that is reliably present the wet season? 0 Toilet and urinal flushlng Ill Landscape irrigation 0 Other: ____ _ 2. If there is a average wet season over a hours. Guidance for planning level demand calculations for toilet/urinal flushing and landscape irrigation is provided in Section B.3.2. [Provide a summary of calculations here] DMA9 Moderate planned water use = 1.470 gallons, Landscape area = 0.22 acre, Demand : 327 gallons = 43.83 cu ft 3. Calculate the DCV using B.2-1. DCV = 435 (cubic feet) 3a. Is the 36 hour demand greateJ: than or equal to the DCV? 0 Yes I 8No t::> ~ use appears to feasible. Conduct more detlilled evaluation and sizing calculations to confirm that DCV can be used at an adequate rate to meet drawdown criteria. 3b. Is the 36 hour demand greater than 0.25DCV but less than the full DCV? 0 Yes I 121 No c::> ~ use may Conduct more detailed evaluation and sizing calculations to detennine feasibility. Harvest and use may only be able to be used for a portion of the site, or (optionally) the storage may need to be up sized to meet long term capture targets while than 36 hours. Is harvest and use feasible based on further evaluation? 0 Yes, refer to Appendix E to select and size harvest and use BMPs. El No, select alternate BMPs. 1-2 3c. Is the 36 hour less than 0.25DCV? El Yes .(), use is considered to be infeasible. February 2016 I I \ Appendix 1: Forms and Checklists 1. Is there a demand for harvested water (check all that apply) at the project site that is reliably present during the wet season? 0 Toilet and urinal flushing Ill Landscape irrigation 0 Other: ____ _ 2. If there lS a estlmate average wet season demand over a period of 36 for planning level demand calculations for toilet/urinal flushing and landscape irrigation is provided in Section B.3.2. [Provide a summary of calculations here] DMA10 Moderate planned water use'"' 1,470 gallons, Landscape area= 0.09 acre. Demand= 132 gallons= 17.64 cu ft 3. Calculate usmg DCV = ..,..2e_o ___ (cubic feet) 3a. Is the 36 hour demand greater than or equal to the DCV? 0 Yes I 8No c::> ~ Harvest use appears to feasible. Conduct more detailed evaluation and sizing calculations to confirm that DCV can be used at an adequate rate to meet drawdown criteria. det.ruuJtd greater than 0.2SDCV but less than the full DCV? D Yes I El No t:::> ~ use may Conduct more det!Wed evaluation and sizing calculations to determine feasibility. Harvest and use may only be able to be used for a portion of the site, or (optionally) the storage may need to be upsized to meet long term capture targets while than 36 hours. Is harvest and use feasible based on further evaluation? D Yes, refer to Appendbc E to select and size harvest and use B:MPs. El No, select alternate BMPs. I-2 Is the 36 hour demand less than 0.2SDCV? El Yes :0. ..,,.,rv,.," and use is considered to be infeasible. February 2016 I I I \ Appendix I: Forms and Checklists the wet season? 0 Toilet and urinal flushing Ill Landscape irrigation 0 Other:. ____ _ 2. If there is a demand; estimate the anticipated average wet season over a penod of 36 hours. Guidance for planning level demand calculations for toilet/urinal flushing and landscape irrigation is provided in Section B.3.2. [Provide a summary of calculations here] DMA 11 ~oderate planned water use= 1,470 gallons, Landscape area= 0.14 acre, Demand= 202 gallons .. 27.01 cu8 3. Calculate the DCV using worksheet B.2-1. DCV = 430 (cubic feet) 3a. Is the 36 hour demand greater thaJl or equal to the DCV? 0 Yes I 8No c::> ~ Harvest and use appears to be feasible. Conduct more detailed evaluation and sJ.zing calculations to confirm that DCV can be used at an adequate rate to meet drawdown criteria. 3b. Is the 36 greater 0.25DCV but less than the full DCV? 0 Yes I E1 No c> ~ Harvest Conduct more detailed c:valuation and sJ.zing calculations to determine feasibility. Harvest as1d use may only be able to be used for a portion of the site, or (optionally) the storage may need to be upsized to meet long term capture targets while thaJl 36 hours. Is harvest and use feasible based on further evaluation? 0 Yes, refer to Appendix E to select and size harvest and use BMPs. El No, select alternate BMPs. 1-2 36 hour demand less than 0.25DCV? El Yes ~ use is considered to be infeasible. February 2016 Appendix I: Forms and Checklists the wet season? 0 Toilet and urinal flushing Ill Landscape irrigation 0 Other:. ____ _ 2. If there is a demand; estimate anticipated average wet season demand over a period of 36 hours. '-7~.LY"•"'-'"' for planning level demand calculations for toilet/urinal flushing and landscape irrigation is provided in Section B.3.2. [Provide a summary of calculations here] DMA12 Moderate planned water use= 1,470 gallons, Landscape area= 0.23 acre, Demand= 337 gallons= 45.18 cu ft 3. Calculate the DCV using worksheet B.2-1. DCV = _54_a ___ (cubic feet) 3a. Is the 36 hour demand greater than or equal to the DCV? 0 Yes I 8No t::::> {1. Harvest and use appears to be feasible. Conduct more detalled evaluation and sizing calculations to confirm that DCV can be used at an adequate rate to meet drawdown criteria. 3b. Is the 36 hour demand greater than 0.25DCV but less than the full DCV? 0 Yes I El No c:::> ~ and use may be ~'"'~>J..U~o;:;. Conduct more detailed evaluation and sizing calculations to determine feasibility. Harvest and use may only be able to be used for a portion of the site, or (optionally) the storage may need to be upsized to meet long term capture targets while than 36 hours. Is harvest and use feasible based on further evaluation? 0 Yes, refer to Appendix E to select and size harvest and use BMPs. El No, select alternate BMPs. 1-2 3c. Is the 36 hour demand less than 0.25DCV? El Yes ~ and use is considered to be infeasible. February 2016 Storm Water Quality Management Plan (SWQMP) Seascape ATTACHMENT1d CATEGORIZATION OF INFILTRATION FEASIBILITYCONDITION 40 Appendix I: Forms and Che~klisus Part 1 -Full lnfikration FcaailzilU)r Sqecpjp&' Ccit.aia Would Wihration of the fuD cleap volume be fcaaible from a phyaical petapec:tive without aoy uacleakable consequences that cannot be reaaooably mitigated? Criteria Screening Question II the eatimated teliable illfiltration rate below proposed facility locatiou ~tet than 0.5 inches pet hoUt? The ruponse to this Screening Question shall be based on a comprehensive evaluation of the factots presented in Appendix C.2 and Appendix D. Provide basis: "' -------~ ------r-·•,.·-·•- Onsite Infiltration rate testing was performed. See Geotechnical report included Yet No Summarize findings of studies; provide reference to studies, calculations, maps, data sources, etc. Provide nanative discussion of study/data source applicability . 2 .. Can infiltration greater thaQ 0.5 inches pet hour be allowed without incteasing riak of geotecluJical hazatds (slope stability, groundwater mounding, utilities, ot other facton) that cannot be mitigated to an acceptable level? The response to this Screening Question shall be based on a comprehensive evaluation of the factors presented in Appendix C.2. Provide basis: There are no natural slopes or existing utilities In the vicinity that will have any Impact. Summarize findings of studies; provide refe.l:ence to studies, calculations, maps, data sources, etc. Provide narrative discussion of study/data source applicability. February 2016 Appendix 1: Forms and Checklists Criteri a 3 - Screening Question Can iafil1:ratioJl great~ thaD 0.5 inches per hour be allowed without increasiDg mk of grotUldwater contamination (•hallow water table, storm wate.r poOutants o.r other facto111) that cannot be mitigated to an acceptable level? The te$ponse to this Screening Question shall be based on a comprehensive evaluation of the factors pre$ented in Appendix C.3. Yes Provide basis: ._,.. ,.. ------ There was no evidence of ground water during soil testing. Tests were done to a depth of 13'. The site is on high ground. No Summarize findings of studie$; provide reference to studies, calculations, maps, data sources, etc. Provide narrative discussion of study I data source applicability. 4 Can infilttation peatet 1baA 0.5 inches per hour be allowed without causing potential water balance issues such as change of seasonality of ephemeral streams o.r increased discharge of contaminated groundwater to surface waters? The response to this Screening Queation 11hall be based on a comprehensive evaluation of the factors presented in Appendi.x C.3. Provide basis: The site is small parcel and has insignificant or no impact on any streams or has any impact on ground water. Summarize findings of studies; provide reference to studies, calculations, maps, data sources, etc. Provide narrative discussion of study I data source applicability. Pa.rtl Result * If all answers to rows 1 -4 are "Yes" a full infiltration design is potentially feasible. The feasibility screening category is Full Jo61wation If any answer from row 1-4 is "No", infiltration may be possible to some extent but would not generally be feasible or desirable to achieve a "full infiltration" design. Proceed to Part 2 *To be completed ustng gathered stte mfonnatton and best profesSional Judgment conS!dettng the definition of MEP 10 the MS4 Pennit. Additional testing and/ or studies may be required by the City to substantiate findings. February 2016 Appendix I: Forms and Checklists Would infiltration of water in aoy appreciable amouot be phyaiclilly feasible whhout aoy negative coosequences that cannot be 1easonably mitigated? Criteria 5 Screening Question Do soil aoci geologic cooclitioos allow for infiltration io aoy appreciable rate or vo}U11).e? The response to this Screening Question shall be based on a comprehensive evaluation of the factors presented iP Appendix C.2 and Appendix D. Provide basis: Yes No Summarize findings of studies; provide reference to studies, calculations, maps, data sources, etc. Provide narrative discussion of study I data source applicability and why it was not feasible to mitigate low infiltration rates. 6 Cao lnfiltratioo io aoy appreciable quantity be allowed without increasing risk of geotechnical huards (slope stability, groundwater mouodiog, utilities, or other factors) that cannot be Dlitigated to ao acceptable level? The response to this Screening Question shall be based on a comprehensive evaluation of the factors presented in .Appendix C.2. Provide basis: Summarize findings of studies; provide reference to studjes, calculations, maps, data sources, etc. Provide narrative discussion of study I data source applicability and why it was not feasible to mitigate low infiltration rates. 1-5 February 2016 Appendix I: Fonns and Checklists Criteria 7 Screening Question Can Infiltration in any appreciable quantity be allowed without posing significant risk for groundwater related concerns (shallow water table, storm water pollutants or other factors)? The response to this Screening Question shall be based on a comprehensive evaluation of the factots presented in Appendix C.3. Provide basis: Yes No Summarize findings of studies; provide reference to studies, calculations, maps, data sources, etc. Provide narrative discussion of study I data source applicability and why it was not feasible to mitigate low infiltration rates. 8 Can infiltration be allowed without violating downstream water rights? The .response to this Screening Question shall be based on a comprehensive evaluation of the factors presented in Appendix C.3. Provide basis: Summarize findings of studies; provide reference to studies, calculations, maps, data sources, etc. Provide narrative discussion of study I data source applicability and why it was not feasible to mitigate low infiltration rates. Part2 Result* If all answers from row 5-8 are yes then partial infiltration design is potentially feasible. The feasibility screening category is Partial Infiltration. If any answer from row 5-8 is no, then infiltration of any volume is considered to be infeasible within the drainage area. The feasibility screening category is No Infiltration. *To be completed usmg gathered s1te mfo.nnatton and best professtonal Judgment consJ.denng the definition of MEP 1n the MS4 Permit. Additional testip.g and/or studies may be requifed by the City to substantiate findings. 1-6 February 2016 POLLUTANT CONTROL BMPS Storm Water Quality Management Plan (SWQMP) Seascape ATTACHMENT 1e 41 Storm Water Quality Management Plan (SWQMP) Seascape ATTACHMENT 2 BACKUP FOR PDP HYDROMODIFICATION CONTROL MEASURES Indicate which Items are Included behind this cover sheet: Attachment Contents Checklist Sequence Attachment 2a Hydromodification Management ~Included Exhibit (Required) Attachment 2b Management of Critical Coarse ~ Exhibit showing project drainage Sediment Yield Areas (WMAA Exhibit boundaries marked on WMAA is required, additional analyses are Critical Coarse Sediment Yield optional) Area Map See attached CCSY A Attachment 2c Geomorphic Assessment of Receiving ~ Not performed Channels (Optional) D Included Attachment 2d Flow Control Facility Design and ~ Included Structural BMP Drawdown Calculations (Required) The Hydromodification Management Exhibit includes the following: IZI Underlying hydrologic soil group IZI Approximate depth to groundwater ~ Existing natural hydrologic features (watercourses, seeps, springs, wetlands) IZI Critical coarse sediment yield areas to be protected (if present) IZI Existing topography IZI Existing and proposed site drainage network and connections to drainage offsite IZI Proposed grading ~ Proposed impervious features IZI Proposed design features and surface treatments used to minimize imperviousness IZI Point(s) of Compliance (POC) for Hydromodification Management IZI Existing and proposed drainage boundary and drainage area to each POC (when necessary, create separate exhibits for pre-development and post-project conditions) ~ Structural BMPs for hydromodification management (identify location, type of BMP, and size/detail) 42 SEASCAPE CT 05-18 SWMP NO. 12-09 HYDROMODIFICATION AREAS DMAid DESCRIP AREASQ FT C** AC 85TH DCV*** TION INCHES CU.FT. DCV REQUIRED FOR ONSITE dma13 Surf Crest 6,100 0.90 5,490 0.62 284 dma14 Surf Crest 6,200 0.90 5,580 0.62 288 dma15 Peregrine 7,680 0.90 6,912 0.62 357 dma16 Peregrine 8,980 0.90 8,082 0.62 418 dma17 SDG&E 32,130 0.30 9,639 0.62 498 TOTAL REQUIRED 1,845 DCV PROVIDED WITH OFFSITE AREA 5,566 ***Design Capture Volume-cu. ft. NOTES: UNDERLYING HYDROLOGIC SOIL GROUP = C APPROXIMATE DEPTH TO GROUNDWATER· >15 FT EXISTING NATURAL HYDROLOGIC FEATURES : NONE CRITICAL COARSE SEDIMENT YIELD AREAS TO BE PROTECTED: NONE EXISTING TOPOGRAPHY : SHOWN EXISTING/PROPOSED SITE DRAINAGE 8c CONNECTIONS TO DRAINAGE OFFSITE :SHOWN PROPOSED GRADING : SHOWN I PROPOSED IMPERVIOUS FEATURES : SHOWN AREA A1·9,068 SF PROPOSED DESIGN FEATURES AND SURFACE TREATMENTS USED TO MINIMIZE IMPERVIOUSNESS POINTS OF COMPLIANCE <POC> FOR HYDROMODIFICATION MANAGEMENT EXISTING AND PROPOSED DRAINAGE BOUNDARY AND DRAINAGE AREA TO EACH POC STRUCTURAL BMP's FOR HYDROMODIFICATION MANAGEMENT : SHOWN ON BMP EXHIBIT ' I 'I I ' ' :II :I . ' " I " " ,' " " I " I I :I :I :I :I :I n :I :I I 1 dma6 I I 0 :I ~· I I ,,_.,....,\ dma5 3: II I II I I II I I II I I I I / I / I --I II I I II I I II ' I ' \ I II I I II I I II I I II \ I I dma4 dma7 dma3 II II dma8 ~ II 0 ~i 0:: dma2 -' II <;: 0:: I II :.:: I II ~ I I II -' I Ill I II I dma9 I II I I II I I II I I II I I I I I I I 0 I I I .<:· --- I I II I ~Ill : Ill : II i II I : II I I Ill I I II 14 I I I I ' ' --------\\ \ ·( ~-= I; \\ a ,0~-------~ I; :11/ ( "' ' \ \ :rt 1 \ ' m r 1 I I :Ill I I w II I I :111 I I I II •II I II I I I 40 20 0 40 It (( n u I I I \ 80 AREA A2-3, 720 -· I I EX. HOUSE I -A3r4.557 SF ~.,_ --.,_ _____ r-- 1-w 0:: 0:: 1-en 1-en w ~! ::::> en "<!-,.... 0 E "'0 BMP NOTES 1. THESE 1M'S ARE MANDATORY TO BE INSTALLED PER MANIIFACTURE:RS RECOMIIENOATIONS OR THESE PLANS. dma11 ----- dma12 2. NO CHANGES TO THE PROPOSED BMPS ON THIS SHEET WITHOUT PRIOR FROIA THE CITY ENGINEER. 3. NO SU8STITUTIONS TO THE MATERIAL OR TYPES OR PLANTING TYPES WITHOUT PRIOR APPROVAL OF THE CITY ENGINEER. 4. NO OCCUPANCY WU BE GRANTED UNTIL THE CITY INSPECTOR STAFF HAS INSPECTED THE PROJECT FOR APPROPRIATE liMP CONSTRUCTION AND INSTALLATION. 5. MAM'ENANCE WILL BE TRANSFERRED FROM SEASCAPE DEVELOPMENTS LLC TO THE HOMEOWNERS ASSOCIATION ONCE HOA IS FORMED. 120 -- CIVCOM & ASSOCIATES 6540 Lusk Blvd. Suit-e C\35 San Diego, Callfornla 92121 <858) 658-9400 Fax: (858) 658-9420 - - GRAPHIC SCALE 1"• 40' I " " ONSITE AREA DMA 15, 16 BMP TABLE 51,733 SF 16,660 SF BM' BM' TYPE SYIIIOL HYOROMODIFICATION 8< TREATMENT CONTROL BF-3 4 475-7 lt.F-1 12 475-7 H*IUIU. y NftJIU. y lt.F-1 475-7 RNJALLY Nfti!JU.Y INF·1 12 475-7 NONUALLY N'NIHJ.Y INF-1 ... 75·7 ~HJ.Y N'NJHJ.Y SD-13 5 475-7 Alf<UALLY loHNU.OU.Y SO-tO 475-7L ALL SHEETS .IHIIJ.OU.Y ANNU.ou.Y SWMr NO. 12-o9 3 60o40 148 PVT PARTY RESPONS18LE FOR MAINTENANCE ROGER BHATIA 4 8024 148 PVT 6540 LUSK Ill. VD. SUITE C135 SAN DEGO, CA 92121 5 800~ 148 PVT PHONE• 858-658-9400• PLAN PREPARED BY' 6 7465 166 PVT CIVCOM l ASSOCIATES 7 7054 PVT 6540 LUSK BLVD. SUITE C135 SAN DIEGO, CA 92121 8 8171 209 PVT PHONE• 858-658-9400 CERTIFICATION • RCE 51348 9 13106 C>73 PVT 10 6581 166 PVT 11 9710 227 PVT 14444 327 PVT 6100 HOA 327 HOA HOA HOA FILTERRA HOA • FOR MORE N'ORWATilN REFER TO SEASCAPE DEVELOPMENTS LLC STORY WATER QUHJTY tUHAGEMENT PLJH 12-o9 " " ~IN F I L T ~R AT 10 i " TYP. SEC. -INFIL TRAT"'~' f"l:"l I /TCI:"~If"U " " HYDROMODIFICATION MANAGEMENT PLAN SHEET CITY OF CARLSBAD I SHEETS I ENGINEERING DEPARTMENT GRADING PLAN FOR: SEASCAPE APPROVED: JASON S. GELDERT ~---4-----+----------------------------------r-~-----r---i~C~IT#,Y~E~N~G=IN~E~ER==~==~P~E~6~3~9~12~E=XP~.~9=-3=0~-~16~~D~AT~E~ 1-::;-;-:;:;~----;=-:;:;;;-;;-f----------------------------------t=;:;-i--;:;-AT;;TT.ii-i'i'Aii OWN BY•.,2AN~-PROJECT NO. DRAWING NO. DATE INITIAL REVISION DESCRIPTION SHT. DATE INITIAL CHKD BY•--CT 05-18 ENGINEER OF WORK NO. CITY APPROV AI.. RVWD BY• = 0 w Site Level Exhibit Critical Coarse Sediment Yield Areas -Regional WMAA Streams Watershed Boundaries Q Municipal Boundaries -Rivers & Streams Potential Critical Coarse Sediment Yield Areas Potential Critical Coarse Sediment Yield Areas Regional San Diego County Watersheds Geosyntec I> Exhibit Date: Sept. 8, 2014 cmtst~tants I -"'1'-? • ~ , .. ~ '"::::-_,.... I I '· I I I Stormwater Bioretentlon iltration System Copyright o 2011 by Filterra Bioretention Systems, a division of Americast, Inc. WesTERN ZoNE (CA, NV, AZ, HI) Engineering Design Assistance Kit (DAKit) v01 a by KRISTAR (800) 579-8819 {800) 579·8819 (707) 524-8186 (909) 790-5239 info@lkristar.com www.kristar.com KriStar Engineering KriStar Sales KriStar Fax Regulatory Support E-mail Web Product Information www.filterra.com 08/2011 6 filterra Filterra® Overview Stormwater Bioretention Filtration System Remove Pollutants and Comply with NPPES Save valuable space with small footprint for urban sites Improve BMP aesthetics with attractive trees or shrubs Reduce lifetime cost with safer and less expensive maintenance Filterra® is well-suited for the ultra-urban environment with high removal efficiencies for many pollutants such as petroleum, heavy metals, phosphorus, nitrogen, TSS and bacteria. Filterra® is similar in concept to bioretention in its function and applications, with the major distinction that Filterra® has been optimized for high volume/flow treatment and high pollutant removal. It takes up little space (often only a 4'x4' unit for each mandatory catch basin) and may be used on highly developed sites such as landscaped areas, green space, parking lots and streetscapes. Filterra® is exceedingly adaptable and is the urban solution for Low Impact Development. Stormwater flows through a specially designed filter media mixture contained in a landscaped concrete container. The filter media captures and immobilizes pollutants; those pollutants are then decomposed, volatilized and incorporated into the biomass of the Filterra® system's micro/macro fauna and flora. Stormwater runoff flows through the media and into an underdrain system at the bottom of the container, where the treated water is discharged. Higher flows bypass the Filterra® via a downstream inlet structure, curb cut or other appropriate relief. Expected Ayerage Pollutant Remoyal Rates (Ranges Varyjng with partjcle Size. Pollutant Loadjng and Sile Condjtjons) TSS Removal 85% Phosphorous Removal 60%-70% Nitrogen Removal 43% Total Copper Removal >58% Dissolved Copper Removal 46% Total Zinc Removal >66% Dissolved Zinc Removal 58% on &Grease >93% I I I I I I \ I \ 10 filterra Table 1: Eilterra® Qyick Sizjng Table (West~[n Zone-0 2 in/hr Uniform lntensi~ Ao~roach) ' Recommended Commercial Outlet Pipe Fl!terra• Box Sizes (feet) Contributing Drainage Area (acres) where C • 0.86 4x4 up to 0.22 4" SCH-40 PVC 4x6 or6x4 0.23to 0.33 4" SCH-40 PVC 4x6.5 or 6.5x4 0.23to 0.35 4" SCH-40 PVC 4x8 or8x4 0.34 to 0.44 4" SCH-40 PVC 4x16 or 16x4 up to 0.87 6" SCH-40 PVC standard 6x6 0.45to0.49 4" SCH-40 PVC 6x8 or8x6 0.50 to 0.65 4" SCH-40 PVC 6x10 or 10x6 0.66 to0.82 4" SCH-40 PVC 6x12 or 12x6 0.83 to 0.98 6" SCH-40 PVC 8x12 or 12x8 0.99 to 1.31 6" SCH-40 PVC 8x16 or 16x8 up to 1.75 6" SCH-40 PVC 8x18 or 18x8 up to 1.96 6" SCH-40 PVC 8x20 or20x8 up to 2.18 6" SCH-40 PVC Recommended Rasldentjal Filterra• Box Sizes (feet) Contributing Drainage Area Outlet Pipe (acres) where C • 0.50 4X4 up to 0.37 4" SCH-40 PVC 4x6 or6x4 0.38to 0.60 4" SCH-40 PVC 4x6.5 or 6.5x4 0.38 to 0.60 4" SCH-40 PVC 4x8 or8x4 0.61 to 0.74 4" SCH-40 PVC 4x16 or 16x4 up to 1.48 6" SCI-I-40 PVC Standard 6x6 0.75 to 0.83 4" SCH-40 PVC 6x8 or8x6 0.84 to 1.11 4" SCH-40 PVC 6x10 or 10x6 1.12 to 1.39 6" SCH-40 PVC 6x12 or 12x6 1.40 to 1.67 6" SCH-40 PVC 8x12 or 12x8 1.68 to 2.22 6" SCH-40 PVC 8x16 or 16x8 up to 2.97 6" SCH-40 PVC 8x18 or 18x8 up to 3.34 6" SCH-40 PVC 8x20 or20x8 up to 3.71 6" SCH-40 PVC Notes: 1. Additional Filterra Box sizes are available by contacting KriStar. 2. All boxes are standard 3.5 feet depth (I NV to TC). 3. A standard PVC pipe coupling ia cut into the wall for easy connection to diJCgarge drain. 4. Dimenlionc ahown are internal. Plcaae add 1' to the internal dimenoion• to obtain tile ext&rnal dimension1 (using 6" walls). 5. In line with TR55 data, for Commerical Developments a minimum (runoff coefficient) C factor of 0.65 is recommended. For Residential Developments. use of C factors lea. than 0.5 require individual site review by KriStar. 6. Please ask for Sizing Tables for other tllrget treatment goals, e.g. 0.3 in/hr. 7. This sizing table is valid for CA. NV, 1\Z.. For the state of HI, pleate contact 11 Filterra" representative. FILTERRA UNIT.- FACE OF CURB.- Ill r --------_.1 ... --------., I I I I I I I I I I I ~L I ~~ -, r- 1 ·9E)· 1"-~~--~ --~- 1 --------~-1 / I I " / I I / ... I I I I I I I LOCAL DEPRESSION -) TRANSffiON, lYPICAL \ I • LOCAL. DEPRESSION. --.50' [6.00"] CURB FACE I I PLAN VIEW ·• ·--AU. EXTERNAL PIPING c!c ANGLES BY OlHERS. (~ INI.ET TO STORMWATER/BYPASS STRUCTURE t.II,JST BE AT LOWER ELEVATION THAN FI!.TfRRA UNIT OuTLEr. BYPASS STRUCTURE ----.".. OUTl.El'. \ CURS INLEI'- STORMWATER/BYPASS STRUCTURf. BY OTHERS. 8YPASS,}. . Fl.OW. 48.00" OPENING PROVIDED AT -- GUTTER Fl.OW UNE. ELEVATION VIEW \__ OPENING FOR CURS INLET STORt.IWATER/BYPASS STRUCTUR£. BY OTHERS. FILTERRA UNIT. -- T&G JOINT. SHIM FOR ·-.... ADJUSTt.IENT TO SLOPE. \ TITLE 4.17' [50.00"1 I L:r""!'"'!J";=::::::z:=;tt.:=:=:;r.-::~'T-... L .... a.oo \ ~~==~~~~==~=, -· =·- • CROSS SECTION Filterra® ·ypical Flowline and Outlet Pipe Relationship \ .. . , : ... ~ ... : -· · CURS INLET ( BYPASS STRUCTURE. BY OTHERS. STORNWATER/BYPASS ~ J STRUCTURE OUTLE'f. ' ·-INL£1' TO STORMWATER/BYPASS STRUCTURE MUST BE AT LOWER EI.£VATION THAN FILTERRA UNIT OUTLE.T • KriStar Enterprises, Inc. . • , 360 Sutton Place, Santa Rosa. CA 95407 f1 n~rra Ph: 600.579.8819, Fax: 707.524.6188, www.krbtar.com us PAT 8.277,274 AND 8,5fi.J21 0006 JPR 6/17/11 JPR 1/5/11 I \ \ \ I \ PAVED OR -- LANDSCAPED SURFACE. STAINLESS STEEL NOSING -- (WITH FILTERRA LOGO). FACE OF CURB. ~- 6.00" STANDARD CURB HEIGHT. LOCAL AREA DEPRESSION _ _.......__ OR FLUME PER LOCAL AGENCY STANDARD. STANDARD 48.00" OPENING. -- FOAM INSERT /DEBRIS GUARD (NOT SHOWN IN THIS VIEW), TO BE REMOVED AT ACTIVATION. ---NO DUMPING PLACARD. PAVEMENT SURFACE. ~·-SASE MATERIAL/BACKFILL AS REQUIRED. ~--STAINLESS STEEL NOSING. I /-FOAM INSERT DEBRIS GUARD 6.00" STANDARD CURB HEIGHT .. --~-\ I TO BE REMOVED AT ACTIVATION. GUTIER FLOW LINE.·-.. ~\ · __ _ . ~ . _ 8.50" FROM TOP OF CURB. "'-". • • .-" • PAVEMENT.- BASE MATERIAL/ ... _ BACKFILL AS REQUIRED. LOCAL AREA DEPRESSION ·- OR FLUME PER LOCAL AGENCY STANDARD. 8.00 TOP SLAB ----t · TOP SECTION FRONT WALL. --BASE SECTION FRONT WALL. --· -·--··-FILTERRA FILTER MEDIA. CROSS SECTION Filterra® Precast Curb Inlet Opening and Gutter I Flume Detail -KR.~ KriStar Enterprises, Inc. ~ 360 Sutton Place. SanUl R0$81, CA 95407 ~ Ph: 800.579.8819, Fax: 70'7.524.8186, www.kriatar.com \ \ I \ I \ filterra 810f9ti1MIJOM S temG Filterra® Standard Plan Notes byKRISTAR Construction & Installation A. Each unit shall be constructed at the locations and elevations according to the sizes shown on the approved drawings. Any modifications to the elevation or location shall be at the direction of and approved by the Engineer. B. If the Filterra~ is stored before installation, the top slab must be placed on the box using the 2x4 wood provided, to prevent any contamination from the site. All internal fittings supplied (if any), must be left in place as per the delivery. C. The unit shall be placed on a compacted sub-grade with a minimum 6-inch gravel base matching the final grade of the curb line in the area of the unit. The unit is to be placed such that the unit and top slab match the grade of the curb in the area of the unit. Compact undisturbed sub-grade materials to 95% of maximum density at + 1-2% of optimum moisture. Unsuitable material below sub-grade shall be replaced to the site engineer's approval. D. Outlet connections shall be aligned and sealed to meet the approved drawings with modifications necessary to meet site conditions and local regulations. E. Once the unit is set, the internal wooden forms and protective mesh cover must be left intact. Remove only the temporary wooden shipping blocks between the box and top slab. The top lid should be sealed onto the box section before backfilling, using a non-shrink grout, butyl rubber or similar waterproof seal. The boards on top of the lid and boards sealed in the unit's throat must NOT be removed. The Supplier (KriStar or its authorized dealer) will remove these sections at the time of activation. Backfilling should be performed in a careful manner, bringing the appropriate fill material up in 6" lifts on all sides. Precast sections shall be set in a manner that will result in a watertight joint. In all instances, installation of Filterrant unit shall conform to ASTM specification C891 "Standard Practice for Installation of Underground Precast Utility Structures", unless directed otherwise in contract documents. F. The contractor is responsible for inlet protection/sediment control and cleaning around each Filterra unit. G. Curb and gutter construction (where present) shall ensure that the flow-line of the Filterra~ units is at a greater elevation than the flow-line of the bypass structure or relief (drop inlet, curb cut or similar). Failure to comply with this guideline may cause failure and/or damage to the Filterra31 environmental device. H. Each Filterra® unit must receive adequate irrigation to ensure survival of the living system during periods of drier weather. This may be achieved through a piped system, gutter flow or through the tree grate. 25 26 fi lterra !liOtBiatllitlll S~gtOITill byKRISTAR Actjyatjon A. Activation of the FilterraQt unit is performed ONLY by the Supplier. Purchaser is responsible for Filterra"' inlet protection and subsequent clean out cost. This process cannot commence until the project site is fully stabilized and cleaned (full landscaping, grass cover, final paving and street sweeping completed), negating the chance of construction materials contaminating the Filterra" system. Care shall be taken during construction not to damage the protective throat and top plates. B. Activation includes installation of plant(s) and mulch layers as necessary. lnclyded Maintenance A. Each correctly installed Filterra" unit is to be maintained by the Supplier, or a Supplier approved contractor for a minimum period of 1 year. The cost of this service is to be included in the price of each Filterra" unit. Extended maintenance contracts are available at extra cost upon request. B. Annual maintenance visits are generally scheduled for the fall to help the system by removing excessive leaf litter. c. Each Included Maintenance visit consists of the following tasks. 1. Filterra~ unit inspection 2. Foreign debris, silt, mulch & trash removal 3. Filter media evaluation and recharge as necessary 4. Plant health evaluation and pruning or replacement as necessary 5. Replacement of mulch 6. Disposal of all maintenance refuse items 7. Maintenance records updated and stored (reports available upon request) D. The beginning and ending date of Supplier's obligation to maintain the installed system shall be determined by the Supplier at the time the system is activated. Owners must promptly notify the Supplier of any damage to the plant(s), which constitute(s) an integral part of the bioretention technology. ...J z 1-u.. ~ ! s.oo·--1 ! , I ~----------~ w ---~-----:__ 6.00" 1 . ..L_-~------i--1--------r+.---------+-n 6.00" 1 Ill _t_______ ----- L I I I I TREE GRATE & FRAME. · FRAME CAST MONOLITHIC INTO TOP SECTION. A _l ____ _ t I ___ L_ __ 6.00" ....----------- 4. 17' [50.00"] -'------------ -~-----------4~------------=-NO DUMPING PLACARD. I I I I ........ -. J.- 1 I I I I I I I -STANDARD 48.00" CURB INLET OPENING. -~-_:\ . ---~;:.:;(, . ' ' ' ' ' ' ' ' ' . I • -CLEAN OUT ACCESS COVER. ' A t I I _ _ _J 3X -2.00" IRRIGATION PORTS IN TOP SECTION. -CLEAN OUT ACCESS COVER. -STANDARD 48.00" CURB INLET OPENING -------·----t--·~ . ' -.' "u--T&G JOINT. : 32.00" BASE SECTION •·~-~~~~~~~~~~~ ----L ... ·. · .. · · .. · ·. :. ·.·.. . 6.00 ~-:.....;· ·:...:.-..__...;....:.~;.;:..;...::...,......;._..;_.;........l~~,..;..r~--_ .. , ---- ! L. SCH-40 PVC COUPUNG PROVIDED. L-----~---7--~--~------~~-~-. CAST MONOUTHIC. OPTIONAL ON ALL FOUR SIDES. SECTION A·A BEDDING ..... BY OTHERS TABULATION L (Feet) 4'X6' 4.00' Precast Filterra® Unit arrow Length Configuration w Tree Grete _(Feet) Quantity I Size 6.00' 1ea./;, F'ILTERRA FILTER MEOlA PROVIDED. UNOERORAJN STONE PROVIDED. Outlet Pipe PVCSCH-40 filterra B1oreteHIIOh 8yotftm& byKRISTAR Filterra® Piping Technical Details Filterra"' is supplied with an internal underdrain system that exits a wall in a perpendicular direction. Most efficient drainage is accomplished when the drain exits on the lower side of the Filterra*, i.e. nearest the overflow bypass. This is more important when using the larger sized Filterra<t Systems. Drawing DP1: Section View through Filterra Precast Box Wall at Outfall Pipe Connection All units are supplied with the drainage pipe coupling precast into the wall, at a depth of 3.50 feet (I NV to TC). Drawing DP1 is a detail of the coupling. The coupling used is SCH-40 PVC. Typically, a minimum slope of 0.5% is adequate to accommodate the flow of treated water from the Filterra®, but each site may present unique conditions based on routing of the outfall pipe (elbows). The pipe must not be a restricting point for the successful operation of Filterra~. All connecting pipes must accommodate freefall flow. Table 3 lists WA DOE approved treatment sizing flow rates of the various size Filterrai@l units. A safety factor of at least two should be used to size piping from the Filterra based on these conservative approved treatment flow rates. Table 3: Filterra Flow Rat~s & Pipe Details Important Note: Actual flow rate may be more than double rates below. Filterra® Size Expected Flow Rate Connecting (feet) {cubic feet/second) Drainage Pipe 4x4 0.037 4" SCH-40 PVC 4 x 6 or 6 x 4 0.061 4" SCH-40 PVC 4x6.5 or 6.5x4 0.061 4" SCH-40 PVC 4 x 8 or 8 x 4 0.075 4" SCH-40 PVC 4x16 or 16x4 0.150 6" SCH-40 PVC 6x6 0.084 4" SCH-40 PVC 6x8or8x6 0.112 4" SCH-40 PVC 6 x 10 or 10 x 6 0.140 6" SCH-40 PVC 6x12or12x6 0.168 6" SCH-40 PVC 8x12 or 12x8 0.224 6" SCH-40 PVC 8x16 or 16x8 0.229 6" SCH-40 PVC 8x18 or 18x8 0.337 6" SCH-40 PVC 8x20 or 20x8 0.374 6" SCH-40 PVC 33 38 Common Filterra® Placements by KRISTAR Typical Filterra placement at a fast food chain. Ideal for stormwater treatment where space is tight. Filterra used with a flumed bypass in a commercial parking lot. www.fllterra.c:om Even the largest Filterra unit blends in with landscaping. High flows bypass Filterra into a grass swale. Providing aesthetics and treatment in a residential area. Filterra~ Curb Inlet with Internal Bypass The Filterra Curb Inlet with Internal Bypass system incorporates biofiltration and an internal high flow bypass chamber into one single structure. This new system eliminates the need and cost of installing a separate bypass structure and enables placement on grade or at low points. The system is designed for decentralized treatment of stormwater runoff and meets low Impact Development guidelines in most jurisdictions. Filterra uses biofiltration to capture and Immobilize pollutants of concern, such as: trash/debris, sediment, TSS, oil/grease, nutrients and metals. Initial runoff flows are conveyed internally from the Filterra weir tray and into the Filterra media chamber. Runoff Is then filtered and treated through engineered soil media and passes into the underdrain system, which then discharges into the internal bypass chamber. Higher peak flows bypass the biofiltration media chamber over the Filterra weir tray and outlet through the internal bypass chamber. Features and Benefits Best Value for High Density Areas. • Compact size • Needs no external bypass • Accepts flow from both directions • Simple maintenance Versatile. Filterra Curb Inlet with Bypass models can be used for: • New construction • Retrofits • Commercial or residential applications. Filterra Curb Inlet with Bypass can be placed: • At sidewalk locations • In parking lots • At roadway improvement projects • In parking lot low-spot islands alntenance. Maintenance is simple and safe, and the first year is provided FREE with the purchase of every unit. The procedure is so easy you can perform it yourself. N FILTERRA ODEL CONTACT US FOR DETAILS byKRISTAR Filterra~ Curb Inlet with Internal Bypass System .... ' •. · . ~. •, :~ . •. . • ' ~ I ' Expected Pollutant R moval (Ranges Varying with Particle Size, Pollutant Loading and Site Conditions) TSSRemoval 85% Phosphorus Removal 60%-70% Zinc Removal >66% Copper Removal >58% Nitrogen Removal 43% TPH* Removal >93% iotal Petroleum Hydrotarbons Information on the pollutant removal efficiency of the filter soil/plant media is based on third party lab and field studies. Fllterra media has been TAPE and TARP tested and approved. 1. Cast Iron Tree Grate for Maintenance Access 2. Protective Mulch Layer 3. Biofiltration Chamber 4. Filterra Engineered Soil Media 5. Perforated Underdrain Pipe 6. Native Tree or Shrubs (numerous plant choice available) 7. Curb Inlet Opening (various widths available) 8. Internal Weir Tray and Inlet to Biotilter Chamber 9. Outlet 10. Internal Bypass Chamber 41 Bioretentlon Plant/Soil/Microbe Complex Removes Pollutants, TSS, Phosphorus, Nitrogen, Bacteria, Heavy Metals, Hydrocarbons, etc. Filterra Flow Une at Higher Elevation than B~s Flow Line filter ra Sio rate11tlon Systo ms New or Existing Catch Basin, Curb Cut or Other Means of Overflow Relief byKRISTAR BMP ID# BMP TYPE 1 -4 FILTERRA L 1 - L12 INFILTRATION CELL 7 INFILTRATION TRENCH Storm Water Quality Management Plan (SWQMP) Seascape ATTACHMENT 3 Structural BMP Maintenance Information CASQA INSPECTION MAINTENANCE NO. FREQUENCY FREQUENCY INF-1 ANNUALLY ANNUALLY INF-1 ANNUALLY ANNUALLY 43 Appendix E: BMP Deeip Fact Sheete E.B INF-1 Infiltration Basin MS4 Petmit Category Retention Manual Category Infiltration Applicable Petfotmance Standatd Pollutant Control Flow Control Pdmaty Benefits Volume Reduction Peak Flow Attenuation Photo Credit: http:I/Www.ltormwttlfPII'tMrB.comlflcllitie&lbllfn.html Ducrlptlon An infiltration basin typically consists of an earthen basin with a flat bottom constructed in naturally pervious soils. An infiltmtion basin retains stonn water and allows it to evapo.mte and/ or percolate into the underlying soils. The bottom of an infiltration basin is typically vegetated with native grasses or turf grass; however other type• of vegetation can be used if they can survive periodic inWldation and long inter-event dry per:iodt. Treatment is achieved prima.tily through infiltration, filtration, sedimentation, biochemical processes and plant uptake. Infiltration bui.ne can be constructed as linear trenches or as underground infiltration galleriet. Typical infiltration basin components include: • Inflow distribution mechanisms (e.g., perimeter flow spreader or filter strips) • Energy dissipation mechanism for concentrated inflows (e.g., splash blocks or .riprap) • Forebay to provide pretreatment surface ponding for captured flows • V egeta.tion selected based on basin use, climate, and ponding depth • Uncompacted native soils at the bottom of the facility • Overflow structure E-35 Februaty 2016 RIPfW' FOR EN!R~Y DIIIIPA110N MAINTENANCI ACCIII ~ NOTTOICALE SECTION A-A' NOT TO tclALI Appendix E: BMP Deaian Fact Sheets Typical plan and section view of an Infiltration BMP Design Adeptlltlons for Pro}lct GOff~ Full infiltration BMP fot ttonn water pollutant control. Infiltration basins can be used as a pollutant control BMP, designed to infiltrate .runoff from direct rainfall as well as runoff from adjacent areas that are tributary to the BMP. Infiltration basins must be designed with an infiltration storage volume (a function of the surface ponding volume) equal to the full DCV and able to meet dta.wdown time limitations. Integrated 1torm water flow conuol and pollutant conuol confipation. Infiltration basins can E-36 FebnJUY 2016 Appendix B: BMP Design Fact Sheets also be designed for flow n.te and duration control by providing additional infiltration storage through increasing the surface ponding volume. Infiltration basins must meet the following design critetia.. Deviations from the below criteria may be approved at the discretion of the City Engineer if it is determined to be appropriate: Siting tUJd DHip Placement observe. geotechnical recommendations regarding potential hazards (e.g., &lope stability, landslides, liquefaction zones) and setbacks (e.g., slopes, foundations, utilities). Selection and design of basin is based on infiltration feasibility criteria and appropriate design infiltration rate (See Appendix C and D). Finish grade of the facility is S 2% (0% recommended). InteDt/RadoiJJile Must not negatively impact existing site geotechnical concerns. Must open.te as a full infiltration design and must be supported by drainage area and in-situ infiltration rate feasibility findings. Flatter surfaces reduce erosion and channelization with the facility. Settling forebay has a volume ~ 25% of A forebay to trap sediment ~ decrease facility volume bdow the forebay overflow. frequency of required maintenance. Infiltta.tion of surface ponding is limited to a 36-hour dn.wdown time. Minimum freeboard provided is ~1 foot Side slopes are= 3H:1V or shallower. Inflow tUJd OverJlow Structurn Prolonged surface ponding reduce volume available to capture subsequent storms. The applicant has an option to use a different dra.wdown time up to 96 hours if the volume of the fadlity is adjusted using the percent capture method in Appendix B.4.2. Freeboard minimizes .risk of uncontrolled surface discharge. Gentler side slopes are safer, less prone to erosion, able to establish vegetation more quicldy and easier to maintain. E-37 February 2016 Siting tUJd Denp Inflow and outflow structures are accessible by requited eqcipment (e.g., vactor truck) for inspection and mamtenance. Intlow velocities are limited to 3 ft/ s or less or use energy dissipation methods (e.g., riprap, level spreader) for concentrated inflows. Overflow is safely conveyed to a downstream storm drain system or discharge point Size overtlow sttucture to pass 100-year peak tlow for on-line basins and water quality peak flow for off-line basins. Appendix E: BMP De. Pact Sheets lnteJJt/&donale Maintenance will prevent clogging and ensure proper operation of the tlow control structures. .High inflow velocities can cause erosion, scour and/ or channeling. Plaoniog for overflow lusens the risk of property damage due to flooding. Conceptual Design and Sizing Approach for Storm Wlter Pollutant Control To design infiltration basins for etonn water pollutant control only (no flow control required), the following steps should be taken: 1. Verify that siting and cleaign criteria have been met, including placement and basin area requirements, forebay volume, and maximum slopes for bWn sides and bottom. 2. Calculate the DCV per Appendix B based on expected site design runoff for tributary areas. 3. Use the sizing worksheet (Appendix B.4) to determine if full infiltration of the DCV is achievable based on the infiltration sto~e volwne calculated from tbe Jurface ponclicg atca and depth for a maximum 36-hour drawdow:n time. The drawdown time can be estimated by dividing the average depth of the basin by the design infiltration rate. Appendix D provides guidance on evaluating a site's infiltration rate. Conceptual Design and Sizing Approach for Storm Weter Pollutant Tl"8fftmMt fllld Flow COntrol Control of flow rates and/ or durations will typically require sjgnificant surface ponding volume, and therefore the following steps should be taken p.tior to determination of storm water pollutant control design. Pre-development and allowable post-project flow rates and durations should be determined as discussed in Chapter 6 of the manual. 1. Verify that siting and design crite.tia have been met, including placement a.nd basin area requirements, fore bay volume, and maximum slopes for basin 11ides and bottom. E-38 February 2016 Storm Water Quality Management Plan (SWQMP) Seascape ATTACHMENT 4 City standard Single Sheet BMP (SSBMP) Exhibit [Use the City's standard Single Sheet BMP Plan .] 44 n II I I I I ' I II I ' I II I ' : I : I : I : I 1 ... ~,';l:l'"" : I I I I I I I I I I I : I : I : I : I : I I 5: _!..-;.,.- I I I I I I I I on :I I I I I I I dma6 dma5 dma4 dma3 dma2 dma1 \c322,35l BMP-L4 BMP-L3 nMP-L2 BMP-L1 I I ------_:::-::-- I ----------:: /~=======---­: ;!'.;< :1// I l I I l I I l I I l I I : I I CIVCOM 8r ASSOCIATES 6540 Lusk Blvd. SuiTe Cl35 Son Dfego, California 92121 (858> 658-9400 Fox: (858) 658-9420 lO .....-- 0 E "'0 --- '\. \ \ \ I I I I I I I I --~---- BMP I DMA EXHIBIT Cl Y OF CARLSBAD SEASCAPE ' I ' I ' I ' I ' /W ' ,u ' <( I / ..,... ' I 'N EX.HOUSE i ~0. i 1--~--1 r--j '\, ____ J. ~'\. / dma17 I I I I EX.HOUSE I I I I I I I I I I 1 I I L-----L-------~---- =- dma10 -L10 - I +1 ' I ' a... I ' EX.HOUSE. ---I36o --------- dma11 BMP-L11 I ' w z 0::: (.') w 0::: w a... dma12 2l I ' I ' I ' I ' \; --4- ' l{) .....-- 0 E "'0 I I I dma7 dma8 BMP-LB ------- dma9 \ \ \ " """"" '\., \ / / I /; "¢ BMP-L12 ....... 0 E "'0 BMP BMP NOTES 1. THESE BMPS ARE MANDATORY TO BE INSTALLED PER MANUFACTURERS RECOMMENDATIONS OR THESE PLANS. 1_1 I I I ,- 1 I I I I I ' l'h I I r,l \ \ n u I I I I I I I I 2. NO CHANGES TO THE PROPOSED BMPS ON THIS SHEET WITHOUT PRIOR APPROVAL FROM THE CITY ENGINEER. I! I • NO SUBSTITUTIONS TO THE MATERIAL OR TYPES OR PLANTING TYPES WITHOUT PRIOR AIPPROV AIL OF THE CITY ENGINEER. I I I I I l (J1 0 lC) t<) I I I I BMP TABLE BMP ID• BMP TYPE SYMBOL CASQA NO QUANTITY DRAWING NO. SHEET NO(Sl INSPECTION FREQUENCY MAINTENANCE CONSTRUCTION FREQUENCY SIGN OFF HYDROMODIFICATION & TREATMENT CONTROL f7'\_ 4 810-RETENTION \.:) FIL TERRA L 1-L 12 INFILTRATION CELL BMPf7' INF~TRATION 1..:J TNH LOW IMPACT DESIGN (L.I.D.l L1-L12 INFILTRATION CELL . BM...r]\ INFILTRATION ~ TRENCH ~ SOURCE CONTROL -l'-{;;:\ INLET tfiiiir;, 0 0-6 STENCLING ~ ~ ..,. 0 I LANDSCAAING/ ,6J..L GRADED PESTICIDE AREAS DMA I BMP DMA LOT AREA BMP 1D NO. SF AREA SF dma1 1 6188 144 dma2 2 6003 174 dma3 3 6040 148 dma4 4 6024 148 dma5 5 6009 148 dma6 6 7465 166 dma7 7 7054 156 dma8 8 8171 209 dma9 9 . 13106 373 ~ma10 10 6581 166 dma11 11 9710 227 ~ma12 12 14444 327 ~ma13 SURF 6100 CREST ~ma14 SURF 6200 CREST ~ma17 SOGE 32130 ESMT . 327 AREA SURF 9068 A1 CREST AREA LANDS 3720 A2 \CAPING AREA MIXED 34388 A3 ~ma15 PERE 7680 GRINE ~ma16 PERE GRINE 8980 BF-3 4 475-7 INF-1 12 475-7 INF-1 1 475-7 INF-1 12 475-7 INF-1 1 475-7 SD-13 5 475-7 S0-.10 1 475-7L TABLE * OMA TYPE OWNERSHIF INFILTRATION CELL PVT INFILTRATION CELL PVT INFILTRATION CELL PVT INFILTRATION CELL PVT INFILTRATION CELL PVT INFILTRATION CELL PVT INFILTRATION CELL PVT INFILTRATION CELL PVT INFILTRATION CELL PVT INFILTRATION CELL PVT INFILTRATION CELL PVT INFILTRATION CELL PVT FILTERRAI INFIL T TRENCH HOA FILTERRAI HOA INFIL T TRENCH INFILTRATION HOA TRENCH FILTERRAI HOA INFIL T TRENCH FILTERRAI HOA INFIL T TRENCH FILTERRAI INFIL T TRENCH HOA FILTERRA HOA FILTERRA HOA • FOR MORE INFORMATION REFER TO SEASCAPE DEVELOPMENTS LLC STORM WATER QUALITY MANAGEMENT PLAN 12-09 RUNOFF FILTERS THRU GRASS BUFFER FOREBAY ~ IN F I L T ~R A T I 0 N~ ANNU,6J..LY ANNU,6J..LY ANNUALLY ANNU,6J..LY ANNUALLY ANNUALLY ANNUALLY ANNUALLY ANNUALLY ANNUALLY ANNUALLY ANNUALLY ALL SHEETS ANNUALLY ANNUALLY SWMP NO. 12-09 PARTY RESPONSIBLE FOR MAINTENANCE ROGER BHATIA 6540 LUSK BLVD. SUITE C135 SAN DIEGO, CA 92121 PHONE:858-658-9400: PLAN PREPARED BY: CIVCOM 8c ASSOCIATES 6540 LUSK BLVD. SUITE C135 SAN DIEGO, CA 92121 PHONE:858-658-9400 CERTIFICATION : RCE 51348 RUNOFF FILTERS THRU GRASS BUFFER FOREBAY TYP. SEC.-INFILTRATION CELL/TRENCH VERIFY BY: INSPECTOR DATE ~ I I I I I I I I I I I I \ I 4. NO OCCUPANCY WILL BE GRANTED UNTIL THE CITY INSPECTOR STAIFF HAS INSPECTED THE f---l-----l--------------------+--+----J---1 PROJECT FOR APPROPRIATE BMP CONSTRUCTION AND INSTALLATION. SHEET CITY OF CARLSBAD I SHE1ETS I 1 ENGINEERING DEPARTMENT 30 0 30 60 90 ---- GRAPHIC SCALE 1"· 30' 40 20 ~PADI-IIl"' C::l"'l>.l t:" 1". A.l1 1 • MAINTENANCE WILL BE TRANSFERRED FROM SEASCAPE DEVELOPMENTS LLC TO THE HOMEOWNERS ASSOCIATION ONCE HOA IS FORMED. ENGINEER OF WORK R. BH~ 051348 DATE fi5GISTRATION EXPIRATION DATE: 6-30-18 DATE INITIAL ENGINEER OF WORK REVISION DESCRIPTION ! SHT. DATE INITIAL NO. CITY APPROVAL SINGLE SHEET BMP I DMA SITE PLAN SEASCAPE CARLSBAD TRACT NO CT 05-18 APPROVED: CITY ENGINEER OWN BY:.-AN"""--- CHKD BY: __ ..:.. RVWD BY: JASON S.GELDERT PE 63912 EXP. 9-30-16 DATE PROJECT NO. DRAWING NO. CT 05-18 4 75-7SW . w 0 ru -0 .•· ,. 1 -· ----- ~"--- in.et -·· mulch .. ~ .... -- { .. _ -- • • ' ~ po: ding .depth overfow soft so ~I mix --------------------~~ . ',, 3:1 SIE-;STAII! R'F'lOUTFAL.L _ ........ ~--- -~4~ . . MSI -DEP-IH • lr MN. -----