HomeMy WebLinkAboutCT 06-13; TABATA 10; AS-GRADED GEOTECHNICAL REPORT; 2015-08-18K
GROUP DELTA
August 18, 2015 ;
Lennar Homes
25 Enterprise, Suite 300
Aliso Viejo, California 92656
Attention: Mr. Brian Nestoroff
SUBJECT: AS-GRADED GEOTECHICAL REPORT
' Casero Development
- Carlsbad, California
.Mr. Nesteroff: -
In accordance with your request, we have prepared this as-graded report summarizing the
results of the testing and observation services provided by Group Delta Consultants at the
Casero development in Carlsbad, California. The general contractor for this project was Lennar
'Homes. The grading operations were conducted by James McMinn Incorporated (JMI) and
Clarke. Grading Incorporated. Underground improvements were made by Cass Construction
and the Schilling Corporation. Paving operations were conducted by Marathon General
Incorporated (MGI). Our geotechnical services for this project were provided between
September 4th of 2014 and July 29th, 2015.
1.0 PURPOSE AND SCOPE OF SERVICES
This report and the associated geotechnical services were provided in general accordance with
the provisions of the refererced agreement (Lennar, 2014). Our field personnel were provided
for this project in order to test and observe remedial earthwork, fill placement and the
compaction operations. These observations rand tests assisted us in developing professional
opinions regarding whether or not the geotechnical aspects of earthwork construction were
conducted in general accordance with our geotechnical recommendations and the geotechnièal
requirements of the City of Carlsbad. Our services did not include supervision or direction of
the work of the contractor, his employees, or-agents. Our services did include the following.
As-needed consultation during grading. Pertinent reports are referenced in Appendix A.
As-Graded Geotechnical Report GDC Project No. 5D365
Casero Development August 18, 2015
Lennar Homes Page 2
. Observation of the preparation of the existing ground in order to confirm that remedial
earthwork was conducted in accordance with our recommendations.
Performing field and laboratory tests on fill materials in order'to support geotechnical
recommendations and conclusions. The laboratory test results are summarized in
Appendix B. The field density test results are shown in Appendix C.
Preparation of daily field reports summarizing the day's activity with regard to
earthwork, and documenting the hours spent in the field by our technicians.
Preparation of this interim report which summarizes site preparation to date, field and
laboratory test results, fill placement, and the compaction operations.
2.0 SITE DESCRIPTION
The subject site consists of the Casero residential development (formerly Tabata 10) located in
the City of Carlsbad, California. The site is located immediately southeast of the intersection
between El Camino Real and Camino Hills Drive, which form the northern and western property
boundaries, respectively. Existing single-family residential developments bound the southern,
eastern and western edges of the property. The approximate location of the site is shown on
the Site Location Map, Figure 1. The geotechnical conditions at the site were described in detail
in the referenced geotechnical investigation report (GDC, 2014a).
Site development included 26 two-story residential buildings supported by post-tension slab
foundations. Other site improvements included a new asphalt concrete paved residential
street, reconstruction of the northern terminus of Camino Hills Drive, new Portland cement
concrete sidewalks and driveways, several new retaining walls, and various subsurface utilities.
A bio-swale and detention basin were also constructed along the northern edge of the site. The
layout of the site and the lot numbers are shown on the Rough Grading Plan, Figure 2.
3.0 GEOLOGY
The site is located within the coastal plain section of the Peninsular Ranges geomorphic
province of California, which consists of subdued landforms underlain by marine sedimentary
formations. Prior to the grading operations described herein, most of the site was covered with
alluvial flood plain deposits associated with Agua Hedionda Creek, undocumented fill, and
stockpiled fills. The Eocene-age Santiago Formation underlies the entire site at depth.
GROUP DELTA N:\Projects\SD\5D365 Lennar, Tabata Development\14-0178\14-0178R3.doc
As-Graded Geotechnical Report GDC Project No. SD365
Casero Development August 18, 2015
Lennar Homes Page 3
The surficial soils used to cap the upper 3 or 4-feet of the building pad areas at the site
generally classify as silty or clayey sand (Unified Soil Classification System SM and SC).
Laboratory tests indicate that the fill soils typically have a low expansion potential (El<50), and
a negligible soluble sulfate content based on commonly. accepted criteria. Specific aspects of
the grading and improvement operations are described in more detail below. )
4.0 GRADING AND IMPROVEMENT OPERATIONS
The geotechnical aspects of the grading and improvemeht operations to date included remedial
grading for the future building pad and improvement areas, and the placement and compaction
of fill soils to attain site grades. These operations are described in greater detail below.
4.1 Remedial Earthwork: Remedial grading was condicted within the planned building
pad areas in general accordance with the geotechnical recommendations presented in
the referenced report (GDC, 2014a). Remedial excavations were first conducted to
depths which typically varied from about 4 to 15 feet below the lowest existing grades
within the pad areas. The excavated soil was then placed as a uniformly compacted fill
to within 3 or 4 feet of finish pad grades. The upper 3 to 4 feet of fill soil placed within
the building pads consisted of select, granular, imported, low expansion soil (El<50). A
summary of the as-graded conditions beneath each building pad is presented in Table 1.
4.2 Fill Soils: The various materials used as fill are described in Figure B-i. The
maximum densities and optimum moisture contents of the soils were determined in the
laboratory using ASTM D1557 as a guideline. The on-site fill soils generated from'
excavations within the alluvium and formational materials generally consisted of lean to
fay clay with a variable amount of fine grained sand (CL or CH). For selected pavement
areas, the expansive clay subgrade was stabilized using 6 percent dry-hydrated lime in
general accordance with our recommendations (GDC, 2014g). The select granular
stockpiled fill material used to cap the buildihg pad areas generally consisted of low
expansion (Ek50) fine grained silty or clayey sand (SM or SC).
4.3 Fill Placement: Grading of the site was performed using typical grading techniques
with heavy earthmoving equipment. In-place moisture and density tests were
conducted during fill placement in general accordance with ASTM D6938. The results of
these tests are presented in Appendix C. The approximate test locations are shown on
the Test Location Plan, Plate 1.
A GROUP DELTA N:\Projects\SD\SD365 Lennar, Tabata
As-Graded Geotechnical Report
Casero Development
Lennar Homes
GDC Project No. 5D365
August 18, 2015
Page 4
The test locations and elevations were based on available field survey information
provided by the grading contractor, and should only be considered rough estimates.
The estimated locations and elevations should not be used for preparing cross sections,
or for the purpose of after-the-fact evaluating of the sequence of fill placement.
5.0 GEOTECHNICAL EVALUATION AND CONCLUSIONS
Based on the observations and tests we conducted at the site, it is our professional opinion that
remedial grading operations and improvement operations were performed in general
accordance with the intent of our geotechnical recommendations, and with the geotechnical
requirements of the City of Carlsbad. Our conclusions are based on observations and tests
performed between September 4th of 2014 and July 295h, 2015. No representations are made \
to the quality and extent of materials that we have not observed.
5.1 Compaction: In the areas we tested and observed, it is our professional opinion
that fill materials were placed in substantial accordance with the minimum compaction
criterion of 90 percent of the maximum dry density based on ASTM D1557. Our tests
indicate that pavement subgrade and aggregate base were placed in substantial
accordance with the minimum compaction criterion of 95 percent of the maximum dry
density based on ASTM D1557. Our tests also indicate that the asphalt concrete was
compacted to between 91 and 97 percent of the Rice density per ASTM D2041. The
density test results are presented in detail in Appendix.C. The approximate density test
locations are shown on the Test Location Plan, Plate 1.
5.2 Building Pads: It is our professional opinion that remedial grading for the building
pads was conducted in general accordance with the intent of our geotechnical
recommendations. Laboratory tests were conducted on samples of the soils placed
within the foundation influence zone for the proposed residential structures. Testing
included expansion index and soluble sulfate content. The laboratory test results are
shown in Figures B-2.1 and 8-2.2. The testing indicates that the new buildings will
generally be underlain by silty or clayey sand (SM or SC) with a low expansion potential
(El<50) and a negligible soluble sulfate content. The as-graded conditions are
summarized in Table 1, and are also shown on the As-Graded Geotechnical Map, Plate 2.
GROUP DELTA N:\Projects\SD\SD365 Lennar, Tabata Development\14 0178\14 0178R3 doc
As-Graded Geotechnical Report GDC Project No. 5D365
Cásero Development August 18, 2015
Lennar Homes Page 5
5.3 Foundations: All of the building pad areas were capped with 3 or 4-feet of low
expansion sand. The as-graded conditions beneath each lot are summarized in Table 1.
The 2013 CBC seismic design parameters are presented in Table 2 The updated post-
tension slab foundation design parameters are described in detail below.
Post-Tension Slabs (Category IA): The following post-tension slab foundation design
parameters are considered to be applicable to building pad areasthatare underlain by
at least 4 feet of low expansion compacted fill. This condition applies to Lots 1, 2, 3, 14,
15, 16, 24, 25 and 26 only, as shown in Table 1. . ..
Moisture Variation, em: Center Lift:. 9.0 feet .'
. . Edge Lift: 5.0feet . .
Differential Swell, ym: Center Lift: 0.4 inches
Edge Lift 0.6 inches •. .
Allowable Bearing: 2,000 psf at slab subgrade /
Post-Tension Slabs (Category IB): The following post-tension slab foundation design
parameters may be used for building pad areas that are underlain by at least 3 feet of
low expansion compacted fill. This condition applies to Lots 12,13 and 17 to .23:
Moisture Variation, em: Center Lift: .9.0 feet
Edge Lift: • 5.0 feet • • :
Differential Swell, ym: Center Lift: 0.5 inches .
Edge Lift: 0.7 inches
Allowable Bearing: 2,000 psf at slab sub grade
Post-Tension Slabs (Category II): Lots 4 through 11 are underlain by highly expansive fat
clays derived from the Santiago Formation (Category II). These lots were all capped with
at least 4 feet of low expansion sand. The following post-tension slab design
parameters apply to Lots 4 through 11 only. • . •
Moisture Variation, em: . Center Lift: '9.0 feet . .
. Edge Lift:. . 4.8feet • . : • •
Differential Swell, ym: • Center Lift: 0.9 inches •
.
• • *•• Edge Lift:
•
1.4 inches •. • •
Allowable Bearing: • .' 2,000 psf at slab subgrade, ••
raRoUP DELTA N:\Projects\SD\SD365 Len nar Tabata Development\14 0178\14 0178R3 doc
As-Graded Geotechniçal Report GDC Project No. 50365
Casero Development August 18, 2015
Lennar Homes Page 6
5.4 Pavements: R-Value tests were conducted on randomly selected samples of the
pavement subgrade soil collected from the site in general accordance with CTM 301.
The results were presented previously (GDC, 2014fhi). Recommendations for lime
stabilization were provided for areas with low the lowest R-Values (GDC, 2014g). The R-
Value testing is summarized in Figure B-3. The R-Values were used to develop
pavement section recommendations for the site, as shown in Figure B-3.
The pavement sections were constructed by first scarifying, moisture conditioning, and
compacting the surficial 12 inches of pavement subgrade. The recycled Class 2
Aggregate Base sections were then placed and compacted. A base course of Type Ill,
Class B2 asphalt concrete was placed directly over the compacted base. The equipment
used for construction of the pavement section included various loaders, water trucks,
vibratory rollers, and asphalt laydown machines.
Conformance testing was conducted on randomly selected samples of the aggregate
base placed at the site. Conformance tests for the base included particle size analysis,
R-Value, Sand Equivalent, and Durability, as shown in Figures B-4.1 through B-4.6. The
test results indicate that the base generally conformed to requirements for %-inch
Maximum Class 2 Aggregate Base from Section 26-1.02B of the 2010 Caltrans Standard
Specifications. However, it should be noted that the gradations for Samples AB-3 and
AB-4 did not meet the Caltrans requirements for Class 2 Aggregate Base in the No. 4 and
No. 30 sieve sizes. In addition, the Durability Index for Sample AB-1 and the Sand
Equivalent for Samples AB-3 did not meet Caltrans requirements. However, all of the
base samples had R-Values well above the minimum required of 78.
Conformance tests were also conducted on the Type Ill %-inch Maximum Class B2
asphalt concrete placed at the site. Conformance tests for the asphalt concrete
included asphalt oil extraction and gradation, Hveem and maximum theoretical (Rice)
densities, stabilometer, and air voids. The asphalt concrete conformance test results
are summarized in Figures B-5.1 through B-5.3. The conformance testing indicates that
the base course of the asphalt concrete generally met the gradation and quality
requirements from Section 400-4 of the 2012 SSPWC.
GROUP DELTA N:\Projects\SD\S0365 Lennar, Tabata Development\14-0178\14-0178R3.doc
As-Graded Geotechnical Report GDC Project No. S0365
Casero Development August 18, 2015
Lennar Homes Page 7
6.0 LIMITATIONS
Our services were performed using the degree of care and skill ordinarily exercised, under
similar circumstances, by reputable soils engineers and geologists practicing in this or similar
localities. No warranty, express or implied, is made as to the conclusions and professional
advice included in this report.
We appreciate this opportunity to be of professional service. Feel free to cotact the office
with anyquestions or comments, or if you need anything else.
GROUP DELTA CONSULTANTS
12-31-15
E25
Matthew A. Fagan, G. .2569 James C. Sanders, C.E.G. 2258
4 Senior Geotechnical Engineer Senior Engineering Geologist
Distribution: (1) Addressee, Mr. Brian Nestoroff (Brian.Nestoroff@lennar.com) r
(1) Addressee, Mr. Brett Hood (Brett.Hood@lennar.com) ep.t4oEve
(1) Addressee, Mr. Moses Kim (Moses. Kim @lennar.com)CEFMFIED
GEOLOGIST
0FCP
1.
GROUP DELTA N:\Projects\SD\50365 Lennar, Tabata Devel6pment\14-0178\14-0178R3.doc
TABLES
ulfate
:posure
gligible
gligible
gligible
gligible
gligible
gligible
gligible
gligible
gligible
gligible
gligible
gligible
gligible
gligible
gligible
gligible
gligible
gligible
gligible
gligible
gligible
gligible
gligible
gligible
gligible
gligible
TABLE 2
2013 CBC ACCELERATION RESPONSE SPECTRA
GDC PROJECT NO. SD365, Lennar Casero Development
-
-
S5=
SI=
Site Class=
F0=
F0=
TL
SMS=
S=
S=
S01=
T0=
T5=
1.070 g = short period (0.2 sec) mapped spectral response acceleration MCE Site Class B (CBC 2010 Fig. 1613.5(3) or USGS Ground Motion Calculator)
g = 1.0 sec period mapped spectral response acceleration MCE Site Class B (CBC 2010 Fig. 1613.5(4) or USGS Ground Motion Calculator)
= Site Class definition based on CBC 2010 Table 1613.5.2
= Site Coefficient applied to S. to account for soil type (CBC 2010 Table 1613.5.3(1)) Latitude: 33.1439
= Site Coefficient applied to S to account for soil type (CBC 2010 Table 1613.5.3(2)) Longitude: -117.2865
sec = Long Period Transition Period (ASCE 7-05 Figure 22-16)
= site class modified short period (0.2 sec) MCE spectral response acceleration = F. x S (CBC 2010 Eqn. 16-36)
= site class modified 1.0 sec period MCE spectral response acceleration = F0 x S1 (CBC 2010 Eqn. 16-37)
= site class modified short period (0.2 sec) Design spectral response acceleration = 2/3 x SMS (CBC 2007 Eqn. 16-38)
= site class modified 1.0 sec period Design spectral response acceleration = 2/3 x SM1 (CBC 2007 Eqn. 16-39)
sec = 0.2 SD1/Sss = Control Period (left end of peak) for ARS Curve (Section 11.4.5 ASCE 7-05)
sec = S1/S05 = Control Period (right end of peak) for ARS Curve (Section 11.4.5 ASCE 7-05)
0.413
D
1.072
1.586
8.00
0
-
1.147
0.655
0.765
0.437
0.114
0.571
- T
(seconds)
Design MCE
1.2
2.600 0.168 0.252 0.4
3.000 0.146 0.218 0.2 MEN
3.100 0.141 0.211 ME
3.400 0.128 0.193 0.0 .. . . .
Sa (g) Sa (g)
0.000 0.306 0.459
0.114 0.765 1.147
0.571 0.765 1.147
0.600 0.728 1.092
0.700 0.624 0.936
0.800 0.546 0.819
0.900 0.485 0.728 1.000 0.437 0.655 1.100 0.397 0.595 1.200 0.364 0.546 1.300 0.336 0.504 1.0 1.400 0.312 0.468 .2 1.500 0.291 0.437 Z 1.600 0.273 0.409 1.700 0.257 0.385 0.8
1.900 0.230 0.345 _ 2.000 0.218 0.328 - o 2.100 0.208 0.312 .200 0.198 0.298 20.6
2.300 0.190 0.285
Uj
w 2.400 0.182 0.273 . IL 2.500 0.175 0.262
2.700 0.162 0.243 2.800 0.156 0.234 2.900 0.151 0.226
3.300 0.132 0.198
0.125 0.187
3.900 0.112 0.168 Period (seconds)
gg 0.121 0.182 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 3.700 0.118 0.177 3.800 0.115 0.172
4.000 0.109 0.164 4.000 0.109 0.164
1.4
_ fflUI !T IN _________ _.__•I- ._I ,r[.II
• ______
S......-•..... .........I I S ••..•uui
1iiIjH1IPJffh1IiiI1ihu.iiiN 1.800 0.243 0.364 C.)MEN
IIHuI!Ui!iIO!INhIINHhIiIN
.5_U. i. 3.200 0.136 0.205 ME MOMME
S
- .
4g
I
4, \ .1_ •-" fop
64
Av
jr
\\
0 .
MIN
'(TREATMENT. HWIP AND PEAK FLOW ATTENUATION)
\No .
41:2— 10 SECTION'A-K
3) JM24 25
BIORETENTION BASIN
-- --
-
B
{ QIA I
IH IB 1A-_
e
1 ~14 CAMIN0HILUDRWRDWG 47270) 17
0
1B
SECTION V
) 1-
H: —
0
J 0 1
1 I
kr,— 13
_ - DUP 68TA
0
ENGINEERS COSU SD365
140178
C
ROUGH GRADING PLAN
REFERENCE: Hunsaker & Associates (2014). Grading Plan for Tabata 10, dated August 11.
//t Ja\N
—
fll —7
12.
43
211
4 42
112
Zo
/ N
211
/ - -
212
N / / 7 / -
Elmn
21
un/ m%,) GROUP NN //
LE N N / / 'N I
Explanation
—:—
EEL
S 036 5
14-0178
AOED GEOTECHNICAL MAP
APPENDIX A
REFERENCES
American Society for Testing and Materials (2006). Annual Book of ASTM Standards, Section 4,
Construction, Volume 04.08 Soil and Rock (I); Volume 04,09 Soil and Rock
Geosynthetics, ASTM, West Conshohocken, PA, Compact Disk.
APWA et al. (2006). Standard Specifications for Public Works Construction, Untreated Base
Materials, Asphalt Concrete, BNI, Vista, CA.
Group Delta Consultants (2013). Geotechnica/ Review, Tabata 10 Subdivision, Carlsbad, CA,
Project lR596, August 30.
Group Delta Consultants (2014a). Geotechnical Investigation, Tabata Development, Carlsbad,
California, Project No. SD365, Document No. 1370339, March 4.
Group Delta Consultants (2014b). Supplemental Settlement Monument Details, Casero
Development (Formerly Tabata), Carlsbad, CA, Project No. SD365, Document No. 14-
0105, June 18.
Group Delta Consultants (2014c). Updated Foundation Recommendations, Casero
Development, Carlsbad, California, Project No. SD365, Document No. 14-0117, July 16.
Group Delta Consultants (2014d). Grading Plan Review, Tabata 10 Development (a.k.a. Casero),
Chula Vista, California, Project No. SD365, Document No. 14-0158, August 13.
Group Delta Consultants (2014e). Seismic and Geologic Hazards, Casero Carlsbad, California,
Project No. SD365, Document No. 14-0165R, September 3.
Group Delta Consultants (20141). Testing of Pavement Sub grade Materials, Casero
Development (Reef Circle Str'et), Chula Vista, CA, Project No. 5D365, Document No. 14-
0197, October 2.
Group Delta Consultants (2014g). Lime Stabilization Recommendations, Casero Development,
Carlsbad, CA, Project No. SD365, Document 14-0203, October 30.
Group Delta Consultants (2014h). Testing J of Pavement Sub grade Materials, Casero
Development (Comma Hi/Is Drive), Carlsbad, California, Project No. D365, Document 14-
'0197R, dated November 13.
DLP DELTA N:\Projects\SD\SD365 Lennar, Tabata Development\14-0178\14-0178R2.doc
APPENDIX A
REFERENCES (Continued)
Group Delta Consultants (2014i). Testing of Pavement Subgrade Materials (Revised), Casero
Development (Camino Hills Drive), Carlsbad, California, Project No. D365, Document 14-
0197112, dated November 18.
Lennar Homes of California, Inc. (2014). General Agreement for Consulting Services, Casero
(Tabata), Carlsbad, Contract No. 19545880, May 5.
Post-Tensioning Institute (2007). Standard Requirements for Analysis of Shallow Concrete
Foundations on Expansive Soils and Addendum No. 1 to the 31(1 Edition of the Design of
Post-Tensioned Slabs-on-Ground, Phoenix Arizona, May, www.post-tensioning.org.
DLJPDEL.TL N:\Projects\SD\SD365 Lennar, Tabata Development\14-0178\14-0178R2.doc
APPENDIX B
LABORATORY TESTING
Selected samples were tested using generally accepted standards. Laboratory testing was
conducted in a manner consistent with the level of care and skill ordinarily exercised by
members of the profession currently practicing under similar conditions in the same locality.
No warranty, express or implied, is made as to the correctness or serviceability of the test
results or the conclusions derived from these tests. Where a specific laboratory test method
has been referenced, such as ASTM, Caltrans, or AASHTO, the reference applies only to the
specified test method and not to associated test methods or practices, and the test method has
only been used as a guidance document for the performing the test, and not as a "Test
Standard." A brief description of the tests performed follows:
Classification: Soils were classified visually according to the Unified Soil Classification System as
established by the American Society of Civil Engineers in general accordance with the
procedures outlined in ASTM test method D2488.
Maximum Density/Optimum Moisture: The maximum density and optimum moisture of
selected fill soil samples were determined by using test method ASTM test method D1557. For
samples with more than 10 percent plus %-inch material, the maximum densities and optimum
moisture contents were corrected using ASTM D4718 as a guideline. The test results are
summarized in Figure B-i.
Expansion Index: The expansion potentials of selected samples of finish grade soils within the
building pad areas were estimated in general accordance with the laboratory procedures
outlined in ASTM test method D4829. The results are summarized on Figures B-2.1 and B-2.2.
Sulfate Content: To assess the potential for reactivity with concrete, ,selected soil samples
were tested for water soluble sulfate. The sulfate was extracted from the soil under vacuum
using a 10:1 (water to dry soil) dilution ratio. The extracted solution was tested for water
soluble sulfate in using ASTM D516 The results are also presented in Figures B-2.1 and B-2.2.
DLJP DELTA N:\Projects\SD\SD36S Lennar, Tabata Developrnent\14 0178\14 0178R2 doc
APPENDIX B
LABORATORY TESTING (Continued)
R-Value: R-Value tests were performed on selected pavement subgrade materials in general
accordance with California Test Method 301. The test results are summarized in Figure B-3.
Base Conformance-Tests: Conformance testing was conducted on a selected sample of the
recycled Class 2 aggregate base used at the site. Individual laboratory tests included Sieve
Analysis (ASTM C136), Sand Equivalent (ASTM D2419), R-Value (ASTM D2844), and Durability
(ASTM D3744). The test results are presented in Figures B-4.1 through B-4.6.
Asphalt Conformance Tests: Laboratory conformance testing was also conducted on selected
samples of the asphalt concrete used at the site. Individual laboratory tests included Extracted
Gradation (ASTM C136), Specific Asphalt Content (ASTM D6307), Hveem Density (ASTM D2726),
Maximum Theoretical Density (ASTM D2401), and Stabilometer (ASTM D1560). Air voids were
calculated using ASTM D3203. The results are shown in Figures B-5.1 through 8-5.3.
DUPDELT1, N:\Projects\SD\5D365 Lennar, Tabata Development\14-0178\14-0178R2.doc
S MAXIMUM DENSITY & OPTIMUM MOISTURE
(ASTM D1557)
LABORATORY TEST RESULTS
14-0178
Project No. SD365
Document No
FIGURE B-i
ID DESCRIPTION
MAXIMUM
DENSITY
[lb/ft3]
OPTIMUM
MOISTURE
[%]
1 Moderate yellow brown clayey sand (SC). 119 1111z
2 Dark yellow brown clayey sand (SC). 123 10Y2
3 Light olive brown sandy lean clay (CL). 120 12
4 Yellow brown sandy lean clay (CL). 1191/z 12
5 Dark yellow brown silty sand (SM). 1211/2 11%
6 Dark yellow brown lean clay with 6% lime (CL). 121 14
B-i Recycled %-inch Maximum Class 2 Aggregate Base. 119 1114
EXPANSION AND SULFATE TEST RESULTS
(ASTM D4829 & D516)
ID SAMPLE DESCRIPTION SOLUBLE
SULFATE
EXPANSION
INDEX
El-i Lot 1 - Moderate yellow brown clayey sand (SC) 0.02% 17
EI-2 Lot 2 - Moderate yellow brown clayey sand (SC) 0.02% 12
EI-3 Lot 3 - Moderate yellow brown clayey sand (SC) 0.04% 17
EI-4 Lot 4— Moderate yellow brown clayey sand (SC) 0.08% 17
El-5 Lot 5 - Moderate yellow brown clayey sand (SC) 0.09% 19
El-6 Lot 6 - Moderate yellow brown clayey sand (SC) 0.02% 16
El-7 Lot 7 - Moderate yellow brown clayey sand (SC) 0.03% 23
EI-8 Lot 8 - Moderate yellow brown clayey sand (SC) 0.02% 15
El-9 Lot 9 - Moderate yellow brown clayey sand (SC) 0.04% 18
EI-10 Lot 10 - Moderate yellow brown clayey sand (SC) 0.03% 15
El-11 Lot ii - Moderate yellow brown clayey sand (SC) 0.03% 25
EI-12 Lot 12 - Moderate yellow brown clayey sand (SC) 0.03% 19
El-13 Lot 13 - Moderate yellow brown clayey sand (SC) 0.04% 28
EXPANSION INDEX POTENTIAL EXPANSION
0to20 Very low
21to50 Low
51to90 Medium
91 to 130 High
Above 130 Very High
SULFATE CONTENT [%] SULFATE EXPOSURE CEMENT TYPE
0.00 to 0.10 Negligible -
0.10 to 0.20 Moderate II, IP(MS), IS(MS)
0.20 to 2.00 Severe V
Above 2.00 Very Severe V plus pozzolan
Document No. 14-0178
DL1P DELTA LABORATORY TEST RESULTS Project No. SD365
FIGURE B-2.1
EXPANSION AND SULFATE TEST RESULTS
(ASTM D4829 & D516)
SAMPLE r%CcrDIrrrIrRI SOLUBLE CVflAMCIfThI vlrLI_ DESCRIPTION IJI -
/
ID
SULFATE INDEX
EI-14 Lot 14— Dark yellow brown silty sand (SM) 0.02% 10
EI-15 Lot 15 - Dark yellow brown silty sand (SM) 0.02% 4
El-16 Lot 16 - Moderate yellow brown clayey sand (SC) 0.02% 13
El-17 Lot 17 - Dark yellow brown silty sand (SM) 0.02% 8
El-18 Lot 18— Dark yellow brown silty sand (SM) 0.02% 0
El-19 Lot 19— Dark yellow brown silty sand (SM) 0.02% 1
El-20 Lot 20— Dark yellow brown silty sand (SM) 0.01% 5
EI-21 Lot 21 - Moderate yellow brown clayey sand (SC) 0.04% 17
El-22 Lot 22— Dark yellow brown silty sand (SM) 0.02% 5
El-23 Lot 23 - Moderate yellow brown clayey sand (SC) 0.02% 14
El-24 Lot 24— Dark yellow brown silty sand (SM) 0.02% 10
El-25 Lot 25 - Dark yellow brown silty sand (SM) 0.02% 7
El-26 Lot 26 - Moderate yellow brown clayey sand (SC) 0.03% 24
EXPANSION INDEX POTENTIAL EXPANSION
0to20 Very low
21t050 Low
51t090 Medium
91 to 130 High
/
Above 130 Very High
SULFATE CONTENT [%] SULFATE EXPOSURE CEMENT TYPE
0.00 to 0.10 Negligible -
- 0.10 to 0.20 Moderate II, IP(MS), IS(MS)
0.20t02.00 - Severe V
Above 2.00 Very Severe V plus pozzolan
eA 13ROUP.
Document No. 14-0178
LABORATORY TEST RESULTS Project No. SD365
FIGURE B-2.2
R-VALUE TEST RESULTS
(CTM 301)
Sample
No. Sample Date Street Name Sample
Location Sample Represents R-Value
R-1 10/10/14 Reef Circle Station 17+00 Reef Circle Street, Station 16+00 to 19+00 5
R-2 10/14/14 Reef Circle Station 25+50 Reef Circle Street, Station 24+00 to 27+00 20
R-3 10/15/14 Reef Circle Station 22+00 Reef Circle Street, Station 21+00 to 24+00, 24
R-4 10/15/14 Reef Circle Station 20+00 Reef Circle Street, Station 19+00 to 21+00 10
R-5 11/10/14 Camino Hills Station 14+00 Camino Hills Drive, Station 13+00 to 16+00 14
R-6 11/14/14 Camino Hills Station 11+00 Camino Hills Drive, Station 10+00 to 13+00 12
R1* 10/23/14 Reef Circle Station 17+00 Reef Circle Street, Station 16+00 to 19+00 67
R4* 10/23/14 Reef Circle Station 20+00 Reef circle Street, Station 19+00 to 21+00 72
NOTE: Samples R1* and R4* were retested using 6.0% dry-hydrated lime slurry.
RECOMMENDED PAVEMENT SECTIONS
Pavement Area Design
R-Value
Traffic
Index
Asphalt
Section
Base Section / Lime
Treated Soil (LTS)
Camino Hills Drive, Stations 10+00 to 16+50 12 6.0 4 Inches 10 Inches
Reef Circle Street, Stations 16+50 to 21+00 5 5.0 4 Inches 4 Inches / 8 Inches LTS
Reef Circle Street, Stations 21+00 to 27+00 5 5.0 4 Inches 8 Inches
NOTE: Lime stabilization was only conducted between Stations 16+50 and 21+00 of Reef Circle Street.
ik
LABORATORY TEST RESULTS
Document No. 14-0178
Project No. SD365
FIGURE B-3
GRADATION ANALYSIS
SIEVE
SIZE
PERCENT
FINER AS
TESTED
SPECIFIED
OPERATING
RANGE
1" 100 100
3/4" 95 90-100
3/8" 77
No.4 58 35-60
No.8 45
No. 16 33
No. 30 23 10-30
No. 50 16
No. 100 10
No. 200 6.8 2-9
U.S. Standard Sieve Sizes
3/4" 3/8' #4 #8 #16 ' #30 #50 #100 #200
100
90
80
.c .70
C) \\
60
UPPER LIMIT OF SPECIFICATION
50
U-
4-
40
a. 30
20
10
LOWER LIMIT OF SPECIFICATION -.
0
100 10 1 - 0.1 0.01
Grain Size in Millimeters
CLASS 2 AGGREGATE BASE, 3/4" MAXIMUM
CALTRANS STANDARD SPECIFICATIONS
2010 EDITION, SECTION 26-1.02B
- SAMPLE ID: AB-1 (Recycled)
DATE SAMPLED: 11/14/2014
SAMPLE LOCATION: Reef Circle Street (@23 Tons)
QUALITY SPECIFICATIONS
R-VALUE (CTM 301)
MAXIMUM DENSITY (ASTM D1557)
MAXIMUM DENSITY: 77,7- .PC
OPTIMUM MOISTURE: 12
RESULTS SPECIFIED
85 78 MIN
SAND EQUIVALENT (CTM 217) 40 22 MIN
DURABILITY (CTM 229) 28 35 MIN
LA ABRASION, 100 REV (CTM 131) -- 15 MAX
LA ABRASION, 500 REV (CTM 131) -- 52 MAX
/ Document No. 14-0178
% GROUP DELTA.. CONFORMANCE TEST RESULTS Project No. 5D365
FIGURE B-4.1
U.S. Standard Sieve Sizes
3/4" 3/8' #4 #8 #16 #30 #50 #100 #200
100-
90 -----\\ ------ - - ___ ___
80
70
\ , 0
60 -----
UPPER LIMIT OF SPECIFICAT ON
---- ___ - - ___
50
LL
40
----
20
10 LZ
LOWERLIMITOFSPECIFICATION _
0 , , , ,
- _____ _______ - ____ ____ ____
________
100 10 1 0.1 0.01
Grain Size in Millimeters
MAXIMUM DENSITY (ASTM D1557)
F
XIMUM DENSITY:
TIMUM MOISTURE: --
GRADATION ANALYSIS
SIEVE
SIZE
____
PERCENT
FINER AS
TESTED
SPECIFIED
OPERATING
RANGE
100 100
3/4" 98 90 -100
3/8" 77
No.4 56 35-60
No.8 44
No. 16 32
No. 30 20 10-30
No. 50 12
No. 100 7
No. 200 4.4 2:9
CLASS 2 AGGREGATE BASE, 3/4" MAXIMUM
CALTRANS STANDARD SPECIFICATIONS QUALITY SPECIFICATIONS RESULTS SPECIFIED
2010 EDITION, SECTION 26-1.02B
SAMPLE ID: AB-2 (Recycled)
DATE SAMPLED: 11/20/2014
SAMPLE LOCATION: Reef Circle Street, Station 20+00
R-VALUE (CTM 3O1) 83 78 MIN
SAND EQUIVALENT (CTM 217) 60 22 MIN
DURABILITY (CTM 229) 54 35 MIN
LA ABRASION, 100 REV (CTM 131) -- 15 MAX
LA ABRASION 500 REV (CTM 131) -- 52 MAX
Document No. 14-0178
GRDLJP DELTA. CONFORMANCE TEST RESULTS Project No. SD365
FIGURE B-4.2
GRADATION ANALYSIS
SIEVE
SIZE
____
PERCENT
FINER AS
TESTED
SPECIFIED
OPERATING
RANGE
1" 100 100
3/4' 99 90 -100
3/8" 83
No.4 65 35-60
No.8 52
No. 16 39
No. 30 28 10-30
No. 50 19
No. 100 12
No. 200 7.8 2- 9
U.S. Standard Sieve Sizes
3/4" 3/8' #4 #8 #16 #30 #50 #100 #200
100
90
80
\
\ .70 \ ,
N ' UPPER LIMIT OF SPECIFICATION
60
Q)50
U- --- \
4Q
Q 30
20
10
LOWER LIMITOF SPECIFICATION
0
100 10 1 0.1 0.01
Grain Size in Millimeters
CLASS 2 AGGREGATE BASE, 3/4" MAXIMUM
CALTRANS STANDARD SPECIFICATIONS QUALITY SPECIFICATIONS
2010 EDITION, SECTION 26-1.02B
SAMPLE ID: AB-3 (Recycled)
DATE SAMPLED: 12/1/2014
SAMPLE LOCATION: Reef Circle Street (@ 25 Tons)
MAXIMUM DENSITY (ASTM D1557)
MAXIMUM DENSITY: --
OPTIMUM MOISTURE: --
)
RESULTS SPECIFIED
R-VALUE(CTM 301) 84 78 MIN
SAND EQUIVALENT (CTM 217) 48 22 MIN
DURABILITY (CTM 229) 33 35 MIN
LA ABRASION, 100 REV (CTM 131) -- 15 MAX
LA ABRASION, 500 REV (CTM 131) -- 52 MAX
Document No. 14-0178
GROUP DELTA CONFORMANCE TEST RESULTS Project No. 5D365
FIGURE B-4.3
U.S.- Standard Sieve Sizes
3/4' 3/8' #4 #8 #16 #30 #50 #100 #200 100 ------k -
90
80
70
it 60
)
UPPER LIMIT OF SPECIFICATION N
_'\ - --- --
50
30
20
10 /
LOWER LIMIT OF SPECIFICATION
0
100 10 1 0.1 0.01
Grain Size in Millimeters
MAXIMUM DENSITY (ASTM D1557)
MAXIMUM DENSITY: --
OPTIMUM MOISTURE: --
GRADATION ANALYSIS
SIEVE
SIZE
PERCENT
FINER AS
SPECIFIED
OPERATING
1" 100 100
3/4" 98 90-100
3/8" 85
No.4 71 35-60
No.8 61
No. 16 48
No. 30 35 10-30
No. 50 22
No. 100 12
No. 200 6.7 2- 9
CLASS 2 AGGREGATE BASE, 3/4" MAXIMUM
CALTRANS STANDARD SPECIFICATIONS
2010 EDITION, SECTION 26-1.02B
SAMPLE ID: AB-4 (Recycled)
DATE SAMPLED: 12/1/2014
SAMPLE LOCATION: Reef Circle Street (@ 570 Tons)
QUALITY SPECIFICATIONS RESULTS SPECIFIED
R-VALUE (CTM 3O1) 81 78 MIN
SAND EQUIVALENT (CTM 217) 55 22 MIN
DURABILITY (CTM 229) 50 35 MIN
LA ABRASION, IOO REV (CTM 131) -- 15 MAX
LA ABRASION, 500 REV (CTM 131) -- 52 MAX
Document No. 14-0178
4) ERDUP DELTA CONFORMANCE TEST RESULTS Project No 5D365
FIGURE B-4.4
CIFIED
RATING
NGE
100
-100
5 -60
)-30
- 9
H 10
LOW U ER MITOF SPECIFICATION
100 10 1 0.1 0.01
Grain Size in Millimeters
CLASS 2 AGGREGATE BASE, 3/4" MAXIMUM
CALTRANS STANDARD SPECIFICATIONS QUALITY SPECIFICATIONS
2010 EDITION, SECTION 26-1.02B
SAMPLE ID: AB-5 (Recycled)
DATE SAMPLED: 1/7/2015
a - tan. — I ts .an. I-s ------I i:II_ rs..:..... ns_s:... An • fin
MAXIMUM DENSITY (ASTM D1557)
MAXIMUM DENSITY: -
OPTIMUM MOISTURE: --
RESULTS SPECIFIED
R-VALUE 301) 80 78 MIN
SAND EQUIVALENT (CTM 217) 58 22 MIN
DURABILITY (CTM 229) 46 35 MIN
LA ABRASION, 100 REV (CTM 131) -- 15 MAX
LA ABRASION, 500 REV (CTM 131) -- 52 MAX
Document No. 14-0178
GROUP DELTA CONFORMANCE TEST RESULTS Project No 5D365
FIGURE B-4.5
U.S. Standard Sieve Sizes
3/4" 3/8' #4 #8 #16 #30 #50 #100 #200
100
iI =iI 70
60 -u--- UPPER LIMIT OF SPECIFICATION
- -- ___
50
40
30
20
10
LOWER LIMIT OF SPECIFICATION -.....
0 -
100 10 1 0.1 0.01
Grain Size in Millimeters
MAXIMUM DENSITY (ASTM D1557)
MAXIMUM DENSITY: --
OPTIMUM MOISTURE: --
GRADATION ANALYSIS
SIEVE
SIZE
_____
PERCENT
FINER AS
TESTED
SPECIFIED
OPERATING
RANGE
1" 100 100
3/4" 94 90 -100
3/8" 74
No.4 57 35-60
No.8 46
No. 16 36
No. 30 26 10-30
No. 50 17
No. 100 11
No. 200 7.0 2-
CLASS 2 AGGREGATE BASE, 3/4" MAXIMUM
CALTRANS STANDARD SPECIFICATIONS
2010 EDITION, SECTION 26-1.02B
SAMPLE ID: A13-6 (Recycled)
DATE SAMPLED: 1/9/2015
SAMPLE LOCATION: Camino Hills Drive, Station 14+00
QUALITY SPECIFICATIONS RESULTS SPECIFIED
R-VALUE(CTM 301) 81 78 MIN
SAND EQUIVALENT (CTM 217) 51 22 MIN
DURABILITY (CTM 229) 36 35 MIN
LA ABRASION, 100 REV (CTM 131) -- 15 MAX
LA ABRASION, 500 REV (CTM 131) -- 52 MAX
- Document No. 14-0178 41 ' ERDUP DELTA CONFORMANCE TEST RESULTS Project No 5D365
FIGURE 13-4.6
SIEVE
SIZE
PERCENT
FINER AS
SPECIFICATION
INDIVIDUAL MOVING
TESTED TEST RESULT AVERAGE
1" 100 100 100
3/4" 99 87-100 90-100
1/2" 84
3/8" 63 50 -80 60 -75
No. 4 35 30 -60 40 -55
No.8 26 22-44 27-40
No. 16 20
No.30 16 8-26 12-22
No.50 11
No.100 6
No. 200 3.5 1 1 -8 3 - 6
U.S. Standard Sieve Sizes
3/4" 1/2' 3/8" #4 #8 #16 #30 #50 #100 #200 100
90
'
80
\' ,70
.60
.E 50 UPPER LIMIT OFSPECIFICATION - - - - ____ - - _____
40
30
0
i --—--
/
20
-
- LOWER LIMIT OF SPECIFICATION
100 10 1 0.1 0.01
Grain Size in Millimeters
TYPE III CLASS 132 ASPHALT CONCRETE QUALITY SPECIFICATIONS
"STANDARD SPECIFICATIONS FOR PUBLIC WORKS
CONSTRUCTION", 2012 EDITION, SECTION 400-4
SAMPLE ID: AC-1 (Escondido Asphalt, Inc.)
DATE SAMPLED: 11/24/2014
SAMPLE LOCATION: Reef Circle Street (@21 Tons)
TEST
RESULTS SPECIFIED
SAND EQUIVALENT (ASTM D2419) --- 45 MIN
STABILOMETER VALUE (ASTM D1560) 46 35 MIN
SPECIFIC ASPHALT CONTENT (ASTM D6307) 5.0% 4.6% - 6.0%
HVEEM DENSITY (ASTM 1562) 152.8 N/A
MAXIMUM THEORITICAL DENSITY (ASTM D2041) 160.5 N/A
PERCENT AIR VOIDS (ASTM D2041) 1 4.8% 2.0% - 6.0%
7. Document No. 14-0178
DUP DELTA ASPHALT CONCRETE CONFORMANCE Project No. SD365
FIGURE B-5.1
SIEVE
SIZE
PERCENT
FINER AS
SPECIFICATION
INDIVIDUAL MOVING
TESTED TEST RESULT AVERAGE
1" 100 100 100
3/4" 99 87-100 90-100
1/2" 77
3/8" 57 50 -80 60 -75
No. 4 35 30 -60 40 -55
No.8 26 22-44 27-40
No. 16 20
No.30 15 8-26 12-22
No.50 10
No. 100 6
No. 200 3.2 1-8 1 3-6
TEST
RESULTS SPECIFIED
U.S. Standard Sieve Sizes
100 3/4" 1/2" 3/8' #4 #8 #16 #30 #50 #100 #200
90
80
.7n
60
E 50
LL
UPPER LIMIT OF SPECIFICATION
40
30
20
10 -
- LOW LIMIT OF SPECIFICATION
1111d--
100 10 1 0.1 0.01
Grain Size in Millimeters
QUALITY SPECIFICATIONS
SAND EQUIVALENT (ASTM D2419) --- 45 MIN
STABILOMETER VALUE (ASTM D1560) 46 35 MIN
SPECIFIC ASPHALT CONTENT (ASTM D6307) 5.0% 4.6%-6.0%
HVEEM DENSITY (ASTM 1562) 153.3 N/A
MAXIMUM THEORITICAL DENSITY (ASTM D2041) 160.1 N/A
PERCENT AIR VOIDS (ASTM D2041) 4.2% 12.0%-6.0%
TYPE III CLASS 132 ASPHALT CONCRETE
"STANDARD SPECIFICATIONS FOR PUBLIC WORKS
CONSTRUCTION", 2012 EDITION, SECTION 400-4
SAMPLE ID: AC-2 (Escondido Asphalt, Inc.)
DATE SAMPLED: 11/24/2014
SAMPLE LOCATION: Reef Circle Street (@ 442 Tons)
Document No. 14-0178
ERDLIF DELTA\ ASPHALT CONCRETE CONFORMANCE Project No SD365
SIEVE
SIZE
PERCENT
FINER AS
SPECIFICATION
INDIVIDUAL MOVING
TESTED TEST RESULT AVERAGE
1" 100 100 100
3/4" 99 87 -100 90 -100
1/2" 88
3/8" 71 50-80 60-75
No. 4 46 30 -60 40 -55
No.8 35 22-44 27-40
No. 16 27
No.30 21 826 12-22
No.50 14
No. 100 8
No. 200 4.3 1 - 8 3-,6
I
U.S. Standard Sieve Sizes
100 3/4" 1/2 3/8' #4 #8 #16 #30 #50 #100 #200
90
80
-
70 1 IN C)
>60
a, .E 50 \ UPPER LIMIT OF SPECIFICATION - - ____ - ..
40
30 ----_ --
--
_
-_
20
10 LOWER LIMIT OFSPECIFICATION
0
100 10 1 0.1 0.01
Grain Size in Millimeters
TYPE III CLASS 132 ASPHALT CONCRETE
"STANDARD SPECIFICATIONS FOR PUBLIC WORKS
CONSTRUCTION", 2012 EDITION, SECTION 400-4
SAMPLE ID: AC-3 (Escondido Asphalt, Inc.)
DATE SAMPLED: 1/13/2015
SAMPLE LOCATION: Camino Hills Drive (@358 Tons)
TEST
QUALITY SPECIFICATIONS RESULTS SPECIFIED
SAND EQUIVALENT (ASTM D2419) --- 45 MIN
STABILOMETER VALUE (ASTM D1560) 42 35 MIN
SPECIFIC ASPHALT CONTENT (ASTM D6307) 5.2% 4.6%-6.0%
HVEEM DENSITY (ASTM 1562) 151.5 N/A
MAXIMUM THEORITICAL DENSITY (ASTM D2041) 155.8 N/A
,PERCENT AIR VOIDS (ASTM D2041) 2.8% 2.0%-6.0%
H Document No. 14-0178
RDLJF DELTA ASPHALT CONCRETE CONFORMANCE Project No 5D365
APPENDIX C
FIELD TEST RESULTS
The results of the field density tests taken during the grading operations at the subject site are
presented in the following Figures C-i through C-lU. Note that the elevations and locationsof
the field tests were determined by hand level and pacing relative to survey data provided by
the grading contractor.
The following abbreviations were used to describe tests reported in this appendix.
AB = Aggregate Base
AC = Asphalt Concrete
CG = Curb & Gutter
FG = Finish Grade
FBG = Finish Base Grade
FSG = Finish SubGrade
iT = Joint Trench
ITS = Lime Treated Soil
NU = Nuclear Density Test
SD = Storm Drain
SG=SubGrade
55 = Sanitary Sewer
W = Water
WB = Wall Backfill
DLJP DELTA N:\Projects\SD\SD365 Lennar, Tabata Development\14 0178\14 0178R3 doc
Document No 14-0178
450 Lk"k- GROUP DELTA DENSITY TEST RESULTS Project No. SD365
FIGURE C-I
Test Test Elevation! Soil Max. Dry Moisture 7 Dry Relative Required Retest Test
No. Date Location Type Density Content Density Compaction Compaction Number Method
[ft] [pcfl [%] [pcf] [%] 1%]
1 09/11/14 81 4 119.5 11.5 110.0 92 90 NU
2 09/11/14 82 4 119.5 14.6 112.2 94 90 NU
3 09/11/14 82 4 119.5 14.5 108.5 91 90 NU
4 09/11/14 83 4 119.5 13.8 107.9 90 90 NU
5 09/12/14 86 2 123.0 9.4 106.6 87 90 6 NU
6 09/12/14 87 2 123.0 9.2 104.9 85 90 7 NU
7 09/12/14 88 2 123.0 10.5 110.5 90 90 NU
8 09/12/14 89 2 123.0 12.5 111.4 91' 90 NU
9 09/12/14 86 4 119.5 . 13.5 110.0 92 90 NU
10 09/12/14 87 4 119.5 12.8 108.8 91 90 NU
11 09/12/14 86 4 119.5 14.0 108.0 90 90 NU
12 09/12/14 87 4 119.5 15.2 107.5 90 90 NU
13 09/12/14 93 4 119.5 14.5 107.3 90 . 90 NU
14 09/12/14 91 2 123.0 12.3 110.5 90 90 NU
15 09/12/14 92 2 123.0 12.3 111.5 91 90 NU
16 09/12/14 86 2 123.0 12.2 108.0 , 88 90 18 . NU
17 09/12/14 87 2 123.0 11.5 107.6 87 90 19 NU
18 09/12/14 86 2 123.0 12.5 111.9 91 90 NU
19 09/12/14 87 2 123.0 12.9 112.1 . 91 90 NU
20 09/15/14 92 2 123.0 19.3 106.5 87 90 21 NU
21 09/15/14 92 2 123.0 14.6 111.1 90 90 NU
22 09/15/14 93 2 123.0 16.9 106.1 86 90 23 NU
23 09/15/14 93 2 123.0 12.8 113.5 92 90 NU
24 09/15/14 94 2 123.0 10.5 114.9 93 90 NU
25 09/15/14 95 2 123.0 10.8 115.6 94 90 NU
26 09/15/14 89 2 123.0 13.3 110.5 90 90 NU
27 09/15/14 90 2 123.0 10.4 110.2 90 90 NU
28 09/16/14 88 2 123.0 12.8, 111.4 91 90.. NU
29 09/16/14 91 2 123.0 20.8 100.1 81 90 30 NU
30 09/16/14 91 2 123.0 12.3 113.0 92 90 NU
31 09/16/14 99 4 119.5 10.3 108.3 91 90. NU
32 09/16/14 103 4 119.5 12.2 107.0 90 90 . NU
33 09/16/14 104 4 119.5 12.0 108.6 91 90 NU
34 09/16/14 82 2 123.0 10.7 114.5 93 90 NU
35 09/16/14 84 2 123.0 11.4 110.3 90 90 NU
36 09/16/14 89 2 123.0 9.5 110.8 90 . 90 NU
37 09/16/14 88 2 123.0 10.7 110.1 90 90 NU
38 09/16/14 87 2 123.0 10.4 . 110.4 90 90 . NU
39 09/16/14 . 92 2 123.0 16.3 113.4 92 90 NU .
40 09/16/14 . 93 2 123.0 14.9 112.1 91 90 NU
41 09/1/14 92 2 123.0 11.5 110.8 90 90 NU
42 09/16/14 93 2 123.0 10.2 115.3 94 90 NU
43 09/17/14 95 2 123.0 15.5 111.2 90 90 NU
44 09/17/14 96 2 123.0 16.0 110.7 90 .90 NU
45 09/17/14 95 4 119.5 16.0 . 109.0 - 91 90 . ' NU
46 09/17/14 96 4 119.5 15.9 108.5 91 90 NU
47 09/17/14 95 2 123.0 13.8 112.1 91 90 NU
48 09/17/14 96 4 119.5 15.5 107.9 90 90 . NU
49 09/17/14 97 4 119.5 16.0 107.4 90 90 NU
50 09/17/14 101 4 1195 120 1074 90 90 NU
Document No. 14-0178
Ak~ ISR - DUP DELTA DENSITY TEST RESULTS Project No SD365
FIGURE C-2
Test Test Elevation! Soil Max. Dry Moisture Dry Relative Required Retest Test
No. Date Location Type Density Content Density Compaction Compaction Number Method
[ft] [pcf] [%] [pcf] [%] [%]
51 09/17/14 102 2 123.0 14.0 110.8 90 90 NU
52 09/18/14 94 4 119.5 12.0 107.9 90 90 NU
53 09/18/14 95 4 119.5 12.4 107.4 90 90 NU
54 09/18,114 96 2 123.0 13.2 113.1 92 90 NU
55 09,118,114 97 2 123.0 14.4 112.1 91 90 NU
56 09/18/14 94 2 123.0 13.9 111.9 91 90 NU
57 09/18/14 96 2 123.0 13.3 111.5 91 90 NU
58 09/18/14 102 2 123.0 14.4 112.0 91 90 NU
59 09/18/14 104 4 119.5 17.6 109.1 91 90 NU
60 09/18/14 96 2 123.0 11.9 112.5 91 90 NU
61 09/18/14 98 2 123.0 10.0 111.4 91 90 NU
62 09/19/14 108 4 119.5 9.2 105.0 88 90 64 NU
63 09/19/14 109 4 119.5 9.0 104.8 88 90 65 NU
64 09/19/14 108 4 119.5 11.4 107.6 90 90 NU
65 09/19/14 109 4 119.5 13.2 109.8 92 90 NU
66 09/19/14 111 1 119.0 11.6 109.8 92 90 NU
67 09/19/14 112 1 119.0 11.4 107.8 91 90 NU
68 09/22/14 100 2 123.0 10.5 110.7 90 90 NU
69 09/22/14 102 2 123.0 10.0 111.0 90 90 NU
70 09/22/14 103 2 123.0 11.5 112.2 91 90 NU
71 09/22/14 104 2 123.0 10.9 110.9 90 90 NU
72 09/22/14 105 2 123.0 10.2 111.4 91 90 NU
73 09/22/14 104 2 123.0 9.9 110.4 90 90 NU
74 09/22/14 105 2 123.0 11.0 111.2 90 90 NU
75 09/22/14 106 2 123.0 15.5 107.6 87 90 76 NU
76 09/22/14 106 2 123.0 10.4 110.9 90 90 NU
77 09/22/14 107 2 123.0 13.8 113.3 92 90 NU
78 09/22/14 104 2 123.0 11.3 111.1 90 90 NU
79 09/22/14 105 2 123.0 10.5 110.6 90 90 NU
80 09/23/14 85 2 123.0 10.3 103.6 84 90 80 NU
81 09/23/14 86 2 123.0 9.7 106.8 87 90 81 NU
82 09/23/14 85 2 123.0 10.6 110.8 90 90 NU
83 09/23/14 85 2 123.0 12.0 110.9 90 90 NU
84 09/23/14 88 2 123.0 11.1 114.5 93 90 NU
85 09/23/14 88 2 123.0 11.4 110.8 90 90 NU
86 09/23/14 112 1 119.0 10.2 107.8 91 90 NU
87 09/23/14 113 1 119.0 10.8 107.0 90 90 NU
88 09/24/14 94 2 123.0 10.3 112.6 92 90 NU
89 09/24/14 95 2 123.0 11.1 111.1 90 90 NU
90 09/24/14 97 2 123.0 11.7 110.1 90 90 NU
91 09/24/14 98 2 123.0 11.3 111.8 91 90 NU
92 09/24/14 100 4 119.5 14.8 107.1 90 90 NU
93 09/24/14 102 2 123.0 9.7 114.6 93 90 NU
94 09/24/14 94 4 119.5 12.5 109.4 92 90 NU
95 09/24/14 95 4 119.5 12.8 107.2 90 90 NU
96 09/24/14 97 2 123.0 12.8 111.3 90 90 NU
97 09/24/14 99 2 123.0 11.9 110.9 90 90 NU
98 09/24/14 104 2 123.0 11.5 112.0 91 90 NU
99 09/26/14 86 2 123.0 10.0 112.4 91 90 NU
100 09/26/14 88 2 123.0 10.5 113.6 92 90 NU
Document No. 14-0178
GROUP DELTA DENSITY TEST RESULTS Project No SD365
FIGURE C-3
Test Test Elevation! Soil Max. Dry Moisture Dry Relative Required Retest Test
No. Date Location Type Density Content Density Compaction I Compaction Number Method
[ft] [pci] [%] [pci] [%] [%]
101 09/26/14 100 3 120.0 12.2 108.5 90 90 NU
102 09/26/14 102 3 120.0 12.1 109.9 92 90 NU
103 09/26/14 103 3 120.0 15.6 100.3 84 90 105 NU
104 09/26/14 104 3 120.0 13.7 106.0 88 90 106 NU
105 09/26/14 103 3 120.0 13.5 109.0 91 90 NU
106 09/26/14 104 3 120.0 14.2 108.6 91 90 NU
107 09/26/14 82 2 1230 10.7 110.4 90 90 MU
108 09/26/14 83 2 123.0 12.4 110.7 90 90 NU
109 09/26/14 85 2 123.0 10.7 112.4 91 90 NU
110 09/26/14 86 2 123.0 12.5 111.3 90 90 NU
111 09/26/14 88 2 123.0 14.2 102.2 83 90 112 NU
112 09/26/14 88 2 123.0 12.3 111.0 90 90 NU
113 09/29/14 92 2 123.0 13.0 • 106.9 • 87 • 90 114 NU
114 09/29/14 92 2 123.0 11.3 113.3 92 90 NU
115 09/29/14 89 2 123.0 14.5 110.6 90 90 NU
116 09/29/14 90 2 123.0 13.3 111.0 90 90 NU
117 09/29/14 80 2 123.0 10.3 107.6 87 90 119 MU
118 09/29/14 81 2 123.0 8.7 105.9 86 90 120 NU
119 09/29/14 80 2 123.0 10.1 110.6 90 90 • NU
120 09/29/14 81 2 123.0 10.5 111.8 91 90 NU
121 09/29/14 83 4 119.5 14.7 110.9 93 90 NU
122 09/29/14 84 4 119.5 12.7 109.6 92 90 NU
123 09/30/14 87 4 119.5 15.1 110.5 92 90 NU
124 09/30/14 89 4 119.5 14.4 107.9 90 90 NU
125 09/30/14 79 4 119.5 12.6 107.7 90 90 MU
126 09/30/14 81 4 119.5 12.5 108.2 91 90 NU
127 09/30/14 83 4 119.5 13.8 108.9 91 90 NU
128 09/30/14 85 4 119.5 14.1 108.7 91 • 90 NU
129 09/30/14 87 4 119.5 13.9 109.3 91 90 NU
130 09/30/14 79 4 119.5 12.9 108.2 91 90 NU
131 09/30/14 81 4 119.5 12.5 108.4 91 90 MU
132 10/01/14 83 4 119.5 11.9 110.5 92 90 NU
133 10/01/14 85 5 121.5 11.3 111.2 92 90 NU
134 10/01/14 86 5 121.5 11.5 110.3 91 90 MU
135 10/01/14 80 5 121.5 11.5 110.7 91 90 MU
136 10/01/14 82 5 121.5 10.8 108.9 90 90 NU
137 10/01/14 85 5 121.5 11.1 113.9 94 90 NU
138 10/01/14 87 5 121.5 11.9 108.8 90 90 NU
139 10/02/14 96 5 121.5 11.5 112.8 93 90 NU
140 10/02/14 98 5 121.5 11.4 114.6 94 90,NU
141 • 10/02/14 82 4 119.5 11.5 109.7 92 90 • NU
142 10/02/14 89 4 119.5 12.0 110.5 92 90 NU
143 10/02/14 90 2 123.0 9.7 116.5 95 90 NU
144 10/02/14 88 2 123.0 9.9 110.5 90 90 NU
145 10/02/14 90 4 119.5 13.8 108.8 91 90 NU
146 10/02/14 92 4 119.5 11.6 109.0 91 90 MU •
147 10/02/14 94 4 119.5 11.8 112.1 94 90 MU
148 10/02/14 96 4 119.5 12.5 111.5 93 90 MU
149 10/02/14 98 4 119.5 11.2 111.5 93 90 MU
150 10/03/14 94 3 120.0 12.4 108.8 91 90 NU
Document No. 14-0178
GROUP DELTA DENSITY TEST RESULTS Project No 5D365
FIGURE C-4
Test Test Elevation! Soil Max. Dry Moisture Dry Relative Required Retest Test
No. Date Location Type Density
I
Content Density Compaction Compaction Number Method
Eft] [pcf] [%] [pcf] [%] 1%]
151 10/03/14 95 5 121.5 11.6 110.1 91 90 NU
152 10/03/14 95 5 121.5 14.3 110.8 91 90 NU
153 10/03/14 96 5 121.5 14.5 111.3 92 90 NU
154 10/03/14 98 5 121.5 15.6 110.2 91 90 NU
155 10/03/14 99 5 121.5 14.8 109.1 90 90 NU
156 10/03/14 101 3 120.0 12.3 104.3 87 90 157 NU
157 10/03/14 101 3 120.0 12.6 108.9 91 90 NU
158 10/03/14 102 3 120.0 13.0 109.2 91 90 NU
159 10/06/14 105 4 119.5 14.0 108.6 91 90 NU
160 10/06/14 106 4 119.5 11.3 109.0 91 90 NU
161 10/06/14 106 5 121.5 12.3 111.0 91 90 NU
162 10/06/14 107 5 121.5 11.9 112.7 93 90 NU
163 10/06/14 108 5 121.5 13.0 110.1 91 90 NU
164 10/06/14 112 5 121.5 11.9 111.5 92 90 NU
165 10/06/14 112 5 121.5 7.2 103.5 85 90 166 NU
166 10/06/14 113 5 121.5 11.2 108.9 90 90 NU
167 10/06/14 113 5 121.5 11.4 111.7 92 90 NU
168 10/06/14 113 5 121.5 8.7 106.0 87 90 169 NU
169 10/06/14 108 5 121.5 11.2 110.0 91 90 NU
170 10/06/14 108 5 121.5 10.3 110.5 91 90 NU
171 10/06/14 108 5 121.5 10.0 111.7 92 90 NU
172 10/06/14 103 1 119.0 9.3 113.2 95 90 NU
173 10/07/14 103 1 119.0 8.0 111.6 94 90 NU
174 10/07/14 109 5 121.5 9.4 111.4 92 90 NU
175 10/07/14 109 5 121.5 9.1 118.3 97 90 NU
176 10/07/14 108 5 121.5 9.7 110.7 91 90 NU
177 10/07/14 108 5 121.5 8.9 109.5 90 90 NU
178 10/07/14 108 5 121.5 9.3 112.8 93 90 NU
179 10/07/14 108 5 121.5 10.0 110.9 91 90 NU
180 10/09/14 94 3 120.0 17.0 103.9 87 90 181 NU
181 10/09/14 94 3 120.0 14.6 110.2 92 90 NU
182 10/09/14 96 3 120.0 17.6 103.7 86 90 183 NU
183 10/09/14 96 3 120.0 13.9 109.0 91 90 NU
184 10/09/14 98 2 123.0 8.7 108.9 89 90 185 NU
185 10/09/14 98 2 123.0 11.0 112.1 91 90 NU
186 10/09/14 100 2 123.0 9.9 111.2 90 90 NU
187 10/10/14 103 2 123.0 12.1 114.1 93 90 NU
188 10/10/14 106 2 123.0 10.3 116.8 95 90 NU
189 10/10/14 109 2 123.0 11.5 115.5 94 90 NU
190 10/10/14 108 1 119.0 10.3 112.3 94 90 NU
191 10/10/14 109 1 119.0 10.2 112.1 94 90 NU
192 10/10/14 110 1 119.0 11.0 112.0 94 90 NU
193 10/10/14 111 1 119.0 10.9 107.1 90 90 NU
194 10/10/14 FG 5 121.5 7.6 119.1 98 90 NU
195 10/10/14 FG 5 121.5 8.2 112.1 92 90 NU
196 10/10/14 FG 5 121.5 6.9 120.0 99 90 NU
197 10/10/14 FG 5 121.5 6.2 119.2 98 90 NU
198 10/10/14 FG 5 121.5 6.8 113.2 93 90 NU
199 10/10/14 FG 1 119.0 7.8 111.4 94 90 NU
200 10/10/14 FG 1 119.0 8.4 113.4 95 90 NU
9.1 113.5 . 95 90
10.8 107.7 91 90
9.2 110.7 93 90
7.5 108.4 91 90
9.4 119.1 98 90
9.4 112.7 .93 90
11.4 110.1 . . 91 . . 90
7.8 . 110.5 91 90
9.9 113.5 93 90
11.1 120.4 99 90
10.1 118.1 97 90
10.6 112.7 93 90
11.1 111.1 91 90
10.3 109.9 90 90
11.6 111.6 92 90
12.3 110.4 91 90
10.5 113.2 93 90
11.6 109.2 90 . 90
10.3 . 115.3 95 . 90 .
10.5 110.1 91
11.0 114.4 94 90
10.8 111.9 92 90
10.3 111.9 92 90
11.1 . .. 110.8 91 90
11.0 111.7 92 90
12.0 . .112.0 .92 90-
12.2 112.3 92 90
11.9 111.4 92. 90 .
11.5 110.7 91 90
12.1 112.2 92 90
11.9 . 111.7 92 90
10.5 .. 110.9 91 .. 90
12.5 110.9 91 90
11.9 112.8 92 90
13.5 110.6 9,0 90
12.9 111.4 91 90
9.5 114.5 96 90
9.6 117.2 95 90
10.2 117.5 96 90
8.3 : 113.2 95 90
9.4 113.9 96 90
8.7 114.2 96 90
5.6 109.0 90 90
5.0 111.0 91 90
4.9 110.0 91 90
5.9 . 114.0 94 90
11.1 113.6 95 95
12.7 . 116.6 98 95
11.8 115.3 97 95
NU
NU
NU
NU
NU
NU
NU
NU
NU
NU
NU
NU
NU
NU
NU
NU
NU
NU
NU
NU
NU
NU
NU
NU
NU
NU
NU
NU
NU
NU
NU
NU
NU
.N U
NU
NU
NU
NU
NU
NU
NU
NU
NU
NU
NU
NU
NU
NU
NU
Document No 14-0178 A DLIP DELTA DENSITY TEST RESULTS Project No 5D365
FIGURE C-5
Test Test Elevation! Soil Max. Dry Moisture. Dry Relative Required Retest Test
No. Date Location Type Density Content Density Compaction Compaction Number Method
[ft] [pcf] [%] [pcf] [%} [%j
Th
201 10/14/14 FG 1 119.0
202 10/14/14 FG 1 119.0
203 10/14/14 FG 1 119.0
204 10/15/14 FG 1 119.0
205 10/15/14 FG 5 121.5
206 10/15/14 FG 5 121.5
207 10/15/14 FG 5 121.5
208 10/15/14 FG 5 121.5
209 10/16/14 FG 5 121.5
210 10/16/14 FG 5 121.5
211 10/16/14 FG 5 121.5
212 P10/16/14 FG 5 121.5
213 10/16/14 FG 5 121.5
214 10/16/14 FG 5 121.5
215 10/16/14 FG 5 121.5
216 10/16/14 FG 5 121.5
217 10/16/14 FG 5 121.5
218 10/16/14 FG 5 121.5
219 10/16/14 FG 5 121.5
220 10/16/14 FG 5 121.5
221 10/16/14 FG 5 121.5
222 10/16/14 FG 5 121.5
223 10/16/14 FG 5 121.5
224 10/16/14 FG 5 121.5
225 10/16/14 FG 5 - 121.5
226 10/16/14 FG 5 121.5
227 10/16/14 FG 5 121.5
228 10/16/14 FG 5 121.5
229 10/16/14 FG 5 121.5
230 10/16/14 FG 5 121.5
231 10/16/14 FG 5 121.5
232 10/16/14 FG 5 121.5
233 10/16/14 102 5 121.5
234 10/16/14 103 2 123.0
235 10/16/14 99 2 123.0
236 10/16/14 100 2 123.0
237 11/18/14 FG 1 119.0
238 02/23/15 104 2 123.0
239 02/23/15 105 2 123.0
240 02/25/15 106 1 119.0
241 02/25/15 FG 1 119.0
242 02/26/15 105 1 119.0
243 06/02/15 FG 5 121.5
244 06/02/15 FG 5 121.5
245 06/02/15 FG 5 121.5
246 06/02/15 FG 5 121.5
AB-1 11/20/14 FBG B-i 119.0
AB-2 11/20/14 FBG B-i 119.0
AB-3 11/20/14 FBG B-i 119.0
Document No. 14-0178
GROLJP..DELTA DENSITY TEST RESULTS Project No. SD365
FIGURE C-6
Test Test Elevation! Soil Max. Dry Moisture Dry Relative Required Retest Test
No. Date Location Type Density Content Density Compaction Compaction Number Method
[ft] [pcf] [%} [pci] [%] [%]
AB-4 11/20X14 FBG B-i 119.0 12.3 116.2 98 95 NU
AB-5 11/20/14 FBG B-i 119.0 11.4 115.8 97 95 NU
AB-6 11/20/14 FBG B-i 119.0 12.0 116.3 98 95 NU
AB-7 01/16/15 FBG B-i 119.0 11.9 118.0 99 95 NU
AB-8 01/16/15 FBG B-i 119.0 11.7 117.6 99 95 NU
AB-9 01/16/15 FBG B-i 119.0 12.0 118.1 99 95 NU
AB-10 01/16/15 FBG B-i 119.0 11.5 117.3 99 95 NU
AB-11 01/16/15 FBG B-i 119.0 11.6 117.9 99 95 NU
AB-12 01/17/15 FBG B-i 119.0 10.7 118.0 99 95 NU
AB-13 01/17/15 FBG B-i 119.0 11.0 118.3 99 95 NU
AB-14 01/20/15 FBG B-i 119.0 9.0 118.0 99 95 NU
AB-15 05/28/15 FBG B-7 123.0 8.2 121.3 99 95 NU
AB-16 05/28/15 FBG B-7 123.0 8.7 122.5 100 95 NU
CG-1 11/13/14 STA 23+00 2 123.0 11.7 118.8 97 95 NU
CG-2 11/13/14 STA 25+00 2 123.0 10.9 119.0 97 95 NU
CG-3 11/13/14 STA 24+00 2 123.0 11.5 117.7 96 95 NU
CG-4 11/13/14 STA 22+50 2 123.0 11.3 118.1 96 95 NU
CG-5 11/14/14 STA 25+50 B-i 119.0 15.8 118.3 99 95 NU
CG-6 11/14/14 STA 24+00 B-i 119.0 11.6 117.9 99 95 NU
CG-7 11/14/14 STA 22+50 B-i 119.0 12.3 117.6 99 95 NU
CG-8 11/14/14 STA 21+00 B-i 119.0 12.0 118.5 100 95 NU
CG-9 I1/14/14 STA 19+50 B-i 119.0 11.9 117.2 98 95 NU
CG-10 11/14/14 STA 18+00 B-i 119.0 14.3 116.9 98 95 NU
CG-ii 11/14/14 STA 16+50 B-i 119.0 12.2 116.5 98 95 NU
CG-12 11/14/14 STA 16+00 B-i 119.0 11.7 117.0 98 95 NU
CG-13 12/01/14 STA 14+50 B-i 119.0 11.3 113.7 96 95 NU
CG-14 12/01/14 STA 13+50 B-i 119.0 11.5 115.5 97 95 NU
CG-15 12/01/14 STA 12+50 B-i 119.0 11.0 115.0 97 95 NU
CG-16 12/01/14 STA 11+50 B-i 119.0 11.8 117.7 99 95 NU
CG-17 01/06/15 STA 10+10 B-i 119.0 11.4 117.3 99 95 NU
iT-i 11/05/14 FSG i 119.0 11.1 114.1 96 95 NU
JT-2 11/05/14 FSG 1 119.0 10.5 113.7 96 95 NU
JT-3 11/06/14 FSG 1 119.0 9.7 113.9 96 95 NU
JT-4 11/07/14 FSG 1 119.0 10.3 114.4 96 95 NU
JT-5 11/07/14 FSG i 119.0 0.4 113.5 95 95 NU
JT-6 11/07/14 FSG i 119.0 9.6 114.0 96 95 NU
JT-7 11/24/14 FSG i 119.0 9.6 113.8 96 95 NU
JT-8 11/24/14 FSG i 119.0 10.9 115.0 97 95 NU
JT-9 11/24/14 FSG 1 119.0 11.0 114.3 96 95 NU
SD-1 11/10/14 90 1 119.0 10.6 109.8 92 90 NU
SD-2 11/10/14 92 1 119.0 11.0 108.8 91 90 NU
SD-3 11/10/14 94 1 119.0 11.3 109.7 92 90 NU
SD-4 11/10/14 92 1 119.0 12.4 113.9 96 95 NU
SD-5 11/10/14 96 1 119.0 11.8 114.3 96 90 NU
SD-6 11/10/14 98 1 119.0 12.1 114.6 96 95 NU
SG-1 11/13/14 FSG 6 121.0 17.0 109.0 90 90 LTS NU
Document No. 14-0178
GROUP .09...T.1%I DENSITY TEST RESULTS Project No. SD365
FIGURE C-7
Test Test Elevation! Soil Max. Dry Moisture Dry Relative Required Retest Test
No. Date Location Type Density Content Density Compaction Compaction Number Method
[ft] [pcf] [%] [pcf] 1%] 1 [%]
SG-2 11/13/14 FSG
SG-3 11/13/14 FSG
SG-4 11/13/14 FSG
SG-5 11/13/14 FSG
SG-6 11/13/14 FSG
SG-7 11/13/14 FSG
SG-8 11/13/14 FSG
SG-9 11/13/14 FSG
SG-10 11/13/14 FSG
SG-ii 11/13/14 FSG
SG-12 12/19/15 FSG
SG-13 12/19/15 FSG
SG-14 12/19/15 FSG
SG-15 12/19/15 FSG
SG-16 01/06/15 FSG
SG-17 04/21/15 FSG
SG-18 04/21/15' FSG
SG-19 04/21/15 FSG
SG-20 05/01/15 FSG
SG-21 05/01/15 FSG
SG-22 05/01/15 FSG
SS-1 10/23/14 103
SS-2 10/23/14 109
SS-3 10/23/14 108
55-4 10/23/14 104
SS-5 10/23/14 108
SS-6 10/23/14 108
SS-7 10/23/14 105
55-8 10/23/14 109
SS-9 10/23/14 108
SS-10 10/23/14 110
55-11 10/23/14 110
SS-12 10/23/14 109
SS-13 10/23/14 102
SS-14 10/23/14 98
55-15 10/24/14 96
SS-16 10/24/14 95
SS-17 10/24/14 96
SS-18 10/24/14 95
SS-19 10/24/14 93
SS-20 10/24/14 92
SS-21 10/24/14 93
SS-22 10/24/14 94
55-23 11/04/14 105
SS-24 11/04/14 FG
SS-25 11/04/14 FG
SS-26 11/04/14 FG
SS-27 11/05/14 FG
SS-28 11/10/14 93
6 121.0 22.6 108.6
6 121.0 17.6 110.1
6 121.0 17.2 109.5
6 121.0 17.3 110.3
2 123.0 12.9 118.6.
2 123.0 10.3 120.0
2 123.0 11.0 117.7
2 123.0 12.6 . 117.9
2 123.0 11.9 118.4
2 123.0 10.1 117.2
5 121.5 . 10.5 115.4
5 121.5 9.2 115.9
5 121.5 . 9.8 116.1
5 121.5 10.3 115.0
6 121.0 15.3 114.8
B-i 119.0 6.4 116.2
B-i 119.0 6.9 115.3
B-i 119.0 7.7 115.8
B-i 119.0 10.6 , 114.6
B-i 119.0 10.9 108.3
B-i 119.0 10.7 112.5
3 120.0 11.9 108.4
3 120.0 12.01 109.5
3 120.0 12.1 110.1
2 123.0 12.6 115.1
3 120.0 12.3 103.5
3 120.0 12.5 111.6
2 123.0 11.3 112.2
3 120.0 14.3 108.9
3 120.0 12.1 . 108.2
2 123.0 11.4 114.5
3 120.0 11.9 109.7
3 120.0 11.6 108.3
2 123.0 12.2 . 112.5
2 123.0 11.0 112.1
2 123.0 12.0 113.0
2 123.0 12.4 114.2
2 123.0 12.1 112.1
2 123.0 12.9 111.9
2 123.0 11.7 110.6
2 123.0 12.3 111.9
2 123.0 12.2 114.6
2 123.0 13.0 111.8
1 119.0 9.6 110.6
1 119.0 9.4 114.1
1 119.0 10.2 113.8
1 119.0 9.7 114.4
1 119.0 13.6 113.6
1 119.0 10.5 . 111.5
90 90 LTS NU
91 90 LTS NU
90 90 LTS NU
91 90 LTS NU
96 95: NU
98 95 NU
96 . 95 NU
96 95 NU
96 95 NU
95 .95 NU
95 .95. NU
95 95. . NU
96 95 . NU
95 .95 NU
95 . 95 NU
98 95 NU
97 95 NU
97 95 NU
96 90 NU
91 90 NU
95 .90 NU
90. 90 NU
91 90 NU
92 . 9Q NU
94 90 NU
86 90 55-6 NU
93 .90. NU
91 90 NU
91 90 NU
90 90 NU
93 90 NU
91 90 . NU
90 90 NU
91 90. NU
91 90. - NU
92 90 . . NU
93 : 90 NU
91 90 NU
91 90 NU
90 90 NU
91 90 NU
93 90 NU
91 90 . NU
93 90 NU
96 95 . NU
96 95 NU
96 95 NU
95 . : 95 : . . NU
94 90 . NU
Document No. 14-0178
NN, ERDUP DELTA DENSITY TEST RESULTS Project No SD365
FIGURE C-8
Test Test Elevation! Soil Max. Dry Moisture Dry Relative Required Retest Test
No. Date Location Type Density Content Density Compaction Compaction Number Method
[ft] [pcfl [%] [pcf] [%] [%]
SS-29 11/10/14 95 1 119.0 10.9 113.5 95 95 NU
SS-30 11/14/14 93 1 119.0 11.4 113.8 96 95 MU
SS-31 11/14/14 95 1 119.0 11.9 114.2 96 95 NU
SS-32 11/14/14 103 1 119.0 12.2 114.0 96 95 NU
SS-33 11/14/14 105 1 119.0 11.3 113.5 95 95 NU
SW-1 01/30/15 FSG 2 123.0 10.1 119.0 97 90 NU
SW-2 01/30/15 FSG 2 123.0 9.7 118.3 96 90 NU
SW-3 01/30/15 FSG 2 123.0 10.3 119.1 97 90 NU
SW-4 01/30/15 FSG 2 123.0 10.6 118.0 96 90 NU
SW-5 01/30/15 FSG 2 123.0 9.6 117.5 96 90 MU
SW-6 01/30/15 FSG 2 123.0 10.0 117.9 96 90 NU
SW-7 02/13/15 FSG 2 123.0 10.2 114.9 93 90 NU
SW -8 TEST NUMBER NOT USED
SW-9 04/17/15 FSG 2 123.0 9.6 117.2 95 90 MU
SW-10 04/17/15 FSG 2 123.0 9.2 118.0 96 90 NU
SW-11 04/17/15 FSG 2 123.0 10.4 117.6 96 90 MU
SW-12 04/17/15 FSG 2 123.0 8.9 118.5 96 90 MU
SW-13 05/28/15 FSG B-7 123.0 9.6 111.4 91 90 MU
SW-14 06/03/15 FSG 4 119.5 14.5 112.1 94 90 MU
SW-15 06/03/15 FSG 5 121.5 10.8 109.0 90 90 NU
SW-16 06/03/15 FSG 5 121.5 11.7 111.2 92 90 MU
sw-li 07/17/15 FSG 5 121.5 11.2 115.5 95 90 NU
SW-18 07/17/15 FSG 5 121.5 10.7 116.1 96 90 NU
SW-19 07/17/15 FSG 5 121.5 11.4 116.3 96 90 MU
S-20 07/17/15 FSG 5 121.5 10.9 115.9 95 90 NU
SW-21 07/29/15 FSG 5 121.5 11.0 114.8 94 90 NU
SW-22 07/29/15 FSG 5 121.5 10.8 106.5 88 90 SW-29 NU
SW-23 07/29/15 FSG 5 121.5 9.0 118.0 97 90 MU
SW-24 07/29/15 FSG 5 121.5 12.5 115.5 95 90 MU
SW-25 07/29/15 FSG 5 121.5 11.9 109.6 90 90 MU
SW-26 07/29/15 FSG 5 121.5 13.8 115.5 95 90 MU
SW-27 07/29/15 FSG 5 121.5 12.8 110.6 91 90 NU
SW-28 07/29/15 FSG 5 121.5 12.9 105.0 86 90 SW-30 NU
SW-29 07/29/15 FSG 5 121.5 11.2 110.6 91 90 MU
SW-30 07/29/15 FSG 5 121.5 12.5 111.1 91 90 NU
W-1 10/30/14 FG 1 119.0 8.9 113.7 96 95 MU
W-2 10/30/14 FG 1 119.0 9.2 114.0 96 95 NU
W-3 10/30/14 FG 1 119.0 10.0 113.3 95 95 NU
W-4 10/30/14 FG 1 119.0 10.8 112.5 95 95 MU
W-5 10/30/14 FG 2 123.0 9.6 117.0 95 95 NU
W-6 10/30/14 93 2 123.0 10.3 118.3 96 95 MU
W-7 10/30/14 FG 2 123.0 9.9 118.8 97 95 MU
W-8 10/30/14 FG 2 123.0 10.5 117.9 96 95 MU
W-9 10/30/14 FG 2 123.0 10.7 118.6 96 95 MU
W-10 11/04/14 FG 1 119.0 10.3 113.9 96 95 MU
w-li 11/04/14 FG 1 119.0 9.4 113.6 95 95 MU
W-12 11/18/14 FG 2 123.0 11.4 119.2 97 95 MU
W-13 11/18/14 FG 2 123.0 10.9 118.8 97 95 MU
Document No. 14-0178
GROUP DELTA DENSITY TEST RESULTS Project No. SD365
FIGURE C-9
Test Test Elevation! Soil Max. Dry Moisture Dry Relative Required Retest Test
No. Date Location Type Density Content Density Compaction -Compaction Number Method
[ft] [pcf] 1%] [pcf] [%] [%]
W-14 11/18/14 FG 2 123.0 11.6 119.5 97 95 NU
WB 1 11/24/14 116 1 119.0 11.4 114.5 96 95 NU
WB-2 11/24/14 117 1 119.0 10.6 116.8 98 95 NU
WB-3 11/24/14 115 1 119.0 10.7 115.2 97 95 NU
WB-4 11/24/14 114 1 119.0 10.3 114.3 96 95 •• NU
WB-5 12/19/14 118 1 119.0 10.2 114.9 97 - 95 NU
WB-6 12/19/14 120 1 119.0 9.9 113.7 96 95 NU
Document No. 14-0178
DUP DELTA DENSITY TEST RESULTS Project No SD365
FIGURE C-b
Test Test Elevation! AC Hveem Rice Field Air Relative Relative Required
No. Date Station Type Density Density Density Voids Compaction Compaction Compaction
IN [pcf] [pcfJ [pcf] [%] (Hveem) [%] (Rice) [%] Rice [%]
AC-1 11/24/14 FG AC-1 152.8 160.5 149.8 6.7 98 93 91-97
AC-2 11/24/14 FG AC-1 152.8 160.5 - 149.5 6.9 98 93 91-97
AC-3 11/24/14 FG AC-1 152.8 160.5 153.1 4.6 100+ 95 91-97
AC-4 11/24/14 FG AC-1 152.8 160.5 154.1 4.0 100+ 96 91-97
AC-5 11/24!14 FG AC-1 152.8 160.5 149.8 6.7 98 93 91-97
AC-6 11!24/14 FG AC-1 152.8 160.5 150.2 6.4 98 94 91-97
AC-7 11/24/14 FG AC-1 152.8 160.5 151.9 5.4 99 95 91-97
AC-8 11/24/14 FG AC-1 152.8 160.5 147.3 8.2 96 '92 91-97
AC-9 11/24/14 FG AC-1 152.8 160.5 149.8 6.7 98 93 91-97
AC-1 11/24/14 FG AC-1 152.8 160.5 153.2 4.5 100+ 95 91-97
AC-11 11/24/14 FG AC-1 152.8 160.5 151.9 5.4 99 95 91-97
AC-12 11/24/14 FG AC-1 152.8 160.5 149.0 7.2 98 93 91-97
AC-13 11/24/14 FG AC-1 152.8 160.5 147.4 8.2 96 92 91-97
AC-14 11/24/14 FG AC-1 152.8 160.5 148.2 7.7 97 92 91-97
AC-15 11/24/14 FG AC-1 152.8 160.5 147.5 8.1 97 92 91-97
AC-16 11/24/14 FG AC-1 152.8 160.5 148.3 7.6 97 92 91-97
AC-17 11/24/14 FG AC-2 153.3 160.1 148.0 7.6 97 92 91 -97
AC-18 11/24/14 FG AC-2 153.3 160.1 155.3 3.0 100+ 97 91-97
AC-19 11/24/14 FG AC-2 153.3 160.1 149.1 6.9 97 93 91-97
AC-20 11/24/14 FG AC-2 153.3 160.1 149.0 6.9 97 93 91-97
AC-21 11/24/14 FG AC-2 153.3 160.1 153.8 3.9 100+ 96 91-97
AC-22 11/24/14 FG AC-2 153.3 160.1 150.9 5.7 98 94 91-97
AC-23 11/24/14 FG AC-2 153.3 160.1 149.8 6.4 98 94 91-97
AC-24 11124/14 FG AC-2 153.3 160.1 155.4 2.9 100+ 97 91-97
AC-25 11/24/14 FG AC-2 153.3 160.1 150.1 6.2 98 94 91-97
AC-26 11/24/14 FG AC-2 153.3 160.1 151.2 5.6 99 94 91-97
AC-27 11/24/14 FG AC-2 153.3 160.1 155.8 2.7 100+ 97 91-97
AC-28 11/24/14 FG AC-2 153.3 160.1 148.4 7.3 97 93 91 -97
AC-29 11/24/14 FG AC-2 153.3 160.1 154.1 3.7 100+ 96 91-97
ACL30 11/24/14 FG AC-2 153.3 160.1 146.7 8.4 96 92 91-97
AC-31 11/24/14 FG AC-2 153.3 160.1 148.0 7.6 97 92 91-97
AC-32 11/24/14 FG AC-2 153.3 160.1 152.8 4.6 100 95 91-97
AC-33 01/13/15 FG AC-3 151.5 155.8 150.3 3.5 99 96 91 -97
AC-34 01/13/15 FG AC-3 151.5 155.8 150.5 3.4 99 97 91-97
AC-35 01/13/15 FG AC-3 151.5 155.8 151.5 2.8 100 97 91-97
AC-36 01/13/15 FG AC-3 151.5 155.8 150.2 3.6 99 96 91 -97
AC-37 01/13/15 FG AC-3 151.5 155.8 150.4 3.5 99 97 91-97
AC-38 01/13/15 FG AC-3 151.5 155.8 149.8 3.9 99 96 91-97
AC-39 01/13/15 FG AC-3 151.5 155.8 150.1 3.7 99 96 91 -97
AC-40 01/13/15 FG AC-3 151.5 155.8 150.6 3.3 99 97 91 -97
AC-41 01/13/15 FG AC-3 151.5 155.8 149.6 4.0 99 96 91-97
AC-42 01/13/15 FG AC-3 151.5 155.8 150.3 3.5 99 96 91-97
AC-43 01/13/15 FG AC-3 151.5 155.8 150.9 3.1 100 97 91-97
AC-44 01/13/15 FG AC-3 151.5 155.8 149.4 4.1 99 96 91 -97